HomeMy WebLinkAboutB14-0045 REV5 transmittal Department of Community Development
75 South Frontage Road
TOWN Of VAIL; vai�, CO 81657
Tel: 970.479.2128
www.vailgov.com
Development Review Coordinator
TRANSMITTAL FORM
Use this form when submitting additional information for planning applications or building permits.
This form is also used for requesting a revision to building permits. A hvo hour minimum building review
fee of$110 will be charged upon reissuance of the permit.
_ _ - --__ __ __ __ -- _--- __ _ _
IApplicatlonlPermit#(s)information appiies i
�a� Artention: �Revisions I
Q Respanse ta Correction Letter '
I PRJ13-0699 Martin A. Haeberle �attached copy of correction letter �
� 814-0045(Building 4) �Deferred Submittal �
!�j Other
I -_ . __. _ ;
__ __ _-
__
_ _ _.
__,
Project Street Address: '
1265 North Frontage Road '
� i
,(Number) (Street) (Suite#) >._ _ ___
�
Building/Complex Name: Lion's Ridge Apartment Homes � Description of Transmittal/List of Changes, Items Attached: ',
� ---�---------------------�--��--- Bulletin 4 dated 12-15-14,Bulletin 5 dated 1-26-15. � ..
I Applicant Information s !
� � -Stair framing at entries was rotated and changed to douglas fir. � �
i(architect,contrector,owner/owner's rep) -
� -Stair wall detail was revised to clarify shear wall. i
�ontact Name: Ben Marshall >
' � -Exterior balcony beam was changed from LVL to 2xt2 treated.
Address: 200 N. Main St.
� � -Unit entry doors were upgraded to 60 minute rating. �
City �regon State: W� Zip: 53575
Contact Name: Ben Marshall � i '
� �(use additional sheet if necessary) �.
-_ . _:_._.-'- ---..- _,__ ._-._
608-835-5534 � - ,
Contact Phone: Building Permits:
bmarshall@gormanusa.com,ppatrello@gormanusa.com Revised ADDITIONAL Valuations(Labor&Materials)
i Contact E-Mail: �(DO NOT include original valuation) �
I hereby acknowledge that I have read this application,filled out 'Building: $
in full the information required,completed an accurate plot plan, ;
and state that all the information as required is correct. I agree to i plumbin
icomply with the information and plot plan,to comply with all Town j 9� $ '
ordinances and state laws, and to build this structure according i Electrical: $
I to the town's zoning and subdivision codes, design review ap-
proved,lnternational Buil51i and Residential Codes and other �Mechanical: $
j Xrdinanqe of the To r� piicable th�ret . �
'/ i Totai: $0 �
I OwnedOwner'sYReFp esentative Sign�ure(Required) � - - - _ _ _ i
' _ __ _ _ _ _ _ __ _ ___ i Date Received:
For Office Use Only: �.
i
,=ee Paid:
Cash Check# '
CC: Usa/MC Last 4 CC# exp.date: �.
Authorization# �
�ORMAN �� «���f;, �;s-,������
F; (��t�) �»-:z9��� REAL ESTATE DEVELOPMENT
200 N. Main Street • Oregon,WI 53575 www.GormanUSA.com MILWAUK[E MIAMI PHOENIX CFIICAGO DENVER
Revision#8,Bulletin 4,Dated 12.15.2014 aud Bulletin 5.Dated 01.20.2015
Lion's Ridge Apartment Homes—Building 4
PROJECT:
Lion's Ridge Apartment Homes
1265 N. Frontage Road West
Vail, Colorado
PROJECT MANAGER:
Rob Padley
GORMAN&COMPANY, INC.
200 North Main Street
Oregon, WI 53575
Phone: 608-835-3223
ARCHITECT:
Patrick Patrello
GORMAN&COMPANY, INC.
200 North Main Street
Oregon, WI 53575
Phone: 608-835-6339
Bulletin Numbers 4 and S Include: Detail Undates Based On Contractor RFPS
Bulletin# 4 Bulletin#5
G101 —Cover Sheet Index update G101 -Cover Sheet Index update
5001 —Gravity load table was updated G 103 - Stair wall Detail WS was updated to
show plywood at first floor per Structural shear
S 141, S 142, S 150—Entry stair framing was wall.
revised from LVL to douglas fir.
S 152—Detail 3 balcony beam framing was
S302—Foundation Detail 4 was slightly revised. changed from LVL to 2 x 12.
5620—Detail 8 was updated. S302—Detail 3 was revised slightly.
S621 —Detail 1 was revised. S610—Details 6, 8, 10 were revised.
A403 —Details 11 & 15 were split apart to S612—Details 3 &5 were updated.
clarify.
A501 —Detail 17-20 were updated.
A503 —Detail 13 was updated.
Page 1
�ORMAN ��: «��>r�, f;��-������� �
' F: (60Y1 835-39z3 REAL ESTATE DEVELOPMENT
200 N. Main Street• Oregon,WI 53575 www.GOrmanUSA.COm MILWAUKEE MIAMI PHOENIX CI-IICAGO DENVER
Revision#8,Bulletin 4,Dated 12.15.2014 and Bulletin 5.Dated 01.20.2015
Lion's Ridge Apartment Homes—Building 4
A601 —Unit entry doors were upgraded to 60 A503—Accessible notes were updated because
minute rated. some Type `A'requirements were listed under
Type `B' previously.
M001 —Mechanical damper was changed.
A504—Deck detail was revised to show a step
M401,M402—Damper information was down so snow doesn't leak into unit. Allowed
updated. since the upper floor units are not Type `B'.
M141 —Gas pipe routing was updated.
END Revision#S,Bulletin 4 dated 1215.2014 and Bulletin 5.Dated 0120 2015
Page 2