HomeMy WebLinkAboutinspection reports*VAIL TOWN OF
FINAL REPORT OF SPECIAL INSPECTIONS
Project: Vail Village Inn Structure Rep. Permit Number: B -14 -0227
Project Location: Vail Village Inn Parking Structure
Owner Town of Vail
Address 75 S. Frontage Road City: Vail Zip: 81657
Special Inspections Agency
- Design PFo€essieRal kFGhaF GROUND Engineering Consultants, Inc.
Address: PO Box 464
city: Gypsum State: CO Zip: 81637 Phone: (970) 524 -0720
Fax: (970) 524 -0720 E- mail:ChrisH @groundeng.com Car1H @groundeng.com
* ** PLEASE SEE REPORT 14- 6551 .expansionanchors.140722.SS * **
To the best of my information, knowledge, and belief, the special inspections and/or testing required for
this project, have been completed in accordance with the contract documents.
Interim reports submitted prior to this Final Report of Special Inspections form a basis for, and are to be
considered an integral part of this final report. Any discrepancies that were noted in all interim reports
have been corrected.
Prepared by:
Carl Henderson, P.E.
T pe or Print N e
Signature
8 -14 -2014
Date
-12-
p0 R. 0
11AEly�
38882 O:
;u a
NAG
Preparer's Seal and Signature Required
GROUND Client: Mr. Chad Salli
Town of Vail
1309 Elkhorn Drive
ENGINEERING CONSULTANTS Vail, CO 81657
Vail Village Parking Structure Repairs
Drill and Epoxy Cover Report
Date: July 22, 2014 Job Number: 13 -6551
General Contractor: unknown Rep. Notified: N/A
As scheduled, a representative visited the project site to perform special inspections for drill and epoxy at
locations requested.
Comments or Photos:
Yes No
Discrepancies Reported this Date?
No. of Pages Attached: 1
Field Representative: Shane Sorensen
www.groundeng.com
Englewood, Commerce City, Loveland, Granby, Gypsum, Grand Junction, Casper
GROUND Client: Mr. Chad Salli
Town Vail
1309 Elkhorn Drive
ENGINEERING CONSULTRNTS Vail, CO81657
Vail Village Parking Structure Repairs
Report Date: July 22, 2014 Job Number: 13 -6551
General Contractor: Unknown Rep. Notified: N/A
Subcontractor: N/A Rep. Notified: N/A
Documents Used: Plans
Drill and Epoxy
Drillincl
Location: 1.) 5 holes on each side of double tee support hanger
2.)
3.)
4.)
Orientation (vertical /horizontal):
1.) Horizontal
3.)
2.)
4.)
Hole Diameter (inches):
1.) 7/8
Length (inches):
1.)
7
2.)
2.)
3.)
3.)
4.)
4.)
Hole Spacing (inches):
1.) 4.5 vertical spacing
3.)
2.)
4.)
Drilling Equipment: Hammer drill
Method to Clean Hole: Wire brush, compressed air
Epoxv
Epoxy Type: N/A
Epoxy Expiration: N/A
Placement Method: N/A
Reinforcement
Type (rebar /bolt/anchor): 1.)
Expansion anchor Size:
1.) 3/4
Length (inches) 1.) 61/2
2.)
2.)
2.)
3.)
3.)
3.)
4.)
4.)
4.)
Placement Method: Not yet installed
Additional Reinforcing Steel: N/A
Field Representative: Shane Sorensen
Comments: We arrived on site to inspect drilled holes for diameter, length, and cleanliness. Holes were not cleaned on our first visit. We
found the holes to be clean our second visit. Contractor was not on site for either of our visits. John King with Town of Vail was
notified of our observations.
www.groundeng.com
Englewood, Commerce City, Loveland, Granby, Gypsum, Grand Junction, Casper
J.R. HARRIS & COMPANY
STRUCTURAL ENGINEERS
1775 Sherman Street, Ste. 2000, Denver, CO 80203
3031860.9021 Fax 3031860 -9537
August 12, 2014
Mr. John King
Facilities Maintenance Manager
Public Works Department
1309 Elkhorn Drive
Vail, CO 81657
Re: VTC Double Tee Bearing Repairs
Letter of Substantial Completion
Mr. King,
Our drawing dated June 16, 2014 details the repairs at (3) locations in the Vail
Transportation Center where the bearing ledge supporting the concrete double tees has spalled.
We visited the site on August 1, 2014 to observe the installed repairs. The purpose of this visit
was to observe the repairs for general conformance with our drawings. We issued a construction
observation report for this visit which provided direction to resolve discrepancies between the as-
built repairs and the drawings. A review of photographs indicates these issues have been
addressed. A copy of our construction observation report is included with this letter.
Additionally, an independent testing agency that you retained, Ground Engineering, has also
provided a report of their inspection and observations.
To the best of our knowledge, based upon our periodic site observations and a review of
the other documents noted above, the deviations noted in our report have been resolved and
corrected by the contractor. The work we were able to observe appears to have been completed
in general conformance with the contract drawings.
If you have any questions or need additional assistance with this matter, please contact
out office at your earliest convenience.
Sincerely,
J.R. HARRIS AND COMPANY
p,00 REG /-'�N
o�: ••' • c,49o'F
., .
UO�� een l
Donald Carroll, P.E. •,
Project Manager ,c''•., db�r��'
Enclosures
James Robert Harris, P.E., S.E., Ph.D., NAE Gene R. Stevens, P.E., S.E. G. Brent Norris, P.E.
Frederick R. Rutz, P.E., Ph.D. Kenneth W. Cobb, P.E., S.E. Donald C. Carroll, P.E.