Loading...
HomeMy WebLinkAboutDRB140325 with Action FormProjectName:McIntyreWaterFeature DRBNumber: DRB140325 ProjectDescription: WaterFeatureonNEcorneroflot. Participants: OWNER VAILMORTGAGETRUST 07/31/2014 12222MERITDR1660 DALLAS, TX 75251 APPLICANT PRISTINELANDSCAPES 07/31/2014 Phone: 970-376-7143 POBOX9015 AVON CO 81620 License: C000003343 CONTRACTORPRISTINELANDSCAPES 07/31/2014 Phone: 970-376-7143 POBOX9015 AVON CO 81620 License: C000003343 ProjectAddress:1191HORNSILVERCRVAILLocation: LegalDescription:Lot: 3Block: 2Subdivision: VAILVALLEY ParcelNumber:2101-092-0200-2 Comments:Pleaseseebelow. BOARD/STAFFACTION MotionBy: Action: STAFFAPP SecondBy: Vote: DateofApproval: 08/06/2014 Conditions: Cond: 8 PLAN): NochangestotheseplansmaybemadewithoutthewrittenconsentofTownof Vailstaffand/ortheappropriatereviewcommittee(s). Cond: 0 PLAN): DRBapprovaldoesnotconstituteapermitforbuilding. Pleaseconsultwith TownofVailBuildingpersonnelpriortoconstructionactivities. Cond: 201 PLAN): DRBapprovalshallnotbecomevalidfor20daysfollowingthedateof approval, pursuanttotheVailTownCode, Chapter12-3-3: APPEALS. Cond: 202 PLAN): Approvalofthisprojectshalllapseandbecomevoidone (1) yearfollowing thedateoffinalapproval, unlessabuildingpermitisissuedandconstructionis commencedandisdiligentlypursuedtowardcompletion. Cond: CON0013841 Theapplicantshallcoordinateallworkwiththeadjoiningpropertyowner (Golf Course) perexistingaggrements. Planner:JonathanSpence DRBFeePaid: $20.00 TOWN OF VAIL, COLORADO Statement Statement Number: 8140001111 Amount: $20.00 07/31/201412:59 PM Payment Method: Check Init: SAB Notation: 4902 Pristine Landscapes Permit No: DRB140325 Type: DRB -Minor Alt,SFR /DUP Parcel No: 2101 - 092 - 0200 -2 Site Address: 1191 HORNSILVER CR VAIL Location: Total Fees: $20.00 This Payment: $20.00 Total ALL Pmts: $20.00 Balance: $0.00 ACCOUNT ITEM LIST: Account Code Description Current Pmts DR 00100003112200 DESIGN REVIEW FEES 20.00 TOWN OF VA JUL 3 0 2014 LC- WN OF VAIL Department of Community Development 75 South Frontage Road Vail, CO 81657 Tel: 970 -479 -2128 www.vailgov.com Development Review Coordinator Application for Design Review Minor Exterior Alteration General Information: This application is required for all proposals involving minor changes to buildings and site improve- ments, such as roofing, painting, window additions, landscaping, fences, retaining walls, etc. Applicable Vail Town Code sections can be found at www.vailgov.com under Vail Information — Town Code Online. All projects requiring de- sign review must receive approval prior to submitting a building permit application. An application for Design Review cannot be accepted until all required information is received by the Community Development Department, as outlined in the submittal requirements. The project may also need to be reviewed by the Town Council and /or the Planning and Environmental Commission. Design review approval expires one year from the date of approval, unless a building per- mit is issued and construction commences. Fee: 0— Multi- Family /Commercial C Single Family /Duplex X_ Single Family I— Duplex F Multi- Family f Commercial Description of the Request: 1 141--,) 1°A t.J Physical Address: / Iql Parcel Number: c l Qf (Contact Eagle Co. Assessor at 970 - 328 -8640 for parcel no.) c j lPropertyOwner: /YJ y ,a L,,`, G. ;, r l i 'r` -Psi Mailing Address: Phone: I -- Primary Contact/ Owner Representative: Address: Mailing .1 Phone: 9-rn - 3ye'- -X/e For Office Use Only: Cash_ CC: Visa / MC Last 4 CC # Exp. Date: Auth # Check # Fee Paid: Received F Meeting Date: DRB No.: i Fj Planner: Project No: r Zoning: Land Use: Location of the Proposal: Lot: Block:_ Subdivision: ' - Nnv 9n1n Pristine Landscapes PP1s&e PO Box 9015 Avon, CO 81620 970 - 376 -7143 hjmdSCApeS pristinealpineO— hotmail.com 970-376-7143 22- Jul -14 Town Of Vail Department of Community Development 75 S. Frontage Rd. Vail, CO 81657 To The Design Review Board! This proposal was started back in August 2013. The homeowners at 1191 Homsilver Circle had decided that they wanted a change with the noise levels that were being emitted from 1 -70. So we started the process of building and designing a water feature to minimize the noise levels. Our first step was to hire an acoustics engineer from DL Adams. They came out and recorded different levels of the highway from different viewing points within the property. Next we went around and measured similar water features that we would build on the property to give us an overlaying sound effect for starting our design. Our company is very conscience about keeping existing areas clean and undamaged. This is why we are laying out 3/4" plywood for our heavy equipment to drive on. This plywood is double stacked to give 1.5" of cushion to the ground below. All of our unloading sites will have 3 layers of 3/4" plywood to minimize damage from boulders. All plywood is completely removed for the weekend and removed once during the week. This allows the grounds below to be irrigated and maintained during the building process. Thanks for your time. Thank You, David Probst Owner Page 1 Property Information Property Address Parcel # Allowed Existing Legal Description Gross Residential Floor Area maximum) Chapter 12 -15 Primary sq ft Development Site Area sq ft Secondary sq ft acres buildable sq ft EHU sq ft Zone District / SDD # Hazard Zones Sections 12 -21 & 14 -7 Snow Avalanche High Severity F- Severityf5,N /A Debris Flow r—High Flow f- Moderate Flow (— High Avalanche N/A Rock fall r— High Severity [—Medium Severity /A Excessive Slopes f—a30% r— N/A F/oodplain 100 year floodplain F— Floodway j- Wetlands NN /A Creeks, Streams Section 12-14-17 Gore Creek (— on site r adjacent to site 5CN /A Other tributary: r`onsite (— adjacent to site rN/A Project Information Project Description Development Standards Allowed Existing Proposed Gross Residential Floor Area maximum) Chapter 12 -15 Primary sq ft Secondary sq ft EHU sq ft TOTAL sq ft 250 Addition Interior Conversion Credits: Setbacks (minimum) Section 14 -10-4 Front ft Side ft Side ft Rear ft Watercourse ft Site Coverage (maximum) see definition Section 12 -2 -2 Building Height (maximum) see definition Section 12 -2 -2 Sloping ft Flat ft Landscaping See definition Section 14 -2 -1 Section 14 -10 -5 Softscape sq ft Hardscape sq ft TOTAL sq ft Driveway Sections 14 -3-1 & 14 -3-2 Max Curb -cuts Max Grade @ cen- terline Min Width Heated drive? Yes No Yes (—No Snow Storage % Parking Sections 12 -10 & 14-5 Enclosed Spaces Unendosed TOTAL Outdoor Lighting (maximum) Section 14 -10 -7 fixtures PROPOSED MATERIALS Building Materials Type of Material Color Roof Siding Other Wall Materials Fascia Soffits Windows Window Trim Doors Door Trim Hand or Deck Rails Flues Flashing Chimneys Trash Enclosures Greenhouses Retaining Walls Exterior Lighting // // --,, // // Other 7n4 /n, )34- 6 Zaz Notes: Please specify the manufacturer's name, the color name and number and attach a color chip. PROPOSED LANDSCAPING Botanical Name Common Name Quantity Size PROPOSED TREES ,U Z,Q AND SHRUBS EXISTING TREES TO BE REMOVED Minimum Requirements for Landscaping: Deciduous Trees — 2" Caliper Coniferous Trees — 6' in height Shrubs — 5 Gal. Twe Square Footage GROUND COVER SODS SEEDA IRRIGATION TYPE OF EROSION CONTROL Please specify other landscape features (i.e. retaining walls, fences, swimming pools, etc.) UTILITY APPROVAL & VERIFICATION This form serves to verify that the proposed improvements will not impact any existing or proposed utility services, and also to verify service availability and location for new construction and should be used in conjunction with preparing your utility plan and scheduling installations. A site plan, including.grading plan, floor plan, and elevations, shall be submitted to the following utilities for approval and verification. PLEASE ALLOW UP TO 2 WEEKS FOR APPROVAL OR COM- MENTS FROM THE UTILITY COMPANIES. if you are unable to obtain comments within that timeframe please contact The Town of Vail. Subject Property Address: fi/ r r,,.ta>, ',z LoQ Block Subdivision: JPrimaryContactIOwnerRepresentative: A rrj a o'Vl Phone: =5z Plans Dated: Primary ContactlOwner Representative Signature 1. Utility locations must be obtained before digging. 2. A Revocable Right-of-Way Permit may be required for any improvements wither a street right -of -way. Contact the Public Works Department for verification 970.479.2198. 3. It is the responsiblW of the utility company and the applicant to resolve problems identified above. 4. The Primary Contact/Owner Representative is required to submit any revised drawings to the above agencies for re- approval & re verification if the submitted plans are altered in any way after the authorized signature date. Authorized Signature Comments Date CENTURY LINK jf- S f2'J 1ryS/bi i oOC • C970.328.8288 (td) 970.328.8282 {fax) a S>smer loeWAe rld L3r1/ 97-23. IVContacts: Kelly McClemon kelly.mccernon@ontMEXiink.com more, 7F6eh&;f1 CAr10;0- Iy f j S t . XCEL HIGH PRESSURE GAS 970.406.1784 (tel) 970.468.1401 (fax) Contact: Remington Baker reminaton.c.bakerOxcelan2EML.corn HOLY CROSS ENERGY 970.947.5425 (td) 970.945.4081 (fax) Contact: Jeff Vroom ivroomtolvaass.com XCEL Energy 970.262.4039 (tel) 970262.4038 (fax) Contacts: Pam McGuire oameia.mcauire@=IengUy.com EAGLE RNER WATER & SANITATION DISTRICT 970.477.5449 (tel) 970.845.7218 (fax) Contact Tug Birk tblrk0erwsd.ora COMCAST CABLE 970.930.4713 (tel) 303.603.1004 (fax) Contact: Michael Johnson Michael iohnso, n0cable.comeast.com my 1, CDOT Righ - 970.683.6 Contact: us ou t rrir3 roussEnCr dot tate._ 1. Utility locations must be obtained before digging. 2. A Revocable Right-of-Way Permit may be required for any improvements wither a street right -of -way. Contact the Public Works Department for verification 970.479.2198. 3. It is the responsiblW of the utility company and the applicant to resolve problems identified above. 4. The Primary Contact/Owner Representative is required to submit any revised drawings to the above agencies for re- approval & re verification if the submitted plans are altered in any way after the authorized signature date. UTILITY APPROVAL & VERIFICATION This form serves to verify that the proposed improvements will not impact any existing or proposed utility services, and also to verify service availability and location for new construction and should be used in conjunction with preparing your utility plan and scheduling Installations. A site plan, including.grading plan, floor plan, and elevations, shall be submitted to the following utilities for approval and verification. PLEASE ALLOW UP TO 2 WEEKS FOR APPROVAL OR COM- MENTS FROM THE UTILITY COMPANIES. If you are unable to obtain comments within that timeframe please contact The Town of Vail. Subject Property Address: 119/ r,,: 6 z Lot3 Block c Subdivision: Primary Contact /.Owner Representative: Phone:,- .fi• -3 J Plana Dated: Primary Contact/Owner Representative Signature ta. 1. Utility locations must be obtained before digging, 2. A Revocable Right of-Way Permit may be required for any improvements within a street right-of-way. Contact the Public Works Department for verification 970.479.2198. 3. It Is the responsibility of the utility company and the applicant to resolve problems Identified above. 4. The Primary Contact/Owner Representative is required to submit any revised drawings to the above agencies for re- approval & re- verification if the submitted plans are altered in any way after the authorized signature date. Authorized Slanaturs Comments pate . CENTURY LINK 970.328.8288 (tel) 970.328.8282 (fax) Contacts: Kelly MoClemon kellv.mcdernoniticenturylink.com XCEL HIGH PRESSURE GAS 970.406.1784 (tel) tf-t! 970.468,1401 1 m t9fax) Contact: Remington Baker re rrtinton.c.bakerQxceienergy.com HOLY CROSS ENERGY 970.947.5425 (tel) 970.945.4081 (fax) Contact: Jeff Vroom v roomna.holvcross.com XCEL Energy 970.262.4039 (tel) 970.262.4038 (fax) Contacts: Pam McGuire p trela.mcguirefxcelenergy.corn EAGLE RIVER WATER S SANITATION DISTRICT 970.477.5449 (tel) 870.845.7218 (fax) Contact: Tug Birk tblrkiQerwsd,ora COMCAST CABLE 970.930.4713 -(tel) 303.603.1004 (fax) Contact: Mlchael:Johnson Michael johDson cable.comggst,com my in CDOT Righ - 970.68.3. I Contact: ou roussin0dot.atate c ta. 1. Utility locations must be obtained before digging, 2. A Revocable Right of-Way Permit may be required for any improvements within a street right-of-way. Contact the Public Works Department for verification 970.479.2198. 3. It Is the responsibility of the utility company and the applicant to resolve problems Identified above. 4. The Primary Contact/Owner Representative is required to submit any revised drawings to the above agencies for re- approval & re- verification if the submitted plans are altered in any way after the authorized signature date. UTILITY APPROVAL & VERIFICATION This form serves to verify that the proposed improvements will not impact any existing or proposed utility services, and also to verify service availability and location for new construction and should be used in conjunction with preparing your utility plan and scheduling Installations. A site plan, including grading plan, floor plan, and elevations, shall be submitted to the following utilities for approval and verification. PLEASE ALLOW UP TO 2 WEEKS FOR APPROVAL OR COM- MENTS FROM THE UTILITY COMPANIES. If you are unable to obtain comments within that timeframe please contact The Town of Vail. Lot 3 Block A Subdivision: pmsentative: Phone: cZ- i--Vk3 Subject Property Owner Plans Dated: 1. Utility locabons must be obtained before digging. 2. A Revocable Right-of-Way Permit may be required for any improvements within a street right -of -way. Contact the Public Works Department for verification 970.479.2198. 3. It is the responsibility of the utility company and the applicant to resolve problems ldeMif€ed above. 4. The Primary Contact/Owner Representative is required to submit any revised drawings to the above agencies for re- approval & re- verification N the submitted plans are altered in any way after the authorized signature date. Authorized Signature Comments Date CENTURY LINK 970.328.8288 (tel) 970.328.8282 (fax) Contacts: Kelly McClemon keity_uWemgfl@cSntg.r ink.com XCEL HIGH PRESSURE GAS 970.406.1784 (tei) 970.468.1401 (fax) Contact Remington Baker reminoton .c.bakerftcelenerau.cnm HOLY CROSS ENERGY Date: 970.947.5425 (tel) 970.945.4081 (fax) i v_ -_ 2014.07.29 Contact: Jeff Vroom 15:22:35 iwoom0hoNcross.rom 06'00' XCEL Energy 970.262.4039 (tel) 970.262.4038 (fbx) Contacts: Pam McGuire aame1a .mcauire0xce1e_neray.wm_ EAGLE RIVER WATER & SANITATION DISTRICT 970.477.5449 (tef) 970.845.7218 (fax) Contact: Tug Birk tbirk&Qrwsd.ora COMCAST CABLE 970.930.4713 (tell 303.603.1004 (fax) Contact Michael Johnson Michael iohnson@cabte.corttcast.cam my in CDOT Righ - 970.683. 4 Contact -. froussinOdot.state.c 1. Utility locabons must be obtained before digging. 2. A Revocable Right-of-Way Permit may be required for any improvements within a street right -of -way. Contact the Public Works Department for verification 970.479.2198. 3. It is the responsibility of the utility company and the applicant to resolve problems ldeMif€ed above. 4. The Primary Contact/Owner Representative is required to submit any revised drawings to the above agencies for re- approval & re- verification N the submitted plans are altered in any way after the authorized signature date. UTILITY APPROVAL & VERIFICATION This form serves to verify that the proposed improvements will not impact any existing or proposed utility services, and also to verify service availability and location for new construction and should be used in conjunction with preparing your utility plan and scheduling installations. A site plan, including.grading plan, floor plan, and elevations, shall be submitted to the following utilities for approval and verification. PLEASE ALLOW UP TO 2 WEEKS FOR APPROVAL OR COM- MENTS FROM THE UTILITY COMPANIES. If you are unable to obtain comments within that timeframe please contact The Town of Vail. Subject Property Address: /19/ } r ,'i/G.t?. t/,z ---- Lot,3 Block Subdivision: Primary Contact / Owner Representative: _ ,.': '7,: Phone: Plans Dated: Primary Contact/Owner Representative Signature 1. Utility locations must be obtained before digging. 2. A Revocable Right- of-Way Permit may be required for any improvement witNn a street right -of -way. Contact the Public Works Department for verification 970 .479.2198. 3. It is the responsibility of the utility company and the applicant to resolve problems identified above. 4. The Primary Contact/Owner Representative is required to submit any revised drawings to the above agencies for re- approval & re- verification If the submitted plans are altiered in any way after the authorized signature date, Authorized Signature Comments Date CENTURY LINK 970.328.8288 (tel) 970.328.8282 (fax) Contacts: Kely McCiemon keliv .mcclernon(acenturylink.com XCEL HIGH PRESSURE GAS 970.406.1784 (tel) 970.468.1401 (fax) Contact: Remington Baker reminoton .c.bakeraxcelenergy.com HOLY CROSS ENERGY 970.947.5426 (tel) 970.945.4081 (fax) Contact: JeffVroom ivroom0holvcross.com XCEL Energy 970.282..40394039 (tel) 970.262.4038 (fax) Contacts: Pam McGuire Z uamela.mcauireCdlxcelenemv.com in EAGLE RIVER WATER & SANITATION DISTRICT r 970.477.5449 (tel) 970.845.7218 (fax) Corned: Tug Birk tbirMentiscl,ora COMCAST CABLE 970.930.4713 (tel) 303.603.1004 (fax) Contact: Michael Johnson Michael iohnsonftable.comcast.com My in CDOT Righ 970. 68 C3. c . ate. 1. Utility locations must be obtained before digging. 2. A Revocable Right- of-Way Permit may be required for any improvement witNn a street right -of -way. Contact the Public Works Department for verification 970 .479.2198. 3. It is the responsibility of the utility company and the applicant to resolve problems identified above. 4. The Primary Contact/Owner Representative is required to submit any revised drawings to the above agencies for re- approval & re- verification If the submitted plans are altiered in any way after the authorized signature date, UTKM APPROVAL a VERIFICATION This form servas to verify that the Proposed irnprovements will not impact any Busting or proposed utility services, andalsotoverifyserviceavaIWAtyandlocationfornewconstructionandshouldbeusedinconjunctionwithpreparingyourudtyplanandschedulinginstalatims. A site plan, including grading Plan. floor plan, and elevations, to the hah be submittedlowingu0tlesforapprovalandverification. PLEASE ALLOW UP TO 2 WEEKS FOR APPROVAL OR COM- MENTS FROM THE UTILITY COMPANIES. If you we unable to obtain comments widen that timeframe please contactTheTownofVal. Subject Property Address: IRI Lot_,;_ Block o Subdh isiion: Primary Contact / Owner Representative: _J_i :a%r,..•, o...... a.._ -. yip 1 Prbnsry Contact/Owner Reprosentative Signature Plans Dated: I- Utlity locations must be obtained befm digging. 2. A Revocabik Rig*of -wsy Permit may be required for any in p ovements within a street ri9t*W -way. Contact theKkkWorksDepartmentforverification970.479.2196. 3. It Is the ratp0rWbi4ty of the utility company and the appkcant to resolve problems Identified above. 4. The Primary CorrtaWova er to Is required to submit any revised drawings to the above agencies forre- approval & re-mllnvcation N the submitted plans are aftered In any way after the auuxwt ed sowgure date. CENTURY LO K 970.32SAM (1e1) 970.328.8282 (feu) Contacts: Kelly Mcasmon nk EL l fiOli OAS 970.406.1784 970.468.1401 (ia c) Contact: Remhgton Baker e' RRY&ME May 970.947.5425 (1d) 970.945.4051 (feu) Contact: Jeff Vroom cam HE Era my 970.282.4039 (tal) 970.282.4038 (fan) Contacts: Pam McGuke EAGLE RNM WATER a S ATION DISTRICT bN 970.477.5449 (IQ 970.848.7218 (fan) j 2S(f Contact: Tug Bak tb1rkaKNdAoro COMCAST CABLE 970.930.4713 (tsl) 303.803.1004 (fax) Contact: Michael Johnson Micheal IohMg0dk%&jLcorncasLc;om in COOT 970.683. Cooled: roll , s q I- Utlity locations must be obtained befm digging. 2. A Revocabik Rig*of -wsy Permit may be required for any in p ovements within a street ri9t*W -way. Contact theKkkWorksDepartmentforverification970.479.2196. 3. It Is the ratp0rWbi4ty of the utility company and the appkcant to resolve problems Identified above. 4. The Primary CorrtaWova er to Is required to submit any revised drawings to the above agencies forre- approval & re-mllnvcation N the submitted plans are aftered In any way after the auuxwt ed sowgure date. UTILITY APPROVAL & VERIFICATION This form serves to verify that the proposed Improvements will not impact any existing or proposed utility services, and also to verify service availability and location for new construction and should be used in conjunction with preparing your utility plan and scheduling installations. A site plan, including grading plan, floor plan, and elevations, shall be submitted to the following utilities for approval and verificaton. PLEASE ALLOW UP TO 2 WEEKS FOR APPROVAL OR COM- MENTS FROM THE UTILITY COMPANIES. If you are unable to obtain comments within that dmeframe please contact The Town of Vail. Subject Prooerty Address: _ rl/ „ 'u ,t r,'z Lot8 Block Subdivision: ked" i j Primary Contact I Owner Representative: ad Phone: 210- _M4112- f Plana Dated: Primary ConteeVOwner Rtpresantative Signature 1. UtiNty locations must be obtained before digging. 2. A Revocable Right- of-Way Permit may be required for any Improvements within a street right -of -way. Contact the Public Works Department for verification 970.479.2198. 3. It is the responsibility of the utility company and the applicant to resolve problems identified above. 4. The Primary Contact/Owner Representative Is required to submit any revised drawings to the above agencies for re- approval & rew lfttlon if the submitted plans are altered In any way after the authorized signature date. Autho Q!k CENTURY LINK 970.328.8288 (tel) 970.328.8282 (fax) Contacts: Kelly McClemon kellx XCEL HIGH PRESSURE OAS 970,406.1784 (tel) 970.468.1401 (fax) Contact Remington Baker HOLY CROSS ENERGY 970.947.)426 (tel) 970.945.4081 (fax) Contact: Jett Vroom Ir gMillholvc ross.com XCEL EnwW 970.262A039 (tel) 970.282.4038 (fax) Contacss: Pam McGuire oameia.mcauireltaxcelsneray.com EAGLE RIVER WATER A SANITATION DISTRICT 970.477.6449 (tel) 970.845.7218 (fax) Contact: Tug Birk tb1rk9I1erwsd.ora COMCAST CABLE 970.930.4713 (tel) 303.803.1004 (fax) Contact: Michael Johnson Michael iohnsongbcable.comcast.com iY in COOT 970.683. Contact: u 1. UtiNty locations must be obtained before digging. 2. A Revocable Right- of-Way Permit may be required for any Improvements within a street right -of -way. Contact the Public Works Department for verification 970.479.2198. 3. It is the responsibility of the utility company and the applicant to resolve problems identified above. 4. The Primary Contact/Owner Representative Is required to submit any revised drawings to the above agencies for re- approval & rew lfttlon if the submitted plans are altered In any way after the authorized signature date. LLI I NSWDYti a-,,> F to oo - m o Koota' w- 4 > A, l I z- I fit pro RIN, RIX1 -, I€ 1 . fig¢ a 1 50 m m O z 9- 9 I 4p l1 11 110-13' z z f I rb L Jr j:: 67 > 7 M m m CD mz 0 m z z f I rb L DESIGN REVIEW ADMINISTRATIVE APPROVAL By jspence at 2:03 pm, Aug 06, 2014