HomeMy WebLinkAboutB13-0146 REV2 Blower Door Test Department of Community Development
75 South Frontage Road
TOWN OF VAIL g van, co s�s57
Tel; 970.479.2128
www.vailgov.com
Development Review Coordinator
TRANSMITTAL FORM
Use this form when submitting additional information for planning applications or buiiding permits.
This form is also used for requesting a revision to building permits. A two hour minimum building review
fee of$110 will be charged upon reissuance of the permit.
_ _ _ _ _
Application/Permit#(s)information applies
to: Attention: �Revisions
{, ,''� �Response to Correction Letter
15� � ' � �� �„ � � �attached copy of correction letter
. -
� �,�.� �� '�C� � � . �Otherred Submittal
�
Project Street Address:
I 3� � I�J h►-i� c � C_,�-C--�Iil�- ►`-�
(Number) (Street) (Suite#)
Building/Complex Name: Description of Transmittal/List of Changes, Items Attached:
Applicant Information �
�.9� r�',�� p p�R. 'i�Si'
(architect,contractor,owner/owner's rep)
Contact Name: �-/���,� ��-I L.(� ��`�� M�1� f�n l)�(^ _ �C.I f� L E-1 (�
Address: � �Q.X l� �`�
City 1=.,��A�-.��� State:�Zip: ��-
ContaCt Name: (use additional sheet if necessary)
Contact Phone: 3 1� �� � Building Permits:
Contact E-MaiL (T��Y�l �t��-L e �������-� � �,;�f= ised ADDITIONAL Valuations(Labor&Materials)
(�OV NOT include original valuation)
I hereby acknowledge that I have read this application,filled out Building: $
in full the information required,completed an accurate plot plan,
and state that all the information as required is correct. I agree to Plumbing: $
comply with the information and plot plan,to comply with all Town
ordinances and state laws, and to build this structure according Electrical: $
to the town's zoning and subdivision codes, design review ap-
proved,International Building Residential Codes and other Mechanical: $
ordinances the To a thereto.
X � Total: $�
Owner/Owner's Representa iv Signature(Required)
Date Received:
For Office Use Only: � � � � � �
Fee Paid: D
Received From: '���� � ] ����
Cash Check#
CC: Visa/MC Last 4 CC# exp,date:
Authorization# 'roW 1 V o F V/�11 L�
�
.*- �`"�"11�'I'4 r����+t
i�
�����:�-3��. �.�c.
Blower poor Performance Testin� Report
Date ioi3oiia _ :
�
Project Name Ruttum Residence '�
Address �388 Buffehr Creek Rd
�
BuilderGary Hill � ����d�`3.'�� �' �
Builder Contact Gary Hill
HERS Rater Kristen Hartel
HERS Rating Company Active Energfes
Building Square Footage 3,522 Building Volume 37,631
Number of Stories in Building 3.� N-Factor 13.0
Outdoor Temperature 3� Indoor Temperature 65
Testing Procedure .Single Point Blow Reason for Testing_Code Compli
Background
Blower door testing is a specialized testing procedure used to identify air infiltration within a
building. Utilizing blower door equipment, a trained energy rater can measure the amount of
air infiltration, while also identifying major areas of leakage for mediation. An infrared thermal
imaging camera is typically used to identify variations in temperature that appear when air
infiltration enters the building envelope. The infrared thermal imaging camera can also aid an
I energy auditor in identifying areas of missing or ineffective insulation within building cavities. I
Results
� CFM501,3i o ACH50 2.09 NACH o.16
CFMSO —The cubic feet per ACH50 — The number of air NACH — The number of air
minute removed from the changes undergone in tne changes undergone in the '
building in order to reach a building each hour under an building each hour under
pressure of-50 Pa. induced pressure of -SO Pa. natural conditions. This value
I This value is commonly is the best determination of
referred to in codes and green the expected air infiltration of
building programs, as it is a the home and is dependent
direct measurement of the upon the building height and '
building's infiltration without exposure.
regard to other site conditions,
like height or exposure.
1'�t�,��; l. (rf�{i
"-
_
1.$����.� �r,�,,N_ Uti:._ _ � ��� __ -����� .� ;x r,��'� L`' �i?€3�?', , 3s:fi_�di ,.��1; ��� „�..._�n.<<,., rrr�,
�� ���� +..� � � � � �
���'
�����1�I"������
:����r�������_�.��.
Blower poor Performance Testin� Report
Date ioisoila �,.;;_������
Ruttum Residence Lockoff ������� ��� �
Project Name ����
Address 1388 Buffehr Creek Rd
BuilderGary Hill
Builder Contact Gary Hill �
HERS Rater Kristen Hartel °� °�
�;
HERS Rating Company Active Energies
� .
�'r` �" ���, `�
Building Square Footage 598 Building Volume 5,980
Number of Stories in Building 3•� N-Factor 22.0
Outdoor Temperature 45 Indoor Temperature 65
Testing Procedure .Single Point Blow Reason for Testing_Code Compli
Background
Blower door testing is a specialized testing procedure used to identify air infiltration within a
building. Utilizing blower door equipment, a trained energy rater can measure the amount of
air infiltration, while also identifying major areas of leakage for mediation. An infrared thermal
imaging camera is typically used to identify variations in temperature that appear when air
infiltration enters the building envelope. The infrared thermal imaging camera can also aid an
energy auditor in identifying areas of missing or ineffective insulation within building cavities.
Results
CFM50 57 ACH50 0.57 NACH o.oa
CFM50 —The cubic feet per ACHSO — The number of air NAeH — The number of air
minute removed from the changes undergone in the changes undergone in the
building in order to reach a building each hour under an building each hour under
pressure of-50 Pa. induced pressure of -50 Pa, natural conditions. This vafue
This value is commonly is the best determination of
referred to in cades and green the expected air infiltration of
building programs, as it is a the hame and is dependent
direct measurement of the upon the building height and
building's infiltration without exposure.
regard to other site conditions, ,
like height or exposure.
�f� �: � �
�;Fi : i. � . ��� �i�_i . !.ir:_+�s i_ 4ifz�i?:; I � �i;t;,l 3.�.��tkj r u��.�e�€i... �<;j.t�,�.E:iszr�
t �
�� �� �� � �� �