Loading...
HomeMy WebLinkAboutDRB140374 Plans ApprovedReceived TONIN OF VAI L .1 By Carolyn Godfrey at 1:37 pm, Aug 25, 2014 NEW 2 PIECE FASCIA TO MATCH EXISTING EAVE EAST T.O. (N) SHEATHING EL. 8233'-q 5/8" WOOD BRACE IXS HORIZONTAL WD LAP SIDING "FRY RE6LET" (OR EQUAL) X CORNER MOLDING - 3/4" EXPOSURE TYP @ HORIZ LAP SIDING NEW GLAD WINDOWS (TYP) 2x8 WOOD NINDON TRIM Ix8 VERTICAL WOOD SIDING AT CORNER ACCENT UPPER LEVEL EAST T.O. (N) DEGKIN6 EL. 8220'-0 7/8" f F--� - (N) EXTERIOR LIGHT FIXTURE - I `� FULL GUT -OFF STYLE PER TOWN CODE - VERIFY L16HT FIXTURE WOWNER METAL GUARDRAIL PER CODE (TYP) CONCRETE PAVER PATIO (HEATED) ON GONG SLAB ON MTL DECK FRAMING TRASH ENCL. RE: STRUCTURE MAIN LEVEL EAST T.O. (N) DEGKIN6 EL. 820q'-8 1/4" ENTRY LEVEL EAST T.O. (N) DEGKIN6 EL. 8208'-1 1/4" T.O. PATIO EL. 8207' - — CONCRETE PAVERS (HEATED) ® SITE STEPS RE: SITE PLAN (E) GARAGE EAST T.O. (N) SLAB EL. 8200.0- (N) FDTN DRAIN IN GRAVEL BED (TYP) - DRAIN TO SUMP PUMP REPLACE (E) FIXTURE w/(N) EXTERIOR LIGHT FIXTURE - FULL GUT -OFF STYLE PER TOWN CODE - VERIFY STYLE WOWNER (N) STAIR WND TREADS, NO RISERS (CLOSED) AND WD STRINGERS LOFT LVL NE5T \ T.O. (E) DEGKIN6 EL. 8222'4" (b=2.05) UPPER LVL NE5T T.O. (E) DEGKIN6 T EL. 8218'4" (5218.08') (N) RA I L I N6 0 (N) WATERPROOF DECK ID IX6 WOOD SIDING TO = o MATCH EXISTING _ T 0 MAIN LVL NEST T.O. (E) DEGKIN6 EL. 820II'-O" PLACE FLASHING UNDER LAST 6"± OF SIDING AND DOWN 6"± BELOW GRADE AND OVER TOP EDGE OF FOUNDATION INSULATION (TYP) 12 21 DRB140374 O EAST TRASH E-101 IV O METAL FRAME WNELDED WIRE MESH D INFILL @ NEW CHIMNEY GAP A4.1 NEW STONE VENEER EXISTING CHIMNEY STA NDIN6 SEAM METAL ROOF FON (N) ROOF FRAMING RE: ROOF PLAN 2 I (N) ASPHALT SHINGLES ON (E) ROOF FRAMING • RE: ROOF PLAN �J O O � L J L L o oaoo Jr - GLASS PANEL MAN DOOR 6LA55 PANELS OVERHEAD GARAGE DOOR PLACE FLASHING UNDER LAST LAYER OF SIDING AND DOWN 6"± BELOW GRADE AND OVER TOP EDGE OF FOUNDATION INSULATION (TYP) METAL FRAME WITH WELDED WIRE MESH INFILL a NEW CHIMNEY GAP EXTEND EXISTING FLUE CHASE AND CHIMNEY TO BE 2' ABOVE ANYTHING WITHIN 10' NEW STONE VENEER a EXISTING CHIMNEY METAL GUTTER WHEAT TAPE TO DOWNSPOUT WHEAT TAPE TO SPLASH BLOCK AT GRADE EXIST j EXIST EXIST EXIST EX 7 A4.2 FF A4.2 PROVIDE GLAD MULL COVER FOR 2X COLUMN BETWEEN WINDOW UNITS E:1 n O (N) BEAM @ (E) ROOF RE: STRUCTURE IIT UILIII AA —I,1 2 REMOVE (E) WINDOW - PATGH/FILL OPENING TO MATCH (E) WALL (TYP) ------------ _ II II OIL T.O. WALL EL. 8206-6" (N) SIDING TO MATH EXISTING ® NEW CONSTRUCTION IN; BELOW (E) METAL FLASHING (TYP) CANTILEVER NORTH ELEVATION II III I II II STANDIN6 SEAM METAL ROOF 1 3.0 5GALE: 1/4" = 1'-O" RE: ROOF PLAN $ NOTES I 11 II II II WOOD FASCIA TO MATCH EXIgTIN6 I --- L------------- I------------� — --- O 1 2 4 8 ---�XTERTO�G tTLT61�5�T D F- ------1 ROOF SOFFIT (TYP OF THREE)- — J L_ — J DRAINAGE BOARD ON WATERPROOFING ON GONG RETAINING WALL GUT STONE GAP � STONE VENEER AT ENGINEERED CONCRETE RETAINING WALLS ® DRIVE FOOTING DRAIN - VERIFY LOCATION, TYPE AND MATERIAL WNATERPROOFIN6 USED AT WALL G B A A4.1 A4.0 A4.0 I I I F _I o — - ] 0Z < 0 PROPOSED GRADE / RE: SITE PLAN L EXI5TIN6 GRADE - ,� _ T • III � L— — — — — — L- — J =1 D SAND SET GONG PAVER STEP TO SAND SET GONG PAVER PATIO RE: SITE PLAN II (N) EXTERIOR L16HT FIXTURE - FULL GUT -OFF STYLE PER TOWN CODE - VERIFY L16HT FIXTURE w/OWNE . - 3 THUS ® THIS ELEVATION II L ----J L — — — ----------- - ----------------- m I NEW ASPHALT SHINGLES EXISTING ROOF STRUCTURE 2 PIECE WOOD FASCIA GALVANIZED MTL GUTTER vi/HEAT TAPE WOOD SIDING TO MATCH EXISTING ON WALLS OF NEW DORMER T.O. (E) PLATE EL. b226' -I" (8226.08') BUILD UP @ STRUGT BEAM TO EXTEND EAVE - VERIFY STL PLATE TOP RAIL AND SUPPORT w/GABLE RAIL 4" O.G.- TYP @ ALL RAILINGS UPPER LVL WEST T.O. (E) DEGKIN6 EL. E,210'41 (8218.08') NEW 8X8 ND COLUMN w/6" STEEL COLLAR ® BASE SAND SET GONGRETE PAVER WALKWAY (HEATED) TO ENTRY PORCH W (2) 5" RISERS AND (1) 15" TREAD RE: SITE PLAN EXISTING AND PROPOSED GRADE NEW 2 PIECE FASCIA TO MATCH EXI5TIN6 WOOD BRACE (TYP) EAVE EAST OIL T.O. (N) SHEATHING EL. 8233'-q 5/8" Ix 6 WOOD SOFFIT GLAD WINDOW (TYP) 2x8 WOOD WINDOW TRIM "FRY RE6LET" (OR EQUAL) X CORNER MOLDING - 3/4" EXPOSURE O z TYP o HORIZONTAL LAP 5IDIN6 U-1 loo C� o METAL FLASHING (TYP) STANDING SEAM METAL ROOF - TYP a ALL NEW 2:12 ROOFS 2 IX8 HORIZONTAL OWOOD LAP SIDING O Ix8 VERTICAL WOOD SIDING O AT CORNER ACCENT m STL PLATE TOP RAIL AND SUPPORTS w/GABLE RAILS a 4" O.G. - TYP @ ALL RAILINGS III II II II II II I �I II II UPPER LEVEL EAST T.O. (N) DEGKIN6 EL. 8220'-0 7/8" (8220.07') EAST BEDROOM I MAIN LEVEL EAST T.O. (N) DEGKIN6 EL. 820q'-8 1/4" (820q.bq9 TO MATCH EXISTING ENTRY LEVEL EAST T.O. (N) DEGKIN6 EL. 8208'-1 1/4" (8208.10') MAIN LVL WEST T.O. (E) DEGKIN6 EL. 8206'-0" (820q.00') EXTERIOR MATERIALS ROOFING METAL RIB - DARK GRAY ASPHALT SHINGLE - GAF - WEATHERED WOOD SIDIN6 CEDAR - HORIZ; Ix8 LAP - COLOR TO MATCH EXISTING - VERT; TO MATCH EXI5TIN6 CORNER METAL - "X" CORNER MOLDING DETAIL 3/4" EXPOSURE (EAST SIDE) OTHER WALL STONE - MO55ROGK - 6RAY FASCIA WOOD - TO MATCH EXISTING SOFFITS WOOD - I x6 T$6 NATURAL GUTTERS 4 GALVANIZED - DARK BROWN DOWNSPOUTS METAL WINDOWS WOOD/GLAD - TO MATCH EXISTIN6 WINDOW TRIM BRICK MOLD - PAINT TO MATCH EXI5TIN6 (WEST SIDE) WINDOW TRIM CEDAR - 2X8, SMOOTH - NATURAL (EAST SIDE) DOORS GARAGE - FROSTED GLASS PANEL EAST ENTRY - FROSTED GLASS PANEL MAN DOOR - FROSTED GLASS PANEL DOOR TRIM CEDAR - 2X8 - NATURAL FLASHING METAL - PAINT TO MATCH ADJ MATERIALS BRACES WOOD - 6X10, ROUGH SAWN - NATURAL DECK RAILS STEEL - STEEL PLATE GAP AND SUPPORTS GABLE RAILS CHIMNEYS METAL GAP - WELDED WIRE MESH; PAINTED - BLACK CHASE - M055ROGK - GRAY TRASH STONE - M055ROGK - 6RAY ENCLOSURE WOOD DOORS - 5IDIN6, PAINT/STAIN TO MATCH EXISTING RETAINING STONE VENEER - GRAY MO55ROGK WALLS BOULDERS EXTERIOR REGE55ED - SEE PLANS FOR LOCATIONS L16HTIN6 SCONCES - "GORDELIA LIGHTING, GAPE CODE WALL MOUNT" - BRONZE NOTE: VERIFY ALL EXTERIOR COLOR SAMPLES WONNER ELEI/ATION NOTES: I. THESE ELEVATIONS (INGLUDIN6 WALL HEIGHTS, FLOOR ELEVATION AND ROOF PITGHE5) ARE BASED ON INFORMATION FROM EXISTIN6 DRAWINGS AND SOME FIELD MEASUREMENTS BUT NOT FROM EXTENSIVE REVIEW OF AS -BUILT CONDITIONS. CONTRACTOR TO VERIFY ALL EXISTING CONSTRUCTION AND CONDITIONS IN THE FIELD BEFORE NEW CONSTRUCTION BEC21NS AND NOTIFY OWNER, ARCHITECT AND STRUCTURAL ENGINEER OF ALL DISCREPANCIES THAT REQUIRE REWORK OF THE PROPOSED DRAWINGS. 2. SEE GENERAL NOTES SHEET A2.0, TYPICAL GONSTRUGTION NOTES SHEET A4.0 AND COVER SHEET FOR ADDITIONAL INFORMATION. 3. PLACE FLASHING UNDER LAST LAYER OF SIDIN6 (UNDER BOT 6"± OF VERTICAL) AND DOWN 6"± BELOW GRADE AND OVER TOP EDGE OF FOUNDATION INSULATION. 4. ALL NEW EXTERIOR MATERIALS TO MATCH EXISTING UNLESS NOTED OTHERWISE. 5. ELEVATION GALL OUTS ARE ROUNDED TO THE NEAREST I/8". 6. EXISTING FLOOR AND RIDGE ELEVATIONS ARE APPROXIMATED BASED ON KNOWN STRUCTURAL INFORMATION. 7. ALL FINISH GRADES TO DRAIN AWAY FROM BUILDING. 8. (E) = EXISTIN6 (N) = NEW PLACE FLASHING UNDER LAST LAYER LEGEND: OF SIDING AND DOWN 6"± BELOW GRADE AND OVER TOP E06E OF FOUNDATION INSULATION (TYP) NEW CONSTRUCTION 6ARA6E EAST OIL T.O. (N) SLAB EL. 8200.0' 1 EXISTING CONSTRUCTION TO REMAIN Design Review Staff Approval TOW0 F �A, � By Warren Campbell at 10:30 am, Aug 28, 2014 U 0 No0D O Z j r;- �? o X U LL L a F - �J w W C C) W Q � O co Wat)O O CC) M -0 Ca J co M 0O X 0 W m U � > C O .� oCJ000 Cf7 > o � . a¢O2V O W =100J U z tn2 z> U K W U W O¢ U z X O K U H O~ W ~ W? z (n z co p w Z w O� F U O z 0-¢ W �(n UHZUd' W Olo- af ¢ W ¢UW w¢ t/75OOw w= >>�- a 10 z-w�a~criz �°��wao c7 oaQo�zQa z�z��¢ ofJ L= ¢wo o_0000Z J U0=L 22 I- Ld W Q �LLz �O� ~�z o U) _ 2 W a 2 W 2 O Z I �Wi o W W O U COm<w w�Op w?QF-mwr aY p z¢ t U O a = O 2�= w W O W 0 0 0 }¢¢} O— U O =w�Wn=xz z�>zxx� U F m(n CL IL U) ¢❑ W ¢d3:¢ LU p W W } O F Hm¢Q Q W O �2Z JF - p O z W LL U 2 0= Z Z w U O J J U -oI->� 'c��-=LLzo- o��>nwozO2oz�00w¢ F= Om= U (n ¢¢ J H= Z m= FCOi�O'�Ow�-`�z2 0a�� ¢ U O z U¢ mzOz���g W nZ¢OO W zcWJm- =�FaQ<<000W0Z�wwo W �u���Owz �n❑ w ��o U w z m o z O 0.2 ui w w w 0< 0 0 ¢ O~ U UM J m U O n U zz:Z wo W aLLoiUmzzaoN 2 J n a' J Z�<(nZw W mFZ ¢�=OLL J—W F W U J J ¢¢ ZO ll W F J W U U F~— W WH=bZ — z¢ozaoQO 2 l~i Z }O (� W U OU F Z K (`J F 7 U o w rn O z_ c.� 2 Fs¢ W o',-�,ZwmaoQOz W UZ) m.ew 2 W W LL W= n U U C� Z 0 =(n O Of U) W U W ptLmO��J UC7}LLI w�OZFcnwzO¢ W }pU = z m U=} O O J}¢ m Z W¢ W 2 P W¢= W� W 2 of 2 W O0 x�, WW mUpUi-z�J�dO�¢->-Ow ¢ x¢ W >- 0 0,¢ 2,¢ w LL z=_ z w� m> 2 a LL x w LL U LL' O¢ F F Z 0 O Z F— _ J LL Q F - �J w W V C) W Z Wat)O D J to J W W > W oCJ000 (l)— aJ V J 0 Q � J V J ~ J J — H 0 N o Q J M i N T- T- tz 2 r 00 T- a i i D o i O N Z 00 0a A3.0 I BUILDING ELEVATIONS I 5TANDIN6 SEAM METAL ROOF - TYP 0 ALL NEW 2:12 ROOFS EAVE EAST T.O. (N) SHEATHING EL. 8233'-q 5/8" (8233.80') NEW 2 PIECE FASCIA TO MATCH EXISTING IX8 HORIZONTAL WOOD LAP SIDIN6 "FRY RE&LET" (OR EQUAL) X CORNER MOLDING - 3/4" EXPOSURE TYP o HORIZONTAL LAP 5I0I146 UPPER LEVEL EAST OIL T.O. (N) DEGKIN6 12 EL. 8220'-0 7/8" 2 777777 (8220.07') NEW GLAD WINDOWS ` 2x8 WOOD WINDOW TRIM SAND SET CONCRETE PAVER WALK (HEATED) RE: SITE PLAN EAST BEDROOM I MAIN LEVEL EAST 2 2 T.O. (N) DEGKIN6 OIL EL. 820q'-8 1/4" (5204.r q,) =rF TO MATCH EXISTING I STL PLATE TOP RAIL AND SUPPORTS W GABLE RAIL a GUARDRAIL BELOW - MOUNT RAILING POSTS AT CENTER OR WEST SIDE OF GONG WALL (NOT VENEER) TO CLEAR LOWER ROOF PROPOSED GRADE EXISTING GRADE NEW ASPHALT SHINSLE5 ON EXISTIN6 ROOF STRUCTURE METAL GUTTER WHEAT TAPE (E) T.O. BEAM - - EL. 5250'-q" (N) WOOD SIDING TO MATCH EXISTING 49 NEW WALL CONSTRUCTION a DORMER (TYP) (E) T.O. PLATE O II II II II II II IL - II ® LU II - GAF - WEATHERED WOOD SIDING CEDAR EL. a2261-1" , (8226.0,5') (N) DOWNSPOUT WHEAT TAPE TO CONCRETE SPLASH BLOCK GRADE 7777 UPPER LVL WEST T.O. (E) DEGKIN6 EL. 8218'-I " (8218.08') BEAMWORK a SOFFI ® UNDERSIDE OF CANTILEVER SLOPED STONE GAP ON (E) GONG RETAINING HALL-- L ALL MAIN LVL WEST T.O. (E) DEGKIN6 EL. 82011'-O" (,52011.00) NEW STONE VENEERo EXISTING SITE WALL NEW 8X8 WD COLUMN ON (E) GONG RETAINING WALL LOWER (E) SOFFIT a BLDG CANTILEVER TO ALIGN w/B.O. NEW DECK 12 2 REMOVE EXISTIN6 SKYLI6HTS AND EXTEND ROOF I BUILD UP AT 5TRGUT BEAM ' TO EXTEND EAVE - VERIFY-* --7\ I I / FF 4 5TAGK WINDOW REMOVED I 0 I I I EX15T I I PLACE FLASHING UNDER LAST LAYER OF 5IDIN6 AND DOWN 6"± BELOW GRADE AND OVER TOP EDGE OF FOUNDATION INSULATION (TYP) O T1 I NEW 8X8 WD COLUMN w/6" STEEL COLLAR 0 BASE REPLACE (E) FIXTURE W(N) - EXTERIOR LIGHT FIXTURE - FULL GUT -OFF STYLE PER TOWN CODE - VERIFY L16HT FIXTURE WOWNER ----------•------------------ J-------------- �I I GHAN&ED FROM CASEMENT TO DOUBLE HUNG WINDOWS REMOVE (E) WINDOW - PATGH/FILL OPENING TO MATCH (E) WALL (TYP) fD A4.2 A4.1 STL PLATE TOP RAIL AND SUPPORTS w/GABLE RAIL 4" O.G. - TYP ALL RAILINGS A4 . FRY REOLET (OR EQUAL) X GORNER MOLDING - 3/4" EXP05URE12 TYP @ HORIZONTAL LAP SIDIN6 I 2 HH JJ L I;�&`N�� I I �I��, O 2 PIECE WOOD FASCIA METAL &UTTER WHEAT TAPE (N) SIDING TO MATCH EXISTING a (N) DORMER WALL NEW ASPHALT 5HIN6LE5 ON EXISTING ROOF FRAMING T.O. (E) BEAM EL. 8230'-q " (N) METAL GUTTER WHEAT TAPE o (E) ROOF TO DOWNSPOUT WHEAT TAPE OIL T.O. (E) PLATE EL. b.226'4' (8226.08') 5TL PLATE TOP RAIL AND SUPPORTS WGABLE RAIL 4" OG - TYP @ ALL RA I L I NGS CONCRETE PAVER DECK w/WOOD DECK FASCIA UPPER LVL WEST T.O. (E) DEGKIN6 EL. &21&-1" (8218.08') NEW GLAD PATIO 5LIDIN& DOOR IN (E) DOOR OPENING (TYP OF 2) /- MTL FLASHING FROM UNDER DOOR THRESHOLD TO BELOW PATIO - CONTINUE 6" UNDERSAND BASE (TYP OF 3) SAND SET CONCRETE PAVER PATIO RE: SITE PLAN MAIN LEVEL WEST OIL T.O. (E) DEGKIN6 EL. 82011'-0" (820q.00') ADD NEW STONE VENEER t,4/SLOPED STONE GAP (SLOPE AWAY FROM PATIO) @ EXISTIN6 SITE WALL Oil r (12) R15ER5 ® 10" REBUILD EXISTIN6 - 10,0"NEW STAIR w/WOOD TREADS 4 I WATERPROOF DECK RISERS (GL05ED RISERS) AND GABLE RAIL ON WOOD STRINGER - VERIFY RISER HE16HT INFIELD BEFORE FRAMING STAIR - ADD RISERS/TREAD AS NEGE55ARY TO MAINTAIN 7-3/4" OR LE55 RISER HE16HT II I II II I II II I II I METAL FRAME w/WELDED WIRE MESH INFILL @ NEW CHIMNEY GAP NEW STONE VENEER EXISTIN6 CHIMNEY NEW 2 PIECE FASCIA TO MATCH EXISTIN6 EAVE EAST T.O. (N) SHEATHING EL. 8233'-q 5/8" (8233.80') WOOD BRACE IX8 HORIZONTAL WOOD LAP SIDING NEW GLAD WINDOW (TYP) EXTEND EXI5TIN6 FLUE CHASE AND CHIMNEY TO BE 2' ABOVE ANYTHING WITHIN 10' 2x8 WOOD WINDOW TRIM STANDING SEAM METAL 12 ROOF - Tl'P a ALL NEW -12 2:12 ROOFS UPPER LEVEL EAST OIL _ T.O. (N) DEGKIN6 EL. 8220'-0 7/8" (8220.07') OANGLED BRACE BAY WINDOW RE: FLOOR PLAN DOWNSPOUT WHEAT TAPE BEYOND MAIN LEVEL EAST L OIL T.O. (E) DEGKIN6 EL. 820q'-8 1/4" (820q.6q') EXISTIN6 GRADE PROPOSED GRADE EDGE OF BUILDIN6 PLACE FLASHING UNDER LAST 6"± OF SIDING AND DOWN 6"± BELOW GRADE AND OVER TOP EDGE OF FOUNDATION INSULATION (TYP) EXTERIOR MATERIAL5 ROOFING METAL RIB 0 ® LU m - GAF - WEATHERED WOOD SIDING CEDAR - HORIZ; Ix8 LAP - COLOR TO 2 PIECE WOOD FASCIA METAL &UTTER WHEAT TAPE (N) SIDING TO MATCH EXISTING a (N) DORMER WALL NEW ASPHALT 5HIN6LE5 ON EXISTING ROOF FRAMING T.O. (E) BEAM EL. 8230'-q " (N) METAL GUTTER WHEAT TAPE o (E) ROOF TO DOWNSPOUT WHEAT TAPE OIL T.O. (E) PLATE EL. b.226'4' (8226.08') 5TL PLATE TOP RAIL AND SUPPORTS WGABLE RAIL 4" OG - TYP @ ALL RA I L I NGS CONCRETE PAVER DECK w/WOOD DECK FASCIA UPPER LVL WEST T.O. (E) DEGKIN6 EL. &21&-1" (8218.08') NEW GLAD PATIO 5LIDIN& DOOR IN (E) DOOR OPENING (TYP OF 2) /- MTL FLASHING FROM UNDER DOOR THRESHOLD TO BELOW PATIO - CONTINUE 6" UNDERSAND BASE (TYP OF 3) SAND SET CONCRETE PAVER PATIO RE: SITE PLAN MAIN LEVEL WEST OIL T.O. (E) DEGKIN6 EL. 82011'-0" (820q.00') ADD NEW STONE VENEER t,4/SLOPED STONE GAP (SLOPE AWAY FROM PATIO) @ EXISTIN6 SITE WALL Oil r (12) R15ER5 ® 10" REBUILD EXISTIN6 - 10,0"NEW STAIR w/WOOD TREADS 4 I WATERPROOF DECK RISERS (GL05ED RISERS) AND GABLE RAIL ON WOOD STRINGER - VERIFY RISER HE16HT INFIELD BEFORE FRAMING STAIR - ADD RISERS/TREAD AS NEGE55ARY TO MAINTAIN 7-3/4" OR LE55 RISER HE16HT II I II II I II II I II I METAL FRAME w/WELDED WIRE MESH INFILL @ NEW CHIMNEY GAP NEW STONE VENEER EXISTIN6 CHIMNEY NEW 2 PIECE FASCIA TO MATCH EXISTIN6 EAVE EAST T.O. (N) SHEATHING EL. 8233'-q 5/8" (8233.80') WOOD BRACE IX8 HORIZONTAL WOOD LAP SIDING NEW GLAD WINDOW (TYP) EXTEND EXI5TIN6 FLUE CHASE AND CHIMNEY TO BE 2' ABOVE ANYTHING WITHIN 10' 2x8 WOOD WINDOW TRIM STANDING SEAM METAL 12 ROOF - Tl'P a ALL NEW -12 2:12 ROOFS UPPER LEVEL EAST OIL _ T.O. (N) DEGKIN6 EL. 8220'-0 7/8" (8220.07') OANGLED BRACE BAY WINDOW RE: FLOOR PLAN DOWNSPOUT WHEAT TAPE BEYOND MAIN LEVEL EAST L OIL T.O. (E) DEGKIN6 EL. 820q'-8 1/4" (820q.6q') EXISTIN6 GRADE PROPOSED GRADE EDGE OF BUILDIN6 PLACE FLASHING UNDER LAST 6"± OF SIDING AND DOWN 6"± BELOW GRADE AND OVER TOP EDGE OF FOUNDATION INSULATION (TYP) EXTERIOR MATERIAL5 ROOFING METAL RIB - DARK 6RAY Nod N I, - ASPHALT SHIN6LE - GAF - WEATHERED WOOD SIDING CEDAR - HORIZ; Ix8 LAP - COLOR TO 6x MATCH EXI5TIN6 U LL - VERT; TO MATCH EXI5TIN6 CORNER METAL - "X" CORNER MOLDING DETAIL 3/4" EXPOSURE (EAST SIDE) C OTHER WALL STONE - M055ROGK - GRAY FASCIA WOOD - TO MATCH EXI5TIN6 SOFFITS WOOD - 1x& T � 6 NATURAL GUTTERS $ GALVANIZED - DARK BROWN DOWNSPOUTS METAL �e WINDOWS WOOD/GLAD - TO MATCH EXISTING WINDOW TRIM BRICK MOLD - PAINT TO MATCH EXISTING (WEST SIDE) C O .� WINDOW TRIM GEDAR - 2X8, SMOOTH - NATURAL (EAST SIDE) (l)— a DOORS 6ARA6E - FROSTED 6LA55 PANEL > EAST ENTRY - FROSTED GLASS PANEL Q MAN DOOR - FROSTED 6LA55 PANEL DOOR TRIM CEDAR - 2X8 - NATURAL FLASHING METAL - PAINT TO MATCH ADJ MATERIALS BRAGES WOOD - 6X10, ROUGH SAWN - NATURAL DECK RAILS STEEL - STEEL PLATE GAP AND SUPPORTS > N T_ T_ GABLE RAILS CHIMNEYS METAL GAP - WELDED WIRE MESH; a i PAINTED - BLACK i � CHASE - MOSSROGK - GRAY TRASH STONE - MO5SROGK - GRAY ENGL05URE WOOD DOORS - SIDIN6, PAINT/STAIN 0a TO MATCH EXISTIN6 RETAINING STONE VENEER - GRAY M055ROGK WALLS BOULDERS EXTERIOR REGE55ED - SEE PLANS FOR LOCATIONS LIGHTING SCONCES - "GORDELIA LIGHTING, GAPE GODE WALL MOUNT" - BRON2 NOTE: VERIFY ALL EXTERIOR COLOR SAMPLES w/OWNER ELEI/ATION NOTES: I. THESE ELEVATIONS (INGLUDIN6 WALL HEIGHTS, FLOOR ELEVATION AND ROOF PITCHES) ARE BASED ON INFORMATION FROM EXISTING DRAWINGS AND SOME FIELD MEASUREMENTS BUT NOT FROM EXTENSIVE REVIEW OF AS -BUILT CONDITIONS. CONTRACTOR TO VERIFY ALL EXISTIN6 GONSTRUGTION AND CONDITIONS IN THE FIELD BEFORE NEW CONSTRUCTION BEGINS AND NOTIFY OWNER, ARCHITECT AND STRUCTURAL EN61NEER OF ALL DISCREPANCIES THAT REG2UIRE REWORK OF THE PROPOSED DRAWINGS. 2. SEE GENERAL NOTES SHEET A2.0, TYPICAL CONSTRUCTION NOTES SHEET A4.0 AND COVER SHEET FOR ADDITIONAL INFORMATION. 3. PLACE FLASHIN6 UNDER LAST LAYER OF SIDIN6 (UNDER BOT 6"± OF VERTICAL) AND DOWN 6"± BELOW GRADE AND OVER TOP E06E OF FOUNDATION INSULATION. 4. ALL NEW EXTERIOR MATERIALS TO MATCH EXISTIN6 UNLESS NOTED OTHERWISE. 5. ELEVATION GALL OUTS ARE ROUNDED TO THE NEAREST I/8". 6. EXI5TIN6 FLOOR AND R106E ELEVATIONS ARE APPROXIMATED BASED ON KNOWN STRUCTURAL INFORMATION. 7. ALL FINISH GRADES TO DRAIN AWAY FROM BUILDING. 8. (E) = EXISTING (N) = NEW LEGEND: NEW CONSTRUCTION EXI5TIN6 CONSTRUCTION TO REMAIN Design Review Staff Approval By Warren Campbell at 10:30 am, Aug 28, 2014 TOWN N O F Uhl! L _' U 0 Nod N I, - O Z W 6x U LL L a w co C U Q C0 O a 2 co WaL)o O C0 M -0 Ca J �e co M 0O X 0 W U U W >W C O .� oCJ000 p � Qap°v 0 WW =Z n n W J C ZZ (n X: W Z U < c w U F W Z U K a U ~ W 3 U U X Z W 2 U p W U W W 2 U w W W O K X O W p H w ~ W z Z U Z W p a z F O F U O z 0-¢ g ¢> LIJ 2 U w 0 1�) z0- xOx a w2WaOw In a~f- W Wa U z m X, W d 0 c7 oQQOOzz¢a z"zX''.¢ - L= aW0 j- co 0Z J UpU�=�22 I- LLI= W a Z x 0 a3: W z = 0 0~3: z p _ 2wa2w2oz 0uwi0,WL)(_) U-` W a Z W p W� 0 W z Q H m WLu I- Y p Z a LL U p Wa p 0 2 2 CL � W w O W= 0 0 >¢ a Y 0- U 0 2w�'xW x zW>zx=fr U 1-00W d OH IL ap W ad3:a W p W W > O F HmaQ Q 2 UjW W U 92Z LFLl O 9 Z 'L w U= 02 Z Z W J U O J J U �0�0>� �c�,n�=Wzo� zL0W0WooO7ozW0,Wa F p p[��Ucn aha J(6 z FCUi�O��Ow�-`�zoc~i�p0a�j ¢ U O Z U¢ Z O [OZU' ZHHC`I�w(n2 W ZUmH W� m¢�woo0W0z TU x U m o z O W CO 'n W W Lj a 0¢ z O�Wzpa�FWO2Fox)WFO z=z �oz W N 2m a o N =WUa¢}U¢ Zz�(nZW W (OFZ acn W B=OLL J-WcnW==O-aOW WU (nJ F W p U' - W x 0 F F~ J a¢ ll W F J 10 2 WW 0 U U (nF~ w w W_ b, Z = z C 0 z d p Q 0 := z8 -MW -8 011 c07iU o< n 0 z_ U W D¢ w O~ z w m a O a O Z W zW cn� A2www T2;Uu C�ZC7U = U O Of O W 0 W p W m O LLIJ U C7 y W� O z W W W z O a W> ¢p U =Z 07UZ)}Ocq J} ¢UZ W a W w¢=W W of c 002 cqW cn(n p Ol-z J dp=¢ -YOw a>caw-00=¢-2=awWz== z W� m a W 2 W W 00� 0¢ F- � Z 0 O Z _ J U. Q w W J U Z a WaL)o 0 J �e o to J W W >W oCJ000 (l)— a V J > J 0 Q ,, J V J ~ J J � ~ O N 0 J M > N T_ T_ tz 2 r m T_ a i i � � o i O N N D Z 00 0a A 3.1 BUILDING ELEVATIONS NEW ROOF GONSTRUGTION SEE NOTE ® R16HT NEW 2 PIECE FASCIA TO MATCH EXISTING (N) R106E OL T.O. SHEATHING EL. 822q'-5 3/4" I X8 HORIZONTAL WD LAP SIDING "FRY REOLET" (OR EQUAL) X CORNER MOLDING - 3/4" EXPOSURE TYP a HORIZ LAP 51DIN6 T.O. GONG TOPPING EL. 8220'-2 3/8" UPPER LEVEL EAST T.O. (N) DEGKIN6 (8220.07') r NEW GLAD WINDOWS (TYP) 2x8 WOOD WINDOW TRIM m a� MAIN LEVEL - EAST T.O. (N) DEGKIN6 EL. 820q'-8 1/4" (820q.(qq') TO MATCH EXISTING MAIN LEVEL WEST T.O. (E) DEGKIN6 EL. 820G'_O" MTL PLATE AND GABLE GUARDRAIL PER CODE SLOPED STONE GAP - SLOPE AWAY FROM DRIVE HALL - WEST T.O. (N) SLAB EL. 8200'-0" B G A4.0 A4.1 WELDED WIRE MESH IN METAL FRAME @ (N) CHIMNEY GAP EXTEND CHIMNEY TO BE TWO FEET ABOVE ANYTHING WITHIN 10 FEET I (N) STONE VENEER ADDED TO EXISTING CHIMNEY 1-2 12 I METAL FLASHING 2 2 I/2 ± FE ROOF AT EAST L I V I N6 ROOM BEYOND \ WINDOW n WEST W O REMOVED / I WALL o / si I � I 12 \ � 2 F1 I E F G � I \ EAST EAST WEST WEST WE5 1/ANITY 2 E3ATH BEDROOM 2 BATH I — — —N RY E-216 217 -22 -23 7 I � II II II II II II II I— — — — — — — — — — J (E) CONSTRUCTION NEW ROOF CONSTRUCTION SEE NOTE o RIGHT OVER FRAME AT CRICKET SHELF/BENGH FOR WOOD STORAGE - TO FIT BELOW EXI5T WINDOW SILL (E) UPPER LEVEL WEST T.O. DEGKIN6 - - EL. 8218'-1 " (8218.08') FURR ® NEW FRAME WALL TO ALIGN WFURRIN6 c) GONG WALL BELOW STEP (N) GONG FDTN WALL WIDTH TO 5 1/2" ABOVE SLAB LINE - RE: STRUGT WEST T.O. SLAB - - EL. 8201f' -O" (820q.00') (N) FLR FINISH MATERIAL ON (N) GONG SLAB CONST SEE NOTE @ RIGHT (N) FIN FLR MATERIAL ON (N) ELEG MATT HEAT (OR HYDRONIG HEAT TUBES IN 1/2" MORTAR BED) ON OVERFAME ON (E) STRUCTURE - NO GONG TOPPING - TYP 0 BATH 2 $ VANITY 2 - (E) WEST GR4WLSPAGE ADD SOUND ATTENUATION INSULATION AND (N) GYP BOARD a (E) FLOOR FRAMING /E3 A4.1 A4.0 • NEW WINDOWS IN EXISTING OPENINGS DRAINAGE MAT (AS NECESSARY) ON 2" RIGID INSULATION (R-5 MIN) ON 13 12 14 PASSIVE RADON VENTING. LOCATION TO BE DETERMINED. PROVIDE 2— 2 WD TREADS w/I WOOD (24" ABOVE GRADE AT WEST WALL OF EAST UNIT). 2" FOAM EXI5T 2 1/2± EXISTING CANTILEVER ® WEST STAIR VAPOR BARRIER o INTERIOR. RISER E NEW SAND SET GONG PAVERS NEW CONCRETE 5LAB CONSTRUCTION (HEATED) 0 ENTRY WALK CONCRETE SLAB vi/HYDRONIG HEAT TUBING ON 10 MIL VAPOR BARRIER EXI5T ON 4" GRAVEL (PEA GRAVEL OR LARGER) ON GRADE (SEE MAIN LEVEL WEST STRUCTURE). R -I5 INSULATION. AT VAPOR BARRIER OVERLAP 12 1-1/2" FURRING SET 2" FROM , TAPE AND SEAL ALL PENETRATION AND E06E5. - PROVIDE 4" PVG EXIST THROUGH SLAB TO GRAVEL LAYER (SEAL VAPOR BARRIER WJI10 FACE OF CONCRETE WALL z HALL GUARDRAIL NEW WINDOW U -VALUE =0.32 co T_ Wat)O -TYPICAL AT ALL LIVING iz W-�16 PER CODE \ EXI5T J Design Review SPAGE WGONG WALLS o I By Warren Campbell at 10:30 am, Aug 28, 2014 U U TOWN� 12 C .M oCJ000 ----------\--- - — — — — — — — — — — — — ��- — — 2 aJ (N) FDTN DRAIN IN GRAVEL BED ' (TYP) - DRAIN TO SUMP PUMP 0 (N) GONG SLAB GON5T . SEE NOTE @ RIGHT ~ \ (E) UPPER LEVEL WEST T.O. DEGKIN6 - - EL. 8218'-1 " (8218.08') FURR ® NEW FRAME WALL TO ALIGN WFURRIN6 c) GONG WALL BELOW STEP (N) GONG FDTN WALL WIDTH TO 5 1/2" ABOVE SLAB LINE - RE: STRUGT WEST T.O. SLAB - - EL. 8201f' -O" (820q.00') (N) FLR FINISH MATERIAL ON (N) GONG SLAB CONST SEE NOTE @ RIGHT (N) FIN FLR MATERIAL ON (N) ELEG MATT HEAT (OR HYDRONIG HEAT TUBES IN 1/2" MORTAR BED) ON OVERFAME ON (E) STRUCTURE - NO GONG TOPPING - TYP 0 BATH 2 $ VANITY 2 - (E) WEST GR4WLSPAGE ADD SOUND ATTENUATION INSULATION AND (N) GYP BOARD a (E) FLOOR FRAMING /E3 A4.1 A4.0 • NEW WINDOWS IN EXISTING OPENINGS / (E) WEST GRAWLSPAGE \� \ - -- - - - --- -- -- - - - WEST TAKE GRADE BACK FROM (N) HALL FOOTING RE: STRUGT I BUILD 1 NG SECTION E L: SCALE: 1/4" = 1'-0" 0 1 2 4 8 EXTERIOR WALL BEYOND (SOUTH WALL OF EAST UNIT) (E) FOUNDATION AND (E) FLOOR FRAMING O NEW ROOF CONSTRUCTION SEE NOTE @ RIGHT FURR GEILING 50 PITCH ® EACH 51DE OF RIDGE MATCH (N) RIDGE T.O. SHEATHING EL. 822q'-5 3/4" (822q.48') VERIFY LOCATION WOWNER $ ARCH BEFORE IN5TALLIN6 WINDOW NEW BEAM RE: STRUGT (N) UPPER LEVEL - WEST T.O. GONG TOPPING EL. 8220'-2 3/8" (8220.20') ADD CELLULOSE INSULATION AND FURR (E) 2X4 FRAME WALL TO ALIGN SECTION LEGEND: NEW CONSTRUCTION EXI5TIN6 CONSTRUCTION TO REMAIN � I I � I -HOUR WALL � CEILING ASSEMBLIES RE:A6 DRW65 SECTION NOTES: I. THESE SECTIONS (INGLUDING WALL HEIGHTS, FLOOR ELEVATION AND ROOF PITCHES) ARE BASED ON INFORMATION FROM EXISTING DRAWINGS AND SOME FIELD MEASUREMENTS BUT NOT FROM EXTENSIVE REVIEW OF A5 -BUILT CONDITIONS. CONTRACTOR TO VERIFY ALL EXI5TIN6 CONSTRUCTION AND CONDITIONS IN THE FIELD BEFORE NEW CONSTRUCTION BEGINS AND NOTIFY OWNER, ARCHITECT AND STRUCTURAL ENGINEER OF ALL 0I5GREPANGIE5 THAT REQUIRE REWORK OF THE PROPOSED DRAWINGS. 2. THESE SECTION DRAWINGS ARE FOR ARCHITECTURAL GOORDINATI0 AND REPRESENTATION ONLY - SEE STRUCTURAL DRAWINGS FOR FRAMING SELECTIONS. 3. VERIFY ALL INTERIOR WALL AND GEILING FINISHES, INTERIOR DOORS AND DOOR TRIM AND INTERIOR WINDOW TRIM WITH ARCHITECT AND OWNER PRIOR TO PURCHASE AND INSTALLATION. 4. SEE GENERAL NOTES SHEET A2.0 AND COVER SHEET FOR ADDITIONAL INFORMATION. 5. ALL FINISH 6RADE5 TO DRAIN AWAY FROM BUILDING. 6. (E) = EXISTING (N) = NEW I HOUR ABSEMBLY NOTES: I. PROVIDE ONE-HOUR WALL $ GEILING ASSEMBLIES FOR ONE HOUR FIRE RE515TIVE SEPARATION BETWEEN DWELLING UNITS. 2. ALL ONE HOUR ASSEMBLIES TO MEET REGUIREMENT5 OF 8302.3 OF THE 2012 INTERNATIONAL RESIDENTIAL GODE. 3. USE FIRE RATED GAULKIN6 AT ALL INTERSECTIONS OF WALL TO GEILING. 4. ALL DOORS IN ONE HOUR ASSEMBLY TO BE I HOUR FIRE ASSEMBLIES. 5. SEE A6 DRANIN65 FOR I HOUR SEPARATION LOCATIONS. TYPICAL CONSTRUCTION NOTES NEW ROOF CONSTRUCTION ® 2:12 ROOFS STANDING SEAM METAL ROOF (COLOR = DARK GRAY) ON HIGH TEMPERATURE SELF-ADHESIVE FULL GOVERA&E WATERPROOF MEMBRANE OVER ROOF SHEATHING ON ROOF FRAMING (SEE STRUGT) WITH FOAM INSULATION (R -4q MIN) ON 6 MIL VAPOR BARRIER. NEW ROOF CONSTRUCTION a EXTERIOR ROOFS (® NORTH ELEVATION) STANDING SEAM METAL ROOF (COLOR = DARK GRAY) ON HIGH TEMPERATURE SELF-ADHESIVE FULL GOVERA6E WATERPROOF MEMBRANE OVER ROOF SHEATHING ON ROOF FRAMING (SEE STRUGT) NEW SHINGLES ® EXISTING ROOF CONSTRUCTION "GAF" GLASS A ASPHALT SHINGLES (COLOR = WEATHERED WOOD) ON 30# ROOFING FELT OVER SELF-ADHESIVE FULL GOVERAGE WATERPROOF MEMBRANE ON EXISTING ROOF FRAMING NEW EXT WALL CONSTRUCTION EXTERIOR WALL MATERIAL (SEE BUILDING ELEVATIONS) ON BUILDING WRAP ON WALL 5HEATHIN6 ON 2X FRAMIN6 (SEE STRUGT) WITH CELLULOSE INSULATION (R-20 MIN). SEE STRUCTURAL DRAWINGS FOR SHEAR $ BEARING WALL SPECIFICATIONS. GYP BOARD ON 6 MIL VAPOR BARRIER AT INTERIOR. NEW FLOOR CONSTRUCTION FINISH FLOOR MATERIAL ON CONCRETE TOPPING WITH HYDRONIG HEAT TUBING ON FLOOR FRAMIN6 (SEE STRUGT) w/SOUND ATTENUATION INSULATION. NEW TOPPING a EXISTING EAST UNIT MAIN LEVEL FLOOR FINISH FLOOR MATERIAL ON CONCRETE TOPPING WITH HYDRONIG HEAT TUBING ON EXI5TIN6 FLOOR FRAMING. NOTE: NO CONCRETE TOPPING AT EAST BATH 2/VANITY 2. NEW BASEMENT/GONGRETE WALL CONSTRUCTION w/NEW WALL ABOVE ROOF - DRAINAGE MAT (AS NECESSARY) ON 2" RIGID INSULATION (R-5 MIN) ON 13 12 14 PASSIVE RADON VENTING. LOCATION TO BE DETERMINED. PROVIDE 2— (N) SIDING TO MATCH EXI5TIN6 ® (N) (24" ABOVE GRADE AT WEST WALL OF EAST UNIT). 2" FOAM EXI5T 2 1/2± EXISTING CANTILEVER ® WEST STAIR VAPOR BARRIER o INTERIOR. MINIMUM REQUIRED R AND U VALUES FOR THIS PROJECT E NEW SAND SET GONG PAVERS NEW CONCRETE 5LAB CONSTRUCTION (HEATED) 0 ENTRY WALK CONCRETE SLAB vi/HYDRONIG HEAT TUBING ON 10 MIL VAPOR BARRIER EXI5T ON 4" GRAVEL (PEA GRAVEL OR LARGER) ON GRADE (SEE MAIN LEVEL WEST STRUCTURE). R -I5 INSULATION. AT VAPOR BARRIER OVERLAP 12 WEST , TAPE AND SEAL ALL PENETRATION AND E06E5. - PROVIDE 4" PVG EXIST THROUGH SLAB TO GRAVEL LAYER (SEAL VAPOR BARRIER or R-13 GAV+R-5 GONT OILT.O. z HALL GUARDRAIL NEW WINDOW U -VALUE =0.32 co T_ Wat)O iz W-�16 PER CODE \ EXI5T J Design Review - o I By Warren Campbell at 10:30 am, Aug 28, 2014 U U TOWN� 12 C .M oCJ000 2 aJ J ' 0 . J ~ \ J J - I N o . J M > N T_ T_ NEW FLR CONST m T_ a SEE NOTE a RIGHT L � E � o i Q N N D Z WEST \ WEST EAST EAST �(E) BATH I BED 2 13ATH 2 VANITY 2 �NE57 -23 46 42 -22 E-2 7 E-216 ENTRY -22 / (E) WEST GRAWLSPAGE \� \ - -- - - - --- -- -- - - - WEST TAKE GRADE BACK FROM (N) HALL FOOTING RE: STRUGT I BUILD 1 NG SECTION E L: SCALE: 1/4" = 1'-0" 0 1 2 4 8 EXTERIOR WALL BEYOND (SOUTH WALL OF EAST UNIT) (E) FOUNDATION AND (E) FLOOR FRAMING O NEW ROOF CONSTRUCTION SEE NOTE @ RIGHT FURR GEILING 50 PITCH ® EACH 51DE OF RIDGE MATCH (N) RIDGE T.O. SHEATHING EL. 822q'-5 3/4" (822q.48') VERIFY LOCATION WOWNER $ ARCH BEFORE IN5TALLIN6 WINDOW NEW BEAM RE: STRUGT (N) UPPER LEVEL - WEST T.O. GONG TOPPING EL. 8220'-2 3/8" (8220.20') ADD CELLULOSE INSULATION AND FURR (E) 2X4 FRAME WALL TO ALIGN SECTION LEGEND: NEW CONSTRUCTION EXI5TIN6 CONSTRUCTION TO REMAIN � I I � I -HOUR WALL � CEILING ASSEMBLIES RE:A6 DRW65 SECTION NOTES: I. THESE SECTIONS (INGLUDING WALL HEIGHTS, FLOOR ELEVATION AND ROOF PITCHES) ARE BASED ON INFORMATION FROM EXISTING DRAWINGS AND SOME FIELD MEASUREMENTS BUT NOT FROM EXTENSIVE REVIEW OF A5 -BUILT CONDITIONS. CONTRACTOR TO VERIFY ALL EXI5TIN6 CONSTRUCTION AND CONDITIONS IN THE FIELD BEFORE NEW CONSTRUCTION BEGINS AND NOTIFY OWNER, ARCHITECT AND STRUCTURAL ENGINEER OF ALL 0I5GREPANGIE5 THAT REQUIRE REWORK OF THE PROPOSED DRAWINGS. 2. THESE SECTION DRAWINGS ARE FOR ARCHITECTURAL GOORDINATI0 AND REPRESENTATION ONLY - SEE STRUCTURAL DRAWINGS FOR FRAMING SELECTIONS. 3. VERIFY ALL INTERIOR WALL AND GEILING FINISHES, INTERIOR DOORS AND DOOR TRIM AND INTERIOR WINDOW TRIM WITH ARCHITECT AND OWNER PRIOR TO PURCHASE AND INSTALLATION. 4. SEE GENERAL NOTES SHEET A2.0 AND COVER SHEET FOR ADDITIONAL INFORMATION. 5. ALL FINISH 6RADE5 TO DRAIN AWAY FROM BUILDING. 6. (E) = EXISTING (N) = NEW I HOUR ABSEMBLY NOTES: I. PROVIDE ONE-HOUR WALL $ GEILING ASSEMBLIES FOR ONE HOUR FIRE RE515TIVE SEPARATION BETWEEN DWELLING UNITS. 2. ALL ONE HOUR ASSEMBLIES TO MEET REGUIREMENT5 OF 8302.3 OF THE 2012 INTERNATIONAL RESIDENTIAL GODE. 3. USE FIRE RATED GAULKIN6 AT ALL INTERSECTIONS OF WALL TO GEILING. 4. ALL DOORS IN ONE HOUR ASSEMBLY TO BE I HOUR FIRE ASSEMBLIES. 5. SEE A6 DRANIN65 FOR I HOUR SEPARATION LOCATIONS. TYPICAL CONSTRUCTION NOTES NEW ROOF CONSTRUCTION ® 2:12 ROOFS STANDING SEAM METAL ROOF (COLOR = DARK GRAY) ON HIGH TEMPERATURE SELF-ADHESIVE FULL GOVERA&E WATERPROOF MEMBRANE OVER ROOF SHEATHING ON ROOF FRAMING (SEE STRUGT) WITH FOAM INSULATION (R -4q MIN) ON 6 MIL VAPOR BARRIER. NEW ROOF CONSTRUCTION a EXTERIOR ROOFS (® NORTH ELEVATION) STANDING SEAM METAL ROOF (COLOR = DARK GRAY) ON HIGH TEMPERATURE SELF-ADHESIVE FULL GOVERA6E WATERPROOF MEMBRANE OVER ROOF SHEATHING ON ROOF FRAMING (SEE STRUGT) NEW SHINGLES ® EXISTING ROOF CONSTRUCTION "GAF" GLASS A ASPHALT SHINGLES (COLOR = WEATHERED WOOD) ON 30# ROOFING FELT OVER SELF-ADHESIVE FULL GOVERAGE WATERPROOF MEMBRANE ON EXISTING ROOF FRAMING NEW EXT WALL CONSTRUCTION EXTERIOR WALL MATERIAL (SEE BUILDING ELEVATIONS) ON BUILDING WRAP ON WALL 5HEATHIN6 ON 2X FRAMIN6 (SEE STRUGT) WITH CELLULOSE INSULATION (R-20 MIN). SEE STRUCTURAL DRAWINGS FOR SHEAR $ BEARING WALL SPECIFICATIONS. GYP BOARD ON 6 MIL VAPOR BARRIER AT INTERIOR. NEW FLOOR CONSTRUCTION FINISH FLOOR MATERIAL ON CONCRETE TOPPING WITH HYDRONIG HEAT TUBING ON FLOOR FRAMIN6 (SEE STRUGT) w/SOUND ATTENUATION INSULATION. NEW TOPPING a EXISTING EAST UNIT MAIN LEVEL FLOOR FINISH FLOOR MATERIAL ON CONCRETE TOPPING WITH HYDRONIG HEAT TUBING ON EXI5TIN6 FLOOR FRAMING. NOTE: NO CONCRETE TOPPING AT EAST BATH 2/VANITY 2. NEW BASEMENT/GONGRETE WALL CONSTRUCTION w/NEW WALL ABOVE ROOF - DRAINAGE MAT (AS NECESSARY) ON 2" RIGID INSULATION (R-5 MIN) ON REPLAGE (E) DOOR FRAME AS REG'D FOUNDATION WATERPROOFING ON CONCRETE FOUNDATION WALL (SEE PASSIVE RADON VENTING. LOCATION TO BE DETERMINED. PROVIDE STRUGT). CARRY WATERPROOFING 12" ABOVE GRADE WHERE POSSIBLE (N) SIDING TO MATCH EXI5TIN6 ® (N) (24" ABOVE GRADE AT WEST WALL OF EAST UNIT). 2" FOAM EXTERIOR WALL INFILL BELOW INSULATION (R-13 MIN) AT INTERIOR LIVING SPACE. GYP BRD ON EXISTING CANTILEVER ® WEST STAIR VAPOR BARRIER o INTERIOR. MINIMUM REQUIRED R AND U VALUES FOR THIS PROJECT - VERIFY IF INSULATION REQUIRED AT GARAGE NEW SAND SET GONG PAVERS NEW CONCRETE 5LAB CONSTRUCTION (HEATED) 0 ENTRY WALK CONCRETE SLAB vi/HYDRONIG HEAT TUBING ON 10 MIL VAPOR BARRIER EXTERIOR WALLS R-20 ON 4" GRAVEL (PEA GRAVEL OR LARGER) ON GRADE (SEE MAIN LEVEL WEST STRUCTURE). R -I5 INSULATION. AT VAPOR BARRIER OVERLAP 12 T.O. DEGKIN6 , TAPE AND SEAL ALL PENETRATION AND E06E5. - PROVIDE 4" PVG EL. g20a'-O" (820¢.00') THROUGH SLAB TO GRAVEL LAYER (SEAL VAPOR BARRIER U 0 PENETRATION). CONTINUE PVG UNINTERRUPTED TO VENT AT ROOF FOR Nod N I,- PASSIVE RADON VENTING. LOCATION TO BE DETERMINED. PROVIDE NEW SAND SET GONG ELECTRICAL OUTLET AT ATTIG FOR POTENTIAL IN-LINE FAN PAVERS (HEATED) ON GONG INSTALLATION. SLAB @ WEST ENTRY MINIMUM REQUIRED R AND U VALUES FOR THIS PROJECT BUILT IN BENCH AND GUBBIE5 (CLIMATE ZONE (b) • ROOF/GEILING (TO EXTERIOR) R -4q NEW GONG WALL CONSTRUCTION EXTERIOR WALLS R-20 SEE NOTE o RIGHT FLOOR (TO EXTERIOR) R-30 • BELOW GRADE BASEMENT R-Iq GAV HALL or R -I5 GONT SLAB or R-13 GAV+R-5 GONT OILT.O. SLAB R-10 (ADD R-5 FOR HEATED) ' -O" EL. b200' -O" NEW WINDOW U -VALUE =0.32 co T_ Wat)O SEE TOWN OF VAIL AMENDMENTS TO DETERMINE IF CONTINUOUS REQUIRED FOR THIS PROJECT J Design Review M � Staff Approval X o By Warren Campbell at 10:30 am, Aug 28, 2014 U U TOWN� U 0 Nod N I,- O QO j F— _ o X U M LL L a F_ cf) W W C L) LU IL � O 2 co T_ Wat)O Ca J M � 0 X o W U U W > C .M oCJ000 p � a¢owv O WW 2ZW W J 0 ZZ tn= U W ZUw,< d wOCCF�LL z- M K w U ~ W 0 U X Z LU 2 U p W- w W = U w� W 0 K <U�pHw ~ w?z(nZw W - a U F U H Z Q x W O F z x of a W 2¢UW fW-¢ 2 ZI=-W ZwOUz OKX, 02 Z c7 oaQozzQa z�zX0z¢ � Jw= awo O-000� J 2 pLL, W 22 I-pU W=W Q z W w Q LL p W ~— U —_x Z p 0 U 3: Z _ o W a0 W 0OZ xwio W wou U—` W a Z W p W� 0p W z Q H m W H Y pz a tWi 00 a� x�=02�2 CL W W O w 00 }¢¢} O- U O =W�xW2Exz z�>zx=of U F m 0 a p H a O ¢ 0 W a d ¢ LU wpw w } O� HmaQ Q WJF- 0 0 Z w w U== Z z W V O J J U �0�0>� �c�.�=wzo� o� F> U LL, o. O 9 p Z O W a FOp W �U ¢ Wa-�co v7 F-zm= wF¢OO �z�-`U�azUnoZa0�J WpzOUrvam��Fn-mFOoz =�FQ-�-�7gwU wx W ozo.oLL oz z W1xU <'� QawgDa0~Mpo = U L WaOLLLwp Z�<(nZw W mFZ aU1W �2017i H J— W U W =�0—¢ p W W U_(nJ LU Dw p U' " W x 0 F F~ J a a ll w F J W U U W w�_�ZF�=z¢ozapQO E:-:) = � z 50'. ° F c Z,0, 0- 0 o-� W- Oz_U 02 ,-�¢ W Oc~i� -zwmaOaOz W cZn LLJ IU) 00 OfO W U W p0 OO<J U C7 } W� o z W W W z 0¢ w} o U p Z m U p} O cn J>< W z W a W 2�w¢=wX W 2 2aiO�x J w QxaW�2O�a�=awwz== ? w p m w w= w w U 0¢ Z 0 O Z F— _ J LL 0 Q F_ cf) W W J L) LU Z Wat)O D J to J W W > W oCJ000 aJ J > 0 J ~ J J - H 0 N o - Q J M > N T_ T_ I= 2 r m T_ a L � E � o i Q N N D Z 00 0a A4.2 BUILDING SECTIONS