Presentation of
Facilities Master Plan
Vail Planning and Environmental Commission
October 13, 2014
1
Today’s Agenda
Introductions
Response to Questions from 9/22
Follow-up - Meadow Drive/Loading and Service
Overall Traffic and Circulation
Parking
Building Massing/Architecture
Employee
Housing
Middle Creek
LAGATTA
2
Follow-up Questions from 9/22
How can loading provisions be enforced?
How many ambulance trips?
Is this a complete master plan – re: West Lot and US bank building?
Feasibility of ramp (for deliveries) from South
Frontage Road
LAGATTA
3
Follow-up Questions from 9/22
LAGATTA
4
Follow-up Questions from 9/22
LAGATTA
5
Follow-up Questions from 9/22
LAGATTA
6
Follow-up Questions from 9/22
LAGATTA
7
24 ft.
FRONTAGE ROAD ELEVATION: 8171
LEVEL 1 ELEVATION: 8147
8
24 ft.
9
8 ft.
10
13 ft. TRUCK HT.
10 ft. RAMP HT.
11
Meadow Drive/Delivery and Service
LAGATTA
12
Meadow Drive/Delivery and Service
LAGATTA
13
Meadow Drive/Delivery and Service
LAGATTA
14
Meadow Drive/Delivery and Service
LAGATTA
15
Meadow Drive/Delivery and Service
LAGATTA
16
Meadow Drive/Delivery and Service
LAGATTA
17
Meadow Drive/Delivery and Service
LAGATTA
18
Meadow Drive/Delivery and Service
LAGATTA
19
Meadow Drive/Delivery and Service
LAGATTA
20
Meadow Drive/Delivery and Service
THIS IS WHAT WE WILL HAVE with creating front door at frontage road
LAGATTA
21
Meadow Drive/Delivery and Service
LAGATTA
22
Meadow Drive/Delivery and Service
LAGATTA
23
Meadow Drive/Delivery and Service
LAGATTA
24
Meadow Drive/Delivery and Service
LAGATTA
25
Meadow Drive/Delivery and Service
LAGATTA
26
Meadow Drive/Delivery and Service
LAGATTA
27
Meadow Drive/Delivery and Service
LAGATTA
28
Meadow Drive/Delivery and Service
LAGATTA
29
Meadow Drive/Delivery and Service
LAGATTA
30
Meadow Drive/Delivery and Service
LAGATTA
31
Meadow Drive/Delivery and Service
VVMC Master Plan- Delivery and Service
Loading docks and loading activity shall be located inside the building
The number of loading bays within the facility should range from between
3-4 and accommodate turning movements (within the facility) for SU-30 sized trucks
Trash and recycling facilities shall be located inside the building
Streetscape/landscape adjacent
the loading facility should be designed to define distinct spaces (for pedestrians and for trucks) and to discourage parking on West Meadow Drive
Role of West Lot
Aesthetic considerations
Management
and Operations Plan
LAGATTA
32
Meadow Drive/Delivery and Service
“Design and manage loading and service facilities to meet the needs of VVMC while at the same time minimize potentially adverse impacts on the surrounding neighborhood and on West Meadow
Drive”.
LAGATTA
33
Meadow Drive/Delivery and Service
Is Meadow Drive/Delivery and Service appropriately addressed at Master Plan level?
If not –
What additional information is needed?
Are changes to Master Plan necessary?
Are additional
“expectations” needed in the Master Plan to better clarify CUP review process?
LAGATTA
34
Traffic and Circulation
Vail Valley Medical Center Traffic Impact Study
Turnkey Consulting LLC
South Frontage Road Access Improvement Study
Town of Vail/VVMC/Evergreen Collaboration
LAGATTA
35
Traffic and Circulation
LAGATTA
36
Traffic and Circulation
LAGATTA
37
Traffic and Circulation
LAGATTA
38
Traffic and Circulation
LAGATTA
39
Traffic and Circulation
LAGATTA
40
Traffic and Circulation
LAGATTA
41
Traffic and Circulation
LAGATTA
42
Traffic and Circulation
LAGATTA
43
Traffic and Circulation
LAGATTA
44
Traffic and Circulation
LAGATTA
45
Traffic and Circulation
LAGATTA
46
Traffic and Circulation
LAGATTA
47
Traffic and Circulation
LAGATTA
48
Traffic and Circulation
LAGATTA
49
Traffic and Circulation
LAGATTA
50
Traffic and Circulation
LAGATTA
51
Traffic and Circulation
LAGATTA
52
Traffic and Circulation
LAGATTA
53
Traffic and Circulation
LAGATTA
54
Traffic and Circulation
LAGATTA
55
Traffic and Circulation
Is traffic and circulation appropriately addressed at Master Plan level?
If not –
What additional information is needed?
Are changes to Master Plan necessary?
Are additional “expectations”
needed in the Master Plan to better clarify CUP review process?
LAGATTA
56
Parking
VVMC’s goal for Parking
Parking requirements for hospitals and medical facilities
Town’s parking formula
Based on SF
Today would require 697 spaces
“Employee based” formula
Based
on number of employees, exam rooms and patient beds
Today would require 645 spaces
LAGATTA
57
Parking
Existing Parking Situation
407 on-site spaces
92 “alternative” spaces
173 off-site leased spaces
672 total spaces
Range of spaces - 645/672/697
Why the “employee based” formula?
LAGATTA
58
Parking
Master Plan Parking Solution
Need for 50-60 additional spaces
All parking to be on-site
Total parking req. estimated at 730-740 spaces
Parking provide via:
“Alternative spaces”
US Bank
Building
West lot surface spaces
New structure at East Wing
LAGATTA
59
Parking
Is parking appropriately addressed at Master Plan level?
If not –
What additional information is needed?
Are changes to Master Plan necessary?
Are additional “expectations” needed
in the Master Plan to better clarify CUP review process?
LAGATTA
60
Building Massing/Architecture
LAGATTA
61
Building Massing/Architecture
LAGATTA
62
Building Massing/Architecture
LAGATTA
63
Building Massing/Architecture
LAGATTA
64
Building Massing/Architecture
Is building massing appropriately addressed at Master Plan level?
If not –
What additional information is needed?
Are changes to Master Plan necessary?
Are additional “expectations”
needed in the Master Plan to better clarify CUP review process?
LAGATTA
65
Employee Housing
“employee housing impacts need only be mitigated for a redevelopment that results in a greater number of employees generated from an increase in net floor area”
VVMC existing employee
housing program
Estimate of new employees from master plan expansion
Estimate of employee housing requirement
Off-site mitigation
LAGATTA
66
Employee Housing
Is employee housing appropriately addressed at Master Plan level?
If not –
What additional information is needed?
Are changes to Master Plan necessary?
Are additional “expectations”
needed in the Master Plan to better clarify CUP review process?
LAGATTA
67
Middle Creek
LAGATTA
68
Middle Creek
List comments from MP – range of improvements that can be implemented along creek edge.
What PEC will see at CUP review – detailed design of creek/parking lot improvements
“VVMC will evaluate potential improvements to the relationship of the parking lot to the creek corridor”
Expand language in Master to Plan to identify specific measures that may include:
Increased
landscape buffer between parking area and creek
Direct parking lot drainage away from creek
Installation of oil/sand separators or other means to improve quality of water that leaves
site
Snow storage/management
Outdoor spaces along creek
LAGATTA
69
Middle Creek
Is Middle Creek appropriately addressed at Master Plan level?
If not –
What additional information is needed?
Are changes to Master Plan necessary?
Are additional “expectations” needed
in the Master Plan to better clarify CUP review process?
LAGATTA
70
Next Steps
Summary of where we stand on today’s discussion
Oct. 27th meeting - helipad
LAGATTA
71
End of Presentation