Loading...
HomeMy WebLinkAboutB14-0045 REV5 transmittal Department of Community Development 75 South Frontage Road TOWN Of VAIL; vai�, CO 81657 Tel: 970.479.2128 www.vailgov.com Development Review Coordinator TRANSMITTAL FORM Use this form when submitting additional information for planning applications or building permits. This form is also used for requesting a revision to building permits. A hvo hour minimum building review fee of$110 will be charged upon reissuance of the permit. _ _ - --__ __ __ __ -- _--- __ _ _ IApplicatlonlPermit#(s)information appiies i �a� Artention: �Revisions I Q Respanse ta Correction Letter ' I PRJ13-0699 Martin A. Haeberle �attached copy of correction letter � � 814-0045(Building 4) �Deferred Submittal � !�j Other I -_ . __. _ ; __ __ _- __ _ _ _. __, Project Street Address: ' 1265 North Frontage Road ' � i ,(Number) (Street) (Suite#) >._ _ ___ � Building/Complex Name: Lion's Ridge Apartment Homes � Description of Transmittal/List of Changes, Items Attached: ', � ---�---------------------�--��--- Bulletin 4 dated 12-15-14,Bulletin 5 dated 1-26-15. � .. I Applicant Information s ! � � -Stair framing at entries was rotated and changed to douglas fir. � � i(architect,contrector,owner/owner's rep) - � -Stair wall detail was revised to clarify shear wall. i �ontact Name: Ben Marshall > ' � -Exterior balcony beam was changed from LVL to 2xt2 treated. Address: 200 N. Main St. � � -Unit entry doors were upgraded to 60 minute rating. � City �regon State: W� Zip: 53575 Contact Name: Ben Marshall � i ' � �(use additional sheet if necessary) �. -_ . _:_._.-'- ---..- _,__ ._-._ 608-835-5534 � - , Contact Phone: Building Permits: bmarshall@gormanusa.com,ppatrello@gormanusa.com Revised ADDITIONAL Valuations(Labor&Materials) i Contact E-Mail: �(DO NOT include original valuation) � I hereby acknowledge that I have read this application,filled out 'Building: $ in full the information required,completed an accurate plot plan, ; and state that all the information as required is correct. I agree to i plumbin icomply with the information and plot plan,to comply with all Town j 9� $ ' ordinances and state laws, and to build this structure according i Electrical: $ I to the town's zoning and subdivision codes, design review ap- proved,lnternational Buil51i and Residential Codes and other �Mechanical: $ j Xrdinanqe of the To r� piicable th�ret . � '/ i Totai: $0 � I OwnedOwner'sYReFp esentative Sign�ure(Required) � - - - _ _ _ i ' _ __ _ _ _ _ _ __ _ ___ i Date Received: For Office Use Only: �. i ,=ee Paid: Cash Check# ' CC: Usa/MC Last 4 CC# exp.date: �. Authorization# � �ORMAN �� «���f;, �;s-,������ F; (��t�) �»-:z9��� REAL ESTATE DEVELOPMENT 200 N. Main Street • Oregon,WI 53575 www.GormanUSA.com MILWAUK[E MIAMI PHOENIX CFIICAGO DENVER Revision#8,Bulletin 4,Dated 12.15.2014 aud Bulletin 5.Dated 01.20.2015 Lion's Ridge Apartment Homes—Building 4 PROJECT: Lion's Ridge Apartment Homes 1265 N. Frontage Road West Vail, Colorado PROJECT MANAGER: Rob Padley GORMAN&COMPANY, INC. 200 North Main Street Oregon, WI 53575 Phone: 608-835-3223 ARCHITECT: Patrick Patrello GORMAN&COMPANY, INC. 200 North Main Street Oregon, WI 53575 Phone: 608-835-6339 Bulletin Numbers 4 and S Include: Detail Undates Based On Contractor RFPS Bulletin# 4 Bulletin#5 G101 —Cover Sheet Index update G101 -Cover Sheet Index update 5001 —Gravity load table was updated G 103 - Stair wall Detail WS was updated to show plywood at first floor per Structural shear S 141, S 142, S 150—Entry stair framing was wall. revised from LVL to douglas fir. S 152—Detail 3 balcony beam framing was S302—Foundation Detail 4 was slightly revised. changed from LVL to 2 x 12. 5620—Detail 8 was updated. S302—Detail 3 was revised slightly. S621 —Detail 1 was revised. S610—Details 6, 8, 10 were revised. A403 —Details 11 & 15 were split apart to S612—Details 3 &5 were updated. clarify. A501 —Detail 17-20 were updated. A503 —Detail 13 was updated. Page 1 �ORMAN ��: «��>r�, f;��-������� � ' F: (60Y1 835-39z3 REAL ESTATE DEVELOPMENT 200 N. Main Street• Oregon,WI 53575 www.GOrmanUSA.COm MILWAUKEE MIAMI PHOENIX CI-IICAGO DENVER Revision#8,Bulletin 4,Dated 12.15.2014 and Bulletin 5.Dated 01.20.2015 Lion's Ridge Apartment Homes—Building 4 A601 —Unit entry doors were upgraded to 60 A503—Accessible notes were updated because minute rated. some Type `A'requirements were listed under Type `B' previously. M001 —Mechanical damper was changed. A504—Deck detail was revised to show a step M401,M402—Damper information was down so snow doesn't leak into unit. Allowed updated. since the upper floor units are not Type `B'. M141 —Gas pipe routing was updated. END Revision#S,Bulletin 4 dated 1215.2014 and Bulletin 5.Dated 0120 2015 Page 2