Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
B14-0040 Rev 3 APPROVED
NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES MWWOF �¢ Town of Vail, Community Development, 75 South Frontage Road, Vail, Colorado 81657 p. 970.479.2139, f. 970.479.2452, inpsections 970.479.2149 COMBINATION BLDG PERMIT Permit #: B14 -0040 Project #: PRJ13 -0733 Job Address: 521 E LIONSHEAD CR VAIL Applied.....: 03/18/2014 Location......: COMMON ELEMENT: VAIL 21 CONDOMINIUM ASSO Issued...: 11/11/2014 Parcel No....: 210106403001 OWNER SUSAN WONDRIES CATALANO TRUS 03/18/2014 4612 VIN ETA AVE LA CANADA, CA 91011 CONTRACTOR G.E. JOHNSON CONSTRUCTION CO 03/18/2014 Phone: 970 - 845 -0272 ANDY SANDOVAL PO BOX 8809 AVON CO 81620 License: C000003321 Description: Common Element - Vail 21 - NEW WINDOWS & PARTIAL RE -SKIN New Windows and sliding doors at all residential units. New entry features trellis and sunshades. New siding, new Corten metal paneling at elevator tower. New snowmelt at loading zone. Replacement of light fixtures in exterior corridors. Occupancy: R -2 Type Construction: IB ++++ w+ w+++w+ wwwwwwwwwww+++++ wwwwwwwwwww�. w++++ wwwwwww * * * * *i,wrwwww *w++wwwwwwww * +* *+ FEE SUMMARY Valuation: $1,500,000.00 Building Permit -- - - - - -> $7,433.75 Bldg Plan Check - - - - - -> $4,831.94 Use Tax Fee---------- - - - - -> $29,800.00 Electrical Permit > $1,983.75 Elec Plan Check -- > $1,289.44 Restuarant Plan Review - - -> $0.00 Mechanical Permit - -> $500.00 Mech Plan Check - > $125.00 Additional Fees - - -- -> $0.00 Plumbing Permit - -> $0.00 Plmb Plan Check - - - -> $0.00 Recreation Fee--- - - - - -> $0.00 Investigation - -- - - - -> $0.00 Will Call--- ---> $15.00 TOTAL PERMIT FEES--> $46,418.88 Payments ---------- ----- -- - - - - -> $46,418.88 +++++++ wwwwwwwww++ x+»+++ wwwwwwwwwwww+:+ wwwwwwwwwww++ w++ wwwwwwwwwwwww+ xr+ rw++++ wwwwwwwwwww*+++ w+ x++++ wwwwwwwwww+* BALANCE DUE------ wx+++ r+ w+ ww*« wwww+ ww++»++++++++ ww+ wwwwww - - - - -> ++ + +w+++++ $0.00 ++e + + + +++wwwwwwwww DECLARATIONS I agree to comply with the information and plot plan, to comply with all Town ordinances and state laws, and to build this structure according to the town's zoning and subdivision codes, design review approved, International Building and Residential Codes and other ordinances of the Town applicable thereto. REQUESTS FOR INSPECTION SHALL BE MADE TWENTY -FOUR HOURS IN ADVANCE BY TELEPHONE AT 970.479.2149 OR AT OUR OFFICE FROM 8:00 AM - 4:00 PM. combination permit - 012811 CONDITIONS OF APPROVAL TO BE MET PRIOR TO FINAL SIGN OFF Permit #: B14 -0040 Owner: SUSAN WONDRIES CATALANO TRUST COMMON ELEMENT: VAIL 21 CONDOMINIUM ASSO Cond: CON0013661 Notified Building Dept on 3/24/14. Code determination needed by Building Department: Comments to CBO: I have looked at the code analysis they provided. I note it does not meet the 2009 IBC. I thought we were using the 2012 edition now. There is a plan note that the 2009 and 1979 review under Incidental Use Areas shows a 1 hr rating or automatic fire extinguishing system but only for the Mechanical Room. Section III Allowable Area & Height .proposes 6 stories, allows for 4 stories and an increase for area or number of stories is not allowed. Under the 1979 edition, he counts the number of stories above the B Occupancies as 'A over 2" for a total of 8. I don't think the analysis adequately addresses the basement issue. I am of the opinion that the fire sprinkler system should be extended throughout the basement level. Michael McGee Deputy Chief Entry: 04/21/2014 By: McGee Action: AP Cond: CON0013693 Fire Alarm Rebuild Entry: 05/15/2014 By: McGee Action: AP From: John Lang [mailto:jlang @min- chem.com] Sent: Friday, May 9, 2014 3:41 PM To: 'sls' Cc: 'Geoffrey Wright'; 'Bruce Zivic'; linda.malaby @gmail.com; 'John Halloran' Subject: Vail 21 -Fire department letter Attention: Mike Mcgee Deputy Chief, Fire Department The Homeowners' Association Board of Directors for the Vail 21 Condominiums agrees to complete the scope of work as outlined in the May 7th, 2014 letter from Shaner Life Safety (see attached). The fire alarm system will be upgraded in phases as outlined in the combination permit_012811 Address: 521 E LIONSHEAD CR VAIL Location: letter. We will complete the work in the noted timeline. The board has retained the services of Deborah Shaner, P.E., Fire Protection Engineer to facilitate completion of this project. John Lang President, Vail 21 Condominium Association PO Box 1073, Frisco, CO 80443 970.409.9082; fax 970.797.1898 May 7, 2014 (Revised) Deputy Chief Mike McGee Vail Fire and Emergency Services 2399 N. Frontage Road W. Vail, Colorado 81657 Dear Mike, This letter will outline a proposed plan for upgrading the fire alarm system at Vail 21. The project will be completed in Phases. Phase 1 of this work is being conducted concurrently with a Building Permit project. The associated fire protection and life safety scope was outlined in a separate letter dated April 10th, attached for your reference. The following outlines a phased approach to upgrading the fire alarm system at Vail 21. This work is currently in design and will be documented with drawings and other submittal information at the time of permit. The purpose of this letter is to establish the scope of work, phases and a schedule for completion. Phase 1: One for One replacement of existing fire alarm system Schedule: July 1, 2014 — November 1, 2014 This phase will include a one - for -one replacement of existing fire alarm devices. The existing fire alarm panel is a Mircom FX -2000, which is a current, addressable, UL listed fire alarm panel. This panel may or may not be replaced depending on the chosen fire alarm contractor. All existing detectors, pull stations, modules, horns and strobes will be replaced with new devices. Existing conventional zones will be converted to addressable. No new functions or devices will be added to the system outside of addressable modules as needed. In early June, we will submit a formal fire alarm permit application which will include drawings, calculations, wiring diagrams, a points list and equipment data sheets. Phase 2: Installation of one smoke /heat/carbon monoxide detector per unit Schedule: Spring /Summer, 2015 This phase will include the installation of one combination smoke /heat/carbon monoxide detector with integral sounder into each unit. We propose to install the device approximately May 8, 2014 Vail 21 Page 2 Shaner Life Safety letter 15-20' into the unit from the front door, which will place it centrally in the Hallway /Living Area. This detector will initiate a general alarm condition upon activation of the heat detector element. Carbon monoxide detection will sound a local alarm, but call the fire department. Smoke detection will be a local, combination permit_012811 supervisory condition only. This device will have an integral sounder base for occupant notification, temporal 3 pattern for smoke or heat detection, and temporal 4 pattern for carbon monoxide. Phase 3: Addition of smoke detectors to sleeping rooms in units Schedule: Completed by end of 2016 In this phase, each unit will have smoke /heat detectors installed within the sleeping rooms. These will be addressable, combination smoke and heat detectors with sounder bases. Activation of the heat detector will cause a general alarm and activation of the smoke detector will initiate a supervisory condition. Phase 4: Ongoing maintenance of system; upgrade of commercial units as tenant finishes occur The expected life of the new fire alarm system will be 20 -25 years. Phase 4 will be an ongoing maintenance plan to ensure this system meets its life expectancy. Annual testing and inspections will be performed. As commercial units are remodeled, they will be evaluated for compliance with current fire department standards. We believe that this plan provides a reasonable approach to upgrading the fire alarm system. At Vail 21. Please advise if this plan is acceptable. Of course, the Vail 21 management, HOA and Board of Directors understand the commitment made in this letter and will follow through on future phases. Phasing will be further outlined in the upcoming permit submittal. Please let me know if you have any questions. Sincerely, Deborah L. Shaner, PE Fire Protection Engineer combination permit_012811 TOWN OF VAIN REQUIRED INSPECTIONS AND STATUSES Permit* B14 -0040 Owner: SUSAN WONDRIES CATALANO TRUST COMMON ELEMENT: VAIL 21 CONDOMINIUM ASSO Address: 521 E LIONSHEAD CR VAIL Location: Item: 00010 BLDG - FOOTING 10/01/2014 By: JRM Action: PI Comments: SONO TUBE FOR TRASH ENCLOSURE NEW NORTH ENTRY FOR @ VAIL 21 6 PILASTERS FOR TRELLIS 10/08/2014 By: JRM Action: PI Comments: NEW NORTH BREEZE STAIR WALLS AND NEW NORTH ENTRY WALLS Item: 00020 BLDG - Foundation /Steel Item: 00120 ELEC -Rough 08/04/2014 By: sgremmer Action: PI Comments: Fire caulk at pull stations 08/19/2014 By: sgremmer Action: PI Comments: Fllors 3-6 common areas 08/25/2014 By: sgremmer Action: PI Comments: common area floor 1 and 2 09/16/2014 By: sgremmer Action: PI Comments: north wall of Breeze 11/04/2014 By: sgremmer Action: AP Item: 00200 MECH -Rough 07/10/2014 By: sgremmer Action: PI Comments: snow melt mains to exsisting stair snow melt 10/10/2014 By: JRM Action: AP Comments: all snow melt complete 100 # air test Item: 00030 BLDG - Framing 09/17/2014 By: JRM Action: PI Comments: NORTH BREZZE SHED ROOF AND WALL Item: 00050 BLDG - Insulation 06/23/2014 By: sgremmer Action: PI Comments: NW wing 06/26/2014 By: sgremmer Action: PI Comments: 305, 306,307 07/08/2014 By: sgremmer Action: PI Comments: 601, 602, 503, 504, 505,406,407,405,404,403,303,304 08/12/2014 By: sgremmer Action: AP Comments: 602, 504, 502, 402, 404 09/10/2014 By: sgremmer Action: AP 09/22/2014 By: sgremmer Action: AP Comments: north of breeze Item: 00060 BLDG - Sheetrock Nail 07/01/2014 By: sgremmer Action: PI Comments: electrical rm 08/21/2014 By: sgremmer Action: PI Comments: common area lids on floor 4,5,6 08/27/2014 By: sgremmer Action: PI Comments: 1st, 2nd, 3rd floor common area 09/17/2014 By: JRM Action: PI Comments: 2 LAYERS EXTERIOR WALL ASSEMBLY NEAR BREEZE STORE combination permit-012811 AND INTERIOR ROOF EAVE 2 LAYER 10/06/2014 By: sgremmer Action: PI Comments: fire wall at breeze Item: 00070 BLDG -Misc. 06/23/2014 By: sgremmer Action: DN Comments: U- values checked units 602, 502, 402 are required to have egress window in bedroom 06/26/2014 By: sgremmer Action: PI Comments: 305, 306,307 07/08/2014 By: sgremmer Action: PI Comments: U- values 601, 602, 503, 504, 505,406,407,405,404,403,303,304 08/12/2014 By: sgremmer Action: AP Comments: 602, 504, 502, 402, 404 u- values 08/18/2014 By: JRM Action: AP Comments: ALL LATHE APPROVED Item: 00190 ELEC -Final 11/04/2014 By: sgremmer Action: AP Item: 00390 MECH -Final 11/03/2014 By: sgremmer Action: AP Comments: snow melt Item: 00090 BLDG -Final Item: 00542 PLAN -FINAL Item: 00543 PW FINAL combination permit_012811 ************************************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** TOWN OF VAIL, COLORADO Statement ************************************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** Statement Number: R140001939 Amount: $220.00 11/11/201401:51 PM Payment Method:Credit Crd Init: SAB Notation: Visa -John Halloran ----------------------------------------------------------------------------- Permit No: B14 -0040 Type: COMBINATION BLDG PERMIT Parcel No: 2101- 064 - 0300 -1 Site Address: 521 E LIONSHEAD CR VAIL Location: COMMON ELEMENT: VAIL 21 CONDOMINIUM ASSO Total Fees: $46,418.88 This Payment: $220.00 Total ALL Pmts: $46,418.88 Balance: $0.00 ************************************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** ACCOUNT ITEM LIST: Account Code Description Current Pmts -------------- - - - - -- ------------------------ - - - - -- ------ - - - - -- PF 00100003112300 PLAN CHECK FEES 220.00 Department of Community Development 75 South Frontage Road TORN OF VAIL' Vail, CO 81657 Tel: 970.479.2128 www.vailgov.com Development Review Coordinator TRANSMITTAL FORM Use this form when submitting additional information for planning applications or building permits. This form is also used for requesting a revision to building permits. A two hour minimum building review fee of $110 will be charged upon reissuance of the permit. Application/Permit #(s) information applies to: ssu\. t BA - ao4-0 I. a V) A,6 e to Correction Letter copy of correction letter Submittal Project Street Address: Number) (Street) (S,V) 1 Building/Complex Name: ( Description of Transmittal/ List of Changes, Items Attached: Re a Mw. ,N. 11TAI D J " 1JMIim" Applicant Information tJ11i1 l4 OL> U31a G Attention: m evisions Response attached Contact Name: ., Deferred O Other _ e to Correction Letter copy of correction letter Submittal Project Street Address: Number) (Street) (S,V) 1 Building/Complex Name: ( Description of Transmittal/ List of Changes, Items Attached: Re a Mw. ,N. 11TAI D J " 1JMIim" Applicant Information Owner /Owner's Representative Signature (Required) Date Received: For Orifice Use Only: Fee Paid: Received From: Cash Check # CC: Visa / MC Last 4 CC # exp. date: Authorization # SEP 2 E 2014 TOWN OF VAIL t I tJ11i1 l4 OL> U31a G architect, contra or, ow er /owner's rep) Contact Name: ., Address: City State: Zip: nn Q O XL4, Contact Name: use additional sheet ifnecessary) Contact Phone: 0" 3407 Building Permits: Contact E -Mail: C © C , -A SO11.CAM Revised ADDITIONAL Valuations (Labor S Materials) U 10 DO NOT include original valuation) I hereby acknowledge that I have read this application, filled out Building: in full the information required, completed an accurate plot plan, and state that all the information as required is correct. I agree to Plumbing: comply with the information and plot plan, to comply with all Town ordinances and state laws, and to build this structure according Electrical: to the town's zoning and subdivision codes, design review ap- proved, International Building and Residential Codes and other Mechanical: the T vvn plgpicablethereto" Xrdinan'N Total: 0 Owner /Owner's Representative Signature (Required) Date Received: For Orifice Use Only: Fee Paid: Received From: Cash Check # CC: Visa / MC Last 4 CC # exp. date: Authorization # SEP 2 E 2014 TOWN OF VAIL t I Chuck Coe From: Joseph Sammartino <JSammartino@359Arch.com> Seat: Thursday, August 28, 2014 4:32 PMTo: Chuck Coe Subject: FW: North Shed roof foundation I Follow Up Flag: Follow up A Flag Status: Flagged Categories: Red Category Chuck, Please see below. Those concerns you had are confirmed. Thank you, - Joseph Josep ammartino 359 DESIGN, LLC 303 - 478 -6102 www.359arch.com From: Craig Carroll [ mailto :ccarroll@monroe- newell.com) Sent: Thursday, August 28, 2014 4:22 PM To: Joseph Sammartino Cc: Will Hentschel Subject: Re: North Shed roof foundation That is correct. Sent from my iPhone On Aug 28, 2014, at 3:51 PM, "Joseph Sammartino" <J5ammartinoCa)359Arch com> wrote: Hello Craig, For Option 2: They would like to have a raked top plate at the underside of the rafters with double cut studs & attached with A35 hangar (1 per stud) Would these solutions be acceptable? Thanks again! Joseph Joseph Sammartino 359 DESIGN, LLC 1 PARTITION TYPES- GENERAL NOTES 1. REFERTOTITLESHEETS) NDPROECTMANUAL FORGENERAL PROJECT NOTES, SYMBOLSANDABBREVIATIONS. 2. NOTALL PARIRION TYPESDELINEATED MAYBE USED, 3. REFERTOPLANS FORDESIGNATION OFPARTITIONTYPES ANDRATINGS. 4. ALLMETALSTUDANDC.M.U. PARTITION ARETOEXTENDTOUNDERSIDE OF STRUCTURE UNLESSNOTED OTNBWISE, S. WHERE TWODIFFERINGPARTITIONTYPESABUTIN ALINE ANDALONGA CONTIMIOUS LENGTH OFPARTITIONS, THECONTINUOUSFINISHED SURFACES OF TIESEPIiBBO16SMALLAKGN UNLESSNOTED OTHERWISE. S. ALL METALSIDSTOBESPACEDAT7A' O.C. UNLESSNOTED OTHERWISE. 7. INCREASEDSTUDGAGE ORSPACING MAYBE REOUNEDDUETO HEIGHT OF PARTITION. MAXIMUMALLOWABLEDEFLECTION SIULL BE 1840. S. PROVIDEFOR1' DEFLECTION ATALLPARTITIONHEADSUNLESSNOTED OTHERWISE. PROVIDE MINIMUMTDEEP4EG TRACKS. 9. PROVIDEDOUBLE20GAGE STUDAT EACHDOOR JAMB. 10W NOTPLACEGYPSUMBOND ORJOINTATCORNER OFDOORFRAME. 11. USEWTYPE -XGYPSUM BOARD ATRATEDPARTITIONS. USESWGYPSUMBOARD AT ALLOTHER UNLESSLESS NOTEDOTHERWISE. 11 USEWATERiESISTANT GYPSUMBOARDFORWALLSINALL TOIETROOMS, JNATOISCLOSETS, SHOWERROOMSANDASNOTED 01'HERWISE, 13. USEWATER4 ISTANTGYPSUM BOARDFORCEILINGS IN SHOWIER ROOMS. COMPLYWITH GO2509.3. 14. USECEME TITIOUSBACKER UNITSAND SPACE STUDS AT 18' O.C. AT PARTITIOIS TO RECEVECERAMICTILEOR STONE. 15. PNRTRIONS WHICHDONOTGO TOSTRUCTUREABOVESHALLHAVE INTERSECTING PAWITI NOR BE BRACED TOSTRUCTURE ®12QC. 18. PROVIDECONTROL JOINTSINCOLBIG EXCEEDING2500S.F. ANDIN PARTITIONS, WALLSANDFURRINGRUNSEXCEEDING30FT. VERIFYEXACT LOCATIONS WITH ARCHITECT. SEEDETAILS THISSHEEP. ITALLFIREJRESB PARTITIONSTIVEPARTITNS SHALL. BE CONSTRUCTED IN FULL COMPLIANCE WITH TESTINGREQUIREMENTS ANDMANUFACTLNERS RECOMMENDATIONSFOR CONDITIONS AS REWIRED, CONSTRUCTIONOF ALL SYSTEMS SHALL EOUALTHATOF THETESTED ASSEMBLY. CONTRACTORSMAY SUBSTITUTEANOTHER LISTED ASSEMBLYFORTHATINDICATEDWITH PRIOR APPROVALONTHEARCHITECT AND THE BUILDING DEPARTMENT. TESTINGFACJUTIES AREABBREVIATED AS FOLLOWS' UL- UNDERWRITERSLABORATORIES INC. GA - GYPSUM ASSOCIATION NPR- NATIONALEVALUATION REPORT WH1- WARNOCKHERSEVINTERNATIONAL 1S. THROUGNPENETRATIONS M RATED PARTITIONSSHALL BEFIRESTOPPED IN ACCORDANCEWITH THE IBC 71131 19. MEMBRANEPE]ETRATIONS INRATEDPARTITIONSSHALLHE IN ACCORDANCE WITH IBC 713.32. 19, MEMBRNE NETRATIONS WRATEDPARTTK)NSSHALLBE IN ACCORDANCEWITH SC712.32 N. PROVIDE ACOISTICA SEALANTAT ALL PENETRATIONSIN ACOUSTICAL PARTITIONS, 21- ACOUSTICAL BATTWSUAATIONTOTERMINATE AT THE STURCTURE UNLESSNOTED OTHERWISE OF COto 4 O 09 JOSEPH M. O SAMMARTINO ARC,,--4402444 SFO ARGN` // VAIL 21 521 EAST LOINSHEAD CIRCLE Vail, Colorado ERA #::2]59] 2x LAYERS OF % GYP. BD. - , EXISTING TO REMAIN 2x4 FRT AND BATT. LEDGER BOARDINSULATION 2x LAYERS OF % GYP. BD. - EXISTING ROOF FRAMING SIMPSON CONNECTOR TOP PLATE SHIP LAP WOOD SIDING ACOUSTICAL CEILING TILE 2x LAYERS OF EXTERIOR GRADE % GYP. BD. 2x4 FRT AND BATT. INSULATION METAL FALSHING 2x LAYERS OF % GYP. BD. STONE WAINSCOTING BUILDING PAPER EXTERIOR GRADE PLYWOOD FELT EXPANSION JOINT NEW 4" CONCRETE PATH a TITLE: 2 -HR FIRE WALL TO CEILING DETAIL SCALE: 3j RFI #: 25 DRAWN: JT CHECKED: JS PROJECT NO. 14021 METAL FLASHING BACKER ROD AND SEALANT TREATED 2x6 EXPANSION BOLT PER STRUCT. TREATED SIL PLATE EXISTING CMU WALL 359 DESIGN 710 W COLFAX, DENVER, CO 80204. 720.390.7400 Monroe & Newell Engineers, Inc. FWW20H piofte)2*1 (t1 JOB VA I V 2.1 SHEET NO. OF CALCULATED BY DATE V&tj CHECKED BY DATE SCALE 4u V op io+4 Z Department of Community Development 75 South Frontage Road TOWN OF VAIL 3 Vail, CO $1657 Tel: 970.479.2128 www.vailgov.com Development Review Coordinator TRANSMITTAL FORM Use this form when submitting additional information for planning applications or building permits. This form is also used for requesting a revision to building permits. A two hour minimum building review fee of $110 will be charged upon reissuance of the permit. Application/Permit #(s) information applies to: P.aw # BA-ao4.0 to Correction Letter copy of correction letter Submittal Project Street Address: hA" It Number) (Street) (Suite #) i Building /Complex Name: , Description of Transmittal/ List of Changes, Items Attached: Applicant Information architect, contractor, ow er /owner's rep) Attention: St. evisions Response 1 attached Contact Name: Deferred I 0 Other _ to Correction Letter copy of correction letter Submittal Project Street Address: hA" It Number) (Street) (Suite #) i Building /Complex Name: , Description of Transmittal/ List of Changes, Items Attached: Applicant Information architect, contractor, ow er /owner's rep) D Contact Name: IO Address: P.D. . I31W g D U A A M Cfty State: Zip:' ao 1A Y, Contact Name: use additional sheet ifnecessary) Contact Phone: l O / - 3407 Building Permits: Contact E -Mail: Q. e_ t A6 Y1 S011 Revised ADDITIONAL Valuations (Labor & Materials) 19 .CAM DO NOT include original valuation) I hereby acknowledge that 1 have read this application, filled out Building: in full the information required, completed an accurate plot plan, and state that all the information as required is correct. I agree to Plumbing: comply with the information and plot plan, to comply with all Town ordinances and state laws, and to build this structure according Electrical: to the town's zoning and subdivision codes, design review ap- proved, International Building and Residential Codes and other Mechanical: ordinan ofthe T wn plicable thereto. X 1 Total: 0 ( Owner /Owner's Representative Signature (Required) Date Received: For Office Use Only: Fee Paid: Received From: Cash Check # CC: Visa / MC last 4 CC # exp. date: Authorization # IEC IF SEP 2 6 2014 TOWN OF VAIL 53.0 JOB Monroe & Newell Engineers, Inc. SHEET NO. OF CALCULATED BY DATE CHECKED BY DATE 5 141 Ctf kt ti out r`{ "AXDti' sx r r r w o Q I-H o U D CO 0 m > H F- DJo 9 Z 0 Q w aq a F.rZ ¢ o mO-w_ a• Rio M o > 0 cnzcn w Z sZ 2m j a wuj w J aDy NZ z¢w03: w X 0 >-0 SHOPm r0= mQ QW0w0 maw OIU- iZZfnzCO (=mow zU owoc}oZ LL QPm ow. m0ir w U) CD WQnzrn 0<< -Zxw 0ww W O Jwa'_ LL' > C7 LL• o LLILJJ coO ly p> IX F - X:D3:o -1 0000WLL<0Z_o JD QNwwaLLOWwa= ZzozQ goow:;z W- ng. CO WazJUQng.m0ui zz0:WMC Cn¢2aOo Nvi4t6 0 CO 6 W Cl4 6 s N N p; + $ jt• Q . r. 7: N M 1 I 1 I 1 1 1 1 1 t 1 1 - Ci qobkl nl o• Z w H O Z Z a. O 0 U- 0 w 0 who w vr N Q Ai cne 10 KOM-41 Monroe & Newell ice Engineers. Inc. SHEET NO. OF CALCULATED BY DATE CHECKED BY DATE SCALE Aac) LI 0 7da11 < 7 6 ( - '` 1pe: <iH44 -!5 L4 n bo fl LL. KO AJQ-. alAkW PAA Y,4 26c,- A 5, ,, a