HomeMy WebLinkAboutB14-0139 REV1 special inspection report West Siope Testing& Inspection LLC Report #1
3177 Glendam Dr. �
Grand Junction, C4 $1504 Page 1 of 1
Phone: 970-434-6988
Cell: 970-260�2844
Inspection Report
Date: 10-16-14
Client: HP Geotech{Job #HI' 114 450A)
Project: Unit 1021 4 Seasons Lodge
Address: 1 Vail Rd. Vail, CO
Building Permit No: B 14-0139
General Contractor: RA Nelson
Inspection of shop fabrication or feld work at job site: Fieid
Report: Visually inspected welding at bent beam splice plates & beam connection
where existing column had been removed.
Discovered some welds that needed completed, increased in size, and/or
repaired. These corrections where completed. Then the field welding inspected
above appeared to be in substantial conformance with the plans, and the quality
requirements of the AWS D1.1 Structurai Welding Code.
Dougtas E.Young
C Certification#514ZZ24
ucta f VVeI ng Speci 1 ector
Inspector/Technician: Douglas E Young St uctu i Stce Bolti g ' isi spector
r - ied ' proofing ' Ilnspcctuc
Douglas E Y ng
�� CWI 96070 31
Qcj �xQ.7rv2a�7
� � � � � �
� D
:iC� � 1 �?����
TOWI� OF V'Ai�
� r��� _� � �� �� �