Loading...
HomeMy WebLinkAboutDRB140310 Plans ApprovedLION SQUARE EAST REDEVELOPMENT VAIL, COLORADO EAST BUILDING BREEZEWAY RAMP -SKI YARD ACCESS 6 -5 -14 MELICK ASSOCIATES INC TOWN OF VA Design Review Staff Approval By Warren Campbell at 2:01 pm, Aug 15, 2014 Ile 8122' / I X114 \ \ 8124 8124' 8120 8118 8112' 81 10' / 8116' 8108 ' 8106' EXISTING SOD TO 8125' EXISTING ASPHALT BE REPLACED WITH WALK NEW ASPHALT 8125.5' 8126' NOTES: 1. PROVIDE DRIP IRRIGATION TO NEW SHRUBS UPON INSTALLATION. 2. MODIFY EXISTING LAWN IRRIGATION AS NECESSARY TO PROVIDE IRRIGATION TO NEW SOD. EXISTING STEPS EL. = 8125' EXISTING ASPHALT i TO BE REPLACED WITH SOD T.O. WALK EL. = 8127.2' ti SOD AREA TO T EXISTING EXISTING DECK EL. = 88' -4 1/211 RAILING 2 EXISTING TIMBER RETAINING WALL A2 TO REMAIN S AIRS @ L VEL EL W M TRUCK OUTRIGGERS, TYP. \ BOOM TRUCK b \ OP TURRET I\_ 1 &lA A2 2`S�s, NEW GUARD RAIL TO EXISTING RETAINING WALLS .... MATCH EXISTING (TO REMAIN) ---------- ------------- - - - - -- ------ - - - - -- EL. 8127.2'— R RUNGS 8126.5' - ��T - -j -- �- -- - - ---- �REMOVAB UARD RAIL SYSTEM I EL. 8123' TO MATCH E NG RAILING O - EXISTING m_ - G� - -� _ - REMOVE ETING UARD A>SL- �� -- -� -- �A- �m- ---- -- r.r OPEI�,TQ'BELO - -- -- STEEL BRIDGE - CON CTION ='f OPEN T� -BELOW I EXIST TO MATCH EXISTING r \` XF r INFILL EXISTING DECK EW RAILING & FASCIA 100 -0 = 8127.2 TO MATCH EXISTING —� EL. = 99' -0 i I STEPS TO BE '-'-' z REMOVED LL l A2 w j II 'i LK 'i ' — 8 7.2' — - r UNIT UNIT Z I 103 W 101 w i 00 UP I 0 O -- 4"X2" TS TOP RAIL 4 "X2" TOP RAIL 4 "X4" TUBE STEEL 10 4 "X4" TUBE STEEL POSTS POSTS 2 "X2" RAIL 2 "X2" RAILS/STILES 1 "X1 " TS BALUSTERS 10 1 "X1 " BALUSTERS @ EAST BUILDING FIRST FLOOR PLAN- @ <4" O.C., TYP. "' N <4" O.C., TYP. 2 "X2" TS RAIL HINGE METAL DECK CONCRETE TOPPIN ON METAL DECK STEEL BRIDGE STRUCTURE OPEN BELOW — ELEVATION - REMOVABLE RAILING SYSTEM LION SQUARE EAST REDEVELOPMENT VAIL, COLORADO EAST BUILDING BREEZEWAY RAMP -SKI YARD ACCESS 6 -5 -14 MELICK ASSOCIATES INC TOWN OF VA Design Review Staff Approval By Warren Campbell at 2:01 pm, Aug 15, 2014 LION SQUARE EAST REDEVELOPMENT VAIL, COLORADO EAST BUILDING BREEZEWAY RAMP -SKI YARD ACCESS 6 -5 -14 MELICK ASSOCIATES INC BREEZEWAY BRIDGE ASSEMBLY OPTIONS RAILING, PAINT (MATCH EXISTING) RAILING (MATCH EXISTING) CONCRETE PAVERS (MATCH EXISTING) 4" CONCRETE TOPPING SLAB 4" SAND BED SNOW MELT HYDRONIC TUBING SNOW MELT HYDRONIC TUBING (TIE INTO EXISTING SYSTEM) (TIE INTO EXISTING SYSTEM) 3 1 /2" CONCRETE 3 1/2'' CONCRETE DECK DECK STEEL ANGLE, PAINT (MATCH EXISTING) � STEEL ANGLE, PAINT (MATCH EXISTING) - :. ; - , : -• - : : : WATERPROOF MEMBRANE ------------------------ �- •-- •� -�.�: - - - - - --WATERPROOF MEMBRANE � a W /PROTECTION BOARD a W /PROTECTION BOARD a a METAL DECK METAL DECK C- CHANNEL GIRDER, PAINT (MATCH C- CHANNEL GIRDER, PAINT (MATCH EXISTING), RE: STRUCTURAL EXISTING), RE: STRUCTURAL JOISTS JOISTS RE: STRUCTURAL RE: STRUCTURAL OPEN BELOW — OPEN BELOW — BRIDGE SECTION - CONCRETE PAVERS OVER SAND BED WITH SNOW MELT SYSTEM BRIDGE SECTION - ALTERNATE A: CONCRETE TOPPING SLAB WITH SNOW MELT SYSTEM 1 ]A SCALE: 1 1/2'' = 1'_0° SCALE: 1 1/2'' = 1'_0" 8c RAILING BEYOND, PAINT (MATCH EXISTING) CONCRETE PAVERS OVER 4" SAND BED EDGE OF BUILDING (ALT. A: CONCRETE TOPPING SLAB) BEYOND SNOW MELT HYDRONIC TUBING (TIE INTO EXISTING SYSTEM) STEEL ANGLE RE: STRUCT. WATERPROOF MEMBRANE W /PROTECTION BOARD 0 0 0 0 0 0 o 0 0 0 0 0 0 0 o 0 a a a a s � a a s META L DECK °a a < a a EXISTING PAVING C- CHANNEL GIRDER BEYOND, PAINT EXISTING , RE: STRUCTURAL (MATCH ) EXISTING STAIRS JOISTS, PAINT (MATCH EXISTING) (TO BE REMOVED) SHEAR RE: STRUCTURAL LINE OF EXISTING PLATE /CONNECTION PEDESTRIAN BRIDGE GRADE RE: STRUCT. STRUCTURE BEYOND OPEN BELOW Design Review Staff Approval By Warren Campbell at 2:02 pm, Aug 15, 2014 TOWN � F �A� � SECTION - LONGITUDINAL (j)BRIDGE SCALE: 1 1/2" = 1'_0" LION SQUARE EAST REDEVELOPMENT VAIL, COLORADO EAST BUILDING BREEZEWAY RAMP -SKI YARD ACCESS 6 -5 -14 MELICK ASSOCIATES INC BREEZEWAY BRIDGE ASSEMBLY OPTIONS