COMBINATION BLDG PERMIT Permit #: B14-0391
Project #: PRJ14-0541
Job Address: 1750 S FRONTAGE RD W VAIL Applied.....: 10/02/2014
, Location......: Spruce Creek Townhomes B-2 Issued. . . : 11/11/2014
Parcel No....: 210312317006
OWNER ACSM LLC 10/02/2014
PO BOX 8485
SPRING
TX 77387
CONTRACTOR DGN INC. 10/02/2014 Phone: 970-904-0062
L JASON NOBREGA
PO BOX 6158
� VAIL
CO 81658
License: C000003929
Description:
Remodel two bathrooms.Work includes replace fixtures. Tubs
to be cnverted to showers. Remove sauna in master bathroom.
New electrical swtiches in entire unit.
Occupancy: R-2 Type Construction: VA Valuation: $20,000.00
.........................,........�.................,......».....,xx,.x..==,_...., FEE SUMMARY .......��,...,.,,.,,,....,...<.,....,.,......,,,..,......>_..�...,................
Building Permit-----------> $321.25 Bldg Plan Check----------> $208.81 Use Tax Fee-----------------------> $200.00
Electrical Permit---------> $86.25 Elec Plan Check-----------> $56.06 Restuarant Plan Review--------> $0.00
Mechanical Permit------> $0.00 Mech Plan Check---------> $0.00 Additional Fees--------------------> $0.00
Plumbing Permit--------> $150.00 Plmb Plan Check---------> $37.50 Recreation Fee--------------------> $0.00
Investigation-----------------------> $0.00
Will Call------------------------------> $15.00
� TOTAL PERMIT FEES--------------> $1,074.87
Payments-------------------------------> $1,074.87
BALANCE DUE------------------------> $0.00
.....x.................xx..............�.,,x.x........,................xx...�.............xx...x.x......,..«.�.........xxx.....,......................_..._......�................,.z.
DECLARATIONS
I agree to comply with the information and plot plan, to comply with all Town ordinances and state laws, and to build this structure
according to the town's zoning and subdivision codes, design review approved, International Building and Residential Codes and
other ordinances of the Town applicable thereto.
REQUESTS FOR INSPECTION SHALL BE MADE TWENTY-FOUR HOURS IN ADVANCE BY TELEPHONE AT 970.479.2149
OR AT OUR OFFICE FROM 8:00 AM -4:00 PM.
combination permit_012811
i
.: ' . ,�
�
��V� I+��. 1 .
.+.�x.a.....r.<.w...ww..�.�+x:�>���x�ra,rw�>.+.+ee...+.+:r+.�+r�.���s.s.�:�a�s.,r�ax.�xs..��.��+�.........,e.+.x�v.x.,r���s.���+.+r.�t�+x���..+.<.w..eew+w«r..,r..�>�,r�+s.x�+��+��xxxs.xxx��x���w�xxx
CONDITIONS OF APPROVAL TO BE MET PRIOR TO FINAL SIGN OFF
�
Permit#: B14-0391 Address: 1750 S FRONTAGE RD W VAIL
Owner: ACSM LLC Location: Spruce Creek
Townhomes B-2
.,,......................................x...,..,.............,.,...,.x.........�...........,.....,..,,,,�x......>..w.......,..........,.,,.,:x.,........,.......,.,..................
combination permit_012811
I
, i
�
�����1�L �
**.,.««***««««««**«*********««.**..*****,�***.**.««*****,,,+««*««***«****«««******�«****.«****«*�*******.,****«**«*****«««******«****�*«,+*****«********«««
REQUIRED INSPECTIONS AND STATUSES
�
Permit#: B14-0391 Address: 1750 S FRONTAGE RD W VAIL
Owner: ACSM LLC Location: Spruce Creek
Townhomes B-2
*.**.*.********«**********�**************�****�*********************„*******.**********************,.******„***„*«**«**«********««.,*****«*„***««,.,****
Item: 00120 ELEC-Rough
Item: 00220 PLMB-Rough/D.W.V.
Item: 00230 PLMB-Rough/Water
Item: 00030 BLDG-Framing
Item: 00060 BLDG-Sheetrock Nail
Item: 00050 BLDG-Insulation
Item: 00070 BLDG-Misc.
Item: 00190 ELEC-Final
Item: 00290 PLMB-Final
Item: 00090 BLDG-Final
combination permit_012811
i
�
�� �� Department of Community Development
f / � 75 South Frontage Road
���� �� �k��� v Vail, CO 81657
Tel: 970-479-2128
www.vailgov.com
Devetopment Review Coordinator
BUILDING PERMIT APPLICATION
(Separate applications are required for alarm &sprinkler)
,Project Street Address: Project#: ��� � � �
1750 West Frontage RD South g2 �
(Number) (Street) DRB#:
(Suite#)
'Building/Complex Name: Spruce Creek Townhomes Building Permit#: ��"l �d�3��
;Contractor Information Lot#: Block# Subdivision:
Business Name: DGN Inc. �� TF-�I P��Z.
Business Address: P•O. box 1292 'Work Class: New(�j Addition�j Alteration(�
'City Vail State: C� ZiP; 81658 Type of Building:
Ja Nobre a Single-Family�j Duplex�) Multi-Family(�j
Contact Name: Y 9
Commercial� Other�j
Contact Phone: 970-904-0062
Contact E-Mail: Jay@vailconstructiongroup.com Work Type: Interior� Exterior� Both�
I hereby acknowledge that I have read this application,filled out Valuation of '
' in full the information required,completed an accurate plot plan, Work fncluded Plans Included Work
' and state that all the information as required is correct. I agree to
comply with the information and plot plan,to comply with all Town Electrical �i Yes �)No �i Yes �No 5000.00
ordinances and state laws, and to build this structure according to Mechanical �Yes �i )No �Yes QNo
the town's zoning and bdivision codes, design review ap-
' proved,Intemational uilding and Residential Codes and other Plumbing �Yes �jNo �Yes �No 10 00.00
ordinances of the T4wn applicable thereto.
' g Building �i Yes �No �Yes QNo 5000.°�
'^'R ` •-�°" Value of all work being performed: $ 20000
Owner/Ow r's Representative Signature(Required) (value based on IBC Section 109.3&IRC Section 108.3�
Electrical Square Footage 1400
Applicant Information Detailed Scope and Location of Work:
'Applicant►vame: Jay Nobrega Remodel of finro bathrooms. New plumbing fixtures in
Applicant Phone: 970-904-0062 Baths. Fixture locations to remain the same. Tubs to be
Applicant E-Mail: lay@vailconstructiongroup.com converted to showers. New electrical switches entire
Project Information ���� �� unit. Remove sauna in Master Bath
Owner Name: �'�fi j
'!:Parcel#: 2103-123-17-006
;,(For Parcel#,contact Eagle County Assessors Office at(9T0-328-8640 or visit
l www.eaglecounty.us/patie)
- (use additional sheet if necessary)
For Office Use Only: �/7
Fee Paid:�,���•`}`� Date Recei � � � Q ��/ �
Received From: �
Cash Check# -� °� ;�'
��,��` � �� :�(f�l�.
CC: Visa/MC Last 4 CC# exp date:
Auth #
TOWN OF UAIL
12-Mar-2012
State of Colorado
Asbestos Testing &Abatement Requirements
Asbestos testing and abatement protects workers, homeowners, neighbors and emergency services responders from ex-
posure to harmful asbestos. It is your responsibility to be in compliance with the State. Please contact the State directly
for their requirements at the contact info listed below.
When is asbestos testina reauired?
ANY building projects disturbing more than these threshold levels of building materials require asbestos testing:
One- and Two-Family Dwellings: 32 square feet
All Others(commercial spaces, hotel rooms, etc): 160 square feet
Definition of a single-family dwelling: any dwelling unit that is used primarily for a single family, including
multi-family/condominium units,and fractional fee units.
Asbestos testing results must be provided with your application for a building permit.
Tests which identify POSITIVE results at more than 1% require abatement by a State-certified abatement contractor. The
air clearance letter or form must be submitted to the Town of Vail before the building permit will be issued.
Project Checklist
My project falls into the category checked below:
� Will not disturb more than the threshold limits identified above.
� Tested negative, or at 1% or below (1 copies of test results included)
� Tested positive at more than 1%, requires abatement (1 copies of test results included)
Tips&Facts:
. Even recent construction projects may include asbestos-containing materials, so buildings of�age require testing.
. The"1989 Ban" on asbestos-containing materials is commonly misunderstood. "In fact, in 1991 the U.S. Fifth Circuit
Court of Appeals vacated much of the so-called "Asbestos Ban and Phaseout" rule and remanded it to the EPA. Thus,
much of the original 1989 EPA ban on the U.S. manufacturing, importation, processing, or distribution in commerce
of many asbestos-containing product categories was set aside and did not take effect." -CDPHE
Asbestos test results should be submitted to: Town of Vail, Community Development, 75 S Frontage Rd,Vail, CO, 81657.
Town of Vail Contact• State of Colorado Contact:
Fire Prevention Bureau . Colorado Department of Public Health
Vail Fire Department and Environment
75 S Frontage Rd Asbestos Compliance Assistance Group
Fire_inspectors@vailgov.com 303-692-3158
970-479-2252 asbestos@state.co.us
www vailaov.cam www cd�he stat�.co.us
Ol-Jan-11
�� � ��� �
�
� � _ : �
� � � �
�
� � �
�
Asbestos Inspection and Sampling Report
1750 S Frontage Road, B2,Vail, Calorada 81657
Spruce Creek Condominiums
Presented To:
Mr.Jay Nobrega
Crossroads Realty Ltd.
1650 Vail Valley Drive
Fallridge, Suite C-3
PO Box 1292
Vail, CO 81658970-904-0062
�avC�crossroadsvail.com
Prepared By:
Mr. Brandon Sinkbeil
DS Consulting,Inc.
PO Box 6864
Avon, CO 81620
Office: 970-274-8859
Brandon@dsconsultinginc.com
Project Details:
Project Number: 10851
Conducted: September 20, 2014
� �� '� '��-z� �
TABLE OF CONTENTS
PROJECT OVERVIEW
1.0 Introduction
2.0 Scope of Work
3.0 Site Description
4.0 Certifications
5.0 Inspection,Sampling&Analytical Procedures
5.1 Inspection Procedures
5.2 Sampling Procedures
5.3 Analytical Procedures
6.0 Homogeneous Areas
6.1 Material Friability
6.2 Material Classifications
6.3 Material Conditions
6.4 Sample Quantities
7.0 Overview of Findings
8.0 Conclusion&Recommendations
9.0 Asbestos Abatement&Demolition Requirements
10.0 Major&Minor Asbestos Spill Response Actions
11.0 Disclaimer&Limitations
12.0 Project Design&Project Manager Requirements
13.0 Copyright Notice
APPENDIX A Inspector&Firm Asbestos Certificates
APPENDIX B Analytical Data
2
PROJECT OVERVIEW
1.0 Introduction
On September 20, 2014, Mr. Brandon Sinkbeil with DS Consulting, Inc. (DSC) conducted a limited
asbestos inspection and collected asbestos bulk-samples of suspect asbestos-containing materials (ACM)
within specific portions of the single-family residence located at 1750 S Frontage Road, B2, Vail,
Colorado,as defined by the client.
The purpose of the limited inspection was to identify and sample potentially hazardous friable and non-
friable ACM that will be impacted by upcoming remodeling and renovation activities. Asbestos bulk-
samples were collected of the textured drywall on the back-splash and tub-surround walls in the
bathrooms. All of these samples were found to be none-detected for asbestos.
2.0 Scope of Work
The scope of the limited inspection and bulk-sampling was limited to specific areas and materials of the
residence defined by the client as listed above. The remaining areas and materials within the residence,
garage or any out-building on the property were not included in the scope of the inspection. The limited
asbestos inspection did not constitute a full building inspection and does not fulfill the asbestos
inspection requirements for structures that are to be demolished.
3.0 Site Description
The residence is a multi-story wood-framed, single-family condominium in a larger, multi-unit complex
with an attached garage.
4.0 Certifications
The limited asbestos inspection and bulk-sampling was conducted by Mr. Brandon Sinkbeil with DSC.
DSC is a Colorado Department of Public Health and Environment (CDPHE) certified Asbestos Consulting
Firm, Registration No. 14912. Mr. Sinkbeil is a CDPHE certified Building Inspector; having certification
number 134452 (see Appendix A for certificates).
5.0 Inspection, Sampling& Analytical Procedures
5.1 Inspection Procedures
The limited asbestos inspection was conducted by an Environmental Protection Agency (EPA) and
CDPHE certified Building Inspector. The inspection procedures included identifying and sampling
suspect ACM within the pre-defined areas, submitting samples to an accredited laboratory for analysis,
classifying the materials and assessing their condition, and compiling a final report detailing the
inspection and the analytical results of the bulk-samples.
5.2 Sampling Procedures
Statistically random bulk-samples representative of the suspect ACM of each homogeneous area were
collected according to the guidelines published as EPA Final Rule: Title II of the Toxic Substances
3
Control Act (TSCA), 15 USC, Sections 2641 through 2654 and in compliance with 40 CFR, Part 763 and
CDPHE Regulation Number 8, Part B -Asbestos (Reg. 8).
DSC has collected the appropriate number of bulk-samples to meet all regulatory requirements for the
classification and quantity of each homogeneous area. Some minor destructive sampling was
conducted; however, walls, columns and perimeter pipe chases were not broken into in order to locate
and quantify suspect ACM. It should be noted that additional ACM might be located in these and other
inaccessible areas.
5.3 Analytical Procedures
All asbestos bulk-samples were analyzed by a National Voluntary Laboratory Accreditation Program
(NVLAP) accredited laboratory via Polarized Light Microscopy (PLM) for asbestos content (see
Appendix B for laboratory report).
The percentage of asbestos within each individual bulk-sample can vary depending on sample location,
homogeneity of the material, and the type of application. Any sample reporting a "TRACE" amount of
asbestos must be considered positive for asbestos greater than 1% unless it is re-analyzed utilizing the
point-count method and verified to be less than 1%.
Materials containing less than 1%asbestos are not regulated by CDPHE Regulation 8, Part B -Asbestos.
However, all demolition/abatement activities should be performed following the applicable
Occupational Safety and Health Administration (OSHA) regulations. This would include,but not limited
to,the appropriate asbestos training for the type of material being removed/disturbed as well as having
a properly trained supervisor onsite, using wet removal methods, wearing adequate personal
protective equipment (HEPA-filtered particulate respirators), medical surveillance of workers,
personal-exposure air monitoring, area air monitoring in occupied buildings, etc. There may also be
landfill disposal requirements for these materials, depending on the facility. DSC recommends that all
demolition/renovation areas involving any amount of asbestos be subjected to visual inspections and a
final clearance air testing by a CDPHE-certified Air Monitoring Specialist (AMS) after the work has been
completed,but before any containments are dismantled and the area is reoccupied.
6.0 Homogeneous Areas
A Homogeneous Area (HA) includes materials that are uniform in appearance, color, texture and date of
application. The asbestos content of the bulk-samples collected within a homogeneous area can be
applied to the entire homogenous area if they conform to the above characteristics and the regulated
minimum sample quantities of each type of material are collected and analyzed.
6.1 Material Friability
A material can either be friable or non friable. A friable material is one that, when dry, can be
pulverized, or reduced to powder by hand pressure, a non-friable material cannot. A non-friable
material may become friable if its condition had deteriorated or has been impacted by forces that have
rendered it friable.
6.2 Material Classifications
Sampled materials are divided into one of the following three categories:
• Surfacing Material: sprayed or troweled onto structural building members
• Thermal System Insulation (TSI): any type of pipe,boiler,tank,or duct insulation
4
• Miscellaneous Material: all other materials not classified in the above two categories
6.3 Material Conditions
Sampled materials are placed into one of the three following categories of conditions:
• Good: none to very little visible damage or deterioration
• Damaged:the surface is crumbling,blistered,water-stained,gouged, marred or otherwise abraded
over less than one-tenth of the surface if the damage is evenly distributed, or one-quarter if the
damage is localized
• Significantly Damaged: the surface is crumbling, blistered, water-stained, gouged, marred or
otherwise abraded over greater than one-tenth of the surface if the damage is evenly distributed,
or one-quarter if the damage is localized
6.4 Sample Quantities
DSC collected at least the minimum number of samples from each homogeneous area necessary to meet
all regulatory requirements for the quantity of material to be disturbed. The quantities listed in this
report are approximate and on-site verification of the exact quantity of each material is required. The
following outlines the minimum sample quantities required per homogeneous area:
. Surfacing Materials: up to 1,000 ftz of material requires a minimum of three (3) samples; between
1,000 ftz and 5,000 ftz of material requires a minimum of five (5) samples; over 5,000 ft2 of
material requires a minimum of seven (7) samples; one (1) sample of each patch
• Thermal System Insulation (TSI): each homogeneous area requires a minimum of three (3)
samples; at least one (1) sample must be collected from each patch; and collect enough samples
sufficient to adequately assess the material and determine the asbestos content for TSI fittings
such as pipe elbows or T's.
• Miscellaneous Materials: collect enough samples sufficient to determine the asbestos content
7.0 Overview of Findings
DSC collected a total of three (3) asbestos bulk-samples of one (1) homogeneous area. Asbestos bulk-
samples were collected of the drywall texture found throughout the bathroom areas of the residence. All
of these samples were found to be none-detected for asbestos.
Table 1 below describes the materials composing each homogeneous area as well as the locations of each
bulk-sample collected. Also listed is the classification, condition, friability and estimated quantity of
material to be removed and/or disturbed, as well as the asbestos content within each bulk-sample.
Please see Appendix B:Analytical Data for the layer break-down of each bulk-sample.
5
� �' � � Z �
a � d �
, , ,
od od ot7 b � � o 0
o � o � o � � � � o
W N �"' ¢' [�D
� n
f0 \ � Q
� � � � d � b � ' C 'Y y
� � � � � � � �
a �
� a
w x a� x' �, x' �. �'�„ �o
'Q � � �
w o � o � o o '^" �
�. � o- � � � � �
o � o -3 0 � �
�
�. � �. � � � m
� k
n � o � o �
� a' � a' '� ¢,
� C7 G'�
O. �. O.
' l� G�
�.� �.� o O � � � �.
� � �a vo
�n �' �n p,' '�,Y �'� � ¢.
A�
� � r � � �
a7, � C �
v�i v�i � C7
�r rt � �
� � �
C� OG �' �
�
�' � O �
� � � �
�
� n x �
^-3 � M�
3 � � y fl � �C
a �
� � o `C
� ^., .� y
,Y O
O � �'
,^� fD
d d d � A
� �
�►
� r
.-� � C/�
,_�_„ � �
W W W A � '
0 0 0 � = � � �
0 0 0 � � � � �
� � �: � � � � �
� � � �.
�c � �
� � � � � � � �
� �n m
n�' a�' w� �a � � �
a� a� � �. �0 3 �
i� c� � � �. � ?7
�' �' �, �
� ��
� �
o'
z o y �
d � �
o �
� y
i
8.0 Conclusion & Recommendations
Asbestos was not identified within the materials of the residence that were within the scope of the
limited inspection and bulk-sampling performed on September 20, 2014; therefore, no professional
abatement activities are required to remove or disturb the above-referenced sampled materials.
9.0 Asbestos Abatement& Demolition Requirements
If ACM is to be removed or disturbed in a single-family residence, and the total quantiry exceeds any of
the regulatory trigger levels of 50 linear ft. on pipes, 32 ftz on other surfaces, or the volume equivalent of
a 55-gallon drum, a CDPHE-certified General Abatement Contractor (GAC) is required to perform the
work. The regulatory trigger levels within a commercial building are 260 linear ft. on pipes, 160 ftz on
other surfaces, or the volume equivalent of a 55-gallon drum. In addition, formal notification to CDPHE
prior to the abatement of ACM as well as air monitoring, visual inspections, and final air clearances by a
CDPHE-certified Asbestos AMS is required. DSC can provide the client or building owner with a proposal
for project design,abatement oversight and air monitoring upon request.
CDPHE regulations allow for the demolition of a building that contains non-friable asbestos-containing
materials, such as caulking, mastic or resilient floor tiles. However, demolition must be completed
without causing the non-friable ACM to be rendered friable. Burning a building with any ACM is
prohibited. Operations such as sanding, cutting, crushing, grinding, pneumatic jacking, etc. of ACM are
not permitted. Recycling of building materials such as concrete, metal, or wood that are bonded or
contaminated with ACM, e.g. glue, caulking, or mastic is also prohibited. If any of the non-friable asbestos
containing materials are to be recycled and rendered friable after demolition (i.e. crushing mastic-coated
concrete),these materials must be abated of all ACM prior to shipping offsite for recycling.
OSHA regulations regarding occupational exposure during demolition activities is still mandatory. OSHA
29 CFR 1926.1101 requires that workers performing construction-related activities be protected from
asbestos fibers in excess of the permissible exposure limit of 0.1 f/cc of air. Contractors are must comply
with applicable provisions of OSHA 29 CFR 1926.1101 during demolition and renovation activities.
These OSHA provisions include,but are not limited to, PPE and respirators, personnel training, personal-
exposure air monitoring, employee medical surveillance, wet removal methods, signage for regulated
areas, etc.
10.0 Major&Minor Asbestos Spill Response Actions
If ACM is significantly damaged and the total quantity exceeds the regulatory trigger levels, the area is
deemed a "Major Asbestos Spill." The area is consequently subject to the requirements in Reg. 8, Section
III.T.1. -Major Asbestos Spills, as outlined below. Additional asbestos air or dust sampling should also be
conducted within the remaining areas not directly impacted by the Major Asbestos Spill to determine if
asbestos-containing dust/debris has spread to adjacent areas. If asbestos fibers are found within any
other areas or on building contents, they should be included in the scope of professional abatement and
decontamination. The following response actions must be followed per Colorado Reg. 8 when a Major
Asbestos Spill occurs:
• Restrict access to the area and post warning signs to prevent entry to the area by persons other
than those necessary to respond to the incident
• Shut off or temporarily modify the air handling system to prevent the distribution of asbestos
�bers to other areas.
• Immediately contact the Division by telephone, submit a notification in compliance with
subsection III.E. (Notifications) and, if in an area of public access, apply for a permit in accordance
with subsection III.G. (Permits).
• Be exempted from the requirements to have a certified Supervisor on-site at all times, until such
time as the immediate danger has passed. Any cleanup or asbestos abatement that must occur
after the immediate danger has passed shall be supervised by a person certified by the Division.
• Using certified Supervisors and certified Workers in accordance with section II. (Certification
Requirements) of this Regulation, seal all openings between the contaminated and
uncontaminated areas and establish none-detect air pressure within the contaminated area in
accordance with paragraph III.J. (Air Cleaning and None-detect Pressure Requirements).This is to
be accomplished using polyethylene sheeting to cover areas such as doorways, windows, elevator
openings,corridor entrances,grills,drains,grates, diffusers and skylights.
• HEPA vacuum or steam clean all carpets, drapes, upholstery, and other non-clothing fabrics in the
contaminated area, or discard these materials.
• Launder or discard contaminated clothing in accordance with subsection III.R. (Waste Handling).
• HEPA vacuum or wet clean all surfaces in the contaminated area.
• Discard all materials in accordance with subsection III.R (Waste Handling).
• Following completion of subparagraph III.T.l.a. through III.T.l.i. above, comply with air
monitoring requirements as described in subsection III.P. (Clearing Abatement Projects); air
samples shall be collected aggressively as described in 40 C.F.R. Part 763, Appendix A to Subpart
E (EPA 1995), except that the air stream of the leaf blower shall not be directed at any friable ACM
that remains in the area and
• Comply with any other measures deemed necessary by the Division to protect public health.
In the event of an asbestos spill involving less than or equal to the trigger levels, the building owner or
contractor should take the following non-mandatory steps:
• Restrict entry to the area and post warning signs to prevent entry to the area by persons other
than those necessary to respond to the incident
• Shut off or temporarily modify the air handling system to prevent the distribution of fibers to
other areas in the building.
• Seal all openings between the contaminated and uncontaminated areas. This is to be accomplished
by using polyethylene sheeting to cover all areas such as windows, doorways, elevator openings,
corridor entrances, drains,grills,grates,diffusers and skylights.
• HEPA vacuum or steam clean all carpets, draperies, upholstery and other non-clothing fabrics in
the contaminated area, or discard all contaminated materials in accordance with subsection III.R.
(Waste Handling).
• Launder or discard contaminated clothing in accordance with subsection III.R. (Waste Handling).
• HEPA vacuum or wet clean all non-fabric surfaces in the contaminated area.
• Following completion of subparagraphs III.T.2.a. through III.T.2.f. of Regulation 8, conduct air
monitoring as described in paragraph III.P.3 of Regulation 8. (Final Clearance Air Monitoring and
Sample Analyses); air samples shall be collected aggressively as described in 40 C.F.R. Part 763,
Appendix A to Subpart E (EPA 1995), except that the air stream of the leaf blower shall not be
directed at any friable ACM that remains in the work area.
11.0 Disclaimer& Limitations
The activities outlined in this report were conducted in a manner consistent with a level of care and
expertise exercised by members of the environmental consulting and industrial hygiene profession. All
8
activities were performed in accordance with all applicable federal, state, and local regulations as well as
generally accepted standards and professional practice. No warranty is either expressed or implied. DSC
assumes no responsibility or liability for error in public information utilized, statements from sources
other than DSC, or developments resulting from situations outside the scope of this project.
The details provided within this report outline the inspection activities on the date(s) indicated and
should not be relied upon to represent conditions at a later date, the limited number of bulk-samples
collected, and the laboratory results of those bulk-samples. The laboratory results contained in this
report apply specifically to the materials in which bulk-samples were collected. The results do not
include or apply to any other materials within the structure that were not sampled, but may contain
asbestos; including materials that may be hidden or inaccessible. Additional inspection and bulk-
sampling activities would be required to determine if any other materials contain asbestos.
This report has been prepared on behalf of and exclusively for use by the Client,with specific application
to their project as discussed in the scope of work. The results of any surfacing material indicated in this
report also includes any associated overspray of that material, e.g., under carpet, above suspended
ceilings, etc. The information contained in this report is intended as supplementary material for
abatement design and is not to be used as the scope of work for abatement activities, bidding or billing
purposes. Contractors or consultants reviewing this report must draw their own conclusions regarding
further investigation or remediation deemed necessary. DSC can provide a full scope of work for
abatement upon request. DSC does not warrant the work of regulatory agencies, laboratories or other
third parties supplying information which may have been used in the preparation of this report.
12.0 Project Design &Project Manager Requirements
DSC can provide an Asbestos Project Design as well as fulfill the Colorado Asbestos Project Manager
requirements for any asbestos abatement project,as applicable below.
Project Design
An abatement Project Design is an accurate and detailed scope of work, which includes project
specifications and procedures, containment design/equipment placement, and descriptions of
engineering controls and work practices for an asbestos abatement project or response action that is
required by CDPHE Regulation Number 8, Part B - Asbestos (Reg. 8) on large asbestos abatement
projects. Prior to the start of any asbestos abatement project in a non-school building,where the amount
of asbestos-containing material (ACM) to be removed or disturbed exceeds 1,000 linear feet on pipes, or
3,000 square feet on surfaces, or in a school building in which the amount of friable ACM to be abated
exceeds 3 linear feet on pipes, or 3 square feet on surfaces, a written Project Design must be developed
by a State of Colorado certified Project Designer in accordance with subsection IV.G.7 of Regulation 8. A
signed copy shall be posted on-site prior to commencing any abatement activities, shall be available on-
site at all times, and shall remain onsite until final air clearances have been completed by a State of
Colorado-certified Air Monitoring Specialist(AMS).
Project Manager
A Project Manager shall be used on all asbestos abatement projects in which the amount of friable
asbestos-containing material to be abated exceeds 1,000 linear feet on pipes, or 3,000 square feet on
other surfaces per CDPHE Regulation Number 8, Part B - Section III.B.6. An asbestos Project Manager on
an abatement project shall be responsible for assessing that the project is conducted in accordance with
Regulation 8, assessing that the Project Design is followed,assessing that the abatement project is cleared
in accordance with Regulation 8, assessing that the asbestos waste generated on the project is properly
9
i
manifested and disposed of in accordance with Regulation 8, and communicating these assessments to
the building owner or GAC. Project Managers must have proof of Colorado certification as an asbestos
Project Designer and Air Monitoring Specialist in accordance with Section II of CDPHE Regulation 8 as
well as a minimum of one (1) year of experience supervising, overseeing or monitoring asbestos
abatement projects. A 4-year college degree in industrial hygiene, a degree in environmental health with
a major concentration in industrial hygiene, or the possession of a certified industrial hygienist (CIH)
certificate given by the American Board of Industrial Hygiene (ABIH) may be substituted for the Colorado
asbestos Air Monitoring Specialist course.
The GAC shall notify the building owner during bid proposals as to whether or not a project manager is
required. Project managers shall be independent of the asbestos abatement contractor and work strictly
on behalf of the building owner to the extent feasible, unless the abatement is being performed in-house.
Project managers must sign the original copy of the abatement permit for the permit to be valid.
13.0 Copyright Notice
c0 DS Consulting, Inc. 2014. All Rights Reserved. This document contains material protected under
Federal Copyright Laws. No part of this document or any of its contents may be reproduced, copied,
modified or adapted,without the prior written consent of the author and DS Consulting, Inc.
10
f
APPENDIXA
INSPECTOR c4z. FIRM ASBESTOS CERTIFICATES
�.
�`�°
�� ��
,�
;� �+
� ���,.-�
e
^�. ���T6`�Y
�P�A2�0 UC�1'dKR2Ql[
' oFF'�d+liciieaEth
and�mirann�enc
ASBESTOS
CFRTIFICATION%
This a�nities th�t.
f3randaa Sinkbeil
.,y`''��� Certifiaatioo Naz t3442
�� E��nai che requi:�mza'its of25-7-507,C.R.S.and Aiz{.�.ralit}�Control �
�:'. t"ammission�Regu€aUan'4�.R,Part B,and`es here6}�certiPied tfy cli�
staYe�€C'c+lorado in the follvwing.liscip[i:re:
Tnspectorlivlan$gement Ytanner*
: [xsned; Jaae 6M1,2014
`:�.tipiresa June GA,2D75
�
�t �� °
��.`,.�.am-�ww�,�r.wia�y..uY«.�f< � ��
r
Aku/w�n➢Y'n J�reMf+q7<rtuascuM/T4mbn '��,ti�""A��
/n�br'YwSrrR+re.a1'n+.J��f auu.e lv.Sxiuetl.B.P fleG>`se.,tmrve
`.En�.
F�
�
�'�� � �'�� F-,�"� �A�."".�'b«�,�"��A'w�°,+,�f 4 i-s�s^'"�' a±,.;: `°�,'..%"'g:�
R'a
........ ...._...
, , . .._..., ._.._. ._..... _..... . ....,
,,. � �'. _ .. _�;.. .....,,�. ...,,.y�,,,.��
pw,�Yt"."�g°z'z-r<e.sm.�.-k�55.��• �^"'^"' ,.,�»£.,, . '.rf.:•t,R°!'.�'L"+�
�w....
� -�fi"" �
. . i.'``�:�rok'� . ... �
�:�. ��E�: � �
y�'�:�wK^��rr'. . �x:��'
, . ,�k?srn�,�. . .
C:oloraa�Llepumient '#
af('ublic l leatth
�nd Fn��mnmenr .�
,�, „
� AS13I:STt7iS+C(7�1�5[1L'CTNG F lli��1 '� `
� � � � .
� . Tbis�ecrtafi,sthat �
DS Cousulting,ine.
�
�,� . Fegisirativ�'_ya..ACF-Y4!llv � � �'
�..
� � kav niei tt;�regis�.trnrinn requ}renaei�tz iaf 2� . a�l',t;.1i S.uxid t�e.+�ir pvatiFy.G-nntm7
C'o�nn.�nsiore[ts�idalinn ivo,R.Pare B .u�d is�mt�v a7�cWotin.�i Pc��x3c>xAn n.tt�:tc�e rnt�s�a3tip� ��.. ��
�act'iviiA.�s us required ui�dnr Re�nlatian�u R,Pnri:i.Tii tttC�slste nf Qrlo�xSO.
�.
,�- � � .. . .. � . . � . � � . � �
9 p
�: i�KUCd: Javruerv 3U.LAt?4 � � .,. .
d
$�� CaNres, l,�mr.as3�S,2f'!FS . � .. ..i, f r �,.+�>.,• =. ;r�
r .. . . . <°�'
"� . � . . . � rts�ra.�.mu f�arr.�.,�+.mm,Q :.i',�
y � � '�sk�,a �'�i..��«aa.Sl\ +,-..+uti.'� .�v`Y Y.��d �- trn' �� �,y„ 3 .
H �
� "�
x �h� � s
� �„, �, �� � � � � � .
4 �b ( � S n
�L. t^ .;iE*�` ..�. A�y. 4 , ,m3A� ��'9fi°'j...�a�.��� _. .a"'V'.:: a'?. � ,e^� � «��
1 1
APPENDIX B
ANALYTICAL DATA
12
_
Reservoirs Environmental,Inc. Effective January 1,2014
Reservoirs Environmental�A Manual T:\QA�C\Lab\Reservoirs Environmental QA Manual.doc
�
REI LAB �►,����oirs �'nvironment�l, Inc.
��
September 22, 2014 Subcontract Number: NA
Laboratory Report: RES 301005-1
Project#/P.O.# None Given
Project Description: 1750 S.Frontage Rd.#B2,Vail,
CO
Brandon Sinkbeil
DS Consulting, Inc.
5366 Flatrock Ct.
Morrison CO 80465
Dear Customer,
Reservoirs Environmental, Inc. is an analytical laboratory accredited for the analysis of Industrial Hygiene and
Environmental matrices by the National Voluntary Laboratory Accreditation Program (NVLAP), Lab Code 101896-0
for Transmission Electron Microscopy (TEM) and Polarized Light Microscopy (PLM) analysis and the American
Industrial Hygiene Association (AIHA), Lab ID 101533 - Accreditation Certificate #480 for Phase Contrast
Microscopy (PCM) analysis. This laboratory is currently proficient in both Proficiency Testing and PAT programs
respectively.
Reservoirs Environmental, Inc. has analyzed the following samples for asbestos content as per your request. The
analysis has been completed in general accordance with the appropriate methodology as stated in the attached
analysis table. The results have been submitted to your office.
RES 301005-1 is the job number assigned to this study. This report is considered highly confidential
and the sole property of the customer. Reservoirs Environmental, Inc. will not discuss any part of this study with
personnel other than those of the client. The results described in this report only apply to the samples analyzed.
This report must not be used to claim endorsement of products or analytical results by NVLAP or any agency of the
U.S. Government. This report shall not be reproduced except in full, without written approval from Reservoirs
Environmental, Inc. Samples will be disposed of after sixty days unless longer storage is requested. If you have any
questions about this report, please feel free to call 303-964-1986.
Sincerely,
. � �
a � ��� �..,,� ��1�,t� 1
�..... ��
;z_..�.�� .... ����,,n
Jeanne Spencer
President
P:303-964-1986 5801 Logan Street,Suite 100 Denver,CO 80216 1-86&RESI-ENV
F:303477-4275 www.reilab.com
Page 1 of 2
� v v v � � n � � m � � c�' cu' m D
°' � o 0 0 � 3 � m � � m � � � (/� W
� m � � � ��a � y v o � .-. '. ... ` r
m � o 0 o m co � o �- v -o � ' o m
„� o- w n� � � n� � � o o � ��
00 � � � Q � �' � Z � � m
W w � v m � � � � r o.�.
�m � a �' � Z � 3 yy
J P
V W � � � � � fii RI
� < <.
cn O! ���„,� n �• �' � r � 3
i T
L� � � � 1 ^ > >
� D °' °'
3 3 Q' � � z °_
n� � O D �"
°� m m m m vcri � � � � � o airn � �
m � n � � � Z � � = D a o � n f/� �
,� � o � .� � _ �D O � D � � ua -
O
�' N N N 3 � � O � � � O �
,'^. L�` � � � � � � � � � '�1L y � Ill
�.:k' �D � �p � �p C O
� �� � � �
C�Ji � ' N � N 7 � �= �
�i 1�1 W N � � � I'T1
�
`� m � C� ooD ooD v� D � m � Dr c rno �D 3 y
6 � , j a �
� � � � � � � � � � � tnA m
Q � � � � � � � � � � � n
0
3 mmmm� cu m� m mcu � N O
v v m o v`o' n� m v o pp 3
cp � x -a � � x � � � �
�_ 3 m � _. O
°—' nm o � am ao � - �
0
� v � Q � v � vQ p O Rt
� — N
o � � � � � � W li1
N � m � a m � � < v C
o � � � � ? �
m �. cu °� in m� p p = �
r � �
� � � �U � � �l1 (7 � C N r
�, � �' � � �.m 3 � � N
o r � f�� m m � m
v ~ � o' � a °' Z
lc c � � r � �
N
N � � 0 0 T
p � � � � /V
N ° � O � O
;° v � � Z
� � � � �
W �
�
° � ° ° Z
o �
N O W
°� °' D
r
z
c�
cVi, iv � ww oo c�i, u' o v c
�. 6
3 ;;�;,<,
3
lD
�
O1
�
________' .: C>
O
� N n
N �
� �
£� �
m " �
D <. �"'
ZZZZZ ZZ ZZ � c a��� a
vvvvv vv vv _ d -
- �
n � � o m
�
0 3 " �� `-
, D � z o�
.,..�.. 'a tn n m 'm m o
� Q T� Q II _ o �.
7 Q (p � � � m m
� m y � � ' ' � = C 0 0 �. C N �N
� m m';: CT O O U7 O CJ7 O U7 O cA tn cn 7 � c a „,z
a� � [��i °—' = ro
• -: d'
o Z � O � N o �
a < 3 ,,..._, � o � p
m � T m d
� ��
7 Q Z m
�°,�`1 � � � � �
� � Q
ODOO O ODO ODO o � C O
� , Ut O O fJi O U7 O CJ� O _. CA a� �
� � Department of Community Development
75 South Frontage Road
Vail,CO 81657
.���� �� ����� Tel: 970.479.2128
www.vailgov.com
Development Review Coordinator
TRANSMITTAL FORM
Use this form when submitting additional information for planning applications or building permits.
This form is also used for requesting a revision to building permits. A two hour minimum building review
fee of$110 wiil be charged upon reissuance of the permit. _ _ -
ApplicationlPermit#(s)information applies Attenticrs: �sions
to: esponse to Correction Letter
b14-0391 VK.� ' �R attached copy of correction letter
�Deferred Submittal
�Other
��cs I�{ �O.S�f ( . _
Project Street Address: B2
' 1750 FRONTAGE RD
(Number) (Street) (Suite#) __ __ _ __
f3uildinglComplex Name: SPRUCE CREEK TOWNHOMES Description of Transmittal/List of Changes, Items Attached:
_ . ._ _
'WOOD FRAME/MULTI FAMILY
Applicant Information PARTY WALL TO BE UNDISTURBED IN DEMO
' (architect,contractor,ownerlowner's rep)
' Contact Name: JAY NOBREGA
i Address: P.O. BOX 6158
;C��,VAIL State: CD Zip: 81658
' Contact Name: �p`Y NOBREGA (use additional sheet if necessary)
Contact Phone: 970-904-0062 Building Permits:
Revised ADDITIONAL Valuations(Labor 8 Materials)
Contact E-Mail: �AY@CROSSROADSVAILCOM __ (DO NOT include original valuation)
$0
I hereby acknowledge that i have read this application,filled out Building:
in full the information required,completed an accurate plot plan, $p
and state that all the information as required is correct. I agree to Plumbing:
' comply with the information and plot plan,to comply with all Town ' $�
' ordinances and state laws, and to build this structure according 'ElectricaL
to the town's zon�ng and subdivision codes, design review ap- $�
proved,Intemational Building and Residential Codes and other MechanicaL
ordinances of the T�n applicable thereto. $p
__..�.,_ Total:
, � ,.
X�' ,- _ _ _
Owner/Owner'S�Representative Signature(Required)
___ _ _
Date Received:
� � � � � V �
For Oftice Use Only:
�� 1
Fee Paid: -- ��'� 1 � 2o1`F
Received From:______.--
Cash _ Check#_ _---
CC: Visa/MC Last 4 CC# _exp.date: TOW� o� �lA+�
vr��
Authorization#