HomeMy WebLinkAboutVAIL VILLAGE FILING 1 TRACT B VAIL ATHLETIC CLUB 1995-1996I Fle VflL
6ltz.E
BBIAN WAGNEN
2$2 Eact Mendow I)rive
Veil, CO SfSSZ
s7o470,-?,4s.4
Tuesday, July 13, 1999
Mr. Dominic F. Mauriello
Senior Planner
75 South Frontage Road
Vail, CO 81657
Re: Vail Athletic Club Un-Landscaped Strip
Thank you for the positive phone conversation we had today regarding the VAC Un-Landscaped Strip.
Thank you for visiting the sight and agreeing that the appearance of the gravel is terrible. I believe the
area looked better with just dirt. I do believe this is not exactly what the Tolrm of Vail had in mind when
they required the area to be landscaped.
I am glad to hear that your research into the situation confirmed:
1. Vail Athletic Clubwasto have removed the bridge.
2. Vail Athletic Club permit drawings show that area as landscaped.
3. Something should be done to prevent parking in the area, such as a couple of large boulders
at the end of the fire lane.
I believe that Vail Athletic Club should fulfill its agreement to landscape the area. I believe they put dovrtn
the gravel, after I had offered to pay for landscaping the area, to avoid ever having the area landscaped.
Sincerely
,----2
-tt'--'t / /"
Brian Wagner ,/mh990713 (/'
cc: Mr. Tomas Zeisel, Manager, Mountain Haus
Town of Vail Council Members
Va,l Utllela Le+"
BBIAI\I WAGNDR
2OP Erct Merdow llrive
Vell, CO 8f657
s7o476-24A4
Tuesday, July 13, 1999
Mr. Dominic F. Mauriello
Senior Planner
75 South Frontage Road
Vail, CO 81657
Re: Vail Athletic Club Un-Landscaped Strip
Thank you for meeting with me today regarding the VAC Un-Landscaped Strip.
I related to you that I have been patiently working with VAC and your department to get this area
landscaped as required Wten VAC removed the trash shed that uras there.
Since March of this year I have offered VAC to share the cost and get it done this spring!
Tuesday, July 06, 1999 VAC Manager told me that they were not going to landscape the area.
I offered to pay for the landscaping. VAC Manager told me that they don't want the area landscaped.
5:00 PM that night the area is posted with a sign: "B&B Gravel for VAC is here"!
Code enforcement inspects the sight and the building department is notified.
Thursday, July 7, 1999 Gravel is dumped and spread on the area.
The Gravel looks terrible and is not the attractive landscaping that The Town of Vail has been talking
about for four years.
I believe VAC graved the area so they can continue to park in the area that is supposed to be landscaped
and has been confirmed as a No Parking area.
I believe Town of Vail should insist that VAC live up to its agreement to landscape the area!
I also ask how are we going to prevent VAC from continuing parking in the area?
I look forward to hearing from you soon.
Sincerely
,--'--2,-''-r<' l.r''
// ,r',///
Brian Wagner /
mh990713
cc: Mr. Tomas Zeisel, Manager, Mountain Haus
Town of Vail Council Members
oo
1996:
VAC Redevelopment District established which requires
VAC to remove trash shed built wilhout permit and
landscape the area.
June 1996
Contractor preparing ground for cement forms. Mike
Mollica contacts VAC and assures me that area is to be
landscaped and is not for Parking.
May 1997
VAC's request to move trash back to old location denied by
TOV.
June 1997
Contractor is measuring area for cement. Mike Mollica
again assures me that area is to be landscaped and is not
for parking.
June 1998
VAC places neur sod up to but not on dirt strip. Dominic
Mauriello assures me that area will be landscaped after the
exterior renovation work of 1999 and the area is not for
parking. Sod dies because it is nol waterecl.
April 7, 1999
To be neighborly, I discussed landscaping the dirt strip ihis
spring with VAC manager. I offered to share the cost.
June9, 1999
Met with VAC Manager and discussed landscaping the dirt
strip. He informs me thal they are talking with their
landscaper and should have plans in a week.
June 16, 1999
Called the VAC Manager. He said that they vnere still
making plans but should do the landscaping betvreen VAC
and MH in two \,veeks.
July 5, 1999
Called VAC Managerwtro informs me: VAC doesn't want to
landscepe the area!
I offered to do the landscaping at my expense and am
informed: VAC doesn't want the area landscapedl
Unlandscaped Strip is posted for a truckload of gravel to
be dumped on the sight tomorrow.
Torrun of Vail Code Enforcement Officer Mitch lmber sees
the area posted with a sign:
'B&B gravel for VAC is here."
Office Mitch lmber is told: lts VAC private property and we
will do anYthing we likel
TNAII,NRINSTRIP
VACYANINSTnIP
B&B SIGN IN STBIP
BrirnWrgnergTGtiIt2z&4
oo
July 6 1999
GRAIDI,DL'}IPED
July 7,
VAC dumps grave on un{andscaped strip and begins
spreading it on area that is supposed to be landscaped.
GIB'AVDI-.SPRI'I} ON
ARIiA
to landscape this area?
VAC from parfting in the
f]NSAI'T) BRTDG}:
"lJ t ^^d,* pL (b',*-- cidyt
6N& l+rkl
l^
LANI}SCAPINGIN
SIMILAn I-,IGIHTING
BrionWrgner
s70-476-249.4
Dominic Mauriello will sees what he can do about the
situation and confirms that VAC does own the un-
landscaped strip
1999
Will the Town of Vail require VAC
How will the Town of Vail Prevent
area?
i'i
IRslI
IG
-U
Q#a,ftAT
drdl.tt
-l.
-
{r,?
{i,
'h
"i'
a
-!|
-
-?
a\v.-rJ
,t ".
-f,JPawfaIrlY
I
I.l
?
-Y(J
a!l(J
AvY
?Artz
-iUIT
,I:
,:"
BAIAN WAGNER
2e2 Drct Merdow llrlve
Yril, CO 8fO$7
97o47B-24e4
Wednesday, July 28, 1999
Mr. Dominic F. Mauriello
Senior Planner
75 South Frontage Road
Vail, CO 81657
Re: Vail Athletic Club Un-Landscaped Strip
Thank you for faxing me the information you found regarding VAC Un-Landscaped Strip. lt's very evident
that you spent a considerable amount of time in your search.
The records confirm:
1 . Gravel was spread over an area that uras supposed to be landscaped.2. VAC is responsible for removing bridge that is noirr unsafe.3. The area is not to be used for parking.
VAC is currently beginning the process of obtaining a building permit to repair the sidewalk in front of their
building. This is also u,ork that rrrras supposed to be done as a part of the Vail Athletic Club Expansion and
Renovation Plan.
I believe that it tlould be appropriate to require the landscaping of the area and removal of the bridge as a
part of this naar building permit. A couple of large boulders should also be required to prevent parking in
the area.
I appreciate all the time you have spent on improving this area and keeping me informed.
Sincerely
,-t- | ,/,'' ,a'-., /".t'_:/_:-tza_.//zrU.t-r-u.-.,
Brian Wagner ,,/
mh990728cc: Mr. Tomas Zeisel, Manager, Mountain Haus
Town of Vail Council Members
BBIrll\i WAGNEB
2Sl Drst Merdow l)rlve
Vrtl, CO 8IO57
s7o47o,-''4A4
Saturday, July 31, 1999
Mr. John Hildreth
Vail Athletic Club
352 East Meadour Drive
Vail, CO 81657
Dear John:
It was a pleasure meeting you today! l'm glad you stopped me and introduced yourself.
I enjoyed talking with you about what could be done on the un{andscaped area at the southwest comer
of you building.
lf I can be of any assistance in you planning or implantation of your landscaping plans, please don't
hesitate to call.
The Mountain Haus and The Vail Athletic Club have many interests in common and should cooperate on
improving both of our properties.
Sincerely
Brian Wagner
mh990731
cc: Mr. Tomas Zeisel, Manager, Mountain Haus
,.MrlDominic F. Mauriello, Senior Planner, Town of Vail
BBIA]\[ WAGNEN
?eP Eret Meadow l)rlve
Yall, CO 81057
s7o470'?,4s,4
Friday, August20, 1999
Mr. Dominic F. Mauriello
Senior Planner
75 South Frontage Road
Vail, CO 81657
Re: Vail Athletic Club Un-Landscaped Strip
After you and I spoke this moming, John Hildreth called to tell me that he was working on removing the
bridge and the landscaping.
John said that he would have to wait until Monday to work on the bridge because they discovered a
hornet's nest under the bridge. He asked if the Athletic Club could keep the dumpster out from a few
more days. I told him I hadn't complained about the dumpster but evidently someone else had. He uras
going to call the manager of the Mountain Haus and explain why the dumpster would be there a few more
days.
John also discussed the landscaping of the area. He wanted to bring in some large rocks and some
shrubs. I told him I thought that was great if they got ride of the gravel. John agreed that the gravel looked
bad and he may move it all under the bridge.
Thank you for follorving up on these items and making sure we take care of the safety issue of the bridge
and parking in the area to be landscaped before the season ends.
Sincerely
mh990820cc: Mr. Tomas Zeisel, Manager, Mountain Haus
To\^m of Vail Council Members
Brian Wagner
I
I
7-
d
\f
4)Qih
b!t
EE
.-= ?
a)
d)
!0
Xo,
+
I
-E
:)e0-a-
d
Io(73,J
\,dJ
t-l-l-F- S
(c
o
cn
oo
I
ot)
xID
,{
,fR
va
LV
Jt
-{J\F
U,?
&,
tE js: F'
ic ;'E $i
'5,t sql Ei
9: €;; ?i
;l si; Fi
;i ts; :!
sF s€g g:
F: :HT gS
;gjfii;€
ic !fii f:
tts3 EEIEY;:{! !fi
Fti
;eF-6_Eb: uExif;c;
d.
8Htrtr(
$*$l
*.-.j-"---.-__-
o F+IqD
75 Sottth Frontage Road
Vail, Colorado 81657
e70-479-2 I 3 8/479-2 I 39
FAX 970-479-2452
September 6, 1996
John Perkins
P.O. Box 2007
Avon Colorado 81620
D e p artrnent of C onmunity D eve Lopment
RE: The Vail Athletic Club
Dear John:
As you are aware. the Town's Design ReView Board (DRB) unanimously approved the Phase I proposal for the
Vail Atlrletic Club (VAC) redevelopment. This approval occured 0n August 21.1996. The DRB's approral
canied with it the following fiv'e conditions:
l. The eisting fencc and storage shed. curently located immediately to the southwest of the VAC
building, must be removed.
2. The proposed wall sunoulding the exterior terrace, on the south side of the structure. shall be a stone
veneer wall. Not stucco. as originally proposed.
3. One additionai cinder path shall be added to access the public open space area, located to the south of
the Vail Athletic Club. This patli shall have a sod border along both sides of it, similar to what was
approved for the pathjust t0 the west,
4, Theproposeduseofwoodforthescreenforthespaarea\\?snotapproved. Thescreenshallbea
stone-faced wall, the size and extent to be approved by the planning staff.
5. If the Phase II improvements for the Athletic Club are not submined for DRB review by June 15, 1997,
then the new windows: which are approved as a part ofPhase I, shall be painted to match the existing
windows.
Additionally. thc DRB agreed rvith your proposal that the landscaping and associated stone veneer along the
south side ofthe Vail Transportation Center, shall be defened until Phase II ofthe redevelopment ofthe Athietic
Club.
Should you have any q.restions or concems regarding any ofthe above. please feel free to contact me directly at
479-2144.
Sincerelv.
il.r Y\A"+L:-
MikfMotlica
Assistant Director of Community Development
-----1
ir,, |'
li
li
iuiltlt-i---iiiiil
Iij,*
;llr
I
I
L-llll
I l---
Llw Orrrce s
Dururu, AeplaruaLp & MAURtELLo, P.C.
JOH N W, DUNN
ARTH UFI A. ABPL,A,NALP, JR.
DIANE HERMAN MAU FI IELLO
CARRIE A. HENDON
sFECrAt COIJNStLi
JERRY W. HANNAH
WesrSraa BrNx B u rr-orNc
roa Sourx FRoNTA,GE Roao Wesr
Su trE 3oo
Va.rL, CoLoRADo a t6s7
25 May 1999
TELEPHONE:(970) 476-0300
FACSltvllLE:
\9701 476-4765
KAREN M. DUNN
CERTI'IEO IEGAL ASSISIAIiI
Mr. Russell Forest
Director
Town of Vail
Department of Community Development
111 South Frontage Road West
Vail CO 81657
Date Feceiver
nAy 26 rc99
. | 6- ...;f.., r ,
Re: Vail Athletic Club
Dear Russ:
As you know, our Firm represents Mr. Ronald Robertson, one of the
condominium owners in the Mountain Haus who is most affected by the plans of the
Vail Athletic Club to expand its building.
Regrettably, Mr. Robertson has been unable to insure, through Mountain Haus
management, that he is advised of plans before the Town of Vail relating to the Vail
Athletic club. The most recent proposal for an amendment to the plan, for e:rample,
apparently went through Planning and Environmental Commission consideration
without his knowledge. We have no doubt that notice was given to the Association,
if that was required by the Town's regulations, but the problem could be entirely
within the Mountain Haus' management structure. Mr. Robertson was able to become
invoived at the Council level only because we observed the item on the Town's agenda
and we were aware both of his concern and of the past failure of Mountain Haus to
pass Town notifications on to him.
Against this baekground, we must ask that the Town attempt to let us know if
any further application is received by the Town relating to any revision of or progress
in the development of the vail Athletic club sDD, zoning, or design. while we are
aware of the fact that the Town is not required to advise individual ovrmers of
adjoining condominium projects, we hope thag by adding this note to rhe Vail Athletic
club file or some similar step, Mr. Robertson and we will be come aware of any
pending activity early enough so that it wi[ not be necessary that he atrempt to
become involved at the last moment.
Through the approach whidr we propose, we hope that Mr. Robertson's
concerns (and perhaps those of other Mountain Haus owners) may be part of the
Town's Process at a relatively early date, and that the Vail Athletic Club project may
not be cast in stone by the time our client or other concerned individuals become
involved in tlte process.
Thank you for your consideration of this request, and for the willingness of your
Department to consider the concerns of those whom we represent.
Enclosure
xc: Mr. Ronald Robertson
Mr. Dominic Mauriello
F'LEftot
TOWN OFVAIL
Department of Community Development
75 South Frontage Road
Vail, Colorado 81657
970-479-2138
FAX 970-479-2452
Septemb€r 22, 1998
Brian Wagner
292 East Meadow Drive
Vail, CO 81657
REr VailAthleticClub-southwestcomerofbuilding *t'ractB, Blor|S,',trilt! rih5e L++
Dear Mr. Wagner:
You have inquired about the status of the Lnprovements on the west end of the VAC. The VAC has an
approval for a redevelopment of the entire site. The applicant is in the permitting process for this
redevelopment and plans to begin the redevelopment of this site in the Spring of 1999. At that timc, a
landscape plan addressing the entire site will be implemented which includes ttre area in question.
I have visited the site and spoken with Stan Cope about the landscaping, parking, and storage in this area.
Vehicles in the area are regularly ticketed and Stan has indicated that these vehicles are not owned by his
employees. Stan also indicated that the area was used to stage the delivery of firewood to the site and was
immediately removcd.
The redevelopment plan will result in an area between the two buildings that will be a substantial
improvement over what exists today. You should be encouraged that the VAC has removed the dumpstcr
enclosure so early in the process, as, in accordance with their approval, this would not have been required
until a Certificate of Occupancy was issued at the completion of the redevelopment.
The Town will continue to work with the VAC and the Mountain Haus to insure both properties adhere to
Town recuirements.
"KMChief of Plannins
C: Stan Cope, VAC
{,P *""'"uo"""
BNI]U\[ WAGNDN
292 East Merdow lldve
Vrll, CO 8fS57
s7o47|f,-243'4
Wednesday, September 09, 1998
Mr. George Ruther
Senior Planer. Town of Vail
75 South Frontage Road
Vail, CO 81657
Dear George:
Thank you for talking to me this moming regarding the Vail Athletic Club (VAC) southwest comer that is
not landscaped.
I have wriften to both Mike Millica aM Dominic Mauriello in the past regarding the area where VAC was
required to remo\re its old trash area that is aciually Torvn of Vail property. When they removed the trash
area they were required by the Town of Vail to landscape this area. That was two years ago and the area
remains a muddy mess.
VAC employees continue to park in this area. VAC stores trash and building materials in this area. And on
September 8, 1998 VAC dumped numerous cords of firewood in this area.
This area is supposed to be an attractively landscaped part of the Town of Vail. The area is directly
outside my living room windoru and remains a nuisance area. tandscaping this area as soon as possible
would eliminate this nuisance.
Please let me know when we can expect this area to be landscaped.
Sincerely
?olrr'*,-rr*'P
4v$w*&
6*.',h6r*
Brian Wagner ,//bn€80909.doc /
I
es
ProjectName: Vail Athletic Club
ign Review Action Form
TOWN OF'VAIL
Project Description: Extension of 8121196 DRB condition requiring painting of windows in the club to
matcb tbose existing on building by Jun,! tS. I9qf .
Owner, Address and Phone: JVVT 1987 LLC,352 E. Meadow Drive, Vail, CO 81657
Architect/Contact, Address and Phone: John Perkins
Project Street Address: 352 E. Meadow Drive
Legal Description: Lot a & b, Blk. I' Vail Village First
Parcel Number: BuildingName: Vail Athletic Club
Comments:
Board i Staff Action
Motion by: Action: staffapproved
Seconded by:
Vote:
Conditions: Extension to June 15. 1999
Town Planner: Dominic Mauriello
Date: 5-15-98 DRB Fee Pre-Paid: $20.00
F :\EVERYONADRB\APPRoVAL\98WAC. 5 I 5
RECEIPT - The Town of Vail
DATE
RECETVED FROM
N9 48792
ADDRESS
Permit Numbers Police Receipt Numbers_--..-_--=--'=-6---/Rw fl:How PAlD-cash-che ,u; /O(Lj
Qucstions'l Crn I'ir.:'r.:ing Staiiai 4?i-' 123
APPLICATION FOR DESIGN REVIEW APPROVAL
CENERAL INFORMATION
This application is for any projcct rcquiring Dcsign Rcvicrv approval. Any projcct rcquiring dcsigrr rcvicrv nrust
rcccivc Dcsign Rcvicw approval prior to submitting for a building pcrnrit. For specific information, sce thc subrDittal
rcquircnrcnti for thc particular approvat that is rcqucstcd. Thc application cannot bc acccptcd until all thc rcquircd
intornration is subntittcd. Thc projcct ntay also nccd to bc rcvicrvcd by thc To*n Council and/or thc Planning and
Environntcntal Conrnrissiou. Dcsign Rcvierv Board apploval expircs onc ycal'aftcr final approval unlcss a
building permit is issued and construction is startcd.
TAl'/iNOFVAIL
DESCRTPTION OF THE REQUEST:
B.
PtfYSICAL ADDRESS:
H.
D.
E.
C.
PARCEL O, A 4 b (Contact Eaglc Co. Asscssors Offrcc at 970-328-8640 for parccl #)
ZONING:
NAME OF OWNER(S):
MAILINC ADDRESS:
PHONE:
OWNER(S) SIGNATURE(S):
NAME OF APPLICANT:
ADDRESS:
pnbxE: 41A -e>1nt>
TYPE OF REVIEW AND FEE:
D Ncw Construction - $200 Construction of a nerv building.
Includcs any adtiition rvhcre square footagc is addcd to any rcsidcntial or
comrncrcial building.
$20 lncludes ntinor changes to buildings and site improvcmcnts' such as.
rcroofing. painting. window additions. landscaping. fenccs and retaining
walls, ctc.
DRB fees are to be paid at thc tirnc of subrrrittal. Latcr, rvhcn applying for a building pennit. pleasc identify
thc accuratc valuation of thc projcct. Thc Toun of Vait rvitl adjust thc fce according to thc projcct valuation.
PLEASE SUBMIT THIS APPLICATION, ALL SUBMITTAL REQUIREI\{ENTS AND THE FEE TO THE
DEPARTI\{ENT OF COIVIMUNITY DEVELOPiVIENT, T5 SOUTH FRONTAGE ROAD.
VAIL, COLORADO 81657.
l#:'.
Application ort"r, 5lu(40 DRB Meeting nut.,
$50tr Addition -
'linor Altcration -
f,"irBAIK I ot va'r BENEFICIARY
OF VAIL
17 Vail Road
Vail, CO 810s7
(970) 47Ss686,LENDER'
IRHEVOCABLE
LETTER OF
CREDIT
: 9 6 8608875 S FroDtage RdVaiI, Co 81657
TETEPHONE T.IO.(...) .
ADDRESS
CUSTOMER
JW:t 1987 Vail Linited Partnership
DBA VaiI Athletic ClubThoBas Rousb
325 E Meadow DrVail, CO 81557
TELEPTIO?{E T{O.
EXPIFATION DATE
This Letter of Credit shall expire upon the earlier ot
1. the close oi business on
Februarv 14, 1998
and all drafts and accompanying statements or documents
must be presented to Lender on or before that time; or
2. the day that Lender honors a draw under which the full
amount of lhis Letter of Credit is drawn.
L€nder indicated above ('Lender') hereby establish€s at the requ€st and for the account oi Customer an lrrevocable Letter of Credit in
favor of Beneficiary for a sum of Thtentt Five rhous-qnl! !!!l 4e1 lo.o
n^ll..c /q 25,000 . O0 \
These funds shall be made available to Beneficiary agarnst Lender's receipt from Beneficiary of drafts drawn at sight on Lender at its address
indicaled above (or such other address that Lender may provide Beneficiary with written notice of in the future) during regular business
hours and accompanied bythe signed written statements or documents indicated below.
WARNING TO EENEFICIARY: PLEASE E)(AMINE THIS LETTER OF CREDIT AT ONCE. lF YOU FEEL UNABLE TO MEET ANY OF ITS
REOUIREMENTS, EITHER SINGLY OR TOGETHER. YOU SHOULD CONTACT YOUR CUSTOMER IMMEDIATELY TO SEE IF THE:
LETTER OF CREDIT CAN BE AMENDED. OTHERWISE, YOU WILL RISK LOSING PAYMENT UNDER THIS LETTER OF CREDIT FOR
FAILURE TO COMPLY STRICTLY WITH ITS TERMS AS WRITTEN.
1. DRAFT TERMS AND CONDITIONS
Lender shall honor the drafts submitted by Beneficiary underthe following terms and conditions:
Recei,pt of written aotice frou au authorized iadividual of tbe Town of Vaifstatiag that tbe custorer bas oot completed the firal gradiDg and laadscaPiag of tbe South
side oi the vail Athtetic club a6 appioved for pba6e l-of the amerded sDD by the Desig! aad
Review Boardof the Town of Vait as per tbe Developer lrnproveBeut Agreement betereeE tbe Tow:1
of Vail and ,fWT 1987 Vail Linited Partaership.
Upon Lender's honor ot such drafts hereinafter, Lender, once the full amount of credit available under this Lett€r of Credit has been
drawn, shall be fully discharged of hs obtigations under this Letter of Credit and shall not thereafter be obligated to make any further
payments under this Letter of credh in respect of such demand Jor payments to Beneficiary or any other person. lf a non-conforming
demand is made, Lender shall notify Beneficiary of its dishonor on or belore the time mentioned in Section 5 below.
Beneficiary shall have no recourse against Lender for any amount paid under this Letter ol Credit after Lender honors any draft or other
document which complies strictly with thls Letter of Credit, and which on its face appears otherwise in order but which is signed, issued, or
presented by any party or under the name of any party purporting to act for B€neficiary, purporting to claim through Beneficiary, or posing
as Beneficiary. By paying to Beneficiary an amount demanded in accordance with this Letter of Credit, Lender makes no representation as
to the correctness of the amount demanded and Lender shall not be liable to Beneficiary or any other person for or in respect to any amount
so pard or disbursed for any reason whatso€ver, including, without limhation, any nonapptication or misapplication by Beneficiary of the
proceeds of such payment. 8y presenting upon Lender or a confirming bank, Beneficiary certifies that Beneficiary has not and will not
present upon the other, unless and until Beneficiary meets with dishonor. Beneficiary promises to return to Lender and confirm any funds
received by Beneficiary in excess of the Letter of Credit's maximum drawing amount.
2. USE RESTRICTIONS
All drafts must be marked 'DRAWN UNDER rti rstB,rnlt of vai I
IRREVOCABLE LETTER OF CREDIT NO.9586088 DATED
februarv 14' 1997 ', and the amount of each draft shall be marked on the draft. Only Beneficiary or Beneficiarys
Transf€r€€ (only if transferable) may complet€ a draft and accompanying statements or documents requirsd by this Letter of Credh and
make a draw under this Letter of Credit. This original Letter of Credh must accompany any draft drawn hereunder-
Partial draws f-l are permitted @ are not permitted under this Letter of Credit. Lender's honor of a partial draw shall
correspondingly reduce the amount of credh available under this Leter ol Credh. Following a partial draw, Lender shall return this
original Letter of Credit to Beneficiary with the partial draw noted th€reon; in the alternative, and in its sole discretion, Lender may
issue a substitute Letter of Credit to 8eneficiary in the amount shown above less any partial draw(s).
3. PERMITTEDTRANSFEREES
! This Letter of Credh may be transferred by Beneficiary upon providing Lender with prior written notice of the transfer. The
Transferee shall be.deemed the new Beneficiary of this Letter of Credit and the documents of the Transferee, including drafts
required und6r this Letter of Credit, are to be processed by Lender (or any intermediary) without the original Beneficiarys
intervention and witholrt any further responsibility on Lender's part to the original Beneficiary.
E The right to draw under this Letter of Credit shall be nontransferable, except for:
A. A transfer (in its entirety, but not in part) by direct operation of law to the original Beneficiary's administrator, executor, bankruptcy
trustee, ,eceiver, liquidator, successor, or other representatives at law; and
B. The first immediate transfer (in its €ntiroty, but not in part) by such legal representative to a third party afi€r express approval of a
governmental body {iudicial, administralive, or executive).
MASI6@ OFormAlion Technologi€s. lnc. (3/2/94) (8001 937-3789
86/e-le6 kh8) (r8lz/c) .rut ,set6o|our.tref uolvu.r.rol O BZOstSVn \
lunoujv
:NA/WUO SITVHO lO IN3!\I3SUOON3
L66T ' lT .f,:enrqeg ;p31p6
'elEo uorlElrdx:l srll sioleq ro uo rapuel eql ol p€lueserd ,! pajouorl
Alnp eq 1|mn {paJO ,o ra$al qq} }o stul€] aqt qtrvr acuerldtlor ur pue iepun umplp sU€Jp leql fuEtcususg qU\ s€aJOE lqataq tepual
IUE ,o lua^a oql u!
NOLtvutdx3 '6
'IpeiC ,o Jegs-l srql repun 6urpeeco:d leOe1
6FE=5T63 ,o alels eqt u! palecol uollorcsrp slr ur Japua"l Iq papalas unoc ,{ue Jo anua^
pue uotlctpsunl aql ol ]uesuoc rtercgeueg pue Jopual 'd3n aql qU\ lua$tsuocut elE s/v\El tl3ns ]uexa eql ol ldacxa 'E3uaulv ]o sepls
pauun ' opE:oToc- io etEls aql Jo s//rpl aql ql/v\ ecuEproccE u! ponJFuoc pue Aq pautaaoo eq lpqs lueruaajoyslql 'IpalC lo Ja$€l stql o1 Aldde lPqs puE urereq paprodJocur p se Allry se loalaq yed e peueap eq spedsa.r llE ur llPqs dCn aql
NOil-ClCSrUnn/M\a ro 33tOHC '8
'^poq sJa$el
eql ulqlM s]Eedde uotstnold qcns alaq/vi ra$Eul ou 'lperC jo Je1el srrll u; suolspold Joqlo lp apulano lpt-ls uorsrirold AlpqEia^as-uousltll 'paJlncco Jeleu pEt{ ltpolC Jo Jslls'l sr(.1} q6noql se olqelrEne s}qOU lp qyr* pardncco eAEq plno
^
qcea uo4rsod aql o} p6:o}sal
eq |;eqs fueogaua8 puE lapua'l qloq puE 'oluul qE pro^ puE ltnu pauraap eq lpqs UpelC lo leuel srql lepun luau:a6e6ua elBue s/apual
'uotlctpsunl butneq Ipoq qelueuu.renob :o ynoc,{ue r{q uoseer Iue to} olqeacJo1uaun polslcop JoAa sl IpaJC }o :aua-1 sgqtlo oedse,{ue 11
Al-t'IgVUfAf S.NON
'6urpro,ra qcns ;o lenordde psnurluoc
puE l€tlul s,/beogauag outlnusuoc sE lueurpuaujp qons lo lcel aq1 uodn burlgar sr rapual lEql (!!) puE lfuercgauag uodn
^1e;os
sueLuar
Oulp.torut qcns q$ riltcuts 6ut{ldtuoc lo uaprnq aql'luasuoo ua$:/,r' Joud s,rspuol r.luM papuaurE sr llp€Jo lo ra$al srql lo Ourpro,ra
lueseld eql llun pue ssalun ]Eq] (t) :sebpaprrouqcE pup spuE]$epun fuercgeqsg 'ueuurv\ sE i{lesrcerd ypajg 10 rells'l s .,l} }o $uauiejlnber
aql qry* ecuettdujoc puls butnetqce ur,{lncggrp rsqp Jo Alrqrssodur ,{ue .ro! alqlsuodser pleq eq Jspual lFqs sacuEFurncJlc ou Jopun
N:tcuns lSNVtldl toc
'esolc ol parnbaj lou aje Jo pazlroqlnE tou reqle
gJE ssalppE s/epua'l lo alels stll ul pe]ecol s{ueq ler3lauruloo uorr,lm uo 'Ieptnleg ldacxa'i(ep,4ue ueau ller.ls lec 6uuueg. 'pouad
^e6-€elql
eql ueLll ssel eurl B urLllrM suoseoi s1 Jo uorsr3€p rouoqsrp E ele3runurLlro3 o1 perrnber aq rela Japua-l llELls JoN ';'oala[.{
ol€O uolteJldxf aLll Jalp M€rp E lo uoddns ur slueu.rncop
^uE
q1Mlepuel epraord jo lsenbel /y\eJp E 1ll:qns ol pelglua eq lou lpr1s
fuetcqaueg puE 'elEO uotlettdx3 eqt aloJeq oO ot s,ieo Ourlueg (g) aalql uetlt ssal qtrM epeul lueuluaseid e alepoull..rocoe o] papuoue
eq lou ll€qs eleO uollerdxl eql 'esodtut IELU (.dCn. aqt pallec .rageurataq) aclauuroC lo Jaqureq3 puoltEuralul et$,{q paqsrlqnd
I[uacet ]sotl sE '0Og oN uortE3rlqnd CCI 'uorsrneg e66t 'slparC fuEluauJnco6 rol acrpE:d puE srrlolsnC ulloyun alll se quaurerrnba.r
6urur1 :eq1o pue 'y'e;ap noqlM, ',au.,rt glqeuos€er. eql laur eneLl ot pouloap
^le^rsnpuo3
eq lpqs Jepual 'pouad Aeg-earqg aq1
6uunp uentb os uosear qcns lue rol 'Jouoqsrp roJ uoseei ,{ue:o 1;es1 uolslcep rouoqsrp aq} burulecuoc .tepue"l uro! (s)uotlectunuuloc
fueututrlerd r(ue 1o poue6 r(e6-eerq1 arll aplsu! 6ulun aLlt (rr) ro 'ageg uol1elrdx3 aql e:oFq epeur ueulusssrd
^ue
1o 6urul1
eq1 (r) :eq11e ol preber FoquM uospal qcns,{ue uodn {1ar ol pel!}u6 sq lpLls rapue'I '(.pouad lteg-aarq1. eql) uaurlueserd s,fueogeueg
lo ued 6u!u.uo, waurncop ]sEl €ql pe^ra3e: sEq Japue'l rage sr(e6 Eurlueg (g) ee:ql urrluM sa^laca: raluasard aqt ro fuepgeuag
qcrLl/ uorlEcrunuuoc E ur uerrro jouoqsrp Jo] uosEaj
^uE
uodn 6uu{;ar uor; pepnlcard eq rapual lpqs saSue}sujncJo ou Jopun
uoNoHSro ro 9N[,''ill
'fuerc4auag pur6uo eq1 ro1 AlJoqFE []il/{ lcE o1 ro qbno.lql u.rrelc o},fuloqFe s,.te}uesard aql Moqs r]crqM slueu,ncop
eroLu ro suo or'lt lo Adoc pa4ryac e 'g'g Japun Aued p:lrll E ro V'e qderbeled rapun aaJalsuerl pa$u.red e sl :eluasa.rd eql uaqM '€
puE :e qdEJOEJpd ,{q pE$lured re}uese.,d aql lo fuetcgauag putouo eql
reqle Iq pencaxa pue,o auiEu eq1 ur eq Ietu sluauncop r.lcns leqt ldecxe 'llpalC lo Ja$el slul u! oJaqivraslo pe:tnbet sueutrcop llv 'V
.L
:opnlcur lleqs MErp e :o1 parlnba: suauJncop aql 'enoqe g qderEe:ed :epun aerajsuell pa$tuiad e st Jaluesard eqg ueq6
ATlnraxg
sr.N3t4n3000lutno3Hs,l3u3isNvur'?
.TTB'IJ{(
OF VAIL
17 Vait Boad
Vail, CO 81657
(970) 47$5686,LENDER"
irw:r 19 87
DBA Vail
Thomas
AOORESS325 E Meadow. DrVaiI. Co 8165 z
TELEPHOiIENO. IOE}fNRCATION NO.
va_il LiEited pertrershipAthletic CIub
Rousb
BENEFICIAFY
75 S FroDtaqe RdVail, Co 8155?
TELEPHOiIE }IO.(...) .
ADDRESS
toENTrFlcATtofl No.
IHREVOCABLE
LETTER OF
CREDIT
NO.: geseosg
CUSTOMEF EXPIFATION DATE
This Letter oi Credit shall expire upon the earlier of
1. the close of business on
February 14, 1998
and all drafts and accompanying statements or documents
must be presented to Lender on or before that time; or
2. the day that Lender honors a draw under which the full
amount oi this Lener of Credrt is d.awn.
. Len{er indicated above ('Lendef) hereby €stablishes at th6 request and ior th€ account of custom€r "n lu"uo""bl"Glffifavor of Beneficiary for a sum of lwenty five Ttrgusand'and no/io0 --- --
il*" tu"d. .hril b;@**t l"nu*. ,""",pt r,.o' e"n.fi"iury or 3illili*!1;fiffii** "G;;J;indicated above (or such other address that uenoeimay prouioe a"nefr"i; ffi';il;;,i""'"ti" #?"r:;i;ijr-^;;;ffi;";#:::hours and accompanied bythe signed written statements oi oocuments indicated below.
WARNING TO BENEFICIARY: PLEASE EMMINE THIS LETTER OF CREDIT AT ONCE. IF YOU FEEL UNABLE TO MEET ANY OF ITSREOUIREMENTS, EITHER SINGLY OB TOGETHER, YOU SHOULD CONTACT YOUR CUSTOMEF IMMEDIATELY TO SEE IF THELETTER OF CREDIT CAN BE.AMENDED. OTHERWISE, YOU WILL RISK LOSING PAYMENT UNDER THIS LETTER OF CREDIT FORFAILURE TO COMPLY STRICTLY WITH ITS TERMS AS WRITTEN.
1. DRAFT TERMS AND CONDITIONS
Lender shall honor the drafts submitted by Beneficiary under the following terms and conditions:Receipt of writteu uotice from an authorized iadividual of the Towu of vailEtating that tbe custouer has uot J"rpietea tn- iinii-gria:.o9 anat Lardscaping of the soutbEide of the vail Athletic club as app-ronea for Pha6e 1-of the ameuded sDD by the Design andReview Boardof the lown of vair "r !,'ii tue oe,rerof;; ir;;";;neat Agreement betweea the Townof vaiL and JWT 1997 vail Linited pirinership. ^
Upon Lender's honor of such drafts her€inafter, Lender, once the full amount oi credit available under this Letter of Credit has beendrawn, shall be fully discharged of hs obligations. under this Lett€r of Credit and shall not thereafter be obligated to make any fufiherpayments under this Letter of Credit in respect of such demand for payments to Beneficiary or any other person. lf a non-conformingdemand is made, Lender shall notify Beneficiary of its dishonor on or before the time mentioned In Section 5 below.
8eneficiary shall have no recourse against Lender for any amount paid under this Letter of Credit after Lender honors any draft or otherdocument which complies strictly with this Letter of Credit, and which on its face appears otherwise in order but which is signed, issued, orprssent€d by any party or under the name of any party purporting to acl for Beneficiary, purporting to claim through Beneficiary, or posingas Beneficiary. By paying to Beneficiary an amount demanded in accordance with this Lefter of Credit, Lender makes no representation aslo the correctness of the amount demanded and Lender shall not be liable to Beneficiary or any other person for or in resped to any amountso paid or disbursed for anyreason whatsoever, including, without limitation, any nonapplication or misapplication by Beneflciary of theproceeds of such payment. By presenting upon Lender or a confirming bank, deneficiary certifies that Beneficiary has not and wilj notpresent upon the other, unless and until Beneficiary meets with dishonor. Beneficiary promises to return to Lender and confirm any fundsreceived by 8eneficiary in excess of the Letter of credit's maximum drawing amount.
2. USE RESTRICTIONS
All drafts must be marked.DRAWN UNDER FirstBank of. vail
i:i513ff H-'1Tii"T":['.':lT,l;.;ffi ft **."",,.*?,"1??Transferee (only if transferable) may complete a draft and accompanying statements or documsnts required by this Letter of Credit andmake a draw under this Letter of Credit. This original Letter of Credit muJt accompany any draft drawn hereunder-
Partial draws I are permitted @ are not permitted under this Letter of Credh. Lender's honor of a partial draw shallcorespondingly reduce the amount of credit avallable under this Letter of Credh. Following a partial draw, Lender shall return thisoriginal Lefter of Credit to Beneficiary with the partial draw noted thereon; in the alternative, and in its sole discretion, Lender mayissu€ a substhute Lefter of Credit to Beneficiary in the amount shown above less any partial draw(s).
3. PERMITTEDTRANSFEREES
I This Lefter of Credit may be transferred by Bene{iciary upon providing Lender with prior written notice of the transfer. TheTrans{eree shall be deemed th€ new Beneficiary of this Letter of Credh and the documents of the Transferee, including draftsrequired under this Letter oJ Credit, are to b€ procossed by Lender (or any intermediary) without the original Beneficiary'sint€rvention and without any furth€r rosponsibility on Lender's part to tne original 6eneficiary.
@ rne right to draw under this Letter of credh shall be nontransferable, except for:
A' A lransfer (in its €ntirety, but not in part) by direct operation of law to the original Beneficiar/s administrator, execlrtor, bankruptrytruslee, receiver, liquidator, successor, or other representatives at law; and
I' The first imm€diate transfer (in its entirety, but not in part) by such lsgal reprosentative to a third party after express approvat of agovemmental body fiudicial, administrative, or executive).
MAST6O2 O FormAtloo lcchnologies, Inc- (3/A,/91) {S0Ol937_3799
4. TRANSFEREE'SREOUIREDDOCUMEO
When the presenter is a permitted Transferee under paragraph 3 above, the documents
o
required for a draw shall include:
A. All documents required elsew,here in this Lettsr of Credh, except that such documents may be in the name of and executed by either
the original Beneficiary or the presenter permitted by paragraph 3; and
B. When the presenter is a permittad Transferee under paragraph 3.A or a third party u.nder 3'B, a certified coPy of the onE or more
documents which show the presente/s authority to claim tfirough or to act with authority lor the original Beneficiary'
TIMING OF DISHONOR
under no circumstancss snall Lender be precluded irom retying upon any reason tor dishonor given in a communication which
Beneficiary or the presenter receives within three (3) Banking days after Lender has received the last document forming paft oi
Beneficiary's presentment ltne 'Three-Day Period'). Lender shall be intitled to rely upon any such reason whhout regard to either (i) tha
timing of any presentment made befoie the Expiration Date, or (ii) the timing inside the Three-Day Period of any preliminary
communication(s) from Lender concerning the dlshonor decision itself or any reason for dishonor. For any such reason so given during
the Three-Day period, Lender shall be ionclusively deemed to have met the 'reasonable time', 'without dela)/, and other timing
requirements as th€ Uniform Customs and Prac.tice for Documentary Credits, 1993 Revision, ICC Publication No 500',as most recontly
published by the Internattonal Chamber of Commerce (hereinafter called the 'UCP') may impose. The Expiration Date shall not be
extended to accommodate a presentment made with less than three (3) Banking Days to.go beiore the Expiration Date, and Beneficiary
shall not be entifled to .un.it a draw request or provide Lender with any doluments in support of a draw after the Expiration Date
hereof. Nor shall Lender ever be required to communicate a dishonor decision or hs reasons within a time less than the Thre+Day
period. .Banking Day' shall mean any day, except Saturday, on which commercial banks tocated in the state of Lende/s address are
either not authorized or are not required to close.
COMPLIANCE BURDEN
Under no circumstanc€s shall Lsnder be held responsible for any impossibility or other difficulty in achieving strict compliance whh the
requirements of this Letter oi Credk precisely as wiitten. Beneficiary understands and acknowledges: (i) that unless and until the present
;;i^g of this Letter of Credit is amended with Lendeds prior written @nsent, the burden of complying striclly with such wording
remainl solely upon Beneficiary; and (ii) that Lender is relying upon the lack o{ such amendment as constituting Beneficiary's initial and
continued approval of such wording.
NON-SEVEBABILITY
lf any aspect of this Letter of Credit is ever declared unenforceable for any reason by any court or governmental body having iurisdiction'
Lender,s entire engagement under this Letter of Credit shall be doemed null and void ab inhio, and both Lender and Beneficiary shall be
restored to the position each would have occupied with all rights available as though this Letter of Credit had never occurred' This
non-severability provision shall override all other provisions in this Letter of Credit, no matter where such provision appears within the
Lette/s body.
8. cHolcE oF LAW/JURISDICTION
The UCp shall in all respects be deemed a part hereof as fully as if incorporated herein and shall apply to this L€ttor of Credit' This
Agreement shall be governed by and construed in accordanie whh the laws of the state of cororado , Unhed
States of America, except to th"
"r,trnt
such laws are inconsistefit with the UCP. Lender and Beneficiary consent to th€ iurisdiclion and
venue of any court selected by Lender in its discraion located in the State of --C,olqrado
in the event of any
legal proceeding under this Letter of Cr€dit.
9. EXPIRATION
Lender hereby agrees with Beneficiary that drafts drawn under and in compliance with the terms of this Letter ol Credit will be duly
honored i{ oresented to the Lender on or before the Expiration Dat6.
ENDORSEMENT OF DRAFTS DRAWN:
Dated: February LAt L997
of vail
rll FormAtion Technologies. lnc. (3/'219.{) (3O0) 337'3799
o o
DEVELOPER IMPROVEMENT AGREEMENT
THIS AGREEMENJ, ma{e anfl entered into tnis 2l $ Oay ot 1e1:L
!v_ g nO amo ngWh e re i n aft e i ca | | e i t h e-" D e vetop and the
LETTER OF CREDIT FORMAT
(hereinafterTOWN OF VAIL (hereinafter called the,,Town',) and
called the "Bank").
WHEREAS, the Developer, as a condition.of approval ot fie frns^,Llv !> fi0
ptans, dated ititxurly , fb, , 191_b...-wishes to enter into a Gvetoper
lmprovement Ag reement;'and
WHEREAS, the Developer is obligated to provide security or collateral sufficient in the
judgment of the Town to make reasonable provisions for completlon of certain improvements set
forth below: and
WHEREAS, the Developer wishes to provide collateral to guarantee performance of this
Agreement, including construction of the above-referenced improvements by means of the
fotlowing:
Developer agrees to establish a letter of credit with a Bank in Eagle county in a dollar
amount of $_Z{csu-_C2A (25o/" ot the total cost of the work shown below) to provide
security for the following:
IMPROVEMENT
E*O, 6f*a6;tu,; Azut c4*43c,tf:tud aF -fff? So'r'r= Slf6
otr 1++e- L/*it- firrnn,- C.qt its ftf fu-pury ftt- 4"n L *
-Np lal:ta,uat* 'ltfr tf -,tr*- fi=rd-N n*( /tu*-' 6o* c,F ft+c-*7io* * U/'c-
NOW, THEREFORE, in consideration of the following mutual covenants and agreements,
the Developer and the Town agree as follows:
1. The Developer agrees, at the sole cost and expenses, to furnish all equipment
aqd material nec-e^ssary to perform and complete all improvements, on or before
{4acq=r i , 1177 . The.Developer sirall complete, in a good workmantike manner, atl
lmprovements as listed above, in accordance with all plans and specifications filed in the office of
the Community Development Department, the Town of Vail, and lo do all work incidental thereto
according to and in compliance with the following:
a. Such other designs, drawings, maps, specifications, sketches, and other matter
submitted by the Developer to be approved by any of the above-referenced
governmental entities. All said work shall be done under the inspection of, and to
the satisfaction of, the Town Engineer, the Town Building Official, or other official
from the Town of Vail, as affected by special districts or service districts, as their
respective interest may appear, and shall not be deemed complete until approved
and accepted as completed by the Town of vail community Development
Department and public Works Department.
2-' To secure and guarantee performance of its obligations as set forth herein, the
Developer agrees to provide security and collateral as follows:
lrrevoglbje lg;tter of credit #JAL64E __ in the amount ot $]ft_oaa.3a
(name of bank in Eagle County) as
the security for the improvements set forth above if there is a default under the
Date of Expiralion:
Agreement by Developer.
Page 1of3
3. The Developer may at any time substitute the collateral originally set forth above
for another form of collateral acceptable to the Town to guarantee the faithful completion of those
improvements referred to herein and the performance of the terms of this Agreement. Such
acceptance by the Town of alternative collateral shall be at the Town's sole discretion.
4. The Town shall not, nor shall any officer or employee thereof, be liable or
responsible for any accident, loss or damage happening or occurring to the work specified in this
Agreement prior to the completion and acceptance of the same, nor shall the Town, nor any
officer or employee thereof, be liable for any persons or property injured by reason of the nature
of said work, but all of said liabilities shall and are hereby assumed by the Developer.
The Developer hereby agrees to indemnily and hold harmless the Town, and nay of its
ofticers, agents and employees against any losses, claims, damages, or liabilities to which the
Town or any of its officers, agents or employees may become subject to, insofar as any such
losses, claims, damages or liabilities (or actions in respect thereof) that arise out of or are based
upon any performance by the Developer hereunder: and the Developer shall reimburse the Town
for any and all legal or other expenses reasonably incurred by the Town in connection with
investigating or detending any such loss, claim, damage, liability or action. This indemnity
provision shall be in addition to any other liability which the Developer may have.
5. lt is mutually agreed that the Developer may apply to the Town and the Town shall
authorize for partial release of the collateral deposited with the Town for each category of
improvement at such time as such improvemenls are constructed in compliance with all plans
and specifications as referenced hereunder and accepted by the Town. Under no condition will
the amount of the collateral that is being held be reduced below the amount necessary to
complete such improvements.
6. lf the Town determines, at its sole discretion, that any of the improvements
contemplated hereunder are not constructed in compliance with the plans and specifications set
forth in this Agreement on or before the date set lorth in Paragraph 2, the Town may, but shall
not be required to, redeem the letter of credit as necessary to complete the unfinished
improvements. The Bank shall release such funds upon written request from the Town stating
that the improvements have not been completed as required by this agreement. The Bank shall
not require the concurrence of the developer prior to release of the funds to the Town nor shall
the Bank be required to veriiy independently that such improvements have not been completed
as required by this agreement, but shall release such funds solely upon the Town's written
request.
lf the costs ol completing the work exceed the amount of the deposit, the excess,
together with interest at twelve percent per annum, shall be a lien against the property and may
be collected by civil suit or may be certified to the treasurer of Eagle County to be collected in the
same manner as delinquent ad valorem taxes levied against such property. lt the permit holder
fails or refuses to complete the cleanup and landscaping, ad defined in this chapter, such failure
or refusal shall be considered a violation of the Zoning Code.
7. The Developer warrants all work and material for a period of one year after
acceptance of all work referred to in this Agreement by the Town if such work is located on Town
of Vail property or within Town of Vail right-of-way pursuant to Section 17.'16.250.
8. The parties hereto mutually agree that this Agreement may be amended from time
to time, provided that such amendments be in writing and executed by all parties hereto.
Dated the day and year lirst above written.
Page 2 of3
Developer
STATE OF COLORADO
COUNTY OF EAGLE
t n_l The foreg'Yl^dayof_
Witness my hand and official seal.
My comrnissio n expi'res: t l-7'/18
STATE OF COLORADO
COUNTY OF EAGLE
Witness my hand and official seal.
My commission expires:
STATE OF COLORADO
COUNTY OF EAGLE
Witness my hand and official seal.
My commission expires;
SS.
E?flgoil'no'ou"'n'n,.1sJgTef
tw.%*nowplj#qeroremethis
The foregoing Dgveloper lmprovement Agreement was
day of filLnv
Ftasr6o*, d{ VttL
rr
Frr45f4q"t tc:,. /'lhctzile;ic A 1f ezol.J.
Planner, Community Development
before me this
: t'{- The foregoing Deyeloger lmprovement Agreement'-/' ' rfarr n{ /.-p,(1ltr<L? .lS 4?bV
f leYeryon e\forms\dsvimpag.ltr
f?Y
FIL I I
Y
TOWN OF VAIL
D epa rune nt of C ommunity D eve lop m e nt
75 South Frontage Road
Vail, Colorado 81657
970-479-2138
FAX 970-479-2452
December 22.1991
Mark R. Ristow
Execulivc Vice-Prcsident
First Bank of Vail
l7 VailRoad
Vail, CO 81657
RE: VailAthlctic Club
Dcar Mark:
This lcttcr shall constitute thc rclease of the inevocable Letter of Credit No. 968608tt that thc
Towtr was holding for-JWT 1987 Vail Limited Partnership (d.b.a. Vail Athlctic Club) in thc
amount of $25,000.
All improvemcnts associated with thc Phase I construction at thc Vail Athletic Club havc now
bccn completed and a final inspection has now becn approved. Attached for your files is thc
original irrevocable Lettel ofCredit. Ifyou shoutd have any questions regarding thc Lctter of
Credit or the Developer Improvement Agreement, please feel fi'ee to contact me directly al 47g-
2144.
Sinccrclv^
W]^ N,u-
Mike Mollica
Assistant Director of Community Development
cc: Stan Cope
{p *"""""o 'n'"*
Mr. Mike Mollica
Asst. Director, Community Development Department
Town of Vail
75 S. Frontage Road
Vail, CO 81657
March24,1997
Dear Mike,
Flease consider this iettef as authonzaticn to adC the
following language to our Developer Improvement Agreement
dated February 19,1997.
The " Improvement" shall include repairs to the stucco and
building that were damaged on the south side of the building
by the construction should the Vail Athletic Club delay the
beginning ofPhase 2 beyond this summer.
In this case, the work would be completed at the same time as
the landscaping work which is August 1,1997. The original
amount ofthe ietter ofcredit anticipated these potential
repairs when we first submitted the Developer Improvement
Aereement.
W
Managing Agent
Vail Athletic Club
IWT 1987 Vail Limited PartnershiD
Hotel
sfra
352 Ee$ MsADow DRrvE
Ver, Coloneoo 81657
e-moil: vac @ vail.net
Hsrsr 970t476-0700
$pr,9701476-7960
Frx9701416-il51
800 | 822-47 54
ilsign Review Action F;m
TOWN OF VAIL
Category Number
Project Name:
Building Name:
Project Description:
Owner. Address and Phone:
Zone District 5Lh
ProjectstreetAddress: 3-5 2 | , l.'ia---l--.- \rr ,
Comments:
Board / Staff Action
Motion by: Vote:
Seconded by:
! Approval
! Disapproval
\1 StaffApproval
9999999 "' C T ^1't, re . ,n, ,t/+ Uoo o&- ."/* ) * " . n
DRB Fee Pre-paid -€)-
:
ign Review Action rdin'
TOWN OF VAIL
Category Number:
Building Name:
Project Description:
Owner, Address and Phone:
C@contact, Address and Phone:
Pn t'.,4. 2nt;,-t A"-o* ( A t!6zo
Project Street Address:
Board / Staff Action
Vote:Motion by:
Seconded by:
$4on..ou"t
! Disapproval
n $afiApproval
Conditions:
&^^.|
DRB Fee Pre-paia * 200.*
Town Planner
il
i
I
I
I
I
Ii!
i
Itl t
II
I.l
I
I
John M. Perkins, AIA
Vail Athletic Club
Materials and Color
Specifi cation lnformation
April 16, 1997
Stucco -
Windows, Doors & Railines -
Roofing -
"Rheinzink"
Wood Columns -
(Pine peeler log)
Balcony Fascias, Lower Fascias and
Beams & Brackets -
Exposed Metal @ Roof -
Stone Veneer -
"Hump and Bump" texture
Color #2096
Black Green
#RAL 6012 by "Solarhtx"
Zinc Standing Seam
Natural Zinc color by
Semi-transparent stain &
wood preservative by
"Moorwood" #00880
Painted to match zinc
Angular gray granite
^"5+o" coloB.
I
Questions? atn. Planning Statl at 479-2128
APPLICATION FOR DESIGN R-EVIEW APPROVAL
GENERAL INFORMATION
This application is for any projcct requiring Design Review approval. Any project requiring design review must
rcccivc Dcsign Rcvicw approval prior to submitting for a building pcrmit. For specific information, see the submittal
rcquircmcnts lbr thc particular approval that is requested. The application cannot be acceptcd until all the required
infbrnration is submifted. The project may also need to be reviewed by the Town Council and/or the Planning and
Environmental Commission. Design Review Board approval expires onc ycar after final approval unless a
building pcrmit is issued and construction is started.
B.
\--
D.
PI{YSICAL ADDRESS:
ZONING:
NAME OF OWNER(S):
G. TYPEOFREVIEWANDFEE:
WTmrsruction-$2oo
-
l' E MinorAlteration - $20
1 E Conceptual Review - $0
-'-J
MAILINGADDRESS:
E.
NAME OF APPLICANT:
owNER(S) STGNATURE(S):
MAILINGADDRESS:
PHONE:
Construction of a new building.
Includes any addition where squarc footage is added to any residential or
commcrcial building.
includes minor changes to buildings and site improvements, such as,
reroofing, painting, window additions, landscaping, fences and retaining
walls, etc.
For any application where the applicant wishes to meet with Design Review
Board to determine whether or not the project generally complies with the
desigr guidelines. The DRB does not vote on conccptual rwicws.
DRB fees are to be paid at the time of submittal. Later, when applying for a building permit, please identiff
the accuatc valuation of the project. The Town of Vail will adjust the fee according to the project valuation.
PLEASE SUBMIT THIS APPLICATION, ALL SUBMITTAL REQTJIREMENTS AND TT{E FEE TO T}IE
DEPARTMENT OF COMMI]NITY DEVELOPMENT, T5 SOUTH FRONTAGE ROAD,
vArL, coLoRADO 81657.
TOWN OF VAIL
DESCRIPTION OF THE REQUEST:
LOCATION OF PROPOSAL:
PHONE:
Updated 1/97
t?
;'1,_J .:$fl- "#r .lJl .._F*lrial
i'!r.{.i'-r.,' . lgnt'i, i t,)if*t}-.ll-il.$I-iilFt'.J rrtf,F"*sl rtLrir . rji rtrn$ _ ;5g1Olrt
TfiJFl :llilt.Jj.Iu.Jirti dr^fl . *t:^.cjl{{
ctll4 t,F:.)l-liSIA
,..nO$S .$UJTSi*'tl
l=**rruT*gt
. il\ -lfrrl:.; ,i*:Jis;rit tl*-Iqgffq .:l,i .11'3*
qF{a:Et.tF *rt(T''',#iof'.'' Hbi**-' r .'*t"
" . S "I i-utr3+trlt'1 -TE}tEl .!-'tlf l.$i .- sle-.sli,' i ,-s,Ciig . ct..: I 'ji{ t
"11'i f .ilJl5j;1; ..^s l+1.d ,
(-l.Siittl . r}1 .l-lgui\ iill,' .tfe$
-Ti,,\iifr .-f;}fii'
BUILDING MATERIALS:COLOR:*
Roof
Siding
Othcr Wall Materials
Fascia
Soffits
Windows
Window Trim
Doors
Door Trim
Hand or Dcck Rails
Flues
Flashings
Chimncys
Trash Enclosures
Creenhouses
Retaining Walls
Exterior Lighting* *
Other
tlAlww@Hl
$**sl-P*p 6rEeH
rhr.-
zlt4c;f,Fr zJt{c-
EIICI,EHO
* Pleasespecify the manufacturer's color, number and attach a small color chip
** All exterior lighting must meet the Town's Lighting Ordinance 18.54.050(J). If exterior lighting is proposed,
please indicate the number offixhres and locations on a separate lighting plan. Identify each fixture type and provide
the height above gade, lumcns output, luminous are4 and attach a cut sheet of the lighting fixtures.
(:l.f+l fi..ttfl-r
l-ri*sfc3 cf,J<s Frtl:ti i
-" iActutA++..lrtlr$,/l ?:;: 3H:X
A.,'i i
.*flilru rF*r ( ).-fJ.rf?
Cftl,il*Il.5 -!Ldrg{) ,3.:; .ig:tr d,?,ri -.sl*S'
({cx)tuj1r.iY . e.:l
,,^{'f fi'lr$' ri-fl{;iJ I r,'ttr$
Atri"i
pfsf;t*s l)ft$rtf,l't;+ .f.l;\,i*rlr ;,ri'i.;;.1;,1"1$Jr1
A,j;
t{H*Ia'^iJrry?vtt+ r;?cl,r4ut: . Fir_ti,a.
Jl.,,lfs ',ed;$tt-li*{-f .-l**ti4}di",i . }#T li,*.,1\
*)f"lJ.I z1T-.fl-,lis
:TL*iw :.f{.r,}a:iag*,|tir"i:;t*f i-ll:r JFj.
( iJ|r&-?$ "lll"fi F
'{ll }
a.i}{.I.l .-:;llf,::cna$u t l,str}
PROPOSED TREES
AND SHRUBS:
PROPOSED LANDSCAPING
Botanical Namc Common Namc Quantity Sizc*
w Frsrc*4s Vl Et-r-lsohl
EXISTING TREES TO
BE REMOVED:
Type
deciduous trccs - 2 inch caliPer
conifcrous hees - 6 feet in hcight
shrubs - 5 gallons
Squarp Footage
CROUND COVER
SOD
SEED
IRRICATION
TYPE OR METHOD OF
EROSION CONTROL
OTHER LANDSCAPE FEATURES (retaining walls, fences, swimming pools, etc.) Please specifl. Indicate top and
bottom elevations of retaining walls. Maximum height of walls within thc front setback is 3 feet. Maximum height of
walls elsewhere on the property is 6 feet.
*Minimum requiremcnts for landscaping:
j l, i"'l i
' '. r ' r) . !. !a '' -t. 1.. i
.- * I'V . '.. lt rn- . il if. l:
y, f .?: ? ; .:' t'-"; i't
t-lr
I
*i--F ;.*.fF*
*
t .1.. 'ltItaa .,, - a
.-t--'-.- - r
-.1
:-it.?-' -rc.
e-
\,.-_
l"-'{\,.
\
,t.*
M"deL ?h"\os
I n' t,'i
,',
3. , ...i.-+.r. :! ,'.. i: {.a't'
,lt
I;:J
l t. trlil;f r. -*r
.t j -'.,1 r , '' :i
}
I
a
taJ
.l Ja I J
t
,!it- -S*
t lFl
If!!u
f: l, 1 F
F.T-
:--
T>
,t+
'' .-\.;-
"+.
_**
fir
;l
:,') xt
..-- --:1t -
\
H
i
'*#
,*"-*J
t
'*;'Sl
TO:
FROM:
DATE:
SUBJECT:
MEMORANDUM
Planning and Environmental Commissi0n
Community Development Department
March 24,1997
A request for a minor amendment to special Development District #30, Vail
Athletic Club to allow for modifications to the parking garage' Iestaurant,
accommodation and dwelling unit balconies, and common areas within the
building, located at 3S2 Eas[Meadow Drive/Parcels A & B, Vail Village 1st Filing.
JWT 1987 Limited Partnership, represented by John Perkins
Mike Mollica/George Ruther
Applicant:
Planners:
I. DESCRIPTION OF THE REOUEST
The Vail Athletic Club (JWT 1987 Limited Partnership), represented by John Perkins, has
submitted a request for a minor amendment to Special Development District (SDD) #30, to allow
for modifications to the parking garage, restaurant, common areas, and the accommodation and
dwelling unit exterior balconiei.-According to the applicant, the goals of the proposed minor SDD
amendment are to reconfigure certain interior spaces of the building in order to improve interior
circulation, create improved guest accommodations, and meet certain Building Code
requirements.
The specific modilications to the interior of the Vail Athletic Club are as follows:
Increase ol 135 sq. ft. This includes the relocated "pop-out" from
the north elevation to the east elevation (no change to site
coverage). The public seating areas decreased in size and the
kitchen was exoanded in size.
*Restaurant:
*AUs: lncrease of 165 sq. ft.*DUs: Decrease ol 187 sq. ft.*EHU's: Decrease ol 88 sq. ft.*Common Areas: Increase of 499 sq. ft. The bulk of this increase is attributed to an
expansion to the laundry facility & the ski storage r00m.*Conference: Decrease of 45 sq. ft.*Garage: Decrease of 212 sq. ft.
Total Difference: Increase of 267 sq. ft.
Please see the attached development statistics chart for a floor by floor analysis of the proposed
changes.
The proposed changes to the interior of the building will have only minor impacts to the exterior
of the building. The exterior changes include the modilication of the size of the balconies on the
south elevation, a reduction in the size and a relocation of the "pop-out" for the restaurant, and a
slight increase (44 sq. lt.) in the size of the accommodation unit located above the porte cochere,
on the north elevation. Overall, the parking requirements for this SDD do nol change as a result
of the amendments described above.
II. AMENDMENT PFOCEDURE
section 18.40.100 (Amendment Procedure) of the Municipat Q9d9 of the Town of Vail stipulates
the following for miiror amendments to Special Developmenl Districts:
,,Minor Amendments: Minor modifications consistent with the design criteria outlined in
Section 18.a0.020d-any O"
"pprou"d
by the Community Development Department' All
modifications shall be indicated on a completely revised develoiment plan- Approved
cnlnges snatt Ue noteO, signed, dated ana filed by the Deparlment of Community
DeveloPment."
In addition, the Municipal Code further stipulates that the Community Development Department
staff shall inform the Planning and Environmental commission (PEC) of the action taken by the
staff on the minor SDD amendment request.
III. STAFF ACTION
The community Development Department staff . believes that the applicanfs Prgpqqed. .
modifications are consiJtent withine criteria outlined in Section 18'40'0208 of the Municipal
Code and has approved the applicant's request for a minor amendment to Special Development
District #30, vail Athletic club.' The modific'ations have been indicated on a completely revised
development plan as requireO. The statf does not believe that the interior and exterior changes
pioposeO, inciuding tfre net increase in total square footage, will alter the intent of the SDD' nor
iuiil'iinaue any negiative impacts on adjacent property ow-ners or the community as a whole'
o
c
oo
o
o
i5
zul
Eozul
=aoa
IEoz
=
ct
oo
FtuJTF
a
ln
':
{r+
F-
F-
f.-
F-
|'L
:l
+
c\J
(f)
C\t
C\I
sF.
F.F.f.-
o
o
E
E
lr)
LL
cc
It!
t
(5
orf
C!
@
co
<.J.
<t,
(J
s
\
Building Name:
Subdivision t]. t/ ,&(o . , t t! Zone Districf 5 b
^,/
Project Street Address :
Comments:
Board / Staff Action
Motion by:
Seconded by:
I Approval
! Disapproval
ff"tuE"'
Eonditions:
Daret /0./5"?6 DRBFeeere_pad 12O,-
t.e,,d, alLT l'a
DESIGlr RE\ITEII BOARD APPIJICATTON . IIOIII{VAUJ, COIJORADO
Io/ t4 IoIb
o
OF
o
DA,TE RECETVEID:
DATE OF DRB MEETING:
*t**t**t**
I.
A.
*****ta**t
DESCRIPTTON:
B.TYPE OF REVIEW:
Nevr construction (9200. 00)Aatdirion (950.00)
a.af Minor Alterat,ion
Conceptual Review
($2o. oo)
($0)
D.
ADDRESS:
LEGAI, DESCRIsubdivision
f! nrgnelry is described bydesc-ription, please providEEo Enrs application.
a meets and boundson a separate sheet
1egaJ.
and attach
E.
F.
I.
,I.
ZONTNG:
NAME OF
MaiJ.ing
G.
APPLICAIiIT
Address:
Phone
NAI{E OFttailing APPLICANTI
Address:
Phone
H.NAI.{E OF OWNER(S):
uailiog Address:
Phone
APPrJrcATroNs wrrr' Nor BE pRocEssED mr*ow owtr'R,s sxGilIA''RE
Condominiusl ApprovaL if applicable.
DRB FEE: DRB fees, as shown above, are to be paid at Lherime of submirral ot.me-iilnTipir..riorr. rJarer, whenapplying for a b":lg_ilg perrnitl-pieu"" idenrify rhe accurarevaluation of the p-ropoiai. rh; iown or vail wilt adjust rhef:.nli;:tdins to itt"-r.ri" b;i;, - ro ensure the-correcr ree
VAIJUATION$ o-$ 1o,ooo$ 10, 001 - I SO, Ooo$ s0, 001 - $ lsg; 000g1so,oo1 - $ soo;ooo
$soo, oo1 - $1. ooo;600$ Over Ot, OOO, OOO
P_EEq REr'lIErr BoARD AppRo\rArJ ExprRESAPPROVEIJ I'NIJESS A BUrI,DI}Id PSRtfr;' rSIS STARTD.
FEE
$ 20.00
$ s0.00
$100.00
$200.00
$400.00
$s00.00
ONB YEAR ATIER FIIIAIJxssIrED A![D CONSrnucTIor{
II.
A pre-appLicat,ion meeting with a member of the planning
sUaAf irsien€ouraqred to deuq:rrine if any additional
abiliicittoh'tntoimation is needed. rt is the applicant's
responsibility to make an appointment with the staff to
determine if there are additional submiLtal requirements.
Pl-ease note that a CoMPIJETE application will st.reamline ehe
review process for your project.
siEe tapings.and staking must be compleLed prior Eo the
DRB site visit. I The applicant must ensure that staking
done during the lcinter is not buried by snow.
fiIle f eviqrv, :F F gc es fi . {qg,$fl{..Bpf !P{$CF.-Fo rrra I lv r equi re s
"t+iJ iedafaeE'' nieeuinds' dt-'L'tie' oesifur' {eview Board: a
'podeq0id*I, re*lEii ihd a\tinar review.
appriariit!' o;fr,i Rir e"i;li'"lT bAI:Li the -Desiqm Review
eolrcl on Eheir scheduled meeLing date and who have not
asked in advance that discussion on their itern be
postponed, wiLl have their iterns removed from the DRB
agenda unt,i1 such time as the item has been
republished. r"" 1t 1.',
D. The follotriflq.TGene-s|4yl 'af tfhe discret'ion of the
';.:',i ei . ri''ffiffi13".9il'i'3lsE$'t*tt#Ftls.T ::il:i-il::liL
before the DRB may not be required):
.'.'; ll\ r'!l;,',h,'';:;' '
'',, l .Rs:, : r i.:*#Tii, ;ff ifttf 'fl't., :#: l?I"T i iil"l
"t#n""
B.
' \..r ',i. !ri
b.
. ' n") . li+\"t t(rrt ii- _r.
c.
. \rf': ,''t!)l "'1!,suiraidq;Lha*fdird not'*i.sille from anv other lot
or pubtic space. At the time such a proposal is
r;,:H,$e,:I?k8fBlisrHEHt"ei::"?:"*=:i:':"s?*,o'
"'oi*-*"tt.qei oi any adjacent condominir:m association
stating the assoiiation approves of Lhe addition'
E. If a property is located in a mapped hazard.area (i'e'
snow ivalanche, rockfal-l, flood pLain, debris flow,
wetland, etc. ) , a hazard study must be submitted and
the owner musE sign an affidavit, recogmizing the hazard
report prior to the issuance of a building pernit'
appricants are encouraged to check with a Tostn PLanner
piior to DRB appLication to determine the relationship
of the properEy to al.l. mapped hazards.
F. For all residential construction:
a. Clearly indicate on the floor plans the inEide
face of the exterior structural wa1ls of the
building; and
b. rndicate with a dashed line on the site plan a
four foot distance from the exterior face of the
buil-ding wal1s or supporEing columns.
G. If DRB approves the application with conditions or
rnodificallons, all conditions of approval rnust be
addressed prior to tbe application for a building
pe::nit.
trr$TC0FY
irY,sdf$$$'*i:*im# iqr'3s.$.'#"i''t'
inAicate property lines, building l.ines and buildingt
cornera. AL1 trees to be rernoved must be taped. AlL
AVil.ttE
2r Flf< - ln''T.J'+ Ext6T.
q;'c-v. 5t{elTHrxg
6q trt. 6'ruo6
c: 'ATr [i[6r^L3Tr6f
enYeR-s W 6t[fr.
'6a A-rurrr'r- C-rto..fr
March 12,1997 7
@,
John M. Perkins, AIA
ir..j,'L itec,;r. i'eek Bud.
,1..'rsir) .i-llr Rc:ori Suite C ld
' !. - lrr)x .,'t;!l
,,"1i: I olc',:1tt. ij l5 2il
",it.91?.?3t)it 9/t).?49 .C629
George Hanison
Town Planner
Town of Vail
Vail, Colorado 81657
Dear Mike and George,
The following is my assessment of the squre footage changes on a floor by floor basis
for the minor amendment to the SDD zone district.
Upper Health Club,/Parking level: , ,, i. 24parking spaces shown with a valet parking system as approved. T lln c€thn*
. Ski storage will remain as approved with some mechanical duct space required tn:Yg-"-'*
this area. 194 square feet for ski storage and 114 square feet for mechanical . + 244. 95 square feet additional common
"t "Ir$r"g l*d.y. _ __*_<_--Fiislflo-or:
a
a
Dining area is proposed to be 16 GRFA larger than approved with the change
from north side additional seating area to east side additional seating area.
36.15 square feet of common area is added at vestibule #139.
Kitchen is expanded from 816 square feet to 1248 square feet coming out of the
dining and library/lobby areas.
Balcony reconfiguration results in a net loss of 71 GRFA from the
accommodation rooms.
Restaurant seating is for 13 I people.
Second Floor:
44 GRFA is added to the north side of guest room #218.
77.5 GRFA is lost in guest room #218.
77.5 square feet of common area is added to conidor #236.
37.5 GRFA is added to guest room #216.
37.5 square feet of common area is lost to corridor #236.
47.5 GRfA is added to bedroom/guest#22l.
47.25 sqrnre feet common area is lost to conidor #238.
Balcony reconfiguration results in a net loss of 104.5 GRFA from the
accommodation rooms.
Mollica/Ilarrison
YAC3ll2l97 page?
Third Floor:
. Perimeter wall of the privately owned condominiums is revised and corrected in
red. No square footage/GR-FA changes from approved SDD plans.
t 52 GRFA is added to guest room #316.
. 52 square feet of common space is lost from conidor #336.
o 191.25 GRFA is lost from guest room #318.
. 191.25 square feet of common space is added to corridor #336 and newly created
maids closet.
o 47.25 GRFA is added to living room/guest room #323.
t 47.25 square feet of common space is lost to corridor #338.
. Balcony reconfiguration results in a net loss of 42 GRFA from the
accommodation rooms.
Fourth Floor:
r Perimeter wall ofthe privately owned condominiums is revised and corrected in
red. No square footage/GRFA changes from approved SDD plans.
Fifth Floor:
o 75.25 square feet emergency 2nd floor stair is required and will be added.
. 90 square feet ofmechanical space #503 required at west end. 190 square feet of mechanical space as approved is deleted resulting in a net gain
of 25 GRFA from mechanical.
A floor by floor summation of the above information is as follows:
GRFA square feet Common square feet
Upper Health Club/Garage
First Floor
Second Floor
Third Floor
Fourth Floor
Fifth Floor
Totals
Mike and George, please call me and let me go over these numbers and red line plans
with you, at your convenience.
0.0
- 55.06
- 53.25
-134.00
0.0
+ 25.0
-217.31
+ 95.0 laundry
+ 36.25- 7.25
+ 92.0
0.0+ 0.0
+216.0
Thank vou.
OL-l/r@L-,&rx
[z/"* Pertins]en
FIL E CtrPY
75 Soath Frontage Road
Vail, Colorado 81657
970-479-2 I 3 8/479-2 I 39
FAX 970-479-2452
March 5, 1997
John Perkins
John M. Perkins, Architect, Inc.
P.O. Box 2007
Avon, Colorado 81620
Re: Vail Athletic Club Minor SDD Arncndment
D e partm e nt of C ownunity Deve lopment
Dear John,
The staffhas completcd a preliminary review of your minor SDD amcndmcnt application for thc
Vail Athletic Club (V.A.C.). Upon revicw of your application, the staff has determined that thcrc
are outstanding issues which must bc addrcssed, prior to an appcarance beforc thc Planning and
Environmental Commission (PEC). The purpose of this letter is to inform you of thc outstanding
issues and to establish a timelinc for addrcssing the issucs.
The following issucs must bc addrcsscd by no latcr than noon, Wedncsday, March 12, 1997, in
ordcr to remain on thc agenda for thc Monday, March 24, 1997, PEC mceting:
l. Please submit a restaurant scating plan for thc rcconfigurcd restaurant. The scating plan
will be used to determine thc parking requircmcnt for the V.A.C.
2. Please submit a writtcn statcmcnt outlining your requcst. The written statcment shall
address how and whcre the minor amendment deviates from thc SDD Approvcd
Development Plan.
3. The following changes where discovered on your plans, but not indicatcd in your
application:
Sheet A1.8 An accommodation unit was eliminated.
Sheet A1.9 Lock-off unit square footage was eliminated in Unit 309.
Thc linc depicting dwelling unit GRFA is incorrect.
Sheet Al.l0 Lock-off unit square footage was eliminated and GRFA was
rcmoved from the condominiums.
An accommodation unit was eliminated.
A major change to the floor plan near the central stairwcll has
occurred.
Sheet A 1 . I I The line depicting dwelling unit GRFA is incorrect.
$RECYCLED PAPEN
Please indicate the above-notcd changes on your plans, In addition, pleasc rcvicw your plans
closely to insure that no other changcs are proposed and not indicatcd on thc plans' Only thosc
changes indicated on your plans will be considered for review. All othcr changes will bc
considercd unrcviewcd and therefore, not approved'
Again, in ordcr to rcmain on the agenda foithe Monday, March 24,1997, PEC meeting, issucs
addressed in this letter must be reilved by no later than noon, Wednesday, March 12, 1997 ' lf
the issues are not addresscd, I will have no choice but to remove your itcm frorn the PEC agenda'
Should you have any qucstions or concems rcgarding the information addr.esscd in this lettcr'
please do not hcsitaie io give me a call, You can reach me most casily at 479-2145 '
Sincerely,
l1'-"9-Ron^-t
George Ruthcr
Town Planncr
xc: Mike Mollica, Assistant Director of Cornmunity Development
APPLICATION FOR PI.,ANNING AND ENVIRONMENTAL
COMMISSION APPROVAL
CENERAL INFORMATION
This application is for any project rcquiring approval by thc Planning and Environmental Commission. For spccifrc
infornration. scc thc submittal requiremcnts for thc particular approval that is requestcd. Thc application can not bc
accepted until all requircd information is subnrittcd. Thc projcct may also nccd to bc rcvicwcd by thc Town Council
and/or thc Dcsign Rcvicw Board.
qu".,iontdl thc Planning Staff at 479-2 I 38
A. TYPE OF APPLICATION:
tJ Additional CRFA (2s0)
tr Bcd and Brcalda.st
El Conditional Use Permit
tr Major or E Minor Subdivision
tl Rez.oning
n Sign Variance
n Variancc
tl Zoning Codc Amcndmcnt
B.DESCRTPTTON OF Tm REQUEST: E=&IE\J
TOVIN OF VAIL
tr Amcndmcnt to an Approved Devclopmcnt Plan
tr Employco Housing Unit (Typc: )n Major or D Minor CCI Extcrior Altcration
tr
tr
n
cF cjlbprc.E'-3 rc) dlE-
Lfilouf
D.
C.LocATIoN oF PRoPosAL: Lor-F!g!&h€cd|-e FILING VAIL utu/A€#- Flr?sf-
w=rL E, rvtflArctil w)tE DUTLDTNCNAME: V4urzArffr*tta cqJB
NAME oF owNER(s): ut T lq6.) LJMffees PAl4lt.4easl+rfo
MAILINGADDRESS:
F. OWNER(SISrcNA
C. NAMEOFREPRESENTAT
MATLTNGADDRESS: H 2cE'7 A$Ap4t (A g6?.e
FEE - SEE THE SUBMITTAL REQUIREMENTS FOR THE APPROPRIATE FEE.
SUBMIT THIS APPLICATION, ALL SUBMITTAL REQUIREMENTS AND THE FEE TO. THE
DEPARTI{ENT OF COMMUNITY DEVBLOPMENT. T5 SOUTH FRONTAGE ROAD.
For Office Use Only:
ApplicationDate: z'25'?1 PECMeetingDatc:_
ADDRESS:
ZONINC:
H.
PHoNE: ZIZ'fl
41b - o-)oa
VAIL, COLORADO 81657.
Rcvircd fl96
oon 3-tl ,tt22
RECETVED FROM
ADDRESS
RECEIPT- llrc Town of Vril
t?811
hmlt Mrmbers
lnt PAID- cash-Cl.ck /5e
H-s)
Ifalter Patrick Gramm
695 Prospect Street
Winetka IL 60093
Anthony & Constance Rldder
1801 W. 27th Street, Sunset Island
Miami Beach FL 33140
Mr. David Smith
I Cornice Building
108 S. Frontage Rd,
Vail CO 81657
B.A. & Ba.rbara Bridgewater
B3OO lfaryland Ave.
St. Louis MO 63105
ri1 CO. broo r
Robert & MarY Galvin
iiXiii"g-oaks- Farm Route 68
Arri-ngton IL 60010
Marion M. T,l ^r/.1
,2--060 st. M;;i;s RoadrrroerLyville fL 6004g
'Iyr-L,-,-s.a.. ----
% Brandess/Cadmus Real Estate
281 Bridge StreetVail CO 8L657
Vorlaufer Condo Assoc.385 Gore Creek Drive
Vail CO 816b2
of Vail. Frontage Ru.
co 8165?
George Washington Knox IV
291 Bridge Street
Vai-I CO 81657
N.J. Nicholas
50 Centra"l park West
New York Ny 10023
Mountain Haus Condo Associa.tionAttn: Sandy Gray
292 E. Meadow DriveVail CO 81657
,r,t .^, MAY AFFE.T youR p'opr^ri
PUBLIC NOTICE
NOTICE lS HEREBY GIVEN that the Planning and Environmental Commission of the Town of
Vail will hold a public hearing in accordance witn Section 18.66.060 of the Municipal Code of the
Town of Vail on March 24, 1997, at 2:00 P-M. in the Town of Vail Municipal Building. In
consideration of:
A request for a_major exterior alteration in CCl, at the A & D Building, located at 286 Bridge
Streeylots A, B, & C, Btock SA, VailVillage .tst Fiting.
Applicant: 286 Bridge Street, Inc., represenled by Craig SnowdonPlanner: Dominic Mauriello
A re-quest for a major exlerior alteration in CC1, at the Creekside Building, located at 229 Gore
Creek Drive/Lot A, Block 58, VailVillage 1st Filing.
Applicant: Michael Ditch, represented by Dave CarsonPlanner: Lauren Waterton
--f A.request for a minor SDD amendment t0 Special Development District N0. 30 at the Vail Athletic
UtuU, located at 352 E. Meadow Driveiparc6ts A & B, VaiiVillage 1st Filing.=-rApplicant: VWT 1987 Limited partnership, represented by John perkinsPlanner: George Ruther
4 request for a residentlal addition, utilizing the 250 Ordinance, located at 778 Potato Patch
Drive/Lot 18, Block 1, Vail Potato patch. -
Applicant: Fred Bartlit, represented by Bill AndersonPlanner: Tammie Williamson
A request for a major exterior alteration and minor suMivision at Gasthof Gramshammer, located
at 231 E. Gore Creek Dr./Part of Lot A, Block 58, Vail Village 1st Filing.
lRRlicant; Pepi Gramshammer, represented by pierce, segerberg, & AssociatesPlanner: George Ruther
A request for a worksession to discuss a conditional use permit to allow Type lll EHUs {or
seasonal housing, located at 1309 Vail Valley Drive/legally described as:
beginning al the Northwast corner of Section g, Township 5 South, Range 80 west of lhe Si)dh
Principal Meridian thence S 89'3149" E 2333.84 feet, along rhe North li-ne of said Section 9, to apoint on the nort-herly right-of-way fence line of lnterstate Highway No. 70 thence along the
northerly righfof-way fence line of Interstale Highway No. 70 as fbllows:
S 67"41'33' W 41 5.82 feet; thence S78'13'02" W 1534.29 feet, to a point of curvature;
thence 456.43 feel on a curvs to the right with a radius of 5580.00 fe'et, the chord of whicn
bears 580'33'38" W 456.30 feet io a poinl on the Westerly line of said Seclion g:
lhence departing the northerly right-of-way fence line of Interstate Highway No. 70 and following
the Weslerly line of said Section g N00'i821'E 565.1 1 leet to rhe poi-nr of 6eginning.
Applicant: Town of Vail, represented by Andy Knudtsen and susie HervertPlanner: Dominic Maurieilo
The applications and information about the prgpgqals are available for public inspection during regular otfice hours in theproject planner's office located at the Towd of Vail Community Oeveto'pment Oeiparimenr, zs"soirtr froni"g" Fioid.
Sign language interpretation available upon request with 24 hour notification. Please call 47g-2i 14 voice o r 4Zg-2356TDD for information_
Community Developmenl Department
Published March 7, 1997 in the Vail Trait.
MINUTES
VAIL TOWN COUNCIL MEETI
January'16, 1996
7:30 P.M.
MEMBERS PRESENT:
MEMBERS ABSENT:
Sybill Navas, Mayor Pro-Tem
Kevin Foley
Rob Ford
Mike Jewett
Paul Johnston
Peggy Osterfoss
Bob Armour, Mayor
a
NG
A-regular meeting of the Vail Town Council was held on Tuesday, January 16, 1996, in the Council Chambersof the Vail Municipal Building. The meeting was called to ordei at approximately 7:35 p.M.
TowN oFFlctALS pRESENT: Robert w. Mclaurin, Town Manager
R. Thomas Moorhead, Town Attorney
Pam Brandmeyer, Assistant Town Manager
Holly L. McCutcheon, Town Clerk
First item on the agenda was Citizen Participation. Town of Vail resident and former council member, TomSteinberg, expressed his thanks to former town mayor Peggy Osterfoss for her participation and dedicationover the past six years. He.commended her, saying she had
-been
the best leader he had worked with duringhis years of serving with all but one of Vail's mayors. Mr. Steinberg was joined by his wife, Flo.
The second item on the agenda was the Consent Agenda which consisted of the following items:
A. Ordinance No. 1, Series of 1996, second reading of an ordinance, First Amendment to theo, Town of Vail Police and Fire Employees, pension plan.
" B. Resolution No, 2, Series of 1996, i Resolution designating Colorado National Bank, as a
depository for the funds of the Town of Vail Pension Plan as permitted by the Charter of the
Town, its ordinances, and the statutes of the State of Colorado.C. Resolution No.3, Series of 1996, a Resolution designating Colorado National Bank, as a
depository for the funds of the Town of Vail 457 Pension Plan as permitted by the Charter of
the Town, its ordinances, and the statutes of the state of cororado.
Mayor Pro-tem, Sybill Navas read the consent agenda in full. Peggy moved to approve the consent agenda,with a second from Paul Johnston. A vote was taken and passed unanimously, o-0.
Third on the agenda was Ordinancg No 2, Series of 1996, second reading of an ordinance amending SpecialDevelopment District No. 30, The Vail Athletic Club, and amending the de-velopment plan in accorda--nce withChapter 18.40 of the Vail Municipal Code and setting forth detaili in regard thereto.
Sybill read the title in full. Mike Mollica then summarized the revised ordinance, reviewing changes since thefirst reading. Town Attorney, Tom Moorhead added that an indemnification section had been removed fromthb ordinance, because the isdue had been resolved and no longer applied. Discussion then continueo ascouncil members questioned the possibility of the Athletic Club heiting inu nrioge in addition to the sidewalks
on the north and east sides of the building. Town Planner, Mike Mollica stated the;Athletic Club would heatthe sidewalk up to but not over the bridge. Vail Athletic Club representative, Stan Cbpe address"J th" i**r"and informed Council that the possibility had been discussed, but would require an up sized boiler toaccommodate that request. Stan stated the Athletic Club would cooperate in any way they could, but thatmany issues still remained to be discussed. Tom Moorhead informed Council the intent hld oeen that anyheating beyond the sidewalks along the north and east sides of the building would be an expense af theTown. Paul moved to approve Ordinance 2 on second readlng with a second from Rob Ford. n vote wastaken and passed unanimously, 6-0.
The fourth item on the agenda was an appeal to the Town Council, pursuant to Section 1g.54.0g0 of theMunicipal Code, of the Design Review Board decision to deny the olesonA/olinn duplex separati;n requestfor a proposed residence to be constructed on Lot 11, Resubdlvislon of Lot 7, Block .1, Vaitviiiage'rzthFiling/3275 Katsos Ranch Road.
George Ruther, TOV planner assigned to the project, presented the item to Council, and provided thefollowing background: On December 20, 1995, the applicant met with the Design Review Board to requesra determination of significant site constraints and the opportunity to separate thi duplex strueturc Brgpgscdfor Lot 11, Bloek 1, VallVlllage 12th Flllng In aeeordanee wtttr Seetion r6.sa.oSo(r) oiiiic Lnuzuereriidiu" t"uuattachment 1). Upon review by the DRB, a molion was made to deny the applicant's request since the DRB
VA l^ e.*J W n"Jh? mr!,to 0t / | 6/q6
t;t)ly/t0.1*1x\'nlh,*l ra^t rrt z
osnBcaq panbal s,1uecl1dde aql Jo lelu€p pepuauu.roceJ $elq 'sJau/v\o Ayedo.rd 6u1u1ofpe uo{ pa4lacal uaoqpeq pdul ou q6noqle leql palels reqynl {pueg 'luecrldde eq1 o1 a6elrnud prceds 1o pe.r6 e aq-plnorvr ecuetJe^
1q6teq palsanbe.r aq1 Ouuuet6 1eq1 Eurpug '0-? lo alo^ e ,iq eJueuen jqoraq pelsanbe: eq1 p"1ulp rt;snourueun
c3d aq|slqoreq pelsrulsuos'ourisrxa aq1 1e sa6pu ]ooJ eql ur61al o1 -acueuen lqoreq e 1ue.r6 336aql ieql palsenber luecrldde aLll 'uoqelrulll lqblaq looJ-Ea aql a^oqe saqsut t'g;o ,nrrl*"* B palcnrlsuos
€raM C pue 'g 'y saOpu '(311) Eur[arung Ia1ge71 e16e3 {q paprnord saln6rtr lq6req aopu aql pue '(,{anlns
clqdelbodol leutbl.to stll uo paseq) 6uuaaur0u3 urelunoulalul r{q paprno.rd iepe.rb burlsrxa pJlelodrelur aq1
o1 Eutp.toccy 's6utanelp uolle^ala pue ueld alts peqeelle eql uo umoqs se 'C pue g .V palaqel aJe uotlsanb
ut sa6pt.t elll 'sainlcn4s lelluaplsal lo, uorlcrJlsal lqbraq looy-gg eq1 ourpeacxJ slqOreq'le pelcrulsuoc
a:alr seoplr 1oo: egaedas aaJql Jo suorioas leql pelecrpur ;uecrldda aq1"rq peprurqnu (crri alecurpac
uolleco-l lueuenoidutl uV 'uolst^lpqng uor(1 uele '02 lol uo acuaprsat e 6ur1cn:gsuoc lo siecotO aql ul q
luectldde eq1 :punor6>1ceq 6urarro;;o; eq1 one6 pue 'ueir aql palueserd Japnols ,{pueg ,.riuueld pen Jo u^ of
'(f+ CCS) uorsr^rpqns
uo^l uale 'ez lol/elcJlC uaAEqlsaM 6eg! lB patecol s 1celord eql 'saJnpruls lerluaplssJ.rol uo;1e11rr; lq6raqloo]-et alll peecxa ol 'uolpn4suo? J€pun {;iualnc 'ecueprsar B JoJ /v\olle ol eouelJe^ lqbraq e .ro; lsanbel e
Jo leluep (Cad) s,uolsslultlJo3 leluauuoJr^u3 pue 6uruue16 eq1 1o leadde uB se/v\ aA!, Jaqrlnu uelr epua6y
I
r(ddeq aq prno^,\ oq parels ec*o^re*r/! pue'rJJl:'1"ffilffi."1,1iffiffi11'lttf:'5fl"il1Jl[J3';Ti
'pesoddo lned pue lllqAs 'Z-| 'passed pue ualel se/$ alo^ V .elly! uto{ puooas e qlru ,BUO aql Jo uorspap
eq1 ploqdn ol qou Iq apeu uoqt se/n uoqou y 'uonrsoddo u; Oulidn ,i6-6e4 pue ur^ay 'qou 'a>1ry1 ,1sanba1
eq1 Auap ol uorsrcap s,gUO eql ouru:npeno Jo ro^ej ul lllq^S pue InEd ,V-Z,paltr',l pue uslel sEM alo^ V
'penouleJ aq lt1e1eur1;n plno/v\ ler.ll ueld eq1 uo uA oqs
lou aJa/v\ lBql lol eql uo saall lueu e:am oJeql palels Jaqpnt aH 'Jelauletp u! ,,g aJa/v\ ueld patord pesodord
eql uo uMoqs seaJl €ql pue Jalawelp:ut ,,9 senn eell luecgtuBts e 'Jrels o1 Eurp.rocce lEql palels e$loag .sae:1
Jo lunoue lseal aql 6utnoual eq plno/v\ luectJdde aql 'oueua3s pasodo.rd aql rapun 1eq1 bupels ,lureJlsuoo
alls e alnlllsuoc plp soa4 aql pue ,(qderbodol eq1 palse66ns lrepuorleledes eLll Joj fr\olle plno/v\ leqlpalslxo sluleJlsuoe els JeLlleq^^ aulruJelep ol poeu aqlJo sJaqurau ll3uno3 paputuol {66a6 .1o1 aq1 uo 6uruoz
ut e6ueqc e lsenbal oi aq plno/\^ uorloe Jo esrnoc redird aq1 pa1se60ns u"ql
"rflyv
.;r"n6"r'"q1 ir"p o1 fnquoudo:eqlo ou pEt{ 8uo-aql 'a:oleJaq} 'pue 'suor}Eln0el unnol aql ur paurllno sB lureJ}suoc alrs luecyu6rs eelnlllsuoe plno/v\ r.l3tr,l/v\ 6urq10u se^ aJaLll1eq1 Eurpug s,guo oql paureldxe [auJV lapqclr{ 'ueu.tJteq3 guo
'speduut ars lleJaAo ecnpal ol pue eplslptl aql uo lee[cerd se nnol se a]rs eql uo luau.rdo;anop urelurgt11 olJapjo ul 'ecueue^ Iceqlas 1uotl e lsanbal ol aq plno/lit luectldde aql JoJ €nuane alqrssod JeLlloug pa1sa664pally{ 'uo opl3ap o1 lsanba: aoueuen e lou spn\ aJeql sraquletil lrcunoc pepulual e6:oeg .eierjooroob
aJou eq p;nom lsanbeJ eeuelreA aq1 qEnorql 6uro6 1eq1 ilej lllqr{s lllnq aq ol aJn}cnJls la6-6rq qcnru e .ro;Molle plnoa Jlasll lol aql Jo €zls aLtl lBtll lnq 'olecs Jalleus qcnul e uo ourqlau:os aos ol paluB A o1 alods aqiasoql Duqels 'uotlsanb 3ql passeJppe 1[gIg pue 'pefold eql noqe 1p1 sroqqorau €ql /v\or..l o1 se pe.lnbur ulnay'poleplsuoc aq
^;qtssod
plnoc saJnleal epeu ueuJ leql alels ol uo luem aH 'suorlenlrs peue1 pue
^ueu
erannalaql ples puB 'luleJlsuoc alls luEculu6ts e elnltlsuoc lq6rLu leqM Jo sqdmExa- pelstl apoC aql ut uorioes eqllelll paUuelc uo1 'xeldnp e pllnq ol aneq r{1t:essacau luprp peclldde eq} pue Juecr;dde er11 olelqegrene €Je^^suorldo raq10 Aueu l'ql p€lels pJor qou pue 'uorsrcap s,ggq pl0qdn raqla plno,n aq passardxa ua^r\af arrr{
'{06a6 Lq papuocas se/'A uot}oul aqf 'peou qcueg sosley uo ssguaplsal Oupslxeaq1 o1 Alac;u palnqrrluoc uotle:edes pasodord sLll llsl eq 'asnpceq pue 's1ncleru,"n;ip anrsuelxe pro1e ol ,lol
ot,ll jo aas e6re1 eql 01 enp lsanbar uorleledas aql ,{uap ol guo aql lo uorsrsop aL[ uJnua1o o] pe1ou lned
'uospleuo0
IJBIi! 'l9olltlcJB l0e[oJd qltrvr 6uo;e 'litunoC ol lsonbal slr"{ paluosoJd lyedord olll J0 Jau/y\o ,uosalg rueg
'pelue:6 eq o1 uoge:edas e loJ JapJo ur ErJaltJo alerrdordde ag slaar! paford aLll pulJ lsnui ltcunoc leq]puB 19p0C elll,{q ps/ylolls sB 'uo!}Eledss E bunsanbal ,ipeegc seltn 1uec1ldde aql lErll lnunoc peuJo;Ut eor1o6allnJ pue ebloag 'esuelJel e r{;lea: sean lsanber uorle.redes eq} }ou Jo'JeLlleqn o1 se pa:rnbur lpqrtg:peijOoeaq ol papeau lllls eualljc cgtcads eql leql lnq 'lualur ;eraua6 aql ol lool plnoc auo 'eualrc sw butliddeallq/s leql peule;dxe peeluoof! urof 'opoc eql to (l)0g0'tg'gl uopes ur peurllno sB lureJlsuoc a1s luecgru6rse alnlllsuoc lq6tu 1eq1 Eualuo aql papasladns ,,lualul,, uo uotlges aql Jaqisq/v\ peuorgsanb sso;rel.g ,166e3
'epo3 ledntunfrl eqlto (t)oso'rc'gL uorl?as {q perrnba: se }ol eq} uo slurerlsuoc alrs luecgruDrsJo e3ualsrxe €ql p€leJlsuouap lou peq luecrldde aq1 ,uorurdo s,#els ut leql polEls eH .leluep Jo ,9661
'02 laquacoo Jo uotstoep 8UO aql ploqdn lrcunoC u/r^ol eql leql pepuaurutoceJ gels 'lsanbel uoq;eledes
s,luectldde aql lo /v\ellel uodn 1eq1 elels ol uo lue^ a6.roag '(g luauqcege aas) eoueJ€]eJ Jo, paptnoJd
se/vl €poC ledlclunv\ €t{l utoJJ O tq'tg'B t uorloes ;o l{doc V 'uotstcap gU€ aql buru:npeno to} stseq alqrssod
e se (g;6'yg'eL uo[ees) saurleprne ,v\ernau u6rsaq aqllo lua]ur eqlJo acuere;a.r s,luecrldde eq] pue (z
luaulqce$E aas) uotstcep BUO €tll Eur;eedde '966l. '62 roqureceq palep luecrldde alll ruo4 rallal e pacuaralar
uaql a6toa9 '(g-y) /ilsnoutueun passed uorlour €r.ll 'sluleJlsuoc alls guecglubls Jo aouapt^e pug lou plno3
7;30 P.M:
7:35 P.M.
1.
2.
VAIL TOWN COUNCIL
EVENTNG MEENNG
TUESDAY, JANUARY 16, 1996
7:30 p.M. tN TOV COUNCTL CHAMBERS
AGENDA
CITIZEN PARTICIPATION.
Consent Agenda:A. Ordinance No. 1, Series of 1g96, second reading of an ordinance,First Amendment to the Town oi vait Fotice anj Fire emfro*;;;Pension plan.
C.
B.n:::!ll3lg,2, s9riqs of 1.ee6, a Resotution desisnatins cotorado
I:P,T_I a31h as a depository fo, tn" runor-Jiili;"*;fi'i:;
:,"^T:":^l'a-1: pgrmitted [,v tnl-cnarteior the rown, its
lld]nll9".: and the statutes of tire State of Cotorado.
n::,:iTlT^Ig lt9"l". of 1ee6, " n".orriion o'isisnating cotoradoIlPl1 Bank, as a depository tor tne runoi o; ;;;'iffi :f"ff';;;l.*:::^l,l _T e?;Ti1ed .by q,e
- d;;;';i ;; i#;,',:,:ordinances, and the siatutes of the State of Cofor"Oo.
";;;;;^Mikg MOlliCa Snccial Dorratnnmax+ n;^r;lMrKe Mouica soeciatDeveropment oistrict r'-r<i. Cd;ih;Uiiifi"jj;;ffiH;arr*.q,nsMichael Barclay amending the d"-d;;;i phn in accordan""
'.iit'6n"prcr 18.40 of the Vail_J ,^ "__ ^^-Y,.lnicipatCode
and settingfortn oeairs in regaijiiereto.I
0-.. l- A*ir4"e4 'r- "+4 ^a14(0P* "t/ t AClrw"-- |t / tuIt9NREOUSSJET?OFgO :Approve/modity/denyOrdinanceNo.
Kt(rfnl'.L"^ ^
z' series oil66 on secondGffill- r .-O
VtV" o W: Please see the attached memorandum fromthe staff to the prann
i ndand Envi ron mentai b;ffi ;;;ffi ';""H;;J;
11, 199s and Exhibits A-r attacneJ to in"lri.oi"norr.
: Approve Ordinance No. 2, Series of 19g6 as
8:10 P.M.
George Ruther fli,:gg^e^flt:JP Toyl.councit, pursuant to Section 18.54.090 of the
X,:.:,jffi
,",,::of :^ij_tl^"_p_"^",1n_1il;.#;"d""[H"lo"'Jiiy,n"
"ol::?jy_: f l-o ;r {e1 s pa *tffi *q; ;;i i"; ; ft ffi"".i 1, iil ;# L'i:
ffi,?'"tfi".;?1""?"ll,.t^,:I":lbdivisioh of rot i, -Bd.k i, ilii'Virrlii.,.lr.iiFiling/3275 Katsos Ranch Road.
Uphold/overturn/overturn with
ff ,11f illT3e-oesignnffi Boffi eJ"-d;;;;ffi ;ffi #*#,ilduplex separation reqiest.
ffi ''3 i"ffff T."J,: h l?ffi
"'3; "ffrffi:xl :],?constraints and rhe opportunityto
""ri.r*"in" Jdi;; Jilil;,#::';!HLot 11, Brock 1, vair virtale rzin riting-in-l""oro"n"e with section18'54'050(t) of rhe Municipar iode ti"" "tt"lnrent 1). Upon review by rheDRB, a motion was mad'e to o"ni lne dil;;#" request since the DRBcould not find evidence of significlnt
"it"'5o"rii"ints. The motion passedunanimously (4-0).
A letter from the apolicant dated December 29, i99S, appealing the DRBdecision, has been'attached (see attachment zf 'tn tn" appricant,s retter, herefers to the intent of the Design n""i"* 6riO7fines lSection 1 g.54.010) asa possible basis for overturning the DRB O""i"io". O
""pV "i S"li,""18'54'010 from the Municipar c"ooe-rras'f'"Jl""n""n"o for rererence (seeattachment 3).
8:30 P.M. S.
Ran$rstouder
o I Arr htruuMMtsNDAIlQN: Upon review ol the applicant,s separation
::q^r::fF1_recommends that the Town Council uph6ro tne One ieJ.-ionof December 20, tees, of deniat. ln silffb il;;#;il ffii#,;""':"l"Jidemonstrated the existence of significani rii"""onrtr"ints on the rot asrequired in Section 1S.S4.OS0(I) of [he Municipal Code.
|1"!pq of thepranning and Environmentarcommission,s (pEC) deniarofI re1egl for a height variance to a'ow for a residen.", dr"#.v u,ilJ,construction, to exceed the33-foot height rimitation tor resdeniiai.l;;"tr;.The project is rocared at 1939 wEsthaven circreaot es, cilIvo"Subdivision (SDD #4).
Uphold/modify/overturn the pEC's
gtCllGiOUND RATIONAE: .The-apptication is in the process of
::::j::jlg^,"'g:idT"q.-on rot 23,'een Lyon subdivdi;.--1h;lmprovement Locarion certificate trr-cisuumitteo-ilvln"-"ipii""iiiiio,"J"!
11t^!g:1b.5 of lhree separate ioof'ridses *er"
"on"tructed ar heiohrs
fl :1:,:fl :",HJs*:f ::tneatticneo",-,*p*i"J"i*"iif",i;,ffi ,;::
.- "- ,,.,vr I rlrrgr rr resrncuoe ro!. restqenflal structures. The ridgesare.labeled A, B and C, starting at tG toGst otifre ridoes ancJridges and
*::j*g^ j? J_1 T!"_ry:'"red exisri n s s fi d ;;";il; ilil -ffi i: i;
F:,'J::"j':?,,10^T?1."JPg,igi"I"ds'$;re"r;ti,ili#.j;ffi ifi i
! gy 199 oloyioed by Eas re y3ir9y suiveyi"it 0 Lc),
-;ii6;;
;,"i; "iXZ ;3i;.
tne appticantreeuested thatthe pec ffi
:"8 jS ?f: :,^l5-.:1.1'l,sj.::.!:t'r.t"q ne i
jh ts - r n e FEc- u na il;;; l;denied rhe requested n"ignt u"ri"n.e by ii;ol; oiffidi;;
ce would be a grant ofspecial privilege to the appliiant.
:r:+rr rHtrt-uMMbND : Staff is recommending denial of theapplicant'S request to overturn the pEC decision.
a maximum
Town Manager's Report.
Adjournment.
9:00 P.M,
9:05 P.M.
6.
7.
NOTE UPCOMING MEETING STARTTIMES BELOW:(ALL T ES ABE APPROXTATE AT{O SUBJECT TO CHANGE) ---
rHE NExrvnL rowN
"J,!rlJ,i-
l!or** woRK sESsroNwf LL BE ON TUESDAY,lfrzmi,eecrNNiNc ar z,oo p.tr,r. rN Tov couNctL CHAMBERS.
THE FOLLOWING VAIL TOWN COUNCIL REGULAR WORK SESSIONwrLL BE ON TUESDA',2t6ts6, eectNl,riNc lr z,oo p,r'r. rN TOV COUNCTL CHAMBERS.
THE NEXTVAIL TOWN COUNCIL REGULAR EVENING MEETINGWILL BE ON TUESDAY, ,,CISS, ECCiNNINGiT Z,gO P.IT,I. IN TOV COUNCIL CHAMBERS.
lt||ttl
fltJjl?gTBr'?:?T.',:Fli:l*:irabre upon requesr with 24 hour notirication. prease cail 47e-2114voice or
C:\AGENDA,TCE
denial of the variance request.
MINUTES
VAIL TOWN COUNCIL MEETING
January 2, 1996
7:30 P.M.
A regular meeting of the Vair rown councir was herd on Tuesday, January z, 1996, in the councilchambers of the Vair Municipar auircin!- irre ,.Lting was cailed to order at 7:30 p.M.
MEMBERS PRESENT:
MEMBERS ABSENT:
Bob Armour, Mayor
Sybill Navas, Mayor pro-Tem
Kevin Foley
Rob Ford
Mike Jewett
Paul Johnston
Peggy Osterfoss
TOWN OFF|CIALS pRESENT: Robert W. Mclaurin, Town Manaoer
R. Thomas Moorhead, Town Attoinev
Holly L. McCutcheon, Town Clerk
First item on the agenda was citizen Participation. Resident, Bill wilto complimented communityDevetopment Direitor, sur;; c;;;;ilfi;;i", participation in tne vair Host program, and staredit woa.s fabulous to see someone in a position such as hers out on the street greeting guests in the
The second item on lhe agenda was the consent Agenda which consisted of the following items:
s A. Approvar of the Minutes for th_e_meetings of December 5 and 1 g, 1gg5." B' Resolution No' 1, series of t-sso, a resolution designating a public place within theto*:,:lu_1|rgr tfe postins of notice ror punric;-"il;;r of the Vair rown councir,Planning and Environmental commission, Design neview Board, and other boards,commissions, and authorities of the fown oi Viii. --"
c' ordinance No. 25, Series of.rs!-s, 11co1o ru"oing of an ordinance amendingSection 18.24.050 (B) of the Municipal coae or ilre i-own of Vail, setting forth newnrol!1es for eliminating any existing dwelling unit oi accommodation unit or anyportion thereof above the second flooiin comrierciaic;; | #;;;;;;i;i'c;r"llZone Districts.
MayorArmour read the consent Agenda in full. A motion was made by sybill Navas and secondedby Kevin Foley to approve the Conient Rgenoa. A vote was tatenan'o passed unanimously, 6-0.
Third on the agenda was-ordinance No. 1, series of 1g96, first reading of an ordinance, FirstAmendment to the Town of Vail Police and Fire Employees' pension plan. Mayor Armou6 read thetitle in full' steve Thompson presented the item, explaining that the change in text was promptedby an IRS review, at the request of the Town in order to obtain a determination letter from the lRS.Sybill moved to approve Ordinance No. 1 on first reading, with a second from Rob Ford. A vote wastaken and passed unanimously, 6_0.
i'"
' v' v' ' r u\'(r; Yv
The fourth item on the agenda was ordinance No. 2, series of 19g6, first reading of an ordinanceamending Special Development District No. 30, The vail Athletic club, ani amenoing t|redevelopment plan in accordance with chapter 18.40 of the vail Municipal code and setting forthdetails in regard thereto. Mayor Armour iead the tifle in full. Mike Mollica presented the item,explaining that the SDD which was originally approved in 19g3 was now being amended by theapplicant' Mike referenced a mbmorandum 'dated
January 2 to council lrom communityDevelopment (attached) which listed seven conditions of approval as recommended by the pEC.
Mike reviewed the seven conditions and stated the architect, Michael Barclay, was available toanswer any questions. Michael Jewett asked about trash storage and heited walkway anddriveway areas. Stan.Cope, representing the applicant, along with Michael Barclay, addressedthose issues. Stan indicated the project would probably commence sometime in Aprii, 1gg7. paul
Johnston moved to approve ordinance No. 2, series br t gso on first reading with the conditionsas recommended by the_PEC, and Sybill seconded the motion. A vote wa! taken and passedunanimously, 6-0. stan crcpe thqn introduced the owner of the Vail Athletic club, Tom Rousch.
x"] x@ C&J W M4 nh",rd 0t /02/96
iu/lul ts Yru *ru iw,"l FwJ @\ rA
('e1e:ncceul eq [euJ lndul cllqnd e^EO or{^ slenplAlpul uleUa. p saureN)
'y\j'd
9p:g r{la1ew1xodde 1e luawuJnohe Jq, penoq,l JnouJV Jafcyl ,s6aul$nq laqpn} CIu,Oulaq aJaql
'ssaccns 619 e servr ue:6old eq1
polels pue uerOod ,,slJed,, aq1 ur paledlcq:ed oqrr asoql JoJ apn11el6 sgq passadxa fa1o3 ulney
'l! olu! lool plno^r\ aq palels qog pue uoou p{ol aq} o} e^lleula}le ue o} se paJlnbu!
Ined 'g L fueruqa3 ro1 1as doqs4o14 uoledrcq.red ctlqnd eq]]o puE IeaJC JsAEag ul lleH aOelln le
uoou prol otll le /Z fueruqe3 rol palnperlos learlau lteuno3 bululocdn elll ]o s.taquarrt ltcunoopaulolul uunelsu! qog 'la6euel^l u/vlof aql uloJJ uodal F sem epuaoe alll uo xls laqulnu ulall
'0-g 'r(lsnourrueun passed pue
uelel se^ elo^ V '$eiv\af eM
^q
pepuooas se/v\ uotlout aqJ_ .lleH 6alg pue sIJoM ollqnd ruo4
pdut urelqo ol eu[ 6urlro;;e 'Ougaau Euruane Xeu eq] ltlun e .oN ocueulpJo elqel o] lnBd [q epeu
se/r^ uollou V 'sieells lecol uo perv\olle 6ureq salcr{crq pue sapelq le;1o.r Ourple6el suorlsenb peq
1;;q^g 'ua11 eq1 ourgel pa1se66ns llsry\ef elrt/\ .uotstoap leqt 6uHeu ol ropd pe:1nbe: sq plnoM llBH6el9 ':aeu16u3 u/v\ol pue sltoM gtlqnd ruo4 1ndu1 leqpnl peiels ulol 'pesler eq p;noqs Iaqllou
lo Jaqlaq^ pue ecuEutpio otl] ur paureluoc sllurl paads qdu gL eql punoJE peJaluac uotssnosto
'e3uButpJo at{} Jo uotpes ,,1eadag,, eq} Japun uollplts lcalocur ue pa}ou JaqunJ uof 'seale pulslp
ssaulsnq pue le[ueptsal ut sltultl peeds Aleureu 'epoc cujeJl lepor\l aLl} uroJl poJeltp }eLl} sulail
pepnput qstr{rv\ uoflsos ,,s}usulpu€utv,, eql lno burlurod 'ecueulplo eql pe/v\el^el uo1 'suorlsenb
true lamsue ol pueq uo se/n 'uospJo!\ Oarg trarqg aollod lten jo umol .rilquassy leJouoe
atels eql ,iq pelceua s/v\el c[JeJl ele]s oLll lo uol]mljlpoce: ougcegal 'opoC aql ]o uolilpa pasr^er
9661 e paredard peq IOOC leLll pue sspoC cgleJj lepoy\l 216L pue tL6f eqg paldope Ilsnornard
pBq llen Jo u^ of aqi 1eq1 paute;dxa eH 'lueuacJolua q1/v\ 6urleap sapoo cg;ell ledrcrunur snouen
eql puE s/v\el cu]eJl s.alels eql uaaMiaq
^lur.t.ro1un
eprno:d oi popuolul se/v\ opoc agell lopoy!
aql leLll Iouno3 paurolut peaqlooy\i utoj .llnt ul all[ eLll pBeJ Jnor.llv lo^eyl .;oa:aq] uollBlot^
ro; setleued Durprnord pue :qltMelaql lotlJuoc ut saeueulpJo 11e 6ur;eede: l,,se1111edp;unyr1 opeloloC
rol epoC cuJe.tf lapon' aql lo uotrpa g66L aql €ouareral r{q 6u11dope luo11eu oql pue a}els
eq1 lnoq6nolql suotlelnba.r Jepurs ol 6u1u.uoluoc [11e.reue6 pue A el a]els qilrv\ lue]slsuoc suorle;n6a.r
cqlell Jo rualsls e burprnord 1o esodlnd eql JoJ 'opeJolo3 'llen lo u/rloI aLll Iq crge.rl 1o uo11e1n6el
eql loJ ecueurpro ue ;o burpeel ]stg '966 1. Jo sauas 'e 'oN ocueurpJg servr epus6e eLll uo sA$ Lua]l
UalO u^ oI'uoaqcln3cf{':I {loH
:]S3I-IV
'JnowJV'M
'pellruqns {11n;padsag
7:30 P.M. 1.
7:35 P.M. 2.
VAIL TOWN COUNCIL
EVENING MEETING
TUESDAY, JANUARY 2, 1996
7:30 P.M.lN TOV COUNCTL CHAMBERS
AGENDA
CITIZEN PARTICIPATION.
Consent Agenda:
,ttt-- ,' r $- 2, Series of 1996 on first reading.
,.1 - 4-#5f L-O W:rref / -- O lrAUKul-luUND HATIONALE: Please see the attached memorandum from
v okt 'a n: ilgl':"ll?:l?;lilT F:1fli'i[?rfi:'i;:ffi[;Tlo; 0","0 December
Ad
7:40 P.M. 3. Ordinance No. 1 , Series of 1996, {irst reading of an ordinance, FirstSteve Thompson Amendment to the Town of Vail Police and Fire Employees' pension plan.
7:55 P'M. 4. Ordinance No. 2, Series of 1996, first reading ol an ordinance amendingMike Mollica Special Development District No. go, The Va'il Athletic Club, andMichael Barclay amending the development plan in accordance with chapter ig.ao ot tne vait
I "-l ,1 pfi.Municipal Code and setting forth details in regard thereto.
n.,,.!,- \lf*' ' Ot*. ACJION REOUESTED oF OOUNCIL: Approve/modify/deny ordinance No.
( AP ' ',J .rd- 2, Series ot t gsG;nlirst readina -
Approval of the Minutes tor the meetings of December 5 and 19, 1 995.
Hesolution No. 1, Series of 1996, a resolution designating a public
place within the Town of Vail for the posting of notice ior public
meetings of the Vail Town Council, planning and Environmental
Commission, Design Review Board, and other boards, commissions.
and authorities of the Town of Vail.
Ordinance No. 25, Series of 1gg5, second reading of an ordinance
amending Section 18.24.050 (B) of the Municipal eode of the Townof Vail, setting forth new procedures for eliminating any existing
dwelling unit or accommodation unit or any portion thereof aOove the
second floor in Commercial Core I and Commercial Core ll Zone
Districts.
leny ^&"F)
Approve Ordinance No. 2, Series of 1996 as
Adopt Model Traffic Code as
8:25 P.M. I
Tom Moorhead
Buck Allen
Greg Morrison
8:35 P.M.
8:40 P.M.
reading.
Town Manager's Report.
Adjournment.
Ordinance No. 3, Series of 1996, first reading of an ordinance for the
regulation o-f traffic by the Town of vail, colorado, for the purpose of providing
a sy.stem of traffic regulations consistent with state law and generally
conforming to similar regurations throughout the state anc tne nation;adopting by reference the 19g5 edition of the "Model rraffic code foicolorado Municipalities"; repealing all ordinances in conllict therewith; andproviding penalties for violation thereof .
w: The Model Traffic code is intended to provide
unrtormlty between the state's traffic laws and the various municipal traffic
"od"L:. CDOT has prepared a 1995 revised edition of the Code, reflectingrecodification of the vehicre and state traffic raws enacted by the Stat6General Assembly.
6.
7.
presented.
: Pass Ordinance No. 3, Series of 1996 on first
NOTE UPCOMING MEETING STARTTIMES BELOW:
(ALL TMES AFE APPROXIIIATE AND SUBJECT TO CHAI{GEI|ilil1
THE NEXT VAIL TOWN COUNCIL REGULAR WORK SESSION
wlLL BE oN TUESDAY, 119y'96, BEG|NN|NG AT 2:00 p.M. tN Tov couNctl GHAMBERS.
THE FOLLOWING VAILTOWN COUNCIL REGULAR WOBK SESSION
wlLL BE oN TUESDAY, 1/16/96, BEGINNING AT 2:00 P.M; tN Tov couNctl CHAMBERS.
THE NEXT VAIL TOWN COUNCTL REGULAR EVENING MEETING
wlLL BE oN TUESDAY, 1/16/96, BEG|NN|NG AT 7:30 p.M. tN Tov couNctl GHAMBERS.
ililil1
Sign language interpretation available upon request with 24 hour notification. Please cail 47s-21'l4voice or
479-2356 TDD for information.
C:!AGENDA.TCE
2:00 P.M.
2:10 P.M.
2:25 P.M.
Mike Mollicr
2:55 P.M.
Mike Mollica
3:40 P.M. S.
3:50 P.M. 6.
4:00 P.M. 7.
4:10 P.M. B.
4:40 P.M.
1.
2.
?
4.
VAIL TOWN COUNCIL
WORK SESSION
TUESDAY, JANUARY 2, I996
2:00 P.M. tN TOV COUNCTL CHAMBERS
EXPANDED AGENDA
DRB Fleview.
Employee Housing Discussion by Chuck Ogilby.
Site Visit - VailAthletic Club re: Odinance No. Z, Series of 1996.
Discussion of Ordinance No. 2, Series of lgg6, an Ordinance
amending speciar Deveropment District No. 30, The Vair Athretic crub,and.amending the deveropment pran in accordance with chapter 18.4b ofthe Vail Municipal Code and setting forth details in regard thereto.
Applicant: JWT 1 987 Vair Limired Fartnership, (d/b/a Vair ntntetic'cruu;,represented by Stan Cope and Michael Barclay.
: Listen to presentation by staff
," propor"o 5odAmendment.
pALrKuHuU.ND RATIONALE: please see the attached memorandumIrom the staff to the planning and Environmental Commission datedDecember 11, 199s and Exhibits A-F attached to that memorandum.
lnformation Update.
Council Reports.
Other.
Executive Session - Land Negotiation.
9. Adjournment.
NOTE UPCOMING MEETING STARTNMES BELOW:
{ALL TIMES ARE APPROXIMATE AND SUBJECT TO CHANGE)
rHE NExr vArLrowN
"J,lriJ,i-
llou.o" woRK sEssroNWILL BE ON TUESDAY, 1/9/96, BEGINNING AT 2:OO P.M. IN TOV COUTICIT. CHAMBERS.
THE FOLLOWING VAILTOWN COUNCTL REGULAR WORK SESSIONwlLL BE oN TUESDAY, r/16/96, BEGTNNTNG AT 2:00 p.M. rN Tov couNcrl CHAMBERS.
THE NEXT VAIL TOWN COUNCIL REGULAH EVENING MEETINGWILL BE ON TUESDAY, T/TSISE, EEGINIIIII*IC AT Z.gO P.M. IU rOV COUHCIL CHAMBERS.||il1
sisll3lS-l1S:lnterpretation available upon request with 24 hour notification. please call 479-2114 voiceor 479-2356 TDD lor iniormation.
C \AGENDA.WSE
- TOWN COUNCIL AGENDA REOUEST
(Flequest form musl be givEfl'to the Secretary to the Town trrtanageQs:00 a.m. tnursOays.)
MEETING DATE: January 2. 1996
(Prepare a separate Agenda Bequest for each agenda item. lf the agenda
item will be discussed at both a Work Session and an Evening Meeting, be
certain to check both boxes in this section and indicate time needed during
each meeting.)
X wort Session
X site visir
X Evening Meeting
WILL THERE BE A PNESENTATION ON THIS AGENDA ITEM BY NON.TOV STAFF?
n No.
n YES. Specifics: Michael Barclay
WILL THE PRESENTATION OF THIS AGENDA trEM REQUIRE ANY SPECIAL EQUIPMENT?
X No.
tr YES. Specifics:
WILL THERE BE MATERIAL TO BE INCLUDED IN COUNCIL PACKET FOH THIS ITEM?
tr No.
X YES. lf yes, is lhe materiat atso for pubtic distriburion?
X Yes.
n No.
ITEMffOPIC: Ordinance No. 2, Series of 1996, an Ordinance amending Special Development
District No. 30, The Vail Athletic Club, and amending the development plan in accordance with
Chapter 18.40 of the Vail Municipal Code and setting forth details in regard thereto.
Applicant: JWT 1987 Vail Limited Partnership, (dba Vail Athletic club), represented by stan
Cope and Michael Barclay
ACTION REQUESTED OF COUNCIL:
1. Worksession / Site Visit
Review site and listen to presentation by staff regarding the background and details
relating t0 the proposed SDD Amendment,
2. Evening Meeting
Approve / Modify / Deny Ordinance No. 2, Series of 1996 on First Reading.
BACKGROUND RATIONALE: Please see the attached memorandum from the staff to the
Planning and Environmental Commission dated December 11, 1995 and Exhibits A - F attached
to that memorandum.
STAFF RECOMMENDATION:
1. Worksession / Site Visit
None
Evening Meetifig
Approve Ordinance No. 2, Series of 1996 as presented.
TIME NEEDED: 45 minutes
TIME NEEDED: 30 minules
TIME NEEDED: 30 minUtES
2.
Community Development
M P Barclay, nrchitect O
235 East Eleventh Street
New York, NY 10003
?'t?-598-O492
December 16, 1995
Mike Mollica, George Ruther
Community Development
Town of Vail
Vail, C0 81657
re: Vail Athletic Club
Dear Mike and George,
Enclosed are partially rendered elevations of the exterior of the VAC as a predominantly stucco buibing.
I'm also enclosing a xerox of two buildings at Cordierra that reflect the character of the exterior that I hope
to impart to the VAC.
l'll talk with you on Monday and am planning on being in Vail for the January 2nd Town Council and
January 3rd DRB meetings
Sincerely yours,
Michael
a
TO:
FFIOM:
DATE;
SUBJECT:
ilil
District Amendment
On December 11 , 1995, Ihe Planning and Environmental Commission unanimously recommended
approval of The Vail Alhletic Club's proposal for a Major SDD Amendmenl. The vote was 6-0. The
Plannilg and Environmental Commission's recommendalion for approval carried with it the 7 conditions
as reccimmended by staff. The Planning and Environmenlal Commission did, however, modify condition
No.'s 4 and 5 as indicated in the bold type below.
1. That the applicant permanently deed restrict the 55 accommodation units as short-lerm rental
units, and that the 55 accommodation unils shall not be subdivided in the future lo allow for
individual ownership. The condominium declaralions for the Vail Athlelic Glub shall be amended
to include this requirement. These items shall be completed prior 10 the Town's release of any
occupancy permits for the building.
2. The applicant shall execute and have recorded at the Eagle Counly Clerk and Recorder's Office,
the Town's Type lV Employee Housing Agreement for the four employee housing units proposed
in the structure. This shall be required prior to the Town's release of any occupancy permils for
the building.
3. Conslruction drawings, for all the site planning/slreelscape improvements included as a part of
this project, shall be submitted for the review and approval by the Town Engineer. This shall be
required prior to the Town's issuance of a Building permit for the project.
4. That the Planning and Environmental Commission, and the Design Review Board, carefully
review the architectural characler of the building and lhe delails and malerials which are
proposed for use on the exterior of the building. That the proposed oversized shingles not
be used as the exterior siding materials for the building and that the applicant use more
traclitional siding materials such as slucco, wood and slone.
5. That all lhe deck rails and the exlerior siding ol the building be consistent with regard to
design, material and color, and thal this requirement shall include the two existing
condominiums on the third and fourth floors of the building.
6. That this application shall conform to Chapler 18.40.120 (Time Bequiremenls) of the Town's
Municipal code, relating to "sunsel" provisions for special Development Districts.
7. That all the provisions stated in Ordinance No, 27, Series of 1993, be met in full and be included
as a part ol this amendment lo the SDD.
Since the Planning and Environmental Commission meeting, the applicant has modified the Major SDD
Amendment proposal to comply with the PEC's request to cifrange ine exterior materials of the structure.
The applicant is now proposing an exlerior that is predominanlly-stucco. The use of wood and stone is
also apparent on the e)derior ol lhe building. The applicanl's revised building elevalions are attached to
this memorandum to lhe Town Council.
MEMORANDUM
Vail Town Council
Community Development Deparlment
January 2, 1996
Vail Alhletic Club - Major Special Development
tt
ffiil
-F-
rs
*cJtE
.9
(E
I
trJ
Jotn
,oEgI ::
(J I 1!
oi !;rtr: Ei::: !;sii rir
=: I9x>,! lRt
-J'
t:-cCt-.9 k;
g lrUJ JI 8
Xiliiiliililtl
,q3E:
UP :.1
(JiL
F: !ii
k i ri;
s; Ifl
l:
t;
t:
rl!
1r
I
IFtrlEr:1FIII
tFil
t-F0
/
FgsD
F[l q flnn'r
75 South Frontage Road
Vail, Colorado 81657
970-479-2 I 3 8/479-2 I 3 9
FAX 970-479-2452
Sentprnher 6 I QQ6
John Perkins
P.O. Box 2007
Avon,, Colorado 81620
D ep artment of C onmunity D eve lopment
RE: The Vail Athletic Club
Dear John:
As you are arvare. the Town's Design Review Board (DRB) unanimously approved thc Phase I proposal for the
Vail Atliletic Club (VAC) redevclopment. This approval occuned on August 21,1996. The DRB's approral
canied with it the folloling five conditions:
1. The existing fencc and storage shed. currently located immediately to the southwcst of the VAC
building, must be removed.
2. The proposed wall surrounding the exterior terrace, on the south side ofthe struchue. shall be a stone
veneer wall. Not str.rcco. as originally proposed.
3. One additional cinder path shall bc added to access the public open space area, located to the south of
the Vail Athletic Club. This path shall have a sod border along both sides of it, similar to what was
approved for the path just to the west.
4. The proposed use ofwood for the screen for the spa area was not approved. The scrcen shall be a
stone-faced wall, the size and extent to be approved by the planning staff.
5. If the Phase II improvements for the Athletic Club are not subrnitted for DRB review by June I 5, I 997,
then the new windolvs. which are approved as a part 0f Phase I, shall be painted to match the existing
windows.
Additionally. the DRB agreed with your proposal that the landscaping and associated stone veneer along the
south side ofthe Vail Traruportation Center, shall be defened until Phase II ofthe redevelopment ofthe Athletic
Club.
Should you have any questions or concems regarding any ofthe above. please feel free to contact me directly at
479-2144.
Sincerely.
,t r ltt Nl'
fVLl^ fvrdL{---
MikfMollica
Assistant Director of Community Development
Com munifrb.n.top ment Plan Routin glrm
tr Approved Denied (cite detailed reasons) Approved with conditions
Rriutcd To:ieg Hall, Public Wd
Return To:Mikc Mollica, Cornmunity Dcvclopmcnt
icct Dcscription:FAq. } r lrver .lnt le*k oxly
oN t.2t,t\
f:\everyonevlonrvo{iform
CommunifDevctopment Plan Routing frm
Approved Dcnied (cite detailed reasons) Approved with conditions
Routcd To:
(
,6.Effiii Public works
? $96
Rctum To:Mikc Mollica, Community Dcvclopmcnt
Dntc Routcd:s. 6,7b
Return By:* L',X -< ./,,-' 4 ** a44 d,r1,e^ 9/. ;^ /41/.^ /^;t ."^ ,
Projcct Name:Vo;4 A,ut .. aA CZ^; r
Proicct Addrcss:352- E nza/@- -bn*<
Project Legal:
Project Dcscription:l{.'^4 dl/{-//""'-.*-d"t,
4 ryreerytzfr a)se6
^"{4 /*"2 G/,1, /'* *^ffi tu
/)Ur/49F+
O rac €-^ h'.u1 (-? /44 "-^A
.t ' / /
/ " ^' + ,u o* 4 /,,1 ,1 /) r. A/,r/t^*t ./ ^- -, , ; L,J/
o'.n. - 4oalt-^l //.(s/)u^r,//" 4.- /./L.,(-t4o,,). -/-,,) -,L,^ro
,, ',n ^... *- / ' ..', (, ,- l-. o-'J /, ,- ,., ,'.-/-
(.)o/.r', f,,, l/vo-.] 3^.^t c-./ /tt^,j- / c/,.'/. - /on-
,; t,L.',^/ l-+""^-- t+.tA/n.,-^--,J.? ./-L ^,1,,+
./ /T stn r+onm4-c4-
\ , '. / --'--v----71JI--,--T-q
"l lt- n-t./ r;-^ ,^^-Jt.--ln.u /oun^ z2,r^ .i n,,L/,.
'tr//\-DazL loo-1 tra.-'/
2 /,
Reviewcd bv:
ffli"t
I
I
,/
Printed by Mike Mollica 8/02t t5 2:59pm
Froln:Jeff Atencio
To: Mike Mol ]- ica
srrUj..c: vail Aehaeci.c c1ub Phase 1
===NoTE=== =-A/02/96=:2.47p'm==
Dear Mike'.Ilte vail Fire DepartmenL has
no obj ectiong to ttre pla.rts ltou sent Eo
our of f ice. Ttlis is ba.sica].llt arr
interior remodel that wj-].]. provide-
ooorot.un:-ties to imt)rove the exlstsingi
alarm and sprink1er slzscem -
If we had a suq:giestion to ctre vail"
Attllecic club its wou1d be to relocatse
Ehe Fire DePartment' connection located
,rn ttte Norttr tas t corner of tstre
struccure - tlnf ortsunatseIy it is
obsErucced blt clae l-andscape tshac
buf f ers the sCructure, and would pro\re
to be dif f icultr to access in $ti-ncer
monttrs -
ot:berwise thl-ngs l-ook gireat -
oa/02/96
Page: L
{
t.vlaEil e/17191
DESTGN REVIEW BOARD APPIIICASION . TOI{N OF VAIIJ,
DATE RECEIVED: O-7
DATE OF DRB MEETING:**********
TNCOITPT/,ETE APPI,TTrcNS
PRO{IECT TNFORMATION:
DESCRIPTION, YAL AI*II^gTtr- CIJ.)E> f+IHEE CME
B.TYPE OF
_-_y Construction (9200.00) Minor AlLeration ($20.00)I/Addition (950.00) Conceptual neview (g0)
C. ADDRESS:
i
. ,'.
J|JL2$189$
it'i
I.
A.
D.LEGAI, DESCRT
Subdivision
If property is described bydescription, please provideto this appLication.
a meets and bounds
on a separate sheet
1ega1
and aLtach
E.ZONING:
NA}iTE OF
Mailinq
APPI,ICANT:
Address:
G.NAME OF APPLICAI\TT ' S
Address:
PRESENTATMails
NAME OF OIA'NER(S):
FEE SCHEDUI-TE:
VAI,UATION$ o-$ 1o,ooo
$10,001 _$ 50,000
$ 50, 001 - g 150, 000
$150,001 - $ 500,000
9500,001 - 91,000,000g Over 91,000,000
DESIGN REVIEI{ BOARD APPROVAIJ EXPIRES
APPROVAIJ UNIJESS A BUIIJDING PER!{TT ISIS STARTED.
Phone
Phone
CL,^-p
FSE
$ 20.00
$ s0.00
$100.00
$200.00
$400.00
$s00.00
ONE YE.AR AFTER FINAIJ
ISSUED AI\ID CONSTRUCTION
I.
J.
APPrrrcATroNs wrLIJ Nor BE PRocEssED wrrilow owNER, s sr6fvAlruRB
Condominium Approval if applicable.
DRB FEEI DRB fees, as shown above, are to be paid at theLime of submittal of the oRn application. Llter, whenapplying for a building permit,, please identify the accuratevaluation of the proposal . The gown of vair will adjust thefee according to the table below, to ensure the correct fee1s paid.
OWNER (S) SIGT;TA?TIRE :
l4a+l+nS Address:
\
*$lrfEt nrt t
f*r*: :r*"ratf I cllll li-, .)f&:lj/tlri -Jfr{ i'
\
.:'$-:!:*-:'l t*Jryl'\SJfl -if;A:t .".i#S
d.il.li:{'!,:1; .-.Jl*r ,-* -l}t'f ?' .-*r l-}..r1?i,r.s:i
n {.t'l* il i-: :I!*\ \I-ft\l firttl1 tr,,r }fdt4i'r., ."|crilJ:-*bd.i
slr;,;i$ttfl[Vo#if.*p':'ifr atff']*,llft 'S#u'F
'i'::!lfil":tct 'l l.f:j,r't lt: E#",f:ll ..-! tllJl":
'Ltj.i.";:f,-#.fi:y{i .'-l'f : ' i"rtf ,
1l'' i ji9 .,'l) r,l.lrlvr\ l't\r} .irlFt
.\t:].FF -i.l.P
*trrltj.S'q t"'.lcli'
.r t_jtl-s t tu,r;Jd;-ilJrl 'l;?1r*l 5...-',F^- . . ^''.iili',.r-*:ii!,.-"*-' itl;1,* .;L),-';l+:il
.' ilf i.;JS-,&qf l:ltFql ,. f!; t 't?"Ut'.
.',fFJ 'i'.t'Jl , -itt .'r*'fi-
::itq jj: t "t ' rrcv *'tf#r't -f€ztis sr.f-.1.,r:* . ...* ,-lrsv
NAI{E OF PRO.'ECT:
IJEGAL DESCRIPTION:
STREET ADDRESS:
The following information is
Review Board before a final
LfST OF !,IATERIAIJS
BLOCK SUBDIVISION aFTterB
required for submiLtal to the Design
approval can be given:
A. BUILDING TihTERIAI.TS:
Roof
Sidinq
Other Wa11 Materials
Fascia
Soffi ts
Windows
Window Trim
Doors
Door Trim
Hand or Deck Rails
Flues
Flashings
Chimneys
Trash Enclosures
Greenhouses
Ret,aining Wa11s
Exterior Liqhting
other
LANDSCAPING: Name of
TYPE OF MATERIAL COI,OR
f.llA
Alrurh,tltrlt'^ ct-AE) rtyrntc}} Ed{sF)
Nftr
N[A
HfA
tr. lnFtl l..t
Designer:
Phone:
A* AffAc+Eb ppq5lf LFg{atSS
\'.1
.q ll t"'u ..' i'$ tli' i
,t{'f :u'1}'!- .'1t,\ 't' }19 ;. F";1[:t i;|$f |j!'.:.--rJrt.
..' i j;. i
' trr
f, 'rj, I lA:,[1i .'..,]'i
;i,}|ii. ilbl,r" {li:1*l',','; .
:rt .. I
e':,l "1ti
:.,:'.rl +'{ I t i:":,' .'
..r'f.rr t i-l
^l' ' .r.r.r I
I,','1:'.i!fl"' - .rll{l:f,i: !:;1 ',17
l,l;1 tE
.r, i I ,
r, i'i
r.1 lr
.r "irl : i
':' r .
/'r
-j" I
tl ,.
't ti:1 .," I
-' ,b, t ,. 1
:" !.xtii;:
. I i.'i
.'-.',lt '1 .:.r', :'::1' .'';
r :'i'. ^- t,.!ri",
rl"
'"1 !" ;l .'i'i : ' il 1"":,, '. i ;.
- I ;.\"1; i:, 'r :'S' I .
\.' F--O-oi tO ' :6If'
itlnrLI ur
$*
0
2
UI
o
UIJ
F
z
(
J
r.
0,
E6z
Eo
E
E0tJ
$til!'i-
|:l.{l1l
fl_l
lfa lf*l;
I 0l-I r.l
IRlv
l#
lol0-ln
tfrl.lt$| .r,^,t\
I
lw
$s#slE
og
'ao
3
tu
Blr
:r,l ,i 0 r:,,: ::'. .,i,,. ::.:r: :: 5:r:r:r l::: : .:: .; :
i! €,.,,, ,', l', i,
,H.3.x , ,E:E8,F , E, i=
lHE, $E$E,
'E
Fs fFfrFFF#
Elt
0,I+
63o
E
lt
o
P
n
o
C''c-Io
@
r- (11 6il nl il o| E,r € (D
$trllclt;F.F
:1...,:'i::!
uButft&,EHfih
APPI.TCAT]ON - TO$IN OE-VAIL, COLORADO
DnrE REcErvep:lAle:\ zz, t??L
DATE OF DRB MEETING:**********
I.
A.
B. TYPE OF REVIEW:
New Const,ruction ($200, 00)Addition ($50.00)
-/'}{fnor Alt,erabionVconeelrE.ual Review
($20 . 00 )
($0)
D.
ADDRESS:
LEGAL, DESCRIPTION: Lol
Subdivision Block
If propert,y is describecl bydescript,ion, please provide
L.o Lhis application.
zoNrNG, Sbb
a meeLs and bounds
on a seDarat.e sheeL.
lega1
and attach
F'NAME OF APPLICANT:
Mail Address:
NAME OF
Mailing
Phone
APPLIEANT,S REPRESENTATIVE I#ffi- )Address:
TI.NAME OF OWNER(S):
Condominium Approval if applicabte.
DRB FEE: DRB fees, as shown above, are t,o be paid aE Lhe
Lirne of submitLal of the DRB applicaLion. Later, brhenapplying for a building permitr, please ident,ify lhe accuraL,evaluation of Ehe proposal. The Town of Vail wilt adjusL thefee accordinq to the table below, to ensure the eorreet feeis paid.
T
FEE SCHEDULE:
VALUATION$ o $ 1o,ooo
$ 10, 001 $ 50, 000
$ 50, 001 - g 150, 000
9150, 00L - $ 500, 0oo
$500, 00L - $1, 000, 000g Over 91,000,000
DESIGN REVIEW BOARD APPROVAIJ EXPIRES
APPROVAI, tTiUJEgg A BUIIDING PERMIT T8IS STARTED.
-E -D-rr
$ 20.00
$ s0.00
$100.00
$200.00
$400.00
$500.00
ONE YEAR AFTER FINAIJ
Ig 8UED ANB e0filgtrRUeff6l'i
Phone
App]lreArroffs rfrr.r
^r0r
BE prdcEgsED :y'lmt1ur a/fNER, g sfdlwrufrg
Trrr(-4J-r rrcr L a ' J. vJ Ttr.lr(r\ I t\i-Iju.lttrK HNLr1.
o
PR.O.]ECT REGISTR,Y
for the
VAIIJ ATHIJETIC CLIIBa remodel and e:cpansion
352 East Meadow Dr.vail, co 8165?
oFF# 970.4?5.0700
FAr(# 970.476 .6451
oWNERSHI P/ IVIAIIAGEIIENT
1. TOM ROUSH, IM. - O}INER
232 EAST 51FE ST, OFF# 212.980.5585
NEW Y0RK, Ny 10021 FAX# 212,980.5587
2, TOMMY BRUSCA - OWNERS REP.v-A.c. MoBILE# 9?0.390.5016
PAGER# 9?0.S45.3760
FAX# 970 .479,6Q21
3. STA}I COFE - MNGR.v.A.c. L.T. oFF# 970.476.9530
oFF# 970.476.0700
4 . BOB MORONEY - CIJI]B MNGR.v.A.c. oFF# 970 .476.7960
5. LfSA DeKOSTER - SPA DIRECTORv.A.c. oFF* 970.476.0?00
6, IJAURA K. SMITII - FITNESS DIRECTORv.A.c. oFF# 970 .476.7950
1. DAVE MARI]ORAM - PROPERTY MNGR.v.A.e. oFF# 970.476,0700
8. CIIIDY WAI.,T - CHEF @ TERRA BISTROv.A.c. oFF# 970.4'?6.6836
o
Et\n t I'|J-E(J.E)E ra ila\!-r.l .
FROJECT REGISTRY FOR v.A.C, p.j.z
CONSULTANrS
MICHAFL EARCIAY - DESIGN AX.EIIITECT
MICIIAEI,, BARCIJAY, ARCHITECTS
235 EAST 1lrh ST. OFF# 21_2-598.0492
NEW YORK, Ny 10003 FAX# 212 .674.6869
.JOHN M. PERKINS - PROJECT ARCHITECT
iTMP ARCHITECTS, INC.
OO47 EAET BEAVER CREEK BLVD. OFF# 970.949.9322
CIIRISTIE IJODGE RESORT FA:(# 970 .949 .0529
SUITE C-15P.O. BOX 2007, AVON, CO 81620
DA}TIEI, ROMUALDEZ - INTERIOR.S
ROMUAIJDEE AREHITECTS
95 sth ST., 8th FLOOR oFF# 212.989.8429
NE$l YORK, Ny 10003 FAX# 21-2 .929.97L8
4. DAVE ITOT'DESHEIJL - STRUCTUR.AL ENGINEER
JVA INC.
1319 SFRUCF ST.
BOUIJDER, CO 80302
J--
2,
5.
't.
5 " DEI{NIS BEI,UDITI . MECHA}IICAL/ EIJECTRICAL
BEAUDTN, GAI{ZE CONSULTING EIIGTNEERS, rNC,P.O. BOX 39 oFF# 970.949.5108VAIL, CO 81558 FAX# 970.949.6159
BOB HERBST . CIVIL ENGINEER
AIJPINE ENGINEERING, INC.
EDWARDS BUSINESS CTR.P.O. BOX 97
EDWAXDS, CO 81632
oFF# 303 .444,L95r
FAX# 303.444.a957
oFF# 970.926.33?3
FAJ(# 970 - 925.3390
DAVE CORBTN - V.D./ CM./ ET"REE1SCAFEVAII. ASSOCIATES
P.O. BOX 959 oFE# 9?0.845.2530
.avoN, co 8r-620 FAX# 970 . 845 .2555
ECOTT SONES - IJAITDSCAPE ARCHITECT
LAI{D DESIGNS BY ELIJISON, INC.P.O. BOX 2877 oF'F* 970 ,g4g.L'.t}O
VA.IL, CO 81658 FAX# 970.949.3288
o
nTf\ EJ lffo l.r'l.1 I I'{J-E UEtr.]{ Hr(LN.
9 - BILL JO1INSON - KITCI{EN
SBFCO/ SYSCO CO.
1101 WEST 48rh AVE.
DEMIER, CO 80221
10. JON CARRICK, ENGII{EER -
CA,RRICK E ASSOC.P.O. BOX 322
S?R.a,SSBURG, CO 80136
TOWN OF
?5 SOUIII FRONTAGE RD.VAIL, eO 91657
PRoitECT RBGISTRY FOR V.A.C, pg.3
DESIGI,IER
oFF# 303.480.326?
F$(+i 303.480.3376
ADT, LIFT EONSUIJTANT
OFF# 303 .522.9607
8e'.\# 303 ,622.9689
VAII,
oFF# 970 .479.2L38
FAJ(# 970 ,479.2452
2.
1
4.
MIKE MOITIJICA - ASSISTANT DIRECTOR oF coMMttNITY DEV.
COlrlMttNITY DEV. OFF# 970 .4'19.?,:-44
GREG HAIJI' - TO![N ENGINEER
PUBIJIC WORKS OFF# 970 ,479,2L6O
F.eX# 970 .479.2j-66
DAN STANEK - BUII..DING IJIASON OFFICER
COMMUNITY DEV.
CHUCK FIEIJDMAN . BUII',DING
COMMUNITY DEV.
oFF# 970 .479.232L
I}ISFECTOB./ PI,ANS EXAMINER
oFF# 970 .479.2325
TOTRL F.E4
a
I
TO:
FROM:
DATE:
SUBJECT:
MEMORANDUM
Planning Environmental Commission
Community Development Department
December 11, 1995
A request for a Major Special Development District
the Vail Athletic Club, 352 East Meadow Drive, and
follows:
RLEMPY
TLECOPY
(SDD) Amendment, tocated at
more specifically described as
A parcel of land in Tracr B, vair viflage, Firsl Filing, Town or Vail, Eagre county, colorado,
more panicularly described as follows:
commencing al lhe Northeast corner of said rract B: thence N 79.46'00' w alono the
Northerly line ol Vail Village, First Filing, and along the Northerly line of said Tract-B 622.g6
feet: thence S 06"26'52" W a dislarice of 348.83 feet to the Southwest comer of thal parcel ot
land described in Book 191 al Page 139 as recorded January 10, 1966 and liled in Reception
No' 102978 in the Eagle County Records, said corner atso being the True point of Beginnrng;
thence S 79'04'08" E and along the Southerly line of said parcel 200.00 feet to the Sourhealt
corner thereof; thence N 62'52'00" E and along rhe Nonherly line of that parcel of land
described in Book 222 at page 513 as recorded in rgTl in the Eagle counry Records. a' ctistance of 66'78 feet to lhe Nonheasterly corner ol said parcel ol land; said corner berng onrhe wesrerly right-of-way line o1 Gore creek Road, as planed in vait village. Fifth Filing;
thence N 27'13'37" w a distance ot 77.37 leer along said weslerly righr-dl-way line of Gore
Creek Road; thence N 89'29'22" W a distance of 1r.80 Jeel lo the Ndrtnea.terty corner ol thalparcel of land described in Book 191, page tgg as recorded January 10, 1966 ind filed inHeceplion No. 102979 in the Eagle Couniy Records; thence Northw;sterly 26.s1 feer aonglhe arc ot a 37.50 feet radius curve to the lefi having a central angle of 40;90'00" whose chordbears N s3.40'00,' W a distance of 25.96 feet to a pioint ol tangeniy; thence N 73.55,00" Wand along said rangenr 1 66.44 feer; thence N 95" 10'21" w a distance ol s0.40 ieel to theNonhwesterly corner of the Mountain Haus parcel: thence s 02"1g,oo" w and along theeaslerly line of said Mountain Haus Parcel a distance 01 100.00leelto the Southeaifeny
corner thereol: thence s 45'i3'53" E a distance of 3g.70 teer ro lhe True point of Beginning,containing 30,486 square feet, more or less.
Applicant: JWT 1987 vait Limited partnership, (dba vaitAthtetic ctub),. represented by Stan Cope and Michael BarclayPlanner: Mike Mollica
on November 2, 1999, the v.air rown council approved the estabrishment of specialpevgl-oqmeg District (SDD)No. 30 { the VailAtirietic Club) and tn" o"raiteo devetopmenr ptan forthe SDD. The Town Council approval of Ordinance No. 2?, Series of 19g3 passed by a vote of5-2' The Town Council approvai occurred following approximately six-months of review, by thePlanning and Environmental c_ommission (pEc) ano tne Design ieview Board (DRB), duringwhich four joint PEC/DRB public hearings were held. An ove-rview of the 1993 boo ipprouit is
I
listed in outline form-as Exhibit B, attached to this memorandum.
On July 24, 1995, the Planning & Environmental Commission held a worksession to discuss
amendments to the 1993 approved development plan. A copy of the meeting minutes
memorandum, as Exhibit D. Subsequent to this July PEC meeting' the
that the Major SDD Amendment request be tabled, in order to allow them to
to the application.
At this time, the applicant is prepared to move fonrard and Ls requesting a Maior
Amendment to the 1993 approved SDD, to allow for the redevelopment of the vail Athlelic
Club, located at 352 East Meadow Drive. The proposed amendments to the 1993 approved
SDD include the following:
. The creation of three additional accommodation units (AU's) - for a total of 55 AU's for
the SDD. The creation of one additional dwelling unit (DU) - for a total of four DU's for the
SDD.
. The expansion of the spa lounge to the south, over an existing skylight, (190 square feet
of floor area). This expansion does not count as additional site coverage since there is
existing floor area beneath this space. This is the only proposed change to the "general
footprint" of the 1993 approved structure.
. The reconfiguration of the north facing, upper{evel dormers. Nine gable dormers are now
proposed in this area, and are similar in architectural design to the previously approved-south{acing
dormers. The 1993 approval included nine "articulated" north{acing
dormers.
. Th€ addition of a north-facing 5th floor clerestory (as suggested by the PEC in July).
. The south-facing dormers have been slightly modified. Additionally, the south-facing
inverted dormers ("roof cutouts"), originally approved in the center-most area of the roof
have been eliminated.
. Although the overall mass and bulk of the proposed structure has not changed to any
significant degree, an internal reconfiguration of the spaces has occurred. The details of
this reconfiguration (area calculations) are included as Exhibit A. ln summary, the
applicant is proposing an additional 1,769 square feet of gross floor area, to be located
within the building envelope of the 1993 approved plans. Relating to building height, all
the proposed dormers (north and south facing) will meet the 1993 approved maximum
ridge height elevations.
. The reconfiguration ol the interior spaces has resulted in a decrease in the required
number of parking spaces. The 1993 approval required that nine additional parking
spaces be added to the existing 19-20 space garage. This SDD amendment request
requires lour additional parking spaces, which are proposed to be provided within the
existing parking structure.
. All ol fre proposed site and building improvements (including streetscape improvements,
landscaping, etc.) associated with the 1993 SDD approval remain intact. A detailed
J
listing of these improvernents is attached as Exhibit C.
II. CRITEFIA TO BE USED IN EVALUATING THIS PROPGSAL
The proposed amendments described in Section I are considered to be Major Amendments tothe 1993 approved sDD. As stated in the Zoning code, a major amendment is defined asfollows:
"Major amendment means any proposal to change uses; increase gross residential floor
area; change the number of dwelling or accomm-odation units; rnooity, enrarge or expand
any approved Special Development District (other than minor amendments is defined insubsection 1 8.40.0208)."
Since the applicant's proposed amendments to the SDD involve changes to gross residentialfloor area, as well as density LnlTb"r of units), the proposal is requirei to foiiow the Major SDDAmendment procedure. The PEC shall provide a recommendation to the Town Council regarding
the proposal. The Town Council shall approve the proposal via two readings of an ordinaice.
ilt.
As provided for in Chapter 18.40 of the Town's Municipal Code, there are nine SDD reviewcriteria which are to be used to evaluate the merits of a proposed Major SDD Amendment. ltshould be noted that the staff analysis of the proiect's iomptian6e with the SDD reviewcriteria has only focused on the proposed amendments to tite SDD, and not on the balanceof the 1993 approvat. The review criieria, and the staff's analysis ot the proposal's compliancewith the review criteria, are as follows:
A' Design compatibilityand sensitivity to the immediate environment, neighborhoodand-adjacent properties relative to brchitectural design, scale, bulk, Uui-lOing height,buffer zones, identity, character, visual integrity and-orientation.
Due to the nature. of the SDD review process, the PEC has the authority to review andcritique much ol the architectural detailing for the project. The staff will be presenting
colored renderings of the exterior elevations of the structure, of both the l dgg approieddrawings as well as the current l gg5 SDD amendment proposal.
Although there have been a variety of architectural changes made to the design of thebuilding, the overall scale, and mass and bulk of the prodosed structure will g6nerally
remain as it was apPIoYid-I 1993. The primary rooi totins (and buitding neignt) witt atsoremain as approved.in 1993. .The following outlines the areas where the-re aL jroposeo
changes to the architectural design of the itructure:
. Upper level dormers and clerestory (fourth and fifth floors);. lnird level "porches', (north etevatibn);. Gable roof added to east stair tower/iestaurant entry;. Restaurant fenestration (north elevation); and. Architectural character of the building (eiirnination of srucco & the use of wood
siding/shingtes).
B.
The 1993 approval included a series of "articulated" dormers on both the north and south
elevations of the structure. Statf believes that the 1993 architectural approach was very
successful in that it not only broke up the large expanses of roof area, but it also allowed
for a very attractive interior room layout. Additionally, the design kept the shading on
East Meadow Drive to a minimum. Although the project architect is now proposing a
more traditional gable-style dormer, the statf continues to be comfortable wim the design
approach, and we believe this change will improve the overall "alpine character" and
quality of the building.
Staff does, however, have some concerns with the proposed cha4ges to the overall
architectural character of the building. The project architect is proposing to eliminate the
previously approved stucco on the exterior of the building, and is now proposing to side
the building with a mixture of oversized wood shingles, board and batten siding, redwood
trim and a new stone base. A new shake shingle roof is also proposed.'According to the
project architect, the proposed "rustic mountain lodge" design is intended to mimic the
architectural style(s) used for buildings such as the Clubhouse at Cordillera, the Old
Faithful Inn (Yellowstone National Park) and the Boathouse at Saranac Lake (New York).
Please see exhibit E for reproduced photos of these properties.
The staff's concern is that this design style has not historically been utilized in tre Vail
Village area, and although we are not opposed to a "new" design approach, we are
concerned with the precedent setting nature of the issue. We encourage the PEC, and
subsequenfly the DRB, to carefully review the proposal with regard to the overall
character of the building, and specifically, to review ilre proposed exterior materials..
One additional detail relates to the two existing condorniniums in the project (third and
fourth floor locations). These two condominium owners do not wish to modity their
exterior deck rails to conform with the new deck rails proposed for the balance of the
building. Staff believes that a!! the deck rails on the building need to be consistent and
we will recommend this as a condition of approval.
Uses, aetivity and density which provide a compatible, efficient and workable
relationship with surrounding uses and activity.
The general uses within the redeveloped Vail Athletic Club (VAC) are not proposed to
change. Given that the applicant is generally working within the confines of the 1993
approved building envelope, the statf views the addition of three accommodation units to
be a positive element of the proposal. Short-term accommodation units are strongly
recommended in the Vail Village Master Plan, as discussed later in this memorandum. lt
should be noted that one additionaldwelling unit is also proposed at this time. While the
statf would prefer that this unit be an accommodation unit, we also recognize that the
existing VAC has a total of nine dwelling units, and that the SDD proposal calls for the
elimination of five of those units. When viewed as a whole, this is a positive step' in
staff's opinion.
Statf recognizes that approximately 1,769 square feet of gross additional floor area is
proposed to be added as a part of this amendment application. We leel that the proiect
architect has been very creative in the overall design and layout of the interior spaces,
and has now maximized the full floor area potential within the 1993 established building
c.
envelope. wv are comfortable with the reguest for the additional square fooage.
compliance with parking and loading requirements as outlined in chapter 1g.52.
statf believes that the proposed amendments to the sDD are in compliance with this
criteria. As detailed in Exhibit A, the proposed Major sDD Amendrnenl reguires an
additional four parking spaces. This is a reduction from the 1gg3 approval. which
required an additional nine parking spaces. To satisfy the Town's requirement for the
four additional parking spaces, the applicant has proposed a valet parking program, and
will add four parking spaces within the existing parking structure. tne vaiet parring
program was approved in 1993, and the statt continues to support the valet parking
concept.
As approved in 1993, the applicant is continuing to propose a loading area (a pull-out) off
of East Meadow Drive. This area is intended to accommodate the short-term parking
needs of the project, as well as the loading and delivery functions for the hotel andrestaurant' In addition, the applicant is proposing to remove the existing trash facility
currently loceted on the west side of the building, and to construct a train room (with a
trash compactor) within the enclosed paking garage.
conformity_with aplllcable elements ot the vail comprehensive plan, Town policies
and Urban Design Plans.
VAIL LAND USE PLAN
The goals contained in the vail Land Use plan are to be used as the Town's policy
guidelines during the review process for new or amended development proposats. The
staff considered the following Land Use Plan Goals/Policies during the i;iti;l review of the1993 SDD establishment for the Vail Athletic Club, and further, st;ff believes that thesegoals and policies continue to be applicable with regard to the current Major sDD
Amendment proposal:
1.1 vail should continue to grow in a controlled environment, maintaining a
balance between residential, commercial and recreational uses lo serve
both the visitor and the permanent resident.
l=3 The quality of development should be maintained and upgraded wheneverpossible.
A2 The Village and Lionshead areas are the best location for hotels to serve
the future needs of the destination skiers.
33 Hotels are important to the continued success of the Town of vail.
therefore conversion to condominiums should be discouraged.
42 lncreased density in the core areas is acceptable so long as the existing
character of each area is preserved through implementation of the urba;
Design Guide plan and the Vail Village lvtister i'tan.
D.
4;l *'The ambiance of the Village is important to the identity of Vail and should
be preserved. (Scale, alpine character, small town feeling, mountains,
natural setting, intimate size, cosmopolitan feeling, environmental quality.)
53 Affordable employee housing should be made available through private
etforts, assisted by limited incentives, provided by the Town of Vail, with
appropriate restrictions.
5.5 The existing employee housing base should be preserved and upgraded.
Additional employee housing needs should be accommodated at varied
sites throughout the community.
Overall, the staff believes that the proposed Major SDD Amendment application meets
the goals and policies of the Land Use Plan as described above.
VAIL VILLAGE MASTER PL/AN
The staft believes that the 1993 approval for the redevelopment of the vail Athletic club
carried out many of the goals and objectives contained in the Vail Village Master Plan.
Additionally, the staff believes that the current Major SDD Amendment proposal also
furthers the following Master Plan's goals and objectives:
Goal #1 -Encourage high quality redevelopment while preserving the unique architectural
scale of the Village in order to sustain its sense of cornmunity and identity.
Objective 1.2 - Encourage the upgrading and redevelopment of residential and
commercial facilities.
Goal #2 - To foster a strong tourist industry and promote year-round economic health and
viability for the Village and for the community as a whole.
Objective 2.1 - Recognize the variety ol land uses found in the '10 sub-areas
throughout the Village and allow for development that is compatible with these
established land use patterns.
Objective 2.3 - Increase the number of residential units available for short term
overnight accommodations.
Policy 2.3.1 - The development of short term accommodation units is strongly
encouraged. Residential units that are developed above existing density levels
are required to be designed or managed in a manner thal makes them available
for short term overnight renlal.
Objective 2.5 - Encourage the continued upgrading, renovation and maintenance
ot existing lodging and commercial facilities to better serve the needs of our
guests.
Policy 2.5.1 - Recreation amenities, common areas, meeting facilities and other
amenities shall be preserved and enhanced as a part of any redevglopment of
E.
F.
G.
lodgirrg properties.
Obiective 2.6 - Encourage the development of affordable housing units through
the efforts of the private sector.
Obiective 2.6.1 - Employee housing units may be required as part of any new or
redevelopment project requesting density over that allowed by existing zoning.
Goal #3 - To recognize as a top priority the enhancement of the walking expenence
throughout the village.
Objective 3.4 - Develop additional sidewalks, pedestrian-only walkways and
accessible green space areas, including pocket parks and stream access.
Goal #5 - Increase and improve the capacity, efficiency, and aesthetics of the
transportation and circulation system throughout the Village.
Policy 5.'1.1 - For new development that is located outside of the Commercial
Core I Zone District, on-site parking shall be provided (rather than paying into the
parking fund) to meet any additional parking demand as required by the zoning
code.
Policy 5.1.5 - Redevelopment projects shall be strongly encouraged to provide
underground or visually concealed parking.
The staff believes that the proposed Major SDD Amendment application meets, and
furthers, the Vail Village Master Plan goals, objectives, and poticies as described above.
ldentification and mitigataon of natural and/or geologic hazards that affect the
property on which the special development district is proposed.
Although this project is located adjacent to Gore Creek, no portion of the proposal
encroaches into the fifty-foot stream setback. nor into the 1oo-year floodplain. There are
no other natural and/or geologic hazards that affect the property.
Site plan, building design and location and open space provisions designed to
produce a functional development responsive and sensitive to natural features,
vegetation and overall aesthetic quality ot the community.
Although this criteria was discussed extensively during the 1993 review, staff believes
that the proposed Major SDD Amendment will have no negative impacts on this criteria.
A circulation system designed for both vehicles and pedestrians addressing on and
off-site traff ic circulation.
The staff believes that the proposed Major sDD Amendment will have no impacts on this
criteria. The stafl would encourage the PEC to review me september 30, 19g3 statf
memorandum to the PEC (attached as Exhibit F) for background information regarding
this issue.
H. Functional anrl aesthetic landscaping and open space in order to optimize and
preserve natural features, recreation, views and functions.
Again, the staff believes that the proposed Major SDD Amendment will have no impacts
on this criteria.
L Phasing plan or subdivision plan that will maintain a workable, functional and
eflicient relationship throughout the devetopmsnt of the special development
district.
The applicant has not proposed that the construction of this project be phased.
IV. STAFF RECOMMENDATION
The staff recommendation is for approval of the applicant's request for a Major SDD
Amendment, to allow for the redevelopment of the vail Athletic club. we believe that the
proposal meets the review criteria for Major SDD Amendment applications, as detailed in
Section lll of this memorandum. We also believe that the Major SDD Amendment
request is in compliance with the goals and objectives ot the Vail Comprehensive Plan, as
well as the purpose section of the SDD Zone District. The staff recommendation for
approval carries with it the lollowing conditions:
1. That fie applicant permanently deed restrict the 55 accommodation units as
short-term rental units, and that the 55 accommodation units shall not be
subdivided in the future to allow for individual ownership. The condominium
declarations for the Vail Athletic Club shall be amended to include this
requirement. These items shall be completed prior to the Town's release of any
occupancy permits for the building.
2. Tie applicant shall execute and have recorded at the Eagle County Clerk and
Recorder's Office, the Town's Type lV Employee Housing Agreement for the four
employee housing units proposed in the structure. This shall be required prior to
the Town's release of any occupancy permits for the building.
3. Construclion drawings, for allthe site planning/streetscape improvements
included as a part ol this project, shall be submitted for the review and approval
by the Town Engineer. This shall be required prior to the Town's issuance ol a
Building Permit for the project.
4. That the Planning and Environmental Commission, and the Design Review Board,
carefully review the architectural character of the building and the details and
materiels which are proposed for use on the exterior of the building.
5. That all the deck rails on the exterior of the building be consistent with regard to
design, material and color, and that this requirement shall include the two existing
condominiums on the third and fourth floors of the building.
6. That this application shall conform to Chapter 18.40.1 20 (Time Requirements) of
t
I
o
the Tov'in's Municipal Code, relating to .sunset" provisions for Special
Development Districts.
7 - That all the provisions stated in Ordinance No. 27, Series of 1gg3, be met in full
and be included as a part of this amendment to the SDD.
F loveryonE\p.cvn.nosvac.msnd.Dl I I
EXHIBIT A
:'l1(lto
E9
ai3Ft '=
,-rl ..t I I
o! $ 1r) +l e'l*l in lt.l
,a
*t Y?l *>l X -rg:Els !l<l - Hfg g3
O! ..| r-'l <f,| OF{ ( lr.)
>,8'E C).,E5:.
G EEE ..iE* ei b6 - Ye<+.X,
E odFrE'E E.- E!d6 tn EEifrl-Kolx sEs'^:no
u?er r r r IE'Ec.i r,x!?H
T F E5;*nE 6-;\ E
sg#? E?E in<tr.B * I i:+t:lt rtt F * * * t
(l)
{)
q;EfrFE li)(€ ;;g .="nr aa(, fil d. 'F*
z?.41 b jtl
J F{ ql Yl - !:l c.r Ql c'lEVd q q r., g g I ; q R$E< o: tr.ll .+ \A o.t o o o 6 q r.i od..iAcn&l v I dt Fl "|"
I
I
r,r # j d; r' i +j -; J *.; h lL lr. ll.l tr.r-n_+ci++dctA.X9-.X-(14naaa'av)q,tlBl r=EgKs:$l etrl c.r:: Fi-ii< -.:l \5l , +; + + ll ;
d><l n * .Fp*l i d l L i tr tr il #i;l fl s r fl r E i H ;*5r r€K 5EilfiFl il9d : X 'o = R ; : & K
E*l il ,i ,r tr ,; ,i tr ,f fi
EHI E a E a s I I d .x&N4 I
A8I fl H : B E r K fr Fldl -' $ ; = F + ,-i -1 s
€6.. 9 6) .. ..rr ,H L-\ ^a Y ,qfr i 4; i F Y? 6 5€ E * g B u
= x xt E i fr" s E Efr ? d5 s - ,B E S F
EXHIBIT B
Highlishts ol tre1993 JOo *ororn,
1. Decrease fie amount of GRFA allocated to/vards dv,,elling units and increase he amount of
GRFA for accommodation units.
2- Decrease the number ol dnvelling units and increase the number of accommodaton units.
3. Eocroach further into the tront setback with entry and second-sbry accommodalion unit as
wdl as an addition to lhe restaurant to the east of he entry.
4. lrseass common area while decreasing the area allocaled towards accessory uses and
athlEtic club use.
5. Ad dormers to the buiEing on the north and south side which do not exceed the existing
ridge height of he building. lnsert decks into the roof structure on the south elanation.
6. lncrease the arnount of site coverage as a result of the nerv entry and restaurant addition
(554 square feet).
7. Add terrace and expand dining deck on south elwation.
8. Removal of deck on the soutfr elevaton which c-urrently encroaches onto public land.
9. The applicant is proposing to meet $e incremental increase in parking requirements. There
is an existing deficit of 58.44 spaces on the site. The net'tr parking is located in the following
rEnner:
.2 spaces built underground bdev the entry
.2 spaces added by relocating an existing ski storage area
.2 spaces added by relocating the laundry room
.1 space added along the south side of the parking structure
.2 spaces in central area of oarkino structure
I btal
10. Change exterior materids of building. This includes stuccc,, wood trim,'deck railings and a
wood shake roof.
'11. Add streetscape improvements. These include: a 6 foot heated concrete paner walk along
West Meadorv Drive, an 8 foot heated concrele paver walk along Vail Valley Drive extending
over the Gore Creek bridge and street lamps. The pavers on the bridge will not be healed.
12. Relocation of existing trash area and removal of the existing fash facility which is
encroaching onto adjacent properties.
13. The applicant proposes to provide one two-bedroom employee housing unit within he Tovn
of Vail which will be restricted acmrding to the Toan of Vail employee housing requirements.
14- Additional landscaping on the north a4d south sides of he building.
O vArL ATHLE c .LUB O
EXHIBIT C (4 pages)
September 11, 1993
November 11, 1995 revisions in "italics"
SDD - STATEMENT OF PROPOSED IMPROVEMENTS
The Vail Athletic Club (VAC) agrees as part of the implementation of our SDD proposal to make the
following improvements:
Landscaoe - East Meadow Drive / Vail Vallev Drive
The VAC will extend the curb and sidewalk 6'-0" along East Meadow Drive and 8'-0" along Vail Valley Drive
to create a continuous, heated, rectangular concrete paver sidewalk extending from west end of the VAC
service/parking. drive on East Meadow Drive to the Gore Creek Bridge on Vail Valley Drive. This will be
coordinated with the town engineer.
We will revise the curb line at intersection of East Meadow Drive and Vail Valley Drive in accordance with
the "entry feature" concepts put forward in the Vail Village Master Plan and as sfiown on the site plan. Atthe "entry feature" and partially along- Vail Valley Drive, we will eliminate the existing retainingj wail to
bring the landscape down to the level of the sidewalk.
We will reface the existing landscape retaining walls along the garage and Vail Valley Drive with stone.
We will incorporate signage to inform vehicles that East Meadow Drive is a "pedestrian area" open only tovehicles on "official business" with the VAC and the Mountain House.
we will work with the Design Review Board and Alpp to supplement the existing
streetlamps along the VAC side of Vail Valley and East Meadow Drives.
We will create a new car pull-off guest dropoff area directly in front of the new hotel/health club entry.This area will be paved with granite pavers and heated. we fritt need consent from the town's authoritiejthat short-term parking in the opposite direction will be permitted here.
The creation of the new hotel/health club entry and car pull-off along East Meadow Drive should resultminimal disruption to the existing vegetation in the land#aped area a-bove the existing garagre. Allnecessary steps will be taken throughout the course of construction to protect the exiiting vigetation.
New drainage grates will be introduced to handle melting runoff at East Meadow Drive. This will becoordinated with the town engineer.
we will replace the existing wood transformer grate with a new steel grate.
t
Landscaoe - Gore Creek / South Side
We will work with the town to formalize an informal maintenance agreernent regarding the town's property
between the VAC and tl.e pedestrian path along Gore Creek.
We will prune the dead brush in the area between the VAC and Gore Creek.
We will remove the existing wood sundeck that is partially on town property, as well as the existing wood
utility shed by the hot tubs and the existing wood trash shed at the service/garage drive.
We will create a landscaped path from the end of the existing service drive/fire lane through to the town
property on the south side of the VAC.
We will construct a new stone terrace at the existing upper health club/swimming pool level along the
south skle of the building as shown on the site plan. -
Buildino Exterior
We will reside the entire outside of the building. The new siding will be a combination of oversized
shingles at npst of the existing stucco areas, board and batten at the new dormers and redwood trim. There
will be a stone base by the new entry.
We will be installing a new wood shingle roof throughout.
We will be building onto and residing the existing porches, balconies and decks with new wood trim to
create the more traditional porches shown on the elevations.
We will be extending the existing dining deck along the south side of the restaurant to connect with the new
hotel lounge.
We will be constructing a new on-grade hotel/health club entry on East Meadow Drive.
We will be extending the north wall of the restaurant 6'-0" to the north and filling in an existing 28' x 9'
"indentation" alorg the south side of the dining tenace.
We will be installing new clad wood windows and doors throughout.
We will be adding new donners at the fourth floor level along both the north and south sides of the existing
structure.
We will be adding new chimneys throughout for the new gas fireplaces.
o
Interior lmorovements - Health Club
The improvements to the health club will not be extensive, they will focus on increasing the spa and
cardiovascular capacitybf the club and adding new doors and windows along the south ilall of the upper
level in order to introduce more natural light into the club. Most areas of ihe club stay as they are.
We will be adding a new floor at the upper health club level above the existing racquetball court.
we wiff be creating a new staff locker/lounge area at the upper health club level.
Interior lmorovements - Garaoe
we will create a total of 4 additionel on-site parking spaces for a totat of 24.
Interior Imorovements - Hotel
Wc will be. creating a new.double-high hotel lobby which will connect to the new hotel/health club entry.There will be a new open stair to a balcony aboveihe lobby at the second floor.
we will be renovating and revising the existing conference room on the first floor.
We will.be relocating two employee units from the fourth floor to the first floor. The other two employeeunits will be relocated to the third floor. These units will be maintained on-site, as per a preuious
agreement, for the life of the structure.
We. will be eliminating 5 existing DU's and adding 2Z new AU's to create a new room mix of 4 DU's and 55AU's.
All of the existing hotel roorns will be totally renovated. Atl of the bathrooms will be renovated and madelarger.
Other lmorovements
Most of the existing npchanical systems will renovated and relocated to en attic above the fourth floor or
to new mechanical roofus at the lower health club level.
, We will be installing a new, 6-story, hydraulic, passenger elevator within the existing shaft to serve the
hotel and health club.
We will be installing a re;w Z-story, hydraulic, passenger elevator between the restaurant aN the upper
Ievel of the health club to faciltete deliveries and trash removal.
We will be installing a trash compactor and roll away trash containers to handle the hotel/health club
trash. The restaurant grease and trash will be handled in a similar way. Trash storage will be at the west
ervdof garrye.
We will be adding a sprinkler system to the hotel portion of the building.
The entire building will be brought up to the current handicap requirements.
Schedule
We hope to start construction in the spring of | 996 and open the renovated VAC in by the start of the
1996-7 ski season.
.''
:.
i'
{
i
:
I
o
EXHIBIT D
(3 PAGES)
Greg Amsden sairi tha* you a.nd that this meeting was for directional purposes for the applicant.
3. A request for a worksession for a major SDD ameDdmeng located at the Vail Athletic
ClubB52 East Meadow Drive and more specifically described as foilows:
A parcel of land in Tract B. Vait Mlhga First Filing. Torn ol Vail, Eagle Counry, Cotoradd, comrnenc'ing a the.
Nrlheast oomer ol said Tract B; thence N 79'4600' W along rhe Norlherly line of Vait Vilage, First Filing, and
alog the Northedy line of said Traa B 62286
'€a:
thence S 06o2652' W a didanc€ of 348.83 te€t to the
Southwesl comff ol rha parcel ot land described in Bogk 1 91 at Pag. 1 39 as reeorded January 1 0, 1 966 and fled
in Feception No. 102978 in lhe Eagle County Raxrds, said oomer also being the True Poinr ot B€ginning; then6
S 79'O4DS' E and along the Southedy fme ot said parcel 200.00 teet lo rhE Soulhessl conrer lhereof; thence N
62"52'00' E and aJong the Nonherly lhe of tta parcel of land described in Book ,t at Page 513 as recorded in
1971 in the Eagle County Records, a distance of 66.78 feet to the Northea3lerly comer of said parcel of land; said
coN7|er being on lhe Weslerly right-ot-wey fine ot Gore Creek Roa4 es platted in Vatr Wage, Fiflh Filing; fienca N
Z'139f W a disl an4 otTt.s7 leet elong said Westerly right-ot-way line ot Gor€ Cr€€k Road; thanca N
- 8(P29'22' W a drstanc€ of I 280 le€l to the Northeasterly comer of that parcat of tand described in Book 1 91 ,- Page 139 as recorded January 10, 1966 and fled h Heceplion No- 102978 in the Eagle County Reoords; lhenoe
Northweslerly 25.51 teel atong the arc ot a 37.50 leel radius ctrrye lo lhe bn heving e cemrel engls of 40'30t10'
rryhose chord bears N 53'40O0'W a distance ot 25.96 feet ro a poinl of langency; thence N 73'55'00'W and .
alang said langenl 166.44 teel; lhenc€ N 85''lO?1'Wa dislance of 50.40 teel tolhe Northw6tedy corner of the
Mounlain Haus Paroel; thence S 02'181}0' W and slong lhe €esterly line of seid Mountain Haus Parcel e dslanc€
ot 1{D.00 fe€t to lhe Southeaserly comer thereof; thence S 45'1353' E a d'slance of 38.70 feel to thc True Point
of Bgginning. containing 30,a86 square feel, morc or less..
Applicaut
Planner:
fim 1987 Vail Limited Partnersbip, (dlblaYailAthletic CIub), rqrresented
by Stan Cope and Michael Barclay
MfteMollica
.
I
a
:
t
:
Mike Mollica asked the PEC to look at the drawings with the proposed chaDges. Mike revierved
the zouing analysis with the PEC and discussed the staffs idestified issues.
Michael Barclay, represeDtiDg the Vail Athletic Club, spoke about the architectural qualities of the
building and stated that the tlree shed domrers were only one solution to resolve'the snow
problems on the roof.
Mike Mollica said rhe shade and shadow was an issue. He explained that December 2l st was the
u'Orst SceDario-
Bob Amrour said that the 1993 approval was for 1600 sq.ft. of additional floor area and now it's
1800 sq.ft.
Dalton williams stated that he had no pioblems with &e square footage ploposed.
Bob Armor:r asked if everyone was comfortable with tbe addition of hvo accommodation units
for this building. The project also includes additional square footage (from the parking garage)
for a stafflocker area. Bob Armour stated that they were not changing the building envelope, just
adding square footage intemally.
Mi'chael Barclay said they were bettcr offleaving the roof otr aDd using the exha qpace to house
mechanical sysFms.
Henry Prztt said building over the skylight technically changes the building envetope.
Planning and Environmernd Commission
trinues
Daltm Williarns said modifuing tbe domrers chenges the roof beight. Dalton said he likes this. archit€cture better, however, he u'ants to feel secr:re that the height is not changed from the 1993
i approval
I Mike Mollica suggested lowering the dormer beigbt to ihe approved 1993 approved plan.
i
: Henryr Pratt asked for the history of the East Village Hmreoumers Association's issues.
i Dalim Williams explained why Jim Lamontopposedfhe originalplan.
a
: Bob Armour wanted to touch on the parking issues.
:g Mike Mdliea summarized that in 1993 therc were 9 parking spaces reErired. This new proposal
* reduGes that number to 2 spaces.
"::
i JeffBowen has a problem with the lack of parking. He stated, "a hotel of this zubstance can't4.' reduce tbe number ofparking spaccs."
='::.- Mike Mollica said the zoning code is what sets the requirement for the number ofparking spaces
and that &e applicant uas meetiug, and exceeding, tle required parkilg.
JeffBowen said with an SDD, 9 spaces should still be required.
Mfte Mollica said the parking requirement in the zoning code u,as tied to the uses.
JeffBow'en saidthe zoning code was used as an index. Parking sphces were computed for a
reason asd he feels the 9 spaces must remain for the hotel.
- "ob,,ATno*
raid he would like to sbc morc spaces.
I Michael Barclay stated that he is providiug 4 spaces rvben tle Zoning Code only requires tno.
Greg Amsden agrees with Staffregarding the parking.
Creg Moffet had no problem with the parking proposal.
KevinDeighan agreed u'ith S1aff.
Heurlr Pratt also agrees with the parking uumbers that Staff has come up with.
Dalton \f,Iilliams also agrees with the parking numbers tbat Staffhas come up with.
Bob Annour asked the Commissioners if they were comfortable with the 1995 architecture.
Kevin Deigban was more comfortable with the 1993 architecture, btrt doesn't have a probleqr
with iherevised 1995 plan.
Grcg Moffet said tbe arcbitectural decisious \r'ere more appropriate for DRB revierp.
Plannhg and Environmemd Cgrnmission
M;nrnae
o
Greg Arnsden likes the new architectural design aud said that DRB will fiae turc iL
Mfte Mollica stated that the clerestory wai recently added to the plan.
Michacl Barclay said the clerestory world not bc covercd with snow most of thc timg as skylights
would-
Henry Pratt likes the donners, but prefers the 1993 fenestztion. The dormers arc too close
together and he feels will present 6 teaking problem. He thinks tle shed domrers detact from the
dasign
Dalton'Williarns said the clerestory on the roof adds architectural interest on the roof. The 1993
cutouts iu the roof dida't work very well. Dalton reminded everyoue that tle Town mles for a
SDD rcquired PEC to revjew tle architectural details.
JeffBowen, notrvithstanding the fact that he liked the 1993 version, felt the new design was quite
nice. EIe has a problem with tbe second story restaurant expansion in that it doesn't seem to fit
the rest of the building. It seems too massive.
lr{ichael Barclay stated that the vegetation rvas thick and rvould cover it.
Bob Armour &ought the restaurant area was a little too high.
Henry Pratt pointed out that in the 1993 design there were punched windows and now there is a
wiudow rwall. He felt it *'asn,t consistent.
Daltonwilliams asked if the pavers on rhe Gore creek bridge would be heated.
Mike Mollica said the rvalkrvay to the edge of the bridge rvould be heated, but not the bridge
itself- FIe also said there u'ould be brick pavers that would match the Town's Steetscape Flan.
Bob Arrnour asked if there u'as anyttring else to give direction to rhe applicant to look at.
Michael tsarclay had oDe comment about the restaurant windows . Most of the facade is window
or u'ood trim- This mirrors utat is on the south side. They waoted to introduce more wood to
break up the stucco.
Bob Ansrror:r thought the DRB would bav. e some problims with the restaurant design aad h6
directed the applicaut to explore more options.
4, A request for a major SDD amendment to allow for the expansion of the Glen Lyon Officehilding located at 1000 s. FrontageRd JAreaD,cascade village sDD #4.
,d,pplicant Gordon pierce for Glen Lyon partnership
Ptanner: RandyStouder
JeffBowea made a motion to table this rmtil August l4th.
Planning and EnvhonrnenEl Commission
i
!.
M P Barclay, nrcnitectO
Dear Mike,
235 East Eleventh Street
New York, NY 10003
?'t?-598-O492
December 2, 1995
Mike Mollica
Community Development
Town of Vail
Vail, CO 816s7
re: Vail Athletic Club
EXHIBIT E (6 pages)
Enclosed are "in progress" 1/4" elevations of the south, east and north elevations of the VAC.
Hopefully these will provide sufficient detail for you and the staff to clearly understand my proposal for
the outside of the VAC.
My proposal calls for replacing all of the stucco at from the first floor up with either wood shingles, wood
trim (or metal trim detailed and painted to appear to be wood) or board and batten.
Most of the east, north and west elevations of the VAC as it exists today would become sheathed with oversize
(approximately 9" exposure) wood shingles. The new dormers will be sheathed with a rough-faced board
and batten. The south side of the building, as a consequence of its almost continuous porch or windows, will
be a combination of wood trim ard steel painted to read as wood.
The handrails on the south side of the building will be steel with |" square ballusters and 5" spaces. On the
north side of the building, the handrails will either be steel or wood slats 5 1/2" widewith 1/?" spaces.
These will be painted or stained to appear to be the same shade of redwood.
I've also enclosed photographs of some of the buildings that are similar to certain aspects of my proposal
for the outside of the VAc.
Old Faithful Inn, Yellowstone National Park (color and black and white)
- for the the massing, trim and use of oversize wood shingles
Boathouse at Saranac Lake. NY
- for the trim details and the variety of different exterior woods
The Clubhouse at Cordierra
- as an example of a mostly wood exterior and for the combination of board ard batten
and wood shingle
I hope this is helpful. l'll call Monday.
Michael
Wyoming. ldaho.
Montana
u o iatL|Tul Inil ls iocaleo In a qeothermal area w[hOllthful geyser nearby. Co-nstruction of the inn wasstqtrn 1903. Design changes and additions were
made until shortly before Worid War . Small
fli*"lh#rr$ nT:#: T*ir:r:hd:: "
congestton from the service and front desk areas
.{
{:'I
:iI i'j):ra-
Io)E(r9!roc
=Qr6o2,^-
-o!rtr
I €.9-go t.-iEFit
EE5
Est>co
1l '
I
a:lil
.,.
J
'ci
a
ll
.t
;
I
a
i
'ttg
6C
H;E'9cg;fi
;TEtr.. o-=o-
!Es
;$5
TO:
FROM:
DATE:
SUtsJECT:
EXHIBIT F
MEMORANDUM
VailTown Council
Community Development Department
September30, 1993
Rgquest for the establishment of a special Development District to allow
the expansion of the Vail Athletic Club located at gS2 East Meadow
Drive.
Applicant:
Planner:
Vail Athletic Club
Shelly Mello
on september 27, .1993,lhe Planning and Environmental commission (pEC) reviewed a
request from the owners of the Vail Athletic Club for the establishment of a Special
Development District. This meeting was the final hearing after a series of three worksessions
with the PEC and Design Review Board (DRB) beginning in June of this year. Attached
please tind a copy of staff's memorandum dated Septemb e( 27 , lggg regarding the details of
the applicant's request.
The PEC voted unanimously to approve the project with Jeff Bowen making the motion and
Dalton Williams seconding the motion. In addition to the statf's conditions which required thefollowing:
1- The applicant permanently restrict the proposed 52 AUs as short-term rental
unils and that the 52 AUs shall not be subdivided in the future to allow for
individual ownership. The Condominium Declarations shall be amended to
include this point before an occupancy permit will be released for the project.
2. The appricant provide one 1 bedroom and one 2 bedroom employee nousing
unit and restrict them per the Town of Vail Employee Housing Ordinance. T-he
employee housing restriction agreement shall be signed and submitted to the
staff for approval betore a building permit will be released for the project. Theproposed employee units shall provide housing for a total of 6 employees. The
units shall meet the minimum standards specified in the Town of Vail;s
Employee Housing Ordinance.
Further, the PEC recommended the following conditions:
1' That three of the parking spaces currently being proposed on the site for the
incremental increase in required parking inat oL' reiroved and the applicant
shall pay into the parking fund for these three spaces ($g,o0o per space
=$24,000). With ttris provision, the applicant slrall rernove the two exteriorparking spaces adjacent to the structure entry and this area shall be designated
4.
for loading and delivery. An additional space within the interior of tre parking
sfucture shall also be removed from the proposal. This condition was due to
tre PEC's concem with the ability of the parking structure to function with '
twenty-seVen interior valet parking spaces.
That ttre applicant work with the DRB to develop a landscape plan on the south
side of the building between the building and the streamwalk with the goal of
returning this area to a more natural condition. This work includes improving
and allowing public access through the property via the existing bridge and path
on the southwest corner of the building and removing fte.existing sod and
reseeding the area with a natural grass seed mix and possibly adding additional
planting. The area to be returned to a natural condition begins just south of the
willows adjacent to the VAC and extends south to the sbeamwalk.
That the DFIB review the architectural details of the building further to insure
that there is adequate architeclural relief in the window mullions, trim, etc.
That the applicant work with the DRB to improve the signage, landscaping and
general of East Meadow Drive as it intersects with Blue Cow Chute particularly
the north side of East Meadow Drive. The objective of ftis effort is to not only
to improve the pedestrian character of this area, but to also deter unnecessary
vehicular traffic from entering East Meadow Drive.
c:\shellylrnemosWac.930
TO:
FROM:
DATE:
SUBJECT:
MEMORANDUM
Planning Environmental Commission
Community Development Department
September 27, 1993 (Gonectlons made September 27,1993 are in bold.)
A requesl for the establishmenl of a Special Development District to allow the
expansion of the Vail Athletic Club, located at 352 East Meadow Drive, and
niore specifically described as follows:
A parcel ol land in Tract B, Vail Village, First Filing, Town of Vait, Eagle Counly, Cobrado, more
panicularly described as follows:
Commencing at the Norlheast comer of said Tract B: thenc€ N 79'46'00'W along the Northerly
line of Vail Village, First Filing, and along the Northerly line of said Tract B 622.86 reel; thence S
06"26'52' W a distance of 348.83 feet lo lhe Southwest corner of that parcel of land described in
Book 191 at Page 139 as recorded January 10, 1966 and filed in Receplion No. 102978 in the
Eagle Counly Records. said corner also being the True Point of Beginning; thence S 79'04'08' E
and along the Southerly line ol said parcel 200.00 feel to the Soulhdast corner thereol; thence N
62"52'00" E and along lhe Nonherly line of lhat parcel of land described in Book 222 at Page 513
as recorded in 1971 in lhe Eagle County Records, a distance of 66.78 feet 10 the Nonheaslerly
cornet of said parcel of land; said corner being on the Weslerly righttf-way line of Gore Greek
Road, as platted in vail Village, Flfth Filing: thence N 27'13'37" W a dislance of 2.37 teel along
said Weslerly righl-ot-way line of Gore Creek Road; thence N 89"29'2t W a distance of 12.80 teet
to the Nonheaslerly corner of that parcel ol land described in Book 191, Page 139 as recorded
January 10, 1966 and filed in Receplion No. 102979 in the Eagle Cou y Records; thence
Northweslerly 26.51 feet along the arc of a 37.50 teel radius curve 10 the left havinq a ce ral angle
of 40'30'00" whose chord bears N 53%0'00" W a distance of 25.96 teel to a poinl of langency;
thence N 73"55'00'W and along sajd tangent 166.44 te€t: thence N 85"10'21'W a dislance ot
50.40 feel to lhe Nonhweslerly corner ol the Mounlain Haus Parcel; lhence S 02"18'00'W and
along the easlerly line of said Mountajn Haus Parcel a distance of 100.00 feel to lhe Sdrlheaslerly
corner thereof; lhence S 45"13'53' E a distance of 38.70 feet to the True Point of Beginning,
containing 30,486 square feet, more or less.
Applicant: VailAthleticClub
Planner: Shelly Mello
I. PFOJECT OVERVIEW
The applicant is requesting a review of the proposed establishmenl of a Special Development
District (SDD) for the redevelopment of the Vail Athletic Club located at 352 East Meadow
Drive. The Vail Athletic Club is located on the southwest corner of Vail Valley Drive and East
Meadow Drive at the bottom of Blue Cow Chute. The property is currently zoned Public
Accommodation and is considered to be nonconforming with regard to development
standards. The applicant has indicated that the purpose ot requesting a SDD for his property
is to improve the appearance of the building and site as well as make it a more viable hotel.
The proposal includes the deletion of six dwelling units, the addition of twenty{our
t
accommoda:bn units, a decrease to ihe Club Area, a decrease in total restaurant area,
modifications to the elevations, a decrease in common area and the addition of nine
underground parking spaces. The four existing employee units will remain on-site and will be
permanently deed restricted.
The deviations from the Public Accommodation development standards include:
1. Densitv. The proposed densig for the project willbe 30.33 dwelling units (DU), which
will include 52 AUs, 3 DUs and 4 employee housing units. The existing density for the
proiect is 24.33 DU and the allowed density for the project 17.5 DUs. The total density
increase is 6 DUs over the existing development and 12.83 DUs over the allowable' density.
2. GRFA. The applicant is proposing a total of 32,282 square feet of GRFA. In addition
to this, there is an overage on common area of 8,456 square feet. When this is added
to GRFA, the total GRFA for the project will be 40,738 square feet. The allowed
GRFA/Common Area for the projeclis 32,924 square feet. Cunently, there is 33,902
square feet of GRFA in the project which includes overages on common area. This
results in a total increase of GRFA/Common Area ol 6,836 square feet above th6
existing development and 7,814 square feet over the allowable GRFA/Common Area.
3. Common Area. The applicant is proposing to reduce common area, however, the
existing project is in excess of the allowed common area by 13,541 square feet which
is added to the GRFA. The proposalwould exceed the allowable common area by
I,tl56 square feet.
4. Heiqht. The existing building is 67 feet in height on the south elevation and 59 feet on
fie north elevation. The allowable height is 45 feet. The applicant does not propose
to increase the ridge height, however, dormers will be added to both the north and
south of the building where the ridge heights exceed the 45 foot height allowance.
5. Site Coveraoe. Currently, the site coverage for the project is 20,796 square feet. The
application will increase this to 21,350 square feet. Which includes the underground
parking and service areas. The allowed site coverage for the site is 16,767 square
feet.
6. . Accessorv Use. The accessory use allowance is 1O% of existlno GRFA. lf built as
proposed, this project would have an accessory use allowance of 3,228 square feet.
As proposed, the allowable accessory use will be 3,426 square feet. This is a
reduclion from the existing 4,066 square feet. However, there is still an overage of
198 square feet.
7. Setbacks. The applicant proposes to add building along the north side of the project.
This will be in the area of the entry and the restaurant. The addition of fie entry will
result in a 1 foot seback from the property line. The existing parking structure has a o
f00t setback. On the south side of the project, fte applicant is proposing an at grade
lenace which will have a minimum seback of 2 feet. The required setback in this area
would be 10 feet. ln addition, other areas ol the building which are currently in the
sehacks niti U" innf.O. This includes an area on he northwesi comer as well as
decks along the rear of the building. The dormers will also be increasing the amount
of building in the sebacks.
The applicant has proposed to do the following with the applibation:.
1. Decrease the amount of GRFA allocated towards dwelling units and increase. the amount of GRFA for accommodation units.
2- Decrease the number of dwelling units and increase the number of
accommodation unib.
3. Encroach further into the front setback with entry and second-story
accommodation unit as well as an addition to the restaurant to the east of the
entry.
4- lncrease common area while decreasing the area allocated towards accessory
uses and athletic club use.
5. Add dormers to the building on the north and south side which do not exceed
the existing ridge height of the building. Insert decks into the roof struclure on
the south elevation.
6. lncrease the amount of site coverage as a result of the new entry and
restaurant addition (5S4 square feet).
7. Add tenace and expand dining deck on south elevation.
8. Removal of deck on the south elevation which currently encroaches onto public
land.
.
9. The applicant is proposing to meet lhe incremental increase in parking
requirements. There is an exisling deficit of 58.44 spaces on the site. The nevrr
parking is located in the following manner:
.2 spaces built underground below the entry.2 spaces added by relocating an existing ski storage area.2 spaces added by relocating the laundry room.1 space added along the south side of the parking structure.2 soaces in central area of oarkino structure
9 total
10. change exterior materials of building. This includes stucco, wood trim, deck
railings and a wood shake roof.
Add-streetscape improvements. These include: a 6 foot heated concrete paver
walk along West Meadow Drive, an 8 foot healed concrete paver walk along
Vail Valley Drive extending over the Gore Creek bridge and street lamps. The
pavers on the bridge will not be heated.
Relocation of existing Fash area and removal of the existing tash facility which
is encroaching onto adjacent properties.
13. The applicant proposes to provide one two-bedroom employee housing unit
within the Town of Vail which will be restricted according to the Town of Vail
employee housing requirements
14- Additional landscaping on the north and soufr sides of the building.
'For further details on the deviations please see Section lll, Zoning Analysis, of this
memorandum, whiih specity he changes in development standards tor ine project. Atso,
please see applicant's description of proposal for specific details.
II. BACKGROUND
A. ProJect History
The Vail Athletic Club was originally developed in 1977 and included " ri*"0 use building"
with condominiurns and accommodation units as well as the health club facility and offices.
Twenty on-sile parking spaces were provided for the project and a variance was received for
the remaining required spaces. Per the file records, it appears that the variance was granted
in order to facilitate the construction of hotel rooms which were needed in the community at
the time. ln 1977, it was felt that it would be reasonable to grant a parking variance for the
sixteen parking spaces {or this property due to the proximity of the Town parking struclure.
Parking variances for four additional spaces have been granted for the project since that time.
In addition, while variances were not granted for height or density, the project was allowed to
deviate from th'ese standards. Seback variances were granted in 1977 for the development
of the project. The property has been the subject of numerous redevelopments over a
number of yeais and subsequent parking variances.
At the time of the project approval in 1977, it was discussed that possibly a portion of the
property which the Vail Athletic Club had acquired would not be counled towards their
developable site area. Research has been conducted regarding this issue to determine
whether or not lhat was actually done. The staff has found no definitive information which
would indicate that this was completed.
B. Previous PEC reviews
On June 28, 1993, a joint worksession was held with the Planning and Environmental
Commission (PEC) and the Design Review Board (DRB) lo discuss tre establishment of an
SDD for this site. At this time, the applicant was directed to work with the existing volume of
he building. ll was also indicated that it might be acceptable to expand the building adjacent
to the Mountain Haus. lt was stated that some expansion would be acceptable on the
11.
12.
southwest corner and that no additional development should be proposed on the north side ofhe building. In addition, there was a concern with the additional shade/shadow being cast on
Meadow Drive. ln regard to parking, the PEC indicated that the applicant shoutd strive to
accommodate parking on-site.
On-Tuesday July 13, 1993, a worksession was held with the Town Council regarding the
parking for this project. During tris discussion, three of the Town Council members were
gpen t9 discussing turther the possibitity of pay-in{ieu parking for tris site. Three of the Town
Gouncil members felt that the applicant should accommodate parking on-site due to the
already significant overage of pirking which is not provided oi ttre site. As a result of this
discussion, tre applicant has provided an additional nine parking spaces on the site which will
accommodate all of the increases in parking generated by the renovation of the builcling.
On July 26, 1993, an additionalworksession was held with the PEC. Please see the attached
minutes which detail fte discussion
il. zoNtNG AiiALYStS
Usl€d b€tow is lhe zoning ar€lylis tor ne Val ftpUc 6lub SDD propossl.
Sil6 Ar€a:
Satbicksr
Hclghl:
Slte Coverago:
Landscaping:
Unlts:
Acc6sory Use:
Restauranl:
Club Reteil:
Toral:
Common Area:
Hells^,lech:
Conlerance:
Tota, common:
Club Area:
Parldng Gar.g!:
Total Building
squerc Footegef*
ALLOWED DEV.
STANDARDS
30,486 sq. lt.
An f€et
$"",
16,757 sq. lu
EX|SNNG
DEVELOPMEI.IT
$,a86 sq. ft.
norlh: {-
6olnh: ? - 26'
0' (&ck!)
ssst: 12-20
wgsl: 1?
6-t south; 59 norfl
' fl),795 sq. fl. ..
9,071 sq. ft.
28 AU + 9 DU - 23 DU(2 Lo)""
+ 4 emp units" - 24.33 DU(2 LOf
10,927 AU + 8,122 DU
- 19,M9 sq. tl.
+ 1,312 emp units - 20.361
+ 13,541 commm - 33,902
2,036 sq. tr. (Allowedl
3,506 sq. tt
460 so. lt.
4,086 sq. lt.
19,235 sq. tt.
2.842 sq. ft.
22,OTI sq. n.
(13,541 sq. tt. oronge)
.22,251 aq. lt.
4.131 Eo. tt.
n,892 q.rt.
PROPOSED
DEVELOPMENT
$,486 sq.
nonh: {-
south: 2'- 26'
.{l-(deoks)
€a$: 12-2(I
we!l: 12'.
6'l roulh; 59 norlh
18,300 sg. n. + 5,050 sq. tl.
- 21,350 sq. ft. includee
garagB and belou/ grad€
sorvioe areg on €asl sidg.
9,nt0 sq, ft.
(lncluding al-grrde dcck)
52AU+3DU.
29 DU (2 LO)
+ 4 ernp units - 30.33 DU
(2 Lo)
24,U7 AU + 8,252 'DU
- 30,899 sq. ft. + 1.383
emp units - 32,282 + 8,456
@mrnon overag€ - 40,738
3,228 sq. tl. (Allowed),
3,285 sq. fl.
141 sq. fi.
3,425 sq. tl.
14,265 sq. n.
2,727 sq. n.
16,992 sq. fi.
8,456 sq. tl. ovetage)
20,881 sq. tl.
5.512 so. fl.
n,ostf4.tt"
GRFA:
9,1'15 sq. tl.
ai unils per acre
17.5 units
24,388 sq. tl. (8tri6)
10% ol exisling GRFA
I,S6 sq. tl. (35o/t
Pa*ing:- 20 on-site dre to m
approved variances.
Hs,lsr{ech:
CNub Area:
R€rail:
CqfErence Area:
Restaurant:
AU:
DU:
Emp Units:
Totsj Perking:
4-
.|.84 parking spaoes
. 11.8 perking spaces
22.5 Farting speoes
21.8 pa*ing spaces
16.5 parking spaces
.l pa*ino Eoac€s
78.44 parking spaces
B (z42L@trT,ef,ll
+
o-
.47 parking spaces
1 129 parfting spaces
2t).3 parling spacas
44.75 parting spaces
6.5 parling spaces4 parkino soaces
87.31 parking spaces
(8.87 or I epaca increase|
A lockotl is an acoommdalion unit which is attachad lo a dr,velling unit and is no largnr than one-lhird of lhs totat froor
area ol lh€ fiielling unit.
Required by lhe Vail Town Council in 197/. Units are to remain on-site for fre lile of tho building. Ea*r employee unil
couflls as .333 unhs tolvads density.
lodudes GRFA,/Accessory Relail/RestauranVClub/Conmon/Parking. There is a tolal increase of building area ol 6,201
sq. tt.
The memorandums on lhe Vajl Alhletic Glub condominium conversion proc€ss indioals lhat 24 AU and S DU were
rcnlal reslricled and 2 DU were approved with no roslriotions. There are no file records which indcate the approval olhe 4 additional AU's and 2 DU,s cunently on-site.
tv.
As stated in lhe Zoning Code, the purpose of Special Development Districts is as follows:
The purpose of the special developmenl district is lo encourage ftexibility and
. creativity in the development of land in order to promote its most appropriate
ese: to improve the design character and quality of new Oevetopmint within the
Town; lo facilitate the adequate and economical provision of stieets and
utilities; to provide the natural and scenic features oi open space areas; and to
further the overall goals of the community as stated in the Vail Comprehensive
Plan. An approved development plan lor a special development Oisirict, in
conjunction with the property's underlying zone district, shall establish the
requirements guiding development and uses of property included in a special
development district."
The staff finds that the application meets the purpose ot the Special Development District.
Specifically, staff linds that this application furthers the overall goals of the community as
stated in d'te vail comprehensive plan. The project proposes to improve the design
character, function and quality of the developme;t and provide additional short-term units
within the Village which is a specific goal of .many elements of the Comprehensive plan. The
staff as well as the PEC have identified in past rwiews that this site is ippropriate tor
increased densities as well as a variety of uses due to the location and iioxiinity to the Village
core area. In addition, employee housing and streetscape improvements are proposed whiciprovide overall community benefit, Staff recognizes thaathe existing building exceeds the
underlying zoning requirements, but believes that due to the site an-d location it is suitable to
allow for such deviations as proposed in. the application given the goals and policies in the
.T^*9+,Ul"tta1, VailVillage Master Ptan and Sjgtrgpgllg!. ptease see Secrion Vttor turther detaits on thesEFlEfrE.-
7
V. SPECIAL E'EVELOPMENT DISTRICT CRITERIA
The following nine criteria should be used to review the project.
A. Design compatibility and sensitivity to the immediate environment,
neighborhood and adJacent properties relative to architectural design,
scale, bulk, building height, buffer'zones, identity, character, visual
Integrity and orientation.
Massino
The staff feels that this criterion is especially important to the review of this
project. While this application does not propose to increase the maximum ridge
height, the proposal includes adding dormers to the existing roof. The amount
of building area is increased with building infills and the introduction of a series
of dormers. On the south side, roof cut outs are being used for the three
central lop units. Othenrise, dormers have been added to both sides of the
roof form in order to utilize existing "dead" space.
The applicant has also modified the roof form on both the east and west
elevations of the building. The east elevation tenaces back from Vail Valley
Drive and additional windows have been added to this elevation. Terracing has
also been accomplished on the west elevalion adjacent to the Mountain. Haus.
The low eave line which is maintained with this proposal and the landscaping of
the site bring the scale of the building down to a pedestrian level. The staff
feels that maintaining the pedestrian character of this area is important as it is
. seen as a major coridor to Golden Peak and the Village from the parking
structure and is also used by pedestrians to access Ford Park.
The Vail Village Master Plan calls for this building to have a maximum of four
stories. From the original application, the applicant has lowered the building to
the existing ridge line in all locations and decreased the scale of he dormers in
order to decrease the shadow on East Meadow Drive.
Sun/Shade
The proposed building increases the amount of shade on East Meadow Drive
by 5 feet 6 inches in the area of the entry, 24 teet 6 inches on the west wing
and 5 feet on the east wing on December 21st (See attached sun/shade
analysis). The impacts on shade on September 21st will be an increase of 1
foot 6 inches in the cenler of the building, 11 feet on the west wing and 2 feet 6
inches on the easl wing. The amount of shade is determined by both the angle
of the sun and the height of the ridge or eavs line. While fre December 21sl .
date creates the most impact, the September 21sl date is what is specified in
the code lor sun/shade analysis in the CCI zone district. Although this property
is not in CCl, the shade impact is important to address for this pedestrian
area.
The greatest impact in shade is seen on the west wing of tre building. on
December 2tst, the proposed buitding wilt cast shadow onto thelidewalk.
On September 21st, the increase in shade in his area witl be 11 leet and does
not cast shadow onto the sidewatk. lt should be noted that the existing' building casts shadow beyond the sidewalk into the street in tire center of the
building and east wing. In the center and east wing, the additional shade cast
will be 5 feet 5 inches and 8 feet accordingly as-a result of the dormers. The
applicant proposes to heat the paver sidewalk which will make this area safer
for the pedestrian. The staff feels that tre increases in shade have been
minimized to a point that is acceptable.
Entrv
on the north side of the building, the applicant proposes to add a two and a
half story entry area to the building. The entry has been lowered by two floors
for the original proposal. The design of fre entry minimizes the massing
impacts of the element and does not add any more shade to the street.
' Buildino Footorint
The applicant proposes to increase the building footprint by 450 square feet to
allow for the restaurant addition and entry. stafl does not have a problem with
!h" reslaurant addition as no landscaping is removed. The entry will remove
two to four trees which the applicant has agreed to relocate or ieplace.
Streetscaoe
The applicant has proposed to install required streetscape improvements
discussed in section Vlll of this memo. This includes a heated paver walk
along Vail valley Drive as well as a heated paver walk along the south side of
East Meadow Drive. The driveway to the garage will also be heated. In
general, the project is sensitive to adjacent properties through the use of
appropriale architectural design and massing as well as landscaping.
B. uses, activity and density which provlde a compatibre, efficient andworkable relationship with surrounding uses ancl activity.
Densitv
The applicant proposes to increase the totaldensity of the project by six
dwelling units. This inctuges the removiGisix ow-eiling unjts'as wellas the
addition of twenty-four accommodation unhs.
of the nine dwelling units on-site, six are cunently restricted per the.Gondominium Conversion requirements. There are t*o existinf units which
are free market and the applicant wishes to retain one additional u-nrestrictedunit. The staff feels that because thiS unit is already restricted that it should
remain available for short-term rental according to Section 17.26 of the
subdivision Regulations, condominium conveision, or an employee housing
unit should be provided in place of the restricted unit as *'as ittoweO with thl
Vail Village tnn Goodes space. The staff would prefer to see an additional
s
empioyee housing unit versus the restricted DU provided as we believe the
emptoyee housiig unit.atso provides an lmpdrtant community benefit.
The staff feels that tre applicant's desire to increase the short term hotel units
is very positive. The GRFA attributable to dnelling units has been decreased
Uy t,tiZb square feet. 13,270 square leet of GRFA will be added to increase
tlie amount of floor area for aclommodation units. The additional GBFA has
been gained by using existing dead space within the building, using common
area ;ore efficienny, and the- addition of dormers and infilling portions of decks
on the south side: An additional 6,201 square feet of total building area will be
added with this proposal. In order to insure that the AU's remain as short'
term rentals, ttre itatt requests that the owner agree to not subdivide the
unlts in the future per thd Condominium Conversion section of the
Subdivision Regulations.
Emolovee Housinq
Currently, four employee housing units are required on-site per the 197/
parking variance.
'Th-e applicaniproposes that these units remain on'sile and
iras agleeO to restrict these units on a permanent basis. Due to the requesled
increales in density, the applicant has indicated that there may be an increase
of two to four employees on the site.
Utilizing the Employee Housing Guidelines, based on the net increase in
development over ihe existing building, two to four additional employees would
be generated by the expansion. The staff would require that one_two-bedroom
or two one-bedioom units be provided to address the increase. The summary
is as follows:
a) Bar/Restaurant
b) Retail/Service Commercial
c) Dwelling Units
dl Accommodation Units '
e)Total
= 321 sQ. ft. (@6.5/1,000 sq. ft.)
= 2.08 employees (decrease)
= 310 sQ. ft. (@6.5/1,000 sq. ft.)
= 2.0t5 employees (decrease)
= 6 units (@.4/room) = 2-4 employees (decrease)
115 or 12 emPloyees
.12 employees x.15 housing multiplier = 1.8 or 2 employees
.12 employees x .30 housing multiplier = 3.6 or 4 employees
.Assumino two emplovees.oerbedroom. the proposed one two'bedroom unit
ration formula' The statf has used the
higher multiplier due to the overlge{in density. The Employee Housing Report
does not ditferentiate between thJ provision of on-site or off-site housing. As
.7slroom) = 18 emolovee fi
10
')"'
,, o *.,
\ \:il
stated above, the staff would llke to see one more employee unit provided in
order to lifi he use restriction on fie proposed dwelling unit.
C. Compliance with parking and loading requirements as outlined in Chapter
1852.
Parkino
Parking has been a long standing issue on this site. In researching the history
of this project, the staff found that there were a number of variances gnnted to
this project. In December of 1977, twenty underground parking spaces were
approved for this site. At mat fime, it was recognized that surface parking was
not appropriate for his site and that these spaces would be the maximum
number that could be placed on the site. Different arangements have been
made over the years for parking on Town of Vail land as well as other
properties for this project to address the deficit. Variances have been granted
lor a total of twenty spaces over the life of the project. Using today's
standards, there is an existing deficit of 58.4 parking spaces for the project.
There would be a nine space parking requirement increase as a result of this
expansion. This is based on the difierence between the required parking for
the proposed project and the existing development. The applicant is proposing
an additional nine on-site parking spaces which would bring the total on-site
spaces to twenty-nine. All of the parking spaces would be valet.
Currently, the applicant valet parks eighteen parking spaces in the existing
structure. The parking structure will be expanded which will accommodate the
nine additional spaces. Due to the type of use of this facility, valet parking is
appropriate and has been approved for other projects of this nature. With the
full-time concierge and valet, this type of parking solution is feasible. In
addition, after reviewing the function of the existing facility, it appears that the
proposed plan is reasonable and, the additional nine parking spaces can be
accommodated. The two existing exterior spaces will remain adjacent to the
entrance to the parking structure on the west side.
No additional square footage has been added to the health club and therefore
the staff does not feel that it is appropriate to assess a parking requirement for
this facility. Parking for a health club is determined by the PEC. There is no
parking standard for this type of use. No parking requirement has been
assessed in the past and the staff is not assessing any additional parking nor
do we recommend to the PEC that a parkjng requirement be set as no club
square footage is being proposed.
11
D.
Loadilq and Deliverv
The applicant is providing a loading facility with a pull-out from East Meadow
Drive. This will accommodate tre short-term parking needs of the proiect.
Loading and Delivery will also be accommodated in this pull-off arg-a.. Th9
applicant will no longer be allowed to unload deliveries along Vail Valley Drive
adjacent to the restaurant entrance. This is a very ungfe practice which the
Town does not encourage and will not allow to continue.
In addition, the applicant proposes lo remove tre existing trash facility on the
west side of the pioject. This enclosure encroaches bo$r onto Town of Vail
land as well as Mountain Haus property. The applicant would propose to
include the trash facility inside the building in this same area.
Conformity with appticable elements of the Vail Comprehensive Plan,
Town poticies and Urban Design Plans.
There are three other elements of the Comprehensive Plan which apply to this
application: The Vail Village Master Plan, the Streetscape Master Plan and the
tahO Use plan. please see Sections Vl, Vll, and Vlllol this memo for turther
descriptions of these plans. Many elements of the Town's Compreiensive Plan
encouiage the development and preservation of hotel-type units. The applicant
proposei to add an additional twenty-four AU's and delete six DU's for a total ot
fitVltwo AU's and three DU's. This is in keeping with the Comprehensive
Plin's objective to increase the hotel bed base. Please see Sections Vl' Vll
and Vlll that identify the applicable goals and objectives of the plans.
ldentification and mitigation of natural and/or geologic hazards that affect
the property on which the special development district is proposecl.
This site is located adjacent to Gore Creek. No portion of this proposal
encroaches.into the 5i) foot stream setback or the one hundred year floodplain'
SitE ptan, building design and location and open space provisions
desilned to produce a iunctional development responsive and sensitive
to natural features, vegetation and overall aesthetic quality of the
community.
Buildino Desion
While the changes to he site plan through tris proposal are limited, the building
design changeJ Significantly. ln respect to the south or Gore Creek side of the
building, the appficlnt is proposing to change the character of the elevation wilh
frq enilosure ana reCesifn of balconies and to change the window design'
Dormers will be added to the east and west wings and decks will cut into the
roof form in the center area. The applicant has adjusted the south elevation to
brdak up the lacade per PEC and statf comments. Initially the applicant
proposed to increase the height of the westem section of the building.
F.
12
currently, the applicant proposes to maintain all of the existing ridge lines and
not increase the ridge in any area ol the building. The staff t6er tnat tiris is
very positlve.
ln addition, the applicant is proposing to add a terrace at the lower level on the
south side of the project. This will encroach into the 20 foot seback and result
in a 2 foot setback a the tightest point from the south property line.
on the north elevation, the applicant proposes to infill an area on the east wing
adjacent to the restaurant and add an entry. In addition, balconies will be
added to units on the east wing. Dormers will be added in all three areas onhis elevation. This will allow lor the additionaj accommodation units on the
upper level. These additions will cast additional shade onto East Meadow
Drive.
Landscaping has been proposed arong the retraining wail adjacent to the
sidewalk on the north side of the building. This wiliincrease tire landscape
buffer between ttre building and the public area. The staff feels that this
additional landscaping is very important to the project as it will screen the
building and mitigate both the existing and proposed impacts of the building.
The _application impacts the existing tanoscaping on the north side or thebuilding- Approximately two to four large evergreen trees will be lost as aresult of this proposal. The applicant is proposing to landscape along the new
stone retaining wall adjacent lo the west wing in order to better screei thebuilding in areas where landscaping does noi cunently exist. The staff feels
that while it is unfortunate that these evergreen trees will possibly be lost, theaddition of landscaping which includes evergreen and aspen trees along thesidewalk, will mitigate the impact of the losJof these two to four trees. Theapplicant will attempt to save these trees. However, in the event that theycannot be saved as a result of this construction, the applicant does agree toreplace the trees. The applicant has also added a 3 foot planting ste[ to theeast of the existing at- grade parking on the west end of tire builiing in order tohelp screen the parking. The step will also reduce the height of thiwall in thisarea.
on the south side of the buirding, the appricant wiil be removing an existing
deck which is cunenfly located on Town'of vait land. The appiicant profoses
to add additional landscaping in this area which includes strrubs ano'aspentrees. This will buffer the buitding from the pubtic area.
Due to the amount of land and landscaping between the streamwalk and thebuilding, adequate butfer areas are providdd. The proposed landscaping
adjacent to the building will be positive and will not hinder the use of
'thij
open
space area on the south side of the building. The applicant has also agreed toprovide a maintenance agreement to the Town tor ttiii open spaCe. -"
13
G.A ciruutation system designed for both vehicles and pedestrians
addresslng on and otf-slte traffic circulation.
The applicant proposes to add nine underground parking spaces. By adding
additional on-site parking, the vehicular traffic on East Meadow Drive will be
increased. While it is an objective of the Streetscape Plan to make this area
more pedestrianized, it is also an objective of the Vajl Village Master Plan to
have properties in this area provide on-site parking' The staff leels that the
provision of on-site parking to meet the additional requirement is important
given tre constraints on parking our community must deal with.
The applicant does propose to install an entry and pull-off in order to facilitate
he drop-off of guests and loading and delivery. The installation of a dropotf
area will be a benefit to the area as currently there is no off-street drop-off area
for this building and the existing situation creaies congestion along East
Meadow Drive as guests and trucks park in the bus lane on Meadow Drive-
The Town Engineer has signed otf on this solution.
Wth this application, the statf recognizes that it would be ditficutt 10 completely
restrict East Meadow Drive from vehicular traffic, but would strive to limit the
number of vehicles which must access East Meadow Drive. We also believe
trat by providing safe well designed sidewalks, pedestrian circulation can also
be accommodated. The applicant's proposal improves both pedestrian ancl-
vehicular circulation in an area that currently must provide for both uses.
Functional and aesthetic landscaping artd oPen space in order to optimlze
and preserve natural features, recreation, views and functions.
Due to the installation of the pull-otf and entry and relocation of the retaining
wall in this area, two to four evergreen trees could possibly be lost. The
applicant has agreed to attempt to save these trees, however, it would appear
that this may not be possible. The applicant does agree to replace these trees
in addition to increasing the landscaping along East Meadow Drive between the
building and the roadway adjacent to the sidewalk. Trees in the 30 foot range
will be required to replaie the trees that may not be able to be relocated. The
new tantlicaping in tront of the building includes evergreens that range in
slze from 10 to 15 feet and aspens having a minimum of a 3 inch caliper.
io the east of the main entry to the building, the applicant is proposing to
redesign the sidewalk as well as the landscape area. This will involve cutting
back the existing utility grate and bringing the landscape down to the same
grade as the sidewalk. This is accomplished by moving the sidewalk and
curlcline to the south from the existing location.
Landscaping will also be added on the south elevation in the area where the
existing deck is being removed. Aspen trees and shrubs will be added to this
area and the grades will be redone to match the existing topographic
conditions.
H.
14
The landscaping on-site wlll be lncreased as a result of the removal of an
above gracte deik. With thii application, the prolect will be In compliance
with the landscaping requirement for the sile.
l. phasing plan or subdivision plan that will maintain a workable, functional
and efficient retationship throughout the development ot the special
development district.
, The applicanf has not proposed that the construction of tiris project be phased.
VI. VAIL LAND USE PLAN
The goals contained in the Vail Land Use Plan are to be used as adopted policy gu'rdelines in
the riview process for new development proposals. The Land Use Plans Goals/Policies
applicable to the Vail Athletic Club redevelopment are as follows:
i.1 Vail should continue to grow in a controlled environment, maintaining a
' balance between residential, commercial and recreational uses to serve
both the visitor and the permanent resident.
1.2 The quality of the environment including air, water and other natural
resources should be protected as the Town grows.
1.3 The quality of development should be maintained and upgraded
whenever possible.
3.2 The Village and Lionshead areas are the best location for hotels to
serve the future needs ol the destination skiers.
3.3 Hotels are important to the continued success of the Town of Vail,
therefore conversion to condominiums should be discouraged
4.2 lncreased density in the core areas is acceptable so long as lhe existing
character of each area is preserved through implementation of the
Urban Design Guide Plan and the VailVillage Master Plan'
4.3 The ambiance ol the Village is important to the identity of Vail and
should be preserued. (Scale, alpine character, small town feeling,
mountains, natural setting, intimate size, cosmopolitan feeling'
environmental quality.)
5.3 Atfordable employee housing should be made available through private
efforts, assisted by limited incentives, provided by the Town of Vail, with
appropriate restrictions.
15
55". The existing employee housing base should be preserved and. upgraded. Additional employee housing needs should be. accommodated at varied sites throughout the community.
The application meets the goals and policies in the Land Use Plan. The addilion of short-term
holel rooms is a very positive addition to this area. ltem 4.2 specifies that increased densities
in fte core are acceptable if tre character of the area is preserved. The applicant proposes to
change the character of the building by changing the maierials anct design'details of the
building. While the proposal increases the size of the building, the staff believes that the
applicant has attempted to utilize the unused interior spaces ot me UunAing to minimize the
expansion on the exterior of the building. The scale and Oesign of the buil-Oing with the
addition of new materials and landscaping maintain the alpine character of trddevelopment.
VII. VAIL VILLAGE MASTER PLAN
T.h.e Proposed redevelopment of the Vail Athletic Club canies out many ot the goals and
objectives contained in the Vail Village Master Plan. Applicable goals and objectives are as
follows:
Go?l #'l -Encourage high quality redevelopment while preserving the unique architectural
scale 0f the village in order to sustain its sense of community and identity.
Obiective 1.2 - Encourage the upgrading and redevelopment of residential and
commercial facilities.
Goal #2 - To foster a strong tourist industry and promote year-round economic heatth and
viability for the Village and for the community as a whole.
Obiective 2.1 - Recognize the variety of land uses found in the 10 sub-areas
throughout the Village and allow for development that is compatible with these
established land use patterns.
obiective 2.3 - Increase the number of residential units available for short term
overnight accommodations.
Policv 2.3.1 - The development of short term accommodation units is strongly
encouraged. Residential units that are developed above existing density levels
are required to be designed or managed in a manner that makes them
available for short term ovemight rental.
Obiective 2.5 - Encourage the continued upgrading, renovation and .
mainlenance of existing lodging and commercial facilities to better serve the
needs of our guests.
Policv 2.5.1 - Recreation amenities, common areas, meeting facilities and other
amenities shall be preserved and enhanced as a part of any redevelopment of
lodging properties.
16
I
gbi6!.!ive Z.F - Encourage the development of atfordable housing units throughfie efforts of the private sector.
obieqtive 2.6.1 - Employee housing units may be required as part of any new
or redevelopment project requesting density over thai allowed by existinly
zoning.
9oaf f3 'To recognize as a top priority the enhancement of the walking experience
hroughout the village.
ObiectiYe 3.4 - Develop additional sidewalks, pedestrian-only walkways and
accessible green space areas, including pocket parkg and stream access.
Goal #5 - lncrease and.improve fre capacity, efficiency, and aesthetics of the transportationand circulation system throughout the Viliag6.
Policv 5'1.1 - For new development that is located outside of the Commercial
Core I Zone_Dis-trict, on-site parking shall be provided (rather than paying into
the parking fund) to meet any additional parking demand as requirect by-the
zoning code.
Policv 5-1.5 - Redevelopment projects shall be strongly encouraged to provide
underground or visually concealed parking.
Obiective 5.2 - Encourage the use of public transportation to minimize the use
of private automobiles throughout Vail.
Although this location is not addressed in any sub-area concept of the Vail Village MasterPlan, it is discussed with regard to the heighi of buildings. The Vail Village Master plan
specilies that buildings adjacent to Gore Cieek should have a height of f6ur stories. Theexisting building is four stories along East Meadow Drive. The pr6posal builds into theexisting roof to form a fifth floor. This is being accomplished Uy ad'ding dormers, infillingportions of decks on the.s.outh side, and usinfi existing co*ron area inddead space ii theroof form' None of the ridge lines will be incr-eased anO att of the existing eave lines will bemdntained.
This application addresses. the four Vail Village Master Plan goals which are applicable to thesite. lt also meets the twerve poricies and ob]ectives which a-re applicable.
VIII. STBEETSCAPE MASTER PLAN
The streetscape Master plan points out that traffic on vail Valtey Drive is very heavy
P:g,h:-"]lost of ,rhe year. it is. especiaily heavy in the momirig ana rate atiemoons duringme sKl season' and evenings and weekends during the summer months. pedestrian traffichas increased because of the expansion of the Village Parking Structure and he creation of anew eastem exit portal frgm fris facility at Vail Valley Drive. Specific improvements for VaitValley Drive in the area ot the Vail Athletic Club include the addition of an I to 10 foot wideheated concrele unit paver walk on the west side of Vail Valley Drive exiending over the
17
o
bridge at Gore Cree!.- and a 6 foot wide concrete unit paver walk on the south side of East
Mea?ow Drfue. The applicant has included these improvements in tris application with the
exception that only a 6 foot walk is being proposed along Vail Valley Drive due to site
constrainF and I feet along Meadow Drive.
IX. STAFF RECOMMENDATIONS
The staff recommends approval of the application. We find that the proposaf has developed
into one which is in compiiance with the objectives and purBose section of the SDD zone
district as well as the other Comprehensive Plan elements as described in the memo. The
approval includes the following understiandings:
fhe tottowing
'drawings.
That the owner will permanently restrict the 52 Aus as short-term rental.Units
and that the 52 Aus shall not be subdivided in the future to allow for individual
ownership. The condominium declarations shatl be amended to include this
point belore any occupancy permits will be released-
In addition to the one two-bedroom permanently deed restricted employee
housing unit, the owner shall provide one-bedroom employee housing.unit to
allow fir the use restriction to be lifted from the restricted dwelling unit' The
employee housing unit restriction agreements shall be signed and submitted for
sAif approval bef-ore a building permit will be released for the project'
items will need to be addressed furtfrer as he project develops into working
1. Engineered drawings will need to be submitted which address the streetscape
improvements for review by the Town Engineer before a building permit is
released for the Project.
The statf feels that the application is a positive one and does meet the goals and objectives of
the Town's Comprehensive Plan. These include the Land Use, the Village Masler Plan'
Zoning Code ani SDD Criteria. We recognize that the proposal deviates from the existing
zonin[. We recognize that it is important to increase accommodation unils as well as
maintain and impiove existing builiings in town in order lo maintain lhe area. We feel that
this is a site which can handle increaied density and deviations from the site development
standards which include height, density and site coverage while maintaining the existing scale
and character of the neighborhood.
c:tsec\memos$ac.927
a
{
18
?
IIrl
:r ..J 1lgix
,1 i tr
6
.ci rt> a'.g ..:H i;.
.i !t
{n{
4.l
& li 2$ lirit qll
4rdrl
Ht lil
qi fii
,=l lli
-:-*.i
(i , ii:i g !;T.._s.-i f; Iri
I
oli:tldlll
5lfil;
t!
I
I
2
\
';:i
1
It.l
.t
I
:
.l
I
zI(
J.l
t
)
lttr.
=F::li: r!' f.'l:
i
.I{
rJt
Ifit
I
I
I
1
!l
it
o
I
I
(
tlil_
cii
lf[niLF
..'i rF.it lL
lffidt\l[T'trItir; --jn -_- [__T|i=Li,llli r r
ll lll{1*ll ir II LllltHit a - |
iI.! ol
t:
't":_= il_*-
("i-"1 t-* 4
l:; t-.--"-a l\i' I i -y
L_._! ._r_
+--,.- ..---------F:.
l--,.l.\
. t '..-_.
I-.I
.tQ
!\t '\.
I
tilT:
F;I
ll-lr-o:r----'l-.+f
r'-*tnr uilq' .lltE hltr il
._-l
u,,Itl
tll
]I\
nrt
tl
il
tl
lJ
tl
lt
ilr':
llt
tll-i* =
lll ilp:,1
ilt :';
rl rta\i! r':1 \.'l*i..-:'
Jr:. I ril \ lrl
ll tE \ ll I
lE:[/-
;''lHll
ll-,wp<aL
lLl_
ll;s
t
I
I
I
I
I
I
I
I
I
I
I
I
I
--l
I
I
I
I
I
I
I
I
I
trl
v"
tiIit!i
{:
!itll
,l
lF'lri
li ,i4'il'L__t_.
.I
i'-.=J
I f --Irti=;t i'
': -:-rJ I rL ..li I-jt l,;lil]"--t t--il 'lil'lil,
r 1irri
1:_ii'I.ii.t'tl
!
-;
I
rl
il
a
t
I
' !..::.a .lt :i8 i:E :f
ad lll''' !tl
t!
fifl't"--^
I tiI irih iilli i!
ll. - 'il:. . t j
rl;;ili
tiiili
'iiC r J
lii rf il;ilti
.lii *iif,i:; l:9
niil El:
lirilil
I
t.ii;':
r]i:.
t.:l
iiiirlII
t.
Itti
arl
1 .:.
l' .
lrll:li!
i;i.
liiii
iti
l----'-------\\i i't i't- i::----'iL-_.:---l
fls
t- a j8 iT::l .E a
9 !; i
6& tl
:
H' iii
Ei iil
iiiii
lli
ili[
I"'il: :'
ili ;;
tl! t,
iiii
:' tl:lljll !{ilr
F,rl
rf
sg
I
;
I
I
ri
llJirti;,
E:-;-:_-
tLl
ild
lE [:
ttaii
ri !-
rg
I
I
-..r
t,:,iir
ll
o
l'l
I
r!
tra
l: r.
tii
I
fI
aI
€?g
HI
=tTI
il
r 5.1-Iil
I'i
Jri
III'
,t j..l
i iti
irl
i iji
vArL ATrrr^ETrc cLUa
eptember 11, 1993
Snn - STArF?vffit{T OF pROpOSFn TkrpRO\ftrMFl\fTS
The Vail At}Ietic CIub (VAC) agrees as part of the implementation of or:r SDD
proposal to make the follorving improrements:
I-ndscane - F^st Meai
The VAC rt'ill erctend the curb and sidewalk 6'{" along East Meadorv Drive and 8'-
O" along Vail Valley Drive to create a continuous, heated, rectangular concrete
pa\rer sidelvaltrt extending from west end of the VAC service./parking drive ou East
Meadorv Drive to the Gore Creek Bridge onVail Valley Drirrc. This will be
coordinated with tJ:e town engineer.
We nill revise the curb-line at intersection of East Meadow Drive and Vail Valley
Drive in accordance with the "enuy feattrre" concepts put forward in the Vail
ViIIage lvfaster Plan and as shorvn on *re site plan. At the "entr;y' feature" and
paftialiy along Vail Valley Drive, rve will eliminate the existing retaining wall to
bring the landscape down to the level of the sidewalk
We rtill reface the existing landscape retaining rvalls along the garage and Vail
Valley Driv'e with stone.
\Ve rvill incorporate signage to inform vehicles that East Meadow Drive is a
"pedesEian area" open only to vehicles on "official business" with the VAC and tle
It{ountain House.
We tr,ill nork with the Design Review Board and AIPP to supplement the existing
streetlarnps along the vACiide of vail Valley and East lr{eabbw Drives.
lVe rvill create a new car pull-off guest drop-off area directly in front of the new
hoteVhealth club enuy. Tl'is area rvill be paved rvith granite pavers and heated.
We will need consent from the ton'n's authorities that short-term parking in the
opposite direction h,ill be permitted here.
The creation of the new hoteVhealth club enty and car pulloff along East Meadorv
Drive shoutd result minimal disruption to the existiag veietation in the landscaped
area above the existing garage. All necessa4l steps will be taken throughout the
course of consurrction to protect the existing vegetatioL
New drainage grates rt{Il be introduced to handle melting runoffat East Meadow
Drive. This rvill be coordinated rvith the torm engineer.
we will replace the existing wood tansformer grate with a new steel grate.
l; ilii '[
:l
i: iF
Ir !Ft tFr rl
:..h
iiig
i;irr. -"h
i$iirlF
rt g -
Jli 5;l 3€i q
.F
We will work with the town to formalize a.a informal meintenance agreement
regard.ing the town's properry benreen the VAC and the pedestian patb along Core
Creels
We will pnrne the dead bnsh io the area benpeen the VAC and Core Creek
We will remove the existing wood srrndeck that is partially on town properry, uls
well as the dxisting wood utility shed by ttre hot nrbs andthe o<isting w-ood-trash
shed at tie service/gatage drive.
We will create a lqrdscaped path from the end of the odsting service drive./firelane through to the town property on the south side of the VAC.
We will constnrct a new stone terrace at the existing upper health club,/swimming
pool level along the south side of the buitding as shownbn the site plan.
Ruilding-F*'terior
We will restucco the entire outside of tle building. The stucco color will be light,natural color. There will be a stotre base by the new erbry.
We will be installing arewwood 5hingle roof throughout
we will be i:rroducing new wood tri:n and roof overhangs as shown on the
elevations.
We wiil be revising the existing porches, balconies and declcs with new wood trimto.create tie more traditional porches shown on the elevations.
We will be extendi:rg the existing clining deck along.the south side of the restaurant
to connect wittr the new hotel lounge.
We will be constructing a new on-grade hoteVhealth club entry on East Meadow
Drive.
We will be extendisg the norrh wall of the restaurant 6'-Ou to tl.e norrh and fillingin an e"xisting 28' x 9' "indentation" along the south side of &s dining terrace. -.
we will be installing new wood windows and doors throughout
We ryiII !e addPS new dormers at rtre fourth floor level along both the north and .
south sides of the existing stucture.
we will be adding ssl+, chimneys throughout for the new gas frreplaces.
o
The lmprovements to the health dub will not be oftensive, they will focus on
increasing the spa and cardiovascular capacity of the dub and adding new doors
and windows along the southwall of the upperlevel in order to introduce more
natural light into the dub. Most areas of the dub stay as they are
We will be adding new floors at the upper health club level above the weigfit room
and tbe existing racquetball courL
We wiII be creating a new staff locker/tsrrng€ aren at the lower health club level.
Tnterlor Trnnrovements - Garage
. Our SDD proposal will create the need for an aaardonalficars to be parked on site.
We will be relocating a portion of the existing laundry facility to create room for 3
additional cars and eliminating two storage rooms to create room for an additional
4 cars. The remaining 3 cars will be accomodated within the existing garage
through a valet parking arrangemenr
Tnterior Imnrovenrents - Hcrtel
We will be creating a new double-high hotel lobby and lounge areawhich will
connect to the new hoteVhealth club entry. There will be a new opetr stair to a'
balcony above the lobby at the second floor.
We will be renovating ard revising the existing conference room on the first floor,
adrling a new boardroom at tbe second floor and creating a new meedng room
aloag the south side the first floor of the building.
We will be relocating two employee rrnits frorn the fourth floor to the first floor.
Tbe otler two employee rrni6 will be relocated to the tb.ird floor. These rrnils 14,rill
be maintained on-site, as per a previors agreement, for tle life of the sEucture.
We will be eliminating 6 existing DU's and addiqg 24 new AU's to create a rew
room mix of 3 DU's and 52 AU's.
The average size of our new hotel room (AU)'will be increase by 54 square feet to
478 square feet from 424 sqnare feer
All of the existing hotel rooms will be totally renovated. All of tbe bathrooms will
be renovated and made larger.
The improvemenB tothe health club will not be erctensive, they will focus onincr.easrn8 the spa-and card.iovascular capacity of the cr;b and adrting new d.oorsand windows along the south wall of the-upper level in oia.r to introduce rrorenatural light into rbe club. Most areas of tii ctuu stav as tl.y *..-
we will be adding ":* log.tt at the upper health club tevel above the weight roomand the e-xisting racquetball courl
We will be creating a new stafflocker/Iounge area at the lower health club level.
our sDD proposal wiII create the need for an aauttonaficars to be parked on site.
we will be relocating a portion of the oristing laundry facility to create room for 3additional cars and eliminating n"o rtoi"ge rooms to create room for an additional4 cars. The remaining 3 cars tu ueaico-modated *itni" tn" u,dstirg garagetbrough a valet parking arrangemenf -
we wiII be creating a new doubre-high hotel lobby aad rounge area which wiIIconnect to tle new- loteuheaith cluS -enuy. There will be a Bew open stair to abalcony above the tobby at tlei"iooA floor.
we will be renovating_Td l:yiti"g the. existing conference room on the first floor,adding a new boardroom at the seiond nooiiia.r."u"g a new meedng roomalong the south side the nrst nooiLl tne building.
We will be relocating two employee rrnits from the fourth floor to the first floor.The other two emoloyee
'nits wiu ue retocated to tn. tnira floor. These units wilIbe meintained onlsit6, * F" piu;i"; agreemenr, for the life of the stnrcture.
we will be eliminatug.6-$l-trg DU's and adding 24 new AU,s to creare a newroom mix of 3 DU's and 52 AU,s]
The average size of our new hotel room (AU)'wilt be increase by 54 square feet to478 square fggt from 424 square fa;t - \' -Y' lrs L"L 'rrLrEcr"s L'J J-t Dqudrs ler
#:i*:-gttiag hotel rooms will be totally renovared. AII of tbe bathroorns wiIIoe renovated and made larger.
o
@
Most of the e<isting mechanical systens will renovated and relocated to a plenum
above the existing double-high space at the restaurant or to a new mechanical room
at the lower health dub IeVe[
We will be installing a new S-story, hydraulic, passenger elevator $drhin &s
existing shaft to serve the hotel and health dub.
We will be installing a new S-story, hydraulic freight elevator for "back of the
house" services. The existing dumbwaiter at tbe west end of tbe building will
remain.
We will be isstatling a trash conpactor and roll away trash containers to handle the
hoteVhealth dub trash. The restaurant grease and trash will be handled in a
5imilxl way. Trash storage wiil be at the west end of the builrring and at new trash
sEorage closet at the garage.
We will bs aflrting a sprinkler s),stem to the hotel portion of the building.
The entire build.ing will be brought up to ttre current hand.icap requirements.
Schedule
We hope to start consruction in the spring of l994and open ttre renovated VAC in
by the start of tbe 1994-5 ski season.
a
request.
-_
The PEC asked staff to piss on to Council that they supported the Councit's efforts topermanenUy restrid the_six existing employee housing units.
4. A request for a worksession for the establishment of a Special Development District to
allow the expansion of the Vail Athletc Club, located at 352 East Meadow Drive, and
more specifically described as follows:
A parcel of lard in Tract B, Vait Mllage, Fira Filhg, Town of Vail Eagle County, Colorado, mor6 particubrry
descnb€d as follows:
Commercing at tho North€ast com6r of said Tracl B; ihlnce N 79.46'00' W along rhe Northerf lhe of Vait
Vilhge, First Filing, and along lhe Northerly line of saH Tract B 622.86 te€q thencg S 06"26'52' W e distance
of 348.83 feet to tho Sotlthwest com€r of thal parcel of hnd descrbed h Book 191 at Pag€ 139 as recorded
January 10..1966 and titod in Reception No, 102978 in the Eagle County Recods, said @mer also being rhe
True Point of Beginning; thence S 79oO4'08'E and along tl€ SorJ$erv'lino ol said parcol 2OO.Oo feEt to trre
Souheast comer thereot; lherce N 6252'00'E and along the North€ri line of that parc€l ot lard dsscribed h
BoE,k 222 al Page 513 as rEcorded h 197.| h the Eagle County Records, a distance ot 66.7S feel to lh6
Northeasterly cornor ot said parcel ot land; said comer b€hg on tho W€sterv dght-of.way lhe of Gore Creek
Road, as pbned in Vail Village, Flfth Filing; thence N 27.13'37'W a distance ot Z.3T leei along sald Westerly
tighlotway line of Gor€ Creek Soad; thence N 892922'W a distanc€ o{ 12.80leet to the Northeasterly comer
ot that parcel of land desffibed in Book 191, Page 139 as recorded January lq 1965 and liled in Reception. No. '102978 in ths Eagle County Records; thEnbe Northwest eN 26.51teel along the arc of a 37.50 feel radius
curv€ lo th€ left having a cenlral angl€ of 4OC3O'OO' nhose chord bear N 53c40'OO'W a distrance of 25.96 feet
to a Point of tang€ncy; thence N 73055'OO' W and along sald tangent 166.44 fa€t: lhenc€ N 85.1021' W a'
distancB o{ 50.40 leet lo the Nonhweslerly comer of thE Mountain Haus Parcel; lhence S 02ol 8'00' W and along
the easlerly line of said Mountain Haus Paicel a distance ot 1OO.OO teel to th6 Southeasterly comer thereof;
thence S 45013'53'E a distance ol 38.70 leel to the True Point of Beginning, containing 30,486 square leet,
mor€ or less.
Applicant:
Planner:
VailAthletic Club
Shelly Mello
shelly Mello made a brief presentation per the staff memo and stated that her
presentation would focus on the changes that had been made to the proposed vail
Alhletic Club expansion since the worksession with the PEC and DRB on June 28, 1993.
Stan Cope stated that they were trying to create a hotel. He said that the proposed fifth
floor would consist of loft bedrooms. He stated that he would like to see this property
become a small hotel concentrating on suites. He said frat they have decreased the
dwelling units in order to increase the combination accommodation units. He stated that
their goal was to have forly-nine accommodation units. He stated that the modifications
. thal they had made were an attempt to address the concems that the PEC members had
from the June 28, 1993 worksession.
Kathy Langenwalter stated to the PEC members that she would tike them to comment on
whether tre SDD process was appropriate for the project.
Phnning and Envionmental Commlssion
Juy26, 1993
4
ae
:4
bnll-
:-l
IlJ6
G
IU
o
.J
U
Ur
FIlrFI. <a.lJt?l>,t
g$
rii
;iigrt
rl t
ssi
\
,t)
./
o
/
\t
\./
t:t" "'/"\
1. ,4
ririt lil
'#,m
I
l
I
I
I
I
I
I
I
I
i
\
{l.IIitsl
Iol
<tJl{irll:l
/
I
II
I
I
I
t
\
{t
,t
i
t-/l
tl
ll
rt
ir
za
II
Iil,.rl
riitu
II
lr
J:rl
I
I
I
I
I
ii!
i
I
lr,titlr
L
y/4r
'li x
' l';: '
f,I.\t^-
ffisit- Jr*il
.. l{
\'.:,
'i
b
b
it
e
li# i
o
d!!
Hr tii
Ei fli
3! INi
D
t{
Y
I$
Il
i{
;iI
..\
i;1\i
il;
{l,l
ISt
n
\)
qf,,\tl
tl
tt
I
I
JI
it!ll't
i
d
!f
fili
o
)
o
I
A
(rJ
\.y
'!
lj
f* , rr .01
' ;:'A",1'Kg
-l'lvl
ij il
Ji Xi5 liil it
| :l .l tl
:l{
,#ioft,,,,r/or.ror
tn,.
ot
(l
oitrj
illi
,rt
;rI
f()I
r-r I
l{{ iit I
EE t<! t
3i I.:
:l:l| -j l' tl | | |
.9
(!
lljl!
3
ao,ul
I
I
I
c0
dlel
Eg
E{(r
=-'' I-!
t
.l
!.
t
tl
at
5.:
ge
.9
o,,o:tJi
6:
-itJlui
Lt! i'r!<t ll
3i ii
1
1-
t
I
(
!
I
o
t.oo
6
!u(!--arIl
{)t..olJJI
5idrr,..t
='rll i;ii i:
il ii
E{t
EI
u
,o,o
!!t
TJ
v(!ll,
{,
CL
C\
{
tofJ.ulult-,{t
=.,Fd<t
JT*i
li
{I
I
I
{
t{
.I
!
n
IJ
E
l
t.f
!.
g
(
lIa
q
i
,
["r-tr--1
-l
I----/ |. is I'ii ll
:i'- - '-':l
It\ ..J
;ll'il ittl.r.__(_
rll-*--- / , i I' i/{' _J -Jr I f--
i ---'i rlI s li I *--
-,------
-lj-
-' - i i---i . 11 tl-----il ' ! i iI ----1
.ll
i--- -li i i
"------ii 'll5i ----r-t r iilrr-rrrl :r_ '_-1 |< Ji ;r--rli .ii
l.Itlr.
r\|
!l
il
.ll
.irI
t.lt-l
IJ
t
tr
a
\"r - ii '\\L -.J i\\ t'--ul
II'{
ll
ts
!:o--9 I!r- a.
iii
t)iE-rtr I :J>. tItF5 l<!i
=, I:\r +>,t I
t
I
aII
t
a
il
l'I
l..lt.l
titlti
tlil\l
I
I
FC=:::-ffi"1l---1 ' '
ll tql r11 rltt
I
t
J
IriI
r..u..-
!!3
hr
itl:
It--{
t
ii
Ir
,lt
tl
bra-9:tr
!,!
C
3i|n*
'E g3r;el "!
5r ii
ri li
3i i*
{,
{
I
T
t
t
I
?
nU
l'
'l
c
G
oolr
tr
F
Ft FrrrI l/ tit
I
3dlgi
t-r{!
E{<;
-rl
Fi
I
c
icii1ttt!I
TIril:
I
co
dlgt
E{i
ri i
ti r
I'Jl
{ItJt,trtlTIiI
HE
rl
rl
'l
rl
Dalton Williams said trash hoppers are a good idea and if the applicant agrees to put trash
receptacles in the counter, he could change his vote.
Randy Stouder said you would have to eliminate the planter box to put in a large enough trash
receptacle.
Julie lverson asked who maintained the existing trash cans in the area.
Randy Stouder suggested contacting VA and reguesting a new trash can. He offered to follow
up with VA.
Jeff Bowen made a motion to approve the request in accordance with the staff memo, including
the conditions on page 4 and 5 of the memo.
Dalton Williams asked to add to the motion to have the applicant and DRB consider adding a
trash hopper under the counler.
Jeff Bowen agreed to add Dalton's request to the motion.
Dalton Williams seconded the motion.
The motion passed with 5 in favor and Jeff Bowen opposed.
Jeff Bowen said he goes by the area everyday and will call staff if there is a problem.
4. A request for a major SDD amendment, located at the Vail Athletic Clubd 352 East
Meadow Drive and more specifically described as follows:
A patcel of land in Trad A Vail Village Firsl Filing, Town of Vail, Eagle County, Colorado, commencing al rhe
Nonheasl comer of said Tracl B: thence N 79"46'00" W atong the Northerly line of Vail Village, First Filing, and
along lhe Nonherly line ot said Tracl B 622.86 fe€l;thence S 06"26'52" W a distance of 348.83 feel to th;
Soulhwest comer of lhal parc€l of land deEcribed in Book 191 at Page 139 as recorded January 10, 1966 and filed
in Reception No. 102978 in_the.Eagle county Records, said corner ilso being the True Point oi Beginning; thence S
ry:01.q: E and along lhe soulherly line of said parcel 200.00 feel to lhe Sor.iheasl comer lhereof;lhencl N
62'52'00" E_and atong the Northerly line of thal parcel ol land described in Book 222 at Page 513 as recorded in'1971 in the Eagle Counly Records. a dislance ot 66.78 feer ro lhe Northeaslerly comer of Jaid parcel ot land: said
comerbeang on the Weslerly righl-of-way line of Gore Creek Fload, as platted iir VaitVillage, Fifth Filing; thence N27"1337" W a distance olTl.3T leet along said Wesledy right-of-way line of Gore Greek
-Road;
thence N 89.2922'
W a dislance of 12.80 feel to lhe Nonheasledy comer ofthat parcel of land described in Book t'9t . page 139 as
recorded January 10, 1966 and filed in Reception No. 102978 in the Eagle County Records; ihence Njnhwesterly
26.51 feel along the arc of a 37.50 leet radius curve to the left having a &ntal an-gle ol 40"i0'00" whose chord
bears N 53"40 00" W a disrance of 2536 feel to a point ol tangencylfience N 73;5s00" W and along sald tangenl168'44 feet lhence N 85"10'21' W a dislance ol5d.40 le€t tolhe Northwestedy comer of lhe Mountiin Haus -
Parcel;thence S 02"18'0o'W and along the easterly line of said Mountain Haui parcel a distence of 1o0.oo feel tothe Soulheaslerly comer lhereot:lhence S 45'135i" E a disrance of 38.70 leel lo the True point of Beginning,
containing 30,486 squar€ feel, more or less.
Applicant: JWT 1987 Vail Limited Partnership, (d/b/a Vail Athletic club), represented
by Stan Cope and Michael BarclayPlanner: Mike Mollica
Plrnnin g and Environmental Commission
Mirtutes
December I l. 1995
George Ruther gave iite overview for Mike Mollica. The memo indicated the applicant was
glgPgsing to add three AU's and one DU to the building. An additional requirement was for two
EHU's off-site, The parking requirement has been affeited and four additbnal parking spaces
have been required. Through a valet parking program the applicant is able to proviOeinb
Jsquired 4. new parking spaces. Staff is concerned with the applicant using oversize shingles on
lhe entire building. Staff leels the inclusion of 3AU's and 'tDU, without going outside the
previously approved building envelope, adds to the Town's short-terrn OeOOise and is in the
applicant's favor.
Michael Barclay offered to answer any questions about the project.
Henry Pratt was concerned about density adding DU's, but was happy with the tradeoft with the
three AU's. He was advised that two condo owners do not want to itiange the exterior skin and
feels the exterior should be consistent throughout the project. This latest-scheme is a downfall
from what we saw in July and he feels it is not compatiotd with the neighborhood.
Dalton Williams said he agreed with Henry. A hotel in town is much needed and he has no
problem with the density increase. He cairnot approve a project that does not have consistent
architectural skin on the outside.
Larry Eskwith, an altorney for one of the unit owners, spoke on behalf ol the owner that wants to
keep the exterior the way it is.
Michael .Barclay feels the same as Dalton Williams and Henry Pratt and suggested meeting with
the condo owners to convince them it is not an unreasonable request and that the new extlerior
will not diminish their view.
Lany Eskwith said he believes in keeping the architectural integrity on the outside.
Dalton Williams said he has a problem with shingles on the outside because it "feels US western
rather than alpine."
Michael Barclay said it is a great building with shingles. He agreed it would work in a pine tree
environment, but not in Town. He did want to try something new in Town. He will reintroduce
the stucco to reach the same aesthetic level as he had with the shingles.
Greg Moffet said to take the shingles off to keep the character of the village.
Jelf Bowen h_ad nothing to add. He said there is a different philosophy back east with a shingleexterior. Jeff said the 1993 building was what a lot of time was spent'on. Aesthetically, heprefers the 1993 building.
Greg Amsden agreed with Jelf Bowen.
Kevin Deighan disagreed and is fine with a shingle exterior. He feels it mixes well with Vail,sinterpretation of alpine. He does however, tnint tne'g3 plan is more attractive.
Lynn Fritzlen, a local architect, is glad to see the VAC upgrade. Shingles are associated withunusual aethestics and plasticity of form and she is notin favor of them.
Planning and Envirotrmefial Commission
Minutes
December 11, 1995
i
't
Greg Moffet said shirrgles are not consistent with the Village.
Stan Cope, with the VAC, gave additional clarification to the style. He didn't want to be the same
and wanted more American architecture with the introduction of wood. He wanted American
styling incorporated into a Village that had a western heritage.
Dalton Williams said a western look is nol appropriate when Vail has promoted the European
alpine feel all along. He has no problem with the current building;just take off the shingles and
use a stucco exterior.
Greg Moffet asked George Ruther if the request would go before the DRB.
George Ruther said yes.
George Ruther reminded the Commission to look at the conditions, especially No. 5 which
addresses the decks and railings and that they be consistent.
Henry Pratt said to also include that the skin of the building be consistent in condition No. 5.
Jeff Bowen made a motion to recommend to Council that it be approved subject to the conditions
in the staff memo and that an additional condition be that the shingles be removed and the
exterior be returned to stucco and that condition No. 5 include not only the deck rails, but lhe
exterior skin.
Dalton Williams seconded the motion.
George Ruther said the DRB will make the color decisions.
Jeff Bowen said as an amendrnent to the motion that condition No. 4 be that the PEC is
instructing the DRB in accordance with the changes the PEC has made that condition No. 4 is to
remove shingles and to consider the stucco paint color.
Dalton Williams seconded the amendment to the motion.
Stan Cope asked if the whole building was to.be all stucco, or with wood accents.
Jeff Bowen clarified that no shingles and primarily stucco, similar to the 1993 approval.
Dalton Williams had a problem with wood shingles on the side of the building. He doesn't want
shingles under lhe eaves. He had no problem with board and batten and shingles on the roof.
The motion as amended passed unanimously by a vote of 6-0.
5. A request for an additional 250 square feet of Gross Residential Floor Area to construct a
residential addition at the Cook Residence located at 1012 Eagle's Nest Circle/Lot 2,
Block A, Vail Village 7th Filing.
Applicant: Sam CookPlanner: Georoe Ruther
llaming and Environmental Commission
Minutes
December 11, 1995
MP Barclay, Architect
235 East l lth Street
New York, NY 10003
Novembsr 11, 1995
Mike Mollica
Community Development
Town of Vail
Vail, CO
re:VailAthletic Club
Dear Mike,
This is it. This is what we'd like to build. Viele Construction is giving us their preliminary bid early \hisweek. lf their estimate is within range of our budget, we're shooting for a spring 1996 start.
Enclosed are:
'l full size ?4 x 36 set of drawings
I set of plans only with area take-offs
1 colored rendering of the north, west and east exterior elevations
1 complete set of I 1 x 17 xerox reductions
1 zoning analysis and accomodation unit arealparking calculations
1 revised SDD Staternent
Michael Balclay
a/
-_ a,^/ fif- o4jz
o
November l t, l 9sl5liP BdcW, Architect
235 East 1 1th Street
New York. NY 1OOO3
VAIL ATHLET]C CLUB - ZONII{G ANALYSIS
GRFA:
AU's
DU.S
Employee
Common overage +*
TOtaI GRFA
Halls/Mec hanical
Club Area
Garage
Restaurant (incl krtchen,/bar)
Conference
Club Retail
Total Building Area
PARKING ANALYS$
Ha lls/ Mec han ical
Club
Retail
Conference (sf,/240)
Restaurant (sf less kitch.rl 50)
AU'S
DU'S
Employee
Total Requir€d
* based on Mike** based on halls,
Existing
10,927 sf
8,1 22 sf
1,31? sf
1 7,607 sf
37,968 sf
10 ??( cf
22,257 sf
4,i 31 sf
3,606 sf
2,842 sf
460 sf
72,892 sf
o
| .6.f
114
22.5
Z I.'1
14 q
4
78.44
Mollica's calculations
mechanical, restaurant, conference
0
0
6.36
1 5.13 *
46.74
8.50
4.00
80.73 3 add'l sp€ces
Approved
24,647 sf
A ?E? Cf
1,383 sf
1 1,882 sf
+4,164 sf
14,265 sf
40,881 sf
5,51 2 sf
3,285 sf
? 727 <f
14i sf
79,093 sf
Proposed
24,943 sf
8,081 sf
1,312 sf
'1 o,964 sf
45,3OO sf
1 4,738 sf
20,773 sf
4 4,2 4 ..f
? ??\ cf
1,527 sf
Osf
7Q 4?? cf
0
U
o.47
| | -aJ
ao.3
44.75
6.5
6/ -5 |
and retail less 8536 sf of allowable overaoe
tt(L
GRFA Calculations - Accomodation Units and New Pwellinq Units - 1 I /2/95 Lavout
Rm No Area Parkino Rm No Area Parking
First Floor 101 508
102 508
r03 434
144 431
105 428
106 434
107 508
108 508
Third Floor 301
302
303
304
305
306
307
308
309
310
311
5tz
313
5 t+
5t)
316
317
318
319
3e0
3?1
S Demi FP 0.91
N Stan FP 0.78
S Demi FP 0.91
N Stan FP 0.76
5 Stan 0.83
N Stan FP 4.76
lock-off 0.00
N Stan FP 0.76
Vasquez 2.O0
N Stan 0.78
Angelo 2.50
N Stan 0.81
lock-off 0.00
N SIAN FP 0,83
S Stan 0.83
N Stan O.73
S Stan 0.76
N Stan 0.78
S 1BR FP 1.OO
N Stan FP 0.80
N Stan FP 0.BO
S Derni FP 0.86
N Demi FP 0.83
S Demi FP 0.90
N Stan FP 0.83
2 BR DU FP 2.OO
N Stan FP 0.83
N Demi FP 0.85
N Demi FP 0.83
N Demi FP 0.86
NlBR FP 1.'I 3
3 BR DU FP 2.OO
S Demi FP
S Demi FP
S Stan
S Stan
S Stan
S Stan
S Demi FP
S Stan FP
vs. 3238 app'd
0.91
0.91
0.83
0.83
0.83
0.83
0.91
0.91
s08
376
508
360
434
360
434
360
1507
Ji/ O
2207
415
s06
430
433
325
364
378
701
400
400
Second Floor 201
202
203
204
205
206
2Q7
208
?09
210
211
212
213
?14
215
?16
lt I
218
219
ttu
221
B AU's 3759
508
460
508
467
434
467
431
467
454
5/b
454
4?5
508
430
508
326
490
s0B
433
364
701
S Demi FP 0.91
N Demi FP 0.86
S Demi FP 0.91
N Demi FP O.BT
S Stan 0.83
N Demi FP 0.BZ
S Stan O.B3
N Demi FP 0.87
S Stan 0.85
N Stan 0.78
S Stan 0.85
N Stan 0.82
S Demi FP 0.91
N Stan FP 0.83
S Demi FP 0.9i
N Stan 0.73
S Demi FP 0.89
N Stan 0.91
s stan 0.83
S Stan 0.76
S 1BR FP 1.OO
vs.9292 24.98
17 AU': 7128 vs. 6863 app'd
21 AU': 9719
AU parking requirement
DU parking requirement
Total Accomodation Unit Area
Total Dwelling Unit Area
Total Number of Accomodation
vs. ?4,647 approved
vs. 6252 approved
Average Size of Accomodation Unit
9 AU's 4337 vs.5447 30.26
vs. 10,927 existing
vs. 8122 existing
46.74
t'. JU
24,943
8081
55
S Standards
S Demi-suites
S l BR's
Fourth Floor 401 461
402 435
403 498
404 435
405 1486
406 435
407 446
408 432
409 464
410 731
411 1941
N Demi-suites
N Standards
N Standards w./ FP
N lBR
454 sf
10
8
1
IJ
13
)
AU Breakdown
55
I
Vail Athletic Club Adjacent Property Owners
Town of Vail
75 South Frontage Road
Vail, CO 81657
Mountain Haus Condo Assoc.
Sandy Gray
292 B. Meadow Drive
Vail, CO 81657
Robert & lfary Galvin
Rolling Oaks Farrr Route 68
Walter Patrick Gramm
695 Prospect Street
Winetka,Il 60093
Anthony & Constance Ridder
1801 West 27th Street
Suset Island
Miami Beach, FL 33140
Mr. David Smith
c/o Comice Building
108 South Frontage Road
Vail, CO 81657
B.A. & Barbara Bridgewater
8300 Maryland Avenue
St. Louis, MO 63105
George Washington Knox fV
291 Bridge Street
Vail, CO 81657
N.J. Nicholas
50 Central Park West
New York NY 10023
Hotel
sfra
152 EAsr M! Dov DRIrit
VAn, CoLoRADo 8165?
Hors.97014?64?00
Spe 970/476.7960
F.rx 970/476-6451
w182247s4
$@rington,Il 60010
Marion M. Lloyd
25060 St. Mary's Road
Libertyville, IL 60048
Tyrolean Condo Assoc.
c/o Brandess/Cadmus Real Estate
281 Bridge Street
Vail, CO 81657
Vorlaufer Condo Assoc.
385 Gore Creek Drive
Vail, CO 81657
-*. .:
THIS ITEM MAYAFFECTYOUR PROPERTY
PUBLIC NOTICE
IOJ€F |s HEREBY GIVEN that the Planning and Environmentat commission of rhe Town ofVail will-hcid a Brbtic hearing in accordance ,rvitn section 18.6b.6d0 ;i the Municipat code ot theTown of vail on December il, t995,
"ia,oo F.nr. in the Town of vait Municipal Buitding. Inconsideralion of:
A- reqrJest for a major sDD amendment, located at the vail Athletic club/ 352 EastMeadow Drive andmore specificaily OelclGO as foilows:
A parcet of land in Tracr. B, Vail Vilhge First Fiting, Tovi,n of Vail, Eagle Gounry, Colorado, commencing at theNortheast comer of .said rraa B; thjncE l.t zs'46'b; w along^rire^ l.tionheay fi; oiVJvitt"g", Fir5t Filing, andabng the l'lonherly line ot said Trad B 622.86 feer; thence S 06.26b? W a dislanc€ ot 348.83 teet to thasqrthwesl conrer of lhat patc€l of tana o""oiu"a iti gook 1 91 at Pag€ 1 99 6 recorded January i o, 1 966 and filedin Recef{ft]n No. 1 02978 in he Eagle.. comty necoros, _sjld_corn€r atso being th6 True poinl of Beginning; rhence S7g"(xttr E and atolg1lre flor4tr,4l.line oI s;id p;;t 200.00 feer ro rhe Sorineasr comer rtrereot; lhenc€ N6?52'of E atld along thel'lorfrerly line ot lhat parcel ot land described in eox zze a eage 513 as recorded in1gl1 in rle Eagle County Records. a oislance o't ee.ia-teet to the Norae;erry --o or
""io
parcel oi hnd; said.corner being on the weslerly tighl-ot-way line ol Gore creek Boad, as ptanJ ii, V.,ivirr"gu, nffi ming; lhence Nz/"1 3'9r w a dislaSg o! zz s7 teet alo'ng said wesierty dgt'r-ot;t rile oJ eot" cr*x n*o; rhence N 89.29,22.w a dslirpe of 1z8q feel to the NortheaJtedy comer ofit ir parcer 6r rana o;;-b.d;; Book 191, page 199 asremrded Jarua.7 10' 1966 an_d fled in Receition t'to. t oazei in rt "
grgl" C"r"tR;rds; fience Northwesrerly26'51 t€€r arong rh€ arc of a 37.9) teet .aous curve io rtre lefr having a Lnral -ir" "i io;ai6'ii;-J il;' "bears N 53'i(t'0o'Y."^11]:1": glzs.gs t*r ro
"
pointof tangency:rhen". r.t zCGoo'w and aJong said langenl168'44 feeq ftence N
-85'1021
' w a disrance ot ib.+o feet ro in" riit*n"""r.,litr"-r rn. r'1*nain HausPatcd; lhence s 02'18'00- w and.ajong rne ea"rsrly line of said Mountain Haus parcet a distance of loo.0o feet torhe soutrresrerly comer thereof; lhend s +s'r Csd'
'i
a dislance of 38.m r*r ro Ge iru" point of Beginning,conlaining g).496 square fe€1, more or less.
Applicant: JwT 1987 Vail Limited Partnership, (d/b/a VailAthletic club), representedh,__- F)t_Stfl 9ope and Michaet Barctay-rnnner: Mike Mollica
A request for a an additio-nal 250 square feet to allow for an addition to the Tuchmanressence locared at gt l o Booth creek Drive[or g, ebck i VatiVirad" 1 1th Fiting.
Applicant: Mr. TuchmanPlanner: Jim Curnutte
I request for an additioral 25_0 square teet of GRFA for an addition to a residencelocated at 31ro Boorh creek orivblioi s, 6rock 3, vair Viilage .r 1th Firing.
Applicant: Diane H_ugtres, King Hughes and Kendail Burney, represented by Bi1 piercePhnner: Jim Curnutte ' -
I reouest for a side yard setback variance to allow for an addition to the wimer residencelocEted at 2860w nipen I-anen or iz,l-C"JuEiiri.ion or ilci e, Vlii'virrrg" 1 1 rh Filing.
Arclicant: Frank WmerPkrner: George Ruther
2.
3.
4.
I,l
I
-','Jr-
5. A request for a Minor Exterior Alteration-in ccl and a condition-al use Permit to allow for a
new ourdoor dinffi;eai;;Ga"roig rh;a;Gide of one vail Place located at 244 Wall
SireeVn part of Block 5C, Vail Village 1st Filing'
Aoolicant Kiendra Hoover and Julie lverson
Pidnner: RandY Stouder
sign language iot€rpretation available upon requEst with 24 hout notification' Please call 47*2114 roice or 479'2356
TDD for information. ,r.
,,.
o
!..
tr ,Fi!_ t fl q'!F'f
TO:
FROM:
DATE:
Planning Environmental Commission
Community Development Department
July 24, 1995
SUBJECT: A reguest for.a worksession to discuss a major speciat Development District(sDD) amendment, located ar rhe vail atnrerii-Cru6, iil E"rt Meadow Drive, andmore specifically described as follows:
A parcer of rand in Trad B. vair viflage, First Firing, Town of Vair, Eagre counry, cororado, morepartidrlarly described as follows:
commencing ar the Nonheasl corner of said rracr B; thence N 79.46,00" w arong the Northedy rine ofvail village, Firsr Firing, and arolg the Nonherry rine oi."io1r".r B 622.g6 re€r;rhenc€ s 06.26,52,,wa distance ol 348'83 leel to the^southwest cor;e; oi th"tlaror or r"nd described tn aoot< isr at eagre139 as recorded Januarv ro. t966 and titeJ in n""iiii-iil]o2978 in rhe Eagre counry Records,said corner atso being rlie True poinr.or aeginning;l[""#t zg. o+.0-8,, E and along the Sourherty tineof said parcer 200.00 feer lo rhe sourtreastbmer"ih"r"o]]ri"n." rv 62.52,00" E and arong theNorlhedy line ot that parcel ot tano describeJ;; B""kEi'#"g" sr3 as recorded in isii in t" e"gr"county Records, a disrance or ee.rc teer io ihe N;;;;y
"orer ol said parcer o, rand; said cornerbeing on the wesrerry right{tway riT_o] q*" c*"ri""J,L g.n.o in vair vitage, Fifth Firing;tnence N 27" 13'37" w a disrance of 7z.sz teer arorfi saiu-fresredy right-of_way rine or Gore creekRoad; thence N 89'29'22' w a disrance ot rz^eO
-t"&io
;h.'illnn""rr"rty
"orner
of that parcer of randdescribed in Book 191' paoe i39
"" r"";;J;;;",yiii,ibtr and fired in Rec€prion No. 102s7s inthe,Eaglecounty Recordsithence. Norrtwestery essi i""i
"rlng
ft" arc of a g7.so teer radius curveto the lett havins a cenrrar anore of 40.s0'00";6";hili;;s N sg.40,00,, w a distance or 2s.96ll"jj:,:.fgiT "lrangency; rhince N 73,ss'oo" W ana Jong ,aio tangent 166.44 feet; rhenc€ N85'10?l " W a distance of S0.40_feet to rh" 1,f.rtt**""Ay,iirer ol rhe Mountain Haus parcel; thences 02"18'00" w and alonq the easterly line ol saio lrrorn#n ri*r parcel a distanc€ of l0o.o0leel to thesoutheaslerry corner thereof: thence s 45'135s" e
"
air;n"" ot 3g.70 feet to the True point ofBeginning, conlaining 30,4g6 sguare teet, more or le$.
Applicant: JWT 1987_vair Limited partnership, (dibla vairAthretic crub),represented by Stan Gope and Michael BarclayPlanner: Mike Mollica
on November 2, 1gg3, the Vair r.own councir approved the estabrishment of speciarDevelopment Disrrict No, 30 (vair atnr*, Ci"6"Jry rc detaled deveropmenr pran for the sDD.The Town Council approval of OrOinance No]1zl Srri"" of 1g93 passed by a vote of 5_2, wittrl9:!:lg andtapin opposed. This rown councirapprovaroccuired forowing an approximaresrx-rnonth review period, by the pranning ano invironhentar commission leecy and DesignReview Board (DRB)' ouririg whicrt foutioint-#dlonB pubric hearings were herd. An overviewof this 1993 sDD approval is tisteo in oririnf ioiri'", Exhibit B, attached to this memorandum.
. ,t,ar.. - Iylicr"irr ( tr-( 4a .:I t &-Pt
_--_-
.a
a,
ll.
i
At this time, ths applicant is requesting a maior amendment to the 1993 approled SDD' for,
ir,e,eoevel6pment'ot the vailxtrteuc ctun, bcateo at 352 East Meadow Drive. The proposed
amendments to the 1993 approved SDD include the following:
. The creation of two additional accommodation units - for a totral of 54 AU's for the sDD'
.Theexpansionofthespaloungetothesouth,overanexistingskylight,(apptol'111"1Y.^
190 square leet of floor area). This area does not count as additional site coverage' due
to the fact mat frereli
"ii$ii1g
floor area Oeneiin this space. This is the only propbsed
change to the general "fooFrint" of the structure'
. The reconfiguration and simplification of the north facing, upper-level dormers' Three
shed dormers "r"
no* propiseo in this area. The 1993 approval included nine
"articulated" dormers.
. The south facing dormers have been slightly modified. Additionally' the south facing
inverted dormers ('cutouts"), originally apprbveO in the center-most area of the roof have
been eliminated.
. Although the overall mass and bulk of the proposed structure ha11ot changed to any
significant <legre.,
"n
ini"tnal reconfiguration'of the spaces.has occurred' The details of
this reconliguration are included as eifriUit A, which ii attached to this memorandum' ln
summary, tne aplticant is proposing an additlonal 1,536 square feet of floor area, to be
located witnin tfrd general
'envelope
of the 1 993 approved plans'
. The above-described reconfiguration Of the interior spaces has resulted in a decrease in
the required nut|.t-ofiixin-g spic"t. The 1993 approvat required nine additional
parking spaces. This 1b95 SdD'amendment request involves.the addition of only two
additional parking spaces. These two spaces can be provided on-site' within the existing
. parking structure.
. All of the proposed improvements (including streetscape' j1P!91f"' etc') associated wittl
the 1993 SDD apt;;iiemain intict. n OdtaiteO listing of these improvements is
attached to this memorandum, as Exhibit C'
The above-described modifications are considered to be a major amendment to the previously
approveO SOD. As stated in ine Zoning Code, a major amendrnent is defined as follows:
"Major amendment means any proposal to change.uses; increase gross residential floor
area; change the number of dwelling o,
"ccot.-odation
units; modity, enlarge or expand
any approved Speciafbeuelopment-Districl (other than minor amendments as defined in
subsection 1 8.40.0208).'
Due to the fact that the applicants proposed modifications to the sDD involve changesto gross
residentiat 1oor area, asif,ii"r o"irsiir (number of accommodation units), the proposal is
required to follow the major SDD amendment procedure'
RITEilAIqEE ED IN EVAI.UATI
PECIAL DEVELOP
There are nine sDD review criteria which are used to evaluate the merits of an sDD amendment.Because this is a PEC worksession, the st"tr *irr not address eicrr oitnl criteria individualty atthis time' we have provided the criierira oiio* io aid the pEG in iheir;;;uation of the projecrduring the worksession.
The criteria are as follows:
A' Design compafibllity and sensitivity to the immediate environment,neighborhood.an!-adiacent properiles retatlve to archltectural design, scale,bulk' building height, buffer iones, identity, ctraraciei, visual integri-ty
"no
-'
orlsntatlon.
B. uses, activity and density which provide a compatrbre, efficient andworkable relationship with surrounding uses ""J""ilrity.c' Compliance with parking and loading requirements as outlined in Chapter18.52.
D' Gonformitywith applicable elements ot the vail Gomprehensive plan, Townpolicies and Urban Design plans.
E' ldentilacation andmitigation of natural and/or geologic hazards that dfectthe property on which the speciar deveropmeni aisir]ci is proposed. - ----
F. site pran, buildingdesign and rocation and open space provrsions designedto produce a functional development responiive ahd sensitive to naturalfeatures, vegetation and overair aesthefi; quarity oiitre community.
G' A circulation.sv:te-f designed for both vehicles and pedqstrians addressingon and off-site traffic circulation.
H. Functionar and aesthetic randscaping and open space in order to optimizeand preserve naturar features,recreation, views and functions.
l' Phaslry Pl:." or subdivision plan that witt maintain a workabts, functionaland efficient rerationship thrdughout the deveropment of the specialdevelopment distrlct.
IV. VAIL LAND USE PLAN
The goals contained in the-vail Land Use Plan are to be used as the Town,s policy guidelinesduring the review process for new or amenceo ievetopment proposals. The staff consideredm?ny..ol the following Land use Plan Goals/PolicLs during the initiat review of the 199g SDDestablishment for the vail Athletic cruo, ano turtrrer, staff Serieves martnese goats and policiesare also applicabre with regard to the current sdo ma;or amenoment pioposar,
Vail should continue to grow in a controlled environment, maintaining a
balance between residential, commercial and recreational uses to serve
both the visitor and the permanent resident.
The quality of the environment including air, water and other natural
resouroes should be protected as the Town grows.
L!! The quality of development should be maintained and upgraded whenever
possible'
ge The Village and Lionshead areas are the best location for hotels to serve
the future needs of the destination skiers.
gg Hotels are irnportant to the continued success of the Town of Vail'
thereloreconversiontocondominiumsshou|dbediscouraged'
4A lncreased density in the core areas is acceptable so long as the existing
character of eacti area is preserved through implementation of the Urban
Design Guide Plan and the VailVillage Master Plan'
4B The ambiance of the Village is important to the identity of Vail and should
be preserved. (scale, alpine chaiacter, smalltown feeling, mountains,..
natural setting, intimate iize, cosmopolitan feeling, environmental quality.)
EJ Affordabte employee housing should be made available through privatg
etforts, assisted by limited inientives, provided by the Town of Vail' with
aPProPriate restrictions.
5STheexistingemp|oyeehousingbaseshouldbepreservedandupgraded.
Additional impfdye-e housing needs should be accommodated at varied
sites throughout the community.
Overall, the staff believes that the proposed SDD major amendment application meets the goals
and policies of the Land Use Plan as described above.
V. VAILVILLAGE MASTER PLAN
The staff believes that the 1993 approval for the redevelopment of the Vail Athletic club carried
out many of the goats and objectivis contained in the VaiiVillage Master Plan. Additionally' the
Staff believes ftral tne current SDD major amendment proposal also carries out the Master Plan's
goals and obiectives, as follows:
Goal #1 -Encourage high quality redevelopment while preseMng the unique architectural scale
-f the Village in order to sustiain its sense of community and identity'
objective 1.2 - Encourage the upgrading and redevelopment of residential and
commercial facilities.
IJ
1.2
Goal #2 - To foster a strong tourist industry and promote year-round economic health andviabitity for the Viilage and lor ttre commuriitias a wnote.
obiective ?,J - Recognize the variety of land uses found in the 10 sub-areasthroughout.the Village and allow tor leveropme-n-t-trriiis-compatiole with theseestablished land use patterns.
obiective 2'3 - lncrease the number of residential units available for short termovernight accommodations.
Policy ?'3J - The development ol short term accommodation units is stronglyencouraged' Residential units that are developed auove existing oensity telilrare required to be designed or managed ln a riranner init malres them availablefor short term overnighi rental.
obiective ?'5.- Encourage the continued upgrading, renovation and maintenanceof existing lodging and commercial facitities to befter serve the needs of ourguests.
Policy 2'5'1 - Recreation amenities, common areas, meeting facilities and otheramenities shail.be preserved and enhanced "i a pirt or
"ny
redeveropment oftodging properties.
obiective 2'6 - Encourage the developrnent of affordable housing units throughthe efforts of the private sector.
objective e.6.1 - Emproyee housing units may be required as part of any new orredeveropment project requesting density ou.ir mat iro*"0 by existing zoning.
ft!*flnn.]" recognize as a top priority the enhancement of the watking experience throughour
objective 3-4 - Deverop additionalsid_ewarks, pedestrian-onry warkways andaccessibre green space areas, incruding po"i.bip"ikiini'rtr"", access.
Goal #5 - lncrease
"nd 'Igt9Y9 the. capacity, efficiency, and aesthetics of the transportation andcirculation system throughout the Villaje.
Policv S"tJ - For.new development that is located outside of the commercialcore rZone_D.isrri*, on-ste p'ifiing.shar.o;t;;idil (r;iirer man paying inre rhe
#::t rund) ro meer anv adoitionirparkini irr"nJir-*quired by rhe zoning
ee*#; l:g_evgloemenr pojects.sha' be strongty encouraged to provideunderground or visually conceitei partCng.
The staff berieves that,n: p_10*:?o sDD major amendment apprication meets, and furthers, thevail village Master ean gdars, ooiectives, anl-pii.i., as described above.
-
vr. prscussloN lssuEs
The sraff has identified the following issues and concerns which we would like to discuss with
both the PEC and the applicant:
1. Deslon Gompatibllity/Shade & Shadow.
The stafi believes fiat the most significant proposed modification to the approved SDD,involves
architectural changes to the upper-level ot ihe'building's north elevation'. Specifically' the
froposat calls lor iirree shed dd,rrers to be added to the structure. The length of the dormers
would be as follows:
. Western dormer = 59 feet
. Center dormer = 78 feet. Eastern dormer = 49 feet
The 1993 approved SDD included a total of nine "articulated" dormers on this same area of the
structure. Straff believes that the 1g93 architectural approach was- very surcessful in that it not
onfy nrofe up the large "ipinies
of roof area, but it dlio allowed for a very attractive interior
iooin f"Vour. nOOmonany,ine Oesign kept the shade and shadow on East Meadow Drive to a
minimum and also improved the ovirall alpine character and general quality of the building'
The staft continues to recognize that the project architect is very sensitiv..e to the shade and
shadow pafterns cast tr;;ihtbuilding ontoEast Meadow Driv6' ln addition to the fact that the
proposed shed clormers would cast stlghtly more shade and shadow on East Meadow Drive then
the 1993 design, tn. tnf U"fLuei tnaitn6 original design solution.for the.dormers is more in
keeping with the g.n"r"i'"lpin" ttyf" of the Uu-nOing, and of Vail Village.,lt should be noted that
the pedestrian walkways immeOiaiety adjacent to t-he building are proposed to include an integral
snowmelt system.
Staff would recommend, as an opiion, that perhaps the more traditional gable-type dormer be
considered on the north elevation; such as is proposed for fie south elevation of the building' In
g"dr"l, ttr" ,t"tt would recommend that me proiict architect explore other types of dormer
ion't-igri"tionJ*itn *ni"ft-to break up the large etpanse of roof area on the north elevation'
The staff has calculated the shade/shadow impacts (on a square footage basis) on the north side
of the building, along East Mea<low Drive. We have utilized the'Worst case" scenario (December
21sr):
1993 Approved Plan 1995 Amendment
West Area:
Center Area:
East Area:
Totalsr
1,251 sq. ft.
159 sq. ft. .
246 sq. ft.
1,656 sq. ft.
1,305 sq. ft.
229 sq. ft.
293 sq. ft.
1,827 sq. ft.
2. Zonino Shtistics.
Given that the applicant is.working within the conlines of the 'lgg3 approved building envelope,the staff feels that the addition ot ivo accom-mooation unitslo L"-.i,iiiti"r etement 0f theproposal' we also recognize that approxim"tety r,see square feet of adctjtional floor area isproposed to be added
-as
a part of thii amendm6nt appticition. we teei inat the project architecthas been very crearive in th'e overati aeiid iillay"ri oiin" i"t"iiiilprr"r, and has nowmaximized rhe tuil froor area potenriar with-in rhe rs'gs eira6iLh"o t"iroLil unverope.
Q - ls the PEc comfortable with the applicant's proposal to add two additionataccommodationunits to the project?
Q - ls the PEC comfortable with the additional square footiage, as specified in Exhibit A?
3. ArchitecturalDetailing.
Due to the nature of tne ppo review process, ttre PEC has the purview to review and critiquemuch of the architectural detailing torme project. rne^stitr wilrbe pr"r"nting colored renderingsof the eriterior erevations of the siructur";'oort-in" tsgs approved &;;i"g; as we1 as thecurrent sDD amendment proposal. with the exception ot'tiie uppei-storyiorr"r, as previouslydiscussed, there have been a variety ot minorchanges to the ai.initectuiaioetailing. Thesechanges include fenesgation changes, *rtoi"i.tr"nges and color changes to the project.
Q - ls the PEc comfortable with the proposed architecturalchanges? would the pEC suggest orrecommend modifications to the proposal? would the PEc prefer to defer these issues to theDesign Review Board?
FlorreryonsFec\n€mG\racrDed.724
-
,v2
'F
-{i9--
.- ':HE !AB .HE[e, eS-so
tE
-it9co
6)o\Et> iEE EE.t-flc, .Etrl .n t st Ho.l ,n6
ri(\,l
cilrllll zoI
.Eta9tra ra l- A I
E?E E ?ltlt+ * a
o
GT
!)
EGiaA tt-.i5Eab.s bi3c'E'Ea '*N
' {}tltrr-{ f-\o a s+|o; q fl+J-A A A ".; F-] dH'Y_iYr\rl
ofl
FHH ? $ €
rlrrfififiddfit.dtrq : * .i .:. .i. ..' -q E{ ciEl Ff f ?rIA d27JIF-cEOar:r.r^iffibiil E€Fq$Htr{jold,+++*r+'l +
'n d dEEEds
arqa
frtr'i
Eg N EEd -. $
AIt-r ,! .
\r, c
,, EEXn).=EgE6G)r:o&z
?-,
ErE frr\,O
ED
rl]
ts
H
H
X
"$l I l L I 'i E tr H d
H3 # g ri ,r i E I .d #
EA H B" A R E" A f, N s
?dl N \o E R ,.i .*i .{ p
Ir{ tr.8 88(>?"r\
F-dg.t i;$ -l.-a ,-3\'/ (\
.ra
Tt
AErt E :.:
9.8 E;,)o5OL)(J
EXHIBIT ts
Highlighb of the't993 SDD approvat:
Decrease he amount of GRFA allocated towards d,velling units and increase the amount ofGRFA for accommodation units.
Decrease the number ol drelling units and increase the number ot accommodation units.
Encroach further into the front setback with entry and second-sbry accommodation un1 aswell as an addition to the restaurant to the east of the entry.
Increase common area while decreasing the area allocated brvards accessory uses andathletic club use.
Add dormers to the building on the north and south side which do not exceed the existingridge height of the building. lnsert decks into the roof structure on the south elevation.
Increase the amount of site coverage as a result of the na^, entry and restaurant addition(554 square feet).
Add terrace and expand dining deck on south elsvation.
Removal of deck on the south elevation which currenily encroaches onb public land.
The applicant is proposing to meet the incremental increase in parking requirements. Thereis an existing deficit of 58.44 spaces on the site. The new parking is t6catld in the followingmanner;
.2 spaces built underground belovu the entry.2 spaces added by relocating an existing ski sbrage area.2 spaces added by relocating the laund{r room.1 space added along the south side of the parking structure02 spaces in central area of parkino structure
I total
change exterior materials of building. This includes stucco, wood trim, deck railings anct awood shake roof.
Add streetscape improvemenF. These include: a 6 foot heated concrete paver walk alongWest Meadol Drive, an 8 toot heated concrete paver walk along Vail Vallby Drive extendingover the Gore creek bridge and street lamps. The pavers on th; brHge witt not be heated.
Relocation of existing trash area and removar of the exisfing trash facirity which isencroaching onto adjacent properties.
]jt". ryn1i9a,.t proposes to provide one twobedroom emptoyee housing unit within the Townor vall whlch will be restricted according b the To^rn of Vait employee housing reguirements.
Additional landscaping on the north a4d south sides of tfre building.
1.
2.
3.
4.
7.
L
9.
6.
10.
11.
12.
13.
14.
o VAIL ATHLETIC CIUP EXHIBITC-4PAGES
Septcmber 11, 1993
Iune 2?,1995 revisiaas ln 't&arlcs"
The Vall Athletic Club {VAC) agrees as pflrt of the implemmtation of our SDD
proposal to make t}te following irnprovements:
tandrcap$-------East Meadow Drtve / Va$-l/allev Drive
The VAC will ertend the curb and sideraralk 6'{n along East Meadow Drive and 8'-
O" along Vatl Valley Drive to cr€ate a continuous, heated, rectangular conclete --
paver s-idewalk extendtng from west end of the VAC servlce/parkfng {{ve on East
Meadoru Drive to the Core Cneef Bfidge onVail Valley Drive. Thts will be
coordinatd with the town engineer.
We will revlse the curb line at inter$ectlon of East Meadov* Drive and Vail VaUey
Drive in acCOrrlance with the "g|1t4r featufe" concepts put forward in the Vail
Village Master Plau and as shown on the slte plan. At the "entry feature" and
partialty along Vail Valley Drtve, we will eliminate the existrng re€.ining wall to
bring the landscape down to the level of the sldewalk.
We will reface th€ eldstlng landsrape retatning walls along the garage and Vail
Valley Drive with stone.
We wlll lncorporate stgnage to lnform vehicles that Fast Meadow Drive ls a
"pedestrian arra." open only to vehicles on "offlclal business" wtth the VAC and the
Mountaln House.
We wlll work wlth the Deslgn Revlew Board and AIPP ta $upplerilent the eristing
streetlamps along the VAC side of Vatl Valley and hst Meadow Drives.
We will create a new car pull-off guest dropoff area directly in front of the new
hoteVhealth club entry. This area will be paved wrth granite pavers and heated.
We wlll need consent from the town's authorlties that short-term parklng ln the
opposlte dinection will he permitted here,
The creation of the new hotel,/healtlr club entry and car pull-off along h.st Meadow
Dri're should result minimal disruption to tlre edsting vegetation in the landscaped
area above the existing garage. All necessary steps will be taken thrcugbout the
course of construction to protect the exlsttng vegetatlon.
New drainage grates wlll be introduced to handle melting runoff at East Meadorry
Drlve. This will be coordinated with the tolrrn engineer.
We will replace the ecisting wood transformer grate with a new steel grate.
we wiil work wlth the town to formallze an informal malnrenanee agreementrEgarding rhe rown's properry berween the vAC ana the peaotii* iltt-u[ng GoroCreelc
we will prune the ctead brush in the area behueen the vAC and Gore creek.
we will remove the o<isting yood sundec$ rhat is partiaily on rown properry, aswell as the elristing,Y-"d uii3tv snec uy tle hot t.ins *oirre existing wood trashshed at the senrlce,/garage drive.
we will create a landrcaped path from the encl of the existing service drive/firelane through to the torvn pnoperty on trr* ro"tttiia*lr fr" vec.
we will construct a new stone terrace ut,t1" odsting upper health club./swlrrurtngpml level along the south side of theluildlng * ,rr6*fr1" ilre srte plan.
Buildlne Exterlor
we wlll restucco the entife outside of the puil$ins. The stucco cotor will be ltght,natural color. There will be a stone base Uv ifr* f,e*;;,ri;
We will be installing a new wood shtngle roof throughout.
we will be inroducing new wood trfun and roof overhangs as shown on theelevations.
we will be revisingj_!:.s$riF porches, barconies and decks with new,rood trlrnto create rhe more tradrrtonal il*'olrro*"ilil;**il6rr.
we wilt be ertending the existing dining deck along the south stde of the restauranrto connect with the new trotet to"unge.
##u be construcdng a new on-grade hoteuhearth club entry on Easr Meadow
we wrlt be extendturg. the norrh wall of the restaurant 6,-o" to t!9 north and fillingtn an extstrng 2f 'x i "inc"totioiiu?ig tlr*,o,rih-iia* Jrti* dtnrng ref;race.
We will be installtng new wood windows and doors throughout.
ffirH'IH--SrTg #Ir,ft'il:hffhe rourth noor rever arong both the north and
we wllt be adding nerv rhimneys thfoughout for ttre new gas ilrepraces.
H
The lmprorremenh; to the healrlr club wlll not be extensive, they wtll focus orr
lncreasing the spa and cardlovascufar capacfry !f thg5lub:19 adding new doors
ana *indonrs alirng rtr* io"irr walt of thouppir lnef tn o-ry:l-t lntroduce more
niturar [ght tnto fue club. Most a-reas of the club stay as they arc'
We will be adding a new floor at the upper health Club level above the existing
racquetball court-
We wtlt be creating a new staff locker/Iounge area at the upper health club level'
Interlor lqp,rpvements - Garase
Our SDD proposal will create the need for an addltronal 4 cars to be pafked on site-
Nl af tlnse addttunal ptHngqpeces lirtil be rccrlmodanrd on site
Interlor Imorovemerrts - Hotel
We wtll be creettng a new double-hlgh hotel lobby which rvlll connect to the new
hotel,/health club entry. Therewil6e anew open stair to a balcony above the
lobby at the second floor.
We will be renorrating and revlsing the edsdng conference room or the first floor
and adding a new boardiuom at the second flmr.
Wew|llberelocatingtwoemplo}'eeunltsfrornthefourthfloortotheffrstfloor.
The other two empl6yee uniti wiU be retocated to the thtrd floor. These units will
be rnaintatnecl on-slte, a.$ per a previous agreelnent, for the life of the structure.
We will be etiminasng 6 existing DU'S and addlng 26 netar AU's to create a new
room mixof 3 DU'sand 54 AU's.
The average size of our new hotel room (AU) will be increase by 32 square feet to
456 square feet frorn 424 square feet.
All of the odsting hotel rooms wlll be totatly renovated. AII of the bathrooms will
be rmovated and made larger.
oo
' We will be addlng 73,720 sf of new AU's (ex'g - 10,927 sf vs. propb sed. 24,647 sf)-
We wlll be adcling sf of new employee houslng (ex'g l3lZ sf vs. prop. 1383 sfj.
We will be eliminating 1771 sf of DU,s (ex'g - 8122 sf vs. proposed 63j-l s0.
we will be eliminatlng 53r o sf of common,/mechanical space lex'E zz,0TZ sf vs.
proposed 76,767 d)_
We will be elimlnattng IOSI sf of conference/meetlng space (ex'g 2842 sf vs. prop,I75I sf).
The total GRFA increase will be g39Z square feeL
Other Imuroveuents
Most ofthe_erdsting rnehanical systeurcwlll renwated and rclocated to aa atdcanove tke tourth floor or to a new mechanical room at the lornrer health club level
we will be irrstalltng a rrew, 6-story, hjrdrautic, passenger elevatorwithin theedsdng shaft to serve the hotel and treatttr ctuU.
we will be installtng a nery z-story, hydraulic,passenger elevatot benreen ffterasrauranf and tfte upper level of the ltealtlr rtub to fictttate deliyerr'es and nasfiremoyaL
we will be instauing a-tr1qh conrpactor and roll away trash containers to handle thehotel./health club trash. The resiaurant grease and trash wllt be handled in a. similar way- Trash storage will be at thdwest end of garag;.
we will be addrng a sprlnkler systern to the hotel portion of the buildtng"
The entire building wtll be brought np to rtre current handicap rquirements.
Schedule
we hope to start *Hglc-tb} tn the sprlng of 1gg6 and open the renoyated vAc tnby the sart of the 19g6-7 sfci season.*-
tbr
:{
tt
oa
q,
v,
I di!
Hr fii:: rirr" iil
;iiii
\
I
.t
I
t
I
J
r!rt
t
I
\
tlt;il
'1
i
\
L
l,\trltll;lcll
=i{
I
;.1
/'I'
3i
:l.II
I
!ii
I
I
a
Iirlr;
i:
;:i
;
I
!
I
I
I
I
t
I
l"
t
''lt
':
.i
l!
I iri.::J i:!';il!:t tjlo..lia A
{
T
{
ii
ii
dit
Hr rii
=i
iii<i t:r
3i iii
b
€t
:.!
It.:f
!l:.
t!
:lt'I
it
3t
iii,i:
TI
it
-l i.:J'iDl i
rl
3tl;t 3
{ed HI E
iii
r3
!
{I
I
bvr!E.OL
r!slrr, I
o
att t
drtsl -t
5i iiEi ri
3_! i:
I
.lil::t
:g
|.i
3 Srv, r5
ss:dr tl
si ri;ii tiiri t:l
I
L-
a--/au,t=
i;-
tF=
lr-JtiTl i-
l#F
ITF
t-Jl'l
i_ilEtrtiltr
l-i Ili I
;!
7u..rrlt/'r
-z5!dlist -lEr i{+, it-t _.!?: 5c;t r:-, !!j! ii
o
I
.4
Y
I
'i1
rl
tl
<l
'*l
<l
!l
'l
sl
;l
t
I(
*!
I r.i i5f
i!5 !:dr tl
Ei rii
;iiii
:cl
ql
o. l2l
S!dr!ul t
E; il!i ii
=i
i:Itt"sIi
I
IIl
I
tl
It
tlT
C
i
t
g.
.__{r
l',;-,tl:JJltl
.. xl '\\l\r--.\
5,i'
llr:
.g r-l! llj
3!idr !iul i'E; !r:+i l!:!i ril
r-! i:i
?.2
IalJItl!trlil\l
I
I
--J
ii
II
I
I
I
I.le
I
ir
i!tt
t"
I
ac
I
I
I
I
\
|il
iit
ri
I
tit.
i!
{
I
!io3 :cv, tt
s9:dl ri
si ri;!i iii
3i lir
;t If.!: tr
i?i i3iii !-E
:i rF
ig€
r! +c;3lq*F
bioLtri
=.s li
ss!dr r.!
ii rl;
:iiii
ai.
(i:
,
I
I
II
F
THIS ]TEM MAY EFFECTYOUR PROPERTY
PUBLIC NOTICE
NOTICE 1S HEREBY GIVEN that the Planning and Environmental Commission of the Town of
Vail will hold a prblic hearing in accordance with Section 18.66.060 of the Municipal Code of the
Town of Vailon September 25, 1995, at 2:00 P.M. in the Town of VailMunicipal Building. In
consideration of:
1. A request for a Maior SDD Amendment, to SDD No. 7, to allow for the conversion of 17
dwelling units to accommodation units at the Marriott located at 715 West Lionshead
Circle/Marriott Mountain ResorVLots 4,7,C & D, Block 1, Vail Lionshead 3rd Filing.
Applicant Mary French for Marriott Mountain ResortPlanner: George Ruther
2. A request lor a wall height variance to allow for the construction of an elevated parking
deck at the Kreiselmeier Residence located at 2686 Davos Trail/Lot 5, Block C, Vail
Ridge Stbdivision.Applicant Michael Smith for Chrishine KreiselmeierPlanner: George Ruther
A request for a Major SDD Amendment, to SDD No. 30, located at the Vail Athletic Club/
352 East Meadow Drive and more specifically described as follows:
A trarcel ol land in Tract g, Vail Village First Filing, Town ol Vail, Eagle County, Colorado, commencing al lhe
Nqthesst c.mer ot said Tract B; thence N 79'46'00" W along lhe Northerly line of Vail Village, Firsl Filing, and
atong the Northedy line ol said Tract B 622.86 leel; thence S 06"26'52' W a distance of 348.83 feel to lhe
Soulhwest corner ol thal parcel of land described in Book 191 at Page 139 as recorded Januery 1 0, 1 966 and filed
in Reception No. 102978 in the Eagle Counly Records, sejd comer also being the True Poinl of Beginning; thence S
79P04'08" E and aiong lhe Sodherly line of said pareel 200.00 feel lo the Southeasl comer thereol; lhence N
6252m' E and along lhe Norlherty line of thal parcel of land described in Book 222 at Page 513 as recorded in
19!.'1 in the Eagle Counly Records, a distance ot 66.78 feel to the Norlheaslerly corner of said parcel of land; said
ener being on the Wesledy righlot-way line of Gore Creek Road, as phned in Vail Village. Fitttt Filing; thence N
2f13'37' W a dislance of 77.37 feel along sajd Weslerly rightol-way line of Gore Creek Road; thence N 89"29'22'
W e distance ol 1 2.80 feel lo the Northeasler4y comer of thal parcel of land described in Book 191 , Page 139 as
recoded January 1 0, t 966 and filed in Reception No. 102978 in the Eagle Counly Recods; thence Norhweslerly
26-51 feel along the arc ot a 37.50 feet redius curve lo the left having a central agle ol 40'30'00" whose chord
bears N 53'40'00" W a distance of 25.96 leel lo e point ot tangency; lhenc€ N 73'55'00' W and along said langent
166.44 feetllhence N 85"10'21'W a distance ot 50.40 feel lo lhe Northwestedy comer oflhe Moudain Hzus
Parcel; lhence S 02"18'00' W and along the easlerly lhe ol said Mounlain Haus Parcel a dblance of 100.00 feel lo
lhe Southeaslerly corner lhereof: lhence S 45'13'53' E a dislance of 38.70 leet lo th6 True Poinl of Beginning,
corilaining 30,t186 square feel, more or less.
Applicant:
Planner:
JWT 1987 Vail Limited Partnership, (d/b/a VailAthletic Club), represented
by Stan Cope and Michael Barclay
Mike Mollica
4.
5.
A request for an additional 250 square feet of Gross Residential Floor Area for an
expnsion to the Scott Residence located at 1150 Vail View Drive/Lot 5, Block C.
Applicant RussellScottPlanner: Lauren Waterton
A request lor a wall height variance to allow for the reconstruction of a driveway al the
Redpath Residence located aI2692 Cortina Lane/Lot 10, Block B, Vail Ridge.
Ap$icant Bob RedpathPlanner: George Ruther
F:\everyon€\p€6trsotice\099595
FIL E COPY
TH]S ITEM MAY EFFECTYOUR PROPEHTY
PUBLIC NOTICE
NOTICE lS HEREBY GIVEN trtat the Planning'and Environmental Commission of the Town of
Vail will hold a public hearing in accordance wifi Section 18.66.060 of the Municipal Code of the
Town of Vail on August 28, 1995, at 2:00 P.M. in the Town of Vail Municipal Building. In
consideration of:
1. Faessler Healty Company - Conditional Use Permit.
501 North Frontage Road WesVPart ot Lot 8, Block 2, Vail Potato Patch.
Applicant Larry Storms of SASI, representing Faessler Realty Company
Planner:Randy Stouder
2. A request for a major sDD amendment, located at the vail Athletic club/ 352 East
Meadow Drive and more specifically described as follows:
A parcel ol land in. Tract B, VailVlllage Firsl Filing, Town of Vail, Eagle County, Colorado, commencing al the. Norlheasl comer of said Tracl B; thence N ?9'a6O0' W along the Norlherly line ol Vail Village, Firsl Filing, and .
along the Norlherly line of said Tract B 622.86 feet; lhence S 06'2652' W a dislance of 348.83 feel to the
Southwesl comer ot thal parcel of land descdbed in Book 191 ai Page 139 as recorded January 10, t 966 and filed
in Feceplion No. 102978 in rhe Eagle County Records, said comer also being the True Poinl ol Beginning; lhencs
S 79'0408' E and along the Southedy tine cf said parcel 2C0.00 leet to the Soulheast comerthereof; thence N
62"52'00' E and along the Northerly line ot rhal parcel of land dessibed in Book 222 at Page 513 as recorded in
1971 in the Eagle Coumy Flecords, a distance ol 66.79 leei to ihe Northeasterly comer of said parcel of land; said
comer being on the Weslerly right-of-way line ol Gore Creek Road, as platted in Vail Village, Filth Filing;thence N
27'1337'W a dislance ol'17,37 leet along said Weslerly right-of-way line of Gore Creek Road; thenca N
89'2922' W a distance ot 12.80 teet to lhe Northeasledy oomer ot thal parcel of land descdbed in Book 191,
Page 139 ss recorded Januari 0, 1966 and filed in Receplion No. 102978 in lhe Eagle County Reoords; lhenco
Norlhweslerly 26.51 {eel along the arc of a 37.50 teel radius cuwe lo lhe lett having a cenlra, angle of 40'30'00"
whose chord be6rs N 53'40'00" W a dislance ol 25.96 feet lo a poinl of tangency; lhence N 73'55'00' W and
along said langenl 166.44 leetilhance N 85'10'21" W a dislance of 50.40 teel lo the Northweslerly comer of lhe
Mounlain Haus Parcel: lhence S 02'18'00" W and along lhe easlerly line ol said Mounlain Haus Parcel a dislanco
of 100,00leel to lhe Southeasterly comer lhsreof; thence S 45"1353" E a disrance of 38.70 feel lo lhe True Poinl
of Beginning, conlaining 30.486 square teet, more or less.
Applicant: JWT 1987 Vail Limited Partnership, (d/r/a VailAthletic Club), represented
by Stan Cope and Michael BarclayPlanner: Mike Mollica
3. A request for a minor SDD Amendment to Special Development District #21 lo allow for
an interior remodel to Gateway Condominium Unit #5, 12 Vail Roadilot N, Block 5D, Vail
Village 1st Filing.
Applicant: KarlKehrmanPlanner: George Ruther
FlBverlone\pec\notices\o8 I 495
q\ $'
a
1.
THIS ITEM MAY EFFECTYOUR PROPEBTY
PUBLIC NOTICE
NOTICE lS HEREBY GIVEN that the Planning and Environmental Commission of the Town of
Vail will hold a pLblic hearing in accordance with Section 18.66.060 of the Municipal Code of the
Town of Vail on August 14, 199s, at z:00 p.M. in the Town of Vait Municipat Building. In
consideration of:
A request for a Conditional Use Permit to allow for an addition to the Town ol Vail Public
works Administration Building and a renovation to the Transportation and Fleet
Maintenance Buildings located at 1309 VailValley Driveion an unplatted tract, located
north of Vail Village, Eighth Filing.
Applicant Town of VailPlanner: Andy Knutdsen
A request for a site coverage variance to allow for additions to the existing residence
located at 1868 West Gore Creek Drive/Lot 47, Vail Village West Filing #1.
Applicant: John and BobbiAnn HoutsmaPlanner: George Ruther
A request for a setback variance to allow for an addition ot the existing residence located
at 5119 Black Bear Lane/Lot 8, Block 2, Gore Creek Subdivision.
Applicant Ron and Chris YarosPlanner: George Ruther
A request for a major sDD amendment, located at the vail Athletic club/ 3s2 East
Meadow Drive and more specifically described as follows:
A paroel ol land in Tracl Q Vail Viltage Firsl Filing, Town of Vail, Eagle Counly, Colorado, commendng at the
Nodheasl cotner of said Tracl B; lhence N 79'46'00" W along rhe Norrherty li;e of Vail Village, First Filing, and' slong the Notlherly line of said Tracl B 622.86 teer; lhence S 06'26'02' W a distance of 348.83 feel lo lhe
Soulhwesl comer ot lhal parc€l ot land described in Book 191 al Page 139 as recorded January 10, 1966 snd filed
in Beception No. 102978 in lhe Eagle County Records, said comer also being the True Point oi Beginning; thence
S 79'04O8' E and along lhe Soulherly line of said parcel 200.00 teet 10 lhe Sbutheast comerlhereof: thence N
6?"52 0O' E and along the Norlhedy line ot thar parcelof land described in %oR 222 at Page 5t3 as recorded in
197'l in lhe Eagle County Becords, a distance of 66.78 teet to the Nonheasterly comer of iaid parcel of land; said
comer being on lh€ Weslerly righrof-wey line ot Gore Cre€k Road, as platted in Vail Village, Fitth Filing; thence N
27"1337'Wa dislance of 2.37 leet along said Weslerly righl-ot-way lino of Gore Creek Road;lhenc€ N
89"29'22' W a dislance of 1 2.80 feel to lhe Nonheasterly corner of that parcel of land described in Book 191 ,
Pag€ 1 39 as recorded Jan uary 1 0. 1 965 and filed in Reception No. r 02itZ8 in ttre Eagle County Records; thenoa
Nonhweslerly 26-5'l feel along the arc ol a 37.50 feet radius curve to the lett having Jcentrat angle of 40.30'OO"
whose chord bears N 53'40O0'W a dislance ot 25.96 feet to a point ol tangency; iirence N 23.5s'00' W and
along said tangenr 166.44 feel; lhence N 85'1021" W a distance of s0.40 tiel l; the Northwesterly comer of lhe
Mounlsin Haus Parcel; thence S 02"1800" W and along the easledy line ol seid Mounrain Haus Paroel a distance
of 100.00 leel to rh€ Soulh€asledy comer thereot lhence S cs'ts'sg" E a dislance of 38.20 teet to th€ True Point
of Beginning. containing 30,4g9 square feel, more or less.
Applicant: JWT 1987 Vail Limited Partnership, (d/b/a Vail Athtetic Club), represented
by Stan Cope and Michael BarclayPlanner: Mike Moilica
2.
3.
F1*sr),gn€\pscvtotic€sv'8 I 495
5. A request lor a conditional use permit to allow the Medical Center to park a mobile
catheter lab/trailer at the Meadow Drive loading area, located at
181 West Meadow Drive/Lots E & F, VailVillage 2nd Filing'
Applicant:VailValleyMedicalCenler,representedbyDanFeeneyPlapner: HandY Stoude(
. 6. A request for a major SDD amendment to allow for the expansion ol the Glen Lyon Office
Buitding, tocated ai tOOO S. Frontage Rd./Area D, Gascade Village SDD #4.
Applicant Gordon Pierce for Glen Lyon Partnership
Pianner: RandYStouder
F:\evsryono\pednolic6\08 | 495
Easr Yruen Honruowrunns A TION,Ixc.
Officers: Presider,t - Bob Galvin Secretary - Greha Parls Treasurer - Patick Gmmm
Drectors - Judfh Berkoqria - Dolph Brifuewater Ellie Caullins - Ron Langley - BiIl \{,-'rtcn - Cornie PJdder
'l'o: Plarning and Lnviroffriental Commission
From: Jirn Lamont Administrator
Date: July 24, lgg5
RE: \[ork Session Major SDD Amendmen! \'ail Athletic Club
A cursory rerierv of ttre proposed amendruent to the Vail Attrletic Club SDD indicates
that the modiiication to the tburth tloor architectural eleratioq due to increasing accommrrdation
units and square footage in the building, increases raflrer dran decreases dre apparent nrass and
bulk of dre building.
The peaked dormers on Se north facade in the 1993 proposal, aside tlom their ofter in-
herent problerns, oeated a stong since ofarchitectural style for *:e building. The proposed 1995
cxlcrior changcs diminishcs ralhcr than cnhancc d:c 1993 proposel. Thc push to cvcr incrcasc drc
size of the building, at dre axpense of quali[. architectural design for the building's facade, is ob-
jectionable ro lhe Homeouners Associatiot.
Given the rapacious degree ofspecial privileges already granted io this building, the As-
sociation doubts the sinceritl'of ttre building on'ner's commitnent to a qualitS' devehcpnrent.
Prst Oflice Box 2i8
Telephone: (S70) 827-56f, 0
! aii, Colorado S 1658
\,fessage/FAX: (9?0) 827-5855
Oi/24/1995 11:51:55 Al-t P.2
Officers: Presi<ient - Bob Galvin Se')retary - Grefis Pads Treasruer - Pahicl: Gramm
Directors-iudrthBerkovdtz-DolphBridgewater-Elhecaulkjns-Ronlangley-Bill\I,-.dcn-CorrieRidder
'l'o: Planning and L,nrironmental L:omnrission
From: Jim Lamont Administrator
Date: July 24,199i
RE: Work Session Major SDD Amendmen! \'ail Athletic Ctub
A cursory re\ien' of the proposed amendmeut to the Vail Athletic Club SDD indicates
lhat flle moditication to fte tburth floor a.rchitectural eleratioq due to increasing acccrmmodation
units and squme footage in dre building, increases rather thur decreases the apparent mass and
bulk of fre building.
The peaked dormers on the nordr facade in dr: 1993 proposal, aside fram their odrer in-
herenl problerns, created a stong since ofarchitectural style for d:e building. The proposed 1995
c:frcrior changcs diminishcs ralhu than cnhancc dre 1993 proposal. Thc push to oicr incrcasc thc
size of the building, at dre expense of qualiq'architectural design for the building's facade, is ob-
jectionable to the Homeo\.mers Association.
. . Gven the rapacious degree of special privileges already grantetl to this buildirrg, the As-
sociation doubts flre sinceritr of dre building c'lr,'ner'fconmitnent to a qualill'derelopment.
Pcst Office Box 238
Telephone: (970) 827-5680
Val. Colorado 81658
\4ersacelFAX: (970) 827-58-{6
ol / 2,1/ !9Y 5I
To:
EVHA FAX TRANSMISSION
2 pages including cover.
Planning and Environmental Commission
Susan Connelly
Mike lvfollica
Jim Lamont, Administrator
Ivfondav, July 24, 1995
Ify'ou do not receire all pages, please contact:
East Viilage Hotneowters Association
Post Office Box 238
Vail, Colorado 81658
Phone Number: 303-827-5680
Fax Number: 303 -827-5856
Subject: Amendment Vail Athletic Club SDD
Special Instruction: Please review and respond as appropriate.
Please present to the Planning and Environmental Commission at this
aftemoon work session.
From:
Date:
.^ , !J.yrr-.<.5-?f r?-;4q
J v
Mi+hael Barclay, Architect
235 Ea$t Eleventh gtreet
l'{sr York, NY 10003
phone - 212 598 O{92
fax - ?l? 674 6869
F. E?(q)V
June ?2, 1995
Surftnarv-of[le npd;fications to the aooroyed olar6 jol$e Vail AthlFlle ebb SDD
weVe added a addifi;mal AU's for a totEl of 54 AU$ Ttn AU GRFA stnl€ tlre si rE as *as
app'rored in 1993- This resdts from a mme efflcient iilt€.br hyout and our deci$ion not
to bose an AU in order to crcate a douHe-heigltt lounge on dE soufi $ide of tfte hdHing.
The spa ldurue ha$ been extend€d oter an exbting Srylight,
The nonh-facing dornrers harre been simplifiexi and pulled back. The south-facfrg cfornrers
on the ea$t section of ttre braldtg harre been simplified. The south-{acing "cutottts" above
the fourth ffoor of th+ senter section have been eliminated. the mmirg of the hrilding has
been decreased which has decre.esed tlre shadour inpact Of otr popmed i'ennration
Tte required addnional parking generated by tte proposed renovation has ben ruduced by 5
cers resulting in the need to acco.nodate anfy an additional 4 cats, all of which can be
houssd on+ite. This is the resutt of elimindting aH the retail urhtrin the trealth c'lub ancredrhB the siee of the restaurant aod conference epace.
h{P Earclay, Archltect
235 East l lth Strcet
l,lew York, NY lO0O3
ZOIIIilG AHALYSIS.
q,FFA: sllowed
AU's
D{J'*
EmFloyee
Cornrngn overage
Totat GRFA Z4,3BB sl
Accessory U$€:
R€sta $raftt
Chb Retail
Conrmon Area:
Halls/Mechanical
Conferense
Total Conrnon
alkrwed oven*ge (3S%)
Club Area
$argqe"
Tstsl Bu{$lioq-Are-a
PARKING Al,trLLyStS_
Halls,/Mecharucel
ch.s
Retril
Conference l
RBsteurBnt I
AU's
DUK
Erployee
Tstal Re+Itred {lncrease}
Exlstlng
1O,927 sf
SlZA $f
I3lZ sf
13,541 sf
33,50? sf
3606 sf
460 sf
19,235 $f
Z8+2 sr
27,O77 st
8536 sf
21,257 sf
4t3l sf
72,49? sf
ADpla\req
24,647 sf
6?52 sf
1383 sf
8456 rf
40,738 sf
3285 sf
141 +f
14,265 sf
2727 sf
1s,99?;f
8535 sf
20,881 sf
S5l2 sf
79,093 sf
space/2ag sf
rpseel'l 20 $f
ff
u
t.B4
I t.8
77.5
u l.8
16.5
4
78.4 spsces
o
.47
| 1.e9
zo.3
44.75
8.5
4
?-ld( ./t\
. "f )
VAIL,,ATHLEIE gtIJB
Fropmd
e4,642 sf
6351 sf
I 318 sf
99S2 sf
42,299 sf
3203 sf
O$f
16,767 rf
175'l Bf
1B-5lB *f
8s36 #
19,O16 $f
+556 sf
77,S50 sf
o
o
o
7.3
18.3 {2198 sf)
46"3
6.5
4
87-31 sFaceg (+ 8.87) SZ.4 spsc€s {+ 4}
I..lUFt-Eif-t7A Ft< I'F- BS ,.'7h
L'1-/
vAc
6RFA CN|+ulpli$,.r'lF,-- AU
Flrst Floor
Rm iio
10r
!ou
r03
r04
105
106
107
108
Area
438 5 Demi FP
49f $ Demi FP
419 5 Stan
419 S St3n
42r S Sten
421 5 Stan
497 S Oemi FP
45/ 5 Dsml FP
3669 's. 3238 app'd
Third Floor
62Q
8K
2 KIQ
w. 24,S47 approved
1 0 5 Demi-suites
4 lrl Demi-suites
301 5ft1 5 Demi FP
302 355 N Stfln FP
303 $00 5 Dtmi FF
304 355 N Stan FF
305 428 S Stan
306 355 N Stan FP
3$7 lock-off
3OB 355 hl Stan FP
31O 376 N Stan f
3tI Du
31e 398 !,1 Stan K
313 lock-off
314 436 N5tan FF 2A
315 428 S$tan K
316 s63 H 1 BR FP K/Q
317 4O8 5 Stan aO
3lB 373 NSta* FP ZQ
319 616 5.18R FP K/q
I7A 373 Nstan FP K
6S15 v=. 6863 app'd
,f0t 5u5 5 tBR FP IVQ
401 40O Nstan FP K
403 se5 s lBR FP K/Q
40+ 400 N Stan FP K
405 703 S IBft FP KIQ
4ffi 400 H $tan FP K
407 532 N lBR FP K/Q
408 569 N 1ER FP K/Q
409 662 518R FP K/Q
4lO 375 N$tan FP K
5091 vs. 544/ app'd
Rm No
?t'l
h.
za
K
Zq
K
.u
za
za
za
K
K
ZQ
2Q
5zQ
ZK
Second Floor Z0l SO0 S Dffni Fp
?O" 46$ HDetni FF
13 eQ eo3 s00 S Demi Fp
5 K ZM 454 NDefli Fp
Z KJQ ZOS 4eB ,S Stan
ZOG 4ZO f,t Demi Fp
eOZ 4ZB S St3n
208 {Se NDemi Fp209 448 S Stan
210 376 Hsran
211 {49 s st3n21? 398 N Stan
713 SOO S Demi Fp
714 436 lr{ Sran Fpet5 SO0 S Defii FF215 354 Nstan Fp217 485 S StanZlg Boardrm FpAtg 4AB $ SrafiZZA +OS S Stsn
271 61G S lBR FP
eQ
2a
2A
2A
2A
ea
2A
2A
K
K
K
K Fourth Floor
2A
2Q S K/Q
& 4K
K/0
.2Q
K
aa
K/Q
9O68 vs.9ZSZ app'd
Tdtal Accomodation Unit Area Z+,6+t
Total Rt-[hber of Accomodation 54
Average SzE #f Accornodation 4SS sf
AU Breakdo*n 14 5 St*ndards
17 N Stildtrds
6 S IBR's
3 N lBfl's
Bed <onfigrrations 25 tfls, I 9 K,s, t 0 K/e,s
o
Vail Athletic Club Adjacent Property Owners
Town of Vail
75 South Frontage Road
Vail, CO 81657
Mountain Haus Condo Assoc.
Sandy Gray
292 E. Meadow Drive
Vail, CO 81657
Robert & Mary Galvin
Rolling Oaks Farm Route 68
Walter Patrick Gramm
695 Prospect Street
Winetka,Il 60093
Anthony & Constance Ridder
1801 West 27th Street
Sunset Island
Miami Beach, FL 33140
Mr. David Smith
c/o Comice Building
108 South Frontage Road
Vail, CO 81657
B.A. & Barbara Bridgewater
8300 Maryland Avenue
St. Louis, MO 63105
George Washington Knox IV
291 Bridge Street
Vail, CO 81657
N.J. Nicholas
50 Central Park West
New York, NY 10023
Hotel
352 Ersr }lr,mv Dmvr
V,cn, CoroRAm 8165'l
Hom9?0/4?64700
SPA9Mi6.7960
Fu97014764451
8ffi1822.4754
+.lr'?f
sfra b't t"'X
$@rington,Il 60010
Marion M. Lloyd
25060 St. Mary's Road
Libertyville, IL 60048
Tyrolean Condo Assoc.
c/o Brandess/Cadmus Real Estate
281 Bridge Street
Vail, CO 81657
Vorlaufer Condo Assoc.
385 Gore Creek Drive
Vail. CO 81657
- --N r(t$,ww
THIS lTEl'll lvlAY EFFECT YOUR PROPERW
PUBLIC NOTICE
NOTICE lS HEREBY GIVEN that the Planning and Environmental Commission of the Town of
Vailwill hold a public hearing in accordance with Section 18.66.060 of the Municipal Code of the
Town of Vail on July 24,1995, at 2:00 P.M. in the Town of Vait Municipal Buitding. In
consideration of:
1. A request for a Conditional Use Permit to allow for lhe remodel ol lhe Golf Course
Mainlenance Facility,located atlzTSVailValley DriveiParcel E, VailVillage 7th Filing,
Applicant: VailRecreation District, represented by Ernie BenderPlanner: Russell Forrest
2. A request for a major SDD amendment, located at the Vail Athletic Club/352 East
Meadow Drive and more specifically described as follows:
A patcel of land in Tracl B, Vail Vlllage Fi6t Filing, Town of Vail, Eagle Gounly, Colorado, commencing at the
Nodheast comer of said Tract B; thence N 79'46'00'W along the Northedy line of Vail VillaEe, Fiat Filing, and
ajong the Nonherly line of said Tract B 622.86 leet: thence S 06'2652' W a distance ot 348.83 le€t lo the
Soulhwesl comet ot thal parcelof land descnbed in Book 191 at Pa-oe 139 as recorded Januery tO, 1966 and nbd
in Reception No. 102978 in the Eagle Cou y Flecords, said comer also being lhe True Point of Beginning; thence
S 79'04O8'E and along lhe Sodher{y line ol said parcel 200 0O feel 10 the Southeast comer lhereof; lhence N
62'52'00' E and eJong th€ Norlherly tine of lhat parcel ol land described in Book 222 al Page 513 as recorded in
1971 in lhe Eagle County Becords, a dislance of 66.78 leet lo lhe Nonheasterly corner of said parcel of tand; said
comer being ofl the \4reslerly righl-otway line of Gore Creek Road, as plafled in Vail Vitlage, Fitth Filing;thence N
27'13'37' W a dislance ol 77.37 feel along sald Weslerly righl-olway line of Gore Creek Road; thence N
89'29'22' V" a dislance of 12.80 leel 10 lhe Nonheaslerly comer ol that parcel ol land described in Bcok 191,
Page 139 as recorded January 10, t 966 and filed in Receplion No. 102978 in lhe Eagle County Rec€fds; thence
Nonhwestedy 26.51 teet along the arc ol a 37.50 leel radius curve lo the len having a cenlral angle ol40.30'00'
rvhose chord beals N 53'40 00' W a distanc€ of 25.96 leel to a point of tangency; rhence N 73.55'00' W and
along said tangenl 166.44 leet: lhence N 85'10'21' W a distance of 50.40 l;et t; lhe Norlhweslerly comer ol the
Mounlain Haus Parcel; lhence S 02"18O0'W and along lh€ easledy line of said Mountain Haus Parcel a dislance
of 100.00 feet lo the Soulh€eslerly corner lhereol; thence S 45'13'53' E a dislance ol 38.70 leel lo the True Poinl
of Beginning, containing 30,a86 square feet, more or less.
Applicant: ANT 1987 Limited partnership, represented by Stan CopePlanner: Mike Mollica
A request for a major SDD amendment to allow for the expansion of the Glen Lyon Of{ice
Building, located at 1000 S. Frontage Rd./Area D, Cascade Village SDD #4.
Applicant: Gordon Pierce for Glen Lyon partnership
Planner: Randy Slouder
A request lor a site coverage variance to allow for an expansion to an existing residence
located at 1 81 6 Sunburst Dr./Lot 1 , Vait Vailey Third Fiting.
Applicant: John StanleyPlanner: Randy Stouder
.t.
4.
FleverpnegecMorices\o724 95
o
5. A request for a parking variance and a conditional use permit to allow the Medical Center
lo pa;k a mobild catheler lab/trailer at the Meadow Drive loading area, localed at
181 West Meadow Drive/Lots E & F, VailVillage 2nd Filing.
Applicanr: VailValley Medical Center, represenled by Dan Feeney
Pfanner: Randy Stoudet
6. A request for a Conditional Use Permit to allow for an addition to the Town of Vail Public
Works Administration Building and a renovation to the Transportation and Fleet
Maintenance Buildings locate=d at 1309 Vail Valley Drive/on an unplatted tract, located
north of Vail Village, Eighth Filing.
Apillicant: Town of Vail
Planner: Andy Knutdsen
FilYerlone\pec\nolioes$T?495
f '-. '?"t^
I
JUN E3',95 ge:sgp]'l R0rJ5H/z1z-BB-558?fl..tOtE/593-1515
rsvfs€d tO/S/g? (l t1-'.\')
DtrTS APPI/ICB,TION
* ,,
r - rhis proeedure. rs requrred ror any prolecr. .rJi'J;lyldiVl, DEll DEPIthroush rhe sp6qt*I o'rveropmcnt' uiairrii pd;;;u;;.
fhe apFllcation nill not be accepted unEll all tnformationis suhrhitted.
lplease print or rypel
ApPLrcAr{r yAtL AlilLf ll&.4tJ&%
HArr.,rNG lolwss qqb %thJ flddw VfiuL , r{t'ir J,
AsPrrtrc$,rlst ratrx
DISTN,IG!
A.
ET APPI,]QPq1I S REPRESBNTTTTVE
ADoREss ?46 0, llr"' 1a1
PROFERTY O?VHEft{SJ
owlrBR($) src$rtroRr(sl
I'{AILING ADDRES$ T,6a
,{a^
tOn EPECI.*Ir DEIrlIroPHEST trl frr ,r c .,D3lnmn*nr pi.*ii_r_ __ _ .rurr z u ]gg5
# t6t
5+,
14a
f?h -t
n
3iffi"il"ffil31?'o*,
t,l*h(LOT-BLOCK--$UBDTVTSI
f ,.$TAI.IFED, EDDRES-5EDAr,L pRopERrr an-rxnnsfln*p::I g.r.-T! HAMSS oF ot{lMERs*,','$F"fff i"*i$gi-ili",,ig,;g_ffi;"iH3f"ff[,T..f Ri oF
. F. A TIITT T(I;PORT TO VGRIFY OICNER$HIP TND EASEI,IENTS.I:. F.our ({} copisubmitceu. . _es of the follorlng lnformatlon nust be
oerail€d wrirten/grrphlc descrlption of proposal,.
lil-':;;i!}':ffii;r*t1cr reporr sharl be subni.red ro
i:;i j"iii:";Tit:::'ilii.i"oi"3:lfit;;;Hifr tmf:i"^0,
l-trrr (Jpen space andth e.derna nd; -;d;;. fi;T;.if;:"l.fj ilJl5.r t c+ Frr t c mee r,pur{Ien on ava i labre or i*6p_""Ii
.;ilff:"F.;iil;i:":ffi;,,
trfltr,'i'#i''.T ,';$f, tff {-Iiidi :* ry;*
-.
; :
)
F{
.'
f-1rc
D.
.l"t Un l5-.,:
o/slez
P. O9
or.vi'rd. 10
DATE APPLICATION RECEI1IED
IPPITICEIIOI* FORIII PO8, SPECIAI, DEVEI.oPT&Nj!
DTSfRICT DIYEI4}PXEBI FIAIE
not be acc€pted until all information
I. This procedure is required for any project bhat rould gothrough the $p€cial Development nlslrict procedufe "
The app.] icat ion nillis submitted.
(Please pxi-nt or type)
PrArrrNG npDREss 141t 0 frtt6':
-. _ pnawa_AL_:l.joo_-
B-AP PLICANT' S REPRESENTATIVE
ADORESS IIONE
C. PROPERTY O!iI{ER(SI
ofltrEB (s) SICHAII0RE (St
UAILI}IG ADDRtsS$
HONE
I,OC&TIOH OF PROPO5AL:srREf,T ADDREss: qqL
LOT_BLoCft_$ uBD rlrt s r oN
E. STAMpED, ADDEE$$ED ENVELOPES OF ?HE Ne.irES OF OITNERS OrALL FROPT:RT{ AD.JACENT TO I.HE SUBJECT PRQFEFTY AND ALIST QF THEIR NAI{E$ .\ND ]4AILING ADDR],SSES.
- F. A IITTE REPORT TO VERTFY OWIIERSHIP A$T} SASEMEHTS.
rr. Fo.Dr. (4) capies of the following i(rformation must besubnitted:
A- Delailed wr itlen,/qraphi c descriprion of prcpcGali
a. A-r environrqentnl . iftpact report shalt be subrnitt€d tothe u qning adminiscrator ii, accordance &ith Chapteril;li"iil-* unress uaived uv-i""ii"" rels6.o:jii-Jr,**,nr
C, an open space and recreational plan sufficienL Lo meetlhe demands crn"io.. "J"*."::i::?!.d bv the deveropnent withodL uqduer LaDte or proposed public tacilitiesj
D. Existing conLorrrs having co tour inLerqa]s of not morethan f arTq 1-gp1c,"ns" pn,**.: ;l i::":":;"fli.;,:ffrl:..i:r:i::r:";; -
nqL $lo_re than t€n feet'ii-tle-a"JI"i" ufoo" of t_he -cii.Fls gleat.€r than Enenty percent,
E- l- prol:)osed "il:-tr:lr at a scale n()t smarrer tha,., onernch equals rirty. reit, "["* i"g-t irJ-"ppro]r:mar erocarions and dimension" "i iii iuira.ng* uncst ructure.s, u se-s
.
therei n, -lrI^_'r ilil"clpal si b.edevelopnenr f-il!\rT:"r *ui*, - i" iulallup.a *r*u",recrearionat facirities. p_;;"4;i;;";lazas andralkways, servtc€ entries-, dri;;;;;"; and off_sLreetparkrng and roading a.*.s'niih pr"ioi*o ccnrours aftergrading ancl sire oi"nr"p^"rfr.. .-!eHv.
P- 16
F. ?o.*rr*n.ry landscdp€ Ftan,. aE " ,t* nor. Ematrerthan one illch eguaL$ fifty feee, shoring exieLingland$cape .features tO be c€tained or removedf andsholring proposed landscapilg and landscaped sitedew4L6p6gn1 featuresr such a.s sutdoor recrea!.lonaLfacilit.ies, blcycle paths. trails, pede6trian plazasarid walkrays, fiarer feaLures and other elenencs;
c- Preliminary building elevations, sections, and floorplans, at a scale not .Fmat-ler than one-eighth equalsone foot, in su,fficient detail to deterruiie flodr area,grass residentlal fldor area, iflterior circulation, 'locarions of uses e,ithin buiidings. and t"he generaiscale and app€arallce of the prop6sed developient.
IIT. TIHE RBQUTR.EHENTS
NOTE:
ApplicaLlon Fees! are as fc,llor"s:
a. E$tdbli.sfutenl of SDF ;
b. tri*Jos leta(hsnt,g;
c. Minor A&endrnents r
Application fee pard: s
A. Trle Flanning' and Environnental Coffnission neeEs on theZnd end 4th Mojrdays of each f{ronttl, a:r ippfication ftithth6 flecessary accir,npany:.ng matrrial $rus t t]e subrnittedfour $eeks prior to the d;te of t.he meeiinq.
B- The developer must begin initial constr ction of the$peeiat development dist"i"t "iii J"--ifliJ" years tro&the Liiue cf its fiflal approval, i"J "o"ii"r* dillqenrly:::lf 9_ !h.. cgnprer i on. o'r' c rre pi-o Jecr .
"-'; f t;. -;;;;;;i -'
developneni" dist.rlcr is to be- d€;etoped i$ th_;;;;-il*developer must begln canaLruction oi' iubu*q.r*r,t. prru"a"wr.thin one year oi the conpletiort of ite'pr:eviouspnase.
ll__i f,Ig! ""**flded rhar nefore a Specraluevelopnent District aDFlication is subrditred, apre-application meetln; should he *"i ;p-;;i; "member of the Deparrfte;t of communiiv riE"*io'o*".,".
Dat€
91/s00.00
$1,S09.{0
$ 200.00
Check #
a_
i:":li"-i!i:';:';::-;:?"1:::-t ::p"-"re,review-by anrr
i:: i
; riil qri[r;Fn.6:g4jl":i jrl:i:il":i
"",
"1..
;: :-i ill'i:-l';"iij'lioi";llgif ;; - :i" ii;f, ;;, o*.""
=
[i[+iiii:i]*":'iii.l".;:=T:":i:j:"':F g;{,:F lf;l;5ii::"i*";"liion.iti.l', the. appricd;;' J'.ei.,esr, any
oe. re-pult'rsir";I"at.;]t-learinq. causJnq the matEer Lopubr ic !r i," -"i,Ii
r -ffi ,';, :l-r;':iJ""iii, Ili. luch re_
APpLications deemed bv
ff na:
;ff jil: ""[1ff ";ii"ii:::iii:ii i':' I:l;oT:t' ",
iiff :i;i;T;";: lru
r: "l:r$i, *. i:l utl; j ff F;"
1*i"
;ri. ls: : ::ilr, jr:*l$ffi
, ijfiu=r"j:i *: :"i:";
"""
snall pstimaLe Che d$ouni of
ZXIIIBI?.A.
co\m,t: r il-tl DtcLAFAIlor F'JF
i'AlL cl-"D :.rttlillii3i3
L!GAr i,!SC P .l i r tr)'i ,f 7
LA\a ..7r.h.-gD FI D;l LA FIR?
;.'lrn?nclni' a: tr." :;1rth"ti: c'r1er o! trlil tr'ct li t!r':13' N
t9'{5'00' h' r!..nq :'. rort\erly ilra of vai! Yilllg!, ?lrtt filrnq'
!r.d rl.!:- r-'-.F No!th.rl)* i |rc c{ r'rid trl':! E all.f6 !att, th'anc" S
:6't6'!.' i r dis:r... .l lla.3! f"at :') ?ht sout!}ra3t c'rnct ct
ttr: prr:., I tf jarl jesrri:':C ,-. F.r,:t tiI rt tata 139 'r r'coldad
.'a-,.r.riv i . 19166 en'! frlai !r. t e"ptlon flo. l02t?8 ln tha E'91!
.-rJ.r7 l^ :rr.1r, lat,! i.)ln?( rlr:, b?ln9 the Trua Polnt of lagtndtr'ti
tr.,,,-.' .3 -c'r|08' E rad ei,ong th? go'rth.?lt llnr ol r!l{_ Pf-r_c.!lf 0.O,' f",:i '.o th" soutlc.e' co(tet ther?oft thQnc! ta 6?'tl'f0' e
^n4 ri.rnc :h? Northr:iv trna o( tt!! garscl o! lrnd dalcflH in
t1',. ",. 2Ji Ar- 919" 3 i ! '!3 r.c?r'ta.-t rn- l9?l tn tha Eigl{ Couaty
trA\- .: !c. ,r Cirtinca n! 66,''!t !a!t to tba fortD{.tlr. lI cc3ntE ot
r.rd i,rrc-: of lan.lt rrtd corn.r bf i'tg On tha ftatlrty rlqht'ot-t.t
l:,rr "
(' .t ;r.!l F.t{. ta 91..-t..'t ifi Vrll Ytllaga, ?lllb tlllngt
rirr'\ '. ll .1 :'lltlt' r r dlrtric. of '!i.!1 taat llong arld-|..t?arly
!tgrt-1f-rlI !ln. r'f Gorr C(?.t lo.dt lit cl I lt',trll',l '.trire"cr .'f il.Co tr.r, to th.:lorthr.rtrrlt.otnar of th.t El-lcal -9!lx?r.r {.r.rih..l in !.'<.t lglr Prga l!9 rr ?l€ordfa Janurry 10, Itl6
rr,4 | I1.4 ln F.eapr i.n tlo. l02t?t tn tha Srtll countl l|c€r-ll' I
thf"c? Hrr'.ht"r:crly 16.t! tlet .long tha lre of a t-t.!o a€t ladlu'
.urvq tr ",. tff! -h.rrn! | c*'r:t.1 anglc of a0't9'00' rhora "ho.df.rrrs li 1t'lc'00't a rlrilrncr of i!-f6-(eat to r gotat o! ttogGlett
thrnc, !t ?J'55'00' r rfl6 rlo{rg rrrd tatrfirnt l0a.aa lrrtt lhrnaa ll
85'10'21'H r dir:!.,i! of 50.10 t.rr to dbe lortlr.artrslt ror*.r ot
thr iounlrli ll..Jr P.rcalr th!nc. ! 0l'ltr0or I aad rlon! tht
frrt.rly t lnc .I i.rd tortntrtn Hrur P.rctl, a dlt:ancr of 100.00 fat!
to th" 3.rurhrJ3:rrIy corn.r tha??o[r thr|lcc ! at'Llrt]' ? a dlrta[€ilo! 18.70 l.q'. !o -tlc tt.rc PoinB o! J*91oalnt i ' .cdrt|tnlni lorall
lqufr" f e?|-, [o!t ol l"tl. -,.: :.-;:Sub)e.t t, th! f ol lortng 3 I i,: ;,,,:",,";:.
l. Arrht of ptoprlator ot r r.ln ot lod. to .rtr.ct arld
rene.re hir or" th"r"tror chould thr rrlr br tdcnd to panltrata o;
inter3ecL th" Pr?ntsfr rr rcrrrv(d Ln Bnllrd ltalaa tltlnt trco?dll
July 12, llt9' rr iDot 2t rt t.9. lt5. :_
:. ii!!': ,f rrl lor .l rtchrr or crn|lt c\rltructrd bt tta
Authc..tty .)f th" !-rr.r "rd s!.t"3 tl rcrerrld ln gnttai ltattt Prtatl?
r.co!'l-d J.:i 1 12, 18q9, t^ Booh ll r' ?r9r 171'
rftffi
A o.rs": .,1 ilnd in Trrct B. i'rr! V. i!rgc, Frlrt ?llln9, Tov:r ol
','.ril, E.r9l" Ccun::', c'ri.'rt3o, ,rDrt Partlcrlrrly drrctlD'd 'ri .-.: : .rvt :
l. R.d!rl.'.tonr rt,tch d" not con'-:ln r forlaltiJrf tr
ravftt?t ('l )stn, i.rJt ,tnlttla9 r!tt? lfttonl' tt rnyr Dalad On th'r,
c)Ior, tGl 19lon, or .r!lonrl art{ln, la cort.lnd 1|r lrr'tr!r.1t
t.cordcd AurtJrt te, lt6l, l,n B.r) t I ia .t t|{a l?l;:-.^ -- .i:;
a. Utll t'.i atl-n.n..1 rr :trntrd :4 Holy Cr'1.s [:.ctri,cAsia'"'lrtl.'r. lic. r"cord"4 Ju!7 19, It-?, lr b.rok 25i rt P.9? 187
rn.l B.Et li' r. P.t. 5EB .n,t .,'rly t9, :l:tr lr Bock 2,'i .t tri" all
fnd rf i' .^ .?. ri. C,)r:4:nlalur t.g p?".-,r-? | by E ta'i " la', lc'l
l.^1in?.rr'': I Srrr'?7in.r, l^-,4.:r4 Apttl lq, '9c1.
5. f,5cr^ra^l-a'!: ',f b,Jila!r!g onr,' !ai:: lerl . a-r7e !si..).1 o- -.- l.nt-:.lr ria.y zrz-stred 4 Zag." tt.|.! r-. l!1e-.'i:'. 1 I
5;rv..'yl:r-r. 1,1(. d,!:.4 A;'!: lr. t98a.
tLl '.-.a A,jra.ta^: tn Co'.!.rac:i rr yl:i ari I o..t,,ach'n.n'. ta :. r"Ct: l+-t ta th. Er?'r? Cj,rn:; ,.Ir!( acrl pf :l?f t-r "
':!ic".,
4. Er:.ro-' rnd nilri ^{ 'da.i 1:: i;,.r" Cr"ft.: r'- .::e:tf.ubJ.".- lr(-pnr.'t rr jh,rr. ;-, -n? r..-r. J"d Pirt .tl ;t.l ,tl:rlr.
ll:i. 7r I ri:.
rfis;
A-e
. .:MP Barclgy, Architect' 235 East 1 l th Street
New York, NY 10003
June 3, 1995
George Ruther
Comrnunity Development
Town of Vail
Vail, C0
rer VAIL ATHLETIC CLUB
Dear George,
Enclosed are the revised plans for the proposed modification to the VAC's SDD approval.
we are back to 54 AU's with a boardroom at the second fbor above the new entry.
These plans show my area take-offs, which I have summarized and attached.
My parking calculations show us requiring an additional 4 spaces which l've shown within our garage.
l'll call Monday to go through all of this with you.
Sincerely yours,
[^.,t ,{lh,tl,-1
Michael Barclay
-* / - I ..,'I\ tt,,'l'-r,^ / ,.J -h^, -- ,{J//
.0/
D "- - ' ,-r, --a o-^-.-. -J, ?*r-.t l. ,/ --rn -ue-*.,-^ *t."-.-
./ /
. -ilL -L"., .,-" _-t__,,..r .,, _jl-<_^La-..r- o * . _ *y'/
.. ' , -'^''-.'. ',-/ / o--"- .-- :*^ ar-'//
/ 11'
,,, -zt-<-.aLt tt. t--<-c , t --, , , , ,->h"---.--r-.,"-, _-:? zfl z ,./8
MP Barclay, Architect
235 East I I th Street
New York, NY 10003
ZONING ANALYSIS
GRFA:
AU's
DU's
Employee
Cornmon overa ge
Total GRFA
Accessory Use:
Restaurant
Club Retail
Common Area:
Halls,/Mechanical
Conference
Total Common
allowed overage (35%)
Club Area
Garage
Total Building Area
PARKING AN,ALYSIS
Halls,/Mechanical
Club
Retail
Conference
Restaurant
Allowed
24,388 sf
1 space/240 sf
1 space/'l 20 sf
a
Existing
10,927 sf
8'l?2 st
1312 sf
13,541 sf
33,902 sf
3606 sf
460 sf
19,235 sf
284? sf
22,O77 sf
8536 sf
22,257 st
4131 sf
72,89? st
Approved
24,647 sf
6252 st
1383 sf
8456 sf
40,738 sf
3285 sf
141 sf
14,265 sf
2727 sf
16,992 sf
8536 sf
20,881 sf
5512 sf
79,093 sf
16,767 sf n
1751 sf V
18,518 sf 4
8536 sf
19,01 6 sf V
4596 sf I
77,65O sf {
V,AIL ATHLETIC CLUB
Prooosed 6/2/95
24,558 sf ,i\
6351 sf +
1318 sf f
9982 sf +
4?,299 st t
3203 sf 0
osf t
AU's
DU's
Employee
Total Reguired (lncrease)
0
1.84
1 1.8
22.5
21.8
16.5
4
78.4 spaces
00
00
.470u
11 .2s 7.3 v
20.3 18.3 Y(21e8 sf)
44.7s 46.3 +
6.s 6.5
44
B7.31 spaces (+ 8.87) 82.4 spaces (+ 4)
VAC
GRFA Calculations - AtJ
Fim Floor
Second Floor
Total Accomodation Unit Area
Total number of Accomodation Units
Average size of Aceomodation Unit
9481 vs. 9?92 app'd
?5,O78
55
456
Room Number
't 01
102
103
104
105
106
ioz
108
Total
zo1
zo?
e03
204
205
206
zo7
208
209
21A
211
?1?
?13
214
zt5
216
2't7
2r8
219
220
?21
Total
Area
s00
500
419
419
421
478
500
500
3687 vs.3238 app'd
Third Floor
Fourth Floor
floom Number
Tot al
Total
proved
Area
500
5JJ
500
3s5
428
3s5
lock-off
355
DU
376
DU
398
lock-off
436
478
JbJ
408
3/5
6r5
373
6819 vs.6B63 app'd
525
400
525
400
703
400
532
5bv
66?
375
301
302
303
304
30s
306
307
308
309
310
311
312
313
314
3i5
316
317
318
?10
320
401
442
403
404
405
406
407
408
409
410
500
469
500
454
428
470
428
452
448
376
448
398
500
436
500
354
4qq
413
428
408
516
5091 vs.5447 app'd
431 additional
sf
additioral
I
TOWN OFVAIL
75 South Frontage Road
YaiL Colorada 81657
970-479-213V479-2139
FAX 970-479-24s2
June 8. 1995
MP Barclay, Architect
235 East I lth St.
New York NY 10003
Department of Community Development
rILE COPY
RE: The Vail Athletic Club Major SDD Amendurcnt.
Dear Michael:
Thank you for taking the titne to rrreet with nre on Thursday. June I , 1995 to discuss the proposed
amendments to the existing Vail Athletic Club Spccial Developurcnt District. I hope our discussion was
helpful to both yourself and Stan.
As promiscd' I briefly discusscd the proposed changes to thc Vail Athletic Club Special Developnrent District
with other metnbers of the planning staff. Upon review of your proposcd plans. Staff has determined that you
will necd to proceed through the review process with a Major Speciai Development Disfict Anrendment
rcquest as per the Town of Vail Municipal Code.
Revicw of a Major Special Development District Anrcndurent requcst is heard by both thc plamring and
Environmental Commission (PEC) and the Town Council. Your requcst will first go to thc plalning and
Environnrental Commission. at which point the PEC will make a recommendation to the Town Council on
your request. At that point. the proposed changes to the Special Dcvcloprncnt Distict rvill be drafted into
otdinance fornr and presented to the Torr,rl Council. The Town Couucil will review the proposed ordiualce.
Approval ofthe ordinance by thc Town Council will require two readings at cvcning meetings.
For your refoence' I have enclosed a copy ofChapter 18.40 (Special Developrnent Districa) ofthe Town ofVail Municipal Code. Additionally, please find enclosed a schcdule of the Planning and Environrlental
Commission meeting dates for 1995. Pleasc pay special attention to the submittal dates.
Should you have any questions or concerns with regard to the infomration addressed in this letter, as always,qlTt: do not hesitate in giving rne a call. I can be reached ruost easily during rcgular office hours at (970)479-2t38.
Sincerelv.
-fJ-,^-rr*?*na
George Ruther
Town Planncr
f:\everyone\george\lercr\barcloy.608
{S r""r"uo r**
Miehael Barclay, Architect
235 Esst Eleventh Sveet
Nerv Yo*, NY 10003
ffrrur* - Ur? Sgg 0{9e. fal., - 2'12 674 6869
June I, 1995
Cornmunity Developnnm
Town of Vail
Vail, CO
Merno re: Modificetions to t}le approved phns for tlre Vail Athletb club renovation
From: MichaetBarclay
1' 3 addltional AU's (431 edditional sf AU GRFA) - this is the product of a rnore efficient interiorlayout, th€ massing of the buildirq tus actuallv decreased '
2. the north donners have been sirnprified, decreasing the srudorr impact
3. the south-facirE Sth fbor/loft "cutouts', have been etiminated
4, drc spa lourg€ has been extended owr an exi.st*ry skylffi
du*