HomeMy WebLinkAboutB14-0216 Planning Finalo.
Requested Inspect Date: TuesdaYl January 20.1.2015
Site Address: 1067 PTARMIGAN Ru VAIL Wells Residence
AlP/D Information
B14-0216 Type: COMBO Sub Type: ASFR Status: ISSUED Con Occupancy: Use: U Insp Area: MAD JACK TRUST
Contractor: INTEGRATED LANDSCAPE MANAGEMENT Phone: 970-471-6529
GROUP INC
Description: Install new pool, decking and site wall. Replace existioo boilers.
Comment: paper s al routed fo F-1 and laserfiche -CGODFREY
Comment routed t -JMONDRAGON
Comment: Shelley icked up plans t and will bring them back. -CGODFREY
Comment soils report rec'd approved - J AGON
Comment: paper REV1 routed to F-1 and lase he and JS in planning dept -CGODFREY
Comment: ~~er submittal routed to laserfiche and MH -CGODFREY-
Comment: CRl paper submittal routed to F-l CGODFREY
Requested Inspection(s)
Hem: 542 PLAN-FINAL Requested Time: 08:00 AM
Requestor: INTEGRATED LANDSCAPE MANAGEMENT Phone: 970-471-6529 GROUP Comments: 471-6"-'.....-.......
Assigned To: GR HER Entered By: JMONDRAGON K Action: Time Exp:
0"-' I-)~I 5
Inspection History
Item: 10 BLDG-FOOTING •• Approved ••
07/24/14 Inspector: sgremmer Action: PI PARTIAL INSPECTION
Comment: retaining wall
07/28/14 Inspector: sgremmer Action: AP APPROVED
Comment:
Item: 20 BLDG-Foundation/Steel .. Approved··
07/14114 Inspector: sgremmer Action: DN DENIED
Comment: CMU wall not approved through TOV plan review pour at own risk
Engineer drawing was on site and inspected per those drawil1gs
07/28/14 Inspector: sgremmer Action: AP APPROVED""
Comment:
07/30/14 Inspector: sgremmer Action: AP APPROVED
Comment: Pool walls
08/04/14 Inspector: sgremmer Action: AP APPROVED
Comment: CMU
Item: 120 ELEC-Rough •• Approved ••
07/30/14 Inspector: sgremmer Action: PI PARTIAL INSPECTION
Comment: Pool bonding
08/21/14 Inspector: sgremmer Action: DN DENIED
Comment: must meet 680.b.1 and 2 equipotential pool deck grid
08/25/14 Inspector: sgremmer Action: AP APPROVED
Comment:
10/16/14 Inspector: sgremmer Action: AP APPROVED
Comment: cover bonding complete
Item: 240 PLMB-Gas Piping •• Approved ••
07/30/14 In§j:lector: sgremmer Action: AP APPROVED
Comment: MED pressure test at 60 PSI ok for new meter set
Item: 250 PLMB-PooVHot Tul:) •• Approved ••
07/30/14 Inspector: sgremmer Action: AP APPROVED
Comment:
Item: 190 ELEC-Final •• Approved"
11/04/14 Inspector: sgremmer Action: DN DENIED
Comment: Bond black pipe ahead of CSST
label panel install breaker blank
01/15/15 Inspector: sgremmer Action: APAPPROVED
Comment:
Item: 90 BLDG-Final •• Approved'·
11/04/14 Insfcector: sgremmer Action: DN DENIED
Comment: La ching for spa
01/15/15 Inspector: sgremmer Action: APAPPROVED
Comment:
Item: 542 PLAN-FINAL
Item: 200 MECH-Ro~h •• Approved"
07/28/1 Inspector: sgremmer Action: APAPPROVED
Comment: Flue pipes
REPT131 Run Id: 14902