HomeMy WebLinkAboutB14-0120 CR1 Special Inspection Report INDEPENDENT TESTING & INSPECTION SERYICES INC. 12084 VASEEN CT. CONIFER, COLORADO 80433 303-674-7560 FAX 303-674-7560 Page 1 of 2 OBSERVATION REPORT Client: SRE Building Associates ITIS Job No. 061814 Date: 6/18/14 Project: Brantley Residence/The Lodge @ Vail Location: Vail, CO Inspector: David L. Sturgeon This report package contains information concerning specific tests and inspections of structural steel welding, structural bolting, structural sprayed fireproofing, and/or nondestructive testing. The specific criteria utilized in judging the degree of conformance for each area of inspection are contained on each individual inspection form. Also included may be ITIS' "List of Outstanding Discrepancies" (O.D. List). The O.D. List will be consecutively numbered for each page issued throughout the duration of the project. Each individual item listed will also be consecutively numbered. If there are any questions regarding the content of this report, please feel free to contact ITIS at your convenience. David L. Sturgeon President ICBO Certified Inspector#1138247-85 AWS QC-1 #82122691 Resident Level III INDEPENDENT TESTING & INSPECTION SERYICES INC. 12084 VASEEN CT. CONIFER, COLORADO 80433 303-674-7560 FAX 303-674-7560 Page 2 of 2 INITIAL VISUAL INSPECTION OF WELDING FIELD REPORT FORM � Inspector: David L. Sturgeon Job No. 061814 Date: 6/18/14 Field Made Welds X Shop Made Welds Type of Welds lnspected: Fillet X Groove Other Type of Component(i.e.: Column,beam girder,moment weld,etc) As Recorded Applicable Code or Standard: AWS AREAS OF INSPECTION LEVEL OR ELEVATION: iJNIT 347 Upper Level B of S-1 Modified Framin� GRID LINE LOCATON(S): CONDITIONS OF NONCONFORMANCE/INSPECTION RESULTS : The column base anchorages were found conforming. The G.C. is to grout the base plate at a later date. LEVEL OR ELEVATION: U�per Level G of S-1, Section H Beam to Beam GRiD LINE LOCATiON(S): CONDITIONS OF NONCONFORMANCE/INSPECTION RESULTS: The bolted connection was found conforming LEVEL OR ELVATION: U�per Level Detail C of S-1, Section A of S-1 Beam to Wa1lBeam to Column GRID LINE LOCATION(S): _ CONDITIONS OF NONCONFORMANCE/INSPECTION RESULTS: The wall connection was completed with 3/4"x 6"Titan anchors. The anchors were found tight with two slightly askew. The connection was found conforming.