Loading...
HomeMy WebLinkAboutB14-0216 Planning Finalo. Requested Inspect Date: TuesdaYl January 20.1.2015 Site Address: 1067 PTARMIGAN Ru VAIL Wells Residence AlP/D Information B14-0216 Type: COMBO Sub Type: ASFR Status: ISSUED Con Occupancy: Use: U Insp Area: MAD JACK TRUST Contractor: INTEGRATED LANDSCAPE MANAGEMENT Phone: 970-471-6529 GROUP INC Description: Install new pool, decking and site wall. Replace existioo boilers. Comment: paper s al routed fo F-1 and laserfiche -CGODFREY Comment routed t -JMONDRAGON Comment: Shelley icked up plans t and will bring them back. -CGODFREY Comment soils report rec'd approved - J AGON Comment: paper REV1 routed to F-1 and lase he and JS in planning dept -CGODFREY Comment: ~~er submittal routed to laserfiche and MH -CGODFREY- Comment: CRl paper submittal routed to F-l CGODFREY Requested Inspection(s) Hem: 542 PLAN-FINAL Requested Time: 08:00 AM Requestor: INTEGRATED LANDSCAPE MANAGEMENT Phone: 970-471-6529 GROUP Comments: 471-6"-'.....-....... Assigned To: GR HER Entered By: JMONDRAGON K Action: Time Exp: 0"-' I-)~I 5 Inspection History Item: 10 BLDG-FOOTING •• Approved •• 07/24/14 Inspector: sgremmer Action: PI PARTIAL INSPECTION Comment: retaining wall 07/28/14 Inspector: sgremmer Action: AP APPROVED Comment: Item: 20 BLDG-Foundation/Steel .. Approved·· 07/14114 Inspector: sgremmer Action: DN DENIED Comment: CMU wall not approved through TOV plan review pour at own risk Engineer drawing was on site and inspected per those drawil1gs 07/28/14 Inspector: sgremmer Action: AP APPROVED"" Comment: 07/30/14 Inspector: sgremmer Action: AP APPROVED Comment: Pool walls 08/04/14 Inspector: sgremmer Action: AP APPROVED Comment: CMU Item: 120 ELEC-Rough •• Approved •• 07/30/14 Inspector: sgremmer Action: PI PARTIAL INSPECTION Comment: Pool bonding 08/21/14 Inspector: sgremmer Action: DN DENIED Comment: must meet 680.b.1 and 2 equipotential pool deck grid 08/25/14 Inspector: sgremmer Action: AP APPROVED Comment: 10/16/14 Inspector: sgremmer Action: AP APPROVED Comment: cover bonding complete Item: 240 PLMB-Gas Piping •• Approved •• 07/30/14 In§j:lector: sgremmer Action: AP APPROVED Comment: MED pressure test at 60 PSI ok for new meter set Item: 250 PLMB-PooVHot Tul:) •• Approved •• 07/30/14 Inspector: sgremmer Action: AP APPROVED Comment: Item: 190 ELEC-Final •• Approved" 11/04/14 Inspector: sgremmer Action: DN DENIED Comment: Bond black pipe ahead of CSST label panel install breaker blank 01/15/15 Inspector: sgremmer Action: APAPPROVED Comment: Item: 90 BLDG-Final •• Approved'· 11/04/14 Insfcector: sgremmer Action: DN DENIED Comment: La ching for spa 01/15/15 Inspector: sgremmer Action: APAPPROVED Comment: Item: 542 PLAN-FINAL Item: 200 MECH-Ro~h •• Approved" 07/28/1 Inspector: sgremmer Action: APAPPROVED Comment: Flue pipes REPT131 Run Id: 14902