June 12, 2014
R.A. Nelson &Associates
Attn: Mike Kowalski
P.O. Box 5400
Avon, Colarado 81620
i}tf.'��n�alsl:i(u�rt_uielsi;n.c:mi
Job No. 112 316C
Subject: Masonry Construction Observation and Reinforcement Stee1 Inspections
Completion Letter, Gerald R. Ford Amphitheater Phase II Improvements,
530 South Frontage Road East, Vail, Colorado
Gentlemen:
As requested, we are providing a summary of our observations provided for the above
referenced project. The reports of the services requested and performed for the project
are attached for reference. The services were performed in accordance with our
agreement for services with R.A. Nelson&Associates dated October 31, 2013.
The observations were inade on a daily basis when requested between February 18 and
March 14, 2014. A total of 6 masonry construction observations and 3 reinforcement
steel inspections were inade. All of the observed construction met the specification
except for the reinforceinent steel inspection on March 6, 2014 which was missing one
bar and was reported to the contractor.
Based upon inferences drawn from our observations, as documented by the attached daily
field reparts, it is our professional opinion that the referenced construction has achievcd
the specified conditions except for the one reinforcement bar noted. Please recognize that
construction observation and testing are sampling functions that involve direct
observation and testing of very limited amount of the overall work to evaluate the
construction compliance.
If you have any questions or need further assistance, please call our office.
Sincerely,
HEPWORTH—PAWLAI{ GEOTCHNICAL, INC.
_ .�"ENj``:`Q;��
i 6�&R• �%. ��
~ 'ko 152,�.3 �
Steven L. Pawlak, P.E. ���/„_ //�t
LI R
SLP/ksw ��.FSSfopA���>'Op
qpf.. .o.... �Q
Attaclunents: Masoruy Con rvation and Reinforcement Steel Inspection
Reports: 2/18/14 through 3/14/14 (total of 9)
Pa�rl:c� iO3-�{1-i I1�) • Cul��r.�d�� 5prin��s 71)-633-55v2 • Sil��crthurne 910-�}6ti-I)�J
5020 CounEy Road 154
�t � Pho e�970-945�7988 O 87601
HEPWORTH-PAWLAK GEOTECHNICAL Fax:970-945-8454
i.y��.� �r�ii�i)�iqO1CO�Lf.p111
MASOfVRY COldS�"R!lCTBON ���ER!lqTl01� R�PORl°
Client: R. A. AJelson & Associates Job No. 112 316C
Attn: �e��iis ilif�ea uay: ►ueseiay
P.O. Drawer 5400 Date: 2/18/14
Avon, Colorado 81620 Sheet: 1 of 1
Project: Gerald R. Ford Amphi4heater Phase II Improvements, Ford Park, 530 South Frontage
Road East, Vail, Colorado
Masonry Contractor:Berich Masonry
Weather Partly cloudy, windy, dry Temperature: in tent 65° F
Times of Observation: 4:OOp
A: Concessions, South Wall
Location(s) of Work Observed: B:
C:
A: 4'
Elevation(s): g:
C:
_ _ _-- __,.._ _ °__—_,. . _ -
A B C Remarks
Nom. CMU Size: g"
CMU Laid surface Dr : X
Full Face Shell Mortar Bed Joint: X
Full Mortar Head Joint: X
Cells Clear of Debris: X
Cleanouts Provided:
Size: �q
Vertical Reinforcement: Spacin 1' -4"
Lap: 24„
Centered: x
Grouted: X
Grout T pe (coarse /fine :
Hei ht of Grout Liit: 4�
Bar Size: 2-#4
Ciond Beam Reinforcement: La : Z4��
Lap @ Corner: 24°°
[;routed: „
Grout Sampled:
Notes:
Distribuiion:
f�A Nelson&Assoniates- 6ennis Ward (dward@ranelson.com)
�A Nelson &As�ociates—Mike KowalsE:i (mkowalski@rancison.com)
Justin Orgill D�wid A, Youn P.�e
Field Technician R�vievded By
�� 5020 Coun4y Road 154
`�' � Glenwood Springs, C8 81601
Phone: 970-945-7988
HEPWORTH-PAWLAK GEOTECHNICAL Fax: 976-945-8454
. ., ,u;lu�;b: ,� .:.!;.,. .nl
!YI!'le3�li![S� b�ltl�7 E SEVFr 9 ��ltl ��a7�Rd€'9��E21tl 6F6r�TE A
Client: R. A. Nelson & Associates Job No. 112 316C
�if�: E3�6„ii� E"va�€� Day: ifJeanesday
P.O. Drawer 5400 Date: 2/19/14
Avon, Colorado 81620 Sheet: 1 of 1
Project: Gei•ald R. Ford Armphifheater Phase II Improvements, Ford Park, 530 South Frontage
Road East, Vail, Colorada
Masonry Contractor:�erich Masonry
Weather Cloudy, Iighf breeze, dry Temperature: in tent 70° F
Times of Observation: 10:30a/2:30p/4:30p
A: Concessions, Middle Wall
Location(s) of Work Observed: B: Concessions, 5outh Wall
C:
A: 4'/8'/TOW
Elevation(s): g: g�
C:
_ -- . _._. , . .-..
A B C Remarks
Nom. CMU Size: 6" 6"
CMU Laid surface D : x x
Full Face Shell Mortar Bed Joint: x x
Full Mortar Head Joint: x x
Cells Clear of Debris� x x
Cleanouts Provided:
Size: #4 #4
Vertical Reinforcement: S acin : 1' -4" 1' -4"
Lap: Zq�� 24"
Centered: x x
Grouted: x x
Grout T pe coarse /fine):
Hei ht of Grout Lift: 4'/4'/20" 4°
Bar Size #4 #4
Bond Beam Reinforcement: La : 24" 24"
Lap @ Corner: 24°' 24'°
Grouted: ^ x
Grout Sampled: M .
Notes: xAM grout sampleel only
Disfribution:
RA Nelson&Associates -Qennis Ward (��Ward,(rDranelson com)
RA Nelson&Associates—Mik� Kowalski (mkowalskl(�ranelsora,corii)
Jea�firs Orgill David �. Young p �
Field Technician Revi�w�d By
�� 5020 CounYy Road 154
� Glenwood Sprinys,CO 89601
Phone: 970-945-7988
HEPWORTH-PAWLqK GEOTECHNICAL Fax:970-945-8454
ii;,�ir_vr,���," . . , .,__ ��in
I fVlASOIVRY CONS7RlIC1'10�1 O��ERVATIOIV l��PORT
Clien4: 12. A. Nelso� & Associates Job No. 112 316C
A'�ti'i: �EfSFif� W�PCI Day: I hurscfay
P.O. Drawer 5400 Date: 2/20/14
Avon, Colorado 81620 Sheet: 1 of 1
Project: Gerald R. Ford Amphitheater Phase II Improvement�, hor�l T��rk, a3� �a�sC� F�ontage
Road East, Vail, Colorado
Masonry Contractor:Berich Masonry
Weather Cloudy, lighi breeze, dry Temperature: in tent 70° F
Times of Observation: 10:30a/2:30p
A: Concessions, Top Wall above window
Location(s) of Work Observed: B: Concessions, South Wall
C:
A: TOW
Elevation(s): B: TOW
C:
-°— ---°
-- _.,. --
A B C Remarks
Nom. CMU Size: 6" 6"
CMU Laid surface Dr : x x
Full Face Shell Mortar Bed Joint: x x
Full Mortar Head Joint: x x
Cells Clear of Debris: x x
Cleanouts Provided:
Size: #3 #4
Vertical Reinfiorcement: S acin : g°° ry• _4��
Lap: hooked 24"
on bond
beams
Centered x x
Grouted: x x
Grout T e (coarse /fine):
Height of Grout Liff: 8°° lifts 4°
�28„
total
13ar Size t� ,�q�
Bond Beam Reinforcement: La : 24" 24"
Lap Corner: 24'° 24°'
Grouted: X
Grout Sampled: X
Noies: *see structural drawings foe bond bearrs �chedule and �fe festo ca�tilLVer
Distribution:
RA Nelson &Associates - f3enrois Ward (dward@ranelson.com)
RA Nelson &Associa4es—Mike Kowalski (nikowalski@ranelson.cobn)
Justis� Orgill David �1. Youne� P.�.
Field Technician Revi@wed 13y
�� 5020 County Road 154
� Glenwood Sprinys,CO 81601
Phone: 970-945-7988
HEPWORTH-PAWLNK GEOTECHNIrAL Pax: 970-945-8454
iip�.����,��.,iji�.,,�;c�iecl�,c<,�n .
7NiWa7�AV f�Y ��9�ia� 9 �i9a�i�fi�eV ��.7�Y��✓�"i�l�fli ��P''�P��
Clien4: R. A. P7elson & Associates Job No. 712 316G
A[itn: Dennis �ard Day: ��°iday
P.O. Drawer 5400 Date: 2/21/14
Avon, Colorado �1620 Sheei: 1 of 1
Project: Gerald R. Ford Arnphi4heater Phase II la5a��r�es��avent�, �ord E�a�SC, ��0 South Frontage
Road East, Vall, Colorado
Masonry Contractor:�erich Masanry
Weather Partly cloudy, light breeze, dry Temperature: in tent 70° F
Times of Observation: 9:OOa
A: Concessions, cantilever
Location(s)of Work Observed: B:
C:
A: first course
Elevation(s): g;
C:
--- _ - _° °°-•-°
A B C Remarks
Nom. CMU Size: g��
CMU Laid surtace Dr : X
Full Face Shell Mortar Bed Joint: X
Full Mortar Head Joint: X
Cells Clear of Debris: X
Cleanouts Provided:
Size: #3
Vertical Reinforcement: S acing: g�•
Lap: hooked
on bond
beams
Cenfered: X
Grouted: X
Grout T pe (coarse /fine):
Hei ht of Grout Lift: 8" lift
Bar Size: #4*
Bond Beam Reinforcement: Lap: Zq��
I_ap @ Cn;-ner: ?4,•
Grouted: x
Grout Sampled: &
Notes: `see struetural drawinc�s for bond bearrs schedule.
Disfribution:
RA Nelson &Associates -Dennis Ward(dward(a�ranolson_can)
RA Nelso�i &Associafes—Mike Kowalski(inkowalskl(rDranelson.com)
Jaastin Orgill Davad A. �dous�q P.�.
rield 7echnician R�viewed By
� 5020 Gounty Road 154
�� � Glenwood 9prings,CO 89601
Phone: 970-945-7988
H�.PU�ORTH-P;�WL,^-,K Gc(JT,EC;-!p!!Cq� I=ax: 970-945-8454
. . :."r,i�Iir�C.dri:l�.i.��ni
M�,SONRY COIV�TRUCTION O�SERVi�TION R�PORT
Client: RA Nelson Job No. 112 376C
Attn: Dennis Ward Day: Thursday
P.O. Drawee 5400 Date: 2/27/14
Avon, Colorado 81620 Sheet: 1 of 1
Project: Gerald R. Ford Amphitheater Phase II Improvements, Ford Park, 530 South Frontage
Road East, Vail, Colorado
Masonry Contractor:Berich Masonry
Weather Cloudy, light breeze, dry Temperature: in tent 70°
Times of Observation: 11:30a
A: Concessions, Cantilever
Location(s) of Work Observed B:
C:
A: 2nd course to TOW
Elevation(s): g:
C:
_ _ :_- °°-._ —.. _
A B C Remarks
Nom. CMU Size: g��
CMU Laid surface Dr : X
Full Face Shell Mortar Bed Joint: X
�ull Mortar Head Joint: X
Cells Clear of Debris: X
Cleanouts Provided:
Size: #3
Vertical Reinforcemenf: S acing: g��
Lap: hooked
on bond
beams
Centered: X
Grouted: X
Grout T pe (coarse /fine
Hei ht of Groui Lift: g�� �ifts
Bar Size: #4k
Bond Beam Reinforcement: Lap: Zq��
Lap @ Corner: 64°'
Grouted: X
Grout Sam led: X
Notes: "see structural drawings for bond beam �chedule as well as sheet No. SSK4 dated
2/24/14 fior updated changes.
Distribution:
RA Nelson &Associates -Dennis Ward(dward@ranelson.com)
f?R Nclson k Assaciates—Mike Kowalski (�nkowalski@ranelson.com)
Ja��tifa �rcjil9 �avid A. Youe�g P.�
Field I�chnician �eviewed By
� 5020 Coun'ry Road 154
� � Glenwood Speings, CO 81601
Phone: 970-945-7988
HEPWORTH-PAWLAK GEOTECHNICAL Fax:970-945-8454
I�pr�ca;±Zuh,;�q,.uic.�,fi.uqm
NIA�O�lRY �OryS`TRUCTIO�! O�SE�l�^,-.Tl09�! R�PORT
Client: R. A. Nelson & Associates Job No. 112 316C
f�itn: �ennis Viiarcf Uay: Tuesday
P.O. Drawer 5400 Date: 3/4/14
Avon, Colorado 81620 Sheet: 1 of 1
Project: Gerald R. Ford Arnphitheater Phase II Imprrovements, Ford Paek, 530 South Frontage
Road East, Vail, Colorado
Masonry Contractor: �erich Masonry
Weather Cloudy, light breeze, dry Teinperature: in tent 70°
�Cimes of Observation: 10:30a
A: Concessions, Cantilever Pilaster
Location(s) of Work Observed: B:
C:
A: TOW
Elevation(s): g:
C:
-- --- -_.. ° - -°-- _:
° -
A B C Remarks
Nom. CMU Size: g�
CMU Laid surtace Dry: X
Full Face Shell Mortar Bed Joint: X
Full Mortar Head Joint: X
Cells Clear of Debris: X
Cleanouts Provided:
Size: #6/#3• `#3 hook bars grouted
Vertical Reinforcement: into existing wall every
vertical 2'
S acin :
Lap:
Centered: X
Grouted: X
Grout T pe(coarse /fine):
Hei ht of Grout Lift: 8°' lifts
6ar Size:
6ond Beam Reinforcement: Lap:
La @ Corner:
G�outed:
Grout Sampled: X
Nates: "�see sheet fVo. SSK4 dated 2/24/14 for updated cantilever changes.
Distribution:
RA Plelson&Associa4es -Dennis Ward �Jward a�ranelson,com)
i2A PJelson &Associaies-Mike Kowalski(inkowalskino ranelson.com)
Justir� Orgill David A. Your�c�, P.�.
Field Technician Reviewed By
�� 5020 County Road 154
� Glenwood 3hrings, CO 89601
Phaie:950-945-7988
HEPWORTH-PAWLAK GEOTECHNICAL r�x: 970-945-8454
REINFORCENIENT S7EEL IfVSPECTIOfV REPORT
Client: R. A. Nelson & Associates Job No.: 112 316C Day: Thursday
Attn: Dennis Ward Date: 3/6/14
P.O. Drawee 5400 Page: 2 of 2
Avon, Colorado 81620
Project: Gera�d 12. �ord Amphitheater Phase II Improvements, Fard Park, 530 South Fro�rtage
Road East, Vail, Colorado
Area of InspecYion: Pile Cap #1
Reference Documents Structural drawings provided by Gallegos dated 07/01/13
Used:
Inspection Status: � Preliminary ❑ Final
❑ Concrete reinforcement as noted above was judged to be in reasonable conformance with fhe
referenced construction documents.
� Exceptions Noted: 1-#4 tie at top of verts was missing.
Verbal Jerimiah with Gallegos and Dennis with RA Nelson were informed of our
Communication: inspection results. Gallegos informed us that the tie would be fabricated
and installed prior to concrete placement.
Distributian:
RA Neison&Associates -Dennis Ward dward(�ilranelson com)
L--
RA Nelson&Associates—Mike Kowalski mkowalski anranelson.com)
Justin Orgill David A. Youn P �
Fi�id 7ech7�aan °�vievded �y
5020 Caunty Road 154
�� � Glenwood Springs, CO 8160h
Phone: 970-945-7988
NEPWORTH-PAWLAK GEOTECHNICAL Fax: 970-945-8454
I i�!qrin.rOhprinq[,n,rh.rODl
REINFORCEMENI' STEEL IN�PECTiON R�POR7
Client: R. A. Nelson & Associates Job No.: 112 316C Day: Monday
Attn: Dennis Ward Date: 3/10/74
P.O. Drawer 5400 Page: 1 of 1
Avon, Colorado 81620
Project: Gerald R. Ford Amphitheater Phase II Improvements, Ford Park, 530 �outh Frontage
Road East, Vail, Colorado
Area of Inspection: Pile Caps#7 and #2
Reference Documents structural drawings provided by Gallegos dated 07/01/13
Used:
Inspection Status: ❑ Preliminary � Final
� Concrete reinforcement as noted above was judged to be in reasonable conformance with the
referenced construction documents.
❑ Exceptions Noted:
Verbal Jerimiah with Gallegos and Dennis with RA Nelson were inofrmed of our
Communication: inspection results.
Notes: Ground wire was in place prior to concrete placement
Distribution:
RA Nelson &Associates - Dennis Ward(��Ward(u�ranelson com)
RA Nelson&Assaciates—Mike Kowalski(���kow.�lski ranolson.cprn) -
_�...__--- --
Justin Orgill David A. Young P E
rield Techiiician Reviewed By
�°'� 5020 County Road 154
�� � Glenwood�prings, C�81609
Phone: 970-945-7958
HEPWO�iTH-PAWLAK GEOTECHNICAL Fax: 970-945-8454
!t�]rir:r�ouh7,��r.�;t-.�.f;. :o�u
REINFORCEMENT STEEL IIVSPECTION REPORT
Client: R. A. Nelson & Associates Job No.: 112 316C Day: Friday
Attn: Dennis Ward Date: 3/14/14
P.O. Drawer 5400 Page: 1 of 1
Avors, Colorado 51620
Project: Gerald R. Ford AmphitheaYer Phase II Improvements, Ford Park, 530 South Frontage
Road East, Vail, Colorado
Area of Inspeetion: Pile Caps #6 and #7
Reference Documents Structural Drawings provided by Gallegos dated 07/01/73
Used:
___ __ __
Inspection Status: ❑ Preliminary � Final
� Concrete reinforcement as noted above was judged to be in reasonable conformance with the
referenced construction documents.
❑ Exceptions Noted:
Verbal Dennis with RA Nelson was inofrmed of our inspectfon results.
Communication:
Distribution: _ _ _
RA Nelson &Associates-Dennis Ward(��,y��d(cDranolson com)
RA Nelson&Associates—Mike Kowalski (ipkowalski�ranelson.c�in)
Justin Orgill Daviel A. Young, P.�.
Field Technician Reviewed By