HomeMy WebLinkAboutB14-0263 Boiler Venting Info Department of Community Development
, 75 South Frontage Road
TOWN OF UAtI'` � �— ' va�i, co s�ss�
p � Te1: 970.479.2128
(_� www.vailgov.com
Development Review Coordinator
TRANSMITTAL FORM
Use this form when submitting additional information for planning applications or building permits.
This form is also used for requesting a revision to building permits. A two hour minimum building review
fee of$110 will be charged upon reissuance of the permit.
_ _
_ . _ _ _.. __ _ _ _ __
Application/Permit#(s)information applies
to: ` � Attention: Q Revisions
� (�(� �'''�� �Response to Correction Letter
� \ ��- '-� /� . �attached copy of correction letter
P�I �y ���� _ p Deferred Submittal
f�Other
Project St e t Add ess:
1 ���� 1-��r�C�S�'`��
(Number) (Street) (�Suite#)
Building/Complex Name: ��V C/�'-' d� Description of Transmittal/List of Changes, Items Attached:
� _ � _.. __ . _� _ _. ____R�� — g�� C.�- 11�wT►tSU�. ��) �
Applicant Information
(architect,contractor,ownedowner's rep)
Contact Name: 1 )��`��'1 +' �����`��
Address:
City State: Zip:
ContaCt Name: ���� ��.�/� (use additional sheet if necessary)
Contact Phone: e>�,�—��/ � � Building Permits:
Revised ADDITIONAL Valuations(Labor&Materials)
Contact E-Mail: (DO NOT include original valuation)
I hereby acknowledge that I have read this application,filled out Building: $
in full the information required,completed an accurate plot plan,
and state that all the information as required is correct. I agree to Plumbing: $
comply with the information and plot plan,to comply with all Town
ordinances and state laws, and to build this structure according Electrical: $
to the town's zoning and subdivision codes, design review ap-
proved,International Building and Residential Codes and other Mechanical: $
ordinances of the Town applicable thereto.
x Total: $�
Owner/Owner's Representative Signature(Required)
Date Received:
For Office Use Only: � � � � � �
Fee Paid: D
Received From:
Cash Check# y�
CC: Visa/MC Last 4 CC# exp.date: ��� �- � 2�14
Authorization#
TOWN OF VAIL
� 1 Triangle Lane
,� •��° Blackwood,New Jersey
�I Tri a nr.,�1 e z ��,.���`'' 08012
,.._,..„_
Robinson Plumbing&Heating of Squaw Creek
Eagle, Colorado 81631
Subject: Kelton Residence Prestige Solo 110 Venting
tb�j`'1 ld�+�,,''��i},�ik.,�. �.�.:s�_C�.
September 2,2014
�_ Y�-
��,�: v„.
Flex Polypropylene Vent Systems manufactured by Centrotherm Eco Systems and Muelink
and Groi B.V. / Duravent have been tested and approved for use with the Prestige Solo 110. Flex
Polypropylene Vent System installations must follow the vent system manufacturer's installation
instructions as well as meeting all restrictions listed on page 9 of the Prestige PVC, CPVC, PP & SS
Vent Supplement.
Sincerely,
,j
,� ,
t
. ='�d.r�� � s�.!�;«�'',.
Michael Senk
Product Engineer
Pre-Installation Requirements
Fiex Paiypropyfene Vent System Restrictions - Maintain 5�8"psr ioat siope back towarci appiiance on
ail horizontal runs of rigid �lypropylene vent pipe.
- 3" Flex venting is limited up to the PRESTIGE Solo - The use of a wall plate is required to seal rigid
�75 polypropylene vent pipe at the entrance of the chim-
ney or chase to prevent mortar or cement from con-
- 2" Flex venting is limited up to the PRESTIGE Solo tacting the poiypropylene vent pipe.
110 & Exce(lence 110.
- Requires supports(elbow or base, flex chimney and
bracket), spacers, chimney cap and end pipe.
AWARNING Consult vent manufacturer for complete list of other
parts required.
Contact approved polypropylene vent manufacturer
for a capy of their installation instructions. Read, - Any termination piping extemal to the building must
understand and follow all of the vent manufacturer's be UV resistant(black}.
instructions before beginning the installation. _ Do not apply insulatian directly to vent. Maintain
Contact vent manufacturer if you require any techni- vent manufacturers clearances to combustibles.
cal support. Failure to praperty install and support
vent system can lead to carbon monoxide poisoning - Flex plastic venting systems shall not pass through
or fire due to joint separation or pipe breakage. rated fire separations.
- Approved for vertical installations anly, where a - Prior to assembly of any joints, ensure joint gasket is
clean, structurally sound unused chimney or chase present and properly installed. Contact vent manufac-
is used as a raceway. turer if gasket is missing or damaged. Verify the
- Vertical offsets must not exceed 45° and are limited
integrity of joints upon completion of the vent system.
to a maximum number of 2.
- Requires rigid polypropylene vent pipe with locking
band clamps or connector rings and wall straps or
support clamps from the appliance to the entrance of
the chimney or chase.
.
�entrotherm
� Eco 5ystems
Contents of the Kit
� �.._,i
�^ B-Vent Cap
� with Caver
--- i
� � Flex End Pipe
i
�-�-- with Locking
_� f Ring
� (IFEP03 Shown)
I
i
_.._._��
Flex Pipe
—_..------ i25',35'.40'or 50')
_�.—._•- Spacer
� _.._._.__.._ Connector
� _.._..._._.__ B-VendChimney
Gasket
�-------�
I
�
� ' � Base Support
�_ --�
.�
�
------_.J
� _.—_.--- Centrocerin
��
InnoFlue�
Installation Instruttions for the 3" &4" B-Vent Kit
�
;o,
a
�'a
� x
,a+
�LL
7 �
� N
i ,�
,�
0
i�
' o
;�-
�
��
1..�_�i.�i
�—_—�
Installation Instructions
� IMount metal bracket of Base Support
between floor joists and below B-Vent.
,�
� �1 `�'�
2 Cut the Flex Pipe Qust under a male part)at the length of the B-Vent.
Attach a Spacer to liner every 2 meters.Pull Flex Pipe through the
B-Vent,inserting a male end into the Base SUpport.Ensure that the
connector is properly installed.
� � 2,.v.
, _ 1 __
3 Slide B-Vent �
Cap over
FIeX Pipe and
tighten hose
clamp.
4 Snap on Flex
End Pipe
Locking Ring - ��'._
to Flex Pipe. �, � '
u
r, Cut Flex Pipe at t�ap of Flex End Pipe Lacking Ring at �,
recess in corrugations. =` '
0
r�
�
Insert Flex E�d Pipe into B-Vent Cover, � �
screwing in tight.
Attach top of B-Vent Cover.
�
. .... ... . .... . ._........�.�.._._.._.,__�_.._.__..,_._._._...�
F r Coaxial Air Intake,proceed to step 70.Othervvise,install Rigid
ent Length(sold separately)with ConnectoP into Base Support.
Affix the Wall Plate(sold separstely).
Continue with Rigid Vent Lengths and Eibows to appiiance.Refer to
approved appliance matrix for appropriate appliance adaptor.
I F B K43 .� i F B K04
�LEXIBLE
Flex PIpe Inst�lied
Inside Existing
B-Vent
Existing B-Vent
Centrotherm Eco Systems,LLC•75 Champlain Street•Albany,NY 12204•877 434 3432•info�centrotherm.us.com•www.centrotherm.u5.com Page 1 of:
!
�entrotherm
' Eco Systems
�
�
InnoFlue�
Optionai B-Vent Coaxial Air Intake Installation Instruttions
ins�kallation
�:
sY
��I install B-vent Tee(by others)to base af B-Vent.
11
12
Cut hale in tenter of B-Vent T�e Cap(by others)per table.
Verrt Diameter Hole 51ze
�� ,� � 2.82���
3° 3,625"
4° a.8"
Insert B-VenUChimney Gasket(nto newly created hole in
B-Vent Tee Cap.
�"'�'"'� V�nt Diameter Gask�t SKU
2" IACGE02
3'"µ ~ IACG E03
4" IACG E04
13 AttaCh B-V�ent Te+�Cap to B-Vent 7ee(slide�aver Inno-
Flue), InnoFlue shauld pratrude from center of B-Uent
Tee Cap with B-V�nt/Chlmney Gasket fittinp tightly
betvaeen Cap and InnoFlue when installed correctly,
14 I To attach r�turn air rigid pipe:
• Install InnoFlu�Rigid from Air Intake
Callar on appliance fcri�owing "General
installation Instrudions for InnoFlue
Rigid W811„
FLEXIE�LE
. . Page 2 of:
Centrotherm Eco Systems,LLC.75 Champlain Street•Aibany,NY 12204•877 434 3432•info�centrotherm.us.com•www.centrotherm.us.com
�
�
��"
� ��, _:
�
; ���
� v��
�� �} �;:
f,. �
�. ,
� �; ��
�� '� <
'�
���
i�
, _-
��.. . _ �� � ,
��� 'PY�s.*3-y'�„ .,'s°f�3 .. r ...�
�'g 4 -c
� � �
�
�•`' ����
� � �
. .� -.5. � - � .
' ..�.: ..'�': ` -�� .-w'•�;'-"- ..
, .. _,..-.._.n....v.v�, .,... . .. �..
' °.. .
�,
��
,�� .
a�� ��
W�,�tp g�. . . .. .
..., `�{:'. . . . .
�.;
�
� `
_. r.