Loading...
HomeMy WebLinkAboutB14-0289 CR1 \ Department of Community Development ' 75 South Frontage Road TOWN OF UAIL '` — � va�i, co s�ss7 Tel: 970.479.2128 www.vailgov.com Development Review Coordinator TRANSMITTAL FORM Use this form when submitting additional information for planning applications or building permits. This form is also used for requesting a revision to building permits. A two hour minimum building review fee of$110 will be charged upon reissuance of the permit. __ _ _ _ _ _ _ _ _ _ . _ Application/Permit#(s)information applies to: Attention: �Rev' ' ns � (� ,_o� ' � � n� � sponse to Correction Letter 1�1� attached copy of correction letter �� �,(. Q Deferred Submittal � 1 `-G �f�� (('�Other Project Street Addrres,,s�: I�_ /�/ ,_ � f-P�v`Z` ?�°,- ��� (Number) (Street) (Suite#) Building/Complex Name: Description of Transmittal/List of Changes, Items Attached: _ _ _ _ __. _.�..... � t�i���i�v5� !a Commr� r� � ~—�4pyFieant Information 141�11.'� • (architect,contractor,owner/owner's rep) Contact Name: � � �� ' �� ' ^ Address: �O�� N• 1"7Zl1Kf/���j� �/• t'��'(! "�1.'7�1�1 ('(N!'71l`(� City ���� State:�_Zip:`�� 6�- �7(L ,�/'IY�'il��`� ` '�O�I�ID 1 I -- ►�-{ r'�ri-��12i°�d 1.—� � ContaCt Name: ��r-{� �U��N (use additional sheet if necessary) Contact Phone: �N" 3��� 1n35 [5 Building Permits: � Revised ADDITIONAL Valuation�(Labor&Materials) Contact E-Mail: ��[�Z�jlN� 0��-�1`Jk�/.('LW`,�DO NOT include original valuation) I hereby acknowledge that I have read this application,filled out Building: $ in full the information required,completed an accurate plot plan, and state that all the information as required is correct. I agree to Plumbing: $ comply with the information and plot plan,to comply with all Town ordinances and state laws, and to build this structure according Electrical: $ to the town's zoning and subdivision codes, design review ap- proved, Int ' nal B �di nd Residential Codes and other Mechanical: $ ordinances f e n pplic ble thereto. � X Total: $� Owner/ wner esen 've +�natura{Required) Date Received: For Office Use Only: Fee Paid: Received From; Cash Check# CC: Visa/MC Last 4 CC# exp.date: Authorization# KNorr LADORATORY, LL� Forensic Engineering d Mimofion Corbin.14242-0814 September 8, 2014 Martin A. Haeberle Chief Building Official Town of Vail 75 South Frontage Road West Vail, CO 81657 Re: B14-0289 Revision 1 Timber Ridge Apartments 1280 North Frontage Road Vail, CO 81657 Dear Mr. Haeberle: Please find our response in reference to your questions documented in your September 2, 2014 letter pertaining to this project. Architectural Comments: Sheet S1 1. Show handrails in compliance with section 1012 IBC 2012 edition. Plans indicate to be removed and reinstalled. • No handrails will be removed during the process of replacing the wood columns. 2. If guards are to be removed and reinstalled need to show compliance with section 1013 IBC 2012. • No guards will be removed during the process of replacing the wood columns. The guards will be disconnected from the existing posts, new posts installed, and the guards reconnected to the new posts. Details of the new connection between the existing guards and new posts have been provided in the drawings. Structural Comments: Sheet SO 1. Engineer of record to identify special inspection criteria on plans. References section 1704.3 IBC 2012 edition. Please note the f c for concrete to help identify required special inspections. • Special inspection is required for the soils only of this project per the 2012 IBC and are detailed in the general notes of the construction documents. • The fc for concrete footings is 5000psi 1 YE,�s 1185 South Tucson Way•Centenniol,[0 80112-3987�p 303.925.1900•f 303.925.1901 www.knoMlab.com SINCE 198Z Martin A. Haeberle Corbin.14242-0814 September 8, 2014 Page 2 of 2 2. Show location of proposed work, typical. • Buildings with Decks to be affected by these plans are shown on S0. The decks are located full length on the southern or northern side of each of these buildings. 3. Clarify snow loading at decking is being addressed in live load data. Reference section 1607.2 IBC 2012 edition. • Snow loading on the decks is assumed to be accounted for within the live load — 60psf(1.5 times the live load of the occupancy served - 40psf), since the decks are beneath covered roofs/decks above. Sheet S1 1. Provide design for reinstallation of handrails as indicate on plans showing compliance with section 1607.8 IBC 2012 edition. • Details for reattachment of guards to decks are shown on S1. Handrails are not altered by this scope of work. Respectfully submitted, KNOTT LABORATORY, LLC PD .���F . , , Stanle II, M.Eng., PE ' �842 ' , � Engineering Manager 'O�•., 9/8/2014 ,'�� o�FSS�ONA1.EN��