HomeMy WebLinkAboutCASCADE VILLAGE VAIL CASCADE RESORT COMMON LEGAL (2)tul
Xa-l rt-c'.L-a- t.rr- F
DEPARTMENT OF COMMUNITY DEVELOPMENT
NOTE: THIS PERMIT MUST BE POSTED
*of Gas Appliancec:
FEE.sUD1''IARY
TOWN OF VAIL
75 S. FRO}ITAGE ROAD
vArL,, co 8L557
970-479-2L38
APPLICANT
CONTRACTOR
OhINER
Mechanical--->
Pl.an Check- - - >
Investi9aE.ion>
will ca]l---->
MECIANICAL PERMIT
MEYER BOILER CO
PO BOX L573, GLENWOOD SPRINGS CO
MEYER BOILER CO
PO BOX 1.573. GLENWOOD SPRTNGS CO L-O VAIL HOTDING INC
WESTIN HOTEL THE, VAIL CO 81657
ON .]OBSITE AT ALL TIMES
Pennit #: M9B-0075
,: ISSUED
.:U05/18/:-998
.: 05/aB/a998
.: ).1 /L4/L998
Phone: 9709458313
Phone: 9709458313
VaLuaEion:15, 000.00
*Cf l,qood/Pa11et:
Job Address...: l-300 WESTHAVEN DR Status..LoeaEion..... .; 1300 WESTHAVEN DR (STEPS LEADIApptied.Parcel No.... .: 2103-121-00-012 Issued..Proj ect Nurnber: Expires .
8a602
816 02
DescripLion:
SNOW MELT SYSTEM (EXTER]OR BO]LER)
Fireplace Info!_nalion: R€sEricLed:
300.00 ReEtuarant PIan Review- >
3. OO
.OO ToLal Calculated Fees
.00 AddiEional Feec -------->
:l78-0o Total Per-niC Fee - ---
l7a . oo
.oo
174.00
378. OO
BAI"ANCE DUE . OO
Item:0510 05/rB/L998 05/tB/L99B Item: 0560 05/LS/1-998
O BUILDING DEPART'IVIENT .fRM ACTiON: APPR APPROVED iIRM AcLion: APPR DRB APP O FIRE DEPARTMEI{I JRM AcLion: APPR N/A
BUILDING Dlwision:
FfRE Division;
Dept:
JRI\4-
PER CB Dept:
1
3.
4.
5.
6.
1
8.
9.
t_0.11.
CONDITION OF APPROVAL
FTEI.,D INSPECTIONS ARE REQUTRED TO CHECK FOR CODE COMPLTANCE.COMBUSTION AIR IS REOUIRED PER SEC. 607 OF THE ].991 UMC.INSTALLATION MUST CONFORM TO MANUFACTT'RES INSTRUCTIONS AND TO .A,PPENDIX C}IAPTER 21 OF THE ].99]. UMC.
GAS APPLIANCES STALL BE VENTED ACCORD]NG TO C}APTER 9 AND
STIAI.,L TERMTNATE AS SPECIFIED IN SEC.9O6 OF THE 199]. I.]MC.ACCESS TO HEATING EOUIPMENT MUST COMPLY WITH SEC.5O5 AND 703 0F THE r-991_ UMC;BOILERS SIALL BE MOIN{TED ON FLOORS OF NONCOMBUSTIBLE CONST.I]NLESS LISTED F'OR MOIN{TING ON COMBUSTIBi,B FI,OORING.PERMTT,PI,ANS AND CODE ANALYSIS MIUST BE POSTED IN MECHANICAL
ROOM PRIOR TO AN INSPECTION REQUEST.
DRAINAGE OF MEC}IANICAL ROOMS CONTAINING HEATING OR HOT-WATER SUPPTY BOTLERS SHALL BE EQUIPPED WITH A FLOOR DRAIN PER SEC.2L1_9 0F THE 1991 IJMC.BOILER TO SCREENED WITH PICKET FENCE SIDE WALK NEEDS TO BE ON DIFFERE}flT ZONE
WALK OUT I,ANDING PAD TO BE MIN/MAX OF 44 INCHES SfDE I^IAIJK HAS TO BE A MININIJM OF 51./2 FEET IN WIDTH
** *****t*****.** * *;*******
TOI,{N OF VAII, CGI.,ORADO ****************************************************************
stat,enulE. Number: REC-0408 Amount. :J /8.00 05/29/98 10:28
Ini.t: IIRM,PalmenE, Method: CK NotaLion: 4597
I
***********
Statenmt
o ****************************
This Payment
****************************************************************
Permit No: M9B-0075 T)4)e: B-MECH MECTTANICAL PERMIT Parcel No: 2l_03-L2L-OO-OLZ
Site Addressl L300 WESTITAVEN DR
LOCATJ-ON: ]-3OO WESTHAVEN DR (STEPS LEADING TO C.CLI]B)Total Fees:378-00 Totaf ALL Pmts:
Bal_ance:
378.00 . 378.00
.00
Account Code
MP 00100003111300
PF 00100003112300
wc 00100003112800
Description
MECIANICAL PERMIT FEES
PLAN CHECK FEES
WILL CALL INSPECTION FEE
Amount
300.00
75.00
3.00
=2 _, 1 o ? 1.^-?
.L?G...\,r/{b ZP d,\
e 5.+!.
\,\
TE I
N
\
N'
t', \ S,
t$, *
ft\
o
:5 (*J
1 t'
.\ r-.
\-s-\
-t-,
n*
;l
-1 r
" (JJ
l'
0
\
a :oncacE Eaglc CounEy Assessors Offlce
ifu?!' i ?w'31**?; xil :, :ii ; 3fi " FSii-,q DATE:
r'FPSITT /J
. APPLICATION MUST BE FTLLED OUT COMPLETELY OR I1' HAY NOT BE ACCEPTED I
* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * PERHIT TNFORMATIoN * * * * * * * * * * * * * * * * * * * * * * * * * * * * ,?-t l-BuiLding I j-P]-umbing [ ]-Elecrrica] [/-Mechani-caI [ ]-other
rob Name: C&scma teff Job Acldre "=, LO4? uerrt*-r-"t D"'
Legal Description: Lot-- Block__ Filing susorvrsroN:
lwners Name: WAddress,
-
ph.
\rchitect:Address:Pn.
leneral Description:
lork crass: [ ]-New [ ]-Alteration l,,fraaitionar [ ]-Repair [ ]-other
turnber of Dwelling Units , D Number of Accommodation Units:
'tumber and TVpe of Fireplaces: cas Appliances , -'
?* * * * * *** ** * *** * * * ** * * ** * *** * * * ** * VALUATIONS
Gas Logs_ Wood/Pe)-J-et
lur"oron., $
?LUMBING: $MECFIANICAL: f TOTAL: $t
( * * * * * * *'* * * tr * 'l * * 't ,r * *.* * *.* * * * * CONTRACTOR INFORMAI,f ON Ieneral contractor:tlrltf '4******* *****'t*** * * * * * **
EI'ECTRICAL: $
********** *** *** ** **** *** ** * **)t**
OTHER: $
Town of VaiI Reg. NO.
Phone Number:
Town of VaiI Reg. NO.
Phone Nunrber:
ilectrical Contractor :
rddreiss:
iddress:
rlunrbing
iddress:Town of Vail Reg.
Phone Nunber:
NO.
}UILDING PERMIT FEE:
,LUMBING PERMI'I FEE:
IECHANICAI, PERMIT FEE:
;LECTRfCAL FEE:
)THER TYPE OF FEE:
)RB FEE:
BUILDING:
SIGNATURE:
ZONING:
SIGNATURE !
Contractor:
techanical Contractor:
\ddress:Phone Number:
: rt * rt**rt rt rt:t**** * ** * * * * *** * ** *** * *FOR OFFICE USE * * * * * * * * * * * * * * * * * * * rk * t< ?t * ?t * 'l * * * J<
Town of vail Reg, No./7L'P/
BUILDING PLAN CHECK FEE:
PLLIMBING PI,AN CHECK FEE:
MECHANICAL PI,AN CHECK FEE:
RECREATION l'EE:
CLEAN-UP DEPOSIT:
TOTAL PERMIT F.EES:
loInnents:
VALUATION
,
CLEAN IIP DEPOSIT REFTIND TO:
75 south t.onlage road
vail, colorado g.l65?
(303) 479-21.38 or 479-2L39
TO:
FROM:
DATE:
SUBJECT:
olllce oI communl!y developmenl
ALL CONTRACTORS CURRENTLYL REGISTERED WITH THE TOI{I{ OF VAIL
ToWN oF VAIL PUBLIC WoRKs/cot"fI\,IiJNITy DEVELoPIIENT
MARCH L6, 19II
CONSTRUCTION PARKING & MATERTAL STORAGE
rn summary, ordinance No. 6 states that it is.unlawful for any person to rirter, rrack or deposit ;;;-=;irl-rlJ., sand, debris or material, including trash iu*p=t"r.. portable toilets and workrnen vehicles. |pon any street., sidewalk, al1ey or public prace or anv nortibn th;;";;:--ine right-of-wav bn alr Town of Vair streetl ina.I:".d= is .pproxi;^l;i;"s"r..'lru pavemenr.This ordinance w11| be.;iri;ii;"enforced by the Toi+n of Vai]Public works Deoartrnent. persln= found violating this ordinance wilL be given a z4 hour r.itiun--r,otice to remove'said rnateriar.In the event the person so notified.d?es not comply with the notice within the-24 hour.t:-m"-lp*-ified, the puLric works Department wirL rehove said mare;r;i-;;-ih:";";;;.e or person nohified' The provis:-""s-"r-'filr= ototnance shalr not be applicable to cbnstruction, nuir,t.nu.ce or repai.r projects of any street or alley or any utiiitie" in the right_a_way.
To review Ordinance No. 6 in fu'l, please stop by the Tov/n of vair BuiLding Department to obtain a copy. riranl you for you.cooperation on this matter.
'Jll '11
acknowledged
(i.e. contractor, owner)
75 3outh ,rontage road
vall, colorsdo 81657
(303) 479-2138 or 479-2139 o lllce ol communlty devolopmerrt
BUILDING PERTiIT ISSUANCE TII,tE FMI,IT
If thi.s permit requj,res a Tov,n of Vail [ire Department Approval ,Irgirirr ''s..(prrflii ltgrf s) leview unJ'ipp'ouui,-i'pi'r-.,iin!'b.pu"*.n,
I::]:y_9l.Heal th Depar!.inl. revi ew, and' a revi e* tu-ln."drir ai ne uepartment' the estfnated time for a total review-ilay'iu[e'as ting as three weeks,
All commercial (large or smail) and a, murti-family permits wili have to fottow the ibove ;;;ii;n;;-ri*irrr requirements. Residentiar and.small projects shou'rd take a resser amount of time. However, if residential or snra'r 'r er.projects impaii the various above mentioned departmcnts rvith reqard'to-necessary review, tr-'.i. pr.j..fi ,nuy also take the three week perioJ.
Every attempt wil'l be Tgle by this deparlnrent to expedite this pet'mi't aS s.eon as possib'le. -
I' the undersigned, understand the p1 an check procedure and time frame -
'Communi ty Development Departme;rt,
TO:
FROM:
DATE:
FE:
MEMORANDiJM
ALL CONTRACTORS
TOWN OF VAIL PUBLIC
MAY 9, 1994
WHEN A "PUBLIC WAY
WORKS
PERMIT'
DEPARTMENT
IS REOUIRED
1)
2)
Job Name:
Date:
Please answer the following questionnaire regarding the need for a
YES
ls this a new residence?
ls demolition work being performed
that requires the use ol the right
of way, easements or public property?
ls any'utilily work needed?
ls the driveway being repaved?
ls different access needed to site
other than exisling driveway?
ls any drainage work being done
affecting the right ol way, easements,
or public property?
Way Permit'
5rFy'':Sfuaz"u*-tc" /l^
'PublicWay Permit";
NO
(
f
K
. .t F
v'r',
-t F
v'r
s)
4)
s)
6)
7) ls a "Flevocable Right Ol
required?
B) A. ls the right ol way,
public property to be used
parking or fencing?
easements or
{or slaging,
K
A
B. lf no to 8A, is a parking, staging X ?
or {encing plan required by Community
Development?
lf you answered yes lo any of these questions, a 'Public Way Permit" must be obtained.
'Public Way Permit" applications may be obtained at the Public Work's office or at
Community Development. lf you have any questions please call Charlie Davis, the Town
of VailConstruction Inspector, at 479-2158.
I have read and answered allthe above questions.
Job Name Contractcir's nature
ENGINEER:
CONTRACTOR:
PREPARED BY:DATE:
MODEL H-13Ii}
136
TYPE H
HYDRONIC BOILERS
. RESIDENTIAL
. COMMERCIAL
MBH INPUT
HESIDENTIAL BOILER
Require aulomatic venl dampers, l l D'rgnitio n.
COMMEFCIAL BOILER
Used when heating nonresidential buildings.
EFFICIENT
Thermal efiicierEy 82%. Highest of any atmospheric boiler available today.
THERMAL SHOCK PROOF
2o-year warranty against thermal shock damage up to 150'F diflerential.
Maximum op€ftiling temperature: 230"F
LIGHT WEIGHT
A floor load to 70 lbs/sq. fl. or less.
HIGH RECOVERY
Culs fuel costs substantially because the standby and radiation losses
normal lo olher boilers are eliminated.
LOW WATER OPERATING TEMPEHATURE
Operates with walerlemperature low as 105"F without condensation.
STANDARD EQUIPMENT
HEAT EXCHANGER . ASME lnsp€ct€d and Stamped
r50 PSIG . National Eoard Approved . Cast lron Headers . Finned Copper Tubes . ASME Ste€l Tube Shest . Silicon O-Bings . 45 PSIG ASME Pressure
Relief Valve . Temp€rature and Pressure
Gauge
CONTROL . 115V, 60 Hz, 1 Ph Power Supply . I 15V€4V Translormer . 100% Pilot S h utotl/Lockout . Pilot: Eloctronic, Intermittent
lgnition (l.l.D.). High Limit Control . On&{f Switch . Opsrating Limit Control . Economaster ll Pump Time Delay . Flue Gas Spillage Sensor . Flame Roll-Out Sensor
GAS CONTROL TRAIN
' Manual Main Gas Shul-ofl Cock . Main Gas Pressure R€gulator . Safety Shut-otl Valve, B€dundant . Conlrol Valve
Firing Mode . AGA Design Certilied. ANSI 221.13
ReouirEments.
CONSTRUCNON
l-1 IndoorlS outdoor (Commercial only)
E Combustibl€ Ftoor Shiero.
(Standard On Outdoo0 . Vent Terminal . Fronl ControJs Enclosed . Stainless Sleel Burnsrs . Polytui Powder Coat Finish . Vsnt Damp€r
NOTE: (1 ) Residential space healing
applications, 300,000 BTU/Hr or less
require minimum 80% A.F.U.E. rating.
Vent damper lor indoor unit only.
OPTIONAL EQUIPMENT
CONTROLS
Outdoor ResEt Control
Flow Switch
REGULATORY AGENCY
E F.M., Factory Mutual Insurance
Bequir€ments
E
EI
E
Catalog No.:2000.201 11-15-94 Etfeclive: 1-01-96
TYPE H HYDRONIC HEAflNG ''..7
MODEL H-i3g E tNDooR
EOUTDOOR
136 MBTUH INPUT
t-
I
I
t__
7-
9-'
tNoooR
UP FRONT
CONTROLS
ELEC.
CONN.'tl2 GAS
3-1t4-,
NOTES:
Ratings shown are for elevations up to 2000 feel. Elevations
over2000 test ratings should be reduced al the rate ol 4o/olor
each 1000 feet above sea level.
BOILER RATE OF FLOW AND PRESSURE DBOP
i tan
4-7t8
COMBUSTIBLE
FLOOR SHIELD
OPTIONALON
INDOOR Frg. t4257.2
(818) 889-1s00 Fax (818) 889-4522
Lirho in u.s. A.
dtl,:nrrF
llodsl
NO
Input
METUH
Indoor Outdoor Shlpplng Wt.
Lbs (Approx.)
Output Oulput
MBTUH MBTUH
H-133 136 1 12.0 109.0 160
1OO AT 2O"AT 30'AT 40OAT
GPM AP FT.GPM AP FT.GPM AP FT.GPM AP FT.
22 14.7 1't 3.8 7 <1 <1
Raypak, Inc.,31 lll Agoura Road, Westlake Village, CA91361-4699
WPE H HYDRONIC HEANNG
t
BOILERS
4-
6
1tg-r
I
I
.t._
45
'T ll
| ?4-,1t4
t_l_
MODEL H-133 EINDOOR
Ef,OUTDOOR
136 MBTUH INPUT
Afrscttrt
INDOOR
UP FRONT
CONTROLS
ELEC.
CONN.
1/2 GAS
3-1t4"-'
NOTES:
Ratings shown are lor elevatbns up to 2000 feel. Elevations
orer 2000 feet ratings shouH be reduced at lhe rate ol 4"hIol
each 1000 feet above sea level.
Bo|LER RATE OF FLOW AND PRESSURE DROP
COMBUSTIBLE 2
FLOOR SHIELD
OPTIONALON
tN000R Ftg. &57.2
(sl8) 889-1500 Fax (818) 889-4s22
Litho in U.S. A.
Itodel
NO
Input
MBruH
lndoor Outdoof shrpPlng wt.
Lbs (Approx.)
Output output
MBTU}I MBTUH
H-l33 136 I 12.0 109.0 160
IOO AT 2O"AT 30"AT 40'AT
GPM AP FT.GPI'AP FT.GPM AP FT.GPM AP FT.
n 14.7 11 3.8 7 <'l 5 <1
Raypak, Inc., 3.|111 Agoura Road, W€stlakg Village, CA 91361-4699
_ros
J13
SUBMITTALS
'TCHASE ORDER
CHANGE ORDER
#oF
APPHOVED FOR CONTRACT IJ
Meyer Boiler Company
MECHANICAL CONTRACTORS
1 186 Airoort Center P.O. Box 1 573
Glenwood Springs, CO 81602 Telephone (970) 945-8313
JoB NAME Jhll-ttletilt-
MECHANICAL EQUIPMENT
I \: lppnovED To oRDER
APPROVED CHANGE ORDER
DATE
DATE
DATE
DATE APPROVED FOR PAYMENT
Meyer Boiler Company
MECHAN ICAL CONTRACTORS
1 186 AirDort Center Post Office Box 1573
Glenwood Springs, Coiorado 81602
Telephone 970-945-831 3
Fax 970-945-8065
ffiate ffieeeived
[,lAY 22 lggg
JR Mondragon
Town of Vail
Dept. of Community Development
75 South Frontage Road
Vail. CO 81657
May 22.1998
DearMr. Mondragon,
The Cascade Athletic Building's gas piping system lvill have no ill effect
by adding a small 133,000 BTU boiler to heat the south steps, approximately
100 square feet.
Respectfully.
Clement F. Meyer"
President
CFM/clb
la
TOI,']N OF VAII.,
75 S. FRONTAGE ROAD vAlL, CO 8L657
970 -479 -2L38
DEPARTMENT OF COWIJNITY DEVELOPMENT
NOTE: THIS PERMIT MUST BE POSTED ON
PIJBLIC WAY PERMIT
.]OBSITE ;\T ALL TIMES
Permit #: PW9B-0022
iIOb AddTCSS: ]-3OO WESTHAVEN DR
LOCAIiON..,: TO FRONT DOOR OF CASCDE CLIJB
Parcel No.. ; 2L03-l2L-00-012
APPLICAIiTT MEYER BOILER CO
PO BOX L573, GLENWOOD SPRTNGS CO
CONTRACTOR MEYER BOILER CO
PO BOX L573, GLENWOOD SPRTNGS CO
OI{NER L-O VAIL HOLDING INC
WESTIN HOTET THE, VAIL CO 81657
DeseripElon:
DEMO & REPLACE STAIRS
81602
ttrbuz
STATUS...: ISSUED
Applied..: 05/29/L99B
rssued...: 05/29/1998
Expires. . : 05/29/1-999
Phone 9709458313
phone: 9709458313
FEE SUMMARY
Public way--->
Investrigabion>
Bond AmounL- - >
TOTAI, FEES--->
Pa!'menLs - - - -
BAI,ANCS DUE----
?5 .00
. oo
75.O0
l5.00
.00
ITEM: O55OO PIJBI,IC WORKS O5/29/L998 LARRY P Act,ion: APPR LP ItdM: 05550 ENGINEERING
Dept: PIIB WORK
Dept-: ENGINEER
Diwision:
Diwision:
CONDITION OF APPROVAL
D ECI.ARAT IONS
I cer-tify that I have rea,l all chapters of Title 12-Str of the Vai] Nluni.cipal Code and all uLility company agreemenLs, signed
by ne, and till abide by Ehe sane, and thaL all utilitiied as requir-ed.
Public work6 si1l have a spec/detsail booh available in April of 1995.
**** REQUESTS FOR INSPECTIONS SHALL BE MADE TWENTY-FOUR HOqRS IN ****
IN ADVANCN-SY-TEI-,EPHONE AT 479-2L38 OR AT OUR OFFTCE FROM B:OO A]VI TO 5:OO PM
SIqNATURE OF OWNER OR CONTRATITOR HIMSETF AND OWNER
* * * ,3r-f +*-* *i * * * * * * * * * * * * * *
TOUIN OF VArr,, COLORADO ****************************************************************
SeaternnE Number: REC-0408 Amount :75.00 05/29/98 L0:29 Init: ,-fRM Payments Method: CK NotaLion: 4597
o
****************************
o
***********
Statemnt
PermiE No: pW98-0022 Tlpe: puBWAy PLIBLIC Parcel No: 2103 -L2L-00-0L2
SiTe Address: 13OO WESTHAVEN DR
LOCATiON: TO FROIfI DOOR OF CASCDE CLT]B Tota] Fees:This Payment 75.00 ToEal ALL Pmts:
Bal_ance:****************************************************************
WAY PERMIT
75.00
75.00
.00
Account Code
sT 00100003112r-00
Description
PI'BLIC WAY FEES
AmounL
75.00
I
ffi*"'i'iiirn,,r,
l:0!_aCI=*"-
Hil.03{F
2tml?r{x)o12
Re{}rq''(1r"il ''l
t'-.1.;t:
i'
.1 ,. , ,l
"-'i:l:iri::r.
lbm: s0 gl$G-Ftnst
33bt: EOA CoNgTRUf,IrL |J irir:
. 303:434{564 cmvls
IntlcqtboHllbrt
!bm: 3D BLDe-F.Eming 01/tgm ktsgecrcr:hm: 6O BlDG-lnsrtaibn
Ot/l8Y0? ln3g*'-tq,r.lhnr: 80 BlDe$hedrock hlall
,?l,i
.rRIrr
Jtsl i
J
^/ tr l7-Y'hm:iJ}r:lrm:
tunr
It.|n:
01llg02 l*rpectrr:bil$ 70 El,D6-Mbc.
90 Bl-D&Fflal i$t: 5i}7 ruANFll,{AL Cro
5G' PtnfsrAl ci/o
21 PII$ILC Foundatbn Fterr
22 PLA'$.|LC s rPbn
t'
clmer:L"O VAIL HOLDF{G iIJI,
BOA CONSTnLTCTIST.i r$:
BOA COt\tgTRl,CT!]t i iili..
tlirv doun|e dftt iftbe e.trs', r,r,.,
NEFTl31
l",gn Fievrew Actron ilt
TOWN OF VAIL
Category Number S , t ,.., 1, ,, ,
Projed.Name:vl -,,- r^ , I -7, -...., r ,t
Building Name:
Project Description:
Owner, Address and Phone: r.Ln , ./ -r' ,' .,, .
er"nitecu6#ta Odress and Phone:r'1,/', , -
/.?T't ulL, -. tl, ". , , ,. / D-, , . a, ,
Legal Description: Lot_ Block_ Subdivision Zone District
Projsct Street Address: /.?rEl '. r-. . r ' . -
Comments:
Motion by:
Boar{/ Staff Action )
\ r^+^.
Seconded by:
! Approval
! Disapproval
V StaffApproval
Town Planner
ox"t </Zq/ ?4 DRB Fee Pre-paid
THTWTSTIN RrSoRr
Vail
April23, 1994
Town of Vail
Office of Community Development
Design Review Board
75 SouthFrontageRoad
Vail, Colorado 81657
RE: DRB Application for The westin Resort Entry porte cochere Renovation
Dear Design Review Board Member:
We are very pleased to zubmit the attached plans for the renovation improvements to the entry porte
Cochere at The Westin Resort Hotel located in the Cascade Village development. We believe that
the proposed Porte Cochere renovation will improve the entrance uppr.un". and experience for the
hotel guests. In order to facilitate your review of the attached material we have prepared the
following summary of the proposed plan.
Cuncntly, the existing Porte Cochere has a very urban appearance without a proper visual connection
to the hotel. The new plans submitted keeps the existing structure but creates a more integrated
appearance with the main building by adding arches to match the lower building breezeway arches,
a horizontal layered facia, and more substantial appearing column supports.
We will be treating all zurfaces with matching stucco with a slightly darker harmonious color on the
facia and column bans as noted.
The proposed added lighting will include four (4) surface sconces on the two columns and a circular
chandelier at the under roofceiling. The detailed specifications for lighting are to be determined and
will be submitted for approval and will be in compliance to Ordinance #9 Series of 1993.
This Porte Cochere renovation is planned to be done in connection with the arrival courtyard
landscape renovations this Spring.
you.
f*'dP' ,
V(<t-
Chris I{anen
Gen€ral ltfianager
Thc We*inResort
April23, 1994
Pagc 2
We look forward to our meeting with you and the opportunity to discuss the proposed plans with
CII:tnd
cc: Skip Behrhorst
David Osqruld
Veil
I "".rLted 9/{/91
DRB agPLrCAtroN - ToI{N oF \a'rl., cotoRADO
DATE APPLICATION RECEIVED :
DATE OF DRB MEETING:
**********
TSIS .APPLICATION HIT-,I-. NOT BE ACCEPTED I'NTIL AI.I, REQI'IRED INI'ORMATION IS SUESIIETED **********
PROJECT TNFORMATION:
A. DESCRfPTION: Upgrade/modification of exjstinq Porte Cochere
he Westin Vail Resort Hotel
I.
B.TYPE OF REVIEW:
New Constrrjction ($200.00)Minor Alterat.ion ($20.00)
X Addition ($50.00)Concept,ual Review ($01
ADDRESS:
TEGAL DESCRIPTION:
Subdivision
Lot Block
If property is described by description, please provide
attach to this application.
ZONING; SDD -cial Develo nt Di stri ct
LOT AREA: If required. applicant
st.amped survey showing lot area.
a rneets and bounds legal
on a separat.e sheet and
must provide a current
F
it.
NAI',IE OF APPT-,ICANT: Vail Mailing Address: c/o The
APPTICANT' S REPRESENTATIVE :ri s Hane Address: The Westi-n--Resort V
Phone
NA}48 OF OWNERS:st. dba The Westin Resort VaiI
*SIGNATLRE(S):
Mailing Address:
.l
n.
Vail ' C0 81657 - ptrone
FEE
$ 20.00
$ s0.00
$100.00
$200.00
$400.00
s500.00
Condominlum Approval if applicable.
DRB FEEI DRB fees, as shown above, are to be paid at,the tlne of submittal of DnB application. llter, when applying for a building perrnit, please identify t,he accurate valuation of the proposal . The fown of vail will adjust t,he fee according to the table below, to ensure the correct fee is paid.
FEE SCHEDULE:
VALUATION $ 0-$ 10ro0o
$10,001 -$ 50,0oo . $ 50,001 - $ 150,000
$150,001- - $ 500,000
$500,001 - $1,000,000 $ . Over $1,000,000
.* DESIGN RE\'1TEW BOARD APPROINTL EXPTRES ONE YEAR .LI'TER FINAL alPRo\IA! ttNLEss- A..BUI-LDTNG "PERMIT "rs-rssuED AND coNslRucrroN Is Sr}RIED.
**NO APPI,ICATION HILIT BE PROCESSED IIITBOUT OWNER'S STGNATIIRE
i_..
1
Anci I I ary Trust dba The Westin Resort VaiI
Westin Vail Resort 1300 Westhaven Dr.,VaiI. C0 81657. eno-E @
NA},IE OF Mailing
'(, h/O(,(:/ys
TT
I
PRE-APPLICATION MEETING :
A pre-application meeting with a member of the planning staff is strongly encouraged to determine if any additional application infornation is needed. It is the alplicant's responsibility to make an appointment. with the llaff to determine if there are additional- subnit,tal requirements.Prease note that a coMpLETE apprication will sCrearnline the approval prosess for your project.
III. IMBORTANT NOTICE REGARD,ING ALL SUBMISSIONS TO THE DRB:
A. In addition to meeting submittal requirements, t,he applicant must, stake and tape the pioject site to indicate property 1ines, building lines and building corners. All t.rees to be removed must be taped. AII site tapings and staking must be completed piior to the DRB site.visit. The applicant must ensure Lhat staking done during the winter is not buried by snow.
B. Tlre review process for NEw BUTLDTNGS norrnarly requires two separate meetings of t.he Design Review Board: a conceptual approval and a final approval . Applicants should plan on presentj_ng their development pioposal at a rninimurn of two meetings before obtaining tinal approval .
C. Applicants who faiL to appear before the Oesign Review Board on their scheduled meeting date and, who have not asked in advance that discussion on their item be postponed, will have their items removed from t.he DRB docket until such time as the item has been republished.
D. The following items may, aL the discretion of the zoning adminj-strator, be approved by the Community Development Department staff (:..e. a formal bearinq before the DRB may not be required):
a. Windows, skylights and sirnilar exterior changes which do not aller the existing plane of the buil-ding; and
b. Building addit.ion proposals not visj.ble from any other ]ot or public space. At the time sucb a proposal is submitted, applicants must include letters fron adjacent property ohrners and,/or from the agent for or manager of any adjacent condominium association stating the association approves of the addition.
E. If a property is located in a napped hazard. area (i.e.
snow avalanche, rockfal}, flood plain, debris flow,wetland, etc) r a hazard study must be submitted anb tlre olrner must sign an affidavit recognizing the hazard report prior. to the issuance of a building permit.Applicants are encouraged to check with a town planner prior to DRB application to deterrnine the relationship of the properuy to all nappeci hazards.
F, For all resldentlaL construct,ion:
ar Clearly indicate on the floor pLans Lhe inside face of the exterior st,ruetural walls of the building; and b. fndicate with a dashed fine on the site plan a four foot. distance from the exterior face of the building walls or supporting columns.
G. If.DRB,approve6,-the applj..cation-with csnditions or nodifications, a1l conditions of approval must be resolved prior to Town issuance of a building permit.
IV. NEW CONSTRUC!rcN
Three copies of a recent toposraphic survev, stamped bv a licensed surveyor, at a scale of 1" --0, or larger,on which the folLowing informat.ion is provided:
1. Lot area.
2. Two foot contou! intervals unless the parcel consists of 6 acres or more, in which case, S,contour intervals may be accepted.
3. Existing trees or groups of trees having t.runks with diamegers of 4" or more, as measured from a point one foot above grade,
4. Rock outcroppings and other significant natural features (large boulders, interrnittent streams,
et.c. ) .
5. Hazard areas (avalanche, rockfal1, etc.),centerline of stream or creek, required creek or stream set,back, 100-year flood plain and slopes of 40t or more, if applicable.
6. Ties to existing benchmark, either USGS 1andmark or sewer invert. This infornation should be clearly stated on the survey so that a1I
measurements are based on the same starting point.This is particularly important. for height measurements. See Policy On Survey Information,for more information regarding surveys.
7. Locat.ions of the following:a. Size and type of drainage culverts/ swales,etc. must be shown.
b. Exact location of existing utility sources and proposed service lines from their source to the structure. Utilities to include:Cable TV
Telephone
A.
Sewer
Water
Gas
Rlanfrir.
c. Show all utility meter l_ocations, including any pedestal_s to be located on site or in the right-of-way adjacent to the site. Revocable permits from the Town of Vail are reguired for improvements in the right-of*way.
d. Property lines - dj_stances and bearings and a basis of bearing must be shown.
e. All easenents (TitLe report must also include existing easement locations)
8. Existing and finished grades "
9. Provide spot elevat.j-ons of the street, and a minimum of one spot elevation on either side of the lot, 25 feet out from the side property lines"
Site Plan
1. Locations
B.
of the followinq:
a. Proposed surface drainage on and off site.
b. Proposed driveways. Percent slope and spot elevations must be shown.
All existing j-mprovements including structures,landscaped areas, service areas, storage areas,walksr .d::iveways, .off-street-parking, load.ing areas, ret.aining walls (wj.th top and bottom of wall spot elevat.ions), and other existing si-te
improvements.'
3.
and proposed qrades shown underneath). fhese el-evations and grades must be provided in order for the staff to determine buiLding heighr.. AII ridge lines should be indicated on the site plan.Elevatlons for roof ridges shall also be indicated on the site plan with corresponding finished and existing grade elevations.
4. Driveway grades may not exceed 8* unless approved by the Town Engineer.
Landscape Plan (1rr = 20r or larger) - 3 copies required
1. The foLlowing information must be provided on the landscape plan. The l-ocation of exist,ing 41'diameter or larger crees, the l-ocation, size,spacing and type (common and latin name) of all existing and proposed pJ.ant material . All trees to be saved and to be removed nust. also be indicated. The plan must also differentiate
between existing and proposed vegetation.
2. Complete the attached landscape mat.erials list,.
3. The locaLion and type of exisLing and proposed
wat.ering systems to be employed in caring for plant material following its instal-lation.
4. Existing and proposed contour lines.
In order to clarify the inter-relation of the various
development proposal components, please incorporate as nuch of the above inforrnation as possible onto the site plan.
Siqn gff fron each utility companv verifying t,he location of utility service and availabiLity (see
attached) .
A preliininarv title report must accompany aIJ_submj-ttals, to insure property ownerstrip and location of .e!L easements on property.
Architectural Plans (1/8" - L, or larger, L/4,' is preferred scale for review) 3 copies required.
1. Scaled fJ-oor plans and al.l elevations of the proposed development. Elevations must show both
. existing and finished grades.
2. One set of floor plans must be "red-lined" to show
how the gross residential fLoor area (GRFA) was caLculated.
3. Reductions of all elevations and the site plan (B-1/2" x 11r') for inclusion in pEC and/or ?own Council memos nay be requested.
4. Exterior surfacing materials and material colors shall be specified on tfte attached materials 1ist.This mat.erials list must be completed and submitted as a part of DRB application. Color chlps, siding samples etc., should be presented to llre Design Review Board meeting.
?ong check list (attached) must. be conpleted if project is located within the Single-FamiJ.y, eiirnary/Seeonairy or Duplex zone districLs.
Photos of the existj.ng site and where applicable, of adjacent structures.
NOTE:
n
G.
H.
' r. The ,ont Adninistrator and,/or on#ay require the
submission of additional plans, drawings,specifications, samples and other materials (including
a model) if deened necessary to determine whether a project wilJ- conply with Design Guidelines.
V. MINOR ALTERATIONS TO THE EXTERTOR OF BUTLDTNGS,
Pbotos or sketches which clearly convey the redevelopment proposal and the location (site plan) of the redevelopment proposal may be submitted in lieu of the more formal requirements set forth above, provided all inportant specifications for the proposal including colors and materials to be used are submitted
VI . ADDITIONS - RESIDENTIAL OR COMMERCTAL
A. Original floor plans with all specifications shown.
B. Tbree sets of proposed floor plans L/8" = I' or larger (L/4" = Lt is preferred)
C. Three copies of a site plan showing existing and proposed construction. lndicate roof ridge elevations wit,h existing and proposed grades shown underneath.
D. Elevations of proposed addition.
E, Photos of the existing structure.
F, Specifications for all materials and color samples on materials list (attached) .
At the request of ttre Zoning Adminj-strator you may al.so be required to submit:
G. A statenent from each utility verifying location of service and availability. See attached utj-Iity location verification form.
H. A site improvement survey, stamped by registered professional surveyor.
I. A preJ-ininary title report/ to verify ownership of property, which lists all easements.
VII. FINAL STTE PLAN
Once a building permit has been issued, and construction is underway, and before the Building Departmeni will schedule a framing inspection, two copies of an Improvement Location Certificaee survey (ILC) stamped. by a registered professional engineer must be submitted. The followinq information must be provided. on the ILC:
Building location(s) with ties to property corners,i.e. distances and angles.
BuiJ-ding dimensions to the nearest tenth of a foot.
All- utility service line as-buil-ts, showing type of material used, and size and exact location of llnes.
Drainage as-builts.
Basis of bearing to tie to secLion corner.
All property pins are to be either found or set and stated on inprovement survey.
AIl easements.
BuiJ.ding floor elevations and aII roof ridge elevations with existlng and proposed grades shown under the ridge lines.
A.
E'.
c.
D.
L.
F.
G.
H.
urrr.ao*aurruo,, orth *"urr*
A. Sqbmittal {equirenents: the owner or authorized agent of any project requiring design approval as prescribed by this chapter may submit plans for conceptual review by the Design Review Board to tbe Department of Community Development. The conceptual review is intended to give the applicant a basic understanding of the compatibility of their proposal with the Town, s Design Guidelines. This procedure is recornrnended prinarily for applicat,ions more complex than single-family and two-farnily residences. However, developers of single-family and two-family projects shall not be excluded fron the opportunity to request a conceptual design review. Complete applications must be subrnitted 10 days prior to a scheduled DRB meeting.
The following informatlon shall be submitted for a conceptual review:
1. A conceptual sit,e and landscape ptan aL a minimum scale of one inch equals twenty feet;
2. Conceptual eJ.evat,ions showing exterior materials
and a description of the character of the proposed structure or st,ructures;
3. Sufficient infornation to show t,he proposal
complies with the developnent standards of the zone district in which the project is to be located (i.e. GRFA, site coverage calculatj_ons,
number of parking spaces, etc.);
4. Completed DRB application form.
B. Procedure: Upon receipt of an application for conceptual design review, Lhe Department of Community Development shall review the submitt.ed naterials for general compliance wit.h the appropriate requirements of the zoning code. If the proposal is in basic compliance with the zoning code requirements, the project shalJ- be forwarded to the DRB for conceptual review. If the application is not generally in compliance with zoning code requirements, the application and submittal mateiials shall_ be returned to the applicant with a writt,en expj_anation as to why the Conmunit,y Developnent Department staff has found the project not to be in compliance with zoning code reguirements. Once a complete application has been received, the DRB shal-l- review the subrnitted conceptual review application and supporting mat.erial in ordei to determine whether or not the project generally complies with the design guidelines. The-DRB does not voce on conceptual reviews. The property owner or his represenLative shall be present at the DRB hearing.
LIST OF MATERTALS
NAI'IE OF PROJECT: The Westin Vail Resort Hotel
LEGAI. DESCRIPTION: LOT SUBDIVISION
STREET ADDRESS;1300 l.lesthaven Dr., Vail, C0 81657
DESCRIPTION OF PROJECT: Upqrade and modification of existing "Porte
Cochere" of the Westin Vail Resort Hotel .
The foLlowing inforrnation is
Review Board before a final
A. AUILDING },IATERIAI,S:
Roof
Siding
Other WaIl Materi-als
Fascia
Soffits
Windows
Window Trim
Doors
Door Trim
Hand or Deck Rails
Flues
Flashings
Chimneys
Trash Enclosures
Greenhouses
Other - Lighting
requj.red for submj.ttal to approval can be given:
TYPE OF MATERIAL
Built up - Flat - T&G Pea
f ha f\aci ern
COLOR
Gravel - Grey
Stucco (match existing bldg) Benjamin Moore #861
Stucco (match exi sting bldg) Benjamin Moore # 985
Metal Ben.iamin Moore # 985
TBD - will comply with Ordinance #9 Series of 1993
B. I,AIiIDSCAPING:Name of Designer: N/A
Dlrnno.
PLANT MATERIALS: Botanical Narne Comnon Name Ouantitv Size*
PROPOSED TREES
EXTSTING TREES TO
BE REMOVED
*Indicate caliper for deciduous trees.
Urees.
Indicate
PLANT MATERIA$ Botanical Name ao.*on il" ouanritv Sizen.
PROPOSED SHRUBS
EXISTTNG SHRUBS
TO BE REMOVED
*Indicate size of proposed shrubs. Minimum size of shrubs is 5 qa1lon.
Tvpe Scruare Footaqe
GROUND COVERS
SOD
SEED
TYPE
OF IRRIGATION
IYPE OR METHOD OF
EROSION CONTROL
D. orHER LANDSCAPE FEATURES (retaining walJ.s, fences, swimming poolsl etc.) PJ-ease specify. Indicate heights of retaining walls. Maximum height of walls within the front setback is 3 feet. Maximum height of walls elsewhere on the property is 6 feet.
C. LAI{DSCAPE LIGHTING: If exterior lighting is proposed, ptease
show ltre number of fixtures and locations on a separate lighting.plan. Identify each fixture from the lighting plan on the list beLow and provide t,he wattage, height-above -
grade and type of tight proposed.
SUBDIVISION
JOB NAD{E
LOT BLOCK FILING
ADDRESS
The location and availabil-ity of utilities, whether they be main trun! ]ine9 or proposed lines, must be approved and verifi.ed by the following utilities for the accompanying site p1an.
Authorized Sicnature Date
U.S. West Communications
L-800-922-1987
468-5860 or 949-4530
Public Service Conpany
94 9-57 81
Gary Hall
Holy Cross ELectric Assoc.
949-5892
Ted Husky/Michael Laverty
IleriLage Cablevision T.V.
94 9-5530
Steve Hiat,t
Upper Eag1e Valley Water
& Sanitation District ,,
47 6-7 480
Fred Haslee
NOTE:This form is to verify service availabili.ty and l-ocation. This should be used in conjunction with preparing your utiliLy plan and scheduling inst.allations.
For any new construction proposal, the applicant must provide a completed utility verification form.
3. If a utility company has concerns vrith the proposed construction, the utility representative should not directly on ttre utility verification form t.hat there is a problem which needs to be resolved. ?he issue should then be spelled out j.n
detail in an attached letter to the Town of Vail.However, please keep in mind that it is the responsibility of the utility company to resolve identified problems.
4. If the ut.iJ_it.y verification form has signatures from each of the utility companies, and no
comments are made directly on the forrn, the Town will presume that there are no problems and t.hat the development. can proceed.
5. These verifications do not reLieve the contractor of his responsibitit.y to obtain a street cut permit from the Town of Vail, Department of public
Works and to oErtain utility locations before diqqinq in an t in the Town of Vail . A buildinq permit i.s not a street cut pernit. A street cut permit must. be obtained separately.
't Please bring a site plan, floor plan, and elevations when obtaining Upper Eagle..Va-lley*Wat,er -&--Sanitation .signatures. Fire flow needs must be addressed,
2.
DATE:
LEGAT DESCRIPTTON:
o
FR,
ZONE CHECK
FOR R, R P/S ZONE DISTRICTS
Lot_Block_Filing
ADDRESS:
O$INER PHONE
PITONE ARCIIITECT
**LOT SIZE
ZONE DISTRICT
PROPOSED USE
Allowed
(30) (33)
Existinq Proposed Tot,al
Height
ToTal GRFA
Primary GRFA
Secondary GRFA
Setbacks Front
Sides
Rear
Water Course Setback
Site Coverage
landscaping
Retaining SIaII Heights
Parking
Garage Credit
Drive:
425 =
+ 4?.g- =
20t
15'
15'
(30) (s0)
3' /6r
Regrd
(300) (600) (900) (1200)_
Permitted Slope _lIL Actual Slope
Dat.e approved by Town Engineer:
View Corridor Encroachment: yes
Environmental,/Hazards : 1)
2l
3)Geologic Hazards a) Snow Avalanche b) Rockfal-L c) Debris Flow 4) Wetlands
Prevlous conditions of approval (check property file)
Does tlrls request involve a 250 Addition?
How much of tne allowed 250 Addition is useffififfiis request?
**Note: Under Sections 78.I2.090(B) and 18.13.090(B) of the Municipal code, lots zoned Two Fanily and primary/secondary which are less than L5'000.sq. ft. in area may not construct a second dwerling unit. The Community Development Department. may grant an exception t.o this restriction provided the applicant meets the criteiia set forth under Sections 18.t2.090(B) and 18.13.080(B) of the Munieipat Code including permanently restricting".the, unit,as. a..long-Lerm rental unit for full--time employees of the Upper Eagle ValLey.
No 2 4.,
Flood P1ain
Percent Slope
1_0
_l_J
''l
h'F
l\l r3 IIFZ lr-.iGo I r0-r
lfP
I
il$fr
NB
Fff
t
>4*U re=cEr #r-- HcrsnAcl FffiF rac*tF€
o
Po?,2
l|tr ors
ilE
sr
flri '
x \-,
6:
,kR :E
td :F s r o{\ o 9si o'
6-
Da.J
qf
Bi
FF t-' g
(\*lr
rn
ffi
f;-t 6 z
o
T o H--{b-rn ht lv-.
C) i--o o ?*tn :o m
I J-
[__lf--T-t llll
$,-
nl
t
u J.
L
I f-
b
u
1
$t l-
d
I
N
(,
I
\o
+
?
,g -3
,g s :E ..c ri I ;7,
n
r$,E
dr
'5
Ll
t+
: r...r,
FE.
g,$.
Ff tl .
cl';
f;:lr r
7
F
q
.?
E
*
Ft
]F
g
g
H
F t)F r F !
€-$+
F
o$
a
.g
F
APJJfr
04. ?1.91 0:r lg pM lCF
o
P J ANDEffiN ASSC
.E .T
PAG E2
'l E.1A
{-..-"
313-647-9815
I
t.
,t :r ll 'r
I
I -(
\
,#o'
\ul,_.
a .3
;s
J
-{rn
(\
R I $
.t
rn
S.
\r'(;
J,c
U ln
d c a
['?
C
I
|'ltLl vu$lrw
"l-
eogsdmile Eb e, t (\(!\-.).
-{
-o z
o
C}o o
:E m
:D m
I t,li _ | --._ ---_ __l
\N
F
)o
,?
t
rA
b:
ll
0_sl il
E
5
I
-*---.-
?eg -$;|,;!d qYi -I]IOH NIIS]M >ryd*# ---
:Ftbg2 :=r{cr' ---...._
t
I
a oI
D
o3
o
t ; 8[
->rt
lfSr*re€ctrr n{r-- H{r<rrxtcrFffiF cffi
PAE A2
84/zLl!994 15:16 313-647-9e15
a Frr. _ -
li 'll'
P J ANDE*.N *ll g
I
I
I
I
)
\
,dl
'.ul-,.
tI .3
I {11
/,I d
is l
{
tt.r
(\
R J,
{n J
FI
3Es ':-
T,Tt :'Ept:i'=f v q fl
r-.$' urtrrzx{v
tr
T'
-
C
I
i (\
\r'(:J c
0 lll
d c ()rn g I $
8og0?t€zl8 t u() n^rrw t0d
i
I
LU E lu T:r--
O o
()
a)z o
--
F
&l J
ll,!
I o
!F
n I @
ni J
()o
-- r* IT-ijll
i
t-
,4a,1*^D Ap.er *rat
1-p mcfeH- Ftrcn^r3 ers.erh&1)
,I
i
I
F---_----t rl
}ur,Sor,/ l'lao\e
SGALE:1/8'-f-0'r/te L)sh^t Va'tL Rtrxo,l " ,</o{=t- 4-z.-?+
lld BI!a0 16.Ia'to
rt s 'lF rJ;
4fs
d
+
_9 (+
J
s g nf.
JHg
ldt E
ah i T{3a r,/ lu
6JH
iFt
Fs*
5r (tr,tr-
$Fs
[vi
gE
a t6
e's6
Ht
o
lN
$
?
r,|
b:
!L
?
f"
E
5
q
*l il
04. 21. 94 0?:19 PM F06
o
PERMIT NUMBER OF PFO.EET
DATE
READY FOR INSP
INSPECTION REQUEST
TOWN OF VAIL
. CALLER
MON Tr rtrq \l/c n AM PM
LOCATION:
BUILDING:
I] FOOTINGS / STEEL
PLUMBING:
N UNDERGROUND
! ROUGH / D,W.V-
tr ROUGH / WATER
tr FOUNDATION / STEEL
tr FRAMING
rr ROOF & SHEEB " PLYWOOD NAILING tr GAS PIPING
tr INSULAIION POOL / H, TUB
tr SHEETROCK NAIL
O FINAL
ELECTRICAL:
tr TEMP. POWER
MECHANICAL:
tr HEATING
tr EXHAUST HOODS
CONDUIT I] SUPPLY AIR
tr FINAL
tr APPROVED
CORREGTIONS:
EI DISAPPROVED tr REINSPECTION REQUIRED
DATE
i'', r''t /'.',
INSPECTOR
\
hm
42 W. Meadow Dr.
Vall, Colorado 81657
Vail Fire Department
CORRECTION NOTICE
Date ot original inspection:
Building address:
Time served:
476-2200
2
Date serv6d:
Building name:
. ri' .,'
AuiHing€*€r:' 71.),,1 ..,t,;, ,
THIS SUPPLEMENTAL REPORT COVERS THE FOLLOWING:
6 uNtFoFM F|RE coDE (u.F.c.) vtoLATtoNs o
tr NATIONAL ELECTRTC CODE (N.E.C.) VTOLATTONS tr
tr NATIONAL FIRE CODES (NFPA) VIOLATIONS O
SAFETV VIOLATIONS
UNSAFE PRACTICES
OTHER
DESCRIPTION OF VIOLATION:
.2., , ' ?1 :-'-, .'- '
z' .., .L -a. ,.
.) .-a /v'/ .,
.'...}':'
' ") ,' -:; t"l
.) ).'t '. '/'
-';'4.rt\-" .';' -'
,.,-..-r1,.".- - u .a'., :.
fi'l't t.;.-7 --'o
CITED CORRECTIONS SHALL BE COMPLETED BY:A.M./P.M. Dat€:
I]I ACCORDA]ICE WI?H TOWT{ OF VAIL TUTICIPAL CODE 15.12 IF YOU FAIL TO COMPLY WITH THIS COFRECTIOT NOTICE ON OF
IEFORE THE ABOVE STATEO.COTPLETIOII DATE YOUR FAILURE WILL RESUIT IN FURTHER ACTION EEII{G TAKEI{ UNDEB THE
PROYltlOt{8 OF THE U.F.C. +- EDlTlOttl, WHICH trAY INCLUDE YOUR BEING ]SSUED A SUiTMONS TO APPEAR tN [UNtCtpAL On
COU||?Y COURT FOR THE YIOLATIOI{8 ABOYE SPECIFIEO. UPOI{ A FINDIflG OF GUILW OF SAID VIOLA'IOXS YOU WILL 9E SUB.
JECT TO THE PEIIALTIES PiOYIDED BY LAW.
BUILDING OWNER/MANAGER:
FIRE DEPARTMENT OFFICER:
(S'9netute)
(Stgnatu.')
tsf c0uRIStDE c0tDS totLERs ctRB pll|{57t ilEAD0id tR.
$01 8cl{llDt [ESlDEttE DtDtEn co]lsT, c0. 2430 CHA]t0Nrr
evo cr l l qtonE,Bt Lfir
TTTER THE IIE}I Tt} OUERY
C{IIITRACTOR NUI'IFER STREEI IOI.|E
COf{IRACTOR IIUI1SER SIfiEET TONE
365 VAIL I,ALLEY DR, 4
356 HANSO}I RA}ICH RI}, 4
1300 ilESTI{AVEti 0R. 7
I
t0
m. ilnrr
$tl
' to. t{stE
r7$ 80DB REEUil.UtTtoil HYDER Collsr.llll cilnl8ilillt REfotEt ilELB{tr-tEt8 cot{$.
3E$ tE8til mrEt E.L,F, EIITERPRISES
HllLDlilS PERitT t$0$rArt0rl
JOl XllEr ltBIItl llE0ll. REl{lDEt 0{/10/93
DOTIRICTIffiI TTSIIII RESNI I|AIL PEfitIII T 580?
Gfl8T. IOE 7 t0DRE39r 1,300 IESTHAVEI{ DR.
" x0. 0F tttTE 0 !,tLuAll0lts PLfiilr{ER sflELLy FI SrFl. 0 T{lTf,t f17,000 pLAils cHEc(ER lAil
$$tT TYPE tLT ELECTRTCAL t?,000
l$t TYPE Collfl llEcHiluctL t15,000 [0r,iltEhrls
ffi, FEE rtrE 0.00 PLursrirs r0 ,:.
FIREPLACE IIIFOBIITTTO}I
I ffi OAE IPPTITC O RESTRICIED M
I s 8e5 FtREPt t 0 r 0F r00D 9r 0
PEAiIT FEES UIILDIffi zt! PLf,T I4O
ELECInICAL S0 REC. 0 tccHlilcct 260 DRB r{/A PL$BM VA CLEAT UP IOO
FLUlll, PtAt FEE 0 0IHER FEE /--\l{UllBER 0F RESTRICIE0
E$. PtAil FEE 63 I8lAr. FEES / eSO!ilrrS V (t , - o ____\ /-. . \,^_i \ r
C) L;-* / \'\r.{_ I \'_ \/
i.
'\ ,\ ^-,-/ i-ltt'c,l-;l-\...
L\-\i.-t DZ'i
!l^.* . \ -x.'-.r,t;,.:,.
"\"(") \/
L\lt __)\a,?:
iIOI IIOilTEilEBOE FIREPTSCTg FRI$CO FIREPLACE
S3O2 I,AIL P|IIIII T|IIIIHIIIIE$ TTO 6EfiHARDT
5303 LEVilIE iilr Eutl}A c0ilsT.
53(lI CIIURTSIDE B|lIIDll B|IILERS CANR Pfl{4575 I{EADB}I I}R.I
l0 5S0i gCil||IDT RESIIEilCE DTDIER C0I{ST. C0. 24]0 [HAt't0Nrr
E]{IER THE ]TEf'I TO AUERY
T|l. IIAIiE CI}iIIiACIOR |IUITBER STREET ii}IE
553t
1{0. ITAIIE EIIITTRAITI}R IIUI1BER s]REET IOI,IE
I'{B OOIS REEI,TLUAII|III |{YOER C|II{ST. 36i VAIL VALLTY OR. 4
ii6l cllRlBilillfi RE|I0DEL ilEtE0l{-lEI[ C0t{sr. 356 i.tAitsoll| fiA}'lCH RD. 4
IS33 YEEII!]I }||!TIL E.L.F. EIIIERPRISE$ ISO(I UEETHAVEI1 OR, 1
B]IILDIIIS PERITI T II{FIIR}IATItlI{
l0B llAllEr ftETRIL REII0DEL r{ 0A/10i93
C0llIRlCItllRr flE$IItl REB0RT VAIL PERI'|!T |t 5807
C0I|ST. l0llE 7 ADI}RE$SI I,S00 IIE$IHAIIEII| I}R.
ll0. 0F ulilTs 0 vALuAII0f{S pLAt'tilER ,ilfl lfil 8C,FT. 0 IoTAL tli,000 PLAI'lt CHECI(Efi DAI'I
PERiII IYPE ALT ELECTRTDRL t3,000
usE IYPE HIilt ltEcHf,nt[tl f3!000
RET. FEE ftATE O.OO PLUITBII{B SO
FIREPLACE IIIFORIIATIt}II
| 0F sAs APPtlilC 0 f,EtrRrCrED [0
t 0F 0r9 ilREPtA 0 | 0F t00D sT 0
PERiIT FEES 0utL0IrB t95 PLAir 121
ELECTRICAL i4 REC. O itcHAIICAL 60 !n8 il/A PLU]IEIIIB il/E CLEAII UP IOO
coililE|'lT 5
641 it, Li0|isfrEAD ctR, I
I88I LI(II]SRIDGE LOOP 1I
508 E. LIOII$HEAD CR, 5
PLUilS. PLAIi FEE 0 0IHE[ FEE /-{rUilBER 0F RESTRTITED
iEcH. pLAitFEE ls r0rAr FEES cgtrrs
CONSTRUCTION PERMIT
lnm
dspartment of community development
TO BE F ILLED OUT COMPLETELY PRIOF TO ISSUANCE OF PERMTT
TYPE OF PERMIT
NOTE _ COPY OF
DATE rN 0N (ocT
PERMIT TO BE KEPT ON JOBSITE
15, 1992
DRAI^ININGS ATTACHED
005182
HI r TYPE OF CONSTRUCTION
2 OCCUPANCY G ROUP
DtvtsloN
GTNERAL DESCRIPTION OF WORK
TEAR OIIT NON-BEARTNG
I t rv v
ABEHIRM
'j. 2 2a 3 4
WAI,T,S . R F,MOVF
PERMIT NO.
z o
F
l
BU ILD ING 1 ,000
EL ECTRICAT
PI-IJMBING
DUCTING IN EXISTING MECHANICAL MECHAN ICAL 3 ,000
CHASE.TOTAL 4,000
TYPE GROUP G,R F.A VALUATION PERMIT FEES
II B 0 4,000 BUILDING PERM IT B5
/'\.
l.- r'
'\ ,.'
\'''
t) .'
.. r'-\Y'l '
\j
PLAN CH ECK 55
ETECTR ICAL
NFW( ) ALIERATION() ADDITIONAL( i III PAIR { )PL U M EING
(DEMo)
DWt-t Ltuc uNlTs Accctuf MoDArroN ur.r I s
IIE CHT iN TT NO, FIREPLACES
MECHANICAL $60 / $ls lt4r335
RECREATION FEE
f],V AL LU E DESIGN REVIEW BOARD
C LE AN. UP DEPOSIT 100
USE TAX
TOTAL PERMIT FEES $ 315
DAN STANEK OCT 15, I99
ADDITIONAL PERMITS NEEDEO
Y N INITIAL .l_":' ____1_]x I
,ILDING OFFICIAL DATE
SHELLY MELLO OCT 15, 1992
INING AOMINISTRATOR OATE
BLASTING ll*i ) NJlfQ.q B! Lr-_Q[r,r G Np JE-s_:PARK,NG _J l- |
UT.IIU UN-I,I . Z4 TIUUK SttA!'T TU T'U IN TLAU
AFTER WORK JFE-MPLETE.
I hereby acknowledge that I have read this application, filled out in full the information required,
completed an accurate plot plan, and state that all the information provided as required is correct. I
agree to comply with the information and plot plan, to comply with all Town ordinances and state
laws, and to build this structure according lo the Town's zoning and subdivision codes, design
review approved, Uniform Building Code and other orEinances of the Town applicable thereto.
CLEAN UP TO: WNSTIN RESORT VAIL
13OO WESTHAVEN DRIVE
vArL, co 8L657
LEGAL
DESC.FILING
BNAME: 6ESTIN DEMO
WESTIN RESORT VAIL
urrr roonEss I 300 I,IESTIIAVEN DR
clTY VAIL pt 479-870
OWNER
ARCH ITECT
i,l AII ADDRES_S _
CITY PH,
GENERAL
CONTRACTOR
rrnrr,l WESTIN RESORT VAIL
47 9-7 009
LECTRICAL
NTRACTOR TOWN OF VAIL REG. NO,
PLUMBING
CONTRACTO TOWN OF VAIL REG, NO,
MECHANI
CONTRACTOR
FIRM SIJMMIT MECHANCIAL
roWH orvnt nee. ruO. 352-5
945-2491
OTHER
CONTRACT
TOWN OF VAIL REG. NO.
TELE.
AF:
CONSTRUCTION PERMIT
.L
h nilnl
departmont of community dovelopment
TO BE FILLEO OUTCOMPLETELY PRIORTO ISSUANCE OF PENMIT
TYPE OF PERMIT
NOTE _ COPY OF PERMIT TO BE KEPT ON JOBSITE
oArE /o-/J"?L
u tr BUILDING
ELECTRICAL
I ptuMerNc
D rounoarroN
PERMIT NO.
GENERAL DESCRIPTION OFWORK :
r.lYPE OF CONSInUCT|oN I t tv v
ZOCCUPANCYGNOUP AEEH I R M
OfvfSfON L?2a34
IYPE GRoUp G.n.F.A. VALUAT|ON PERMIT FEES
BUILOING PERMIT
PLAN CHECK
NEW( ) {.TERA ON ( ) AoOtr|oNAL( ) REpAtR( )
OWELLING UNITS
-
H€IG}II IN FI.
THICKNESS N.VALLUE
ADOITIONAL PEFMITS NEEDEO:
INIIIAL
TOTAL PERMIT FEES
IJ''
:!,tU^JMtlre
I hereby acknowledge that I }lave read this appllcatlon. fillod out In tull ths Intormation required.
completed an accurate plot plan, and state that all the information provided es required is coirect. I
agree to comply with the information and plot plsn. to comply with all Town ordinances and state
laws. and lo bulld lhis structure according to the Town's zonlng and subitivlsion codes. design
revlew approved, Unlform Building Code and othor ordinances ol the Town applicable thereto. -
CLEAT T'P DEPOSIT TOI
OF OWNER OR COI{TBACTOR FOR HliilSELF (ro."1,"lL,o'l u;,1)
DD;RJIECHANfCAL B 0,^ut,(,; *,
LEGAL
q-Esc.
8LK LOT
FILING
GtAtrE;-\|\
OWNER NmeW""li.- lLso.t L/a,,1
uxt aooness t 3cto tp."{A.,s- Dt
ct!\ t/^;l c"l" w.477 7s6,
I
/
\
I
ARCHITECT
MAIL ADDRESS
CITY PH.
GENERAL
CONTRACTOR
FIRMtlu"-,1 '' lLt,-;f l/4:l
town or vetL nEG. No. I '-
rete.1 7 1-7oo I
.ffi-'#:3h
FINM
TOWN OF VAIL REG. NO,
IELA
PLUMBING
CONTRACTOR
FIRI,|
TOWN OF VAIL REG. NO.
MECHANICAT
CONTRACTOR
tor"n o, nn,\ rsq. "o." -b=4.5 rELE. '"\\\ - t\\\\
OTHER
CONTRACTOR
FINM
TOWN OF VAIL BEG. NO.
TELE.
75 routh lronlage road
rril, colorado 81657 (3os) 479-2138 or 479-j\39 otflce of communlty developmerrt
If this pery,it. requi.res a Town of Vajl fire Department Approval,Engineeris..(.Pgutlg l,lorks) review and approval, a planning' Depariment review or Health Department review, and'a review by the Auitbing Department, the estimated time for a total review may take as 16ng as three weelts.
All conmerc-ial (1arge or sma'l'l) and a'll multi-family permits will have tq follow the above mentioned maximum requirements. Residential and-smal'l projects should take a 'l esser amount of time. However, if
residentia'l or smaller projects impact the various above mentioned
departments wi.th regard to necessary review, these projects may als0 take the three week period.
Every attempt wi1'l be made by this department to expedite th'is permi.q as. s.qon as possibl e.
BUILDING PERIiIT ISSUANCE TIME FRAME
undersigned, understand the p1 an check procedure and time I, the
frame.
4n',, fLJ-/
ProjEct Name
//r- t f . q1 -
Date Work Sheet was turned into the
Community Development Department.
L
I
75 south lronlage road
Yail, colorudo 81657
(303) 479-21.38 ot 479-2139
TO:
FROM:
DATE:
SU&TECT:
olflce of communlty developmenl
ALL CONTRACTORS CT'RRENTLYL REGISTERED WITH THE
TOWN OT VAIL
TOWN OF VAIL PUBLTC WORKS/COIO,IUNITY DE\rELOpltENt
}IARCH 15, L9I8
CONSTRUCTION PARKING & I,IATERIAL STORAGE
rn summaryr.ordinance No. 6 states that it is unrawful for any person to litter, track or deposit any soil, rock, sand, debris or nateria}, including trash dunpster!, poriable t.oilets and sorkrnen vehicles upon any street, sidewaik, a1ley or public
_p_f?ge or any portion thereof. The right-oi-way on all Town of vail streets and-roads is approxinrately 5 ft. 6ff pavement.This ordinance wilr be strillly enforcld by the Town of vair PYPIi-c works Department. persons found vi-olating this orditrun.e vi-rr be Ei-ven a 24 houl'i,'.rit'ce.r ricLice to re;:'.rve-said rnate:ial.In the event the person so notified does not comply with the notice within the 24 hour tirne specified, the pulfic Works Departrnent will remove said material at the expense of person notified. The provisions of this ordinance sfratf not bL applicable to construction, maintenance or repair projects of any street or alley or any utilities in the right-a-way.
To revietr Ordinance No. 6 in ful1, please stop by the Town of Vail Building Department to obtain a copy. tirant you for your cooperation on this rnatter.
Read. and acknowledged by:
(i.e. contractor, owner)
Pro '11)aqrt rt
-7?Uqtr Ntrs/n EW_
I
r__.l
nil
3t'l-g-e\nw
sl?Bs/ie44t 4
3V () E).YU-L;- a1 tl t 7 V F(l
--r- StoJ awEfT 'N|tn) SilUtueJ-ot- tlud svJJF
gto
c) ll / tY\9?faazL
f-' '-' -A'Jltlt
7
| 3tnapttvv]"[-l-l-
;?9Ftrrvu7 sttno L
F-
Lr
M
,i a t/1 f+'
Ot ,.JVt^Ot'..5p
ROOM
SERV.
-t
I t
I
T
PANTRY
.
--1
DISPLAY
KITCHEN
SKI STORAGE
MAIN ELEV.'S
tl
CONCEIRGE
IOEBY
SERV.
ELEV.
THE LITTLE SHOP
BELLMAN
l-l
LOBEY LOINGE '.--
--a
I '!-tr.t?t . ,
I
I
EINAI INSPECTION'S COMPLETED
The lters U"fo* rrQd to be conplete before glvlng a pemlt a flnal C of O.
Please check off Ln the box provlded.
MECEANICAT,
|JATE:
EINAL
u
n
DATE:
DATE:
T'INA.L ELECTRICAL
DATE:
EAST SIDE:WEST SIDEI
tl
T
w
u
n
rl
TE}TFORARY C OF O
FINAL BUILDINC
DATEI
CERTIFICA?E OF OCCI'PANCY
DATE:
LAI{DSCAPING I}UE
DATE:
FILE NAI{E:
"' 'Jroi"o
ibtp,il",,."
/./e 5Dt/,/u y'4rra 4 /rt /"i
/rt uyo',
/ou
Durc //iL// /ill
'3oJ a/tult', ' 4',
ih ttasT /z/ icz,:
'Ly'- /y';)/
'e/. ii i/ts,
oy
't ,|t'tta ,//
shz r;'/*:o
uate
7on" ftsr,',,/"t tl/tfl
r/,
Filing
al/
Design Review Board
€// f2
DISAPPROVAL
f,"uApprovat
//o kE fufl,d
DRB APPLICATION - TOTN OF \IATL,
DATE APPLICATION RECEIVED :
DATE OF DRB MEETING:
**********
TEIS APPI.ICATION WII.L NOT BE
ITNTIL AIL REQUIRE!
rl*IIFO*RlrtArION
r€vised e/4/9L
COIORADO
ACCEPTED IS SI'BT.{ITTED
I,PROJECT INFORMATTON:
A. DESCRIPTION: TE
AT vAtu.
n
TYPE OF REVIEW:
New Construetion ($200.00)Minor Afteration ($20.00)
Addition ($50.00)Conceptual- Review ($0)
ADDRESS:
LEGAL DESCRTPTION:
Subdivision
Lot Bl-ock
If property is described by description, please provide
attach to this application.
ZONING: -'.,n 'r
a meeLs and bounds legaI
on a separate sheet and
G.
J.
K
. t!.:t
,rl 'l l-
LOT AREA: If required, applicant
stamped survey showing fot area.
m r qt nrn\7 i de e .rlI. I. enl
NAME OF APPLICANT:Mailinq Address:
PirOne
H.NAII4E OF APPLICAN Mailing Address:
' D i(l: .g t(.L ,>TATIVE:
(ec
NlJ
NAME OF OWNERS:
TSIGNATTIRE (S) :
Mai.lrinsn+ddress:
Phone
Condominium Approval if applicable.
DRB FEE: DRB fees, as shown above, are to be paid at the time of submittal of DRB application. Later, when
applying for a building permit, please identify the
accurate valuation of the proposal . The Town of Vail-will adjust the fee according to the table below, to
ensure the correct fee is paid
FEE PAID: S I
FEE SCHEDULE:
VALUATION s 0 - s 10,000
$ 10,001 - s 50,ooo
$ 50,001 - $ 150,000
$150,00L - s 500,000
s500,001 - $1r 000,000 $ Over $1r000r000
FEE
$ 20.00 s s0.00
$100.00
$200.00
$400.00 (q.nn nn
* DESIGN RSVIEW BOARD APPROVAI EXPIRES ONE YBAR AFTER FINAI
APPRO\IAIr ITNLESS A BUILDING PERMIT IS ISSUED AlrD CONSTRUCTION IS
SIARTED.
*iXO TPPINIqATION I|II..L BE PROCESSED WITEOUT OI|NER' S SIGI{trIURE
rr-
A pre-application meeti-ng with a member of the planning
staff is strongly encouraged to deternine if any additional application information is needed. It is the applicant's responsibility to make an appointment with the staff to
determine if there are additional submittal requirements -Please note that a COMPLETE application will streamline the approval process for your prolect.
III. IMPORTANT NOTICE REGARD]NG ALL SUBMISSIONS TO THE DRB:
A. In addition to neeting submittal requirements, the applicant must stake and tape the project siLe to indicate property lines, Uultding lines and buildlng . , corners. AII trees to be removed must be taped. All site tapings and staking must be completed prior to the
DRB site vj.sit. The applicant must ensure that staking
done during the winter is not buried by snow.
B. The review process for NEW BUfLDfNGS normally requires two separate meetings of the Deslgn Review Board: a conceptual approval and a final approval. Applicants
should pl'an on presenting their development proposal at a minimum of two meetings before obtaining final
approvaL.
C. Applicants who fail to appear before the Design Review
Board on thej-r scheduled meeting date and who have not
asked in advance that' discussion on their item be postponed, will have their items removed from the DRB docket until such tirne as the item has been republished.
D. The following items may, at. the discretion of the
zoningr administrator, be approved by the Community
Developmenl Department staff (i.e. a formal hearing before t^he DRB may not be required) :
a. Windows, skylights and similar exterior changes which do not alter the exi-stinq plane of the building; and
b. Building addition proposals not visible from any cjther lot or public space. At the time such a proposal is submit.ted, applicants must incLude letters from adjacent property owners and/or from the agent for or manager of any adjacent
condominium association stating the association
approves of the addition.
E. If a property is located in a mapped hazard area (i.e.
snow avalanche, rockfaI1, flood plain, debris f1ow,wetland, etc) r a hazard study must be submitted and the
owner must- sign an affidavit recognizing the hazard report prior to the issuance of a building permit..Applicants are encouraged t.o check wit.h a Town Planner prior to DRB application to determine the relationship of the property to all napped hazards.
F. For all residential construction:
a. Clearly indicate on the floor plans the inside face of the exterior structural walls of the building,' and b- Indicate with a dashed line on the site plan a four foot distance from the exterior face of the building wal-1s or supporting columns.
G. If DRB approves the application with conditions or modifications, a1I conditions of approval must be resolved prior to Town issuance of a building permit.
rJ
PRE-APPLTCATION MEETING :
,AT"/S ?ez r-*grrrirzD
'l'he COUNTRY CLUB SERIES leaturse o
lange, portable, heavy.duty gae broiler
wlth 6n .ttr6eti\r€ corlblh6tion o{ rlarnlesg
steei and wrought.lrcn work, The entire ilt|lrcr aari '*url rhcll a.sr conitruct.dr
No. 304 etalnlegg ctccl. ThE fice.standfn,MOoEL A+CIC
*noo:. As-c/c
I|OIE: All,untta on thir page qtE sholvn wrth optionat casl iron cookrng grata available at ortrra cost. stalrrL.r gt .l Ghdc| .lrf
'lcDdqrd .qulpE ar ea Coudy Clrrb furr.
ilODEL A2,CIC
A-aERG3 ro,0 !.tu. EuRttttrcoot( ToFE
All MODEL A-SERIES and COUMffY CLUB models
are arrallable wlth 6ny nuqber of 60,000 B.T.U.
RANGE BURNERS and COOKING TOPS. The
nANeE BURNEB can bo orderad ln piace o{ the
OPEN HEARTH SECI'ION. Etample:'Modet A2.C/C
vrith onc costion OPEN HEARTH,'one rcilon RANGE
BURNES, or Modol AI-Q/C with two rcctronr QPEN
HEARTHS and two.octtons RANGE 8U8l -1S WITH
COOKING TOPS.
AGCEASORIE€
WOOD SMOKER
Now aod the smokehouee {iavor to your n6tl coohout with
the new WOOD SMOKER. Slmply add small amounrs oi
m€rquite, hickory. cherry or apple wood to produce the
amoke ilavor oi lour choice, without harm to the 956 suln-
inq. eiement. WOOD SMOK.ER is macie ol hearry-jauge neel wlth cooi-touch spring handles for sdle and cacy piocemcnr
or rsmovar trom Darbeque,
. Statnl?! rtcl eollng tr3u||crtc hoodr, coaplere . with lt5 volt raotosr
.r Strp-up oeclr lqr laannrcd cooLing arcas . Stalnlerr rtecl wrethlr mvrrr for oli models . Free.rtenritng rcffrr|r (Il5 volt motorr)e Hecrry-duty wood rnoltrEt bomc for all models r Prcporr cTllndcrr, rrqrrlaOrr ard hora!
i,I FI f\ J I
Top is on back and sides, 1id
tum.down 4" sink wehsd in ptace. comes
wiih set. Top mounts a gri" glass till€r. ir€s dre-
srampsd qpsning wilh chrcme-plated wire strarn€r, lce ohest
opening is 1072'x 157e', di*stamped with al,i" raised ed-ae. and hss
one-piecc lift-oft cover rn zo-gauge starnle3s steel.
lce bin liner is highimpacr ABS da$rc wilh coved corners and ptched
to 1"{iam€tgr drain. Bin insulated on side3 anct bottrom wrth htgh-
dEnsity polyurethane.
OutE d€ body i5 ptl-gEuQe ga.lvanized m€tal. Unit comes wfh 1331e" x
457r" lront pan€l in z0-gaugs stainlegs steel. ftcr tieid installation.
CUT.OUT OIMENSIONS
ili":ii;.ii
rli?f"';
,"..:#it
''i,ll:#;I ::,.i.1
;t.i't
i;ii;::{",j..,i;:;
{t'.---
DUE rO
^ COiftF{t qrt tmcnrra CF FTOO9CT n tR.E l I OCLFEO hE\t€hlrEg nrE BGtfI lo
tte.ffidlAr.ut
A DMdon cf AIGO Foo&rvlcc Co.
P,o. Eor 470.ltt Ple.rang u|chrg{rn .l€t0|4{47t}
(lr4 7t+?tfl e 8oo4rr{fill
ftrm e(dlttf
iit."l"1
Frnia bvt^'
xx TOTffL FAGE. EEI5 XX
DEI}TE'd
.iS. tb O.aa C.rEr
f'!nA 31 92 B:U7 FRO HtrRTCOZF F I"1 ILLI,.]ORKS FHIIE.. E]EJ\f
t o{tct Ugaogo
60"______:-_
Model 5T4060
60{
-
Modd tl06O! il
60-
-
41"
i- lB"J- 24"* 1E"J
PLA|{ anrt ELEVATION
114" . 7'
- 1 8" -+- 24" ----'- r 8"-.,1
'i
PAN CUTOUT St AES
Ar I l-7l4" x 2e?/8'
6 - 11.7/6" x lY-^?tg"
HgtF; Doo€ may b rF.fiarl in ltdd.
u00Rcrlar^Et
DOOR OeENTNG OllUEr{srotrg
frf er9 s$rlll fld|,f
lctt to ritrt cLI|rra dmrnjqE
tlOTEr Oce( y
b ?rrtld rt t*ioiv.A = 113/4"B. 1S7/8"C.&311"
UODEL
S|IORAGC
cu.FT,
silELVES
so.Fr-
NO Frl{3
u lT
H.P.votTs i ArPs
0{!5.8 14 E 1tl s.5
r(tGola 15.5 11 11 1t.-! tt 5.5
;r{qo .15.5.l4 1ta 115 5.5
-sf.ffio r3.3 t4 1t4 115 5.5
MECHANICAL DATA
€LECTFICAL
cot$d ro rl.? ot e$mst c.ntrrlrl Ll|
to rlfht 16 .bon tloor lr rn t fL cord rldi ifE"f.^ Sr5 P plu+ l15V . 5.9 .rflF - GOc .1 9fi.
Pt.UIIBING
l{ona cukrd
IiLSTALLATIOII HOYE
&frhrntion ,Vfl|cr lr (biinrd F thd jt
rill tlow lr't* l|ni!, illlrdr r|rt ce.tF nr/ec.ing aiaa. rrd od rt fi to r.c at dr snai. AW r3a'tiqr t9 * fLr rill
vcad lta frrurty.
ouE tQ A @tfrlirOu6 PmOrlI|| OF PfE[n Ct ItJtloffo\A OfLFIELD REgE;vlE af€ FICXT 10 rl|AiE enl.GEE |n O€SlGt AirD s?EClF|cAnlO g wnHOrJT Pq|oF NOnCe.
The Delfield Company '@
fur ALCO Standud Compcrq- ,t'\
P.O. Eo( 47O r llL Plc.afrth rttlc gu tlEEfi-OfZO
(3r7) ??3.?9El r 0{Xl.Zl8{Oill
Forn DSdOGO Er
MnR 3l '9e 9r25 t*f HFRrc0,/R R f"l r LLT,JoRKS
I
I|ETJTE,d
PFGE. EAE
PFOJECf
JTEM NO
281/z'
Delfield Autocad'" RefErcnce Numbsrs
arH ftp 8nd UldQtEgunl.r
Rcldgotrto18
Del{l'sld/Alco nbm olsk
llodel No. Etevation Side Pl.n tlo.-
Salad Top Belrlg..rto.
4060€ OAro0OnE DA40oogig OAiOooSP 6
406+14 0A40010E DA400099. DA400I0P 6
underco{nl€f R€ttlgEdot
rJc4060 DA40m8E OA400(BS DA.00o8P' 6
Refrigerator
4060-14
Too io be conslrucled cl one-Drece
22{au9e fronl edgs to be lurneo cjown 10 form
nosing, and turned up in rear to form backgplash. Too to be supplleo
with dig-stamped raised rim opening(s) wif n l i$th pans Installed 2f i-
in. deep. Op€nrng(e) to be supplied with telescoorng rid(s). Lrd(s) to be
oonstruc'ted of 20€29e and z2-gauge slainless steer. Cne (1) com'
posilion.typ€ cutting board to be l,:.in. thick x f-in. wrde. maunteo on
toP.
hierior to be c$nstructed ol on+piece ABS material wilh inteEral shelf
supports, cabinet to be fifled with (6) adjustable epoxy-coaled
shelves. Cabinet to be tully insulaled with foameo'in-olace poly-
urehan9.
Door to bg coGtruc{ed wrth ABS lin€r and 22!auqe slainless $t€el
ertenof. Door tlandleg tg bc congtnrcted ot one.ptece black anodized
metal and will be rec€es€d into door- Door handles extend the tYadth of
thc rlo(rr.
Extgrior 6nds to be constructed of zz€auge statnless st€el
E)dgior back end bonom to be construcd ol one-piece z4-gauge
gah,anized metal.
Comp|rcrot to br 7r h.p. with cuden€€r @il and hot gss condensat€
evaobraor. ano mountgo en caDlnet rear. tsvapofalof con and contrul
to b. rnounted on interior of cablngt trar wall- R€trigorant flow to bi
controlled vir capiflary tub€, Unn to be completely wited with plug and
cod. Unit b maintain gti'- 40f.
Unit to b! mountcd on Sin. high adiuslablg legs.
Self-Contained Gompact Refrigerator
UC4060 and ST4060
Seil-cantained refrigeratsd basc. Top to be constructed ot one-piece
2.-g'/ugc stainle3s sreel. with tront €dgs to b€ tumed down lo lom
no€ing, and tumed down in €ar on UC40@ and turnsd uP in rear lo
form bacKsDlash on 5T4060.
l erior to be construgted ol one-picce ABS maleri8l with inteqral shelf
supports. cabin€t to be tilled with (6) adiustable epoxy-coatecl
6helvoo. snd to br lully insulated wilh foamed-in-plac€ polyurethane.
Dorarc lo be canstructed wilh ABS intenor liner and 22-gauge stainl€ss
$eel extefior. Ooor hanclles to b€ constructed oi one piece blac*
anodlzed rfietltl and will be rccessed inlo door, Door handlos to ext€nd
th3 width of the door.
ExtErior crrds to bc constructcd of 22{auge $ainless steet.
Ext€rior btck and botrom to be conslructed ot on+piec,e z4.gauge
gah/aniztd met8l.
ComprraEor to b6 y. h.p. with condensr coil. and hot Eas condensale
eveDordor mounled on cabinel rear. Evaporalor coil and control to be
rnountad on interior ol cabinct rear ryall. Refrigerant flow to be com-
plrtcly wired with cord and ptug. Unit to maintain 36'o-40"F
unit to b6 fiounEd on 6in. high adiu3tablc legs.
5 r.r J lvt P-42 o
KS
BAH/WAITRESS SINKS. They're real space savers.
ea$y-access, space saving design with highly poiished
constructed of 300 Series stainless steet for
ledr's of wear and tear. Exclusive
self-rimming feature ensures
easy installation. Simply drops
inlo cut-out or hole without
any extra work or mess.
Itcm
Number Dr3criptbn
SIN AVINCS
Our bariwaitress sinks feature
satin lustre flnish, Sturdilv
Drain
Depth Size Case Lo'.^/vl,
Overall
Dimensions
155"4 2.Hole Ledge Badt
K1554C 15li-,,4 Sink Pad(ag6 yyl 7-1if H6igh!
Gooseneck Faucet and Basker Srrainor
1734 2-H,ol. L.dg| g|d(
K1734C t73{ Sink Pedqe wn-1l2'H€ight
Goorcncdt Fercrt end Brsket Strainer
15- x 15'
13'x 17'
13' x 17'
o
6'
o
3-1 i2' 1 -6. C rbs.
3-1/2' 1-9.0 ibs.
3-1t2' 1.6,0 lbs.
3-1/?" 1-9.0 lbs.
CALL (8oo) 23F36ss
FAX (414) 458.22A5
POLAR \NARE CO,VIPANY
F
cc\
/o P"* U''pln o
ft' tsn +3"t z &t td-
3$ff . r*r."
./
^ Ltl -/ ,"L./' /
7 l,-"0,"'',! .,t,, 1^ . l,, rT;"'""'
''^ 'J
l
'"
(^"'
' ' L"u''L<
!.'I1' ffiA
Lr/ t'f"
, l'zx' 'I p).^l-'r,"rl{.l
,l
J'ln
t7-*
lr t
y(,
a
Lr)
afreAAl ,)p x-F'tl9.
StAPlatt rfL.5 u ItTart,
uarl<lrorr OF
?C.rtry*6rtr qq.,4e
lfrrot',o
ar {f c+f
I /n-'
1ir.,-. *lut'\
'"*t )- rt"' rJ .\tzt""
/' /.ltL c
utClltttt{-"Vcao ,@tP\ .l
/7 .', "''/,,,/-'
' tL
/
-.-l'.
,/
i-i .. ,, i .'/'.'t
rr.r94o ordrAJ!.
WAv/otE V(pd,
/
|'Wll / 2rQ7
4'z s'12'
W Proloct:
THE WESTIN RESORT
T€mporary Ganopy
1300 Westhaven Dfi\re
Vail, Co. 81657
May 11, 1992
Drawlng Llst:
Perspec-tive Sketches
Site Plan
Location Plan
Lower Level Plan
West Elevation
Building Section
Plan View @ lsland
Elevations
Archllest:
Peter M. Koliopouhs
P. O. Box €92
Vail, Co. 8'1658
Tel. (303) 479-0503
Program:
To provide a temporary / rernovable, seasonal fabric
canopy on the South deck ot lhe Westin Resort.
General Notes:
All construction documents must comply with
all building and zoning codes as adopted by the
Town of Vail.
Oflner lo ooordinate all submitlals with Town ol
Vail as required by Town of Vail.
u
A1
A2
A3
A4
A5
A6
A7
A8
9Attp oo'+
Drapp
"zl Ailafr 6obcj farfrrea AAptE.
77trr aEgnp
lffifuolel a$nf7.
iti'D i'1AY I i!l.l/
Fl&3tc.
FpoF.f,oe,c- W.
(1hll*'rc-vgap-94ffi03't,
SaAo\JW go?Wt.
FPP-rc '
f469lz q4 prtrbz 4$_4e&il':
751e,Nh-G btffofrS Fn9'r.p|rurvl To
7tur44ru.?Eftol.tl,ae
)o?totr>.
t@opt /+tDa ytEN
5' u'1. '
j
5'6.1a.
' li ;...i ,.
.I
I -t
a
,-.
U
'\*.:;.'
:
\
t
I
l'-rl rllr,
;
I-,EXISTING C.H.C.
BUILDING
t
TERRACE UING
E(lgnhtG'
y'lr,.iA -__
":7./4. -'\
I
I
i -'+':i
\ .)
('rr/3
7/A
t ,
,I
. DRTIN IITE
ILEVELI
I't\
\
\I \-- -t
"...
'\- 't..
)
-t-..-\---
: -.- \-
"--- -'-.----
,.,--..-,1.
"].-.r
\
i,:
:r
i/a aar
!
I
-/
-tt-
-/'
, TIEETHAVEN
PLAZA BUILDING
_-i'z r-
7ft 9i1E P.-AN
-\-/ tbaggr'-art
RIC'DMAYiilgg2
o
7
t]II
_,-_Io:
LEz
a0't',(rE,@
l|'
r+
I
t;
i'
li
+t-'d. f --2'ol
| y','
JJ:;--l
+Ti are Gi,-grr.t! rl,'.e^!-- - )
LOCATIA g PL ATJ
\Jffi-ta * r.-?:== lnl
E
ta-A.!b'
J'rl1i""j1
;:ds31 GF-.
)re'ta t#l al{F-' 7'4.
e e
q
t\
a
€
EN'Ig
EE]
.d
|-
7\ \6 ?etq
4r '#ffi ar4r4rn ?+rt
A n --?ot *1aqT.-
:- ' f-Das.|at -+J7tp\Otl%,tht-v bpaA,
i,^e @
"*rar ll lt-a''".ItP-- . :-11-"9.?. .-, pti$-:-_@
-| -_,-t^a,!811-
ll t1
:l Elr ,i
L,i'Er\Ne @ fuattrp.t'
t?*
I )r
.--... qED K.Al&l ?J'* -.
4GFA a4^ L* - ..
*ey Xa p( r+t tip
r.i l!
I t tbtt s l' -e"$,6,Q 2'
,A.. (
Rtc'0MAY l1lgsz
o 7
tlr+Ea ..!\lEr pel e-
EE
Af irlr--.;-.?L?61 -A1r grAf
- \9\@
e-r@l
^,e
,$.vt
t@rs.r.
@I
'.8,v.').t
FFEP IM
/e.w @
1Ey-1-ar. arrtr -,
@ ig-
r,^. ;rT
5:.<!
a€(!r
e?
''g\-l
ta.€l
tt{-l \.
-/4 . 2 t \---rf>--
\r41 3 -? -i-;41 l"- -l --------* B '-----.t - 6'w'4-=-1
tF-- -
| 'ie'-! i.r--
I
thGe&
@
8r
t-'qi
lN
a
rt
aO.1"'-&, a,'.*ra
'6-
' L?--e qg
- Ft :.1 a;;2 a .2. -:
t=5
d.
-rl
sts--'*- - "--(ni1\4'a tl
ea<-- #,arl"4 *,6, e,{.o\, f-
I 6,g
r
i:a
j-:\:
-s4
,€\iP
,i<
iL€AV
6S-
r^7'
Alt
I.
1d al'
o
--2-)a9.:.
tll-Fia StFk @
i:-"r3-
7-'
+.;
i f,,,
4ro' | .4
o 0 o a
?laal \7
I
I
I
e
I
:
o
6W Vtl*hQ
?vwAaoFl,
rcr
'HW7
-1
)-ffi
I
I
-[-pra
i
I 1*'t\ | .c*a</': e:e<a . ;--i . a??<r=.-
I
ii',:
t
@
ffiffDMAYlitgg'd
o
T:o A
P
,sl$t '9,:e-:-&^.--:-l
I
ra.uStt--"aE
Srestt
tr6ax.t l!A.C\E-+
A SECTIoIII g,/ffi-
mmMAf 11lssl
_p 6 s
I -0
l5'' 1"
,-.-
crLAta 3&1e 9"IAL.
| -FAgFta.
I ' -llTu.bufuffia.g t*,r.AuD,LAIJ VtEhJ
,/4t')t QoQl"
ffir0MAY1i19s2
o
hJFbT atEva f l3 H -ll e a 8' lt, Otl
*5:6:,tr
R|gf. llAiLruq fa tltilrg.
3t,E vl1'trr g HrRrH | *UtFl 6L?v,
| | 4n61t.5l ).(e.42.
4#tut&
l''l*ttt.
l' . rl'/.a.q17 I t 4ncf-al
trnfrAy 11BsZ
CONSTRUCTION PERMIT
lnrn
department of community development
TO BE FILLED OUT COMPLETELY PR IOR TO ISSUANCE OF PERMIT
TYPE OF PERMIT
ExeurLon'lc I pluMarNc
{ik Ere crRtcnr [-l FouNDAloN
! MECHANICAL T- . -"1310 WESTHEAVEN DR.
NOTE _ COPY OF PEHMIT TO BE KEPT ON JOBSITE
DATE rN oN NOV t2, I99I
PLANS ATTACHED
c052 2 4
LEGAL
51111116 THE WESTIN HOTEL
JOBNAME: WESTIN HOTEL PARTITIONS
Nnvr THE WESTI_N_HqIEI
I3IO WESTHAAVEN i
MAIL ADDELSS -
ARCH ITECT
MAIL AODRESS
CITY PH.
GENERAL
CONTRACTOR
FIRM CARPENTRY UNLIMITED
rowru or vo'. "rc. ruo. 107-B
476-7739 q\^j
ELECTRICAL
UNITED ELECTRICT
11 t-E
TOWN OF VAIL BEG. NO.
949-4119
PLUMBING
CONTRACTOR
MECHANI
CONTRACTOR
OTHER
CONTRACT
I. TYPE OF CONSIRUCTION I
2 OCCUPANCYGROUP A
I t tv v
BEHIRM
22a34 DIVISION 1
GENERAL DESCRIPTION OF WORK :
REMOVE PARTTTTONS -TNCTAT.I. NEI^7
PERMIT NO.
z
;
l
BUILOING
ELECTRICAL 3.000
PTUMBING
PARTITIONS WITHIN THB WESTIN HOTEL MECHANICAL
ALL NON-BEARING.TOTAL 15,000
TYPE GROUP G.R,F,A, VALUATION PERMIT FEES
I] FR 0 15,000 BUILDING PERM IT 195
N
),
\
\\\t!")
PLAN CHECK r27
E L ECTR ICA L 54
NEW( ) AI1ERATION (]LU{NDDITIONAL I REPAIR{ )PLUMAING
DWFLL]NC] UN]iS ACCOMMODATION UNITS
-.--
IJE]GHT IN FT,
-,-
NO FIFEPLACES
MECHANICAL
RECREAIION FEE
TH iCKN ESS R-VALLI.]E
NONE
ADDITIONAL PERMITS NEEDED:
N INITIAL
ST, CUT
BLASTING X
ARKING _lt
OEMO x
INSULATION
FLOOR
EXT. WALLS
FOOF
ELEC
DESIGN REVIEW BOARD
CLFAN UP DEPOSIT 100
USE TAX
RENEW CONT. LIC.75
TOTAL PERMIT FEES $ ssl
DAN trX!ffi STANEK NVO 15, 1991
rutlolilc OFFf CtAy DAIE
NO PLANNER
ONING AOMINISTRATOR DATE
lONING & BUILDING NOTES:
VERIFY FIRE ALARM SPKI,R CEANGES !.IIFIRE
DEPT. FIETD INSPECTION REQUIRED FOR
COEE EOMPI.TANNF'
I hereby acknowledge that I hav6 read this application, tilled out in full the information required,
completed an accurate plot plan, and state that all the information provided as required is correct. I
agree to comply with the intormation and plot plan, lo comply with all Town ordina
laws, and to build this structure according to the Town's zoning and subdivisidn codes,
review approved, Uniform Building Code and otherrrd+Fances of thetrtwt'rRplicabhl the
CLEAN UP TO: CARPENTRY UNLIMITED p0 Box 403
EDWARDS CO 81632 ANO THE OWNER.
tate
CONSTRUCTION PERMIT
NOTE _ COPY OF PEFMIT TO BE KEPT ON JOBSITE
DAfg l,tt'f, t'l''SJ,!"'l PERMIT NO.
dop€rtmont of community davalopment
TO BE FILLED OUT COMPLETELY PRIOR TO ISSUANCE OF PERMIT
TYPE OF PERMIT
!u
D
fl u
D
BUILDING
ELECTRICAL
MECHANICAL
PLUMBING
FOUNDATION
r TYPE OF CONSTRUCTION (r lrrr rvv
2, OCCUPANCY GROUP liBI H
'R
M
DIVISION r22a34
PERMIT FEES TYPE GROUP G.R,F.A, VATUATION
FILING
JO8 NAME:
ADDITIONAL l REPAIR ()
OWELLING UNITS
HEIGHT IN Fl
ACCOMMOOAIION UNITS
-NO. FIREPLACES RECREAIION FEE
MAIL ADDRESS
CITY PH.
CLEAN.UP DEPOS'I
TOTAL PERMIT FEES
//td
-DAIE - -
I hereby acknowledg€ that I have read this appllcatlon, fille<l out in lull the Information fequired'
compleied an accurite plot plan, and state that all th€ intormalion provld€d as required is co.rect. I
agteL to comply with lh€ Iniormation and plot plan,lo cornply with all'Town ord.inances and state
la-ws. and to'UuitO this slructure according to'th6 Tqwn's i6dng and subbivision codes, d€sign
review approved, Uniform Building Code and
AND THE OWNEF.
HIMSELF
TOWN OF VAIL REG. NO.
TOWN OF VAIL REG. NO.
luwn
75 south frontage road
vall. colorado 81657
(3031 479-2138 or 479-2\39 ofllce ol communlly development
BUILDING PERI.iIT ISSUANCE TiME FRAME
If thi.s permi.t requires a Town of Vail Fire Department Approvai,
Engineel's (Pub1 ic l,lorks) review and approval, a Planning Department
review or Health Department review, and a revjew by the Buiiding
Department, the estirnated time for a total review may take as long
as three weel(s.
A'l'l commercial (1arge or smal'l) and all multi-family perm'its will
have to follow the above mentioned maximum requirements. Residentjal
and small projects should take a lesser amount of tirne. However, if
lesidential or smaller projects impact the various above mentioned
departments wi.th regard to necessary review, these projects may
also take the three week period.
Every attempt will be made by this department to expedite this
permit as sgon as possible.
I, the undersigned, understand the plan check procedure and time
frame,
Agreed-t6-byi. --
Communi ty Devel opment Department.
i
I
75 south lronlage road
Yail, colorado 81657
(so3l 479-21.38 or 479-2L39
TO:
FROM:
DAEEs
SUBJEC?:
olllce of communlty developmenl
ALL CONTRACTORS CURRENTLYL REGISTERED WITH THE
TOWN OF VAIL
TOWN OF VAIL PUBLTC WORKS/COMMUNITY DEyELOPMENT
MARCH L6, 1988
CONS?RUCTION PARKING & }IATERIAL STORAGE
fn summary, Ordinance No. 6 states that it is unlawful for any person to litter, track or deposit any soil , rock, sand, debris or material , including trash durnpsters, portable toiLets and
workmen vehicles upon any street, sidewalk, alley or public place or any portion thereof. The right-of-way on all town of VaiI streets and roads is approxinately 5 ft. off pavenent..This ordinance wil-I be stri-tly enforced by the Town of vail Public Works Department. Persons found viotating this ordinance will be given a 24 ltour written notice to remove-said material .In the event the person so notified does not comply with the notice within the 24 hour time specified, the puUfic Works Departrnent witt remove said material at the expense of person notified. The provisions of this ordinance shall not bL applicable to construction, maintenance or repair projects of any street or alley or any utilities in the right-a-way.
To review Ordinance No, 6 in fult,Vail Building Departnent to obtain cooperation on this matter.
Read and acknowledged by:
please stop by the Town of a copy. Thank you for your
Positionr/Relationship to Project (i.e. contractor, owner)
Date
'!n'tA.<-t-
=,-ER.
' .3 J -ttill-. : t-
&qJi.---"-j', 1
ll +* TL:1 i-:':- -+'er-*
t-
.r:-r
J t'-5F.
- oF..lr\,
,, 0;18'>-_-.-t
I
,TQ-3*1
az iatAFT
..-rrr---l
* i$^r-]__-;_,\'-
.a4S?l?,4
o
1Y
V
SffiNYYEP-
Ve*nArt
.g?r.:e\ --Al
'ar?
s(nove ve
Ot Lai' @O,alQ4e.tlr,lre -A-
qpproved
0enied
Plan
n
tr
shall
Flro
n
tr
tl
liir{n ot ?ail Communtty
0evelopmenl
tJ
' a_--=_ a-2o
,ValidiW of Permit
, 8
!_,,-;_ ZAi._-!*.e .- : u. >J
i
ri - \3\@
=-a<+A.i*<r 8 tlIluance 0r
of, any
any othBr :J *g
i€i #ce,
.t -g\
bullding
-tlt 6)
t@,
!r\-+r/"..t i -.--.'-n
bt+
;bFA'
:rl't-t'ct af *.) '*
r -?r
-^r{9 t@:A t-
I I r: -,4t..-\f I -,f=--il-ggj
n
JI
ft- -
it
il
i4\-\:*(?t1\o
M
"'"
tF
'z)
qr-o
lazol
AX-r<!g
Cn/'a A @
Yi? r
L,fl 1':.
SiE
I
ia)
illl:
t-l al i;i .
I ['ll rlll ^,gxe
6t=tgaE
14 -5'
SXETCE 2
A). Remove wal-l to create boar<iroon from two (2) function roons,(Note: chese are not sLeeping rooms)
D). Install wal1 to make two (2) offices from one large offlce.E). Wall does not exist as shown.F). Remove wa1-L separating receptionLst from inner offLces Eo open
up offiee area.
G). Remove wa11s to create large open office for accounting
function.
H). Tnstall short wall and door to al1ow locking of accounting and payroll offices fron copier room which is accesslble at ai1
hours .
I). Remove r"rall to open existing space to service nev take-our
window Irith stand-up tables, Allows restauranE to expedite
breakfast crafiic.
J). Replace ralndov lrlth wand-door unit (meeting fire
requirements), and creating take-cut window for fast efficient
selvlce.
I o I o
,l
)^, j]
IF FI ll- L-f
l-,--a- -
7' NN\W
r wal1w1> Fi )Y/5 -+(
-VtoTlSDQez2YltS Q
rnrr!,n'a^,rr.,^.--., --- lb'9\'rt.:tp
a4
A
/'.r.l'1!rs )e tl\lauuJ?1 .l-}|'lq 4tH qnwl vca4 t-twltJ 47
#9,,#:^::qL31cads
,srield prps ut srorre ro ,o,rrr rql
_Dutrrnber rbup6raqr u,oa-i;piiii: o Jbii";i'ftfi#
l,'
tg,
il :f. j r",ll
? f,i:..:::jl9?!trrd s ;
s u e i o' rj boir i,Id; I fi ;. j,
:o^ 3l : nttl sti I u ol lBc! p s u n i r,t p ir';r,;';, li l.t{rlirt
^lH
ii',i
l3':^
ti
1,l
r?,,:::f l^'id a qu'
^u
s ro uol'roii ][if :
io' iiiiio r"
fi Jilft ,tTiff ,'J;\ ffi f :1x T;f,,,t H
t
fl,f,'ou,f fif,?go"t
I
4ih
fling
lueuldo,anan
Aruntuuo3 l'r1 16 u^ol
A.
*#'?l.E(1
r ?rr
).tlc>J F
)'t4tzaa
\ Jte f?Bt.'}t,\\
\\:./
-dtv 4 'r
?,€<1rP tlalqz\r
D
ueld
LJ :I
Li
erlJ rlllesH
firr
dftIflJg
1T\r x*A
|JWQHQ|'.1 4a)t-l
t-- 1 r1 i t^1t
i l-,J | |
-) 11
r l-.( '
-1
J I
-l
L
---- -t.-Ldd . Ll
*NE-qV 4 z E)al(r€"'.,?1,
/^.n
i
il r--t
I
I
Ii=
i
I
.1,
I
r -e}'
dl ,/
@w8 ?rufsp
tl
tl
fl
SKSFCT I
A). Remove existing wa11 and door.
B). Install walls and coor to enclose office.
t
) I \v
PERMIT NUMBER OF PROJECT
INSPECTION:
INSPECTION REQUEST
TOWN OF VAIL
D^rE /i ,' 7/_ JoB
t-ti-NAME :/ '-r'\{jg
MON
CALLER
TUES wED rHUR @v READY FOR
LOCATION:
BI
o
tr
NT
D
tr
D
o
LDING:PLUMBING:
tr UNDERGROUND
O ROUGH / D.W.V,
FOOTINGS i STEEL
FOUNDATION / STEEL
FRAMING tr ROUGH / WATER
ROOF & SHEER
PLYWOOD NAILING tr GAS PIPING
INSULATION POOL / H. TUB
SHEETROCKLNAIL
tr FINAL D FINAL
ELECTRICAL:
E TEMP. POWER
MECHANICAL:
tr HEATING
ROUGH
CONDUIT tr SUPPLY AIR
O FINAL tr FINAL
APPROVED
ECTIONS:
O DISAPPROVED tr REINSPECTION REQUIRED
DATE INSPECTOR
The ltens belort
glving a perult
Please check off
FINAL PLI'MBING
INSPECTION' S
need to be complete
a flna1 C of 0.
1o the box provlded.
CO}IPLETED
before
t_
DATE:
FINAL !,TECHANICAL
tl IMPROVEMENT ST'RVEY RESID. NA}IE:
DATE:
ll I FINAL ELECTRICAL
DATE:
FINAL BUILDING EAST SIDE:WEST SIDE:
DATE:
TEMPORARY C OF O
I
I
DATE:
I
I
I l;
I
CERTIFICATE OF OCCI'?ANCY
DATE:
LAI.IDSCA?ING DIIE
rtA'FE r
FILE NAME:\ssA\
$,wtifirutp uf (Drruilunrg
@uurn (Df liluil
tuililing Drpurtnrrnl
THIS CfRTTf,CATE TSSUED PUR.S|./ANT TO THE REOL/'REMENTS OF 'rH[ UNIFORM BU'I-DING CODE
CERTIFY'NC THAT AT THE l'IMh. OF ISSUANCE THIS.STRT/CTT/RE WAS TN COMPI-IANCE WITH'THE
YAR'OUS ORDINANCI.S OF THF. TOWN REGUI-A77NG EUILDING CONSTR{iCTION, AND OR USE, TO
THF, BFST OF OUR KNOWI.EDGE.
Namc WESTIN TERXACE WING
Use Clasrificarion HOTEL/APARTMEM HOISES croup R-l
Building Permit No.2866 -l ypc Consrrucrion II FR
Owner of Building,VAIL VENTT'RES LTD
Building Address 13OO IIESTITEAVEN DRIVE CASCAI}E VILLAGE
-lht building ()fficilrl ora1. in writing, ruspcnd or rctokc l (itrti-
fttrtrc of ()ctup;rncl is'rrtd unrlcr rhc provi.ions rrf thir trxlt u hcn
rvrr thc ecrti{icarc ir irructl in crr(,r, ('. (}n thc ba'i' oi irerrrcct
infornrltron supplitJ, or rvht'n it ir dcternttnrJ rh;rt rhr huilding or
\rrrrct!rrc r)r grrtion thcrc,rf ir in rirrl;rtiorr of .rnr rrrdirrlnec or
reBulariol o[ th(. lo*n,rl Vril or anr of thc prorisions of this
POST IN A CONSPICUOUS PLACE
Q,vrtifirutp uf (DrrupnnrU
@uun
tuiliing
(Df liluil
Brpurtnnrnl
THIS C-ERTIfICATE ISTUED PURSUANT TO 'IHE REQUIR!'MT'N7S Of THf UNTFORM BUII-DING CODI
CERTIFYTNG THAT AT THE TIME OF ISSUANCE TH'S STRUCTURE WAS IN COMPI-IANCF, WITH THE
YARIOUS ORDINANCES OF THE TOWN REGUI-ATINC BUTI-DING CONSTRUCTION, AND OR USE, TO
THE BES-T OF OUR KNOWLIDGI.
Name PLAZA PHASE II
Use Classificarion ASSEMBLY ROOM 5r.ruo A 2.1
Building Permit No.3040 Typc Construction II lHour
Owner of Building VAIL VENTURES LTT)
Building Addrcss 1298 TESTHAVEN DRIVE CASCADE VILI.ACE
-l hc building rrffieirl nrav. irr u riting. rurptnd or rtvolc a Ccrri-
Iicerr of ()ecuplnel irsutd undcr rht prori.ionr ol rhis crdt s hcn-
crrr tht ccrtificatc it isrutd in rrr()r, ()I .rn thc hasit.f incorrccr
infornr.rrion rupplrcd, or s htn it is dcrcrnr incd that thc building or
ltnr((urc ()r portion thtrrol i,' in violetion of ;rnr' ordtnenct rr
rcgulatron of rhc litlvr of Vail or anr oi rhr protirions of thir
POST IN A CONSPICUOUS PLACE
I O BE FILLEO OUT COMPLETELY PRIOBTO ISSUANCEOF PERMIT
TYPE OF PERMIT
n
D
D
ffi -T
AX
BUILDING
ELECTRICAL
MECHANICAL
PLUMBING
FOUNDATION
1300 llesthaven Dr.
::,:' I
LOT BLK_--
FTLING UR UNPLATTED
JOB NAME: PLMA PHASE I I
C 'ER ures
MAIL ADDRESS
crrY Vai I PH 6-6602
a en
ARCIIITECT anN Roma
CITY Qen
1420 Sutter st.
Frrnr i c rnPH 776-435IL
.IERAL
CONTRACTOR
ELECTRICAL
CONTRACTOR
-:i
PLUMBING
CONTRACTOR
(
F|RM G.E. JoHNSON
,o*" o, uo,r rro. "o.
Pffi
r€LE. 476-5321
-
FIRM
TOWN OF VAIL REG. NO.
FIRM
TOWN OF VAIL REG. NO. -
TELE.
M ECHAN ICAt
CONTRACTOR
FIRM
TOWN OF VAIL REG. NO.
TELE.
OTHER
CONTRACTOR
TOWN OF VAIL REG, NO.
TEI E.
PERMIT
NOTE _ COPY OF PERMIT
August 20, l9B7
DATE
TO BE KEPT ON JOBSITE
OUT Sept. 4, I9Bl
IT NO
I. TYPE OF CONSTRUCTION I II III IV
2. OCCUPANCY GROUP ABEHI RM
DIVISfON 122a34
GENERAL OESCRIPTION OF WORK :
NE[,I- CONSTRUCTION MEETING FACILiII--
PERM
z
tr
Bt,ILDING 1,710,ooo.oo
ELECTRICAL 260 ,000.00
PLUMBING 130,000.00
MECHANICAT 200,000 .00
IO IAL -S-TJU0_IOU-3-U'
PERMIT FEES a*-TYPE GROUP G.R F.A. VATUATION
thr A2- 1 356ffL 2 -300 -000 n(BUItOING PERMIT /6. lAn no Hl sl
SJ
Fu
$s
PLAH CHECK 3.99 I .0n
ELECTRICAL
PLUMBING
3,726.00
Ilctrfl1.300.00 llrwilX ALIERAItoN( ) ADDITIoNAI ( ) REPAIR( )
OWELLING UNITS
HEIGIIT IN FT,
ACCOMMOOATION UNITS
--NO, FIREPLACES
R-VALLUE
TYPE
OF
H
ADDITIONAL PERMII'S
..\
NEEDED:
IN ITIAL
INSULATION:
FLOOR
EXT. WALLS
ST. CUT
BLASl.lIIG
"oii.{Rd
MECHANICAL 3,000.00
RECREATION FEE r 4?l^OO
DESIGN REVIEW BOARD 300.00
CtEAN.UP DEPOSIT
fp00.o0
USE TAX 11,500.00
TOTAL PERMIT FEES $35,377.00
GARY MURRAI N V\-- SCPI. 4 '-ItB7_ _;*#^iei,i'idir'- - - Dni-e
IONITIG ADMINISTRATOR DATE
ZONING & EUILDING NOTES:
lhereby acknowredse that lhave read this.appr.i:.li1"frj1!9.,'^1till:lli::i:"j,Tltli'l:?,X[lioi
;";;, ;;ii; -b,jitJ tnit slructure according to the Town ing and s ision codes, design
ieuiu*ipptouud, Uniform Building Code and olher oyb
cLEAirr up rc,v*tLleor*
I
stGNATtiFE oF owNER oR
AND THE OWNEB.
co FACTOR FOR
CONSTRUCTION PERMIT
department of community development
TO BE FILLEO OUT COMPLETELY PRIOR TO ISSUANCE OF PERMIT
TYPE OF PERMIT
NOTE _ COPY OF
oor. Al'rll 16,
PERMIT TO BE
l9ct
KEPT ON JOBSITE R'\\'V
ll
6
0qi !
EI
U
U.
BUILDING
ELECTRICAL
MECHANICAL
PTUMBING
FOUNDATION
l3f0l tleit ttryen 0r
8LK--=.-
FILING llilr'l rlTrn
JoB NAME: TEprt^(;t I.ltFC
Irl00 5 Fmnt. 8d.
ctry |a I
ARCHITECT
GENERAL
CONTRACTOR
G. E. J0lt{s!.!fl
TOWN OF VAIL REG, NO.
ELECTRICAL
CONTRACTOR
FIRM
TOWN OF VAIL REG. NO.
PLUMEING
CONTRACTOR
f IRM
TOT,VN OF VAIL BEG. NO.
MECHANIC
CONTRACTO TOWN OF VAIL REG. NO.
FIRM
OTHER
CONTRACTO
TOWN OF VAIL REG. NO.
TELE,
Tf i'?:riT8f iT ff ii tf t8,i-; rz-o-
GUSt I n0(f{5 - lt{.r ItL
r. TYPE OF CONSTRUCTTON I t tv v
2. OCCUPANCY GROUP A8 EH IRM
DIVISION r22^aa
PERMTT tqo. Il i ::r't
z I
a
BUITDING 6.0r4.01n.00
ETEC]RICAL 493,1tC0.00
PTUMAING J4J I U4l{}
MECHANICAL 535.000
IKTE IIN itt ) /,455.r.XJt.U0
TYPE GROUP G.R.F.A. VALUATION PERI IT FEES lt rR 9t,3t0 I,4 55.000.0rt BUILOING PERMIT
PLAN CHECK
I() r,l5ll
I l0,613
ETECTRICAL 1,220
NEw(")' ALrER4Tlolr ( ) roornoHeli-l--EEFIiFI PLUMBING Jt.|JU
DWELLING UNITS
HEIGHT IN FT.
ACCOMMOOATION UNITS
-
NO. FIREPLACES
INSULATION:THICKNESS R-VALLUE
ADOITIONAL PERMITS NEEDED:
MECHANICAL 0,025
RECREATION FEE
l{1IAl
D€SIGN REVIEW EOARO 300
CLEAN,UP DEPOSIT I r iJUU
USE TAX ,7.215
TOTAL PERMIT FEES I 96,56c.0{)
I F^,(r |IURR^III 7,------E-LT;I'if I t--
leulotHc-oFrcnL-
--:- - - -DAm -
l---
roNrNG AOMTNTSTRATOR oATE
5{'., . tliJ r"l$se"pil*tffi
I here.by acknowl€dg€ that t.have read this application, fitled out in full the information required,compleled an accuralo ptoi plan, and stats that all the intormation provided as required ic ccirect. i agree to comply with the inlormation and plot plan, to comply with all To*,n ordinances and stats laws, and to build lhis structure ac_cording lo the Town's zoning ano *bdiui"ion cooes, Oesign review approved, Uniform Building Code and other ordinances oithe Town appticable thereto.
C[Enll UP T{l: 0.8. JfilttS0n
SIGNATURE OF OWNER OR CONTRACTOR FOR HIMSELF 80r lu 2lt9
Colorado Sprlngr S'001 AND THE OWNER.
CONSTRUCTION
department of community development
TO BE FILLED OUT COMPLETELY PRIOR TO ISSUANCE OF PEFMIT
TYPE OF PERMIT
)tt aurlorhrc {n Ii] Elrcrntcnr
Ntrl uecHRr.rrcRL
In tr
PLUMBING
FOUNDATION lS0 tlegt tlrven Dr
LEGAL
DESC.
LOT BL K
FILING U:ltIATIEII
JoB NAME: Fl.AZn Pll{SE I , ownen reur V1!l Venture: LT0
lr)(10 5 Front [ttd
MAIL ADDRESS
crrv Yrfl e$-0fi2?
ARCHITECT FIRM
MAII ADDRESS
CITY PH.
GENERAL
CONTRACTOR
FIRM fl. E. Jfifl'lsnrl
rowN or'A,LBEG. No. 12s-,lt trri=tgt-
ELECTRICAL
CONTRACTOR
FIRM
IOWN OF VAIL REG. NO
PTUMBING
CONTRACTOR
FIRM
TOWN OF VAIL BEG. NO
MECHANICAL
CONTRACTOR
FIRM
TOIryN OF VAIL REG. NO.
OTHER
CONTRACTOR
FIRM
TOWN OF VAIL REG. NO
TELE.
ir. prlnl.ry/v6il
PenMr Norts,-coPY oFRER"'t totFgttoN JoBSrrE
PERMIT
22 GUESII!0015 RrlD tU IUI: EXISII|IG
iIOTLL.
PERMIT FEFS TYPE GROUP ' G,R.F.A. VALUATION
BUILDING PERMIT
NEWI ALTERATION AOOITIONAT REPAIR
ACCOMMODATION UNITS
-
NO, FIREPLAGES
THICKNESS R-VALLUE
ADOITIONAL PERMITS NEEDED:
INITIAL
DESIGN REVIEW EOARD
TOTAL PERMIT FEES
"''oHfiff?&$'rntu :;r 6:^8il -
ONING ADMINISTRATOR
ONING & EUILDING NOTES:
I hereby acknowledge that I have read this application, filled out in full tho informalion required,
completed an accurate ptot plan, and state that all the information provided as required is correct. I
agree lo comply with th6 informalion and plot plan, to comply wilh all Town ordinances and stale
laws, and lo build this structure according lo the Town's zoning and subdivision codes, design
review approved, Uniform Building Code and other ordinances of the Town applicable thereto.
SIGNATURE OF OWNER OR CONTRACTOA FOB HIMSELF
ANO THE OWNER.
\Art\rhnuRrS,,
Mn . 6any Hucna in
Chief Bui lding 0{{icial
Town o{ Uail
75 So. Frontage Rd.
Uail. Co1o.81657
Dear Gary,
November 4. 198?
Please {ind enclosed copies o{ building permits {on the recent
addi t ions at the ly'eEt in Hotel in Va i I . To nry knorl edge we have not
nece iued the { inal Cent if icates o{ 0ccuoancy {or e i then the Hotel
addition oI 22 rooms, the Terrace lel ing on the Plaza Con{enence Center.
The {inals raene being held subject to completion of the Iandscaping
this past summer. Such work is noul conplete aE can be veri{ied with
Kn istan Pr itz,
I would also appreciate the return o{ the clean-up deposits to
Vail Ventures. Ltd. on ueri{ication that such deposits have been
ne turned to someone.
The perrnit numbers are 3040 {or the Plaza Con{enence Centen and
2866-28&7 {or the 22 roon add i t i on and Tennace l,^l ino.
Please let knor i{ you have any questionE or need additional in-
+ oFma t ion.
Sincerely,
Fcank B. Fneyen III
R[C'ONOVCBI9Bg
lom SOUTH FRONTAGE ROAD mST, vAlL. COLORADO 91557 o 1303) 47ffi6o2
ORDER DATE DUE DATE CLAIM NUMBER TERMS REQ, NO.VENOOR
NUMBER
P.O.
NUMBER PURCHASE ORDER
I I aqtD Tr'\.
VENDOR:
PAGE NUMBEF
THIS NUMBEB i/4UST APPEAR ON
ALL PAPER & PACKAGES RELATIVE
TO THIS ORDEF.
-l
I
I
_-]
LADING
75 south frontage road
vail, colorado 81657
(303) 476-7000
PLEASE SEND
-
COPIES OF YOUF INVOICE WITH ORIGINAL AILL OI.
F.O.B.
BUYERS NAME
r .' !,:a_ i' :
IMPOFTANT
PLEASE NOTIFY US IMMEDIAIELY tF YOU ARE UNABLE TO SHIP COMPLETE ORDER BY OAIE SPECIFIED.
LIN
NO.
OUANTITY
OROERED UNITS -lo PART
NUMBEB
UNIT
PRICE
TRADE
DISC.
PRICE
EXTENSION
GENERAL LEDGER
ACCOUNT NUMBER
GENERAL LEDGER
AMOUNT
T OIT A L 1, OO0. S0
PART DESCRIPTION
ttl
PART DESCRIPTION ttl
PART DESCBIPTION ltl
PART DESCRIPTION
PART DESCRIPTION
...\St "...,.o \\ /1 /X\- VENDOR ORIGINAL
j'.t,, L3laa
SFIIP TO:
12/QL lffi
ioblt\i OF VAIL
( 1 } I{UNiCIFAL EUILFII{G
75 SOUTFi FRONTAOE ROE[,
vAIL, Ctl AL&17
VAIL VENTURE$ LTD
1OOO 5 FROf{TACE READ i4Eg.T
vAIL, CO 816i7
TOCI4SO C2?373
THIS NUMBER MUST APFEAR ON
ALL FAPER & FNCKAGES BELATIVE
TO THIS ORDER.
. VENDOR:I
_l
LADI.IG.
75 south trontage road
vail, colorado 81657
(3Gr) 476-7qxt
RTASE SEND
-
COPIES OF YOUR IIIIIOICE WTH ORIGIML BLL OF
MRT DESCRIMON
.,ANEXL TURNEULL }
IIPIORTAIfT
PLEAST TOTFY UA IIflEDIATELY IF VOU ARE Ui|ABrl TO SHIP COf,IPI.EIE ORDER BY DA1E SPECIFIID.
MFT DESCRIPTION
MHTDESCR|PflON
IENFNCNT HEA'
RECETVED B/
DEPABTT'EilT COP!
ORDER DATE DUE DATE CLAIM NUMBER TERMS REQ. NO.VENDOR
NUMBER
P.O.
NUMBER PURCHASE ORDER
1. t_l'l
SHIP TO:
VENDOR:
PAGE NUMBER
- € r:. lilTi-.: ii:l'"-ir.1t....-.5 :rt1,'.1'
ii rr- i'LJ r'Lr-ill
' .a l'l r ,Ft l:"r ir:lr'i-' / :- r-.
i ,;i:r..r *. r' :-. Jii.j i .-r:,r':. :, "- *i-:
THIS NUMBER MUST APPEAR ON
ALt PAPER & PACKAGES RELATIVE
TO THIS ORDER.
I
I
l
LADING,
75 south frontage rc
vail, colorado 81657
(3O3) 476-7OOO
- \r*t \'..{q,51
t,$\rr\-.
'N\trr:\r\ \BUYEBS NAME
PLEASE SEND
-
COPIES OF YOUR INVOICE WITH ORIGINAL A]LL OF
F.O.B.
IMPORTANT
PLEASE NOTIFY US IMMEDIATELY IF YOU ARE UNABLE TO SHIP COMPLETE ORDER BY DATE SPECIFIED.
UN
NO.
QUANTITY
ORDERED UNITS Bzo MRT
NI.'MBER
UNIT
PRICE
TRADE
DISC.
PRICE
EXTENSION
GENERAL LEOGER
ACCOUNT NUMBER
GENERAL LEDGER
AMOUNT
PART DESCRIPTION 1}n
PART DESCRIPTION
| | lrolrjni-
PART DESCRIPTION
I L r-rcro. r.'
PART DESCRIPTION
PART DESCRIPT1ON
PART DESCRIPTION
PART DESCRIPTION tt
PART DESCRIPTION
VEND OR
PART DESCRIPTION
O R IG INAL
ORDER DATE t
VENOOR
NUMBER
P.O.
NUMBEB PURCHASE ORDER
THIS NUMBER MUST APPEAR ON
ALL PAPER & PACKAGES RELATIVE
TO THIS ORDER,
SHIP TO:
I
I
_J
LADING.
75 south flontage road
vail, colorado 81657
(3O3) 476-7OOO
PLEASE SEND
-
COPIES OF YOUR INVOICE WTH ORIGINAL AILL OF
PAGE NUMBER
F.O.B.
BUYERS NAME
IMPORTANT
PLEASE NOTIFY US IMMEDIATELY IF YOU ARE UNABLE TO SHIP COMPLETE OROER BY DATE SPECIFIED.
UN
NO
CX.JAMTTY
ffiDEED Bto MRT
NUMBER
UNIT
PRICE
TRADE
DISC.
PRICE
EXTENSION
GENERAT LEDGEF
ACCOUNT NUMBER
GENEBAL LEDGER
AMOUNT
PART DESCRIPTION
t
-1 r')l l: i
PART DESCRIPTION
PART DESCRIPTION
PART DESCRIPTION
PARf, DESCRPNON
PART DESCRIPTION
PART DESCBIPTION
DEPARTMENT HEAD
1\
neceveo ev -r \' i. / \ oke nec:veo
DEPARTMENT COPY
INSPECTION
TOWN OF
UE
,\lor
o
'\J
RE
VAI
ST
PERMIT NU EB OF PROJECT
DATE
READY FOR INSPECTION:
JOB NAME
MON
\nrc,.
CALLER
ruES 6;-.
LOCATION:
BUILDING:
tr FOOTINGS / STEEL
PLUMBING:
tr UNDERGROUND
O ROUGH / D.W.V.
tr ROUGH / WATER
tr FOUNDATION / STEE-
tr FRAMING
n ROOF & SHEEB " PLYWOOD NAILING tr GAS PIPING
tr INSULATION POOL / H. TUB
tr SHEETROCK NAIL
tr FINAL O FINAL
ELECTRICAL:
tr TEMP. POWER O HEATING
tr ROUGH tr EXHAUST HOODS
tr CONDUIT tr SUPPLY AIR
tr DISAPPROVED tr REINSPECTION REQUIRED APPROVED
CORRECTIONS:
INSPECTOR
*
INSPECTION TOWN OF
1{'^r i1
-r1'' /.i [ \] lii
UE
lli,,
REO
vAtL )
,rii iJ
{
ST
r1,7
DATE
READY FOR
LOCATION:
L l-\,.1,-
JOB NAME
MON
CALLER
TUES WED ] THUR FRI PM
PERMIT NUMBER OF PROJECT
BUILDING:
tr FOOTINGS / STEEL
PLUMBING:
tr UNDERGROUND
tr ROUGH / D.W.V.
tr ROUGH / WATER
tr FOUNDATION / STEEL
tr FRAMING
- ROOF & SHEER - PLYWOOD NAILING tr GAS PIPING
N INSULATION POOL / H. TUB
tr SHEETROCK NAIL
O FINAL tr FINAL
ELECTRICAL:
tr TEMP. POWER O HEATING
tr ROUGH tr EXHAUST HOODS
O CONDUIT SUPPLY AIR
tr FINAL
APPROVED
CORRECTIONS:
tr DISAPPROVED tr REINSPECTION REOUIRED
INSPECTOR
INSPECTION
TOWN OF
REOUEST
VAIL PERMI
DATE
T NUMBER OF PROJECT
INSPECTI
JOB NAME
READY FOR
LOCATION:
BUILDING:
tr FOOTINGS / STEEL
PLUITIBING:
r] UNDERGROUND
tr ROUGH / D.W.V.
tr ROUGH / WATER
tr FOUNDATION / STEEL
tr FRAMING
- ROOF & SHEER " PLYWOOD NAILING tr GAS PIPING
tr INSULATION tr POOL / H. TUB
O SHEETROCK NAIL
tr FINAL tr FINAL
ELECTRIGAL:
tr TEMP. POWER
MECHANICAL:
tr HEATING
tr EXHAUST HOODS
tr CONDUIT tr SUPPLY AIR
tr FINAL
APPROVEO
CORRECTIONS:
tr DISAPPROVED tr REINSPECTION REQUIRED
INSPECTOR
t
l,.7ii t .l ,: bh
*
SPE CTION TOWN OF
o
REQUEST vAtL '*PERMI
DATE
T NUMBER OF PROJECT
READY FOR INSPECTION:N
L\
JOB NAME
N I
LOCATION:
lMo
,\\ {l
BUILDING:
O FOOTINGS / STEEL
PLUMBING:
B UNDERGROUND
tr ROUGH / D.W.V.tr FOUNDATION / STEE-
O FRAMING tr ROUGH / WATER
ROOF & SHEER
PLYWOOD NAILING tr GAS PIPING
INSULATION POOL / H. TUB
SHEETROCK NAIL
tr FINAL
ELECTRICAL:
tr TEMP. POWER tr HEATING
tr EXHAUST HOODS
CONDUIT O SUPPLY AIR
tr FINAL
APPROVED
CORRECTIONS:
O OISAPPROVED tr REINSPECTION REQUIRED
INSPECTOR
.4rea
Vrracs v1/tsln
\ArrVrxruRES ,.',,
-WJ: hbt'n{}*a'o N*^b t' ry
Sincerely,
Decenber 7, 1988
Mr. Pet,er Patton
Director of Conmunity Devel-opment
Town of Vail
75 S. Frontage Road
Vail, C0 81657
Dear Pe ter :
Vail Ventures, Ltd., owner of the Terrace Wing of the Westin
Hotel at Cascade ViLlage requests an emergency variance for the
L988/1989 ski season. The varlance is to pernit the Westin Hotel to operate a ski locker facility for its gueats. The request is required because the Cornerstone Building, which is designed and approved for seasonal ski lockers, has not been conpleted. Further,
because of the late conpletion of the retail element of the Terrace
Wing and the contiguous landscaping, i-t was impossibl-e to conpl-ete
the tenant finishes in the Terrace at a date sufficiently early to permit commercial t.enancies. Accordingly, a substantial portion of the retail area will be unoccupied until summer.
Vail Ventures will lease the space to the Hotel for this
season on1y. It will be staffed by Hotel personnel. The
requirement r+i11 t,erminate at the close of ski season in 1989.ALternative space wil-1 be used, if required, for next season.
Should you have any questions, please call
consideration is greatly appreciated.
/h*[
ADN/ t lmj
D. Norris, III
Partner 4/',4,.tuo'*fr#;,1**:f tT':**'h'{'/
W Tnrf ,' f '/ -r',fru;{
^"'
1000 South Frontage
' k*" "&fr',r,fu "*)-!,:fr"r, p+fufr iW,qf iry"W
Road West. Vail. Colorado 81657 . 303/476-6602
lnwn
75 soulh |ronlage roed
vall, colorado 81657
(303) 476_7000
August L0, l_988
Mr. Frank Freyer Vail Ventures, Ltd.
1000 g. Frontage Road W.vail, CO 81657
Re: Landscaping for Cascade ViIIage
ofllcc ol communlty development
Dear Frank:
I understand that your intention is to complete as nuch of the landscaping around the Conference Wing, Terrace Building, and Cascade CIub as is possible this fall. I would like to reguest that you complete the landscaplng along the north elevation of the Cascade Club. It would be wonderful if this issue could be resolved as soon as possible.
I am also requesting that the landscaping along the north elevation of the Plaza Conference Wing be conpleted this faII.Your landscape plan will add a lot to this side of the building.
Pl-ease let me know if you have any problerns with the nighway Department and perhaps the Town can try t,o help you out in finalizing the landscape plan for the Cascaae bfuU. lhanks for your.cooperation on this natter. I know how rnuch you enjoy working with us tree-loving planners on these landscape pflns.
Good Luck!
Sincerely,r) t n.l | /. | l|-/ +r..frv''c1./t,- tn t.f-'\llrJrur) rUI/
Kristan Pritz'Senior Planner
KP: Kc
a
Rd.
Wing
tandscaping
'/vntLVrxruRES.,,
August 8, 1988
Krietin Ptitz
Tonn of Vail
75 S. Frontage
VaiL, C0 81657
Re: Terrace
Plaza II
Dear Kristin:
Per our conversation, it is the intent of Vail Yentures, Ltd.to ptoceed with the execution of. the landscaplng work as set forth in the plans dated August L, 1988 as prepared by W. Wenk Associates. The intended schedul-e incl-uiles the landscaping by
Septenber 30th 1988, of the area between the Terrace Wing and the blke path and along the west face of the 22 roon addition. The
areaa around the Plaza Conference Center and to the north of the Terrace lfiog can not be landscaped unLil G,E. Johnson has conpleted construction of the Conference Center in late 0ctober of 1988. We wiLl aEtenpt to coordinate conpLetion of the building
and the landscape work such that as nuch as possible is coroplete by Novenber lst. Any portion of the work not done by Novenber lst, vi1l be undertaken in the spring of 1989 with total coupletion by June 30, 1989.
We have included hereuith a map of Cascade Village r*hich lndicates the intended completion dates for each area.
/
Dlrector
FBF/ t 1fr
Freyer, III of Developnent
1000 South Frontage Road West, Vail, Colorado 81657 . 303/476-6602
INTERSTATE HIGHWAY NO. 70
r----I
I
I
I
I
I
I
_l
MANSFIELD
VITLAGE
I
I
TOWN OF
BUS STOP
'rffil lLu
I euttotNc I l"c" wEst I l-----.:
;nesj
ffi OFFICES .'nJ
STAIRS
,,1,[W
K
fft4d
rENNrs couRTS _J' 1_J1 __Jj
I ' THE CLUB !I coruoorrafrurunrs I . L ---J
I
CASCADE CLUB/PABKING STRU TURE
l'-ar \ r-r \t d!LJ
MILLRACE ,I
PHASE III 'tsi'i(f/.) I SKYWALK r\/ lm
$J*^"=
t l-L
N\ / T{L
.\ -V
**$cr
Tfuil
'tr/#*+
.'q
+9
Kf,
5V ({
ffi
o
o
m
s
t-
o
rrl
o
I
tr n
I
I
I I
SKYWATK
q{wW
{
f r
3 o c z
=
t
t
t t
CASCADE VILLAGE
VAIL, COLOBADO
/
[uwn
75 Bouth frontage road
vall, colotado 81 657
(3O3) 47&7OoO
July 14, 1988
t{r. Frank !'reyer
VaiL Ventures, Ltd.
1000 S. Frontage Rd.Vail, CO 8L657
Re: Temporary Certificate of Occupancy for the Terrace Wing,
Caacade Village
Qear Frank:
On July 8th, we met to discuss the items that need to be
addressed before the Town can release a tenporary certificate of occupancy for the Terrace wi-ng. These issues incLude:
1. The Cosgriff Parcel Restriction: Open Side Credit
needs to be subrnitted to Gary Murraln.
2. A letter of Credit to cover the landscaping for the
Terrace wing and Plaza Conference center must be submitted. we agrreed that the letter of credit could
be written so that the work must be cornpleted by
June 30, 1-9a9. The letter of credit would also need to be available to the Town for a reasonable period
of tirne so that, if necessary, Ite could get a
contractor to complete the work. As we discussed
over the phone, this is a date that is difficult to
determine. Ilhat we want to try to avoid is the
Letter of Credit becoming void before the Town would
have the opportunity to complete the work. I ttrink
the best thinq to do would be to see \dhat
reconmendations Sea First Bank could offer.
3. The property line on the landscape plan should be
indicated. It is roy understanding that the bike path
is completely on cascade village property. However,f would like to get the property line location
documented. At this time, Cascade Village is
responsible for all naintenance of the bike path.
o
Stan infor:ned me that if, you nere to transfer the naintenance of the bike path over to the Town of VaiJ., the Town wouLd nof except the path until necessary drainage improvenents are made. I would appreciate a statement frorn you that the naintenance of the bike path is still the responsibiLity of the Cascade Development.
4. I would like documentation of the Upper Eagle VaLley Water and Sanitation Districtrs approval of the sewer easenent. I looked through the files for Cascade Village and could not find any final approval for the easement. I do have a letter from Dave Krenek that indicates that the Eewer line rnay be rel_ocated.
5. I suggest that you talk to the Fire Department about their conserns with the landscape plan. I'Iike McGee is in the process of reviewing the plan and has some concerns with the landscaping.
If you have any further questLons about these items, please feel free to give ure a call-. ALso, I lrould appreciate having a fev days to review the information before the contractor would need the temporary certificate of occupancy. I understand that you would like to open the Terrace Wing the first part of Augrust. we will do everythinq possibLe to release the temporary Certificate of Occupancy in tirne for your opening.
Senior Planner
KP:kc
I {
VAIL TOt,lN COUNCIL
bIORK SESSION
TUESDAY, MARCH 22, 1988
2:00 p.m.
AGENDA
1. Discussion of Proposed Sky Lights for the Ford Amphitheater
2. Discussion of Cascade Vil'l age Frontage Road Improvements
3. Report on Year End Investnent Results
4. Discussion of Sign Improvement Program
5. Discussion of Visitors Center - Next Steps
6. Discussion of Recreation Trails Master Plan
7. Information Update
8. 0ther
9. Executive Session - Land Negotiations
I
2:00
Betsy Rosolack
Rud'i Fi sher
2:L5
Andy Norris
2:30
Steve Thompson
Charl ie ldick
2;40
Peter Patten
Stan Berryman
2:55
Peter Patten
1.
VAIL TO|jlN COUNCIL
tloRK SESSI0N
TUESDAY, MARCH 22, 1988
2:00 P.m-
EXPANDED AGENDA
0iscussion of Proposed Sky Lights for the Ford Amphitheater
Action Requested of Council: Approve/disapprove for the
ffint the design to the DRB).
Background Rationale: The Vail Va1 ley Foundation has asked
FudiFiiFer to design sky lights to enclose the open spaces
above the seating area of the Amphitheater in order to give
more protection from the elements.
Discussion of Cascade Village Frontage Road Improvements
Council; Hear Andy Norris's expl anati on
di scuss the Highway Oepartment and
whether any Council action is appropriate.
Background Rationale: Andy Norris and the Cascade Village
ffibeen working with the Highway Dept. for
over a year to get the speed linit lowered to 35 mph past
the Cascade entry road. This would make proposed
intersectjon 'improvements more reasonable because they wouid
be designed for 35 mph traffic rather than 45 mph traffic.
The Counci'l wrote the Highway Dept. over a year ago
supporting the 35 mph speed limit.
3. Report on Year End Investment Results
Baclcground Rationale: Investment reports for 0ecember 31,
1987 and February 29, 1988.
4. Discussion of Sign Improvenent Program
Action Reouested of Council: Decide on how to phase the
project's implementation.
Background Rationa'le: We've had discussion 'i n staff
ffijng/Transportation Task Force meetings
about ihe sign program phasing. Generally, we've discussed
the merits oi mbving the pedestrian signs and directories as
well as the hand heid maps from next year to this year in
anticipation of the tllorld Championships-
Recommendation: Accelerate portions of Phase II to
1988 as peF enclosed memorandum.
5. Discussion of Visitors Center - Next Steps
Action Requested of Council: Decide on how to proceed with
the project
Backqround Rationale: A Visitors Center Task Force was
ffi recommendations to Council' At least
one new alternative has been chosen for further study- The
Chairman of the Task Force feels it shouid be disbanded as
it has finished what it was asked to do.
Staff Recqmmendation: (See enclosed memorandum. ) Al Iow
ffi begin evaluation of all viable
alternatives along with staff and a new "cl'ient group"
selected by Councj l.
2-
ltl o
Cascade Village Metro Dlstrlct 1000 S. Frontage Road, Suite 200 VaiL, C0 Bl6Z0
UVMD Servlce PLan
1988
ilAR - g'ffi
TO:
FROM:
SUBJECT:
DATE:
Larry Eskwlth
Andy Norrls
/\nendnen t to
February 29,
The Town of vail adopted Resolut,ton No.5 on Januaty zL, 19g6,creating a special distrlct pursuant to rlcre 3z cRS. Th; District'is identlfied as the cascade village Met.roporitan District. The District i.ssued bonds rotallng gz m:.tl:.on in July 19g7. rt has conpl.eted construction of the chalrltft, ltft line cleartng and revegetation, acquistition of easements, and engineering disign pursuant to the Service P1an.
The District agreed to deslgn and construct certaln lmprovenents to the south Frontage Road. The lmprovenenta rdere designed by the 0tstrlctts enginier to comply wilh state lllghway specl.f lcattone at a 35 MPH speci.f tcation. 'Tire Town of vail-recoonended a 35 MPII speed linlt for the intersection of westhaven Drive and s. Frontage Road in Resolution 18, serleE of 19g6. Based upon the reconmended speed limtt, the cost of the inprovenents was estineted at $132,000 in December, l9B5 (excluding engineering reesJ.
The Servlce Plan, as adopted, provided for a total cost for road inproveFents of $200,000 lncluding design fees and al_Location of capitallzed Lnterest and offerlng eipensee.
_ In August 1987, the State Hlghway Departnent reJeceed the deslgn crlteria at 35 MPH, tnetsting on a-45 MpH staidard. The cooaequence of the hlgher lpeed is a general doubllng of the leagth of the tapper and amount of fill required. rn fact, the posstblE inpact on Gore creek and private land became very signlflianc. rn Decenber, 1987 the Distrlct authorized tte englnler io redeslgn rhe road improvements,to, conply to the 45 MPH eEandard whlLe respicting the constraints of physical llmitatlons such as Gore creek and utilitles 1n place. ReaListically, the revlsed destgn will be very einilar to the 35 MPH standard. The design utll be iubnttted to tle state in March. .rf it_is reJect.ed, rhe Dlstriet plane to appeal to the Governorre offlce for relief. rt is generarry tert that- the state wilL reduce the epeed llmit to 35 MFH once the inprovementa are accepted.
14.
"\
Glven the delays, addttional engineerlng fees, expanded acope,etc' it is clear that the total project can iot be conpeted for ihe $200'000 budget. The Distrtct rlqueste anendnent to the servtce Plan to tncrease the budgeted cost of road inprovements to 9350,000.An electloo will .be required to approve the increased expenilituie or borrouing. Based upon the Dlstricts aseegeed valuatlon of $14'500r000, the naxinuo lncreaeerr,coet of $150r000 would represent I nl1L lf tt were levied in a eingle year.
r have encl-osed a copy of the DlstrictrB year-end financlaL etaterents for your lnfornation.
March 19, 1987
Ms. Kristan Pritz
Tonn of VaLl
75 S. Frontage Road
Vail, C0 81657
Ileer f,ristan,
Io respoase to
Terrace l{ing
your letter of 3/L7/87t
1. N/A 2. r[/a 3. The helght analysts for the bu1ld1ng is e:Eactly as
preeented to you in t,he sprJ.ng of 1986. The roof heights
are less than 71. feet. I belleve you are Ln possesston
of the elevations on whlch the height analysis was
Plaza Uing
l. The ena11 dormer nindows are for ventilation and nateh
the soa1l dorner wiadowe ia the erl-sting hotel building.
2. 1,1111 be subnitted shortly.3. The hospitalLty roonsr are not Lnteaded to be used ag livtag units. The fold down bede are being deleted fron
the plans and specificatloEs by the architect 4. !li1L be subnitted shortly.5. N/A
provLded.
4. ihe detalltng of the Loggia bases is provided in the
ItetalL book ae ltetalL 3.12 end 3.13 which lE the sane
detaiL as uaa subnltted and approved by DRB last fall.
5. lftll be eubmttted shortly (Septeober 19, 1985 plan).
6. N/A
Gar y
Pe !er
Murrain
Pa c ten
: Terrace lfiag/P1aza Wing
RPORATION
reyer
FBF/eb
1000 South Frontage Road West, Vail, Cotorado 81657 . 303/476-6602
Area Calculations
Uni t
Tyge
I std
t handicap
2 std
2 w/l eve'l change
]xRandeo
3 std
3 w/level change
SLP drawings
lst
TERRACE I,JING
3/L3/87
4th lotal
1
2
14
I
GRFA per
Un it
397
397
430.75
430.75
697
471.25
471.25
469.25
496.7s
696
642
464.5
572.5
977
IT37
based on
Ground
2/73/87
2nd
11
2
3
1
13
I
1
2
GRFA
TotaI 3rd
13
I
5
13
24
2
I
3
3
34
5
i3
3
2
I
6
L4
1
I
9528
794
3446
1292
2091
r6a22
2356
6100
1490
1392
642
2787
8015
977
IL37
4
5 std
5 expanded
5 special
6
Suite 388
Sulte 483
-
Reta i 1
Sheet A2.2
42,4
Total
13
t
r_
ffi at i I
19 33 34 t7 T7 L2A 58069
Buildins Gross Area: (83,600 sf)
693
5163
5856
,:
4,
I
75 3outh trontage road
vail, coloredo 81657
(303) 476-7000
, t.ltb
r^, (taf ^ *rs *i t'i# Pn*
1as(il<ttl I -5+"
olflce of coranunlly dwelopment
March 3, 1,987
Mr. Andy Norris
1000 South Fnontage Road West
Vai I , Col orado 8'1657
Re: Results of the meeting on the Cascade C'l ub condominiun plat January 26, lggT (Note: Revised 1etter dated February 9, l9g7)
Dear Andy:
Below is a summary of our comments on the cascade club condominiun plat.
I. ITEM:
An explanatjon of how the parking structure will be controlled and managed is necessary. The staff would like to have a statement explaining the number of new owners and associated parking spaces and how this affects the number of spaces that are ajlocated per use through the Speciat Developnent District.
RESPONSE:
luwn
Unit
Lower Level Unit I
Grd Level Unit 2
Unit 3 (Ist right off tlesthaven Dr.)
Pontion of Levels 3,4&5,Unit4
Orunershi p
Vail Ventures, Ltd
Cascade Lodge Joint 150
Ventures (the owner-
ship is divjdEd
Vail Ventures Ltd 55%
llestin Hotel 45%)
Vail Ventures, Ltd 149
Cascade Club ttd NA
General Partner is
Vail Ventures, Ltd
Access
Shared access with Unii
2
Shared access with
Unit I
Separate ingress
and egress from Unjts l
and 2
NA
No. of
Spaces
722
Level 1:
Level 2:
Level 3:
Management
The !{estin Hotel wi] 'l manage this leve] . This level satisfies the parking requirement for the CMC,/Cascade }ding, Terrace ina-plaza (luest rooms, conference and retail). vail venturii timitea will own this level .
The access will be managed by the Hestin Hotel . This level will be for hotel guests and anybody elsl who wishes to park on ttis ievet.However, validation privileges will only be ivailable for hotel guests. Others will pay full price for parking. Owner is cascade Lodge Jolnt ventures of which vail vEntures Limited owns 55%.
This.] evel is managed by uail uentures and is to be used by the general public, including day skiers. Validation will be availablE.
(122 spaces)
(150 spaces)
Parking Allocatjon
Cascade Wing (8 d.u.) te
l,Jestin Hotel 115 * Terrace (120 a.u., GRFA 59,709) l1z * Terrace (Retail 6,088) ZO x Plaza (Conf. 8,400 sf) 35 * Plaza (Retai I ,l ,100 sf phase I ) 4 * Plaza (20 a.u.) fO * Plaza (Conf.retaiI .|,140 sf
Unit l:
Unit 2:
Phase II)
Gross No. parking spaces req,d
Unit 3:
cMc:
(149 spaces)
Clancy's (134 seats)
Cascade Theatre
Col lege Classrooms
College 0ffice (95a sf)
Cascade Club:
Retai I 300 sf
8ar & Restaurant (985 sf)0ffice in CMC (828 sf)**l{ellness Center
Gross No. spaces
Total Spaces jn structure
Tatal Al located
4
312 spaces
77
28
40
4
1 I
3 J
110
427
4?2
372
110 w Total allocated spaces with
10% reduction for mixed use 380
Total unallocated spaces 4l
I
* Uses that have an asterisk will need to be verified at the time a
building permit is released to get the exact parking requirement
** Assumed 9 spaces for the l{ellness Center (not existing)
Note "Westin additions" are excluded which were listed on the original SDD
zon'ing sheet, 18.46.089.
Please review th'is parking breakdown. I come up with a different total from what we
discussed in the meeting a1 though you sti1l have 41 unallocated spaces. Please let
me know if you have any corrections to these numbers.
ITEM:
Staff will reguire a written stipulation
that the parking required by the special
uses in the project will be available to
fol Iowing wording:
2-
on the condominium map that ensures
development district for the varjous
users. The staff is suggesting the
2
RESPONSE:
This condominiumization is for ownership purposes only and shall not
effect the zoning and use of the parking spaces which js set forth by
Special Development District 4 established by Ordinance No. 20, Series
of 1984, as amended by the Town of Vail.
ITEM:
From your condominjum declarations, I am unabie to deternine if landscapjng,
drainage and sidewalks are included as general coninon elements which will
maintained by the condominium association- I would like a final copy of the
condominium documents to assure there are maintenance provisjons included for alI corrnonly owned areas which should include landscaping, drainage and
sidewalks.
RESPONSE:
At our meeting, you agreed that a maintenance provision would be
included in the declarations.
ITEM:
The pedestrian bridge connecting CMC to the Cascade Village parking structure is not mentioned in the condominium declarations or shown on the condoninium
map. The bridge shou'ld be indicated on the nrap by a dotted line- At one
time, there was discuss'ion of an air easemsnt for the brjdge's encroachment
over the access and utility easenent on Westhaven Drive. I don't remember
this easement ever being completed. I will search through the Cascade
Village files to make sure that we do not have a copy of the agreement. If
the agreement was never compieted, the air easement should be finalized at
this time.
4.
RESPONSE:
You stated that you would provide a separate drawing for the pedestr.ian bridge and an air easement. l'|e decided that westhaven Road wbuld be
dedi cated when Cascade Vi I 'l age i s comp'l eted.
ITEM:
staff would like an expianation of how the condominium effects the u.s.Forest Service's requirement that you provide 1z5 spaces for day skiers.
lde were unaware of this requirement untii just this morning when we received a memo from the Forest service updating the staff on ski area
improvements.
RESPONSE:
You agreed to provjde a deed restriction that Level 3 would be
used-as pub)ic parking and cquld not be used for any residential park'i ng requ.i rements.
ITEM:
A copy of the compieted condoninium declarations for the project is
n e cessa ry .
RESPONSE:
tllill be submitted.
7 . ITEM:
A compieted appljcatjon form signed by the appropriate owner and a check fon $100 to cover the costs of ieviewing the tondominjum plat should be
submi tted.
RESPONSE:
ttlill be submitted.
8. ITEM:
Three copies, two of which must be mylars, should be submitted.
RESPONSE:
l{i 1 1 be submi tted.
Please let me know if any of this infornation is inaccurate and I can revise the sumrary. I wi'l I wait to rewrite the zoning sheet for SDD4 until you
resubmit with the amendments for the entire SDD this sumrer. Thanks igain for meeting with us to clear up some of these guestjons.
6.
trffi3h
Town Planner
luwn
75 loulh fro[l.ge road
wll, colorado 8'1657
(303f 476-7000 offlce ol cornmunlly deydopment
February 27, 1987
Mr. Frank Freyer
Vail Ventures Ltd,
1000 South Frontage Road West
Va il , C0 81657
RE: Terace lding DRB approva'l
Dear Frank,
This letter is written to confirm that the Terrace Wing located in the
Cascade Village Special Development Djstrict 4 has received final Design
Review Board approval . The final approval was granted by the Design
Review Board on February 4, !987.
Sincerely,
,ll I tll
.{'l .-.rr^f./,f!,r - aat,y,
tr. t, t-v'[ .r' I t
Town Planner
Project Appllcatlon
D,'" z///97
Proiect Name:
Proiect Oescriplion:
Contact Person and Phone
Owner, Address and Phone:
Architect, Address and Phone:
Legal Description: Lot Block Filing , Zone
-
Comments:
Design Review Board
Motion by:
Seconded by:
APPROVAL DISAPPHOVAL
Profect Appllcatlon
Date
Project Name: i'
Proiect Description:
Contact Person and Phone
Owner, Address and Phone:
Archilect, Address and Phone:
Legal Description: Lol Block Filing Zone
Comments:
Design Review Board
Motion by:
Seconded by:
APPROVAL DISAPPROVAL
lrt {'' \{ \,rr ,1 lr i .t
Town Planner -liriJi:
Date: -.'i ili r
E statt Approval
Project Application
""r".
Terrace Wing - Cascade Village
B/18/86
Date
Proiecl
Project
Contact
Description: 1'l0 Room addition to existlne l.Ie.etln Hotel
Person and Phone Frank Freverr'Andv Norris - 476-6602
Owner, Address and Phone: Vail Venturer;, T.td- . I000 Sorrth T'-nntpge Raad Wesl, Vr; 1
676 -b6A2
Architect,Addressandphone: RO!iA Desigu Group, 1420 Sucter St.- San irrancisco, CA 9d10:'
4i5-i 75-4iJ5,l; SLP, 1100 Stouc Street, Ste300, Denver, C0 80204,303-623-7031
Legal Description: Lot Filing - SD-4 , zone
-
Comments:Requesting approval of deslgn modlfieations co building plans and
specif icationg as cutlined in ltail Ventures, Ltd. letter dated 8i 18,/86.
Design Review Board
I t.* ,Motion by:
Seconded
fj
by:
APPROVAL DISAPPROVAL
Summary:
Plan
).:
ner E Statt Approval
. da---
4'(=: c.trUHH '--:-_.
7Ats],tu
^ -^rw(flt4 IA\,-\ I r t v . tt {
=lq>, b-+-fr_=:s=<ze7 -lMF€.L+ 61ta-t61}
4fu,rlW-4;e- -=rLre
-E{=ztoe
\^/L FA,'-ieL
o
I
'(r
D:3J 2 naaw'ccur:ur.-t
lW-': l'-O'l V2zAz4
o
\ATVrxruRES.,,
-i
)l
\
L
-'4\
D)p'\August 18, 1986
Ms. Kristin Pritz
Town of Vail
75 South Frontage Road Vail-, CO 81657
RE: Desien Review Board
Terrice Wing
Dear Kristin,
0n September 18, 1985, the Design Review Board gave final approval to the Terrace lr,ling addition of the Westin Hote1,contingent upon addressing Public work I s concerns before issuing a building pernit. The Board also requested that the landscape plan be revised to include three light bollards along the gravel path connecting the conmon carrier area to the cMC building and that six of the proposed colorado spruces be increased in size fron eight to ten foot trees to twelve to fourteen foot trees. These ."qu"ited revj.sions to the landscape plan were reflected on the Berridge plan dated September 19, 1985, which r^ras supplied to your office.- The Board also requested that the granite pi.11ars along the loggia be beve1led.
Subsequent to the September 1985 IJRB approval, the Terrace l,ling const.ruction drawings were completed in the Spring of l9B6 and then bid by G.E. Johnson Construction Conpany as geneial contractor. G.E. Johnsonrs bid orice for construction was approximately $2,000,000 in excesi of the construction cost a110wed for in the project budget and proposed financing.
As a result, the ownership of the proposed Terrace Wing can not proceed with the proj ec t until a significant reduction in the construction cost is achieved, and therefore certain cost saving design rnodif ications to the building have been undertaken, and ire herewith submitted for LIRB review and approval. The following 1s a summary of the proposed modifications which effect the exterior appearance of the building:
l. Roofing - In addition to the previously approved metal standing searn MEP material - alternate manufacturers of metal standing seam sysLems specifying color to match existing Westin roof
Roof line - 0ne half of the chimneys are deleted
1000 South Frontage Road West, Vail, Colorado 81 657 . 303/476-6602
&*
'I
Ms. Kristin Pritz
August 18, 1986
Page 2
We appreciate your consideratlon of modifications.
3. Siding/Facias - Fron stucco to synthetic (i.e. STO,Drivit)with texture and color to natch existing Westin 6\
\,/ Loggia columns will match existing Westin except concrete bases will be 12t' high
5. Building elevation ehanges (as shown on 8./13/86 plans):
a) North and west (partial) - guestroon balconies are del-eted - balcony door and railing appearance is retained to natch existing lrtestin
b) South and east (part.ial) - 4th floor Loft 1eve1 dormers are deleted and replaced with roof naterial - 4th floor guestroon balconies are replaced with dormers - ground floor patio privacy wa11s are simplified and benihes are deleted.
c) East end - llindows are deleted as required by Tramway Board for chairlift
necessarv
.'!!tLfrtM#
f%",r*4\ltdo
^'Y
ii#ffi,*J
t'&/+\.
J'^, ; !. orn_t
these
lriv
Vai I
By:
Ventures , Ltd.
Montane Cor oo
Frank B.
FBF/sb
Frey
da-
\ArtVnruRES,.
August 18, 1986
Ms. Kristin Pritz
Town of Vail
75 South Frontage Road
Vai1, C0 81657
RE: Design Review Board
Terrace I'line
Dear Kristin,
0n September 18, 1985, the Design Review Board gave final
approval to the Terrace Wing addition of the Westin Hote1,
contlngent upon addressing Public Workrs concerns before issuing a
building permiL. The Board also requested that the landscape plan
be revised to include Lhree light bollards along the gravel path
connecting the common carrier area to the CMC building and that six
of the proposed Colorado Spruces be increased in size from eight to
ten foot trees Lo twelve to fourteen foot trees. These requested
revisions to the landscape plan were reflected on the Berridge plan
dated September 19, 1985, which was supplied to your office. The
Board also requested that the granite pillars along the loggia be
bevel1ed.
Subsequent to the September 1985 DRB approval, t,he Terrace
Wing construct j-on drawings were completed in the Spring of l9B6 and
then bid by G.E. Johnson Construction Company as general
contractor . G. E. Johnson I s bid price for construction was
approxinately $2r000,000 in excess of the construction cost allowed
for in the project budget and proposed financing.
As a result, the ownership of the proposed Terrace Wing can
not proceed with the project until a significant reduction in the
construction cost is achieved, and therefore certain cost saving
design modifications to the building have been undertaken, and are
herewith submitted for DRB review and approval. The following is a
summary of the proposed rnodif ications which qf f ect the exterior
appearance of the building:
1. Roofing - In addition to the previously approved metal
standing seam MEP material - alternate manufacturers of
rnetal sLanding seam systems specifying color to match
existing West,in roof
2. Roof line - One half of the chimnevs are deleted
1000 South Frontage Road West, Vail, Colorado 81657 r 303/476-6602
Ms. Kristin Pritz
August 18, 1986
Page 2
We appreciate your consideration of these necessary
rnodif ications.
Vail Ventures, Ltd.
FBF/ sb
3.Siding/Facias - From stucco to synthetic (i.e. ST0,Drivit)
r^rith texture and coLor to match existing l,iestin
Loggia columns will match exlsting Westin except concrete
bases will- be 12r' high
Building elevation changes (as shown on 8/13/86 plans):
a) North and west (partial) - guestroom baLconies are
deleted - balcony door and railing appearance
is retained t.o match existing Westin
b) Souuh and east (partial) - 4ttr floor loft 1eve1 dormers
are deleted and replaced with roof naterial - 4th floor
guestroon balconies are replaced with dormers - ground
floor patio privacy wa11s are simplified and benches
are deleted.
c) East end - Windows are deleted as required by Tramway
Board for chairLift
4.
5.
Montane Cor po
Frank
O Lrsr oF MATERTALs t q*ryt - t lJlo''
NAME 0F PR0JECT: Terrace Wine - Cascade Vill-aee
LEGAL DESCRIPTION:
STREET ADDRESS:
orsc[i piioN-oF'PRo
The fol'lowing information js required for submittal
Board before a final approva'l can be fiven:
A. BUILDING MATERIALS: TYPE OF MATERIAL
Roof
Si di ng
Other tlal l
Metal/Standing Seam
Trash Enclosures
Greenhouses
0ther
the applicant to the Des';n Review
COLOR
To match Westin
by
Stueco or s5mthetic(i.e. ST0)-Texture & color to match
Uoncrete at Logg
Materia] s coluurr bases To match Westin
Fasci a
Soffi ts \
tJi ndows )t
}Jindow Trim 1
/
Doors
Door Trim
Hand or Deck
Fl ues
Fl ashings
Chimneys
Stucco or Synthetic To match tr'lestin
I^Iood to match tJestin
Metal. clad wood & metal storefronts
Painted wood
Rails Painted metal(co1or/green to match Westin)
Metal to natch roof color
Metal to match roof co1or
Metal to match roof color
Berridge & Associates
NA
NA
B. LANDSCAPING:Name of Designer:
phone:475-0851
PLANT MATERIALS:
PROPOSED TREES
EXISTING TREES
BE REMOVED
Botanical Name Cornmon Name Quani ty Size*
*I ndi cate
/'
caliper for deciducious trees. Indicate height for conjfers-
(over)
75 routh lront ge .oad
yril, colorado 81657
(303) 4?r-7000
Apri I 30, '1986
offlce of eommunlty development
Mr. Frank Freyer III VaiI Ventures, Ltd .|000 South Frontage Road hlest Uail, Colorado 81657
Re: Terrace l.ling
Dear Frank:
According to my calcu'l atjons, the Terrace Wing has a total reta.i I square
footage of 6,088 square feet and a total GRFA of 59,708 square feet. Please
note that I will recheck these figures when drawings are subm.itted for a building permit.
Please calI if you have any further questions.
Si ncerely,
, ) I nt Y-:-l,^ V-'A r\\l) ttu\ Ht tT Kristan Priti
Town Planner
KP: br
o
RES, *
/
I
i
\AtVrxru
Aprl1 28, 1986
Ms. Kristen Pritz
Town of VaiL
75 S. Frontage Road Vail-, C0 81657
RE:
Dear Kristen,
Please confirm Town
area calcul-ations for the
Ttrank you.
}ONTAIIE CORPORATION
Terraee !{ing
of VaiL GRF'A and retail
Terrgcc Wlng, Vail .
f &---
Ffan Freyer III
1 000 South Frontage Road Wsst, Vail, Colorado 81657 . 303/476-6602
t)
\AtVrvruRES, no
.\i
April 17, l9g6
Mr. Gary Murrain Chief Butldlng Official rordtr of Vail Building Departnent 15 S. FronEage Road Vai1, CO AfOSz
o il
RE: Terrace lllne
Cascade Vi1i"g"
Dear Gary,
""0 "lutil::.l;i.rhis
lerter serye as coofirnatlon of our asreenenEa
i:ll::;.1:fi:il::" i:: T:'1f,
"
";::ti:'fi l. :i;;i;iii:ii:;,if l,i::"1,"
As previously agreed, on or.before April 21, 19g6, we will cootretrce Bass excavailoo ".ti"ii:..s on the tuture buildlug site of Ehe rerrace noing."oa ii, i;;;;;."ry_ soifJo;;;;; area for rhe purPose of renoviag existi;;-;i;" a!uri"-;;i;;-f;." been stacked rhereon for sone- three v.rri---iglroe th"-;;;; oi ep.ir 2r, Lg86,we will be subnirting ti-;;;; oiri".-rr;-";;;i";. sets of trrn Progressn consrrucri6o arr,"iigJ-wrrh_;;; ;;;ii;J.roo for buildinc liil.:r:l:.:f::n rn the-;;;;;E-"r $4o,oool6dl."ii" ro,o or vail ;:;;fii:.iffi :::1.::!:*l;,'l:: ;l::-"3;;lil:i ili"ii:i,liiiil,
It ts d"r ""1i:standing thar we have Town of Vail approval to proceed with the_ plaaned r"Jr .i".vat'on of "it"-a.bris and that vithin approxi.na_r:1r-iyi^il;; ;; our appti."tion for a buildins pernir and pavnent-oe $+0,[[[-66 r" witi ue aiiorea ro begin aitual roundarion excavarions r"i-ii.-i::r::" uir,g "oi"irucrion site. noe further undersrand that-uiaii""""r,. tine ""'ttr"-uirrdlng pernir is tssued and the o:r::::-.;-;l;;"';g1..fee ls paid, we cannot ;::o.":::rii:l :;]"consrruciioo'J"rroity oirrei-;;;" the excavarioa
In accordance t l rh n,,-vail' ;-,;;;;i;;;i;"'l:nrl"ilii.ii1"iliirfill ;l:,1:.i".:.:l; I:";"",issued' the Town of v.ii-*iii-.iior gs up [o-'75 catendar days to pav the barance of rhe ;r;;i; il" .na "."o""'#u:rturgn-.rir.rf ne have nor "::l::1 irr"-p."rii prior to iire-'Ixpiration of the 75 ::{,1::t:3'.I".ll9erstand tirar the'i;;; ;;'i"ir=iiy innediately r". ir,"., -ir'iu' ;:ii t.:':
";;:;:"e.;;: ::;.:;:;;:*1.1.;ffi;:il;'j1". .
1000 South Frontage Road Wesr, Vail, Cotorado 8.t657 . 303/476_6602
t
Mr. Gary Murrah April 17, 1986
Page 2
I::"9*?::"".-:.:!11_fi.o.. days afte" !h9 expiratioo of the above 75 1:I :::1"91 _'l_lglee . rhat _ii,. i;;;- oi-i"ii'i.i'il".li ;l:.::;l;"::0,,:no:-ll:_:lti:1!-lo" or iive a"y"-.i.ii ili.l!"';;rl;:";;'ill"""
if undertaken b of Vai1, rill be pald by rhe io*i ot Vail fron the fee of .:.1._!1ld wtrh-applicirioa for building pernit. To at the cogt of refill and revegitation exceedg ve agree to reinburse the Town of Viil for such excess Y the ert.ent that the sha1l refund to us
i.,(l
ys after notlficarioo by rhe Tovn of yai1. i;-cost ie less than $30,000.00, the Tovo of Vail any renalning balance.
o
Please advlse this office inned.iately lf any understandlngs or agreeuents are Dot properly set conpl.y vith discuEsions to date-
VaiL Veotures, Ltd.
By: Maosfleld, Ltd.
of the above forth or do aot
FBF/sb
tane Co orat'i.on
75 south f ronlage road
Yail, colorado 81657
(303) 476-7000 ottlce of communlty develoPment
March 28, 1986
Mr. Frank B. Freyer III
Vail Ventures, Limited
1000 South Frontage Road l^lest
Vai I , Co1 orado 81657
Dear Frank,
I have reviewed your proposal with Peter Patten and Gary Murrain. The
proposal to remove the site debris from the area east of the l'lestin Hotel
as described on your map is approved as long as the following conditions
ane meet:
1 The site material transferred from the Cascade Village site
to Fofd Park must be 'l ocated within the construction
boundaries for the Ford Park Amphitheater. Please talk to
Jack Hunn about the limits of construction activity for the
'amphitheater if you have any further questions on boundaries-
I am concerned that the material does not extend beyond the
construction 'l imit boundary so that other areas of the park
are disturbed.
2 lf a building permit for the terrace wing is not obtained by
July 31, L986, the vegetation must be completed by September
12, 1986.
3 If a building permit for the terrace wing has not been
obtained prjor to May 31, 1987, a landscape plan must be
approved by the Design Review Board and planted by July 10'
1987.
It is our understanding that no excavation will occur for the Terrace
Wing. Any excavation for the Terr::e Wing building would require a
building permit. If you have any questions about this approval please
feel free to call Gary Murrain as I will be out of town for the next two
weeks.
S i nce r"e 1y,
K.thn?.f
Kristan Pritz
Tntvn D l annpr
t^lp"
MITVTxTURES, *.
March 27, 1986
Ms. Kristin Pritz
Town of Vail
Planning Department
75 South Frontage Road VaiL, CO 81657
RE: Cascade Village
Dear Me. Ptitz,
Per our conversation yesterday, we are preparing to initiate excavatlon of sit.e debris from the area to the east and northeast of the existlng Westin Hotel- (previously parking 1ot #2). The debris came from the excavation of the Westin site in 1981. As requested, please find enclosed a schematic plan dated 3/26/86,which indicates the proposed mass excavation of site debris. It is our intent to renove the debris (rock and earth) to return the area to approximately its original grades as indicated on the enclosed plan.
The work w111 connence on or about April 7, 1986. During the course of this work, we estimate that ue vil.1 remove approximately
22,QOO cubic yards of material of which 13,000 will go to Ford Park and 9r000 will be stacked on the Mansfield site.for future use ln
Cascade Village and for the South Frontage Road expansion. It is our intent in early May to obEain a building permit to construct the Terrace l{ing. At that tine we rrrill expand our in process mass excavation work to include the Terrace hling foundations.
We have nutually agreed thaL if we have not obtained a buiLding permit prior to July 3L, L986, we will proceed to revegitate the area of nass excavati.on. ALso we have agreed that if we have not obtained a buiLding permit prior to May 31., 198.7, we will subnit to DRB a plan to landscape the exc.ar6pted area and upon receiving approval- will l-andscape the same. pdceJto rJ\s-
MoNTANE CORPORATToN 1$G
Frank
FBF/sb
Enclosure
1000 South Frontage Road West, Vail, Colorado 81657 o 303/476-6602
75 soulh fronlage road
Yail, colorado 81657
(3{r3) 476.7000 otflce ol communliy devclopmenl
March 28, 1986
Mr. Frank B. Freyer III
Vail Ventures, Limited
1000 South Frontage Road }lest
Vai 1 , Col orado 81657
Dear Frank,
I have reviewed your proposal with Peter Patten and Gary Murrain. The
proposal to remove the site debris from the area east of the llestin Hotel
as described on your map is approved as long as the fo1 lowing conditions
are meet:
The site material transferred from the Cascade Village site to Ford Park must be located within the construction
boundarjes for the Ford Park Amphitheater. Please talk to
Jack Hunn about the limits of construction activity for the -amphitheater if you have any further questions on boundaries.I am concerned that the material does not extend beyond the
construction limit boundary so that other areas of the park
are disturbed.
If a building permit for the terrace wing'i s not obtained by
July 31, 1986, the vegetation must be comp'l eted by September
12, 1986.
If a building permit for the terrace wing has not been
obtained prior to May 31, 1987, a landscape plan must be
approved by the Des'i gn Review Board and p'l anted by July 10,
1987.
It is our understanding that no excavation
Wing. Any excavation for the Terr:ce l.ling
building pernit. If you have any questions
feel free to call Gary Murrain as I will be
weeks.
will occur for the Terrace
building would require a
about this approval please
out of town for the next two
Si ncerel y,
KJ-^?-\t
Kristan Pritz
Town P lanner
\> L'f,r.? l3t
-33
,f ^\ |-. -hfe+ --;
e_{_l}_ __&,
o a
VktL/ tile;f* tE#KacL v(rN{,
9rTrry't r
BASE
4" RUBBER, TOP-SET COVE TYPE AT TILE;
STRAIGITT TYPE AT CARPET
FLOORS
FLOORS - COI'IPOSITE FLOOR CONSTRUCTION TO HAVE
2.HOUR FIRE RATING
FI 4_I/2" CONCRETE SLAB ON METAL DECK WITI{
FIREPROOFlNG, UNDERSIDE
E2 WOOD DECK ON WOOD SLEEPERS ON PROTECTION
BOARD AND WATERPROOF MEMBRANE ON 4-L/2"
CONCRETE SLAB ON METAT DECK WITTT FIRE-
PROOFING, UNDERSIDE
F3 4N CONCRETE SLAB-ON-GRADE WITH VAPOR
BARRIER
WALLS
WALLS - AtL METAL STUDS AT 24" O.C. (12" O.c.
BETWEEN FIRST AND SECOND FLOORS OF EXTERIOR
WALLS, ONLY) UNLESS OTTIERWISE NOTED. USE WATER
RESISTANT GYPSUM BOARD AT ALL BATHROOMS AND
BARS
Wl 1U PORTLAND CEMENT PLASTER (STUCCO) ON
METAL LATH ON 5/8" TYPE "X" GYP. SHEATH-
ING ON 5" STRL. STL. STUDS
w2 lx STUCCO ON METAL LAT[{ ON 5/8" TyPE "X"
GYP. SHEATHING ON 6U METAL STUDS WITTI
R.19 BATT INSULATION AND 5/8" TYPE IIXII
GYPSUT'I BOARD ON INTERIOR
w3 IU STUCCo oN METAL LATI{ ON 5/8,, TYPE "X"
GYP. SI{EATHING ON STRL. STL. STUD CAV]TY
WALL WITH BATT INSULATION, 5/8'I TYPE "X''
GYP. BD, ON INTERIOR
W4 1" STUCCO ON METAL LATH OI.I CONCRETE
W5 POURED-IN-PLACE CONCRETE WALL
W6 NOT USED
B1
w8
s/g" TYPE " {cve. BD. ( EAcH
3-5/8" METAL TUDS (1 HOUR FIRE
5/8" TYPE ''Xr GYP. BD. (EACH
3-5/8" METAL STUDS WrTH 3"
INSULATION (1 HOUR FIRE RATING)
5/8" TYPE "XII GYP. BD. ( ONE
3-5/8 " METAL STUDS WITI{ 3"
-TYF"ot, c<tP4re,oz
SIDE) O
RATING )
SIDE ) ON
ACOUSTICAL
w9
i I'u)tf SqAFArtw
w*rt j
SIDE ) ON
ACOUSTICAL
INSULATION
5,/8X TYPE ''X" GYP. BD. (EACH SIDE) ON 6"
METAL STUDS WITH R-19 BATT ]NSULATION ( I
HOUR FIRE RATING)
2 LAYERS OF 5/8" TYPE 'X' GYP. BD. ON
2-I/2" I,{ETAL STUDS, EACH SIDE OF CHASE
WALL WITIT ACOUSTICAL INSULATION (USE
WATER RESISTANT GYPSUM BOARD AT ALL BATH-
ROOMS AND BARS) (]. HOUR FIRE RATING)
2 LAyERS 5/8" TYPE r'Xrr GYP. BD. ( EACH
SIDE) ON 3-5/8" I{ETAL STUDS (2 HOUR FIRE
RATING )
WI2 WITH ACOUSTICAL INSULATION (2 HOUR
FIRE RATING)
NOT USED
5,/8" TYPE txr GYP.BD. oN 7,/8" I"IETAL FURR-
ING CHANNEL ON CONCRETE WALL (4 HOUR FIRE
RATING )
NOT USED
CAVITY sHAFr WALL - 1 TAYER 1' SHAFr,wlL\ Jwt*U R uwontq LINER SET BETWEEN 2-I/2n C-H STUE WrTH 2 a ' '
LAyERS s/8" TypE'x'cypsuM BoARD AT Cl+Ab?
EXTERIOR (2 HOUR FIRE RATING)
NOT USED
2 I,AYERS TYPE I Xt GYPSUM BOARD ( EACH
SIDS) ON 6" METAL STUDS (2 HOUR FIRE RAT-
ING)
SAME AS W2 EXCEPI 2 LAYERS GYPSUIiI SHEATH-
ING AND 2 I.AYERS TYPE IX' GYPSUM BOARD (2
HOUR FIRE RATING) .
( CLE,AR} IN ANODIZED
w10
wl1
9i12
W IJ
wI4
wl5
w15
wt7
w18
wI9
w2Q
GLASS
Gl 1' INSULATED GLASS
AL. SIOREFRONT
G2
G3
G4
DOUBLE CLAZE*. wm. (DARK BRONZE)
TEIVIPERED GLASS
WIRED GLASS IN STEEL FRAME
CEILI TGS
cl
c2
c3
ROOFS
1,/2" GYP. BD. ON SUSPENDSD METAL FRAMING
1,/2.. GYP. BD. ON SUSPENSION SYSTEIVI
STUCCO CN METAL LATTT ON SUSPENSION SYSTEM
ROOFS - COMPOSITE ROOT CONSTRUCTION 2_HOUR F'IRE
RATlNG
Rl METAL ROOFING ON WATERPROOF I,TEMBRANE ON
5/8.. FIRE RETARDANT PLWiOOD (PRIME P.W. E
VALLEYS) ON I,IETAI DECKING WITH FIREPROOF-
ING, UNDERSIDE
R2 PRECAST CONCRETE PAVERS ON SLIP SHEET AND
PROTECTION BOARD ON WATERPROOf MEMBRANE
ON 4-L/2" CONCRETE SLAB ON METAL DECK
I.[ITI{ FIREPROOFlNG, UNDERSIDE
GENERAL NOTES
REFER TO SHEETS A5.I. A5,2 AND A5.3 FOR
ENLARGED GUESTROOM PLANS. L/8,' GUESTROO}4
PLANS TO BE USED AS KEY PLANS ONLY
REFER TO SHSET A5.I, A5.2 AND A5.3 FOR
TYPICAL GUESTROOM DOOR AND WINDOT\T I"IARKS
01
o2
: ,-
' -,i" ."
t... .'.
".
. .::
,)
ID
G2
G3
G4
DOUBLE GLAZEC,. WM. (DARK BRONZE)
TEI,IPERED GLASS
WIRED GLASS IN STEEL FRAl,lE
CEILINGS
c1
c2
c3
ROOFS
ROOFS
RATING
R1
1,/2" GYP. BD. ON
L/z't GYP. BD. ON
STUCCO ON METAL
SUSPENDED METAL FRAMING
SUSPENSION SYSTEM
LATH ON SUSPENSION SYSTEM
R2
- COMPOSITE ROOF CONSTRUCTION 2-HOUR FTRE
METAL ROOFING ON WATERPROOF MEMBRANE ON
5/8" FIRE RETARDANT PLYWOOD (PRIME P.W. E
VALLEYS) ON METAL DECKING WITH FIREPROOF-
fNG, UNDERSIDE
PRECAST CONCRETE PAVERS ON SLIP SHEET AND
PROTECTION BOARD ON WATERPROOF MEMBRANE
ON 4-T/2'i CONCRETE SLAB ON METAL DECK
VIITH FIREPROOFING, UNDERSIDE
GENBRAL NOTES
REFER TO SHEETS A5.I, A5.2 AND A5.3 FOR
ENLARGED GUESTROOM PLANS. I,/8U GUESTROOM
PTANS TO BE USED AS KEY PLANS ONLY
REFER TO SHEET A5. ]., A5.2 AND A5.3 FOR
TYPfCAL GUESTROOM DOOR AND WINDOI'I MARKS
01
02
-,4r
_?___\lt_!
l-
,l o
tt{_{alt)
lo.lt I6,t
I
A
I tr t
flar
,6hlrr9,t1oar
0-r
fc,Ulr\\ t\pU
}'
I (\l
'
I ".-ft.$r ,7
o
', OA <,U
\tfid. t{t?,f
DtD
\3
1
t
tt
l3
,5
I
I
qS/u^
's.{
qlb
51b
*o5 h,"t
. --\}
5
,, I
5q,,f+
1ts7
lz?6 tl6
o
t
{({
VEA tb
'lL7 lt?.t
tta:L + Jw
SIL + llr qep
, Y(q
t/?6 q evt
Slt +us
)f?.t
l"oJA
Jl'oo
rls+
Yr+Y
@ 1 h :g
{i \-#^
JtttAL, ,flh
tr". - :- Yl.\/
lr'.
Im>,tLll,f
a3+v
L7t
t
o
+ qP"
b 4Pa\
lurfo \ltuflh t-
, (D BtC. ?Flilrtru€ulJ
t\.I(tra,"r' ulrsrru DDIL: )unrl A,u,) ltiflury ukr\t1d , i\\ no-FJ, I "t furt^l il!c+'
u
(Lo_u$ {'q_U=
@
a
a
f,
\l
3 rtSD
Ltto
ra?0
--s?,s-?fir
Ps,s{brr
6ILD_
@ l- ltD
- -r _f,qr
Tli;&fru.
-
vD)
lilD
qrD
1,1
6o:a
6pe
I o
roD ?il
t
GRFA CalculationE:
Ground Floor
let Floor
2nd Floor
3rd Floor
4th F.l.oor
Loft
I
TBRRICE NTtrG
No. of Roome
BXPAITSIOf,
wh,
r ptltb
t7
t7
34
33
f9 (f7 have lofts)
Area
?826
7826
14r 663
L4,.7 35
9,421
5 1236
TotaI:
Retail Area
Calculations
L20
on First Floor
are based on ROIIIA
59 t7A8
-#+x lmrilI/rL
drawing set dated July 5, 1985
\ATVETruRES no
October 2, 1985
Town of Vail Building Department
75 S. Frontage Road West Vail, C0 81657
AttenLion: Gary Morrain Acting Chief Building
Dear Gary,
In accordance with our discussion at todavrs meeting, we have mltually confirmed that the Terrace Wing addit,ion to the Westin Hotel will be consrructed as a Type I building, fu11y fire sprinkled, and having the necessary fi-re detecting and enunciation systems.
Considering the above constralction connrnitments and the underst,anding reached befween Steve patterson
and our office in Fe6ruary of this year, you have confirmed that we wilL not be requii:ed io- have two exiLs from the loft areas of the guest rooms located on the top floor of the buiLdine. We understand that this condition shall apply only-to the Terrace Wing building.
Thank you for your assistance regarding this matter.
MONTANE CORPORATION
: Westin llotel , V
Terrace W
FBF/ sb
1000 South Frontage Road West, Vail, Colorado 81657 r 3O3/476-6602
Project Appllcatlon ,^," q/tr/q5
Project Name:
Proiect Description:
Contact Person and Phone t'1 '.li' {
Owner. Address and Phone:
Legal Description: Lot
Comments:
Design Review Board
orr^ouo(-)
<..)
DISAPPROVAL n
.i 'i \:,- -',''t:'u.\ir
\ ,r.,i,.
I
fr-t r r
r \rlt
t:D ir
E statt Approval
LANDSCAPING
LIST OF MATERIALS
NAI..IE OF PROJECT: WESTIN HoTEL - TERRACE WING ADDITIoN
LEGAL DESCRIPTION:
STREET ADDRESS:
DESCRIPTION OF P
The following
Board before
A. BUILDING
information is required for submittal a final approval can be fiven:
]IIATERIALS: TYPE OF MATERIAL
by the applicant to the Design Review
COLOR
Roof
Siding
0ther bla I I Materi al s
Fasci a
Soffi ts
tl'indows
tlindow Tr{m
Doors
0oor Trim
Hand or Deck Rails
Fl ues
Fl ashi ngs
Chimneys
Trash Enclosures
6reenhouses
0ther
I
B. LANDSCAPING: Name of
PLANT IIIATERIALS:
PROPOSED TREES
Botanica'l Name Common Name
Fraxinus
Pennsyl vani oa
Popul is
Tremulo ides
Picea Pungens
Glauca
l, tt
Mar sha1ls
Seedless Ash
Quaking
Aspen
Colorado
Blue Spruce
AlNnlo Auo.?ut
Quani ty
23
T2
*? 23
G
Size*
zLrt Clumps
I
EXISTING TREES TO
BE REMOVED
*Indicate caliper for deciducious trees. Indicate height for conifers.
(over)
g-10 |T(
PLANT ITIATERIALS:
(con't)
SHRUBS
EXISTIN6 SHRUBS
TO BE REMOVED
o
Botan'ical Name
Po tent illa
Frut ico sa
Pinus lfugho
Mrr ghn s
Cornus
S t ocon ifera
Sallx
Purpurea Nana
Common Name
Jackmans
Po t ent 1lIa
Mugo Pine _
Red Twlg
Doswood
Dwar f Artic
Blue Wi11ow
?\
102
2I
Size '
5 Gallon
5 Ga1lon
5 Gallon
5 Gallon
68
fvpe
cR0ur'to c0vERs Annuals: Marlgolds and Petunias
Square Footaqe
200 Sq. Ft.
-.*-
s0D Sod Lawn 35,000 Sq. Ft.
STED
TYPE OF
IRRIGATION
TYPE OR I{ETHOD OF
EROSION CONTROL
47,000 5q. Fe.
\
c. OTHER LANDSCAPE FEATURES (retaining walls, fences, swimming pools, etc.) please specify.
Spa Pools ln Rock Garden, Ash in Unistone Pavers wlth ]'leta1 Tree Grates, Guards and
Uplights to match exlsttng Weetin Detail, Redwood Seat. and Planter with Annuals.
ROMA Arrlitrctwt . Inkrior Dtsign . Llrban Drsign . Planning
September 11, 1985 Gtorgc T. Aotkis.. fAlA, '4ICP, ASLA
Rotrzrt A. Olcrnatt, FAIA
hris Dtamor, AlA, AICP
Frank Freyer
Vail Yentures, Ltd.
1000 South Frontage Road l{est
Vail, Colorado 81657
The,purpose of this letter is to out'line the history of the design of the
loft'units in the l{estin Terrace f{ing Building and to outline a suggested
course of action. tle believe that Vall Ventures should request a variance
from the current fnterpretation of the 1982 UBC.
As you know, a preliminary set of drawfngs for this proiect was reviewed by
Steve Patterson, the former chief bui'l ding official of the Town of Yai1, on
February 1, 1985. The preliminary set of drawings indlcated a second means
of egreis from the loft'of the type Y unit. At that meeting' which was
attended by Robert Howel'l of ROl'lA and Jere ltalters of Vail Yentures, Steve
Patterson interpreted the Code such that a second means of egress_was not
required frorn *e'toft. His rationale was that the t€quirement that a mez-
zailine nust be less than one-third the area of the primary floor level was
deleted from the definition of a mezzanine in the 1982 Code. Based upon
this ruling, the deslgn development draw{ngs were changed to eliminate the
additional stair, and the construction docunents have been prepared based
upon the Patterson ruling.
l'le believe that it is rational for the Town to grant a varlance from the
current interpretation of the Code to allol one neans of egress from the
loft level. it is our belief that the condition is unique and there are a
number of mitigatfng measures ln th{s building which were not antfcipated in
the UBC Code. As you know, the Code {s general and does not take fnto con-
sideration the specJflc conditions contained in each buf1din9.
The following is an outline of the ratlonale for a yariance: The loft is
not a continuous floor. Neither firc nor smoke can spread horizontal 1y
without penetrating a vertical wall plane. The units could have been
designed'uith a bedroom on the same'level as the llving roon. In the Gase
of a-fire emanating from the llving noom or t$e bedroom, the only nean-s of
egress would be tniough the living-area of tl1e guest unit. Conceptually'
t4!o Sr.tttr.$trrrt . San Frantiao,Cahftrnia g4tog . Tilrykw (4tJ')7?5-43to
!!; rltr|ru r rr|r| rr !t ;!t llll tlt !!r!r lJl! !rl lllrFrtllt!!r
stin Terrace Building Loft Bedrooms
ROl'lA Project llo. 3321.01
ROMA Frank Freyer
September Ll, 1985
Page-2-
the on'ly difference is that the guest in the 'loft bedroon wou'ld have to walk
downstairs to exit to the corridor. For all practical purposes' the occu-
pancy load of the loft would not exceed two people. The Code covers a vari-
ity -ot conditions, inc]uding the hazardous situation of kitchens' etc.
Thise conditfons do not exiit ln the hote'l environment. The provisions of
Section 3303, with its exception which states that only one exit need be
provided from the second stbry of an individual dwe]llng unit, have been.
discussed and I realize that there have been recent interpretatlons which
relate to this section. Nonetheless, we feel that there is a great similar-
iiy with this guest room to the conditions that might be found in a dwelling
un-lt, *ith the-exceptlon that this unlt, from a construction_point 9{ uigt:
is c6nsiderably safbr than the typical wood-franed dwelling for residential
bui I di ngs.
The hotel is a type I noncombustible bui'lding, is fully sprinklered, has-a
siate-of-the-art'iire detection and enunciation system' and has a ful1-time
staff which monitors a'l I of the safety systens. Compared to a comparable.
condominium or aparttnent structur€ wiitr I similar room layout, the hotel is
a much safer building'
lle would be more than happy to assist you in documenting the rationa'l e for
the variance.
0.
0dermatt, FAIA
RAO/dnk
L911FF
erely,
, rrr I rrt! | r [r ll :l llrt lllt! ll I ltu lltl l!
ROMA
August 30, 1985
Arhituturt . Intcrior Dtsiga . Urban Duign . planning
C,corg T. Rocki*, FAII,, AICP, ASIA
Rokrt .4. Odrnau, FAIA
brit Drt noe, AItl, AICP
l,lr. Randy Look
SLP Architects
1100 Stout Street
Denver, C0 80404
RE: l,lestin Hotel Vail lerrace l,lino Project No. 3321.01
Dear Randy,
ll" u19 sending you copies of conference fiEm February I, lgg5 by Bob Howell re.qarding a meeting with steve patterson-iviii 6,iiijing-inip"cto")and Jere l,talters. Note Jiem z page z which siJvd Fiitersoi sato that two exit stairs from loft rrnuld not b6 required
Also enclosed are copies of unit plans dated January 24, 1gg5 showing tm stair condition which as detenninilo not necessary by this February l, l9g5 rneeting with Building Inspector.
R0[4A prepared the Design Developnent-package based upon the zlllgs Building Oepartmnt inforrnation. ttre nei, guilaing inspector hal ippa"ent.ry chosen to make a different interpretation of the codi in this-mali,er according to our phone conversation this date-- ltopefulii iti "iiiir"a-iiterial oocfonting R0f'lA's.history on this matter nill have sor[ effect upon-ilre nan Building Inspector's interaretation of the CoJe.
Jerry l,lanifold
Jn/kb
cFernatt
t 4zo Surt/]r Sttcct . San Francisto, CaliJotnia g4tog . Tclcpbow (4t J') ?j j-4.1Jo
Yours
MAi.JSFlgLD. LTD
t)
ROMA
ERoIEcr: Terrace Building
S courrnnrce f] reucoN
roc^noN: Vail Tourn 0ffices
sultEcr: Euilding Code Corpliance
l)
Anbinatn . Intdot Dtsign . lJlgoo fultgn . planning
CONFERENCE MEMO
PRotEsr No: 30321
D rE: February l, 1985
*i:nouert.ttiildii i
wrrryi' Stei{tPittbissr-,.ya{ | .-, eul.ldlnC'llnspictor
iilgrgll"Lten
The-fol'lo+ing ltems were discussed nlth Patterson regardlng mde conpliance on the Terrace Building: .
l. Construction tvoe:
II !.tp" II FR.is used, the rnrrti-story. ailowabre area is 2 x 29,900, or
9e'999 !:f.; this area can be doub'red-uy utiirzins iud;util; ipiinir""._-[9l!9600 s.t. The allowable number: o-f stories ior type ti i[ i;'
_*Y--a !W!-rhich_may be increased to four by using autonat"ti-spiin[r""r.p/- Ho'{Er, sprinklers may not increase uottr treiitrt and area.-./
The Terrace..Building.has six levers, including the upper story roft.Heeting type II FR standards nould iequire:
a- Classifylng the loxer igtel as a baserent (11'-6' maxirnun height).
b. Usfng the autornatic sprlnkler increase for helght only.
c. Allowlng exlting from the upper loft level through the lower loft level.
d. Oeveloping an^area separation wall to reduce the maximum buildlng area to 59,800 s.f.
The tentative conclusion was that it rould be more cost effectfve to construct the building to type I standards. The prlncipal additfons would be:
a. changing the structural frame fron two to three-hour rating;
b. Changing the roof from one to two-hour rating.
The area of type I constructlon is unlimited.
| 4zo SntI?? Strut . San Ftanrisco, California g4tq . T tpkw (,lt S\ zt r-ll so
iir
3.
4.
(o
-2-
2. l{umber of stories:
The 1982 UBC does not limlt a
cent of the flooi. area of,.the
feels that the upper levels of
mezzanine, not separate story,
nine would not be requiredJ
The area separation wall between the Terrace Euilding and Hotel must be
four-hour rated if the Terrace Euilding is type I.
Link to Hotel:
The retai'l space in the Hote'l/Terrace Building link encroaches on the
Hotel setback ntrich was used for area calculations for the Hotel.
Patterson asks that these calculations be reviewed and given to hinr.
The fire rating of the link retai1 walls may require rated protected
openings.
R0itA will reviery the various code compliance options at the link and
discuss them with Patterson.
5. Handicapped units:
In the Hotel/Terrace link, one handicapped unit is being deleted; this
handicapped unit must be deve'loped in a different location in the
Hotel. The Terrace tling must have a minimum of five handicapped units.
6. . Patterson will be auay from'the offlce on F_ebruary 7 and 8, nhen Horell
'.{s next in Yail; Howell"riiJl give ltalters'a set of. prints with code : -issues highlighted and Ualteis.'rlll revien them with Patterson.
RBll/dnk
fi{z1SP
cc: tfa I ters
0dernatt
I
I
PO oTt ;!s :6 L
-EO FO ?j
a-a
.tU
-
tr o
a-+r
E T'
E)E a-\,
o o o l-L
.o l-
-l o +t o t
g
a-a *t a a
o t
g
E cl o J L
E,lrj
=cl J
I (o lr,ll.JF
95h t(n ;"
FFI l-r!L r zq{J-l et
nm
E!rE
3o gtt d .(u
;-0 go $o
'h
-r-s
?
-o aL
{r,a-r E E
E)c
l-3
a
(,o f-f-
P
a o +,o t
tr a-rF,I r<
t
I
E cf,o
IL
E lrj a-o-
=
(ol
lrJ UJF O-r<>=Frn
FF
=b =J
I o I
;.
I
t
{
I
I
,
,
l"
ol
a
o
E (u
l-o
-o o
It
-.I
TU
.J
c o tL *t
E T'
ot tr 'r-a
=o (,
$L fr
,q r
6 +t o t
.5 *t q
5
|o
@ o
It 6|
L o a c o ?
g
E c,cf
lr-
E.lrj
=(:)
I r\trj IrJF *5h Fttl a
FFI xb- r zos
=J;
tl
tn
tu
tl
E tl
PO
si Tt
d!E :.5 bI 50 Eo
J
II
-
E o arl rt,
E
:T'<
ot g
.I \
-o:o
(U
fr L dt r
TI o *t o r
e,ara +t o
g
t o I
E,o (:)J lL
E,trj (L (L f
t r\lr,LIJF (Lr-r >-=F-r/l
FFT xL- r
=3i
luwn
75 south trontage road
vail. colorado 81657
(303) 476-7000 ofllce ol communlty dGvelopmenl
September 4, 1985
Itlr. Frank Freyer
Vice-Presid6nt, Montane Corp.
1000 S. Frontage Road
West VaiI, C0 81657
RE: Cascade Village Teruace Bu'ilding Design Review Board Issues
Dear Frank:
0n September 4, 1985, the Design Review Board gave final approval to the Terrace Building contingent upon submitting a revised landscape plan, neetjng fire department concerns, as well as public t{orks
Department requirernnts. The folloting corments were made at the reeting:
1. The board requested that you add evergreen trees on the
north elevation so that in the winter time this area does
not look so bleak when a'l 1 the deciduous trees lose the'i r
I eaves.
?. The board would like to see the specific placement of the
shrubs on the south side of the building.
3. Pavers should be used for the stainruay that js to the
south of the bus drop-off area.
4. Some type of lighting is needed on the stairs adjacent to'
the bus drop-off.
5. The board suggested that beveling be used on the granite
at the base of the loggia pillars.
6. Public l{orks had a list of issues that still needed to be resolved. These items included:
a) A dra'inage plan for the north side of the building.
Frank Freyer
September 4, 1985
Page 2
b) SpecifV' the size and type of culverts.
c) Is the new easement for the sewer complete? The Town
engineer would like to know how thjs issue wjll be
resol ved.
d) Is there an agreement for the maintenance of the bike path behind the Terrace w'ing?
e) Framing and foundat'ion plans must have an engineer's
stamP.
f) A soils report will be required.
g) A title report wiII be required.
h) The town engineer would like to see a rore detailed
plan of how the common carrier area will be designed particularly in respect to the adjacent roadway.
Please add the sidewalk off of the existing pathway
coming down to the i'lestin from the coffinon carrier area.
The board felt that it would be irnportant to provide a
lane between the corynon carrier drop-off to the Cascade
Theatre.
I will schedule the landscape plan to be reviewed by the Design Review
Board at the'i r next meeting on September 18, 1985. I would like to
receive the revised plan no later than September 13, 1985. The unresolved
Public Works jssues should be submitted as soon as possible so that these
issues do not hold up your bui'l ding permit. Please call if you have further questions.
Si ncerel y.
(nr+o^ l''h
Kristan Pritz
Town Planner
KP/sm
I Prolect Application
\,,
o^, g/ l/85
Project Name:
Project Description:
Contact Person and Phone
Owner, Address and Phone:
Legal Oescriplion: Lot Block Filing Zone
Com menls:
APPROVAL
Design Review Board *" rt
l..{ /r 5
DISAPPROVAL
Summary:
Date:
E statt Approval
a
Profca't Appllerllon
Projecl Name:
Proiect Description:
Contact Person and Phone
Owner, Address and Phone:
Legal Description: Lot Block Filing Zone
Comments:
"",. 4/tl /[f
Ll r, l t \ -,
Summary:
E star Approval
h'€i3 d^
Am/nih
d^ {4,,* \y?^ pit\o4
iln* a^ ifup^tio u,rQb wA\. MolO *f ,
ft\r | ':f \a,m* \u-coll/trl,t oa.{O."rr .t
t . IidrNe[\L o[t'{i^ of{ o[ cnnrn^ cqrlu!^ hta,Lil+}ud(
i
ffi1dry. f -fu Uu a'v/il.u/uoti,^", r 'flrddal\Q, d\ p,rtl aQoyCla. , ai \a"-u pur.onor* {I r \ t\lr{)"
[t'4UI1 o,r r\o,,nr
-[0w''r\or\ C/l/Ur\ A^0S-
ruh U["n tfluho.-- \n{'*Y tc
F: tut*ik{:h,[ffi-"
\
PROJECT:
DATE SUBMITTED:
COI"II4ENTS NEEDED BY:
BRIEF DESCRIPTION OF
'--...\.-\.
PUBLIC hJORKS \
Reviewed by:
Corments:
I NTER-DEPARTI'IENTAL REV I El^J
DATE OF PUBLIC HEARING
iil] uc I
{-t.
ilrolywntr
@ tS ',.)q?-/L r ^V .&r*,,n!ffiuffi^-
Reviewed by:
fr*-ztn,4,
;ro/<5
Date
ttifr'flffi^\ ar r*\L) ]^.^ Lf
Date
;"'i:@
Date
fre /o^e/4 slae- oF ,Su"o'-<'
6; Sfxtrl €r zq / 4rrr aF cu<-r'*$
a;
€4Se->-t€ttz fr* SclJ€|C
ft-Ze*zv lXtcZo*cH-
rcA ?r,4<u76NryuC?
€o t-t ?c.€-€ 7 Ku,.or.,6
O/- fllg
y' 6rnz4zrotJ /.A, '' '-/ eu'"u@5 Sr-*tz',
@ Zffi)<a
POLICE DEPARTMENT
Rev'iewed by:
Comments:
RECREATION DEPARTMENT
Reviewed by:
Comments:
I u,
-77 7 <r;Ke.-f,o^e./
lsztt- / 7 7 t/gz, FzcA //c).v
Date
\fl
t_
J5,15
lE?.t @
'{'t
Minules
, lr.l-i r 'li-- f-- --l (. lHl rlli r,; j CllJIl-l- \r
1
Ierrccea-e
1100 Stout Sifeei Su re ,100
len"er. ac:crooc 8!201 '3331 523 7431
Project/No
Dr^ a..t a'raalinar | 'vlvv,
Dote
Irme
Locotlon
Present
Drsrributtcn
wEgalr| mBAcE rll|e 85/lll
29 Augrust 1985
10r00 a.n.
Otfloes of Iorn of Vail
@ry t&rrralDr Fo*rr of Vatl Buil.cling Ins1ector
Frank Freyer, Vail venturaa
Ranaly Lookr SI!
Brnie Pyle, sLP
, Itose Pr€E€nt
wBsnril lnnAcB Hrre 85./lll - nil
29 August 1985
Page 2 of 4
18I!|8 DISCOSSE):
Ihe following are items that Gary hae approved for incorporation j-nto
the Congtruction DocumentB for the t{estin Terrac€ Vfingl or where noted t
has suggested furtber study.
GROUI{D FIOOR PI,AIiI: RE: ROITTA ShCEt A2.2
01. If a door is installed at the entry to corridor to the
Electrical Rocnr (024) and Puryt nocn (025) ant if this door is
labeled "Mechanicaln there will be no dead end eorridor
within this mechanical area.
02. Mequate nunber of doors to electrical, PutrlP r chiller'
cooling tower and rnechanical. rooms.
03. stP needs to calculate the percent of floor area on the
ground floor that is sub-grade ard above grade to determine
ghe total number of floors consldered as above grade.
04. Gates in patio ralls on south side of Terrace wing are not
reguired.
05. section 1807 (p.113) of 1982 UBC calls for elevators on all
floors to open into elevator lobbies wtrich are separated frqn
the remainder of the building. sLP proposed a 20 mininun
fusible link or nagnetic catch door linked to fire alarm
system that would aut@atically swlng shut to enclose
elevator shaft opening r tlrereby shutting off the elevator
shaft fro the remainder of the building. These doors are
acceptable on each floor.
FIRSI! ELOOR PLAN: RE: A2.2
01. Restricting gates must be ueed in Stalr *1 andl t2 at first
floor lantling to dlscourage peraorc fro descerdirg to the
ground floor in case of fire.
02. In order to allow glass at both aides of Corridor ll9
adj acent to Retail 12Ot thete Eu8t be fusible fink or
matnetic alarm actl.vated flre doorE (Gary lrefers magnetic
alarrr activated) provided at no greater than 20 feet
o
';l-..i
t{Eyrrtf mRAcB t|lrre 85,/l | | - nil
29 August 1985
Page 3 of 4
IlElS DISCI'SS@3
from eristing hotel corridor (to old rnit fllt4) anct at fire
separati-on wall in line with outside wall of Stair No. 1.
Brit signs will not be uged at these doors. fhoke alarm
system wilL have separate z onea at e:<istirg hotel r lirik and
Terrace !{ing.
SECOIIID FLOOR: RE: A2.3
01 . No Cmnents.
THIRD FtoOR: RE: A2.4
01. Unit Tlzpe 4, South Side: To determine light and ventilation
requirqlents, only the living roorq/dormer alea need be
calculated. Ilnit $pe 4 hag a living,/dormer area of 305
n.f. The Proposed windon unit is 4r-6" x 5'-11-1/4' - 3'l .5
s.f. Even though this ie not all glass r,re are close enough
to be accePtable for the 1,/10 floor area for natural light
requirement. The operable Portion of the window is 4'-6' x
1r-1On x 2 whictr is 16.? s.f. which meets ctith l/20 floor
area for natural ventilation requireroent.
FOURTE FLOOR: RE: A2.5
01. Unit 412, 5' x 5' casement (entire opening operable) is
acceptable to meet l ight arril ventilatiqr requiranents in the
bedroon rnarhed "Suite".
02. unit',P!rpes 6 and 7 - minimum stair sidth eguals 30".
LOFT FLOOR: REs A2.6
01. Unit T!E)e6 6 anct ? - two et(its required frdtr Ioft Level. RE:
Sec.3303 (p.545). SLP queBtioned why the loft leve1 does not
qualify under the erception clause !*rich states: "1. &(cept
as provlaed in Table No. 33-Ar only one exit need be provided
from the second story wlthin an indiviclual clweU ing urit..."
Gary stated that fro paEt experience ald reading
interpretation from ICBO, se@nd story refers to second story
of the buildling ard the unit in questior is at the fifth
'i'
rfBsfrr ltRnrcB nnxi fftllll - il
29 August 1985
Page 4 of 4
rtEgs DrscussE:
floor of ttre Terrace Wing.
<lwelling unit.
ROOF PLAN: RE: A2.7
Also he stated thig is not a
01. Roof accese by laddler le acceptable.
02. overflow o\ter toP of palaPet rhen roof drains are clogged is
acceptable as ldrg as a letter is sublitted fron atr uctural
engineer, statlng that roof is ctesigned for loads of standling
water.
H(TERIOR ELEVATIONS: REr A3.2
01. west Elevation - windosg above 30" above structure of link -
second and thirat Etory windows gualify :tsl unProtected
openings. t{indow at fourth level will be wire glass because
it is withln the stail enclosure.
02. All elevationE - sinulat€d stuc@ ( Dryvit, stor or R-waII )
may be used; subnit srnoke flame spread rating to Buil-ding
Department to detemine fire rating. ( l4infunun Claes I).
ROOF SECTION: RE: A8.2
01. use non-coobustible plfzrooal in roof construct ion ' Fire rated
gypsun board rnneceaaary in roof oonstruction.
r txtD (! t$trt|c llr[urEs r
The precedlng observationa and/or cqments represent an overvienr of
progreas and condtition ( E) of the work. Please notify ua of any
nisunderstandings or required interpretations or clariflcations within
three (3) working d,ays of receipt of ttrese Minutes, as re will lroceed
on the basis that theEe itens are as agreed to by all parties
concerned.
o a
\AITVrxruRES o,
August 20, 1985
Ms. Kri stan Pr itz
Town of Vail
75 S. Frontage Rd
Vai1, CO 81657
RE: Cascade Village Terrace Building; DRB Issues
Dear Kristan:
In response to your summary letter of May 5, 1985, on the above
referenced project, the following se ts forth the status of each of your
inquirires and refers to the ROMA DesJ.gn Development drawing set dated
July 5, 1985, which is submitted herewith.
1. Revised drawlngs shor'ring the final design of the roof and snow
shedding conditions have not yet been produced. Our intention is to
pr ovide the current 1y designed metal roof with a f 1at ridge and access
doors to fac i 1i tate access and maintenance. The eaves will be heated.
There will be no attic space, as living space will extend
to the ridge. The
valleys in the metal roof will be a nininum of four feet wide to
facllitate snow shedding, and standlng seans on the sides of the dorrners
w111 be deleted. We are awaiting the final design recommendations from
the architects, SLP, at which time a final comprehensive roof plan wj. 11
be adopted and drawings will be issued. This item should be completed
withln the next three weeks .
2, The detalls of how the pre-cast columns will be treated is shown
Sheet A8.3 of the July 5 set.
3. The pr ivacy wa11s on the south elevation of the bui 1d ing are shown
to be 4 foot stucco wa11s as indicated on sheet A1.2 of the Julv 5 sec
4, The temporary landscape plan for the southside of the bui 1d i ng is
slrown on Sheet A1 .2. The area to the north of the Terrace building is
sti11 1n the prel iminar y de s ign phase; however , within the next 60 days,
we wi 11 be able to submit addltional information indicating Lhe
location and size of the proposed Plaza/Conference Center building and
our intensions for landscaping in that area and to t.he east thereof .
5. Lighting de tal1s for the loggla area are shown on Sheet A8.3,
Detail 5 as fixtures to match those at the existing I,rIestin Hote1.
6. The design concept for the retail is shown on Sheet A2.2 and
de tai 1ed on Sheet A8.3. The di splay box conceot has been deleted.
1000 South Frontage Road West, Vail, Colorado 81657 o 3O3/476-6602
Ms. Kristen Pritz
August 20, 1985
Page 2
7 . The roof and exterior mat,erials and colors will match the existing Westin Hote1. The only the roof design as indicated in item #1 above.
of the Terrace building
varia tions will occur in
B, Inspection of revlsed elevation drawings on Sheets A 3,L,3.2, and 3.3 suggests that the previous questions on building height have been resolved.
The current phasing schedule is as follows:o
Construction
Start Completlon
Cascade Club
Parking Structure
Terrace Building
Plaza / Conf erence Center
6/Or/8s
s/0l-/e5
9/Ls/8s
s/or/86
2/OL/86
12/rs/Bs
6/Or/87
6/Or/87
10. A temporary parking location for common carriers is shown on Sheet 41..2. The final condition to acconodate comnon carriers will be
addressed with completlon of design of the PLaza/Conference Center and the V111age ent.ry and turnaround.
11. Terrace buildlng construction related parking requirements for 1985 and 1986 wi 11 be minirnal and should be restricted to the construction site. If necessary, workers may be bussed from an alternate site during the winter and spring of 1986-87.
12. The calculation of the GRFA is attached and dared August 20, 1985.The area indicated thereon j.s 59,627 sq, ft. for guestrooms and 5679 sq. ft. for retail. The ROMA set of July 5, 1985 provided herewith indicates a floor by floor sunmary on Sheets A 2,L,2.2,2.3,2.4,2,5,
and 2.6. The detail calculations for each guestroon type are shown on Sheets A4.L and. 4.2.
If you have any questions on the above responses, please call ne at your
convenience. Should additional inf ormati.on be necessary for the DRB meeting on September 4, please 1et me know as soon as possible.
Very truly yours,
CORPORA
Frank B. Fre ve r
Vice-President
t' F / 10
*r-tL
IYT '
7
LIST OF MATERIALS
I{AME OF PROJECT:
LEGAL DESCRIPTION:
STREET ADDRESS:
DESCRIPTION OF
The following infonnation is required for submittal
Board before a final approval can be fiven:
A. BUILDING ITIATERIALS: TYPE OF MATERIAL
by the applicant to the Design Revier
COLOR
Roof
Siding
Other tlall Materials
Fascia
Soffits
Hindows
l,lindow Trim
Doors
Door Trin
Hand or Deck Rails
Fl ues
Flashings
Chinneys
Trash Enclosures
Greenhouses
0ther
B. LANDSCAPING: Name of Designer:
phone:
Botanical Name PLANT }IATERIALS:
PROPOSED TREES
Cormon Name Quani ty
EXISTING TREES TO
BE RB'IOVED
Size* .,$ 'rl'f
lV$./o*f'r @,/''l€#z':l
c-oli'l?).rp *atE
ilsM{,,^l
Nft E
r-
for conifers.
(over)
€Utl(l-l+rD
*Indlca'te caliper for deciducious trees. lndicate height
--
Corrnon Name Quani ty Si ze
t
Botanical Naqe
gDO$R,furaD (EltrlEEnnV
<datElGlfeE
#t4J,(ArU++oMhL ffi-
PLANT }iIATERIAIS:
(con't)
SHRUBS
EXISTING SHRUBS
TO BE REMOVED
GROUND COVERS
cpP^LJ,
Sltol-or.ltFEIA
E.gn'9f^rE!+jinfu APtColr*
Wrfo* *
7l?€rr*
t\b^.fF.
Sguare Footage Type
R EiF.t LAiF U,4NIr9P,CF@ZE-
&EgFLb VYF\,|Ja,.llF^
tnot rrfrdN l-o\E-
s0D
hez SEED
TYPE OF
IRRIGATION
TYPE OR METHOD OF
EROSION COI{TROL
c. oTHER LANDSCAPE FEATURES (retaining walls,fences, swirrning pools, etc.) Please specify'
i
:
wlile you were out
EXPERT NO, 222188
T"F.. -:]-_-:
t-
1.
5;
t
?.
o 'it n
6.The final.design concept for the retail 0e presented. The Board would lika-t;'on the retail display box concepi.'- --
area should
see more detai'l
7. A detailed material board should be presented. The Board was concerned that the-ioot Jr'i[e-i"."i.."'=buitding ral lot nntch exiiily-the tleitin'irii.i'"oot.Also detai'ls on colors and it'ucco should be provided.
8. It was mentioned that.there rnay be a prcblem with the height on the south side oi tn-i ruiiainil'-i'[.r"i"i! you know which .H L am rererrint-to. pteise .al""ii'."y height problems that exist.
9. 'It would be helpful if you wou.ld submit a tentative phasing schedurl.for thl p"oj"ii so that the Board and staff can be up-to-date oil wien areas of the cascade Village project wi'l'l.be unaer-ionstruction. - -:
10. The issue of on-site parking for corrnon carriers should be addressed at this iire uiro"i tht ;;";i;;..ri "r"tn"cascade v'irlage site becomes-too restrictive to ailow . for this parking area.
1l' A written statement explaining how parking wilr be handred for construction workei-s ouriig thii sJmn6r'*i,lri-oi, helpfur.
IZ. In respect to_allowed GRFA for the terrace wing, the SDD states that 55,000 !q.ft. wiil be allowea. nCi6di'ng to your architect's_carcurations, the totar GRFA ii'islaoo :q.ft. My calculations show itat-tre-r"ii'biirn-i]-6q,sso
I "r in the-process of rectrec[ing ry catcutationrl ilo*.r".. even according to your architect-ttrlre is a-ai;;;;p;;.y in rhe GRFA-.-preare o" awire-it.i'ir'is iiit..""i"'il,GRFA wiil affect the amouni or-eirFn iiio*"a'ii."irtr'""buildings for Cascade Viffjge. --
tr will_be out of towl frym April lgth to-April 24th. As soon as I get back' I woutd 'rike to^set :i^1 rrg;ii;g nith ,ir"'punfi.-uiii<s oepartrent and Fire Department !o s9_over anv coic""nl_tfiii iillv'iri"iuu" wirh the Terrace lding proposul. -|'"ui" gj"".-;;-i cat] i.f you hav-e any questions
;;ff::.t"n the addirionar iniorf,aiion-."qr"stea tl-irre-oiribn Review
As soon as you know Design Revilw Board
when-you would like to be schedu.led for the next meeting, please let me know.
KP: aw
Uppgn Eleu Vnu.ev
WATER AND SANITATION DISTRICTS
8/t5 FOREST ROAD . VAlL. COIORADO 81657
(303) 475-74@
April 16, 1985
Mr. Gerald A. WaLters Froject Dlrector
Montane Corporation
1000 S. Frontage Road West Vail, Colorado 81657
Dear Mr. Waltersl
REI SEWER LINE SOUTH OF THE TERRAiE WING ADDITION
As I're diecussed on ApriL Ll, 1985r with the proposed Terrace
Wing Building, the serder line south of this project may be
reLocated further south. The minimun distance between the se\ter line and the buil-ding ls ten feet. A tvrenty-foot
easement centered on the sewer line is also required.
The new sewer llne r,ril-I need to conform to the Upper Eagle
ValJ.ey Consolidated Sanitation District specification.
If you have any further questions, please feel free to contact me.
S i ncerely,
UPPER EAGLE VALLEY CONSOLIDATED
SANITATION DISTRICT
*r".,;Z4J
David Krenek, P.E.
Technical Director
DKr rls
/
MAN+;EE|
l ll PAE ICIPAT'XS DErRrCnr - ARROWHEAD METRO WATER O AVON METRO WATER r BEAVER CREEK METRO WATER r BERRY CREEK METRO 'rOtO ft
f\
EAGI€-vatL METRo warER . EDrryaRDs METRo uyarER o LAKE cr.EEK MEADows warER r uppER EAGr-E valrE.r coNsouDATED saNlrarroN
@
.+| {-;
TrD.arth ,rS|D '|ld n,..obr|ft f$t lD' rrr-rslg
2.
3.
{.
5.
I
I
t
.,.4 2.
6.. The final design concept for the retai'l area should
be presented. The Board would like to see more detail
on the retail disp'lay box concept.
7. A detai'led material board should be presented. The
Board was concerned that the roof of'the Terrace building may not nntch exactly the l,Iestin Hotel roof.. Also details on colors and stucco shou'ld be provided.
$e. It was mentioned that there may be a problem wjth the
he'ight on the south side of the building. I believe you
know which area I am referring to. Please address any
height problems that exjst.
9. It wou'ld be helpful if you would submit a tentative
phasing schedule for the project so that the Board and staff can be up-to-date on when areas of the Cascade
Village project wi'll be under construction.
The issue of on-site parking for comnon cariers should
be addressed at this tinp before the development on the
Cascade Village site becores too restrictive to al'low
*ro'%
for this parking area.
11. A written statement explaining how parking will be handled for construction workers during this sususnurolld be helpful .
ry'z'
In respect to allowed GRFA for the terrace wing, the SDD
states that 55,000 sq.ft. will be allowed. According to
your architect's calcu'latjons, the tota'l GRFA js 59,860 sq.ft. My calculations show that the unit GRFA is 64,550 I am in the.process of rechecking my calculations, however
even according to your architect there is a discrepency in the GRFA. Please be aware that this difference in
GRFA wi]l affect the amount of GRFA al]owed for future
buildings for Cascade Vil'lage.
I wi'll be out of town from April l9th to April 24th. As. soon as I get
back, I would'l ike to set up a meeting with our Public l,lorks Department
and Fire Department to go over any concerns that they may have with the
Temace Wing proposa'l . P'lease give'me a call if you have any questions
concerning the additional information requested by the Design Review
Board.
As soon as you know when you would like to be schedu'led for the next
Design Review Board meeting, please let me know.
mi5,i,lfi,P . Town P'lanner
KP:aw
l:;.APPLIcATIoN ,orr, d.l--$JS
DArE oF oRs,lrrerrNo, 4-11--K
DRB APPLICATION
*****THIS APPLICATION IdILL NOT BE ACCEPTED UNTIL ALL INFORMATION IS SUBI4ITTED*****
I. PRE.APPLICATION MEETING:
4-plg:llltication qqglins wtth_a planning staff member ls strongly suggested to ::fTl|t! jI 3!y additional jnformation is needed. No appl'lcatio-n wiii be accepted . Yllg:t.lt is_complete (must include all items required oy'ttre zoning aamjniiirildri.lf,.ls.tne app'licantrs responsibility to make an dppointnint with th6 staff to find'out about additional submittal requirements. Pleiie note thit a C0MpLETE applica-tion will streamline the_approva'l 'process for vour-prJje.t by decreasing thi'number of conditions of approval .that the'DRB may sti-pulatb. -Att;6ndiiiila;i fipdili-must be resolved before'i luttding pennit is iisued.
A. PROJECT DESCRIPTION:
B. LOCATION OF
Address
Legal Description Lot
Zoning
C. NAME OF
Address
D.MME OF APPLICANT'S REPRESENTATIVE:
Address
E. MME OF
Signature
Address
Block Flling
F. DRB FEE:
VALUATION
The fee will
$ o-
$ 10,001 -
$-so;oor -' $150,001 -
10n000
50,000
150,000
,500,000
1,000,000
1
IMPORTANT NOTICE REGARDING ALL
be pa'ld at the time a building permit is requested.
FEE
$ 10.00
$ 25.00
$ 50.00
$100.00
$2oo.oo ' $300.00
SUBMISSIONS TO THE DRB:
1. In addition to meeting submittal requirements, the applicant must to indicate property lines and building corners. Trees that will
should also be marked. This work must be completed before the DRB
si te.
stake the site
be removed visits the
2. The review process for NEl.l BUILDINGS wlll normally involve two separate meetings of the Design Review Board, so plan on at least two meetings for their approval.
3. People who fail to appear before the Design Review Board at their schedu'led
meeting and who have not asked for a postponement will be required to be
republ i shed .
S}
l@ S, @tW pf terephone 4E@?
i1-' t,
NAMESF PROJECT:
[EeAl orscnlPTIoN:
STREET ADDRESS:
DESCRIPTION OF P
The following information is required for submittal by the appllcant to the Design Review
Board before a final approval can be fiven:
A. BUILDING MTERIALS: TYPE OF MATERIAL COLOR
Fasci a
Soffits
Windows
llindow Trtm
Doors
Door Trim
Hand or Deck Raf'ls
Fl ues
Flashings _..
Chlmneys
Trash Enc'losures
Greenhouses
Other
B. LANDSCAPING: Name of Designer:
phone:
Botanical Name PLANT MTERIALS:
PROPOSED TREES
QuanJ ty Size*
fu"EE+L LMw ureftW(z4"fuw*@
9oL @jW
L
h
EXISTING TREES
BE REMOVED
--t roE W
N*'
rD
)
*Indicate caliper for deciducious trees. Indicate height for conifers.
O LIST OF MATERIAL'
NAI'IE tT PR0JECT:
TTERU DESCRIPTION:
STREET ADDRESS:
DESCRIPTION OF PR
The fol'low'ing information is required for submittal by the applicant to the Design Review
Board before a final approvai can be fiven:
A. BUILDING MATERIALS: TYPE OF MATERIAL COLOR
Roof
Si di ng
0ther |,|all Materials
Fasci a
Soffi ts
},|i ndows
|.|indow Trim
Doors
Door Trim
Hand or Deck Rails
Fl ues
Fl ashi ngs
Chimneys
Trash Enclosures
Greenhouses
0ther
B. LANDSCAPING: Name of
PLANT MATERIALS:
PROPOSED TREES
Botanical Name Si ze*
ll I t
lvluclo A'&AW It / 1
Quani ty
fs
aL1
IU
Vt/
tt
/r t0\
,rep"It
*Indicate caliper for deciducious trees. Indicate height for conifers.
(over)
Desi gner:
phone:
(con't)
SHRUBS
EXISTING SHRUBS
TO BE REMOVED
GROUND COVERS
Tvpe Square Footage
i
-vVl
I !
PLANT MATERIALS: Botanical Name Common Name Quanity Size '.'" ' ;
SOD
SEED
TYPE OF
IRRIGATION
TYPE OR METHOD OF
EROSION CONTROL
C. OTHER LANDSCAPE FEATURES (retainjng wa1ls, fences, swimming poo1s, etc.) Please specify.
K*t y.$.t_
PROJECT:
iNTER.DEPARTMENTAL REVI EI^'
dit
DATE OF IC HEARING
I
I
I
I
I
/J
.?
DATE SUBMITTED:
COMMENTS NEEDED BY:
BRIEF DESCRIPTION OF'THE PROPOSAL:
PUBLIC WORKS
Reviewed by:
Corrnents:
Date
q
$fff"ffih-FiRE DEPARTMENT
Rev'iewed by;
Conme
/,aa,a
'7a*
-J.
\ 7., r-a- '-'- - /,/ /'
A /zadcs_- .
- z / ; lq'kZ'' c oct
d),48,"-4" a-- ztaaa /,// , /-r, g7 5.t<-G
rV, 5,j
..-.....---
Reviewed by:
Comments:
'@"**lp*-l /., Qzdsr".na'L
.rA /---P r'/dr'.,iJ. te,.a'6v /il c.azer-tJp Z*u/t-
h' E4 rz.t*'/:J krQ-"tu-/
;fi -i"rt ,/*- tr /r'"*/.e.7/'L^ zza'J
',#; 7ilrr*Lil tt*E h'g t-'o<cz'-"ae' Eia't)*"r-7
(/bfJrz'tz.'+'< //'<' a''4
-.r. /-''RECREATION DEPAffiffi
^/ft
ffi.o- /'e, n.-u2 {u.yz-.--', 3{ eaz"s F-a"J*,sF- o'''/ 't'/7-"''at'f'zz't
/tAc'Ne-
-/. z-ozzz 4',"/-*- (:,a i14,an yf2 :f:L
.a-o---J -glarz a- ca 4/-4az-y sr 4 sXr'
j) arz,.z- Z 4nn./ ,/? (/ o''s '
C_z.rz s,-,(n- ,*"ryJd,
/1
-4!' 1fr..ta'z*-t-t< - a? -ttn'&, /-<,,,2c.J -,?,,. z t,t/.j,y -y':l1:#: i;ry"},ry ..*..-n; &<n'zc'/ -/2,:tzt"7/'';at - /*'a'a'^'" '!n'/.-?OLICE
OTPARTMENT
,dsmz ,<
Date
/ '')/.
Reviewed by;
Comments:
Date
INTER-DEPARTMENTAL REVI El.l
PROJ ECT:
DATE SUBMITTED:
COMMENTS NEEDED BY:
BRIEF DESCRIPTION OF THE PROPOSAL:
PUBLIC WORKS
Reviewed by:
Comments:
FIRE DEPARTMENT
Reviewed by:
Comments:
POL]CE DEPARTMENT
Reviewed by:
DATE OF PUBLI HEARi NG:
Date:
D ate:
Cornrnents:--(D E *te M*l,t- }sveLoA^, 7H€ ffi/+(L noPL.,NffiJs
T> W UoftfA orn ,7176 c?vsLs{\ OJk K(rAt p;*)-
,y6;&/L, ti z.rA ,cle (P?N*L' @ arnru*t Fffii, Frttt'r't'
a.li fr:&tanouns0. @ fu)ugt< PAit;;loG^ fud'nr,+t* b.^g^tnr>
firr tw1^bT @Dft.tcr cr( FcA.1,,c.@ Du36^) e@YA 6 f/,";;- HDTS, rZu^{/n+r-cs 1-"'tro {?E7nt'c.
ffiil::,
av' trt tte rffi ,o - mzaaii.T @ {*rrcu)
5nQlUb-f cuPtdrfion otr f,,Wtiato p(fi)'L€ /ssd;4K
RECREATION DEPARTMENT
Reviewed by:
Comments:
G)
@
TCP.
Qtt csW-e, ft\67HAL,. ftOW f/uutt PMZ? /is-,r/rt"tTE:n*,^)I C(4.
Date:
nli
75 soulh ttontage road
vail, colorado 81657
(303) 4?6-7000
April 8, 1985
3. A more detailed site Plan
equals 20 feet. The site
landscaped areas, service
outline, etc.
offlce ol communlly development
Jere l^lalters
% Montane CorPoration
1000 South Frontage Road West
Suite 200
Vail, Colorado 81657
Re: Cascade Village Terrace Bui'l ding DRB Submjttal
Dear Jere,
I have tried to cali you several times, but I understand that you are a
bit under the weather-. I thought that I should write you a,letter to inform
you as soon as possible of the-additional information we will need for the
. iqrrapf Building DRB submittal . This informtion includes:
^-alif{\'\$:qfr" proposed randscaping pran. I understand that you are referring
fli ,n to tire irevious landicafle'plan. I would like a copy of that plan.for
I h\0X the submjtta't. The lanhscipe plan should be at the scale of one inch
q\il\. equais 20 feet and should show'specific 'l ocatjons of planting areas,
" U paving, retainage, etc.
2. A topographic survey should be submitted. lrlhile reviewing the-plans,
V petei- ind'I had queitions concerning the existence of a ski lift easement,
U- the corner of the building that is located on the set/er easement, and
the property'line indicated in the center of your site plan'
is needed at a scale of at least one inch
olan should clearly show the'locatjons of
areas, decks, patios, walkways, building
4.A height ana'lysis is necessary. The site pian
will allow you to do this study- One the east
it is difficu'lt to determine if the building is
7l feet.
together with the surveY
elevation of the building
actually under or over
5. The submittal should also include a ljst of square footage calculations-
The list should show the number of accommodation units, number of dwelllng
units, and GRFA totals.
L
Jere l.lal ters
Plaza Building
Page Two
4/8/85
Once re receive this information, we will be able to schedule the project for a Design Review Board meeting. As soon as I receive the cornplete
subnittal , I will route the proposal to other Town departm€nts. The other departments may need add'itional infonnation. However, it shou'ld
not hold up your review.
Please call me if you have any further questions.
Si ncere'ly,
Kristan Pritz
Town Planner
KP: br
RECREATIONAL AMENITiES FEES FOR SDD4
llest haven Condos
Terrace l,ling guest rooms
retai I
Plaza Building
guest rooms
condos
retai'l/Offi ce
coRference- net
SF
22,500
55,000
6,3gg
l g,333
19,500
l9,500
9,500
x .25
$ s,6zs
l3
'
750
I ,599.75
Total
$ 5,625
4,583.25 )4,875 )4,875 )2,375 )
l5,349. 75
16,708.25
$37,683
Project Application on 4-l-'14
Proiect Name:
Project Description:
Contact Person and Phone
Architect, Address and Phone:
Legal Description: Lot ,r^" S,D4,
Comments:
Design Review Board
Motion by:
"","
\[\?l[t
DISAPPROVAL
Seconded bv:
APPROVAL
fl statt Approval
Project Application
Prolect Name:
Prolect Description:
Contact Person and Phone
Owner. Address and Phone:
Archiiect, Address and Phone:
Legal Description: Lot
Comments:
Design Review Board L\iniu\-
Motion by:
S€conded by:
APPROVAL DISAPPROVAL
,iii],\ir'i,'i.1r',p-,ll tt'
I , \ . , ./,.:f I r'l \Date ' \
E Statt Approval
Proiect Application
Proi""t N"r"' ti
Proiect Description:
Contact Person and Phone
Owner. Address and Phone:
Architecl, Address and Phone:
Legal Description: Lot ,ro^" 5b4
Commenls:
trff:L i-i( A'
Design Review Board
Date
Molion by:
Seconded by:
APPHOVAL DISAPPROVAL
. ; t .1
Summary:
E statt Approval
75 aoulh fronlage rord
y8lt, coloredo 81652
(303) 476-7000
Mr. Frank Freyer Vice President, Montane Corp.
LAAA S. Frontage Rd. t{est vail, co. e1657
Re: cascade village Terrace Building finat approval by Design Review Board
Dear Frank:
On september tBr t9g5 the Design Review Board gave final approval to the Terrace wing contingent upon addre"sing public worksl concerns before building perrnit. pub]ic worksr list of itens that need to be addressed include the following:
a. A drainage plan for the north side of the building
b. Specify the size and type of culverts for drainage
c. Is the new easement for the sewer complete? The Town Engineer would like to know how this issue wil.l be resolved
d. Framing and founda tion plans must have an engineerrs
/. s ta rnp
e. A soils report will be required
f. A title report will be required
g. The Town Engineer would 1ike to see a more detailed plan of how the common carrier area wi1l be designed particularly in respect to the adjacent roadway.
h. Is there an agreement for the maintenance of the path behind the Terrace Winq?
The board also made several changes to the submitted prans at the meeting. Firstr the granite pillars along the loggia will be
page two
Frank Freyer
beveL]ed. secondlyr three light boJ.lards will be added to the
gfqve-J path. connecting the common carrier area to the CMC building.'rhlrdryr aix of the propoeed colorado spruce will be increased in size from eight to ten foot trees to -twelve to fourteen foot trees. r have also enclosed ny square footage carcurations for the entire Terrace Wing. f have cal"culated an additional 81 sguare feet beyond yout total figure of 5gt62? square feet. +
show t sguare
'-' -.' --= r-E-+ . If you want to 39 over my calculations please feel free to give ine a call_.Please remember that at the tirne of building permit review tha Fire Departmentr Building Departmentr as well as Public Works !'tr rr once again check the building permi t plans. r encourage you not to wait until the last minute to deal with some of the Public works concerns. congratulations on getting your first .pro ject through our thorough Design Revielr Boar-d !
LAK *W*d/ds6L Sincerely r
i('#^fth
Kristan Pritz
Town Planner
KPlb1f
o
Area
7826
7826
Iotal t l2A 59,7ee
Retail Area on Firet Floor 61579.5
Calculations are based on ROtlt draring eet dated July 5, 1985
o
TERNACE IIAG EXPTNAIOf,
GRFA Calculationa:
No. of Roome
Ground Floor L7
lst Ploor
2nd Floor
3rd Floor 33
4th Floor
Loft
!t
34 14r 663
14,735
19 (f7 have lofts) gr42l
5r236
lonn
75 .outh troniege road
Yall, coloredo 81€57
(3O3) 476-7000
Apri'l 19, 1984
Mr. Andy Norris
1000 South Frontage Road West
Vai1, Colorado 8'1657
Dear Andy,
I thought you mjght want a
Board comments concerning
l. Snow shedding prcb'lems
2. The connection between
ma i ntai ned.
3. The height shou'ld not
offlce ol communlty dcvclopmenl
Re: Terrace l{ing Cascade Village
DRB Conceptua'l Review 4ll8/84
list of the brief Des'ign Review
the Terrace lling. Comnents inc1uded:
should be reso'lved.
the loggia and tlestin Hote'l should be
be greater than the height of the
Sumary.He will
l'lestin.
be back I will also talk to Peter about the Zoning
in the office on l{onday.
Si ncerely,
t) l Dl
l\rirlnn {yrtt
KRISTAI{ PRITZ -
Town P'lanner
KP: br
lnun
75 eoulh trontage road
wil, colorado 81657
(303) 476-7000 offlco of eommunlty devrlopmcnl
April 19, 1984
l'lr. Andy Norris
1000 South Frontage Road l{est.
Vai'l , Colorado 81657
Re: Ifi6"ffi":lifl"f"i:if:''uill3?8,
Dear Andy,
I thought you might want a list of the brief Design Review
Board comments concerning the Terace l{ing. Cornnnts included:
l. Snow shedding problems should be resolved.
Z. The connection between the loggia and l,lestin Hotel should be
mai ntained.
3. The height should not be greater than the height of the lJestin.
I will also talk to Peter about the Zoning Sumlary. He will be back
in the office on Monday.
5i ncerely,
tl.l T, I llriftn\{yrt
KRISTAN P-RITZ
Town Planner
KP: br
Proiect Applicalion
:i\dt, 'tX)lLD/l,b
owner, Address and Phone: ! {{-._- -fi.e';it$U,' f--'i-, L 4_,, i
Proiect Name:
Proiect Description:
Contact Person and Phone
'rJttttVL:
'gean1,1 /W,[n},J
"./{ui; ,:iJ L*1 - l--1 ' / ./' .^.-i ,t'f I {<.) - U:z::L- d-
'A,n,* A:eUilTZt:Architect, Address and Phone:
-lr q. - A?<|-t j 4 Irg,\/4-l {. \
Legal Description: Lot Block Filing Zone
-
Deslgn Revlew Board
Date
Motion by:
Seconded by:
APPROVAL DISAPPBOVAL
Summary:
l.'\ rrn\ U
IY\D vrF.l tiv rnnro0\*
bl**t ihu.rli t'.
ii
DItXd
I IL.t\i l-iLil. {l ,$$ ,.\ot*lrr
{,',!,, ' -}, f-,
""," rtn,\ iilid'l [f statt Approval
d-o *|
Hd o+,O 'rl F{tr hI)
F{tr (do
A 'r'l ttp Oq,
o qra oF o lr{o r-l O d<
Ei ro oh tr{o o |ou +J .r{trtr op (l
O .-{HF{A o &
'ts:+rH 3l.O z
rt
an
+
o o €
*l 04 F{ .rl .t € trrA.S \Ol $l rn@@o(\ (\l -{-FOO\O@lrn r{ Fl F-l C{ ril O
I
llllrol\O
llllFtlFl @lo {-Frl Fl
oN(\tcnFlO .if cO (f) O \Ol dt Ft N f\ c/i f\l \O {-(v) (Yl (n 6"t 6,'l t\lr{
o
6l
rltol artor €
trrol ttt\oa r\
F{
ttto\l tllo\l (n
\o
tlnlnl-ll rrnrnrol Ft F{ .+l
*1
\oo@ctt @!n@@l .+ .$ N a/)
El
581
sxl ..{ (l,l
(J F{l
O F{l tsol ul o, ol
OI}TE I €l
H FrI
cq vl
ll
s
sl
HI
..51 ol el
*rl
oHl ool .rl Ol >ol krl o c/, I v, I
h t{6 c
E (95 zvt H BA,
o0 Er ct (.)rj <o fo &t\;tf HO tr (,
d ut
*o o .,{
fr o (,
F.{
cl
trl
ol\D@@OOl +tl l.n Fr O In O\l .r{l o|r rr1 O F{ F{l fil .l pl (v) .f r.t oo ol
l Fl Fl H l
!h}.|ol{oho HlOOooo OIAOFIOF{OlhF{kFl14 Frlkh t|.l.4rrTtf,rr€tr&rtrFl lrHooJnl 3.r{(rt{O!b-do'r{Fo trI-.Urla(9F{
o \0
N
FI
/c'|\/latl ll .a I
\t.o,/
H o
--
.:i
o
rO
@
CN .n
-*
--\
1.,5L,\'ft an.nnl1+ not,ofu\lx Qq 4a^q^+ E{ n.rd
"
\dh( \,or,*hre- K\tnaL{a. tlncft.X.A ;K'
\irl.l-.-^ \ r\' l.{-qoJ- dlscnb -
"t -ruil*o*ico$ \u h,hL purpoxl K[i^""[{ffi"0s \u h^^t flu'?o'o'
5 s*a ?\o,r^.{l G'.ili\ ql't .f lh \irus a,uQud,o,,
5, trnri{ql 4 ca0c^'h*ml
f^b,rq, [\rr+€r Bw
0
oo
[0vt'rD fl00q-
$/eno\ s40D
H9c'ttf{ --- l} mifi
Prf fa,o€.- a+Sh
l83l
3604 w
,ndr&l. /f,!oo
Y6V JY r$; i-r '
2Db
' 6as lrztf "
;id (nysxt\ t"tP t?t,.;t /\gr/166) 6,i
i,K. 3tA ''4.fi ( Hr.r\ er- |,, --, rl,"-vsg'{€ fC
,3F /luih ffi*r ls
-.l\
:---___-
h
iliv
o tl 'iii 0al \,e0.- \ ar'fi bJine ,t, c
1pr ri{e p.Linq {rr (d\^Yno\ Canderr
iiil"^ \.i o 4 N: c'o, 'urr\'\ p*[,^g ir t"'ft 1 \, f*n
\tr iltto ' .',$rba.x-Jtud\n{4*N'\iirlnnUof'g/et.f **TYhni[dt+'il'[, 'r-, ffi li \ \ l'- 5ni^ofcutr\*di
,l,o uomd [u'n'rq \eq\no I i&,qD rh .i , d_'. L ar";"tned
'I'o'5\^\
anr^\ir rou( ri$ +r' Ail&\. hei
iih h,q,-f , lo.Lt..g k_ffid
;; v
lh^, u,i[ carr\*A,o^ rilc,.t^ L lu"dhd
;'ll. r r'
,Uq\lq
'; u 0
;$r* 6oro*"\ /tr^itdri4 an ll "0d," fr^ f,e*L,
',)''' \ tl
fiir,.r t\addr"u te0rr^J
fnifu \Ll' wr\*l ,ro*r^a I t,t "
nni&rr^rn\ urdo^ \.r- U^{uAc^
rpq hcrau{ d ,J"+ $fu [i'to-\k hrdir\ o
[\o-r toiqi; 0n d\ry. fiis\ flor, Q\nt^'
;:-Wsq Nhd) 5 bL rrqain+^"Ld \ ?a.L Pennrur it ij r
\
J.I r o
o
\" h- ^ild\eor{
in *,^r\ r\d(-
t,
{
\ ,- n tl. ,\. \
\W{'',)n^, )\.uddl,w1 '$l -*ri,
: 0 tD${
:,..r1 t. itn t,UbtAtr^_ A {utffirb&
j "' I l
n'\., 1 r L r n
llJr4b.q bU''af eK- nDT o- *'inal[,U
&- r'$l
iU"pk
I
ut t {il3 ry*t0*l
].ffi&kh,fl ffiM?'
-1,,h* aC',*Q-hd*'I-,f;?
\ tt-^E* ?\^Rf ry{
'/fiffl\,ffuffi.r. iler{'^ h0r0 mdq auil^M^q t obr c rov( ioi'n
J{'hm.ru M^{"ott'"ffiw
f,' $oght-;fu,W^:A6*,y^,H
!t:'/haan, ,d*W, fttrt(D
a\
f o o
L
Lgt
UTILITY I'CATION I'EP.IFICATION
SDIVISIG
JOB NA}IE
BLoct(FILNiG SD-4
ADDRESS 13OO WESTHAVEN DRIVE, vA 7
The locatior of utilities, uhether they be r=iq tnurk lines or proposed lires, r:'st be appror-eC and veriiied by the folloring utilities-foi the
acconpan)':ng site plan-
Authorized Sicr=ture Date
llcuntai n 3e'i I
1- !44--1,3/
rlliestern Slope Gas
Harry Pcyes
l-469-2s28
lPublic Serrice Company
Gary Hall
*.-Holy Cross Electric Assoc.
Ted Husky/ltichael Laverty
vYail Cable T.Y.- .leff_ Hughes :949-5530
lUpper Eagle Yalley lfater ' and Sanitation Discrict
David Krenek
'* For nar const
please fill out
attacheC sheet.
4-a-q</:--)
\
NOTE: These verifications doBot relieve the contractor of his
- responsibility to obtain a street cut permit fron the
Torn of Vail, Departaent of Pr-rblic hbrks and to obtain
utility locations before digging in any public right-
of-way or easenent in the Towr of I'ail. A buifd.ing pernit
is not a street cut perait. A street cut perait ,l,',.1 6s
obtained separately.
This fom is to verify service auailablity and tocation.
This should be used in conjunction rith prepariag your
utilit)' plan and scheduling installations.
I'
l,,t i\lR
"q
{iL{.....-.. ..--..-.-.*.
MANSFIELD,LTD
T'TILITY IOq{TION VERIFIC{TION
SIT3DIVISIO:{GLEN LYON
JO3 ri4ltE TERRACE !ilING (CASCADE VILLAGE)
LOT BLOCK FILL\G SD-4
A!:isss 13OO WESTHAVEN DRIVE, VAIL, CO
The location of utilities, rhether they be nain tnrnk li.nes, rust be approved and verified by the folloring
acco=anying site plan.
Auth:r'ized Sionature
lt;:ntain Bell
1- l.aa-ails!
liastern Slope Gas
Harrv Hoves l-468-2s28
Public Service Company
6ary Hall
Holy Cross Electric Assoc-
Ted Husky/Hichael Laverty
Vail Cable T.Y-Jeff- Hgghes ;949-5530
Up;er Eagle Valley l{ater
and Sanitation Discrict
David Krenek
8165 7
I ines or proposed utilities for the
Date
Aear
* For nex const
please fill out
attachej sheet.
IiOTE: llrese verifications do not relieve the contractor of his
- reqrcnsibility to obtain a street cut peroit fros the
Torrr of Vail, Departnent of Publ ic l{orks anil to obtain
utility locations before digging in any public rigltt-
of-ray or easeEent in the Towr of Vail. A buildilg perait
is not a street cut perait. A street cut perait |i[rs t be
obtained separately.
This form is to verify service avaitablity and location.
This should be used in coajunction rith preparing your
utilit)r plan and scheduling ilstallations.
UTILITY L@ATION VERIFICATION
GI,EN LYON SUBDIVISION
JOB NAME
LOT
ADDRESS
The location of utilities,lines, snrst be approved and
acconpanying site plan.
llountai n Bel l
1_ ?aa-41s/
l.lestern Slope Gas
Harrv Moves
1-469-2528
Pub'lic Service Company
Gary Hall
FILING SD.4
4s1-
whether they
verified by
be main trrrnk lines or proposed
the following utilities for the
Authorized Signature Date
&ffi5
Holy Cross Electric
Ted Husky/Michael
Vail Cable T.V..leff- H.yghqs ;949-5530
Upper Eagle Valley Water
and Sanitation Discrict
David Krenek
NOTE: Ihese verifications do not relieve the conrractor of his
- responsibility to obtain a street cut pernit fron the
Town of Vail, Departnent of Public Works and to obtain
utility locations before digging in any public right-
of-way or easetnent ln the Torsr of Vail. A building permit
is not a street cut pernit. A street cut pernit must be
obtained separately.
This forn is to verify service availablity and location.
Tttis should be used in conjunction with preparing your
utility plan and scheduling Lnstallations.
Assoc.
Laverty
* For nev'l const
please fill out
attached sheet.
SII3DIVISION .:T FItr r v^\l ' \rrJrJrI tJ I ll/tl
BLOCK
ADD.D.ESS 1300 WESTHAVEN DRIVE, VArL, CO 8L657
The location of utilities, r'hether they be nain tnnrk lines or proposd lines, trust be approved and verified by the folloring ut,ilities foi the
accorpanying site plan.
Authorized Signature Date
Hcuntain Sell
1- ?aa-ns/
l{estern Slope Gas
fiairrT-mEs l46g-2s28
Public Service Company
6ary Hall
Holy Cross Electric Assoc-
Ted Husky/Hichael Laverty
Yail Cable T.Y- !
.!ff_ Hyghes i949-5530
Upper Eagle Valley Hater
and Sanitation Oiscrict
Ihvid Krenek
UTILITY LMATIOI{ VERIFIC{TION
-
JOB
LOr
CASCADE VILLAGE
FILL\G SD-4
1-rc aE
* For nen const
please fill out
attached sheet.
ISOTE: fhese verifications do not relieve the contTactor of his
responsibifity to obtain a street cut pernit froc the
Torn of Vail, Ilepartnent of Public lforks and to obtain
utility locatiors before digging in any public rieht-
of-ray or easeeat ia the Torsr of Vail. 4 builaitg perait
is Dot a street cut pelEit. A street cut per4it -,*i 6s
obtained separately.
This foru Ls to verify se*ice availablity and location.
This should be used in cojunction rith preparing your
utility plan and scheduling installations.
UTILITY I,OCATIOi VERIFICTTIO:\|
sBDrYIst0N__GLEt{ r,!eN_
BL(K FILL\G SD-4
JOR WW T
LoT
' mDss 1300 wasrulvrx nRrvn,
The location of utilities, rhether they be nain trl,:rk lines, m-rst be agproved and verified blr tfre folloring
acco:=anying site plan.
Authorized Sionature
Mouniain Bell
1- 244-415!
l{esiern Slope Gas
PubIic Service Conpany
Gary Hall
Holy Cross Electric Assoc.
Ted Husky/t{ichael Laverty
Vail Cable T.Y. I
Jef{ HJrghqs ;949-5530
Upper Eagle Valley l{ater
and Sanitation Discrict
lhvid Krenek
lines or propos ed utiliti.es for the
Date
* For neyr const
p'lease fill out
attached sheet.
9-no( o' ,.'T-f-rr
Jr*,4 -L*o,-rd)-
9a*;"
IiOTE: These verifications do not relieve the contractor of his
- respoosibility to obtain a street cut pernit fros the
Torn of Vail, D,epartaent of Public lforks and to obtain
utility locations before digging in any public right-
of-ray or easelBerrt in the Tom of Vail. A buildi.rrg permit
is not a street cut perEit- A street cut pemit rrst be
obtained separately.
This foro is to verify service availa.blity and location.
This strould be used in conjunction yith preparing your
utility plan and scheduling installations.
r/4. "/ Z.@ A"r"/-,/"'-fr'L ;-l- il '+" 4 *zr*i>/.-,"*
UTI LITY I.E{TIO:{ VERIF IC{TION
SI,:}DIVISION
JOB NA}TE
AD]RESS 13OO }TESTHAVEN DRIVE, vA
The location of utilities, whether they be nain tnnk lines or progcsed liaes, Erst be approved and verified by the folloring utili.ties foi the
acconpanyiag site plan.
Au'.-hsrized Sicnature Date
!4:untai n Eel'l
1-!44-#.5/
h'estern Slope Gas
Harry iloves
1-468-2528
Public Service Company
6ary Hall
Holy Cross Electric Assoc.
Ted Husky/Hichael Laverty
Yail Cable T.Y.Jeff Hughes ;949-5530
Upper Eagle Yalley lfater
and Sanitation Discrict
David Krenek
NOTE: lhese verifications do not relieve the contractor of his
- nesponsibility to obtain a street sut peroit froa the
Torn of Vail, I)'epartneot of Pnblic I'orks and to obtain
utility locations before digging in any pubfic right-
of-r'ay or easerent ia the Towr of l'ail. 4, buifding pereir
is not a stneet cut perait. A street cut persit rust be
obtained separately.
This foro is to verify setvice availablity and location.
This should be used in conjwrction rith preparing your
utility plan and scheduling installations.
I
"F'r'riTJ
erJ sheet.
{
FILNiG SD-4
I
hn
CONSTRUCTION PERMIT
deprrtment of community dwelopment
TO BE FILLED OUT COMPLETELY PRIOR TO ISSUANCE OF PERMIT
TYPE OF PERMIT
EFeutLotr're DSpluMeri{e
El(elecrRrcru [XrounDATroN
EX MEcHANtcAL D tsooo west Haven Dr
LEGAL
-pEsc.
LOT BL K
Fil_rNG U[\|PI_AIIED___lbe runue,
-
OWNER rume VAIL VENTIIRES - LTfi
M^TLADDRE.S 1000 S Front. Rd.
CITY Vai 1 PH6-66n,
ARCHITECT FrRu SL P
GENERAL
CONTRACTOR
,,*u G. E. J0HNS0N
140-n
TOWN OF VAIL REG. NO.
*-l'#irh
FIRM
TOWN OF VAIL REG. NO.
PLUMBING
CONTRACTOR
r'*r\:*\\s\rtr\Nrr
TOWN OF VAIL REG. NO.\\ N\ -\ \SA rELE. -1-i \-.1\ sto
MECHANICAL
CONTRACTOR
,,, u\*\l, r-.. \', qN\\t\\T
TOWN OF VAIL REG. NO. \
TELE.
OTHER
CONTRACTOR
FIRM
TOWN OF VAIL REG.NO
TEL€,
lh.
NOTE _ COPY OF PERMIT TO BE KEPT ON JOBSITE
oo* April 16, 1987
002866
\Jvvv\
)
1. WPE OF CONSTRUCTTON |[u rVV
2. OCCUPANCY GRTOUP ABEH I R lrl
OIVISION 122e34
GENERAL DESCRIPTION OF WORK :
-
*!t NFU nONSTRIICTION - l2O
PERMIT NO.
z o
E 5
BUILDING 6 -n8a - 0n0 - 00
ELECTRICAL 493.000.00
PLUiIEING 343,000
GUSETROOi4S - HOTEL H€CHANICAI 535.000
x0xu T0'AL $ 7,455.000.00
WPE GROUP G.B.F.A. VALUATION PERMIT FEES
II FR 97,340 7 ,455. 000 .00 EUILOING PERTIIT 16,450 I
U
n-V i"g
.) \.
)"1 *O
n G-
PLAI{ CHECK 10,693
ELECTRICAL 7,220
NEW( "t' ALTERATTON ( ) ADDTTTONAL ( ) REPATR (PTUMBING J,4JU
DWELLING UNITS
-
A@OMMODATION UNITS
-
ITIECHANICAt g,025
HEIGHT IN FT.
-
NO. FIREPIACES RECREATIOI{ FEE LZ, Lb I
INSULATION: TYPE THTCKNESS R.VALLUE DESIGN REVIEIV BOARD 300 rr-oon | | |CLEAl{-UP DEPOSIT 1 ,000
EXr. wALLs | | |USE TAX 37 .275
ROOF
TYPE
OF
HEAT
GAS
wooD
TOTAL PERMIT FEES q q6 -56n-00
GARY MURRAI* U-^ May 6, 1987
ADDITIONAL PERMITS NEEDED:
Y N INITIAL
.t. "r' lx | |
ButLolilc oFFtoAL DATt
ZONING AOMINISTRATOR DATE
BLASTING zoNtNG & BUtLotNG NorES: Af'l0llNT DUE $51.550.00 l:=:'1qR6 Plan Check Fee 10.000 4
106 -56n 00 tr
I hereby acknowledge that I have read this application, filled out in full the information required,
complet€d an accurate plot plan, and stat€ that all the information provided as required is corrsct. I
agree to comply with the information and plot plan, to comply with all Town ordinances and state
laws, and to build this structure according to the Town's zoning and subdivision codes, design larvs, and to Dulld tnls slructure accorotng to lne lown's zonrng ano suDorvrslon cooes, oes
review approved, Uniform Building Code and other ordinances of lhe Town applicable thereto.
CLEAN UP TO:
Box 2t39
80901 AND THE OWNER.
\ .. \ . - \ '*\,Qt\\r"S \A
lmn
42 mrt mcrdow ddYe
Yall, colorado 81657
(303).76-2200
May 1, 1987
tlre departmenl
Gary Murrain
Chief Building Official
Town of Vail
75 South Frontage Road
Vail, Colorado 81657
Dear Sir :
It is ny understanding that the owners, project engineer, architect,
nechanical engi.neer and/or the general contractor and fire sprinkler
contractor have elected not to provide a wet pipe fire sprinkler system
on the fourth floor of the Terrace Wing.
The reason for this refusal to provide for a wet pipe systern is to my
understanding, a concern that the systen wilL freeze '. I also have heard
runmors that if a wet pipe system is required, they ( owners, architect, et.al.)
are requesting the Town of Vail sign an assumption of liability for damage
if the system does freeze .
T find the request for the Town to assune liability totally out of the
realm of possibility, beyond reason and simply ludicrous. I do not have
the resources, authority, or responsibility to design the insulation, the
ceilings, the fire protection system nor other factors which are essential
components of a building design and therefor wilL not and could not assune
such liability. I do not feel it is pioper for the taxpayers of the Town
to assume responsibility for a developers inabiLity to effect a proper
design.
The issue of assumpLion aside, I feel it is necessary to again point out
sone of the factors pertinent to this project :
1. I understand there are sone code issues relative to property lines
needing to be adjusted to a11ow construction of this building.
2. T understand there appears Lo be an issue relating to being 122 over
a11owab1e souare footase.
o
1 1987 Terrace Wing l4ay
Page 2
3. I understand there are some unresolved issues relating to the atrium,in addition to the excessive fuel loading in violatj-on of the Uniform
Fire Code.Article 11, Section 209.
4. The Terrace Lling appears to be in violation of Uniforn Fire Code Article
10, Section 301 (c) , in not providing adaquate fireflows as per the I.S.O. Guidelines for Deternination of Required Fire Flow ..
5. The plans as proposed do not comply with the Uniform Fire Code Article
10, Section 207 (b), requiring fire apparatus access roads within 150r of any portion of the exterior wal1 on the first floor.
6. I understand there appeaes to be a problem with the definltion of the
lowest 1eve1 being a basement or a ground f1oor.
In consideratj.on of the identified issues, I would again offer the Vail Fire
Departmentrs willingness to cooperate and work towards an equitable solution.
We have in my opinion, been very tteasyt' in terms of the foregoing issues.
I must stress however, the prcepts upon which we based our reviev were a
fu11y sprinklered building designed as per the I}BC Standards and referenced
NFPA codes.
If the building is not to be equiped with a fourth floor wet pipe fire sprinkler system, I would suggest one of the following alternatives :
a. Submit the entire plans package, including plans for the existing portion
to lhe staff at I.C.8.0. for plan revier+ by their engineering division.
b. Submit the entire package to a mutually approved fire protection engineering firrn to determine equivalency and have the plans stamped. A special inspector would be required,
c. Bring all identified deficencies , including the lack
roads, into conforrnance with the codes and standards
Town of Vail.
I would be willing to discuss other methods of acheiving
Sincerely,
&
Michael McGee
Fire Marshal , Vail Fire Departernnt
cc : Richard Duran, Fire Chief
File
of fire access
as adopted by the
equivalency .
t h
\ATVTxTRES *
May 20, 1987
Mr. Jon llcKee
G.E. Johnson Conatructlon Conpany P.O. Box 2139
Golorado Sprtnga, C0 80901
llr. Gary llurraln
Chtef Bulldlng Offtctal
Toun of Yall
75 S. Frontage Road
Va1L, C0 81657
Gentlenen I
Upoo revlew that the pernite
RE:
of the above
indlcated the
referenced butldtng return of the Clean
perntte, we
Up Deooelt
note is to be sent to G ado Sorlngs.
PLeaee adJuet your recorde accordlogl.y and provlde confirnatloo to thle offLce.
MONTAT{E COBPORATIOT{e
/l L-?c,^L
Frank B. Freyer III
FBF/ab
Enclosure
1000 South Frontage Road West, Vail, Colorado 81657 r 303/476-6602
dofrartmont ol community devetopment
TO BE FILLED OUT COMPLETELY PRIOR TO ISSUANCE OF PEAMIT
TYPE OF PERMIT
ONSTRUCTION PERMIT
EI pLuMarNc
Ellrounorrron n lylOl UEst ftrven
a
E]
U.
BUILDING
ELECTRICAL
MECHANICAL
LEGAL
I pEsc.
I
LOT-..--.- BLK-_-
FILING lflr'l ilTFn
JoB NAME: Ttff'l^(;t t,ltl{6
OWNER
MAI AFFRF"S l{)00 s F]oot. nd.
-eq__lr_u____r6:6s!!e_
rrRM SIP
Stnrrt
ARCHITECT
GENERAL
CONTRACTOR
rrr r4 l3- 5 3? I
ti.E,,r0ilflstl|l
ELECTRICAL
CONTRACTOR
FIRU
TOWN OF VAIL BEGI. NO.
TELE.
I
PLUMBING
CONTRACTOR
FIRM
-
TOWN OF VAIL REG. NO.
TELE.
MECHANICAL
CONTRACTOR
FIRM
-
TOIVN OF VAIL FEG. NO.
TELE,
OTIIER
CONTRACTOR
FIRM
TOWN OF VAIL RECI. NO.
TELE,
lhrrhLtt^ail
NOTE _ COPY OF PERMIT TO BE KEPT ON JOBSITE
oo* Af'rll 16, lgcl il'\tv
0r
T. TYPE OF CONSTRUCTION
2. OCCUPANCY GROUP
DlvtstoN
I t tv v
BEHIRI,|A
I
Ed'rfl 'd8ft 'f i E ii ff tfri*: -rrn-
lt.. ,' \
PERMIT NO. r'i't' ""'
z o tr
J
BUI!DING 6.4,"t.(})0.00
ELECIRICAT 493.tr(r0,00
PLUMEING J{J,$-tT --=---
GUSiln0{H5-m MECHANICAL 535.000 Err ratltutl I[r[IU
TYPE , GROUP , G.R.F.A,, YAIUATTON PERMIT FEES IT TR 9t,3t0 t.4 55.000.00 AUILDIIIG PERMIT IO r.l5ll
o
PTAN CHECK l0,fi13
ETECIRICAL 1,220
NEw ( -'l ,'ftrEnArtONa@ PTUMBIT{G Jr{|A,l
DWELLI NO UNITS .
A@OMMODATION UNIIS
-
MECHANICAL 8,()e5
HEIGHTINFT.
-
NO. FIF€PI.ACES
INSULATION:rYPE THICXNESS F.VALLUE
fLOOR
EXT. WALLS
ROOF 'i
TYPE
OF
HEAT .
RECREATION FEE
L(1UtI
DESIGN REVIEW BOARD 300
CI,EAN.UP DEPO$r
USE TAX 3l r?l5
TOTAT PERMIT FEES t 96,560.00 $r1'1rtrutonrrrl/L-- ffi
lurrDrNcoFflctAl--i - - dltE
:,crrHcnoiiruisrnFon -- --onre-- e
r[ss Pilr- Tgl$ffi# -
]
-__l
I hereby acknow
completed an acc
agrs€ to comply ,
laws, and to bull
revlew approved,
C[E/t!l UP T{l: 0,
'8e
Cl
ledg€ that I have read this apl
rurale plot plan, and stats thal I wllh.lhs Inlormation and plot I d lhls structure accordinq to
Unlform Building Code aid oi
,8. Jfitnt0n
rr lll 2lt0
rlorodo Sprlngs S0g0l
-
rlicalion, filled out in tull lhe informalion required.rll lhe lnformation provided as required i. "oir""i. i ran, lo comply rvith all Town ordlnances and stale the Town's zoning and subdivision
"o0"",-J"rf oi :ner ordinances ot the Town applicable ther6to. -
srcrrAruREor@
AND THE OWNER.
\
CONSTRUCTION P
departmont of community development
TO BE FILLED OUTCOMPLETELY PRIOF TO ISSUANCE OF PEFMIT
{T
{n !
{8 )t4
lltl uecHaNrceu
TYPE OF PERMIT
BUILDING
ELECTRICAL
PTUMBING
FOUNDATION
It00 }|est llrvan Dr
LEGAL
DESC.
LOT
-
8LK-
lirlPLllllE0 FILING
JoB NAME: Pl.lzn Pll4SE I :
OWNER Hnue Vel I Vrntufnr LID
lrri)O 5 tront llrdd
MAIL ADORFSS
crrv Ynfl w+1-6022
ARCHITECT FIRM
MAIL ADDRESS
CITY PH.
GENERAL
CONTRACTOR
,1, E. J0tfilsn{
rowNoFralLBFG, No. lu8-^
q, J;5gI
ELECTRICAL a"*t^tt*
PLUMBING
CONTRACTOR
FIRM
TOWN OF VAIT REG. NO.
TELE.
FIRM
TOIVN OF VAIL REG. NO,
MECHANICAI.
CONTRACTOR
FIRM
TOWN OE VAIL FEG. NO
OTI.IER
CONTRACTOR
FIRM
TOWN OF VAIL REG. NO
TELE.
t t.lni.rylvail
enilrr,, \ ]rs COPV OFPERMIT TO
h.r 6, l?B)^'' ' :''
-- t:
€E KEPr oN J
'l
z o tr
=-J
BUIIDING ''-.- . ",;.'-_,,---1--
ELECTRICAL
22 Rt.rtst8ooils tuD lrt IUI txtsllilc MECHANICAL ' ) ---- _. , -.-'.
lr0lt[.
TYPE GROUP 'O.R.F.A:. ' VALUATION PERMIT FEFS
EUILDING PERMIT FCT
;PtAN CHECK F': li
ETECTRICAL
a- Cl.
NEW (AODTIIONAI ( ) REPATR(PI-UMEING ira trl r/r Br
DWELLING UNITS
-
ACCOMMODATION UNITS
-
MECHANICAL
!'l !tJ lrl I
HEIGHT II.I FT,
-
NO. FIREPLAOES RECREATION FEE
u,,(c .
..- - tl
lNsuLATloN: ryPE THICTNESg B-VAr-LUE
...-.*lT
DESIGN REVIEW BOARD H:E
CLCAN-UP OEPO$T l: I '{, O-B- O:
USE TAX rg -t pE(:)
ROOF
TYPE ELEC.
oF ------------
. i SOLAF
, GAS
I WOOO
TOTAL PERMIT FEES
tsiitll flllBl.Jlllt tll,y 6 r l,r,rtl
ADOITIONAL PERMITS NEEDED: J.
Y. N INITIAL
sl. cur l ll
u'totfiffl'fi,$'rntu rtay olohiii
-)NING AOMINISTRATOR
ONING I BUILOING NOTES:
onrr- - V
6LASIING
PARKING
I hereby acknowledge that I have read thls appllcation, fllled out ln full the inlormalion required,
compl€ted an aecurate plot plan, and stal€ that all the Informalion provided as required is correcl. I
agre€ to comply wilh lhe lnlormatlon and plot plan, to compty wllh all Town ordinances and slale
laws, and to build thls slruclure accordlng to lhe Town's ronlng and subdlvision codes, deslgn
review approved, Unilorm Bulldlng Code and other ordinances of the Town applicable lherelo.
SIGNATURE OF OWNEB OR CONTRACTOR FOR HIMSELF
AND THE OWNER.
ae Edg^,gdL
€'igoEF,
ENGiNEERING TESTING INSPECTION
Juae 10, l98s
mJUe
Yail Ventures, Ltd,
llT l*rn {ronrage Raod yesr rau, uotomrlo 616J7
Attantion: Mr, Fraat Iruyer
*;flxlj;f;mffiftffiT for the professional vorr perforoed on June 2, rss at
If you [ave any questioas, please do aot hesitale o call.
Respeclfully su bmiUed,
CTC-GEOTEK, II{CORPORATED
PrincipE"l
RR:rn
€!c;
gc:
f$flH:ncoastrucdon co.
-55 jCJ;; r]ljVAJO DEI!,EP CCLCI];DO A0223 3!3 698 ,05,
REr
JUN 13 1988
VAIL VENTURE$ [f
FTEI.D OBSEIYATTOT TEPOIT
l.Tirt$l$.Tt;,ff:$n Hotsr Phasp rr
|iH., June 2, rsti-"
?EcfltrcIAt
Jim Acri
T'PE OF IXSPEG?TOX:
xffi' olruy
2,0
Ultrasonic Iospectioa
'o'Hif&* ,111,1?1.
x
Perforned ulbasonic veld inspection oa the folloviog connectioas at the foof level:
P2t.1 - south top aod br yzr.r - norrh flanse ""tTlrffre
acceprabre
YZJj - vest botton flas
v22.6 -*rrh !r;;;'uge
acceplable 0op flanse aotvelded
vzz$ -east top *d bo*t
bt flange acceptable
v zz,5 -nortb fran se rJ;"l;t* acceprabre
Poiats F2i,l nortl aad y22.6 north vere lol misinlerpretadon, The .
rurr pene*adoo *"rdr.
o vor&Er forenan ":;::ff'rffi-"f*i:t"T"1ffi:inspectiol, Ile sta0ed he vould tave them velded turoru ta" oert onsile
.\!rLrr( I U.lr ULTRASONIC TESTING OF It/ELDS COLORADO TEST CENTER, INC.
I55 SOUTH NAVAJO
aTr.r: :r.#"ADo 80223
ff#.,':i",i.'fff:i::,
Wefa .Iotnt AI,IJ:I.leldlng processl
Date:_ 6-rnspectii-
Report No:
Renarke I S;.t I j I. *" n "
r.",A-*ft #*Au)
r i,gl
FE #l Remarks
E"dl
#f5iifu:#"*
-llilll'Y a'or ..P orr
lFcnf,IcrAf,
JimAcri
TIPE OF ISPEGIIOT:
.g'r,.-o1r OVEITIIE COilTIACIED .rY,,ri, trotrrs sdri6*
.{.0
x
Visual and Bolt Torque laspec{oa
EITTA
sFrvrcHt
rErE mxs rHov tr' rrrrrr'. r-- .-
- -{et'e!'..u'q
E xtf, rtux proJECT sPBcfFrc,Arroxs?r8r_I_ IO_
Visuatly iaspectcd velded con.n....j-_- - . .
----'---'--
aeed of corrrcdoar
-'-sd connecdoas and dect spot velding. The fortoviog iloms aru ia
(I) Secoadfloor crr
jll 1."*i ;;;; ilLfiT :'#:'""il"?r are aor verded
(l) Roofbeam cona ({) Roorbo;;;; i, illlfrrrl;l;.'ff cmcred shop crip
(5) Fenglg partitic
colunrn. rgu*.ri'
atnjR'las tie beal ,,,***"*i;1';*":":ffi ;'lTIf ,ilffi n;::-.deo*ie
reiaspecrion
rioas rheser"il;i*fiffi;"lfi*lf:,
(7) Dormer colurlas still require veldiag.
BOLT TOROTIE INSPECTION
l_."T:r* a bolr 0orque.iaspecrion oo rhe ves Ievel I aad srouad floor ,;;;":;;ffiT:: i* or rhe roor. raspecbd conaecdoas oa rujec0ed poitr1, atrd *"
r for Previously reiecter
poiatsviicft *u";*"1Tll, The follovias is alistof the nevf
(I ) Groutd floor _ base olztl, ot n^^ . ,^(2) First noo; ;;,ffJffi,lT Jl,;
-* nssin s nu rs
(3) roof conn ecfion at ZZ.*r" _
"r* r.li
-ooLoR^Do resr c#n nrc.
156 80urH NAVATO
oEilvEa oot.oRADO tGrat @rrs-r4ro
LIST OF OUTSTfi{DING DISCREPANCIES
Location: (r-\rsra.r ?+:a Er-aq- P*nr.- Jobl : rcs.a3? D ate: a/zt/ez -Inspector: \l-T\-._=1en- page: I of
Iten
,
allaz/az
ulsotl-
'as?/eoJ8'l
r-v,-,,
STFUCTUBAL, MECHAI,IICAL AND MATERIA|-S TESTTNG
o
@LORADO TEST CEIiITER INc.
r558dJtH }|AVATO
oEl|nEROOTORADOeB
@DC-t060
Location:
LIST OF OUTSTANDING I'ISCREPANCIES
[Jobl:rcSa3e Date:
of
raTJ/N.l
*a'pg/a,B,1
(z/a,
s/.9)
Inspector: Y:r-Srexaft=r- page:
Iten t
'ivo Q,g.r
STRUCTURAI- MECHAT{|CAL ANO MATERTALS TESTTNG
u5/f.t
,a{f"*
'/",,.."#"#
.oLo*^Dorr*"*t* *.
t55 80u?lt tr v^ro
DElfvEn cotoRAOo*I2|t
rsDt$-rGO
LIST OF OUTSTANDII{G DISCREPANCIES
obl: ?oso3? Date:
fnspector: Dt--brycz*e^er< pagc: ? of \._\
orted | |
tzy'1/at
o/e/et
q//q/a7
y'/'oa-
h/as/8
STRUCTURAT, MECHANTCAL AND MATERIALS TESTING
rtssotfiH'|AVAF
oElfrGR cotoRADO elza t&srg-tE
LIST OF OUTSTAIII}ING DISCREPANCIES
obf: zoSosq Dsgg;
'{ of Iaspector: Or-\ rc.r<rnffc.o page:
Iten I
KUL
3 112
t/s/a't
ro/s/gt
t25 ot'--
STRUCTURAL iIECHANICAL AND MATERIAIS TESNHG
@LOFADO ?ESf CENTER. INC.
TCsSq't||ilAVAD m-ffi*..*
f,IST OF OUTSTANDING DISCREPAITCIES
Location:Jobl t zro<ot, Date:,
InsPector | 7\ 7-tez-nrf,a-. paget
Itea f
Sof
--/-ry
&
t4"rq/Bz
t4e{S-
', t EtttefieOf
,4rr/a,
i..EtfrtAt*DT
1/8t
SIRUCTURAL MECHAT{ICAL AT{D MATERAIS TESTNG
o
COLORADO TESr CEhrrER NC.
rgs SdtrH TAVATO
DEilvH.aoton^Do!@3 (sDs-r@
Locatioa:
o
LIST OF OIITSTAIi|DIIG I'ISCREPAITCIES
Jobf: zosogf Dsi..
Itrspector: Dt\- 4ef pagei e of
dele
Iten
,
,y'a
{ri';,tr'.- ,Z I Z'
J t 1-=t-, stt f-.nt\at -
STRUSTURAI- MECHANICAL AiID MATERIATS TESNilG
@LoRADoEsroG. n "
Location:
rtc8drr|{l|lvAto
E.'rB.odoRADOel3 pge.r00
LIST OF OUTSTAIII,ING I}I SCREPAIIIC IES
Jobl jzceasc Itate:
Ilspector: Dul),e.rana,ee.ea page:ot
Iten I
*44/2oze.r
tolz?/D7
STBUCruRAL MECHANICAL At{D HATEHA TESTIHG
ty'at/gt
rgcsourHMvAlo
DEN!/EB ColonAoo r02zr (sstB-|es
LIST OF OUTSTANDING DISCREPAIiICIES
Locat,ion z/: L^n', *rez f,a,uz,+ze, u),,ro, lobl t, zo<agq Datez ofrtoh-t
Iuspector: DLElccraanF*._ page: F. of
--.\
Jaslerag.
STRUCTUFAL MECHANICAL AND MATEBIAIS TESNNG
ften I
r/e/a
iSerrlarF€br
ooLoRADorEsr **,,na.
rE6 SdJDt lr vA(t
DB.vn ooLonADOea3 @,e.ros
Location:
Inspector:
Item t
LIST OF OUTSTA}II'ING DISCREPAIICIES
obl z7652sn Date:
Pagez Q of
Qza/q
1ln
J) oe (a) *r'
&tf t O?
Roo- Vrl,hzt,/
-J
s-> (-t-jt* i)e-444 .v
ETRUCTUFAL MECHANICAL AND MATERTALSI TESNNG
ooLoRADo*ot*^"
r55S(trIHravAp
g$nrER oolonAooSua3
lGtls-rcn
LIST OF OUTSTAI{DING DISCREPA}ICIES
Location:_Daou 1{.*" Ta,u<e r)arc', J obl: ro6o9? Date:
InsPectot: T\r_$ ,..,rra**,rea- PBge:_Jg_Jf
:
afln*
@.(bv/l3
Item t
L4.5.'-n (zs
A, . (a:;t€-.
*1 /. . hl=r de, ncfu
i. Ao=
t7i t5*zt t
4,/e'
, t*t Jbnrl
STRUCTUBAL MECHANICAL AI{D MATERIAI.g TESNNG
I
oopmoo*"**n*
r33 SdtIH t{Av^p
D|E}{TER.OO|.oRTDO@!@te.toe
LIST OF OUTSTANDING DISCREPA}TCIES
Inspector ia2t-Dtuzae.te{1_ Pagei tl of
Iten t R*r
4,n t ue*l
5
STBUCTURAL MECHANTCAL Ar.lD MATERIAI,S TESTI'{G
ooLoRAoo rEsr
"*
,l r*
tsgsoutn f,AYAn
Ds|uEn oorcn^Doel3 grts-roso
'l
IIST OF OUTSTIIIIIING DISCREPAIiICIES
:{r4*4
Locatiou: De.,n^, lh* {a-'z €l'\,,cJobtzza<o'tr Datez rT/zc-
/Lof Inspector, "g",
Item I
pl4
rzTb/6.r
4w'
STFUCTURAL MECHANICAL AND MATERIAIS TESTING
e{- r/i i .//'
I NVO ICE
$O: FRANK FREYER
T IIEST]N HOTSJ VAIL
13OO WESTHAI/EN DRTVE vArL, @ 91657
tr'ROTiI: VAIt Ff,RE DEPARTMENS
42 W. MEADOW DRI\TE VAIL, CO 81657
RES IERRACE WING N)DITION . SMOKE TtsST . 814188
QUANTITY ITEM / DESCRIPTION
IINItr
PRICE
PRICE
EXTENSION
1 s-MINUIE SIIOKE EOMB $ 5;75 $ s.75
4 FIREF'IGIrIERS 8CIR 2.5 HOURS O $15 PER HOUR 37. s0 1 s0.00
1 FIRE MARSHAL FCIR 3.5 HOURS E $15 PER HOUR 52.50 52 .50
TOTAIJ DUE $ 208.2s
o ,/
TNVOICE
$o: ERANK FREYER
I WESTIN HOTS, VAIIJ
13OO WESTHA\IEN DRIVE VAIL, @ 81557
FROIII: \'AIL FIRE DEPARTMENB
.42 W. MEADOW DRIVE vArL, co 81657
RE: XERAACE WING ADDITION . sMoKE IEST . 8/4/88
QUAr{TITY ITE}I / DESCRIPTION
UNIT
PRICE
PRICE
EXTENSION
1 3-MINU1E SMOKE BOMB $ 3.17 $ 3.17
3 FIRE'IGITTERS IOR 2 HOI'RS G $15 PER HOUR 30,00 1 50.00
1 T'IRE MARSHAL IOR 4 HOT'RS O $15 PER HOUR 30.00 30.00
EOTAL DI'E
-
$ 183.17
o
\ArtVrxruRES,,,
Scptrrhr 29, 19EB
ilr. eery llurrain
Torn of Yal.1
75 g. Froutage Rd.Yail, gO t1657
B,cr Adlltlonal Incpectlons
Dear Grryr
Ercloeed lc our chcck 1l the alount coat of tttre lnapccti-ons at th€ HGrtl.n
Tbrll you for your cooptritl,on.
Slacrrrly 1
Frall D. Ireyor, III Dlrcetor of Devcloprent
?t?/tL;
of $391.42 rhicb covors
Terrace Uing.
the
1000 Sfllf,r Frontago Road West, Vail, Colorado 81 &57 r 3O3/ 476-ffiOz
v0ntfr
Ingtw!4 Esnsilltants, lnr.
August 26, 1987
Ernie Pyle
SLP ArchitecturaJ- Office Terre centre, Suite 3O0
11OO Stout, Street
Denver, CO 80204
*"rffi, Project Number 84010
Dear Ernie:
Telephone corrversation uith Gary Murrainl Town of vail Building Offieialr this date regarding Ltre question posed by Triple A
Electric about adeguate electricaL clearance in the sub etectrieal room of subject project. I explained to Gary sectj.on
lLO-16 of the National El-ectrical Code and asked his interpre-tation regarding the need to use additive clearances vhere panels
are mounted on opposite waLl"s of an elecLric room. It was his
opinion that our interpretation is correct and that only one 3'
elearance is required and Lhat it ean be used in corunon by tvo
electrical panels.. He did, however, state that he would review the situation with the Town of Vail Electrical Inspector when he
returned from vacation.next week.
If you have any additional questions or comments' please do not
hesitate t,o contact me.
ec: G.E. ilohnson Triple A Electrie
Frank Freyer, Vail Ventures, Ltd..e|#li*
Enclosure: Code Section
VSDrd je
Eerchnark Plaza, Suile fi7
P0,&ox 5740. Awn Colorado 81ffi0
30.3-9{9-tt9t . i.8f03f0.32$ t0 0nly
Sinee
I
70-20 NAIIONAL ELEqTREAL CODE
(b) Coollog. Elcarical cquipmcnt which dcpends upon thc natural
cirtutction of air end convecdon principhs for cooling of cxpoecd rurfac*
sball be installcd so that room air flow over such surfaccs is not prcvcntcd
by walls or by adjaccnt instrllcd quipmant. For cquipmcnt dcsigncd for
f,6or mounting, _clearance- bctr*ccn top^sutfaces and adjaccnt surfaces rhell
be prwided io dissipatc rising warm air.
Elecrrical cquipment prorridcd witb ventilstin8 openings shall bc installcd
so that walk o; other otstructions do not prwcnl tlc frcc circulation of air
through thc equipmcnt'
1'1(}14. El€ctrlcal Connectioni. Bocausc of difcrent characteristics of
coooer and aluminum, deviccc such as prcssure tcrminal or pressure splicing
coirirectors and soldering lugs shall be suitablc for thc material of thc
conductor and sball bc prbperly installcd and used. Conductorc of dissitailat
metals shalt not be intermixed in a terminal or splicing conncctor wbcre
ohvsical conuct occurs betw€€n dissimilar conduclora (such as coppcr and
ihiminum, coppcr and copper-clad aluminunl or aluminurn and coppcr.
clad atuminum), unless thC ilevice is suitablc for the purpocc and conditions
of use. Matcrials such as solder, ffuxcs, inhibirors, and compounds, whcrc
emoloyed. shall bc suitable for lhe use and shall bs of a typc which will not
adJcrsely aff€ct the conductots, installation, m cquipment.
| (FPN): Many tffminationt ard cquipmci|t arc markcd u'ith a tightcning torquc.
(a) Terminala. Connection of conductors to tsrminal parts shall cnsure
a tioroughly good connaction without damaging the conduclors and sball
bc nade-by-m-cans of pressure conncctors (including set€cra,v type), solder
lugs, or spiiccs to flexiblc leads.
E)tceDtidt: Connection by means of wire binding screx,s or studs and
nurs lrolving upturned lugs or equivalent sholl be permitted fot No. I0 ot
smaller conductors'
Terminals for more than onc conductot and tcrminals uscd to connect
aluminum shall be so identiied.
(c) ecce
:lq{:"t lry3, rhatl be provided ro giFc.e-ss ro ttrc *oiUnllpace about erectnc equrpment..lbr switchboards and control paaeli,irrcd 1200
(d) Front Worklng_ Space. ,ln.all.cascs wherc thcrc arc livc parts normally erposed on thc front of switchboards ot rotoi cootrotlcnters. lhc
ampcres or morc and over 6 feet (l.gl m) wide, rhcre iliati bc one entonce nor t€ss than 24 inches (6t0 mm) wide and Oh tJjiii.bs _j ilin liliJi
t end-
|
Exception Iio.-I: V4here the equipment location De?mirs o continuousl ana unobstructed wo! ol exit truvcl. I
oott"rl.rion No. 2: Where the work space rcquired by Section I ItLt6(al isl
In addition to the dimcnsions shovn in Tablc I l0-16(a). thc wsk sp6cc shall not bc less than 30 inchcs (?62 mm) widc in frbii oi ttrc clcimc cquipmcnt.
ARTICLE I IO_FEOUIREMET,TTS FOR ELEGTFrcAL NSTALLAflONS 70.21.
Tible'l'1S16{r). Worktng Ctearroc.t
I|ntt||utt| Cb.f Dl.flrEr (trd)Gonfnuon: 1 Z - g'
For Sl ltoits: 6nc inch = 25.4 rnillimctcrs; orc foot - O.3O4g mctcr-
Where the ..Conditions" are as follows:
-J: lIF6q rtve parts on one sidc and no live or grounded parts on t0 orner. $roc ot th€ .wortong - spacc, or cxposcd live parts on borh sides,.gn!"jlYcly Suarsed Dy suitable wood or otlcr insulating matcrials.Insulaleo rtrc or rnsuhted busbars operating st not orrcr 300 y-olts shall not k considercd livs parts.
2. Exposcd live parts on onc sidc and grounded parts on thc othcr side.
e.. -E1q9se! live.parts on borh sides of thc work spacc (not guardcd as prwided in Conditibn t) wirh thc operalor between. '
Exception No. l: Working space shall ,p, be required in back of asscmblies such as dead-front 'switchboatds, o, ^oi6i i*ira'iii-i"wher-e there are no ,ene,raSle or adj:usiii';;;t;'suii i Jiili or.s"arcncs on ,he _hack and where all connections or, lcr"iriiL yroiiiiotions orho than the back.
^^?:f$r::,!9._?,,-Bt speciat .permission smailet spaces nay be permtuea lt) where it is judged that the panicttlar arrdnpement 6f the instatration wtil prcvid3 ade{uarc accesst{iitty. "i tZl' "ilii-iii iliiirl rated pafis arc at a voltage no greater than j0 volts RMS or 4Zv dc.l!) $lear Spacsg.-_ Working space rcquircd by tbis scction sball not be lq) -cleaf specas, Working lpacc rcquircd by tbis scction sbalt not be
:r_r$^^lf_trlg:.. When, norriatiy enckiscd. N; parts -a;';rpoccd
for Inspccl.ron or- s€-rvrcrngr thc working,spac€, if in a passagcway 6r gcnera|
l l(}15. Worklng Spaco About Electtlc Equipment (60t) Volb, Nomlnal,
or Less). Sufficient access and working space shall bc provided and
maintained about all elcctric equipmcnt to p€rmit ready and safc operatiot
and mainbnancc of such equiPment.
(a) working Clearancos. Except as elsewhcre required or permitted in
this Code, the dimension of the working space in thc dircction of access to
live parts operating at 600 volts, nominal, or lcss and likely to requirc
lexaniinarion. adjusiment, servicing. or maintenance whilc encrgized shall ' not be less than indicated in Table I lSl6(a). Distances shall be measured
from thc live oarts if such are exposcd or from the cnclosure froat or
oncnine if suih are encloscd. Co-ncrete, brict, or tilc wqlls shall bc
c6nside-rcd as groundcd.
(bl Sgllcaa. Conductors shall bc spliced o,r joine.d with splicing devices
suiiable for the use or by brazing, welding, or soldering with a fusiblc metal
or alloy. Soldcred spliccs shall first be so spliced or joincd as to be
mecha;ically and elei:trically securc without solder and then soldered. All
splices,and joints. and rhe frie-ends of conductors shall be.covcred with an
iirsulation 4uivalent to that of an insulating devicc
lnwn
42 rcrl mcsdow ddue
uall, colorado 81857
(so3) 47G-2it00
flre department
Septenber 1 , 1988
Harry Nothhaft AI Nothhaft and Sons
41 01 Fox Street Denver, Col-orado 80216
Re:.-' :
J:--
Dear SLr:
Preaee be advised that the vail Fire Department wl.Lnessed, a final test, of the fi.re sprJ-nkl-er system at the westln noteL Terrac,g wing additlon. lthe test Inesed and the_netertaLs test certiflcate waE stgrned by Asslstant Chlef .Tohn Gulick. _,
Assistant chlef Guriclc also perfornedl an inspection of the syatem as installed. our records indlcate no violatlone were found at the time of the test that have not been corrected.
Please be advleed we do not lssue letters of acceptance.
/rz.'-''
Mlchael l'leGee Fire Marshal Vail Fire Departruent
cc: Gary Mumain, Chlef Bullding Official
S incerely,
>l
Septenber 9, 1988
Mlke Sansbury I{estin Hotel
1300 Uesthaven Drive Vai1, C0 8i657 r'ffi
Dear llike:
Gary Murrain has_ agreed to the posting of a si.ngle occupancy linit eign for each floor of the GonferencE center. -The naxirun'occupaney for the Eecond floor ts 950, vhile t,he first floor is 425. These signs should be ln one inch let.rers and instalLed in conspi.cuous locationE in t.he prefunctj.on areas of each floor.
Required wording is trl{arimum Oceupancy Load For This Floor Shall t{ot Exceed #- Pereonsn.
. As you are auare, there are other occupqncy load restrictions rhfch apply t,o lndlvidual roons dependiag on size and nunber of exits. These restrictlons yiLl be set forth on a List provirled by Garyte office and trairtained aod observed by the Westin. Suctr Ll.ct ri1l be aveiLable by Septenber 15th, hovever the naximuns rill generally be as f,olloss:.
Maxl.num
Occupancy LOCACI_On Size
t.
Centennial A 515 88 Centennial. B 615 49x Gentennlal C 615 88
Centenntal. D ?344 334 Centennial E 930 133 Ceatenoial F 915 131
Roeky Mountain 1 509 49r.
Socky Mountaia 2 536 49*
Rocky Mountaia 3 523 49*
Rocky Mountain 4 523 75
*restricted to 49 because roon has only one exlt.
*o/sincerelY
, +*Frank B. Freyer, III r nP -J\,Director of Developdent !' (n1^\
FBF/tfn /\"
1000 South Frontage Road W€st, Vail, Colorado 81657 . 303/476-6602
c Seracuse Lawler Wong Strauch
Terracenhe, Suite 200
1100 Stout Strcet
Denrer, Colorado 80204
(303) 623-7031
Architectur€
Planning
Landscape Architrectue
Interior Archite€tu!e
30 September 1988
Mr. Gary Murrain Vail Building Department
Tor.rn of Vail, Colorado
75 South Frontaqe Road Vai1, Colorado 81657
RE:Colorado
Phase II
Dear Gary:
As discussed in your meeting wi.th Frank Freyer,
fire sprinkler heads are not allo\,ved in the
Elevator Machine Room No. 003 and Electrical Room
No. 101.
By issuance of Architeet's Supplemental Instruction No. Fifty-four (ASI #54 - Ph. fI) we
are instructing tne contractor to remove these
heads and plug the abandoned piping.
Sincerely,
Seracuse Lawler Wong Strauch
a Professional corporation
Axel B.ssell r AIA Principal
ABR:mlz
cc: Frank Freyer - VV
Phil Harris - GEJCC
Dale Mobley - GEJCC
Dennis Beaudin - Yoder
Enclosure: ASI No. 54 (Ph. II)
87325/cA
T
ATCHffICT€
SUttLEr*ilT t U{trnUCnONS
ArA OOCUTW${I GnO il$Uuctions oa fe,t/crrc jidc,
Ql Vall vetrturqc
E seracuse Larrler wong
E Yoder Engineering
El c. e. Johnson const.
E C. e. Johnson Const.
El rire
Owngr
Architcct
Consulhnt
Contnctor
Ficld
Othcr
Strauch
Co.
Co.
PtolECT: rhr gerrla Eot.l ARCH1TECT,S SUppttM€NTAr (nrmr, rddgr) Phase ff Hotel Additions
vail, colorado INSTRUCTION No: Fiftv-four (54)
OWNEI: vail Ventures DATE OF ISSUANCE: 30 september
TO: GE JohnToa ARCHITECT: I{oMA (Contrrctor) 119 s. l4rb Srrrer 1420 Sutrer street Coloredo Sprlngl, @ E0906 S."-fr"""isco, CA
Ph. II
1988
94109
CONTiACf FOR: Gcorrrl Coorrnrcrlon ARCHITECr5 PROJECT NO: s7_32s
Thc work rhrll bc carricd out in accordlncc with the following supplcmcnrel inrtructionr ircucd in .cco;
il:J**::ff':f:??:.1T.T,:-:i1lTl-l.ns" in i"i,,iE !"'"i"i'iiiii.o rimc. prior to procmdin3 in rtordrnsc with thrsc inltructionr, indicatc p'ui acccpranss of thcsc t"rt*-iti|"r-?o;;#ffi:il'H thr work .s conrirt.nt with the contract ooiuiiiit rnd rcturn . cop, to thc Architcct
Dlrcription:
01, Delete fire sprinkler heads in
Machine Room No. 003 per yoder
Electrical Roon No. LOl and Elevator
letter attached.
Att|chtnenE: tt1.rr i,rara t; t^l o, docurrn! dr|. ,o9Fc.r darcip?io, ,
O1. . Yoder letter dated 29 September 1988.
ArA ooclrdlit Gnt .
3l!'7t . tlfE At!*ttCA - -rRCHrrEC_r-s suPPLSMENtAt tNSTiUC1IONS .tNSTrTutt ot
^tcHtrEcrs, 173i x€W yoIX AVt..
MANCH
'9D EOITION
N.W., WASH|NGION,
. AtAa D.C.2|ru Gno-lttt
I
ftffiffiffiftts
the abandoned PlPing.
I! you have any quertlonar pl€asa do not hlsitatc to call'
9l,ncrrelyr
ruGrdJr
F.3r
.l
I watrrn*ma,satnffi?I P.o.axg{'Avur,Mo8ffi I w*n.t&w.@enw
biL€dta afr* firc tsse valve cabinets uill
th€ kt$@ $f the cabinet at 3'ort above
fte
{}:fr
cbmxr*tiona represent an overvi-ew
&hs wrlc, Flease notiry us of .$ irrb*rpretsetisus or cl-ari.f ications
*rf retglBt of trlese meeting notes' as *l€i
$F,!
ail.l
trdt
, L'a*Ler & Fs!:blFra -:sat} Fgfe [kFertilent, Assistant Chief
o I
42 reit meadow drlre
uall, colorado 81657
(303) 476-2100
1987
llre departrcnt
October 22,
Harry Nothhaft L. I{othhaft & Son, Inc.Fire Protection Contractors
41 C1 Fox Street Denver, CO 8021 6
FIRE PROTtsCTION DRAWINGS
WESTII{ TTOTEL - TERRACE WTNG ADDITIOI{
SIR:
- Having reviewed the plans for the fire sprj.nkler system at the westin HoteL Terrace wing addition, r havL macle the follo-vrlnq eonrmentg in my review:
1. Hy<lraulic ealculations appear to meet the ninimum requirernents. There is however one notable exception. that bging Lhe lack of sufflcient pressure in the stanclpipe systein at the roof manifotd.. It is my understanding that l{lnk Rolling of Total Fire did the original design and that this design is based upon flow tests conducted in conjunction with the vai-l Fire Department and a representative froin cigna Loss control. rt should be noted this flow test was conducted on the hydrant at ttre intersection of Vlesthaven Drive and the entrance to the hotel , bei.ng directly across from the CiiC building. The water tap, however, appears to be 1ocated approximately 40 feet higher in elevation than the point at which the flow test was taken. This w111 result in a subsequent loss of approxlmately 20 poun<is in pressu::e available to supply the standpipe system. While not in exact conformance with N.F.p.A. qeguirements and Uniform Building Code standards, f do not fijnd thls pres$ure differential to be signifieant enough to wdrrant a change. This opinion is based upon a number of factors, 1ncl-uding:
A. The probablli.ty of using the roof manifolcl is not high,however, t"\e roof manifold is clearly reguired Uy coae.
B. N.F.P.A. requirement of 65 psl available at the top point of the standpipe is premised upon the pressure
WASTIN HOTEL
Page 2 I
D.
being utilized by building tenants. It appears the concern is irot to have excess pressure in the systerir sufficient to cause personal injury to persons Lsing the standpipe system. It should be noted that the Vail Fire Depart;rent standard operating procedure utilizes a 100 psi nozzle pressure and reguires an additional 55 psi t<>allow for friction loss and fire department hose. ft -would therefore rrecessitate a minimum of 155 psi at the top of the rise in order to operate under Vail Fire Department standard operating procedure. ft is anticipated that VaiL Fire Departrnent will boost t:tre system in the event the standpipe operation is placed into service.
The existing water system in the vicinity of the h'esttil Hotel is subject io two feeds, one being from the west (.liatFerhorn area), and the other being from Lhe east on a 10" main wiLh an B" pRV and iine. Fireflow sufficient to require the operation of a standpipe 1n the interj_o::of a building would presumably also be sufficient to open an B" PRV and thus change the available pressures.
The fourth floor standpipe is approximately B - 1Zl
beLow the head of the roof rnanifold, and therefore, the net deficiency would be approximately 4 - 6 pouncls 1ess.
It is in light of these factors that I do not require the holes in the pre-stressed concrete Lo be re-cored to allow a Iarger standpipe, thus allowing for increaseC pressure. It is also my understanding, according to the letter issued by Cigna Loss ConLrol , dated October 13, 1987, from Adrian Jones, indicating "for insuranee purposes, the suoply and pressure is considered adequate for this occupancy." In addition to the allowance for the 225 gpm for clomest.ic supply, it is premised tlat this amount will be flowing at the tirne of the fire. llhile such guarentees cannot be assured by anyoner it is presuined that Eiven t're proper installation, maintenance and operation of the flre detection system that such pre warning vrill be provided as to reduce the potential for the 225 gpm of domestic vrater being utilized at the time of the fire.FP-1 of the fire protection drawings indicates the ri-inch fire line leaving t'he Terrace r+ing and going around the 4-hour wa.Ll at approximately column lines F and the match line for FP-2. It is my urderstanding that a construction
conference meeting between Chief Duran of the Vail Fire Department and Dennls Beaudin of Yoder Englneering, resulie<l in a decision to create a clemarcation or point of separation at the 4-hour wal1. Thereiore, a change needs to be made at the 4-inch line, and that the sprini;Lers supplie,J to the west of the 4-inch line shall be ,tronsidered to be on the plaza
Phase I side of the alarm zone and that sprinklers on the east will be on the Terrase Winq zone. The reguirement that
2.
J.
WESTTN HOTEL
Page 3
the 4-inch line conti.nue stiIl rernains in order to provide proper hydraulic Loop.
FP-2: The 21 /2-Lnch fire line indicated oir the left hand natch line and column line ,f shal_l noL be allowed to run through the 4-hour wall. Appropriate a,Jjustment shourd be fltade. .Also, sprinkler denslty in the owner's ski lockers,approxjmately liires F - J and lines 1 - 6, as well as honsekeeping storage, approximately lines 6 - g and C - F qriLl need to be calculated Ordinary Group f.
FP-3: It appears i.n reviewing the plans that an additional valve and tamper switch wilt be reguired on the fire main according to the Cigna notes as indicateil on the fire sprinkler system riser schematlc. Alsor a valve tamper will be required on the isolation valve for the 1inen chute sprinkrer system. rt is r,ry understandinq that the sprinkler system for the linen chute is a manufactureci asser,rbly. il should be noted that this asserably has not been submitted for review.
FP-4: On the upper right hand column of .uhe page there is a note that says Remote Area: First Floor Retail density equals .1/1500 + 250 + 225 - 12 HDS. This appears to be incorrect and eonflicts with the crouded area on the right hand column under Hydraulic Design Criteria First Floor Retail. The clcuded note ir"rdicates piplng is designed to provide a .'l 6 gPm per square foot over the remote area of 150C sguare feet of operatlon. VaiI Fire Department find.s that .16/1 500 is the appropriate density to use. A irote should be made to change the note at the upper right hand. corner indicating a densitlz of .1.
6. FP-5: No exception taken.
7. FP-5: It is a recommendation of the Vail Fire Department that the location of sprlnkler heads immediately outside a vanity area specifically, between lirres 1 - 6 and G - J, be relocated to a more central point inside the entry foyer.This is in order to allow for coverage of t\e cloiets and at the entrance to the bathroon vanity area. It should be noted that these closets will technically require sprinkler heacls,but due to the design of the closet, the arrangement of shelves and louvered doors in the closet, I will allor,.r a sprinkler head Lo be placed immediately outside the closet.It should be centered between the enirance between the entrance to the bathroom door and the closet, but no more than 6'5" off the entry front door.
8. FP-7: The location of sprinkler heads shoutci be consistant with the agreed upon design. Of conceril are the rooms with the location of the head in the rooms between lines ts - C and 9 - 17 - It is my recommendation the head be placed 1n the
WESTIN HOTEL
Page 4
center of the corridor at approximatety the same point as indicated on the plan"
9. FP-10: No exceptlon taken.
It should also be noted that hydrostatic testing of the systen 1s reguired. In order to fasilitate optimum schedulirrg,the Vail Fire Department wlll a1low the sprinkler system contractor to briirg various areas of rough end piping up to pressure according to the contractorrs schedule, and the general contractor wiLl be al-lowed to witness the test and slgn the rnaterials test data sheet. The data sheet for each tested. area shall be suppJ,ie<l to the Fire Deoartment at the tirne of the Vail Fire Department inspection. The Vaii Fire Department will reguire a hydrostatic test of 100t of the system prior to the issuance of a temporary certificate of occupancy. AIl manufacturer test sheets shall be submitted to tr\e Vail Fire Departnrent at -uhat-
time. Rough-in inspections will be requj.red by the Town of Vail Buil-ding Department to cover pipe size and hanger l-ocations.
Any further questions on issues or details not covered in this letter should be brought the attention of the Fire frlarshal at your earlj.est convenience. This letter slrall constitute approval in accordance with the not,es providecl herein and the red lines on the plans. A1I work shali be in conformance with N.F.P.A.Standard 13.
S incerell',
'/% -F2*'
T"IICHAEL llcGEE, FIRH MARSHAT
VAIL FIRE DEPARTMENT
ab
155 $eruth Novc.irr
Oenverr , Cr: 'i orodo (303) FCB-1050
Vo i'l VentuFsi$ . Ltd -1000 S. Frontag* Rd.Vaii " CO 616i?
Attn: Frank Fnever
Tegt Numbar:
Jo.b i{arne:
Job Addross:
Contractor:
Supp1 i*r:
Truck i.'io- :r,ru K€to.:
Locatjsn of Four:
Date Castz 12/A1/81
8A223
l$es t
cgrtrc-R€TE .llEpr FESUITS
P.O. l{o.: ,Job No.: TB4O4A
Report Dates z 1Z/Og/Bz
12 / 2e/ 87
01/15/88
Report fo: Va i'l . G.E.
SLF
Ventureg, Led -
Johnson Construction C0-
Arc h i ts6ts
zg't27
Terrdse lrf i ng/P'l aza I
Va i'l Co] orado G. €. Johngon
B & 6 Excavating
830
J. Msrt i nez
Itla'l'lE, N2?.5 to ?2 an
: 10531
B Mr'x 5929+1
l ines -
Iicket No-Mix I.D-:
N to P-2
Pr{Y€r.eAL.. PRqPqRIT ES
S.l umr:: 3-0
Ccncr*te Tern r.r - ^F: 68 Time Batchcd:1:31
S0II{?RESSIY-E STRfl{qTH! Spaeif f ed ZB
Air Temp. -F. 32
Tinre Tested: ?:00
Dav Strensth (psi) .l.gqg
Strength (nsi)
?410
38S0
422A
hft-,/Cu- Ft.: 141.8
Aver€ge St nengt h
Air (t) : 3.9
Cvl tnder I0
01
o2
u5
Age (davs)
n
46
a,d
Size
6.00
6.00
5.99
JAN
VAIL Vil uli
,+u3c
CTC-GEOTEK, INC.
Remarks:
t
l
]rc Etryine*iry lrrlti44- Iwrrc;tim
rl
155 South l{avs.icr
Denver , Co'i urado (303) 698-i050
Va i'l Ventures , Lts .
1000 g. FrontEqe Rri - hleet Vail, CO 6165?
Attn : Frank Frever-
coEg:RETE TEEI RESULTS
P ,O. No. :
Jeb No.: ?04043
Report Dates: 11125 187
| 4./ t0/d I
o1/02/ss
Report To: Va i'l
0.E-
SLP
Ventures, LCd.
Johnson Construct ion CO-Architects
80223
Test Nunber:
Jt:b Narns:
Job &ddrass :
Contr,:lcton:
Supp] ier:
Truck i{o . :
CTC Rep-:
Locat'i on erf Pour ;
PHJq.I.qAL PRo-qE"FTr Es
i9 lump: +. rc
Concnecte Temr:. ^F : 66
Bate Cest:. 11/18/87
4 U U DT}
TerrEce Wing,/Flaza I
Va i 'l Co I orado
G- E- Johnson
B & B €xcavat ing
r-.5u
i - Martinez
Foot i ngs , nort h we 'l l
Air' (?):6.0
Tieket No.: 10445
Mix I.D.:
at M.4 and 32 to 2.3
l,lt ../Cu - Ft - : 137 .2
Time fiatchad:I t:r+D
q-gl-rl?RE3slvE .$TR.EHGTH: $pec if iad
Air Temp- ^F: 21
Time Tested: 12:30
Day $bransth (psi ) *_?-q-Q_Q
Strength (psii
2090
JJUU
.'.:JU
dtt
Cyl inder. ID
a2
UJ
Ag$ (dsys)
I
46
td
Siee
6"00
6-01
O. UIJ
Average 5t rength
3355
r,Iu-\IEU| trA, ltIL.
'ffriL\ffiuREs, LTE'
Retn<r r ks :
I
80223
dUU6U
lerrace hf inq,/Ploza
Ve i'l Cs'i oracio G- E- J ohnsen
B & I Excavat i ng
IU
i. irlart inez
itla'l is M4, 19 to Z2
Oatts Cost : 11 /23/87
4 - 5 WL .,/Cu Air Temp. ^F: 23
Tirne Tgsted: 9z2A
Oay St renqt h ( ps i ) .*l.p p.Jl
CTC*GEOTEK, iNC-
hgineeilng fating Insrytiffl
155 $outh Ncva.io
Benver , Cc'i orecio
( 303 ) 69A-t 050
P.0 - No. :Job No.: 704043
Repont Dates: i1/30/87
12/21/87
01/a7 i8E
Report Tr:: Va.i l
{1. tr,
sLp
Verrtu res , Ltd .Johnson Cons t. ruct i on C0.Anchitects
Veil Vrantures, L.tq -1000 S- Frontaqe Rci " lrieg t Vei'i , C0 6i65?
Attn: Frenk Freoyer-
Test Number.:
Joh iri,arn*::
J ob Acid ree:s :
Contractun:
$upoi ier':
irusx iio-:
\, tr- Keo_:
Locst ion of Foun:
T
Tickat l'lo.: 10486 Mix I -D-: 859291
6*4r1 .5
PH-YSI.AAL PROPERTIES
S'l urno: 3"0
Concnets Temo- ^F: 66
Air (4):
Time 3,:rtcheci:5: Ur+
CQIIP-RESSIVE .STREN€rH"i Sr:eci.f ied Zs
Cyl i ncie r i D
UI
uz,
n?
Aqe ( cieys )
z5
Z6
$trtrngth (nsi;
zcou
5ttou
.tatJU
Fr,. :143.4
Avenage St nengt h Si*,e
5_SS
5-s9
1fr"4 VNitVETTURES, LTD.
Rerna n ks :
fuir:raoriftg iast inq lnspact ian
155 $outh Navajo
Oerrver , Cr:'i orauo
t -tuJ, o!o- rutL
V,giI V*rntunes, l-lcr -1000 S. Fnontaqe Rr:
Vai'i , C0 Ai65?
*4ttn: Fnank Freve:-.
Test Number':
i o ir i',icr..ne :
Jo'p Adciress:
Cr:rlt rac t or :
$upp j ier',
Trurk No-:
CiC Rerl-:
Loca L icrn of ?our:
0ete Cast z 11/25/87
rJU21JJ
- lrins t
coHcRFTS TEqT_,RESULTS
P.O. No.:
Job No.: ?04043
Report Dstes:. 12/A2/87
| 4,/ 45/ 61
a1/as/88
Rep,rrt To : Ve i i Vtsntu res , Ltd .
G- E- Jofrnson Constrqct..ion CO
$LP Architects
2C i r0
Terrace ird i rrg,/P'l aee I
Va i I Cn"i or aciu
G. E. Johrrson
B & 6 Excavet ing
1n
i - [.idrtinrez
Ha'lls" M.6*24.5+2?.5
Ticket No": 10515
Mix I.D.: 8*5929 +1
D ' Ufnp a I - r
C<rncrtrte Tenc- ^F: 6?
ii$e Edtcnec: 12:02
Air (4;):
pgl{P&ESSM.."STRqSGTH : $oec i{ ied 28
3 -Z l.lt .,/Cu
Air Temp- ^F: 31
Time Tested: 12:35
Day Strensth (psi ) *.QggA
Fr-:t.tu. I
Ly I l n(ler l!,
UI
v4
!/ .t
Ace { ci ays )
28
t6
$trength (osiI
t.tan
55ZU
3800
Size
6 - 00
5.98
5 - 99
l*ver age S t. rengt h
JdOU
rs I u-Ftru I c.n. lt\\J -
fEruru
R*:rna r ks :
r35 llff|rr fl€o Dats C€bfldo Wi gxl ct3 roto
6TC PHGECT rtFlt*I
( -r o-s- -s -r -e )
n:tD @f€tr*Ttof{ aEFotT
PRo.|FCf,NATfi
PU}IGTI LIST tlET'
-
TO
o fE I2/2L/87
OT HF
Page I otr 2
xTR SVC COOE *TECHHISIATI ST HR
4.00
{.00
TYP€ oF llf$PEcfloil' vlsllAt_* H €ttlE?rc FAF IOLE_- uLTRAsoNtcwEtDMENT
ULTRASOf*IC- s}IEANCOHNECTOR (ACCOI'SIGAL)-, BOLTTENSION FIHEPROOFING
$GRE NEiIS }ELOW TH€ MINIMUM PROJECT SF€CIFICATIOHS NOTED? YES
-
NO
ITEH NUMSES OEgCSlrPfi O il/LOCi{Tf ON
rnap*tion c'f sFraysd fircpnading Fr€raqe ms done for stnrctural
le\rels 4 and rmf. Fireprmfing is vi$ed frcm floors 3 ard 4.
At fJse leirels, *19. is jrgecl to be ccrplet€d ard, safis;3g1po
e$sceslt for fornr sties rirrere density sapJ-es wene rsrsved today.
Each of the itffi listed fon roof ls,er in tlre relnrt d€ltld Lz/s/87
lretre bsen aorrected sd the rernaining portion of ttre ncrtiern area
has beut etrxapd. At 1€$e1 d, ttre slopirg rmf beans have been
agtrayed a$l its$s listed in the rqnrt dated 1Ll25lBZ have been
mrrected.
The density sqrle sites rauair:uing to be patched are on lcrner
of slc4rirq rcof beanrs at ttre follorirry locations:
At roof le*reJ: tihe L2, A to B
At lenrel 4:
tine 3.5, betr,,resr A to B
LiJte 4, between L to L.9
Lire 13, beb,'reen E to F.8
ACTIOH TAKEH REGARDING ABOVE ITEMS.
coNT sl/c
I
136 8.r*lr hff.F Dsnt Cols.rb *ECil g6t cta E0
]TEM HUHSER
PFalEcr *
DATE
PAGE I
705039
L2/2L/87
2of2
D€SCRIPTION/LOCATION
et l-en "1 2, fle pe'ic'sly unuFray€d ff24 be@ o,n line C befr,reen z
afil I lns rsr bwr firryodeil arrd average is aoeegteO. This
efinillates itar tl.l of the regnrt dat*d, LVE/}7.
rhllf, tf,x tine of thi-s regont is rist€d .E e*tra ser'i.ces si-rce
reiDrsFe"tlon rns lrnnlved or sirrs reu'''ning to areas pe'iorsly
inep,ected btrt rse *ren fini-*d Es irt\rok€d.
ACTION TAKEN HEGARDIHG ABOVE ITEMS.
a|3nl'ffi
155 tnoth t{tr|o
Dci{at C*r.dB 8oe?3 $B .0! fi'to
cTc Ftsrfct*ur*oEF
(705 -0 3 9 l
D. Gargr
PUNCH LIST ITEM
-
TO
FIELO OttErytTtoil tcr'oat
PHOJECT IIAIIE llestin Eo'tel Additiqr
o rE L2/22/87
TECHilrcNil 8?HN
2.00
Page I of 2
coNTsvc xTRsvc coDE*
x
OT HR
TYFE OF F{gP€CTIOI.I. VISUAT- HAGHETTC PARNCLE-, ULTRAsoNIc WEL0MENT-
ULTFASOH]C- SHEARCOI{fiECTOR (ACCOUSTEAL)- EOLTTENSION FIREPFOOFING
WENE ITEMS ggLOW 7}t€ IIINIMUM PFO,ECT SPECIFICATIONS NOTED? YES
-
NO
-ITEM NUMSEF DESCruFTION/LOCATION
l?re denslties of cafco ErF fjreprootiDg 6ry1es takerr frcnr t.tre
Westin gotel a*{ition at Vail, frcm levels 4 arrl roof, have been
deteudreal at cttr-Geotek. these densities exceed uL reqtriranents
for this naterial, vrtdch are 11 pcf nini:mrn density per sanrple ard
13 pef mini&e a\rerage density per area. Resulte for these tr,€
lsvele are:
Ievel 4:Saq:Ie L: i.5.8*SryIe 2: 12.3*Sqrle 3: 13.9
Sanp1e 4: 13.8
AVERA@: l{.0
Roof Lgrel; Sarq>le I:
Sanple 2:
Sanple 3:
Sanple 4:
Sarq>le 5:
Sanple 6:
A\IERAffi:
ACTIO}I TAKEN REGARDIIT.G ABOVE ITEMS.
C}o ta T
t m q
tn o
12.3 pcf*
14.0 tr)of't L4.3 Pcf't L2.7 pcf*
14.4 pcf
l-3.5 pcf
13.5 pcf
* Re$r,lts of these tests were first relDrted on LZ/L/87
r$ &t rfi N.qo
Dm{o Cabaao &lf3 3q|gr@
IT€M ilU*IggR
PRq.'ECT#
DAIE
PAGE *
?0s039
2df 2
DESCRIPTION/IOCA?ION
:h€s€ nstrlta eoncLudo tlre dknEitl' testiJtg Frrqlru for this
Eutstruetim. llbe danaltirc of atl s4les frcm each level lrarre
ecMcd Ap above statd Itnderrrritere Iaboratories siteria.
ACTION IAIGH BSCARDIhIG ABOVE ITEirg.
lS !.d|r |.rqo Ocifi Co|'r.6 fif?rl
100 L r,Go
CTC FNG,EC?T{UffBEN
(Lo-_-o 3 e )
TECHT{|CIAN 8T HR
D. Diclqler 8.OO
FlllJ OlSEiYATtOt nCp,OF?
'IIJNCH
LIST l?EM
-
TO
DATE
FtrlfEcT lt^fifE
OT HR COf.lT SrjC XTR St/C COOE *
x
TYP€ or tHgP€cnoH' vl8u t _-- iilcBETlc P,rFncLE- uLTFAsoNtc WELDMeHT-,
ULTRASOI{IC SI{€ARCOflHEgfOH (ACCOUSNCAL)- BOLTTENSION FIFEPFOOFING
WERE ITEMS EELOIY TH€ MITIIII}IUT,I FRCtrIECT SPECIFICATTOITTS NOTEO? YES
-
NO
lTEr,l I{UMBER oEgcFrPTroN/LOC Ttotl
Visual reinspction of t}re rs$ainirg flrtatardiry d.iseeSnncies
Idas srdlF:tecl at all lernls of tle WesLin Hotel Terrace Wirg
etriU-wt tllis (tate. ftre foUcffirg itere sere fourd to be
repairea in asordanoe to tlre respective triangnitta.Ls:
It qs S9, 13, 14, 29,261 27, 49,62,63, G6,-69, 7l_ & 7Z
ftge itsns $E!e fourd to be repaired as regrrired and visr:ally
aceeptable. Flease fl$C attaclred tlre ocnqpleted List of outstand-
fng d"i€crepnc"ies, as retrprted ani aceepted, which will be on
file wittr Uxis firm.
ACT]OH TAXEN FEGAf,DING ABOV€ ITEMS.
lEcHtificr,Ar{ 8r HR oT HR
8.00
coNT sv,c CODE *xTR SVC
V
IYPE oF lilgP€CTlofil ' tl3t AL ---, MAGHETIC PAFTIGLE
-
ULTRAsoNtc wELDMENT _
ULTR^CO'{C EHEAN CONNECTOfi (AC@USTICAL)
-.
BOLT ?EHSION- FIREPFOOFTNG
wEnC llEHg lELOry rHE HtlllMull PH0ITECT SFEClFlCAllOltlS ilOTED? YES
-
NO _
ITEHfl$$A€F D€SCR' pTtO i,|/LOCATTOT{
Vjla1 reint[se&r! of tJte ]ret qrtstardirrg disqeparnis was
sdrrtit at tlre ksEin tb,tel, Terrse nirg Addition ttris date.
ItE forltriJg itms w fcn:rrl to be =epaired as inst'rcted bv
Ricrrard f*frryamt & Asscciatss, ard vieually acceptable:
ftgrc *Il, *8, *31, *32, 542, *52, *Oa ard #20
Itas rfticlt had rst I'et b€651 repaired are as follcr,.rs:
Itsns *9, *Z5t *27, *49, f56, *Zl, *62, *83, 969 ard *72
Coreming itqa *i-3, t2) 3/it"x4"x3"x10" alq:Ies r{rere installed,
boFh gides otr bem w* ard weLded rf,itt, nrrt /4,, vertlcal fir_r-et
reld.e vitlr 1" ret11rn8 top ard bottsn to bean web aJ3,i oore sribed.
!lr. Jchu $aLo6b nns given ttr-is iJrforretion fc reuien & c.'ment.
A ligt of, t},e 1ret c*tstardirrg diseeparcies $€rs left witfi Jim
klght, G.8. Jolnreon, for firture rqnir.
ACnOfi TrfrEfr RESABStllG A80vE tTE[r$.
7/
156 s*it t{r€F
Omrt Cmrelr tgqCg tcr aaa fio
cTc rnoJccT turraGR
( ?05- o 3 9 t
D. Carsr
PIJ}ICH LIST ITEM TO-
tEcHf{tcr^N $T HR
2-00
OT HR coNT svc XTR SVC
x
COO€ #
I
TYFE OF IHSPECTE}H . T'Igt.[AL MAG}IGTIC FAFNCLE
-
ULTRASONIC WELDMENT
-,
uLTBAgoHtc-SHEABcoNHEcroR(AccousrrcALr-BoLTTENsroN FtREpRooFrNG x
rtEBE l?El{3ltt&Jlt{E rilHlilum PHoJEcrsFEclFEAnoils t{orEo? yEs- No-
hd
trEH H[n#l€F DEECRfpilOil/LOCA'OH q I
ltre dercitiee of forr fi'=F.imeing .drres bken frcrn re'els 4 ard
rrcf lrane becn detennild at clE-Geotek. rhese resurts exceed ut
re$!@rt f,or Caf,oo DCU? ec irdivi&:al earytes 'ftict, is Ii_ pcf
tninime. AveTSe clensiq' \ralucs for eactr legel will be dete$nined
lflen sryfirg ls caryJ_etd at a later date.
I&I'S. 4l Suq>le 1: 1,5.8 Fcf
SaryIe 2: f2.3 pd
Sanple 1: 12.3 pcf
Sanp1e 2: f4.0 pcf
ACIIOI{ TAKEH F€6AFDI!'G iAOYE ITEM$.
fncntSr|lfll
t59 fqxtr ntBp
O:n*r C36gtaOo aOgP3 s3 tts8 r0c0
PUNCH LIST ITEM
-
TO
-
FIELD OASEiTTilA|| FCFCST DATE L2/8/87
CTC FR&,ECT NI'}IIER
{705 -0 3 9 I
D. Ganet
FFo.'€CT fiIASE Vall lbstin ltotel Addition
'ECHH|oIAN
Paqe l of 3
xTR SVC CODE f ST HR
5.00
5.00
OT HB coNr svc
x
x
TYFE OF I'.ISFECNON' VISUAL -.._ MAGHETlG PARNCLE-, ULTRASONIC WELDMEN?-_
uLTftAsof{lc-. 8}IEAFcoN}rEcTofi (AccougncAL)-,BoLTrENstoN FlREpRooFtNc
WERg ITEIdS BELOW T}I€ }'IHIMUM PFOJECT APECIFICATIOI{.S NOTED? YES
-
NO
-ITEiT ilUMBER DESCRIPTION/LOCATION
r&@tlon of, f,ireprrmf,irg coveragre rpas contilued for rof levef
steel in t&e soutlrern area ard, inspectjon reas begun irl tbe rnr&ern
area. n€sults f,or each area af,e pl:esented be]-qir. Scme deficiencies
on unfinishd rmrk rsnain i.n each area.
1) Scutltel:n area; bcnurled by Lines M to F ard 1 to 9:
1.1) $'IoEt Eteel beans, €hnurs, anl iledcirg rritrere required are
adequately fireprmfed.
L.2) Additisral fireprmfiry need€d at slunns 5/71.3, 41U,.3
atral 3lI-3
1.3) additional firepnoofirq needed at perirneter beams 1 (f' to s
9 G{ to L) ald 5 (G.5 to r.). In t}re ca.se of t}re first tdo
beens rrrhictt are true pimeter beinr, tlre outer wall rras
install€d before fireproofirq applicaeion began'
ACT1OH TAKEH REGAFDIIIG AS,OVE |TEMS.
ealt8idE afra* r.!*iirov
I.J
i'ir t
i!
H1
t,
L:.
t.,l..l
i.
,.
I
.:a
!
r55 Sor,th ft.tqo
Dancf 6ste65g 1p23
t03 @ rc50
IIEM IIUMSER
ACTION TAXEil REGAfiOITTG IBOV€ ITSM$. SF[;A:'€d'
PFo.'ECT *
DATE
PAGE *
705039
17/e/s1
2of 3
B*clL mm !o {-t DESCRIPTION/LOCATION
1'3) since the r,rall is adjacent to tire beans, rn fireproofing'
can be pj-aced sr t}te drtside w& surfaces. [he part
remaining to be fireprrmfed are iaterior ffarye Eurfaces
lddch lrere hidden by t}rennal insulatioD. Xtris ondition
aleo murs at 5 (c.5 to F) rrrhich is rpt a trnrirneter beanr.
The tirepmofing foreman has been strobrn ttris cordition,
f.4) Minor patchirg is reeded in the douner areas to seal off
the top ffar€es of fratriry eecurOary beans.
L.5) At al-1 teft level be*ns, a5plication is about half r.'hat
r-s requr.reo.
2l lbrtherrr area; boturded b'y lfuee 5 to 1? arll F to A: The areas
Slspected are. alryncorJrmtely bourded by lines 5 to 8 ard F to A
ard lirps F to D.6 ard I to 1?.
2.1) Ttre trc colums at 6/E afi GP are adjacent to tlre outer
rmll so tiat their outeide liiebs canrpt be sprayed.
Firegroofirq can be applied up to tttis walI fo:mirq an
$clod.lre wittr tfre wall ircorSnrated into tlre protectlon
lnns are located at a qlstsn. PresantlY, tttese coh
tsqnrarat wall erected for healirg prqpoaes arrd are rpt
l:!C Souft t€qo lhnt' Cohrrdo 90tr23 *'3 gt rogo
Acro*
'AKE
H REGARD,ffi?li.,rerrs.
PBO,IECT#
DATE
PAGE *
705039
3of 3
>!tiE m ftl 'Do
-{ -l
g€scnIPT0N/LoCATION
2.?) At otlnr perineter oluuns on lines 6 ard A, the gap
befue€n crrter coltwr fLarge ard exterior wall_ bas been
filL€d with nirsal safirg ard cafco firerproofirg sprayed
over the olurrr up to tle erall.
2.3) At peri*t€r bedra, orrliLion slnilar to item 1.3.
2.4't Ccrditi"qr at domrs sirnilar to item 1.4.
2.5) At toft l.e\rcI bedus, mrdition slmilar to itffi 1.5.
2.6) A fs nis@Il.arprrus locations of defects exist. Their
Iocations are reded on deficienqr diagirans.
2.7) ttn sanples for dersity trFasureruent Here taken fr.cm tlris
area.
3) David Arrsid, firelroofirg foreman for Crossroads Enterprises,
bas rerriaed ttra abore erililions arrl is a*are of conection
requirsnents. I\rc set.' of deficienq' Iocation djagrerns were
Left at tbe site for roof lerrel. Re€ults r+ere brieflv descri-bed
to Churk Eq,vlett b'y Fhste on L2ft0/87.
,l) Due to site sctreftrlirg requirenents' ard add'itional trip has
needed bea'ortd *trat wa"s arrticitrrated based on are of fireproofirq
Half the tire of irrspectiroD is li.ted as cltra senzices for
195 Earh h.t {o
Derucr Cffirdo f@?3
3{n| €8t fGo
cTc PROTSCT fruiftER
l7o3-0 3 9 I G__,rf
D. @rnr
FIELg O'CEtrANOil BEFOiT
FFOJECT }IAHE
PUNCH LIST ]TEM
-
TO
-
o[re 12/11/s7
coNT svc xTR SVC COO€ *
x
.l
-
]EC}If{lcI,AN ST HR OT HR
1.00
wPEof ltt*FE€TloN' vlsuAl"-....-.-. MAGHETICPAFTICLE- uLTRAsoNTcwELDMENT
UL'FA3OBE
-.
SHEAH CONHECIOF (ACCOll$TtcAtl
-_.
BOLT TENs'ON FIREFROOF'N. X
WEFE ffErfil IELOW fHE Mll{rilUM FROJECT SPECIFICATIO|{8 NOTED? yES
-.
No ._-
!TEI{ NUMBEfi
o o m !-l
,m C-m c)DESCRIPTTON/LOCATION
the densities of, txm cafso E/t ftrepoofirg sq)r-es takerr frcrn
rcof level Eteet have been ibternrined at Cac-Geotek. These
res.[ts srceed ItL requirrqDefiEs for irdivr.d'al sarpres r+trich is
11 psf ailatunm. Average dl€nsity valr:es sill be calculated, for
roof l€vel wlren s:,rplirg is ccryleted.
Roof Is/eI
$ample 3: I4.3 pcf
Sarple 4: I2.7 Wt
i'
ACT'OI{ TAX€H FEGAFOI'T|€ ABOVE nEHS.
i'.
I
1
5
a
\ftr\#nrnmE
Jlrrry ll, llet
Slry trmrir ?err rf ta{1
75 li. trlrtt€r td.Yrll" G6 t163?
hrr €ory:
Etn*t
I
Eeatrolrrre l
E€! *ffi st.|
Filrlrtr
liflg€* *r| sopi,tt of, ftnll lnapcetion reporta for structural
*ru* fir*Dr*sf,1il.€, ae the Tcrrace Utng additton to the Ueetin.
i
I
t
lffi' Itsd$firunnaEf m*t $cd, v'frfl, Cs,bredo 81 657 . 3o3 / 47 6-6602
.rl
EEffi @tHf,,Elrt (I)tffilw
PO. Box2139 Colorado Springs, Colo.ado 80gOl
Teleohone (303) 473-532 I
o o
TRANSM ITTAL NO.
PREV. TRANS. NO.
DATE January 12, '1988
,o Town of Vail - Bullding Department PRorEcr ltEsTIN H0TEL ADDITI0NS
75 South Frontage Road VAIL, C0L0RAD0
Vail, Colorado 81657
Attentlon: Gary I'tomaln
wE ARE TRAl,lSMlTTlt{G
-I r"".orro HERE*TTH
_ UiIO€R SEPARATE COVEF
-vlA
-
OTHER
ORIGINATOR CTC-Geotek
FOR
-
APPROVAL
_ CORRECTION AND RESUBMISSION
-
APPROVED
-
APPROVED AS NOTED
-
YOUR ACTION
x voun R EcoR DS/rN FoRMATToN
-
YOUR COST PROPOSAL
COPIES SEPIA DRAWING NO. DESCBIPTION
I Structural Steel Inspection Reports
REMARKS Please replace the reports Jou were given with these final reports showing alI
discrepancies corrected and accepted.
COPIES OF THIS TRANSMITTAL MAILED TO:
Mldwest Steel l{orks
WE HEOUEST THAT
-
SEPIA
-AT
YOUR EARLIEST CONVENIENCE
BE FETURHED TO THIS OFFICE
-AS
SOON AS POSSIBLE
-
ON OR BEFORE
G, E. JOHNSON CONSTRUCTION CO.( x) w/euc.
( I wlENC.
( ) W/ENC.." Phillip E. Harris
Vice President
8701.08/sn
155 South Nala,o
Oeawr Cotorado 00223
303 698 1050
CTC PNO.'ECT NUMBER
(7os-0 3 9 t
D. Diclanqrer
FIELO OBSEBVA?IOH NE POST
Westin l{otelzTerrace PROJECTNAME wesrrn HOteI erTa
PUNCH LIST ITEM
--
TO
D^rE 12/22/87
TECHNICIAN ST IIR
8.00
coNTsvc xrR svc coDE *
x
OT HR
TYPE oF lNsPEcrtoN ' vlsuAL MAcN€Ttc PARTToLE
-,
uLTRAsoNtc wELDMENT _-,
ULTRASONIC SHEAR CONNECTOR (ACCOUSTICAL}
-.
BOLT TENSION-, FIREPROOFING
WEFE ITEMS EELOW THE MIN'MUM PROJECT SPECIFICATIONS NOTED? YES
-
NO
ITEM NUMEER DESCFIPTION/LOCATION
visuaL reirupection of t}e outstandirq discrepancies
was oorducted at all levels of t}re Westj-n l{otel Terrace Wirg
Addi.tion this date. The follcndrg itenrs r,gere fornd to be
repaired in acmndance to ttre respectj-ve tr:ansruittals:
Itsns #9, 13, 14, 20,26,27,49,62,63,06, 09, 7L & 72
These items were for.rnd to be repaired as reguired and visr:ally
acceptable. Please find attached tJ:e ccnpleted list of outstarrd-
ing discrepancies, as relnrted ard accepted, which will be on
file witll this firm.
o o m T {
,tn C.m o
ACTION TAKEN REGARDING ABOVE ITEMS.
'oLoR
Doto,t=*,*.
rns 80un{ i|^yaD
m!ffER, AOTORADO 80€2il
lstf as-1050
Inspector:
Iten
*
LIST OF OUTSTANDING DISCR.EPAI{CIES
/a,
,/<-'
a/az/az
Ulsol<-
/.fi/4"
'asz/ao4.r
STFUCTURAL MECHAI{'CAL AI\IO MATEBIAIS TESTING
"oLonADo*, "t,-*,"..
156 80unr illvAb
ocr{uEn. oolonrDo soz}3 rqts.rso
Locatiou:
fnspector:
Iten t
tIST OF OUTSTANDING DISCPJPANCIES
foIob# : bsa3e Date:
Page: Z of
Date
7
rsTJ/fi.[
/3/
X64g/"a4,1
F/{/87
dL
rs518t
r/a/a,
C*r-td-
g>
7
{d7S /.2oJA. t
c/g)
'/4#rt--
STRUCruRAL ME6HAITIrcAL AflO itATERtALS TESTTNG
//5/tt
@LonAm reor fren nrc.
r5s sot Tlt ilAv*ro
ocf$rtF. oor.oRAoo @!t3 {ssls-r0t0
Location:
Inspector:
LIST OF OUTSTANDI}IG DI SCREPANCIES
obl: ?oso3q D.1u.
Page: 3 of
te Iten I rted
."),$'d'
*-zls/-to"u.t
@.
tfu/az
o/s/az
qr<//a 7
y't5dt-
,/ac/S
+a7
STRUCTURAI- iI€CHAHICAL AND MATERIAIS TESTING
ceonA'o rErsr tr* ,o.
ttsSotTtrMvAro
DGr{t ERCotonADOte23
r{0fi-r060
IIST OF OUTSTANDING DISCR,EPANCIES
Inspcctor:
te
orted
Page:_{ of
Iten I
to/az/82
trY-3J?3,
'/zz/62
.1r4,Pn1
r/s/a't
,o6/st
ro/S/6t
STRUCTURAL MECHAttdcAL AilD MATER|AI S TESTTNG
tr?S Ot --
@ronA'o *r"l,,o,n..
rg5 sottl|t r{AvAro
D€lfvER, co[oRADOS@3
etl€s-r050
o
LIS? OF OUTSTAIiIDING I}ISCREPAIiICIES
Locrtion:Jobt: -o<ort Dste:
fr
' -/r"tp
I I
Inspector z f7 L),,ffiage: 5 of
Iteu
,Date
to/d-?/8?
to/aq/B?
rz/zr/8-
, u)a'+1nnOf
,r/tr/a,
1,'.Er"td#'or
/Fvr/gZ
//ai/82
&
STFIJCTURAI- MECr{A'{EAL llHD MATERAIS l€SrilG
@LonADo **r.t,* ^"||6goun{t|AvAn
DGnm,@ton^0|ot@3
@$t.rora
Location:
LIST OF OUTSTANDING DISCRTPANCIES
Job# : zpsocf Date:
InsPactor: DF,.<. erf p age e of
Item I Date
q,
e-.'4sle B/,1
r45 ltr-l avv
ln/a7
fiuSO
t't
ry'*2,/62
't)L
/a/dq/87
to/a?/67
STBUCTURAL t ECHAT|CAL AND MATERT,AIS TESnNG
@on^Do*eha,n".
rto 84rf}t ltAvAp
DEI{ttEn. oot 0RADO 6e2it Fqrs-r0!0
Location:
Inspector:
Iteu I
IIST OF OUTSTAITIDING DISCREPANCIES
Jobf:zccas? Date:
Page: j of
,l
t 44/8t
opa16z dc-
*)l3/zoza.t
tolzs/ D7
t.tA7
8uX---4*"t
ry'az/gt
STRT,CTURAL MECHA'{ICAL AT{D T/|ATERIALS TESTIT{G
"oroR
Dororl}***.
rt6 80utH r{ vAF
Dg|{tER. CoII.oFAOO tm2g
fsttB.1050
LIST OF OUTSTANDING DISCREPANCIES
Location . / \on^l Arer- ferrrtxp ,),,ur. Jobl z zo<oge Date | @f t bfF,-l
lnspector: Df_f)ar_r,yE*r€rr*- page: R of -.=.\
Jztsfecxe5>.
STFUCTUFAL, USCHANICAL A'{D MATERIALS TESNNG
ften t
e/tz/ez
h)e,^lc1F€br
ooLo*ADotro cl=a,nr.
156 SUH ltAvAn
oGt{tER. OOLOnADO tfia3 raf s-tos
IIST OF OUTSTA}IDING DI SCREPANCIES
Location:
Inspector:
obl :7o5*u Date:
Page: q of
Iten I Date
tolLllS)
(o/z?/87
m
)qe?fr7
ro/2fl/e/
181
STRUCTURAL I'ECXANTCAL AI{D MATERATS T€S1ING
/o/4/87
ooLonADo rro "*=u,n".
rE5 EOtJ?t{ l'tAvAF
DBfirER, ooroR^oo t0223 (oqet-|ols
Location:
LIST OF OUTSTANDING DISCREPANCIES
-Desnu (rt et -f&ra* t \*.,c-, Jobf : rosogi Date:
Inspector: T\r D ,c.r.r^-s.te<__ page: / O of
STRUCTURAL, ttECHAttltCAL ANO UATEBIA|S TESTTNG
Iten
*Y i.4tn t 4
4'/a"
. ta( tl<-artt
*t{-, 7q',
J. t /Z 5","
',1f r';.r, A, (a:,t
C"..
/ r-l / -. l".-t--<f t/44 n (//a,
fivra4e*-) '- ,&
rls Uut Tc: rlirii<t r h )J. (Q
coronADo resr fieR rHc.
rr5 8our..lr t|^YAb
DCltER, Colo*rDoeoe4t
|ss 3$-r0€o
LIST OF OUTSTAI{DING DISCREPANC IES
fnspector ia:>LD,Page:1(of
orted I t Roor {,r.*r,u
ro/zt/6
STRUCTURAL. MECI{ANICAL ANO MATEFI.ALS TESTING
ooronADo TErirlrER NC.
rgsEourH filv*f,)
D$km.COLOHDO@g
F6tcG-ro3o
LIST OF OUTSTAIIIDING DISCREPANCIES
Locetion:L)e.np th.*. 6p g lJrrcJobl:zcraae Datez tr/.u
Inspcctor: t rr-,.--r{a<- pagei /} of.
Iten I
{rrlt
eJr4ED.
STIUCTURAL MECHATSCAL AT.ID MATERIALS TESTING
I
INSPECTION REOUEST
TOWN OF VAIL
DATE l{.,
INSPECTION:
JOB NAME
MON
CALLER
TUES WED THUR FRI
1"2tn ./ .1 ./ /<'o 1,: / 4- .' ,,' ,"
PERMIT NUMBER OF PROJECT
BEADY FOR
LOCATION:
BUILDING:
tr FOOTINGS / STEEL
tr FOUNDATION / STEEL
tr FRAMING
tr INSULATION
-
tr SHEETROCK NAIL
PLUMBING:
tr UNDERGROUND
tr ROUGH / D.W.V.
T] ROUGH / WATER
n ROOF & SHEER . PLYWOOD NA|L|NG tr GAS PtPtNG
tr POOL / H. TUB
trtr
tr FINAL tr FINAL
ELECTRICAL:
/ reue. PowER
MEGHANICAL:
tr HEATING
tr ROUGH E EXHAUST HOODS
tr CONDUIT
Btr
tr FINAL tr FINAL
tr APPROVED
CORRECTIONS:
tr DISAPPROVED tr REINSPECTION REQUIRED
DATE
READY FOR INSPECTION:
JOB NAME
MON
\tNslrEgTtoN REQUEST TOWN OF VAIL
ruES wED rHUR <ZF'r>" ..i ' ,-. - -1*-a ' , ..-, ) ,.- Alvlr pM LOCATION:
DATE 5 - ]8-
/ cdRnecrrorus:
tr DISAPPROVED PROVED tr REINSPECTION REQUIRED
BUILDING:PLUMBING:
5F6brrruos/srEEL a-y, tr,NDERGR.,ND
tr FOUNDATION / STEET tr ROUGH / D.W.V.
tr ROUGH / WATER
tr FRAMTNG
n ROOF & SHEER -. PLYWOOD NAILING O GAS PIPING
tr INSULATION tr POOL / H,TUB
tr SHEETROCK NAIL
ELECTRICAL:
tr TEMP. POWER tr HEATING
tr ROUGH tr EXHAUST HOODS
E CONDUIT O SUPPLY AIH
O FINAL
INSPECT
I
INSPECTION REQUEST
TOWN OF VAIL
JOB NAME
INSPECTION:MON
CALLER
TUES WED THUR(G)READY FOR
LOCATION:
UMBEB OF PROJECT
BUlLDING:
F<-oorrr.rcs / srEEL
PLUMBING:
tr FOUNDATION / STEEL
tr UNDERGROUND
tr ROUGH / D.W.V.
tr ROUGH / WATER tr FRAMING
^ ROOF & SHEER
" PLywooD NAILING tr GAS PIPING
tr INSULATION tr POOL/ H. TUB
tr SHEETROCK NAIL tr
tr FINAL tr FINAL
ELECTRICAL:
tr TEMP. POWER
MEGHANICAL:
tr HEATING
u
tr
tr
ROUGH tr EXHAUST HOODS
CONDUIT tr SUPPLY AIR
tr EINAL tr FINAL
.-I
vl7--q/^PPROVED l
CORRECTIONS:
Ni2\.o :{"'':(':.f i .
o
fln
RETNSPECTTON REqU
.t" , ..,. u\ :, :\
ED
.((l{I i,atr. .'... .I
INSPECTO
DATE b-)-t1 $s
READY FOR
LOCATION:
INSPECTION:MON WED THUB
PERMIT NUMBER OF PROJECT
I
INSPECTION REQUEST
TOWN OF VAIL
CALLER
TINGS / STEEL
PLUMBING:
tr UNDERGROUND
tr ROUGH / D,W.V.
tr ROUGH / WATER
NDATION / STEEL
tr FRAMING
n ROOF & SHEER - PLYWOOD NAILING B GAS PIPING
tr INSULATION tr POOL/ H. TUB
tr SHEETROCK NAIL
tr EXHAUST HOODS
tr SUPPLY AIR
('..tr DISAPPROVED tr REINSPECTION REQUIRED
CORRECTIONS:
INSPECT
?.1\,u
PERMIT NUMBER OF PROJECT
DATE L. '3- is"1 JoB NAME
t
INSPECTION REQUEST
VAIL
INSPECTION:MON
C-L,.'cK..
WED THUR FRI l.- .:., > 4y
CALLEB
TUES READY FOR
LOCATION:
/)
BUILDING:PL
tr
tr
tr
tr
tr
tr
UMBING:
ryf.-oorrr.rcs / srEEL -
tr FOUNDATION / STEEL
UNDERGROUND
ROUGH / D.W.V.
ROUGH / WATER tr FRAMING
n ROOF & SHEER " PLYWOOD NAILING GAS PIPING
tr INSULATION POOL / H. TUB
tr SHEETBOCK NAIL
n
tr FINAL tr FINAL
ELECTRICAL:
tr TEMP. POWER
MECHANICAL:
tr HEATING
tr ROUGH tr EXHAUST HOODS
tr CONDUIT tr SUPPLY AIR
n
EI FINAL tr FINAL
E APPROVED
)RRECTIONS:
tr DISAPPROVED tr REINSPECTION REQUIRED
oot. (r-1-tJ rNSPEcr
/, v.i nl a
PERMIT NUMBER OF PROJECT
/ /\
DATE U. _ 1J 'T I JOB NAME
to
INSPECTION REQUEST
TOWN OF VAIL
\<-
CALLER
READY FOR
LOCATION:
INSPECTION: MON TUES r- WED )THUR FRI
\ ---1 \-y''
.\.- l.1r(_Ir-
BUILDING:
f-r'r5orrrucs / srEEL
PL
tr
tr
E
tr
tr
tr
UITIBING:
tr FOUNDATION / STEEL
UNDEBGROUND
ROUGH / D.W.V,
ROUGH / WATER tr FRAMING
D
tr
ROOF & SHEER
PLYWOOD NAILING GAS PIPING
INSULATION POOL / H. TUB
tr SHEETROCK NAIL
tr FINAL tr FINAL
ELECTRICAL:
tr TEMP. POWER
ITIEGHANICAL:
tr HEATING
tr ROUGH tr EXHAUST HOODS
tr CONDUIT tr SUPPLY AIR
B _n-
a#ul
tr
tr FINAL
\PPROVED
RRECTIONS:
tr DISAPPROVED tr REINSPECTION REQUIRED
lDq.,l
tl -).r-!1 .K
-\ ror^ l!. >Lt lt ,'-
,,^r\ "' \ l-
qj1qr oK
|r 1p\\ c-r
INSPECTO
l;n;r'.'.!r ,.i . '!'a t lr I to INSPECTION REQUEST
TOWN OF VAIL
DATE L"ro -1i-l-JOB NAM
MON
CALLER :f,Dooe
READY FOR
LOCATION:
INSPECTION:tr.. (Gu-) t*r*FRI
BUILDING:
tr FOOTINGS / STEEL
PLUMBING:
tr UNDERGROUND
O ROUGH / D.W.V.
tr ROUGH / WATER
Brou
tr FRA
NDATION / STEEL
FRAMING
D
tr
tr
tr
ROOF & SHEER
PLYWOOD NAILING GAS PIPING
INSULATION tr POOL / H. TUB
SHEETROCK NAIL tr
tr
tr FINAL tr FINAL
ELE
tr1
trF
trC
tr
GTRICAL:M
tr
tr
tr
tr
ECHANICAL:
TEMP. POWER HEATING
ROUGH EXHAUST HOODS
CONDUIT SUPPLY AIR
o #o,-O FINAL
PROVED tr DISAPPROVED D REINSPECTION REQUIRED
r CORRECTIONS:
INSPECT
DATE i.' 'af NAME
c'( a..iJ J
PERMIT NUMBER Ort pRo;EET
READY FOR
LOCATION:
INSPECTION:MON
INSPECTION REQUEST
TOWN OF VAIL
CALLER
TUES WED THUR FRI
BUILDING:
Pfoortrucs / srEEL
PLUMBING:
tr FOUNDATION / STEEL
tr UNDERGROUND
tr ROUGH / D.W.V,
tr ROUGH / WATER tr FRAMING
n ROOF & SHEER " PLYWOOD NAILING tr GAS PIPING
B INSULATION
tr SHEETROCK
tr POOL / H. TUB
NAIL tr
tr D
tr tr FINAL FINAL
ELECTRICAL:
tr TEMP. POWER
MECHANICAL:
tr HEATING
tr ROUGH T] EXHAUST HOODS
tr CONDUIT E SUPPLY AIR
tr
t rlf,tx tr FINAL
/,,(PPROVED
RRECTIONS:
tr DISAPPROVED tr REINSPECTION REQUIRED
INSPECT
I /t ,/
rNsftroN REouEsr
onre i-
READY FOR
LOCATION:
(l'\\ r -- ' ', JoB NAME
INSPECTION:MON TUES '.WED', THUR FRI
TOWN OF VAIL
BUILDING:
tr FOOTINGS / STEEL
PLUMBING:
tr FOUNDATION / STEEL
tr UNDERGROUND
tr ROUGH / D.W.V.
tr ROUGH / WATER tr
u
tr
tr
tr
FRAMING
ROOF & SHEER
PLYWOOD NAILING T] GAS PIPING
INSULATION
SHEETROCK
tr POOL/ H. TUB
NAIL
tr FINAL tr FINAL
ELECTRICAL:MECHANICAL:
tr
tr
tr
tr
TEMP. POWER tr
tr
tr
tr
HEATING
ROUGH EXHAUST HOODS
CONDUIT SUPPLY AIR
o r/tnr-tr FINAL
7777-'
ffieaoveo
cohRecrrorus:
\ n DtsAppRovED D REtNspEcrtoN REQUTRED
<<\oPh.- qqr.r
/ t.--- r'1 op;;e U-t/-)</ tNspECT
2ab t .:
PEHMIT NUMBER OF PROJECT
INSPECTION TOWN OF
REQUEST
VAIL
DATE
CALLER
READY FOR
LOCATION:
INSPECTION:MON J TUES WED THUR FRI
.'( ,,: -'.../
".
BUILDING:PLUMBING:
tr
r
tr
tr
tr
tr
n
FOOTINGS / STEEL tr UNDERGROUND
tr ROUGH / D.W.V.
tr ROUGH / WATER
FOUNDATION / STEEL
FRAMING
ROOF & SHEER
PLYWOOD NAILING tr GAS PIPING
INSULATION
SHEETROCK
tr POOL / H. TUB
NAIL tr
tr FINAL tr FINAL
ELEGTRICAL:
tr TEMP. POWER
MEGHANICAL:
tr
tr
tr
tr
tr
HEATING
tr ROUGH EXHAUST HOODS
CONDUIT SUPPLY AIR
tr
o F/NAL FINAL
PPROVED
CORRECTIONS:
T] DISAPPROVED tr REINSPECTION REQUIRED
,-,a\ f ',
)a,"I
tbrt
L
-_ -_\ '1 -_)1,, 4/- E, /
.\e\ ui
PERMIT NUMBER OF PROJECT
oerc (. - 29 - t} JoB NAME
READY FOR
LOCATION:
INSPECTION:MoN (d (ffi-r+run FRI
I
INSPECTION REQUEST \ n TOWN OF VAIL..\l \ t I r--
\"\}{ \*.r^r- 1.-..,i^b,
BUILDING:PL
tr
tr
tr
tr
tr
tr
UMBING:
UNDERGROUND
ROUGH / D.W.V.
ROUGH / WATER
tr
tr
tr
ROOF & SHEER
PLYWOOD NAILING GAS PIPING
INSULATION
SHEETFOCK
POOL / H, TUB
NAIL
tr
tr FINAL
tr
tr FINAL
ELECTRICAL:
tr TEMP. POWER
MECHANICAL:
O HEATING
tr ROUGH tr EXHAUST HOODS
tr CONDUIT
n
tr SUPPLY AIR
r-l
O FINAL tr FINAL
/)d/o.r*ou=o h., drt.{. tr DTsAPPRovED tr REINSPECTION REQUIRED
CORRECTIONS:
V.Io'(i*-! - t",9 lz: . SS-
I
INSPECTION REOUEST
TOWN OF VAIL
INSPECTION:
JOB NAME
CALLER
MON TUES READY FOR
LOCATION:
UMBER OF PROJECT
BUILDING:
tr FOOTINGS / STEEL
PLUMBING:
TfouNDAroN / STEEL
6 rnnurruo
tr UNDERGROUND
tr ROUGH / D.W.V.
tr ROUGH/WATER
n ROOF & SHEER - PLYWOOD NAILING B GAS PIPING
tr INSULATION tr POOL i H. TUB
tr SHEETROCK NAIL
r'l
tr
n
tr FINAL tr FINAL
ELECTRICAL:
tr TEMP. POWER
MECHANlGAL:
tr HEATING
tr ROUGH tr
tr
EXHAUST HOODS
tr CONDUIT
n
SUPPLY AIR
tr FIYAL tr FINAL W
CORRECTIONS:
tr DISAPPROVED tr REINSPECTION REQUIRED
INSPECT
1 ,\ ..,aeuu I
INSPECTION
TOWN OF
REQUEST
VAIL
r\
PERMIT NUMBER OF PROJECT
oote G - ab - 8) JoB NAME
READY FOR
LOCATION:
INSPECTION:
CALLER
TUES WED THUR PM
BUILDING:
tr FOOTINGS / STEEL
PLUMBING:
tr UNDERGROUND
tr ROUGH / D.W.V.
tr ROUGH / WATER
tr FOUNDATION / STEEL
tr FRAMING
Fr ROOF & SHEER " PLYWOOD NAILING tr GAS PIPING
tr INSULATION B
tr
n
POOL i H. TUB
tr SHEETROCK NAIL
n
tr FINAL tr FINAL
ELEGTRICAL:
tr TEMP. POWER
MEGHANIGAL:
tr
tr
tr
E
HEATING
tr ROUGH EXHAUST HOODS
tr CONDUIT SUPPLY AIR
tr
tr,FINAL O FINAL
PROVED i\.;
CORRECTIONS:
tr DISAPPROVED rO,:tr REINSPECTION REQUIRED
INSPECTOR
t
tNs REQUEST
VAIL
DATEL2-. q--
READY FOR
LOCATION:
JOB NAME
CALLER
INSPECTION: MON TUES
PERMIT NUMBER OF PROJECT
BUILDING:
tr FOOTINGS / STEEL
PLUMBING:
T] UNDERGBOUND
NDATION i STEEL tr ROUGH / D.W.V.
tr BOUGH / WATER
ROOF & SHEER
PLYWOOD NAILING T] GAS PIPING
INSULATION
SHEETROCK
POOL / H. TUB
ELECTRICAL:
tr TEMP. POWER I] HEATING
T] ROUGH tr EXHAUST HOODS
tr CONDUIT
tr FINAL
tr DISAPPROVED tr REINSPECTION REQUIRED
Ltt
lrt rrr'. l t\s\(\ *&U V-tl,\A/,E C cr. r.-..r
INSPECTOR
-.-/'\ Ot I --{ Nt o Lli
PEBMIT NUMBEB OF PROJECT
DATE -7 -11- 8L.roe NAME
INSPECTION:MON READY FOR
LOCATION:
t
NSPECTIO
, A TOWN \! --H.*,
N
OF
I REQUEST
VAIL
THUR FRI )pv
BUILDING:
tr FOOTINGS / STEEL
PLUMBING:
yf6ur.ronroN / srEEL
tr UNDERGROUND
tr BOUGH / D.W.V.
tr ROUGH / WATER tr FRAMING
n ROOF & SHEER " PLYWOOD NAILING tr GAS PIPING
tr INSULATION
tr SHEETHOCK
rl
tr POOL / H. TUB
NAIL tr
n
tr FINAL tr FINAL
ELECTRICAL:TTIEGHANICAL:
tr
tr
tr
tr
TEMP. POWER tr HEATING
ROUGH EXHAUST HOODS
CONDUIT tr SUPPLY AIR
tr 5lNAL tr FINAL
fl/eeeaoveo k> Nol.l tr DTsAPPRovED tr BEINSPECTION REQUIRED
CORRECTIONS:
.; '. :rrt
_t '.\6t01/
PERMIT NUMBER OF PROJECT
onre -l -. 6- el JOB NAME
INSPECTION: MON READY FOR
LOCATION:
t
INSPECTION TOWN OF
REQUEST
VAIL
CALLER ,,^. !-\
TUE'@@FBI %
BUILDING:PLUMBING:
tr UNDERGROUND
tr ROUGH / D.W.V.
tr BOUGH /WATER
OTINGS / STEEL
Fouruolrroru / srEEL
tr
n
tr
tr
tr
tr
FRAMING
ROOF & SHEER
PLYWOOD NAILING tr GAS PIPING
INSULATION
SHEETROCK
O POOL / H. TUB
tr HEATING
tr ROUGH tr EXHAUST HOODS
N CONDUIT
-
tr SUPPLY AIR
tr DISAPPROVED tr REINSPECTION REOUIRED
CORRECTIONS:
t:
| '-\/ \2. F-a, \ i
\,- l.- *--'\ /{a,-to--t 2. I i
r.\
DArE *-f rf -61 TNSPE
-t
a stuu
PERMIT NUMBER OF PROJECT
DATE
-t - t3- 8l JOB NAME
rNsP?croN REeuEsr
PM AM
TOWN OF VAIL
CALLER
READY FoR INSPEcrIoru. ,,6 rues WED THUR FRI t*.--
LOCATION:
l
BUILDING:
tr FOOTINGS / STEEL
PLUMBING:
tr UNDEBGROUND
tr ROUGH / D,W.V.
tr ROUGH / WATER
EKFOUNDATION / STEEL
tr FRAMING
n ROOF & SHEER - PLYWOOD NAILING tr
0
tr
tr
GAS PIPING
tr INSULATION
tr SHEETBOCK
n
POOL / H. TUB
NAIL
T] FINAL tr FINAL
ELECTRIGAL:
tr TEMP. POWER
MEGHANICAL:
tr
tr
tr
tr
HEATING
tr
tr
tr
ROUGH EXHAUST HOODS
CONDUIT SUPPLY AIB
tr,,fINAL tr FINAL
6feeeaoveo
CORRECTIONS:
tr DISAPPROVED O REINSPECTION REQUIFED
I Abtot/
PERMIT NUMBEF OF PROJECT
o
INSPECTION REQUEST
TOWN OF VAIL
JOB \ ,\:l \
NRtrlE [[)r'*.
CALLER
READY FOR
LOCATION:
INSPECTION:MoN G. wED THUR FRI AM PM
DATE I . I'-I
BUILDING:
tr FOOTINGS / STEEL
PLUMBING:
tr FOUNDATION / STEEL
---r)pUtTtDERGROUND
t-/ _^..---tr ROUGH / D.W,V.
tr
B
tr
tr
tr
tr
FRAMING tr ROUGH / WATER
ROOF & SHEER
PLYWOOD NAILING tr GAS PIPING
INSULATION PotL / H. ruB
<--\a.t Lv\,-- \4 SHEETROCK NAIL 'IL < --\a.r t v,"-- \+ ,,rY ^r-t/
FINAL
tr
tr FINAL
ELECTRICALT MECHANIGAL:
tr
tr
tr
tr
tr
TEMP. POWER O HEATING
ROUGH tr EXHAUST HOODS
CONDUIT tr SUPPLY AIR
FINAL tr FINAL
TwRovED I--CORRECTIONS:
tr DISAPPROVED tr REINSPECTION REQUIRED
-.) .}-_- --{
INSPECT
PERMIT NUMBER OF PROJECT
INSPECTION REQUEST
TOWN OF VAIL
,/t;,.y;,li *1i:' '' "t DATE
READY FOR INSPECTION:
JOB NAME
CALLER
MON TUES WED THUP'I FRI
LOCATION:
BUILDING:
tr FOOTINGS / STEEL
PLUMBING:
tr FOUNDATION / STEEL
tr UNDERGROUND
tr ROUGH / D,W.V.
tr ROUGH / WATER tr FRAMING
n ROOF & SHEER " PLYWOOD NAILING tr GAS PIPING
O INSULATION tr POOL / H. TUB
tr SHEETROCK NAIL
n
tr
tr
tr FINAL tr FINAL
ELECTRICAL:
tr TEMP. PO
\,
B ROUGH _,\
tr CONDUIT
MECHANICAL:
YE I tr HEATING
tr EXHAUST HOODS
D SUPPLY AIB
FINAL
tr
tr FINAL
APPROVED- 7.'
CORRECTIONS:
tr DISAPPROVED tr REINSPECTION REQUIBED
rvh I I rE(INS )TION
OWN OF
REQUEST
VAIL PERMIT NUMBER OF PROJECT
c
T(
P
\JOB NAME
MON
CALLER
rres (@\ r"u* FBI :'. ,,ir.... AM {.f.D,READY FOR
LOCATION:
INSPECTION:
DATE -I - ?,E -
BUILDING:
atFo^orrr'rcs / srEEL ./
PLUMBING:
tr UNDERGROUND
tr ROUGH / D.W.V.
tr ROUGH/WATER
ETFOUNDATION / STEEL
tr FRAMING
- ROOF & SHEER
" PLYwooD NAtLtNG tr GAS P]PING
tr INSULATION tr POOL / H. TUB
tr SHEETROCK NAIL
tr
tr
tr
tr FINAL tr FINAL
ELECTRICAL:MECHANICAL:
tr
tr
tr
tr
TEMP. POWER tr HEATING
ROUGH tr EXHAUST HOODS
CONDUIT tr SUPPLY AIR
ozftNnr-tr FINAL
VED tr DISAPPROVED D REINSPECTION REOUIRED
RRECTIONS:
DATE --?- 22-- e7 INSPECTO
e.8r"r I
PERMIT NUMBER OF PROJECT -t'ti-tl JOB NAME
CALLER
INSPECTTON: MON fTUEP
t
INSPECTION
TOWN OF
REQUEST
VAIL
DATE
READY FOR
LOCATION:
THUR FRI Pf\rt
NDATION / STEEL
PLUMBING:
tr UNDERGROUND
tr ROUGH / D.W.V.
tr ROUGH / WATER FRAMING
BOOF & SHEER
PLYWOOD NAILING E] GAS PIPING
tr POOL / H. TUB
tr FINAL
ELECTRICAL:
tr TEMP. POWER tr HEATING
tr ROUGH tr EXHAUST HOODS
tr CONDUIT tr SUPPLY AIR
PROVED As tr DISAPPROVED tr REINSPECTION REQUIRED
CORRECTIONS:
INSPECT
It{r{," I
PERMIT NUMBER OF PROJECT
DATE f *: \*?-l
READY FOR
LOCATION:
INSPECTION:
JOB NAME
MON
CALLER
TUES WED
\ <ri-r. e-e C* ii
@r,,,
INSPECTION REQUEST
TOWN OF VAIL
aMr@r
BUILDING:PLUMBING:
\-d-tr FOOTINGS / STEEL
tr FOUNDATION / STEEL tr ROUGH / D.W.V.
tr FRAMING tr ROUGH / WATER
n ROOF & SHEER " PLYWOOD NAILING tr GAS PIPING
tr INSULATION POOL / H, TUB
tr SHEETROCK NAIL
tr FINAL tr FINAL
tr HEATING
PROVED
RRECTIONS:
tr DISAPPROVED T1 BEINSPECTION REQUIRED
DATE INSPECTOR
:l '1 1,r 1.,,.,
PERMIT NUMBER OF PROJECT
DATE .-. .i ] .": I JOB NAME
INSPECTION REQUEST
INSPECTION:MON
CALLER
TUES wED rlG) FRI ?:o,-l' 6y -fu READY FOH
LOCATION:
TOWN OF VAIL
BUILDING:
tr FOOTINGS / STEEL
PLUMBING:
E,#OUNDATION / STEEL tr'
tr
tr
tr
tr
tr
tr
tr
UNDERGROUND
ROUGH / D.W.V.
ROUGH / WATEH T] FRAMING
n ROOF & SHEER - PLYWOOD NAILING GAS PIPING
tr INSULATION
T] SHEETROCK
n
POOL / H. TUB
NAIL
T] FINAL tr FINAL
ELEGTRICAL:MECHANICAL:
tr
u
tr
u
TEMP. POWER tr HEATING
ROUGH tr EXHAUST HOODS
CONDUIT tr
tr
SUPPLY AIR
tr FINAL tr FINAL
-lt,r tr DISAPPROVED tr REINSPECTION REQUIRED
RRECTIONS:
DATE INSPECT
>tr61 t
PERMIT NUMBER OF PROJECT
-.- ./^ 2 /D^rE ?/L 1/f1 JoB NAME
READY FOR. INSPECTION:
1.. \
ST INSPECTION REOUE
TOWN OF VAIL ces
CALLER
TUES WED
I fi-u
THUR @
LOCATION:
BUILDING:
tr FOOTINGS / STEEL
PLUMBING:
tr UNDERGROUND
tr ROUGH / D.W.V.tr FOUNDATION / STEEL
tr FRAMING tr BOUGH/WATER
- ROOF & SHEER
" PLYwooD NAIL|NG tr GAS. PIPING
tr INSULATION tr POOLI H. TUB
tr SHEETFOCK NAIL
rl
tr
t-'l
tr FINAL tr FINAL
ELECTRICAL:
tr TEMP, POWER
MECHANICAI-:
tr HEATING
flnoueH tr EXHAUST HOODS
tr CONDUIT
n
se-c tr SUPPLY AIR
tr
tr FINAL tr FINAL
t/z tr DISAPPROVED tr REINSPECTION REQUIFED APPBOVED
COFREGTIONS:
tlrp@y&6i!
DATE 7* z 'f- ,f7 rNspEcroR
' :4rrs!
- -!6' t)'i)fi,
INSPEC TION REQUEST
PERMI
DATE
T NUMBER OF PROJECT
JOB NAME
MON TUES WED THUR FRI READY FOR
LOCATION:
INSPECTION:
BUILDING:
r] FOOTINGS / STEEL
PLUMEING:
tr UNDEROROUND
tr ROUGH / D.W.V.tr FOUNDATION / STEEL
tr FRAMING tr ROUGH/WATER
n ROOF & SHEER " PLYWOOD NAILING tr GAS PIPING
tr INSULATION tr POOL/H.TUB
t] SHEETROCK NAIL
E
tr
n
tr FINAL tr FINAL
ELECTRICAI.:
tr TEMP, POWER
ITIEGHANIGAL:
tr HEATING
T1 ROUGH tr EXHAUST HOODS
g(co"ou,t
n
tr SUPPLY AIR
t] FINAL tr FINAL
APPROVED
CORREGTIONS:
tr DISAPPROVED tr REINSPECTION REQUIRED ii'"u '
gSyE z ^t () / . fNSpECTOR
\*
/
o,.tdd.rrl*it Itll tdtbrt/Gil
2i{ 66
PERMIT NUMBER OF PROJECT
DATE
'2.-
"/ JOB
READY FOR
LOCATION:
INSPECTION:.--7-MON TUES /&-ta. - e
CALLER
}q/ED TH f rZr-. -'
.'*t ,-,U
INSPECTION
TOWN OF
REQUEST
VAIL
NAME
PM
BUILDING:
tr FOOTINGS / STEEL
PLUTUB
tr
tr
tr
tr
tr
tr
UNDERGROUND
tr FOUNDATION / STEEL ROUGH / D.W.V.
ROUGH / WATEB tr FRAMING
-, RoOF & SHEER " PLYwooD NAILING GAS PIPING
tr INSULATION POOL / H. TUB
tr SHEETROCK NAIL
E n
tr FINAL tr FINAL
ELEGTRICAL:
tr TEMP. POWER
MECHANICAL:
tr HEATING
tr ROUGH tr EXHAUST HOODS
fcolrourr tr SUPPLY AIR
tr tr
tr FINAL tr FINAL
t APPROVED
CORFECTIONS:
DISAPPROVED tr REINSPECTION REQUIRED
our.7-,//'F7 rNSPEcroR
.'1"
tb 9drd.rtlt all
ac( b=|
arbb
PERMIT NUMBEF OF PROJECT
onre R-5- *-1 JoB NAME
CALLER
TUES WED __6 PM READY FOR
LOCATION:
INSPEGTION:MON
BUTLDING:
tr FOOTINGS / STEEL
PLUMBING:
tr UNDERGROUND
tr ROUGH / D.W.V.tr FOUNDATION / STEEL
tr
tr
tr
tr
n
FRAMING Egoucn / WATER
ROOF & SHEER
PLYWOOD NAILING )rees PrPrNc -
H poor- / H. TUB INSULATION
SHEETROCK NAIL tr
rt
tr FINAL tr FINAL
ELECTRICAI.:
tr TEMP. POWER
MECHANICAL: tO €
E+{EArING i.., .s 'F trSE a(th.
tr EXHAUST HOODS tr ROUGH
tr CONDUIT
D
tr SUPPLY AIR
t]_
tr FINAL tr FINAL
CORRECTIONS:
tr DISAPPROVED tr REINSPECTION REQUIRED
lh! .
A
t
:llqFFT , tF-- a'--
PERMIT NUMBER OF PHOJECT
READY FOR
LOCATION:
,i.tErri . F -t ,. .. f! .r
MON @ THUR INSPEGTION:TUES
I] FRAMING _tr ROUGH/WATER
r-1 ROOF & SHEER . PLYWOOD NAILING
tr INSULATION POOL / H. TUB
tr SHEETROCK NAIL
tr SUPPLY AIR tr CONDUIT
APPROVED
CORR
tr DISAPPROVED REQUIRED
.'J
!* Rlrtart&atl
.ft:-,-,;*:'
INSPECTION
CALLEH
INSPECTION:MON TUES WED
REOUEST
VAIL
- [0a rfl
----@"READY FOR
LOCATION:11
tr FOUNDATION / STEEL
PLUMBING:
tr UNDERGROUND
tr ROUGH / D.W.V.
tr FRAMING tr ROUGH/WATER
n ROOF & SHEER - PLYWOOD NAILING
tr POOL/H.TUB
trsH
tr CONDUIT tr SUPPLY AIR
tr DISAPPROVED T] REINSFECTION REQUIFED
>Y61
!f !- ," .'fF,,r ;,F *
INSP
4"4*'Ld-@d
W,'-t'*
CALLEF
CTION
TOWN OF PERMIT NUMBER OF PROJECT
oare -f
READY FOR
LOCATION:
JOB NAME
@
BUILDING:
E FOOTINGS / STEEL
PLUMBING:
tr UNDERGBOUND
tr ROUGH / D.W.V.tr FOUNDATION / STEEL
tr FRAMING tr ROUGH/WATER
n ROOF & SHEER - PLYWOOD NAILING tr GAS PIPING
tr INSULATION
tr SHEETROCK
tr POOL/H.TUB
NAIL tr
a 4-r--,r*)n t,rtrub '.,
B FINAL tr FINAL
ELECTRICAT.:
tr TEMP. POWER
MECHANIGAL:
tr FOUGH
tr HEATING
tr EXHAUST HOODS
tr CONDUIT
tr_
tr SUPPLY AIR
tr
EhFINAL tr FINAL
a)/tr DISAPPROVED tr REINSPECTION REQUIRED
CORRECTIONS:
tbDrEbrti.all
*
INSPECTION REQUEST
VAIL TOWN OF \
JOB NAME
CALLER
READY FOR INSPECTION: MON TUES wED @--tw rfffi) prra -\
LOCATION:
fa
PLUMEING:
ROUGH / D.W
tr FOOTINGS / STEEL
tr FOUNDATION / STEEL
tr FRAMING tr ROUGH/WATER
n ROOF & SHEER " PLYWOOD NAILING
tr INSULATION
tr SHEETROCK
tr HEATING
tr SUPPLY AIR
tr DISAPPROVED tr FEINSPECTION REQUIRED
COFRECTIONS:
o! ttffitY."i3tl
|-t
INSPECTION
TOWN OF
REOUEST
VAIL
DATE fs^ nq -*-t JOB NAME
INSPECTION: @
CALLER
TUES WED THUR FRI _-___@"READY FOR
LOCATION:
BUILDING:PLUIIBING:
tr FOOTINGS / STEEL -DEFGROUND
tr FOUNDATTON / STEEL tr
tr
tr
tr
tr
t"]
FOUGH / D.W.V.
B FRAMING ROUGH / WATER
- ROOF'& SHEEF u pLYwooD NAILING GAS PIPING _
tr INSULATION
tr SHEETROCK
I]-
POOL / H. TUB
NAlL
tr FINAL tr FINAL
ELECTRICAL:
tr TEMP. POWER
MEGHANIGAL:
tr HEATING
tr ROUGH tr EXHAUST HOODS
tr CONDUIT
E
tr SUPPLY AIR
tr_
tr FINAL tr FINAL
d tr DISAPPROVED tr REINSPECTION REQUIRED
\$o \-\\ros
JOB NAME
CALLEF
INSPECTION:MON TUES
:?=|!FlE:!q4l tF'r :F ,,1
ION REQUEST
TOWN OF VAIL
r".\N \ t N\N\
PERMIT NUMBER OF PROJECT
THUR FRI PM READY FOR
LOCATION:)
BUILDING:
tr FOOTINGS / STEEL
PLUMBING:
tr UNDERGROUND
tr ROUGH / D.W.V.tr FOUNDATION / STEEL
tr FRAMING tr ROUGH/WATER
n ROOF & SHEER - PLYWOOD NAILING tr GAS PIPING
tr INSULATION tr POOL/H.TUB
tr SHEETHOCK NAIL
E
B
n
tr FINAL tr FINAL
ELECTRIGAL:
tr TEMP. POWEF
MECHANICAL:
tr HEATING
tr FOUGH tr EXHAUST HOODS
tr CONDUIT tr SUPPLY AIR \\
rh \x--slXsqsvs\sLbel. rr
tr FINAL
U
7?tr DISAPPFOVED tr REINSPECTION REQUIRED Q A'tsl'll(JvEv-/-l+
CORREGTIONS: -t.)r,
oo* V-t - ,37 rNspEcr
1',V-/ /. I
-4- A ln k (-, .' v Lr *
-L/Y- JoB NAME
* ,,1
INSPECTION REQUEST , TOWN OF VAIL
? 11. ,':'sri* ?t:'
DATE
READY FOR
LOCATION:
INSPECTION:MON
CALLER
TUES
tr FOUNDATION / STEEL
tr GAS PIPING
tr INSULATION
tr SHEETROCK
tr HEATING
tr SUPPLY AIR -
tr DISAPPROVED T] FEINSPECTION REOUIFED
\
.1.. ,t '{ .,"-
r ,_.i
/4
INSPECTION REQUEST
TOWN OF VAIL PERMIT NUMBER OF PROJECT
DATE
READY FOR
LOCATION:
INSPECTION/
JPB NAME
MON
-i:/:-
4-
-_l
I-,CALLER
TUES @r THUR FRI PM
_,i .a
/..,-.1-'_
.i'-
BUILDING: i
tr FOOTINGS / STEEL
PLUMBING:
tr UNDEBGROUND
tr ROUGH / D.W.V.
tr ROUGH / WATER
tr FOUNDATION / STEEL
tr FRAMING
,- ROOF & SHEER " PLYWOoD NAILING tr GAS PIPING
tr INSULATION tr POOL/ H. TUB
tr SHEETROGK NAIL
E
tr
n
tr FINAL tr FINAL
ELECTRIGAL:MECHANICAL:
tr TEMP.
d,"noucn
tr HEATING
tr EXHAUST HOODS
tr CONDUIT
n
T] SUPPLY AIR
n
tr FINAL tr FINAL
tr DISAPPROVED tr REINSPECTION REQUIRED
CORRECTIONS:
,.; ')
.t_ /
DATE INSPEGTOR
''-\ ','/. i'.'it
PERMIT NUMBEB OF PROJECT
DATE JOB NAME
INSPECTION:MON
t
INSPECTION REQUEST
TOWN OF VAIL
CALLER
READY FOR
LOCATION:
ruES r" JFt,THUR FRI
!:" ll
-3 .' t:, d
n Appnoveo .-:" [,'
I GORRECTTONS:
tr DISAPPROVED tr REINSPECTION REQUIRED
BUILDING:PLUMBING:
tr UNDERGROUND
tr HOUGH / D.W.V.
tr ROUGH/WATEB
tr FOUNDATION / STEEL
tr
tr
tr
tr
n
FRAMING
ROOF & SHEER
PLYWOOD NAILING tr GAS PIPING
INSULATION
SHEETROCK
tr POOL/ H. TUB
NAIL tr
r'l
tr FINAL T] FINAL
ELECTRICAL:
tr TEMP. POWER
MECHANICAL:
tr HEATING
tr ROUGH
I tr EXHAUST HOODS
tr CONDUIT
n
tr SUPPLY AIR
n
tr FINAL tr FINAL
.-"1
DATE INSPECT
I
PECTION REQUEST
VAIL PERMIT NUMBER OF PROJECT
DATE
TNSPFQTION:
JOB NAME
CALLER
MON TUES WED THUR FRI
TOWN OF f
PM READY FOR
LOCATION:-i,;' ,1 . l'?,:,.-4-E-L.*j.z*
t' ,,:. ; 11 APPROVED .4 .7'.1i tr DISAPPROVED tr REINSPECTION BEQUIRED
BUILDING:
tr FOOTINGS / STEEL
PLUMBING:
tr FOUNDATION / STEEL
tr
tr
tr
tr
tr
tr
r-l
UNDERGROUND
ROUGH / D.W.V.
ROUGH / WATER tr
tr
tr
tr
D
FRAMING
ROOF & SHEER
PLYWOOD NAILING GAS PIPING
INSULATION
SHEETROCK
POOL / H. TUB
NAIL
tr FINAL tr FINAL
ELECTRICAL:
tr TEMP. POWER
MEGHANIGAL:
tr HEATING
,dnouon tr EXHAUST HOODS
tr CONDUIT tr SUPPLY AIR
tr
N FINAI r't trtNAl
CORRECTIONS: -
DATE
? (7 ".', ../-'-4. i] L"INSPECTION REQUEST
TOWN OF VAIL PERMIT NUMBER OF PROJECT
DATE
READY FOR INSPECTION:
JOB NAME
CALLER
MON TUES WED ( THUR,-, FRI AM &!
i.; r)/'-.
LOCATION:
BUILDING:
tr FOOTINGS / STEEL
PLUMBING:
tr UNDERGROUND
tr ROUGH / D.W.V.tr FOUNDATION / STEEL
tr FRAMING tr ROUGH / WATER
n ROOF & SHEEB - PLYWOOD NAILING tr GAS PIPING
tr INSULATION C] POOL / H. TUB
tr SHEETROCK NAIL
n
tr
n
tr FINAL tr FINAL
ELEGTRIGAL:
tr TEMP. POWER
ilIECHANICAL:
tr HEATING
tr ROUGH tr EXHAUST HOODS
.QtoNourr
n
T] SUPPLY AIR
n
T] FINAL tr FINAL
APPROVED
GORRECTIONS:
tr DISAPPROVED tr REINSPECTION REQUIRED
cNSPECTOR DATE
t.I
INSPECTION TOWN OF
. ,- t
REQUEST
VAIL PERMIT NUMBER OF PROJECT
DATE
INSPECTION:
CALLER
MON TUES WED THUR PM AM FRI READY FOR
LOCATION:: !
,- .i-- -,
BUILDING:
B FOOTINGS / STEEL
PLUMBING:
tr UNDERGROUND
tr ROUGH / D,W.V.tr FOUNDATION / STEEL
tr FRAMING tr ROUGH / WATER
n ROOF & SHEER " PLYWOOD NAILING tr GAS PIPING
tr INSULATION tr POOL/ H. TUB
tr SHEETROCK NAIL tr
tr tr
T] FINAL tr FINAL
ELECTRICAL:
tr TEMP. POWER
MEGHANIGAL:
tr HEATING
tr ROUGH tr EXHAUST HOODS
CONDUIT tr SUPPLY AIR
tr tr
tr FINAL tr FINAL
-
'.tr APPROVED
, CORRECTIONS:
tr DISAPPROVED
'.'/T] REINSPECTION REQUIRED
DATE INSPECTOR
PERMIT NUMBER OF PROJECT
DATE JOB NAME
CALLER
\ MON TUES WED THUR FRI
INSPECTION REOUEST
VAIL
AM /r*.$t'READY FOR
LOCATION:
INSPECTION:
'.rF'APPROVED -
' CORHECTIONS:
t/"tr DISAPPROVED tr BEINSPECTION REQUIBED
BUILDING:PLUMBING:
tr
tr
tr
tr
tr
tr
tr
FOOTINGS
FOUNDATI
FRAMING
/ STEEL tr UNDERGROUND
ON / STEEL tr ROUGH / D,W.V.
tr ROUGH/WATER
ROOF & SHEER
PLYWOOD NAILING tr GAS PIPING
INSULATION trPO OL / H. TUB
SHEETROCK NAIL
tr FINAL tr FINAL
ELECTRIGAL:MECHANICAL:
tr TEMP. POWER tr HEATING
q.Lnoucn tr EXHAUST HOODS
tr CONDUIT tr SUPPLY AIR
tr
tr FINAL tr FINAL
DATE INSPECTOR
INSPECTION REQUEST
TOWN OF VAIL
- ' / r'r .' -, .l-ra-
-
DATE
READY FOR
LOCATION:
INSPECTION:M THUR FRI
-:.:--
BUILDING:
tr FOOTINGS / STEEL
tr FOUNDATION / STEEL
tr FRAMING
n ROOF & SHEER - PLYWOOD NAILING
tr INSULATION
-
tr SHEETROCK NAIL
n
tr FINAL
ELEGTRIGAL:
tr TEMP. POWER
tr ROUGH
tr CONDUIT
tr
tr FINAL
tr FOUNDATION / STEEL
tr FRAMING
PLUMBING:
tr UNDERGROUND
tr ROUGH / D,W.V.
tr ROUGH/WATER
n ROOF & SHEER - PLYWOOD NAILING tr GAS PIPING
tr INSULATION tr POOL/ H, TUB
tr SHEETROCK NAIL tr
tr FINAL
MECHANICAL:
tr HEATING
tr EXHAUST HOODS
tr SUPPLY AIR
tr FINAL
iE APPROVED
CORRECTIONS:
tr DISAPPROVED tr REINSPECTION BEQUIRED
-'".' :.INSPECTOR DATE
PERMIT NUMBEB OF PROJECT
READY FOR INSPECTION:
INSPECTION REQUEST
TOWN OF VAIL
MON THUB FRI AM PM
VAIL
LOCATION::- - --. .?
BUILDING:
tr FOOTINGS / STEEL
tr
tr
tr
tr
tr
tr
tr
FOUNDATION / STEEL
FRAMING
ROOF & SHEEB
PLYWOOD NAILING
INSULATION
SHEETROCK NAIL
FINAL
PLUMBING:
tr UNDERGROUND -
tr ROUGH / D.W.V. _
tr ROUGH/WATER -
tr GAS PIPING
-tr POOL / H. TUB
-n
Fl
-
tr FINAL
-
MECHANICAL:
tr HEATING
tr EXHAUST HOODS
tr SUPPLY AIR
-r-l
'
ELECTRICAL:
tr TEMP. POWER
tr ROUGH
F'CONDUTT
tr FINAL tr FINAL
F,APPROVED
CORRECTIONS:
tr DISAPPROVED tr REINSPECTION REQUIRED
DATE i1 INSPECTOR
-,=
-l\
^\.
-"
\
-.\PECTION \REQUEST
TOWN OF'VAIL
:.
AM
tNs
FRI
I
PERMIT NUMBER OF PROJECT
. JOB NAME DATE
PM MON
CALLER
TUES WED THUR READY FOR
LOCATION:
INSPECTION:
BUILDING: PLUMBINGT
tr FOOTINGS / STEEL tr UNDERGROUND
tr FOUNDATION / STEEL tr ROUGH / D.W.V.
tr FRAMING tr ROUGH / WATER
ROOF & SHEER
PLYWOOD NAILING
INSULATION tr POOL/ H. TUB
SHEETROCK NAIL
-
tr
-tr
u
tr
u
tr
tr GAS PIPING
tr FINAL tr FINAL
ELECTRICAL:
tr TEMP. POWER
MECHANICAL:
tr HEATING
tr ROUGH tr EXHAUST HOODS
F CONDUTT tr SUPPLY AtR
mFl
tr FINAL tr FINAL
tr APPROVED
CORBECTIONS:
tr DISAPPROVED tr REINSPECTION REQUIRED
DATE INSPECTOR
tl' Drlnbry/wll
o
PE tNs CTION REQUEST
TOWN OF VAIL PERMIT NUMBEB OF PBOJECT
DATE ' - ," JOB NAME i ! "--'.
CALLER
READY FOR
LOCATION:
INSPECTION: MON TUES WED
BUILDING:
tr FOOTINGS / STEEL
PLUMBING:
tr UNDERGROUND
tr FOUNDATION / STEEL tr ROUGH / D.W.V.
tr ROUGH/WATER tr FRAMING
n ROOF & SHEER - PLYWOOD NAILING tr GAS PIPING
tr INSULATION tr
tr
tr
POOL / H. TUB
tr SHEETROCK NAIL
tr
tr FINAL tr FINAL
ELEGTRIGAL:
tr TEMP. POWER
MECHANICAI.:
tr HEATING
tr ROUGH tr EXHAUST HOODS
!tr CONDUIT tr SUPPLY AIR
tr tr
tr FINAL tr FINAL
1tr APPROVED
CORRECTIONS:
tr DISAPPROVED tr REINSPECTION REQUIRED
DATE INSPECTOR
INSPECTION REQUEST
TOWN OF VAIL
. | .-i i t..'CALLER
TUES READY FOR
LOCATION:
INSPECTION:MON
'-.,.2- -- tl
WED THUH { -- /-'.
) ''* - t t-
FRI AM ,,'
PERMIT NUMBER OF PROJECT
oere L.'l ' i i, I.loe
BUILDING:
tr FOOTINGS / STEEL
PLUMBING:
tr UNDERGROUND
tr ROUGH / D.W.V.tr FOUNDATION / STEEL
tr FRAMING tr BOUGH/WATER
n HOOF & SHEER " PLYWOOD NAILING tr GAS PIPING
tr INSULATION tr
tr
tr
tr
POOL / H. TUB
tr SHEETROCK NAIL
tr
tr FINAL FINAL
ELECTRICAI.:
tr TEMP. POWER
MECHANICAL:
tr HEATING
tr
b
tr
ROUGH tr EXHAUST HOODS
CONDUIT tr SUPPLY AIR
tr FINAL
tr
tr FINAL
E APPROVED
CORRECTIONS:
tr REINSPECTION REQUIRED tr DISAPPROVED
/--,..'7 'l'-..,r'::.,' '.. .
INSPECTOR
t
DATE
-j ,r.', i"'
PERMIT NUMBER PROJECT
DATE
READY FOR
LOCATION:
OF
:
BUILDING:
tr FOOTINGS / STEEL
PLUMBING:
tr UNDERGBOUND
tr ROUGH / D.W.V.tr FOUNDATION / STEEL
tr FRAMING tr ROUGH / WATER
n ROOF & SHEER " PLYWOOD NAILING tr GAS PIPING
tr INSULATION tr POOL/ H. TUB
tr SHEETROCK NAIL
n
tr
r'1
tr FINAL tr FINAL
ELECTRICAL:
tr TEMP. POWER
MECHANICAL:
tr HEATING
tr FOUGH tr EXHAUST HOODS
tr coNDUtr
n
tr SUPPLY AIR
n
tr FINAL tr FINAL
EI APPROVED
CORRECTIONS:
';;:;.'e'tr DISAPPROVED tr REINSPECTION REQUIRED
DATE
I
INSPECTION REOUEST
PERMIT NUMBER OF PROJECT
' ':;' ''' ' -1 DATE - '- ' .' JOB NAME
READY FOR INSPEGTION:
LOCATION:
THUR FRI AM PM
BUILDING:
tr FOOTINGS / STEEL
PLUMBING:
tr UNDERGBOUND
tr ROUGH / D.W.V.
tr ROUGH/WATER
I] FOUNDATION / STEEL
tr FRAMING
rr ROOF & SHEER " PLYWOOD NAILING tr GAS PIPING
T] INSULATION
T] SHEETROCK
n
tr POOL/ H. TUB
NAIL E]
n
tr FINAL tr FINAL
ELEGTRIGAL:
T] TEMP. POWER
MEGHANICAL:
tr HEATING
tr ROUGH E] EXHAUST HOODS
b cououtr
n
tr SUPPLY AIR
E-
tr FINAL tr FINAL
\]hppRovED .-"' .tr DISAPPROVED tr REINSPECTION BEQUIRED
CORRECTIONS:
DATE INSPECTOR
INSPE o
N
REOUEST
VAIL
N
OF
'. i:-
o
8t. r.
rl
W
;T
9v
t€
c
T(PEBMIT NUMBER OF PROJECT
D^TE IO-?._.fV JOB NAME
READY FOR
LOCATION:
INSPECTION: MON
-t"Q
CALLER
TUES THUB
tr FOUNDATION / STEEL
PLUMBING:
tr UNDERGROUND
tr ROUGH / D.W.V,
tr FRAMING tr ROUGH / WATER
tr ng.-q5gsisFl tr GAS PIPING
POOL / H. TUB ULATION
FINAL
tr HEATING
tr CONDUIT ;'tr SUPPLY AIR
tr APPFOVED
CQRRECTIONS:
tr DISAPPROVED tr REINSPECTION REQUIRED
DATE INSPECTOR
i: l
EUILDING:
tr FOOTINGS / STEEL
g FOUNDATION / 9TEEL
tr FBAMING
n ROOF & SHEEB * PLYWOOD NAILING
tr FINAL
tr BOUGH
tr CONDUIT
tr
g,E!A!
OVED
}TIONS:
tr FEINSPECTION FEQUIFED
T NUMBER OF PROJECT
INSPECTION TOWN OF
REQUEST
VAIL PERMI
DATE NAME t" . .-,
READY FOB
LOCATION:
BUILD!NG:
tr FOOTINGS / STEEL
PLUMBING:
E] FOUNDATION / STEEL
T] UNDERGROUND
tr ROUGH / D.W.V.
tr ROUGH/WATER tr FRAMING
n ROOF & SHEER - PLYWOOD NAILING tr GAS PIPING
tr INSULATION
tr SHEETROCK
tr_
t] POOL / H. TUB
NAIL tr
tr FINAL tr FINAL
ELEGTRICAL:
tr TEMP. POWER
MECHANICAL:
tr HEATING
.H'nouen tr EXHAUST HOODS
T] CONDUIT
tr_
E] SUPPLY AIR
tr_
tr FINAL tr FINAL
fE'neeBovED_ ,tr DISAPPROVED tr REINSPECTION REQUIRED
CORRECTIONS:
oerc ,/ ti' - J tf iF -V rNspEcroR
;TION
OWN OF
IN :il,REQUEST
VAIL
'FRl , '.AM\'I READY FOR INSPFCTION:
LOGATION:
tsUILDING:
tr FOOTINGS / STEEL
PLUMBING:
tr UNDERGROUND
tr ROUGH / D.W.V.tr FOUNDATION / STEEL
tr FRAMING tr ROUGH / WATER
n ROOF & SHEER " PLYWOOD NAILING tr GAS PIPING
tr INSULATION tr POOL/ H, TUB
tr SHEETROCK NAIL
r-ll ----.E+i5:-=$-r ,.
tr FINAL tr FINAL
ELECTRICAL:
tr TEMP. POWER
MEGHANICAL:
T] HEATING
tr ROUGH tr EXHAUST HOODS
tr CONDUIT
n'
T] SUPPLY AIR
r]
tr FINAL tr FINAL
PROVED tr DISAPPROVED tr REINSPECTION REQUIRED
CORREGTIONS:
INSPECTO
INSPECTION
TOWN OF :\--..
REOUEST
VAIL PERMIT N
DATE
READY FOR
LOCATION:
INSPECTION:
JOB NAME
MON
CALLER
TUES WED THUR AM ZPE
BUILDING:
tr FOOTINGS / STEEL
PLUMBING:
tr UNDEBGROUND
E] ROUGH / D.W.V.tr FOUNDATION / STEEL
I !l
ErFRAMING'w.:..1--tc.t-r.oG- r_1{r}\\
U tr ROUGH/WATER
n ROOF & SHEER - PLYWOOD NAILING tr GAS PIPING
tr INSULATION tr POOL/ H. TUB
F-sHEErR OCK NAIL tr
tr tr
tr tr FINAL FINAL
ELECTRICAL:
tr TEMP. POWER
MEGHANIGAL:
tr HEATING
tr ROUGH I] EXHAUST HOODS
tr CONDUIT
n
tr SUPPLY AIB
tr
B FINAL tr FINAL
APPROVED
)RRECTIONS:rL-
tr
\
tr REINSPECTION REQUIRED .t
t-2
NUMBER OF PROJECT
]NSPECTION REOUEST
TOWN OF VAIL
PM AM MON
CALLER
TUES WED ,"fHUF--',FRl t'-------/
TOWN OF
,-, I .- | . -.DATE d.-:l :.1 >: / JOB NAME rf
READY FOR
LOCATION:
INSPECTION:
BUILDING:
tr FOOTINGS / STEEL
PLUMBING:
tr UNDEBGROUND
T] FOUNDATION / STEEL H / D.W.V.
tr FRAMING tr
tr
tr
t]
l-l
ROUGH / WATER
- ROOF & SHEER u PLYWooD NAtLING GAS PIPING
tr INSULATION
tr SHEETROCK
D
POOL / H. TUB
NAIL
tr FINAL T] FINAL
ELECTRICAL:
tr TEMP. POWER
MECHANICAL:
tr HEATING
T] ROUGH tr EXHAUST HOODS
tr CONDUIT
n
tr SUPPLY AIR
n
T] FINAL tr FINAL
tr DISAPPROVED
- 4r+l-.
tr REINSPECTION REQUIRED
RRECTIONS: ll -
f1 -,, I d'' tj"dt*f t
INSPECTION
TOWN OF
heouesr
VAIL PERMIT NUMBER OF PROJECT
pals /,:1/'7,{,rl JOB NAME , .ti :. ,!
INSPECTION:
CALLER
TUES
.}---+-rr
g MON.- )WED THUR FRI AM PM READY FOR
LOCATION:
/l
BUILDI NG:PLUMBING:
tr
tr
tr
tr
tr
FOOTINGS / STEEL tr
tr
tr
tr
tr
tr
UNDERGROUND
ROUGH / D.W.V.
ROUGH / WATER
FOUNDATION / STEEL
FRAMING
ROOF & SHEER
PLYWOOD NAILING GAS PIPING
INSULATTON POOL / H. TUB
$meernocx NAIL
tr tr
tr FINAL tr FINAL
ELECTRICAI-:
tr TEMP. POWER
MEGHANICAL:
tr
tr
tr
tr
HEATING
tr
tr
tr
ROUGH EXHAUST HOODS
CONDUIT SUPPLY AIR
qlfrNAL tr FINAL
APPROVED tr DISAPPROVED tr REINSPECTION REQUIHED
CORRECTIONS:
tro..,L[L L. u
ohJ
C- I C*"{,
a L^,o
Y€?[^-,A..,
l^ ut.
>ts
Al-'
- -t *, I
)
INSPECTION REQUEST
TOWN OF VAIL
INSPECTION:
JOB NAME
MON
CALLER
TUES WED THUR FRI PM AM READY FOR
LOCATION:
PERMIT NUMBER OF PROJECT
BUILDING:
tr FOOTINGS / STEEL
PLUMBING:
tr UNDERGROUND
tr ROUGH / D.W.V.tr FOUNDATION / STEEL
E ROUGH/WATER
; BOOF & SHEER " PLYWooD NAILING tr GAS PIPING
tr INSULATION tr POOL/ H. TUB
ELECTRICAI.:
tr TEMP. POWER tr HEATING
VED
RREGTIONS:
tr DISAPPROVED tr REINSPECTION REOUIRED
agLsL, INSPECTION REQUEST
PERMIT NUMBER oF PRoJEcT TOWN OF VAIL rt\"--_
oare [Ql\-l \t-t JoB NAME L]-].t\uuo'--T-*-u'.*.* ,"-*,^n,,-\
r. rJ
CALLER
READY FOB
LOCATION:
INSPECTION:MoN ruES weo t{ffi) rnr AM@
BUILDING:
tr FOOTINGS / STEEL
PLUiIBING:
tr UNDERGROUND
tr ROUGH / D.W.V.tr FOUNDATION / STEEL
tr-FHAMING tr ROUGHIWATER
r-1 ROOF & SHEER - PLYWOOD NAILING tr
tr
tr
n
GAS PIPING
tr INSULATION POOL / H. TUB
$nerrnocK NAIL
tl
tr FINAL E] FINAL
ELEGTRICAL:MECHANICAL:
tr
tr
tr
tr
TEMP. POWER tr
tr
tr
tr
HEATING
ROUGH EXHAUST HOODS
CONDUIT SUPPLY AIR
tr FJNAL tr FINAL
FJ tr DISAPPROVED tr REINSPECTION REQUIRED
RRECTIONS:
o
INSPE CTION
TOWN OF
REOUEST
VAIL PERMIT NUMBER OF PROJECT
.. i...'\ t,'ii
t'''.i-:-=--.
l:
FEADY FOR
LOCATION:
I[.TI.SPECTION:MO.N
CALLER
TUES i;Hiii-FRI WED ,.--si:-\( PM'-/-
i::-l
AM
''":.. . -"'! r'4.- \
PLUMBING:
tr UNDERGROUND
tr FOUNDATION / STEEL
n ROOF & SHEER " PLYWOOD NAILING
tr INSULATION
tr SHEETBOCK
tr
tr
tr
tr
tr SUPPLY AIR
OVED
RRECTIONS:
tr DISAPPROVED tr REINSPECTION REQUIRED
PERMIT NUMBER OF PROJECT
a-f 61 a
INSPECTION
TOWN OF
oo* t-/ts/t1 JOB NAME
REQUEST
VAIL
lh-
READY FOR
LOCATION:
INSPEGTION:
CALLER
TUES WED UR FRI
tr FOUNDATION / STEEL
PLUMBING:
tr UNDERGROUND
:@ ROUGH / D.W.V.
n ROOF & SHEER - PLYWOOD NAILING
&floucH / wArER
GAS PIPING
tr INSULATION POOL / H. TUB
tr
tr
tr
tr
tr
tr SUPPLY AIR
tr DISAPPROVED tr REINSPECTION REQUIHED
REQUEST
VAIL
DATE
BEADY FOR
LOCATION:
JOB NAME
INSPECTION:
CALLER
(ffiDrues WED THUR FRI ,%il-\ pv
PERMIT NUMBER OF PROJECT
INSPECTION
TOWN OF
BUILDING:
tr FOOTINGS / STEEL
PLUMBING:
tr FOUNDATION / STEE-
tr UNDERGROUND
tr ROUGH / D.W.V.
tr ROUGH/WATER
tr GAS PIPING
tr INSULATION
tr SHEETROCK
tr POOL/ H. TUB
NAIL tr
tr tr
E tr FINAL FINAL
ELEGTRICAL:
tr TEMP. POWER
MEGHANICAL:
tr HEATING
tr ROUGH tr EXHAUST HOODS
tr CONDUIT
n
T] SUPPLY AIR
L'l
,, {*ot ';tr FINAL
/,c IPPROVED
RRECTIONS:
tr DISAPPROVED tr REINSPECTION REQUIRED
t
REQUEST
VAIL
NAME
READY FOR
LOCATION:
INSPECTION: 7fiffi'\rUes WED THUR \-*..---r'FRI AM PM
PERMIT NUMBER OF PROJECT
oere F, tlSil'LB uoe
tr FOUNDATION / STEEL
PLUMBING:
tr UNDERGROUND
tr ROUGH / D.W.V.
tr ROUGH/WATER tr FRAMING
n ROOF & SHEER - PLYWOOD NAILING tr GAS PIPING
tr INSULATION .tr POOL/ H. TUB
tr SHEETROCK NAIL
tr
tr
tr
tr
tr HEATING
tr EXHAUST HOODS
tr SUPPLY AIR
OVED
'coRREcIoNs:
tr DISAPPROVED tr REINSPECTION REQUIRED
2 - ?'-o-.{, -}on i^'--
e.bp
l!oRTE I-/5 r'tr rNsPEcroi It
I
^.-\r I ' I \r' I ^( n r-d. (\l (l s {-r.
PERMIT NUMBER OF PROJECT
t
INSPECTION
TOWN OF
REQUEST
VAIL
DATE
READY FOR
LOCATION:
JOB NAME
INSPECTION:WED THUR FRI
-*--@PM
BUILDING:
tr FOOTTNGS / STEEL
PLUMBING:
tr UNDERGROUND
tr ROUGH / D.W.V.
tr ROUGH/WATER
tr FOUNDATION / STEEL
ROOF & SHEER
PLYWOOD NAILING tr GAS PIPING
E POOL/ H. TUB
tr
tr
tr
tr
tr HEATING
tr SUPPLY AIR
PROVED
CORRECTIONS:
tr DISAPPROVED tr REINSPECTION REQUIRED
(-F<-lt4rr
o
PERMIT NUMBER OF PROJECT
DATE I 1
INSPECTION REQUEST
FRI
JOB NAME
ON
i -r L.'
READY FOR
LOGATION:
INSPECTION:ruEs 1.wQ rH PM AM
l. I ,,{ LL-1"1,tr-lr I "_- ,,71 ,i ,_( t r4-
Z.t, a
BUILDING:
tr FOOTINGS / STEEL
PLUMBING:
tr UNDERGROUND
EROUGH / D.W.V.tr FOUNDATION / STEEL
tr FRAMING tr ROUGH/WATER
n ROOF & SHEER - PLYWOOD NAILING tr GAS PIPING
tr INSULATION
tr SHEETROCK NAIL
tr u
tr tr FINAL FINAL
ELECTRICAL:
tr TEMP, POWER
MECHANICAL:
tr HEATING
tr ROUGH tr EXHAUST HOODS
tr CONDUIT tr SUPPLY AIR
tr tr
tr FINAL tr FINAL
POOL / H. TUB
I] APPROVED
GORBECTIONS:
tr DISAPPROVED
ur ll= i
tr REINSPECTION REQUIRED
INSPECTION REOUEST
TOWN OF VAIL PERMIT NUMBER OF PROJECT i ^t DATE T I V. L tT JoB NAME
READY FOR
LOCATION:
INSPECTION:MON ,^u^'t@ CALLER
TUES WED
TOWN OF
BUILDING:
T] FOOTINGS / STEEL
PLUMBING:
tr FOUNDATION / STEEL
tr
tr
tr
tr
E]
u
r-1
UNDERGROUND
ROUGH / D.W.V.
@rnnurrue ROUGH / WATER
r-1 ROOF & SHEER - PLYWOOD NAILING GAS PIPING
ffisumrroru POOL / H. TUB
@snerrnocK NArL
tr
tr FINAL tr FINAL
ELEGTRICAL:
tr TEMP, POWER
MECHANIGAL:
tr HEATING
tr ROUGH tr EXHAUST HOODS
tr CONDUIT
n
tr SUPPLY AIR
n
tr FINAL tr FINAL
PROVED
TECTIONS:
tr DISAPPROVED tr REINSPECTION REOUIRED
r
_t_alr.ee-I Ii;.-l- !':*i-o
e
PERMIT N UMBER OF PROJECT
INSPECTION REQUEST
TOWN OF VAIL
" | \ \----,
V.Jst'{i -^* \ e.v r,rrt < '"}l ',i'<.-DATE
READY FOR
LOCATION:
JOB NAME
CALLER l3oL.-: R -
INSPECTION:MoN g- ,WED THUR FRI AM 6,
tr UNDERGROUND
-
tr FOUNDATION / STEEL tr ROUGH / D.W.V.
tr ROUGH/WATER
-n ROOF & SHEER - PLYWOOD NAILING tr GAS PIPING
tr POOL/H.TUB
SHEETROCK NAIL
tr EXHAUST HOODS
tr SUPPLY AIR
APPROVED
CORRECTIONS:
tr DISAPPROVED tr REINSPECTION REQUIRED
rl r | (r_rF-lt Li s- L .e ,l{-\ t,r r-4 :--\ tJJ r r.",r,
PERMIT NUM
DATE
o
INSPECTION REOUEST
VAIL
,1,:
INSPECTION:
JOB NAME
MON READY FOR
LOGATION:
WEo AM - i' PM )--
\*.,_.*-."
BER OF PROJECT
-
tr UNDERGROUND
tr FOUNDATION / STEEL tr ROUGH / D.W.V.
tr ROUGH/WATER
ROOF & SHEER tr GAS PIPING PLYWOOD NAILING
-INSULATION E POOL/ H. TUB
tr
tr
tr
B
tr
MEGHANICAL:
tr HEATING .:-"\- t
ffr+rrAusr #5i=-
tr SUPPLY AIR
\-),.7
tr DISAPPROVED tr REINSPECTION REQUIRED
.:.:1.,1:,., e
?,E[.,r{lr
PERMIT NUMBER OF PROJECT
INSPECTION REQUEST
CALLER
MoN i@ wED rHUR FRI AM @>
TOWN OF VAIL
tl
DATE U t, -:.1 -Fd4 _ JoB NAME -'.'--"t,ts._+.i+*-
READY FOR
LOCATION:
INSPEGTION:
BUILDING:
tr FOOTINGS / STEEL
PLUMBING:
tr FOUNDATION / STEEL
tr UNDEBGROUND
tr ROUGH / D.W,V.
tr ROUGH/WATER ET,fRAMING
n ROOF & SHEER - PLYWOOD NAILING tr GAS PIPING
tr INSULATION tr POOL/H.TUB
DSHEETRooK NA|L tr
tr tr
tr FINAL tr FINAL
ELECTRICAI-:MECHANICAL:
tr
tr
tr
tr
TEMP. POWER tr HEATING
ROUGH tr EXHAUST HOODS
CONDUIT tr SUPPLY AIR
tr
tr FINAL T] FINAL
tr DISAPPROVED .t tr REINSPECTION REQUIRED
RRECTIONS:
?3€A
o
INSPECTION REQUEST
TOWN OF VAIL
'.?
' i''"f L '"-!.- f'l)' / ,tp ,t
-
,)-',t_
--'-l
"'-,PM ,,i*- -u
PERMIT NUMBER OF PROJECT
DATE ? i': -:tt it JoB NAME
CALLER
TUES
t--7
WED FRI
?-<
fl.
READY FOR
LOCATION:
INSPECTION: , MON
.P ?ttf fv'n,
THUF
,€ f,!t t
tr FOUNDATION / STEEL
PLUMBINGT
E] UNDERGROUND
tr ROUGH / D.W.V.
tr
u
tr
tr
tr
tr
T] ROUGH / WATER
ROOF & SHEER
PLYWOOD NAILING tr GAS PIPING
INSULATION
SHEETROCK
ELECTRICAL:
tr TEMP. POWER tr HEATING
tr SUPPLY AIR
,""F$eenovED -{- CoRRECTIONS:
-
tr DISAPPROVED tr REINSPECTION REQUIRED
oor,. ,"./ - ! ,) ).' ,,:), tNspEcroR
tno pdnbry/eat
I
INSPECTION REQUEST
TOWN OF VAIL PEBMIT NUMBER OF PROJECT
DATE
INSPECTION:MON
JOB NAME
CALLER
TUES PM FRI AM READY FOR
LOCATION:
WED /THUR-i
BUILDING:
tr FOOTINGS / STEEL
PLUMBING:
tr FOUNDATION / STEEL
tr
tr
tr
tr
tr
tr
n
UNDERGROUND
ROUGH / D.W.V.
ROUGH / WATER TEEAMING
; ROOF & SHEER . PLYWOOD NAILING GAS PIPING
tr INSULATION
ESFTEETRoCK
tr_
POOL / H. TUB
NAIL
tr FINAL tr FINAL
ELEGTRICAL:
tr TEMP. POWER
MEGHANICAL:
tr HEATING
tr ROUGH tr EXHAUST HOODS
tr CONDUIT
E
tr SUPPLY AIR
tr
tr FINAL tr FINAL
,r(nt 5 tr DISAPPBOVED tr REINSPECTION REQUIRED
CORRECTIONS:
INSPECTION REQUEST
TOWN OF VAIL
DATE
READY FOR
LOCATION:
INSPECTION:
JOB NAME
CALLER
WED THUR l,ffir.., pvr FRl.x
PERMIT NUMBER OF PROJECT
BUILDING:PLUMBING:
tr UNDERGROUND
tr ROUGH / D.W.V.
tr FOOTINGS / STEEL
tr FOUNDATION / STEEL
tr FHAMING tr ROUGH/WATER
,-1 ROOF & SHEER - PLYWOOD NAILING tr GAS PIPING
tr INSULATION -tr POOL/ H. TUB
tr SHEETROCK NAIL tr
tr tr
T] FINAL tr FINAL
ELEGTRICAL:
tr TEMP. POWER
MECHANICAL:
tr HEATING
tr ROUGH tr EXHAUST HOODS
tr CONDUIT tr SUPPB\, AIH
tr tr
tr tr F'NAL
J tr DISAPPROVED ' tr REINSPECTION REQUIRED
RRECTIONS:
"i, ?r_ ,^,.,^. .Dr_o, Ffu^--_
?,t,,&/.-, o
PERMIT NUMBER OF PROJECT
READY FOR
LOCATION:
INSPECTION:
JOB NAME
MON
_t.- 1
CALLER 9V\
\t -i.<-\
INSPECTION REQUEST
TOWN OF VAIL
DATE rN?1/g';-
rues 1GJ-) rHun PM FRI AM
tr FOUNDATION / STEEL
PLUMBING:
tr UNDERGROUND
tr ROUGH / D.W.V,
gfioueul wArER
n ROOF & SHEER " PLYWOOD NAILING tr GAS PIPING
tr POOL/H.TUB
tr
tr
tr
tr
tr HEATING
tr EXHAUST HOODS
tr SUPPLY AIR
OVED
RRECTIONS:
tr DISAPPROVED tr REINSPECTION REQUIRED
tk
DK
I
PE tNs CTION
TOWN OF
REOUEST
VAIL
JOB NAME
MON
r& C+ Lr-r t Yr \<
CALLER
READY FOR
LOGATION:
INSPECTION:rues e@) rnun PM AM FRI
-
L.1 .J \.-.:. \},
PERMIT NUMBER OF PROJEET
oare tl?,-1 l8B
BUILDING:
tr FOOTINGS / STEEL
PLUMBING:
tr UNDERGROUND
tr FOUNDATION / STEEL tr ROUGH / D.W.V, -
tr FRAMING tr ROUGH/WATER
n ROOF & SHEER " PLYWOOD NAILING tr GAS PIPING
F$tsuurrou tr POOL/H.TUB
@reernocK NAIL tr
tr u
tr FINAL tr FINAL
ELECTRICAL:
t] TEMP. POWER
MECHANIGAL:
tr HEATING
tr ROUGH tr EXHAUST HOODS
tr CONDUIT tr SUPPLY AIR
tr
tr FINAL tr'FINAL
)tr DISAPPROVED tr REINSPECTION REQUIRED
RRECTIONS:
dK
ol6i
e*=\ .'r,ri..J sps,..(\*.In^16'K G..A q {=. r-,
DATE
READY FOR
LOCATION:
JOB NAME
INSPECTION:MON TUES WED THUR FRI PM AM
tr FOUNDATION / STEEL tr ROUGH / D.W.V,
-tr FRAMING tr ROUGH/WATER
n ROOF & SHEER " PLYWOOD NAILING tr GAS PIPING
POOL / H. TUB
tr HEATING
tr SUPPLY AIR
APPROVED
CORRECTI
ED trDISAPPROVED . trREINSPECTIONREQUIRED
o"r. 38F,"rK(*," \r\.utu.-,\".c- BE( L-<u*O rlK
o
INSPECTION REQUEST
TOWN OF VAIL
JOB NAME
READY FOR
LOCATION:
INSPECTION:
CALLER tc>|\tn--n\MoN (4u8, wED rHUR FRI o@
PERMIT NUMBER_OF PROJECT
BUILDING:
tr FOOTINGS / STEEL
PLUMBING:
tr UNDERGROUND
tr ROUGH / D.W.V.tr FOUNDATION / STEEL
tr FRAMING tr ROUGH / WATER
- ROOF & SHEER
" PtYWooo NATLTNG tr GAS PIPING
tr INSULATION
tr SHEETROCK
tr POOL/H.TUB
NAIL tr
tr tr
tr tr FINAL FINAL
ELECTRICAL:
tr TEMP. POWER
MEGHANIGAL:
tr HEATING
tr ROUGH tr EXHAUST HOODS
tr CONDUIT tr SUPPLY AIR
tr
s,#lNnL
I tr DISAPPROVED tr REINSPECTION REQUIRED o*r, :,#^;ts"+ ro*,-
TNSPECTION REQUEST
TOWN OF VAIL
n1@r rnr
DATE
READY FOR
LOCATION:
JOB NAME
CALLER =S
INSPEGTION:MON TUES WED AM PM
TOWN OF
BUILDING:
tr FOOTINGS / STEEL
PLUMBING:
tr UNDERGROUND
ffiew D.w.v.tr FOUNDATION / STEEL
tr FRAMING tr ROUGH/WATER
n ROOF & SHEER " PLYWOOD NAILING tr GAS PIPING
tr INSULATION
tr SHEETROCK
tr
tr
tr
R
POOL / H. TUB
NAIL
tr FINAL tr FINAL
ELECTRICAL:
tr TEMP. POWER
MECHANICAL:
tr HEATING
tr ROUGH tr EXHAUST HOODS
tr CONDUIT
t-'l
tr SUPPLY AIR
tr_
tr FINAL tr FINAL
/'=
-_,f},APPROVED tr DISAPPROVED tr REINSPECTION REQUIRED
ONS:
\'_l ,{ X.l fitr't
PERMIT NUMBEB OF PROJECT
INSPECTION TOWN OF VAIL
REQUEST
tt onre a/q / trr JoB NAME
CALLER
TUES
ll(-.\^*
READY FOR
LOCATION:
INSPEGTION:MON THUR FRI AM PM
BUILDING:
tr FOOTINGS / STEEL
PLUITIBING:
tr UNDERGROUND
tr ROUGH / D.W.V.tr FOUNDATION / STEEL
tr FRAMING tr ROUGH / WATER
n ROOF & SHEER - PLYWOOD NAILING tr GAS PIPING
tr INSULATION tr POOL/ H. TUB
PTSHEETROCK NA|L tr
tr u
tr FINAL tr FINAL
ELECTFICAL:
tr TEMP. POWER
MEGHANICAL:
tr HEATING
tr ROUGH tr EXHAUST HOODS
tr CONDUIT tr SUPPLY AIR
tr tr
tr FINAL tr FINAL
IPPROVED
RRECTIONS:
tr DISAPPROVED tr REINSPECTION REQUIRED
r'?. ",i E '-7
+= r\ t,, -'
PERMIT NUMBER OF PROJECT
o
INSPECTION REQUEST ." TOWN OF {a,/ - E, .,-
VAIL
.-I .JOB NAME
,'q F,ry .E.r'ec. 7/t',' --CALLER
TUES READY FOR INSPECTION:MON
LOCATION: ':1"t'J4;
/"- ir.e:,
WED THUR FRI '*,
'll
=n" .
AM, PM /=' t..,1 1-, -.:;: ,: L n:a_-_-
BUILDING:
tr FOOTINGS / STEEL
PLUMBING:
T] FOUNDATION / STEEL
tr
tr
tr
tr
u
tr
n
UNDERGROUND
ROUGH / D.W.V.
tr FRAMING ROUGH / WATER
n ROOF & SHEER " PLYWOOD NAILING GAS PIPING
tr INSULATION POOL / H. TUB
tr SHEETROCK NAIL
tr_
tr FINAL tr FINAL
ELEGTRICAL:
T] TEMP. POWER
MECHANICAL:
tr HEATING
tr ROUGH tr EXHAUST HOODS
tr CONDUIT
D-
tr SUPPLY AIR
tr FINAL tr'FtNAL
APPROVED tr DISAPPROVED tr REINSPECTION REOUIRED
CORRECTIONS:
DATE INSPECTOR
'"/' .1 r? / '7
I la _,_ L! L- /
T NUMBER OF PROJECT
INSPECTION
j - ,, f ";!?'.toB NAME
REQUEST
VAIL PERMI
DATE
READY FOR
LOCATION:
EL
BUILDING:
T] FOOTINGS / STEEL
tr FOUNDATION / STE
tr FRAMING
n ROOF & SHEER - PLYWOOD NAILING
tr INSULATION
-tr SHEETROCK NAIL
tr-
T] FINAL
ELECTRIGAL:
tr TEMP. POWER
-,/ffROUGH
tr CONDUIT
Itr
-
I
I
Itr F|NAL
PLUMBING:
T] UNDERGROUND
-
T] ROUGH / D.W.V.
tr ROUGH/WATER
tr GAS PIPING
tr POOL/ H. TUB
tr
tr
T] FINAL
MECHANIGAL:
tr HEATING
trEXHAUST HOODS +
tr SUPPLY AIR
-
u
tr FINAL
ll.Eieppnoveo tr DtsAPPRovED tr REINSPECTION REQUIRED
GOBRECTIONS:
,'? ,a - lrr ,'j t INSPECTOR.DATE
REQUEST
VAIL
I ni:"La
PERMIT NUMBER OF PROJECT
DATE NAME
WED THUR FRI
INSPECTION . TOWN OF /,
:1.-* /" i 1' - i .. - ,1: -:.
BUILDING:
tr FOOTINGS / STEEL
PLUMBING:
tr UNDERGROUND -
tr ROUGH / D.W.V. -tr ROUGH/WATEB _
tr GAS PIPING
-tr POOL/ H. TUB
-r-
n-
tr FINAL
MECHANICAL:
tr HEATING
tr EXHAUST HOODS
tr FOUNDATION / STEEL
tr FRAMING
n ROOF & SHEER " PLYWOOD NAILING
tr INSULATION
B SHEETROCK NAIL
tr FINAL
ELECTRICAL:
tr TEMP. POWER
ROUGH
tr CONDUIT tr SUPPLY AIR
tr FINAL tr FINAL
',E Rppnoveo :-. ,t- tr DISAPPROVED tr REINSPECTION REQUIRED
CORRECTIONS:
..' r
DATE INSPECTOR
--O
PERMIT.NUMBER OF PROJECT VAIL
INSPEGTIONT
JOB NAME
MON
CALLER
TUES WED
i. t,tu
PM READY F'OR
LOGATION:
REQUEST
BUILDII{G:
tr FOOTINGS / STEEL
PLUMBING:
tr UNDERGROUND
tr ROUGH / D.W.V.tr FOUNDATION / STEEL
tr FRAMING
-
tr ROUGH / WATER
n ROOF & SHEER " PLYWOOD NAILING tr GAS PIPING
BJTNSULATION
-<7
n SHEETROCK NA|L
tr POOL/ H. TUB
n
tr
n
tr FINAL tr FINAL
ELECTRICAL:
tr TEMP, POWER
MECHANICAL:
tr HEATING
tr
tr
rl
ROUGH tr
tr
n
EXHAUST HOODS
CONDUIT SUPPLY AIR
tr4FlNAL tr FINAL
tr DISAPPROVED tr REINSPECTION REQUIRED
RRECTIONS:
DATE INSPECT
.--)
\
r-{.
o
INSPECTION
TOWN OF
REQUEST
VAIL
JOB NAME
MON
CALLER
TUES
.-\.=hn
WED THUR FRI PM AM READY FOR
LOCATION:
INSPECTION:
PERMIT NUMBER OF PROJECT
DAIE ?tr \( \ "r:;t
BUILDING:
tr FOOTINGS / STEEL
PLUMBING:
tr FOUNDATION / STEEL
tr UNDERGROUND
tr ROUGH / D,W,V.
tr HOUGH/WATER tr FRAMING
n ROOF & SHEER - PLYWOOD NAILING tr GAS PIPING
tr INSULATION tr POOL/H.TUB
ET€HEETROCK NAIL tr
E tr
tr tr FINAL FINAL
ELEGTRIGAL:
tr TEMP. POWER
MEGHAN!GAL:
tr
tr
tr
tr
HEATING
tr
tr
tr
ROUGH EXHAUST HOODS
CONDUIT SUPPLY AIR
tr FINAL tr FINAL -
tr DISAPPROVED tr REINSPECTION REQUIRED
CORRECTIONS:
-.'-
'1*r \
..--- -)
t-r,\ t
o
PE tNs PERMIT NUMBER OF PROJECT
o
CTION REOUEST
TOWN OF VAIL
DATE ,:i
CALLER -_J$n.,
READY FOR INSPECTION;TUES WED THUR FRI
LOCATION:
AM
BUILDING:PLUMBING:
tr UNDERGROUND El
tr
tr
tr
tr
tr
E
tr
FOOTINGS / STEEL
FOUNDATION / STEEL GH / D.W.V,
FRAMING :l+)RouGH I WATER
ROOF & SHEER
PLYWOOD NAILING
ll'- tr GAS PIPING
INSULATION
SHEETROCK
I] POOL / H. TUB
NAIL tr
tr
FINAL FINAL
ELECTRIGAL:
tr TEMP. POWER
MEGHANIGAL:
tr HEATING
tr ROUGH tr EXHAUST HOODS
tr CONDUIT trT
D-
SUPPLY AIR
tr 11,L!L,*6rrJ 3
tr-FINAL tr FINAL
\PPROVED
RRECTIONS:
tr DISAPPFOVED tr REINSPECTION REOUIRED
G'
INSPECT
tha Fhey/vall
o
INSPECTION REOUEST
PERMIT NUMBER OF PROJECT
DATE
READY FOR
LOCATION:
--: - ,,,,'('- ..)iit' JoB NAME
CALLER
TUES
.N- _;| ,.,t --
WED THUR FRI
r.:-r /. ( t-.l,'(L f- ."-1
BUILDING:
tr FOOTINGS / STEEL
PLUMBING:
tr UNDERGROUND
tr ROUGH / D.W,V.
tr BOUGH/WATER
tr FOUNDATION / STEEL
tr FRAMING
tr
tr
tr
tr
ROOF & SHEER
PLYWOOD NAILING tr GAS PIPING
INSULATION tr
tr
POOL / H. TUB
SHEETROCK NAIL
tr FINAL
tr
tr FINAL
ELEGTRICAL:
tr TEMP. POWER
MECHANICAL:
tr HEATING
ROUGH tr EXHAUST HOODS
tr CONDUIT tr SUPPLY AIR
tr
tr FINAL tr FINAL
DISAPPROVED tr REINSPECTION REQUIRED
CORRECTIONS:
DATE INSPECTOR
I
PE INS CTION
TOWN OF
*-2
REQUEST
VAIL
DATE
READY FOR
LOCATION:
JOB NAME
CALLER
INSPECTION: MON TUES
tr FOUNDATION / STEEL
PLUMBING:
tr UNDERGROUND
tr ROUGH / D.WV.
tr ROUGH/WATER
i1 ROOF & SHEER - PLYWOOD NAILING tr GAS PIPING
E] INSULATION tr POOL/H.TUB
EETROCK NArL Hh.s q/.<,r//-,L,447 tr
tr HEATING
tr CONDUIT
tr APPROVED
CORRECTIONS:
tr REINSPECTI REOUIRED \r 'r k-.
tl
DATE f llr/i?'6 TNSPECT ' '/ i
INSPECTION REOUEST
TOWN OF VAIL
INSPECTION:
JOB NAME
MON
CALLER
TUES WED READY FOR
LOCATION:
@t"'AM PM
PERMIT NUMBER OF PROJECT
BUILDING:
tr FOOTINGS / STEEL
PLUiIBING:
tr UNDERGROUND
tr BOUGH / D.W.V.tr FOUNDATION / STEEL
tr FRAMING tr ROUGH/WATER
n ROOF & SHEEF " PLYWOOD NAILING tr GAS PIPING
T1 INSULATION tr POOL/ H. TUB
ffiHeernocK NAIL
n
tr
f]
tr FINAL tr FINAL
ELECTRICAI.:
T] TEMP. POWER
I'ECHANICAK
tr HEATING
T] ROUGH tr EXHAUST HOODS
tr CONDUIT
r'l
tr SUPPLY AIR
tr_
tr F'NAL tr FINAL
WffiPRovED tr DISAPPROVED tr REINSPECTION REQUIRED
CORRECTIONS:+kl
INSPECTION REQUEST
VAIL
\JI
TOWN OF
READY FOR
LOCATION:
INSPECTION:@ TUES WED THUR FRI AM PM
BUILDING:
tr FOOTINGS / STEEL
PLUMBING:
tr UNDERGROUND
tr ROUGH / D.W.V.tr FOUNDATION / STEE-
T] FRAMING tr ROUGH/WATER
n ROOF & SHEER - PLYWOOD NAILING tr GAS PIPING
tr INSULATION tr POOL/ H. TUB
tr SHEETROCK NAIL tr
tr tr
tr FINAL tr FINAL
ELECTBICAL:
tr TEMP. POWER
MEGHANICAL:
tr HEATING
tr ROUGH tr EXHAUST HOODS
tr CONDUIT tr SUPPLY AIR
tr tr
nfrrr*T] FINAL
:_l tr DISAPPHOVED tr REINSPECTION REOUIRED
ONS:
PERMIT NUMBER OF PROJECT
DATE
I
lNsPECfl*ON,
Ll,io*!.:'n* U,=\*\
REQUEST
VAIL
JOB NAME
TNSPECToN: @ ruES FRI
-i\
CALLER -\rt\rl\n
WED THUR AM PM READY FOR
LOCATION:
BUILDING:
tr FOOTINGS / STEEL
PLUMEING:
tr FOUNDATION / STEEL
tr
tr
tr
tr
tr
tr
tr
UNDERGROUND
ROUGH / D.W.V.
ROUGH / WATER ft*nnvrruc -tr ROOF & SHEER
PLYWOOD NAILING GAS PIPING
tr INSULATION POOL / H. TUB
EsreErnocK NAIL
tr
tr FINAL tr FINAL
ELEGTRICAL:
T] TEMP. POWER
MECHANIGAL:
tr HEATING.
tr ROUGH tr EXHAUST HOODS
tr CONDUIT
tl
tr SUPPLY AIR
E
tr FINAL T] FINAL
t
rt{u tr DISAPPROVED tr REINSPECTION REQUIRED
RRECTIONS:
RE(-e [,i i '
PERMIT NUMBER OF PROJECT
DATE
t
INSPECTION REQUEST
TOWN OF VAIL
\. .:-- tr' :!-,:r i- !> l-,
I
I
INSPECTION:
JOB NAME
MON
,...\TUES i[V!p.t THUR FRI iAM ', PM READY FOR
LOCATION:
-..--.--f-_
CALLER "*L \ '.r^
BUILDING:
tr FOOTINGS / STEEL
PLUMBING:
tr UNDERGROUND
tr ROUGH / D.W.V.
-.>\a^,
tr FOUNDATION / STEEL
FRAMING FFOUGH / WATER
tr
tr
tr
ROOF & SHEEH
PLYWOOD NAILING tr GAS PIPING
INSULATION
SHEETRpCK
tr POOL/H.TUB
NAIL tr
n
tr FINAL tr FINAL
ELECTRTC4
N TEMP. F
tr ROUGH
tr coNDUt'
rl
t-:
OWER
MECHANICAK
-i-. r \ I.-tr f,lHflIre l=' i \ cr r, -: --.-
tr EXHAUST HOODS
tr SUPPLY AIR
\ -?- -:-/-b, + L{- : t* \rl t,!". -]4 r q
I] E'INAL
\-.-
tr FINAL
-
CORRECT
tr DISAPPROVED tr REINSPECTION REQUIRED
-: L-: _, Jl_ ,a.r, ,:\ t '1 (
a- 't
i r/,[5
INSPECT
n-- \-'..--T -.-r>\.3,rlA t <-c,\. rq.,,l.r)"-.---PN-tl (,.t \J
---r-.,i- , i-.s.r.' ..n
\', a^\'
Ca Pnnbrt/eatl
,t :
{-rts,
.--'t r"q t I '^l'iql/.\lrr
PERMIT NUMBER OF PROJECT
FRI
lr
DATe :"'t | ';r:-'['Ak JoB NAME
t1
READY FOR
LOCATION:
INSPECTION:MON TUES /.- WEb-'r THUR \ ,-'-L*-'
INSPECTION REOUEST
TOWN OF VAIL
---@jPM
BUILDING:
tr FOOTINGS / STEEL
PLUMBING:
tr FOUNDATION / STEEL
tr
tr
tr
tr
tr
tr
n
UNDERGROUND
ROUGH / D.W.V.
E-]f-nnutruc ROUGH / WATER
- ROOF & SHEER
" PLYWooD NATLING GAS PIPING
tr INSULATION POOL / H. TUB
BisnEErnocK NAIL
n
tr FINAL tr FINAL
ELECTRICAL:
tr TEMP. POWER
MECHANICAI.:
tr HEATING
T] ROUGH tr EXHAUST HOODS
T] CONDUIT
rt
tr SUPPLY AIR
D
tr F.|,INAL tr FINAL
IFPROVED
RRECTIONS:
T] DISAPPROVED tr REINSPECTION REQUIRED
I I
PE tNs CTION
TOWN OF
REOUEST
VAIL PEBMIT NUM
READY FOR
LOCATION:
JOB NAME
CALLER I
TUES WED ,@
PROJECT
tr FOUNDATION / STEEL
PLUMBING:
tr UNDERGROUND
.ET:ROUGH / D.W.V.
tr FOUGH/WATER
n ROOF & SHEEB - PLYWOOD NAILING
tr INSULATION
tr SHEETROCK NAIL
tr HEATING
tr CONDUIT tr
,.b
tr
PROVED
BRECTIONS:
tr DISAPPROVED tr REINSPECTION REQUIRED
g.a
DATE 3, - i", 3, ? tNSPEcr
((-rJ\'-L'--t
,#ga I O
PERMIT NUMBER OF PROJECT
DATE
READY FOR
LOGATION:
INSPECTION:
JOB NAME
MON
CALLER
TUES
o
INSPECTION REQUEST
BU
trl
trl
trl
I E,
'gl
trl
tr
ILDING:PLUMBING:
tr UNDERGROUND
tr ROUGH / D,W.V.
FOOTINGS / STEEL
FOUNDATION / STEEL
FRAMING tr ROUGH/WATER
ROOF & SHEER tr GAS PIPING PLYWOOD NAILING
INSULATION tr
tr
POOL / H. TUB
SHEETROCK NAIL
tr
tr FINAL tr FINAL
ELE
tr'I
flr
tr(
tr.
CTRIGAL:MECHANICAL:
tr HEATING
ROUGH tr EXHAUST HOODS
CONDUIT tr SUPPLY AIR
tr FINAL
tr
tr FINAL
tr APPROVED
CORRECTIONS:
DISAPPROVED REINSPECTION REQUIRED
.INSPECTOR
PERMIT NUMBER OF PROJECT
INSPECTION REQUEST
TOWN OF VAIL
I"-::.I. THUR ,'. )
.. \'r.!DATE
READY FOR
LOCATION:
I NAME
MON INSPECTION:
CALLER
TUES WED FRI
tr UNDERGROUND
-tr FOUNDATION / STEEL tr ROUGH / D.W.V.
tr FRAMING tr ROUGH/WATER _
n ROOF & SHEER - PLYWOOD NAILING tr GAS PIPING
tr INSULATION tr POOL/H,TUB
tr SHEETROCK NAIL
ELECTRICAL:
tr TEMP. POWER tr HEATING
-:__ ...,-- t!_-. '-
-
*-.-.-_r\;\ ii
tr APPROVED tr DISAPPROVED tr BEINSPECTION REQUIRED
-t
dal(
TNSPECTORi DATE
l|.gt artl€ll
o
INSPECTION TOWN OF
REQUEST
VAIL
JOB NAM
INSPECTION: MoN THUR FRI or (]F'BEADY FOR
LOCATION:
BUILDING:
tr FOOTINGS / STEEL
tr FOUNDATION / STEE-
tr
tr
tr
tr
tr
FRAMING
ROOF & SHEER
PLYWOOD NAILING tr
tr
tr
GAS PIPING
INSULATION
SHEETROCK
POOL / H. TUB
NAIL
tr FINAL tr FINAL
ELEGTRICAL:
tr TEMP. POWER
MEGHANIGAL:
tr HEATING
tr ROUGH tr EXHAUST HOODS
tr CONDUIT
tr_
tr SUPPLY AIR
D
tr_plNAL tr FINAL
17tT-
F AfPPROVED
cohnecrrorus:
tr DISAPPROVED tr REINSPECTION REQUIRED
19,.!-n{.r
PERMIT NUMBER OF PROJECT
I
INSPECTION REQUEST
TOWN OF VAIL
WED THUH FRI AM PM
ooru p-,/t*r{tl: JoB NAME \,J+"-\o^ -1-'*o'r,.,,e (-r=}o;'',\
_-:- |.- \ r-ba |'..\
READY FOB
LOCATION:
INSPECTION:MON
CALLER
TUES
tr FOUNDATION / STEEL
tr ROUGH/WATER
ROOF & SHEER
PLYWOOD NAILING tr GAS PIPING
tr POOL/ H. TUB
tr SUPPLY AIR
tr DISAPPROVED tr REINSPECTION REQUIRED
CORRECTIONS:
0n FdntsttrtvaU
I
INSPECTION
TOWN OF
REOUEST
VAIL
JOB NAME
READY FOR
LOCATION:
CALLER
tr UNDERGROUND
tr FOUNDATION / STEEL
tr FRAMING tr
tr
tr
tr
tr
tr
ROUGH / WATER
n ROOF & SHEER - PLYWOOD NAILING GAS PIPING
tr INSULATION
tr SHEETFOCK
tr ROUGH / D.W.V.
ELECTRICAL:
tr TEMP. POWER
tr SUPPLY AIR
PROVED
ECTIONS:
tr DISAPPROVED tr REINSPECTION REQUIRED
$,L,!
fi, pr'lrtrtlvall
?'?L,r.u
PERMIT NUMBER OF PBOJECT
DATE i,JOB
a
INSPECTION REOUEST
TOWN OF VAIL
NAM E \..r./ e ,: \ ini T-.: c- r ,- -- q n"al ,'^ .,
OALLER f,*ot^'t"'
TUES WED THUR T-FN},READY FOB
LOCATION:
INSPECTION:MON PM
BUILDING:
tr FOOTINGS / STEEL
PLUMBING:
tr UNDERGROUND
tr ROUGH / D.W.V.
tr ROUGH/WATER
tr FOUNDATION / STEEL
EI#RAMING
; ROOF & SHEER " PLYWOOD NAILING tr GAS PIPING
tr INSULATION
h-sHEernocr
B
tr POOL/ H, TUB
NAIL tr
r'1
tr'FINAL tr FINAL
ELEGTRICAL:
tr TEMP. POWER
MECI{ANIGAL:
tr HEATING
tr ROUGH tr EXHAUST HOODS
tr CONDUIT . tr SUPPLY AIR
-
--Tt F'Fr.- lf-r4.,*..o"r ... ::,.j.f'l
n/ftrrrrar-
€7'- rr
tr FINAL ?-<' -'- lr'c+ '"-i,Li -[',.--
'ROVED
ECTIONS:
tr DISAPPFOVED
-,o*-I {=,r,
tr REINSPECTION REQUIRED I
Ft-o ,'.''.,- C,'-.,",t, .\ ,-.,'t= D\i c,n\\ =' c-t uJ\ cn '
C*.-.,'.'^.'.-- -,:,.rl-h- -,,.( ,= a,\*i ,-'.ro\\'= 't; ,:-,,|t,,..i
t .t '
C '. ,,'re, .-\ r-,1( u n-r',{ P'.r,rl T rl ,\,r'.-" = rl--t, l.-\ l- . *.\ . \. ., .--
::-,tlr:l rn', \-l ----r- .-1,,'d L. ,,,Q.. r'rF* ,'l-l ri} ,,.,l-u- -==
L--
. .3 qr \\ -'-"
r';
INSPECTOR
f(itt".. ,,.-.1^I_q\ ll .. ,)
'a
.< (_ a: ._tsJ-
qe-\,,.,- alK
a.K
o
3) ?,t ,lr-,
p INSPECTION REOUEST
TOWN OF VAIL
DATE --.
READY FOR
LOCATION:
INSPECTION:
JOB NAME
CALLER
MON TUES wED rHURi--Gi')
\-*_1,
BUILDING:
tr FOOTINGS / STEEL
PLUMBING:
tr UNDERGROUND
tr ROUGH / D.W.V.
tr ROUGH / WATER
T] FOUNDATION / STEEL
tr FRAMING
n ROOF & SHEER
- PLYWOOD NAILING tr GAS PIPING
tr INSULATION POOL / H. TUB
u
tr
tr
tr
tr HEATING
tr SUPPLY AIR
tr DISAPPROVED tr REINSPECTION REQUIRED
CTIONS:
INSPECTOH DATE
Itra orlntlrtlr€ll
INSPECTION
TOWN OF .-..
REQUEST
VAIL
NAME '.. i .'r!
CALLER
READY FOR
LOGATION:
INSPECTION:WED THUB FRI AM '= eM_..', !6I),r.,
tr ROUGH/WATER
n ROOF & SHEER - PLYWOOD NAILING tr GAS PIPING
tr INSULATION
tr SHEETROCK
tr SUPPLY AIR
PROVED
ECTIONS:
tr DISAPPROVED tr REINSPECTION REQUIRED
2?, GL"
PERMIT NUMBEH OF PROJECT
INSPECTION REQUEST . TOWN OF VAIL
ggE =,f azf *,,' JoB NAME rn/'e-s\r!''. --{-e\-.-c'-t-{ '*rrng.
CALLER Tr',r*
TUEs T-WE6-.f,HUR ''-'---/READY FOR
LOCATION:
INSPEGTION:MON FRI
BUILDING:
tr FOOTINGS / STEEL
PLUMBING:
tr UNDERGROUND
tr ROUGH / D.W.V,tr FOUNDATION / STEEL
tr FRAMING flfoucH / wArER
-, ROOF & SHEER " PLYWOOD NAILING
tr
tr
tr
INSULATION
SHEETROCK NAIL tr
tr FINAL
tr
tr FINAL
ELECTRIGAL:MECHANICAK
tr
tr
tr
tr
TEMP. POWER tr HEATING
ROUGH T1 EXHAUST HOODS
CONDUIT tr SUPPLY AIR
h t
tr FINAL tr FINAL
'T,
|tt tr tr REINSPECTION REQUIRED
RRECTIONS:
..-V/
\
\ i/- I I a 1- |
, --! '.t '_
"_-
a
INSPECTION
TOWN OF
i"'l j_lr-.,t
REOUEST
VAIL PERMIT NUMBER
DATE
READY FOR
LOCATION:
-+_./€ 5 / I
FP o ROfECTT
J=ld to'NAME
INSPECTION:WED THUR .-L -? -{-- / ._N --,
PM
3-it,:.,
CALLER /.-\MON ,TUES,i
L-]=*'ir *'-* , ,r_r \
'.: l- J,. it* f (- /'ti ttr
BUILDING:
tr FOOTINGS / STEEL
PLUMBING:
tr UNDERGROUND
tr FOUNDATION / STEEL tr..ROUGH / D.W.V.
E] ROUGH / WATER tr FRAMING
n ROOF & SHEER - PLYWOOD NAILING tr GAS PIPING
tr INSULATION
tr SHEETROCK
tr POOL/ H. TUB
NAIL tr
tr tr
tr tr FINAL E!Na-l:-
ELECTRICAL:
tr TEMP. POWER
MECHANICALT}_-:-_--
tr HEATING
tr ROUGH tr EXHAUST HOODS
tr CONDUIT tr SUPPLY AIR
tr
tr FINAL
Et ,ROVED
ECTIONS:
tr DISAPPROVED
. | :':.€ --J:r.":.:
tr REINSPECTION REQUIRED -l;;<-!:+'::llz-..!--
lr)o
INSPECTION
TOWN OF
r-
-l -[.''*
REOUEST
VAIL PERMIT
DATE
READY FOR
LOCATION:
CT
JO
PBOJE
rf,/
ERO
..' !
tl
NUMB
B NAME
CALLER
lNSpECroN: MoN ruEs (@ rHUJI FRt ; AM @ r-l i t" V I '; i l- | D,_,,. | -,--L , ,. l.-1 ..{ i ..",'.
tr,+f.,,r," - ;'-, 1 ,
BUILDING:
tr FOOTINGS / STEEL
PLUMBING:
tr UNDERGROUND
tr ROUGH / D.W.V.tr FOUNDATION / STEEL
tr FRAMING
n ROOF & SHEER - PLYWOOD NAILING tr GAS PIPING
tr INSULATION . tr POOLI H. TUB
tr SHEETROCK NAIL
tr HEATING
tr ROUGH tr EXHAUST HOODS
tr CONDUIT tr SUPPLY AIR
E
o{
bl,t",
/:
VED
CORRECTIONS:
tr DISAPPROVED tr REINSPECTION REQUIRED
DATE
,ii'+frtc, I
PERMIT NUMBER OF PROJECT
o
SPE IN CTION REQUEST
TOWN OF VAIL
DATE
READY FOR
LOCATION:
INSPEGTION:MON
JoB NAME U'l e --{i.uJ--l,er fr-,*ce r-rl rrrn,
cRr-lEn-3
rues x'=Gb-r THUR arrr ,:liiii FRI
BUILDING:
tr FOOTINGS / STEEL
-
tr UNDERGROUND
tr FOUNDATION / STEEL
tr ROUGH/WATER
; ROOF & SHEER - PLYWOOD NAILING tr GAS PIPING
tr POOL/ H, TUB
-OCK NAIL
ELECTRICAL:
tr TEMP. POWER
tr CONDUIT tr SUPPLY AIR
ElEPPROVED I
CORRECTIONS:
tr DISAPPROVED tr REINSPECTION REOUIRED
{_. (r:H'r,Vlt\t li1 1i\. --
_ \ _\-r _! lr- r r--4_t\ ._'i _ \.-'. r-l,ln
L
f:
1.^*-. \s' .,- L*ud-*
,v '-.r 'fi'l.'dr(,t : PERMIT NUMBER oF PRoJEoT
DATE L,{*ll -€sb.
INSPECTION REQUEST
\ _ q,_ TOWN OF VAIL
READY FOR
LOCATION:
INSPECTION:
JOB NAME
@ CALLER
TUES WED THUR FRI AM PM
BUILDING:
tr FOOTINGS / STEEL
PLUMBING:
tr FOUNDATION / STEEL
tr UNDERGBOUND
tr ROUGH / D.W.V.
tr ROUGH/WATER tr FRAMING
r-, ROOF & SHEER " PLYWooD NAILING tr GAS PIPING
tr INSULATION tr POOL/ H. TUB
tr SHEETROCK NAIL tr
tr tr
tr FINAL tr FINAL
ELECTRICAI-:
tr TEMP. POWER
MECHANICAL:
tr HEATING
tr ROUGH tr EXHAUST HOODS
tr CONDUIT tr SUPPLY AIR
tr Etr Ftr€- \lf-tr"tl.rt--tr
tr FINAL tr FINAL
tr APPROVED {-dc D tr REINSPECTION REQUIRED
GORRECTIONS:
INSPECTO
" ?E['o(''o O
PERMIT NUMBER OF PROJECT
I
SPE
DATE
READY FOR
LOCATION:
INSPECTION:
JOB NAME
i'[roN-r
'1._-.-.-'
CALLER
TUES
IN
THUR FRI
CTION
TOWN OF
REQUEST
VAIL
PM AM
BUILDING:
tr FOOTINGS / STEEL
PLUMBING:
tr FOUNDATION / STEEL
tr UNDERGROUND
tr ROUGH / D.W.V.
tr ROUGH/WATER tr FRAMING
,_1 ROOF & SHEER " PLYWooD NAILING tr GAS PIPING
tr INSULATION tr POOL/ H. TUB
tr SHEETROCK NAIL tr
tr tr
tr FINAL tr FINAL
ELECTRICAL:
tr TEMP. POWER
MECHANICAL:
tr HEATING
tr
tr
tr
ROUGH tr EXHAUST HOODS
CONDUIT
tr f,rNAL
SUPPLY AIR
tr DISAPPROVED tr REINSPECTION REQUIRED
]ORRECTIONS:
$'
I
DATE 4*/t"*Frg- tNSpEcr
o
SPE
-"/f 'itt
IN PERMIT NUMBER OF PROJECT rr, i t
DArE "l I i -rJ 5,i JoB NAME
I
CTION
TOWN OF
I
REQUEST
VAIL
CALLER
READY FOR INSPEGTION:
LOGATION:
ruEs @,UR
a7
MON
I t''i*
PM AM TH
BUILDING:
tr FOOTINGS / STEEL
tr FOUNDATION / STEEL
tr FRAMING
n ROOF & SHEER - PLYWOOD NAILING tr GAS PIPING
tr INSULATION tr POOL/ H, TUB
-tr SHEETROCK NAIL
tr HEATING
tr ROUGH tr EXHAUST HOODS
tr SUPPLY AIR
PROVED
ECTIONS:
tr DISAPPROVED tr REINSPECTION REOUIRED
r 'r'f,\,-n\.h,
NAME
CALLER
MoN TUES iWEd )
INSPECTION REQUEST . TOWN OF VAIL
THUR FRI AM i-PM READY FOR
LOCATION:
INSPECTION:
BUILDING:
tr FOOTINGS / STEEL
PLUMBING:
tr UNDERGROUND
tr FOUNDATION / STEEL
-
tr BOUGH/D,W.V.
tr FRAMING tr ROUGH/WATER
n ROOF & SHEER - PLYWOOD NAILING tr GAS PIPING
tr INSULATION tr POOL/ H. TUS
tr SHEETROCK NAIL E]
tr tr
tr FINAL . tr FINAL
ELECTRICAL:
tr TEMP. POWER
MECHANICAL:
tr RoucH - . -i _., \':,r , .tr EXHAUST HOODS
tr CONDUIT tr SUPPLY AIR
tr tr
tr FINAL tr FINAL
T] APPROVED
CORRECTIONS:
i-tr DISAPPROVED tr REINSPECTION REQUIRED
PERMIT NUMBER OF PROJECT IN
o
SPE
FRI
CTION
TOWN OF
REQUEST
VAIL
))
INSPECTION:MON WED \, THUR
CALLER
TUES AM PM .)
READY FOR
LOCATION:
BUILDING:
tr FOOTINGS / STEEL
PLUMBING:
tr UNDERGROUND
tr FOUNDATION / STEEL tr ROUGH / D.W.V.
tr ROUGH/WATER tr FRAMING
n ROOF & SHEER " PLYwooD NAILING tr GAS PIPING
tr INSULATION -tr POOL/ H. TUB
tr SHEETROCK NAIL tr_
tr tr
tr tr FINAL FINAL
ELECTRICAL:
tr TEMP. POWER
MECHANICAL:
tr HEATING
H noucn
tr SUPPLY AIR
tr tr
tr FINAL tr FINAL
tr APPROVED
CORRECTIONS:
tr DISAPPROVED tr REINSPECTION REQUIRED
DATE INSPECTOR
iia Irhtary/Ya!
o
SPE
cnr-r-eR-
z4-.
MON ,-- TUES- WED THUR FRI
-AM
i PM \+'
IN CTION
TOWN OF
REQUEST
VAIL
DATE
':
READY FOR
LOCATION:
JOB NAME
INSPECTION:
PERMIT NUMBER OF PROJECT
{
BUILDING:PLUMBING:
tr FOOTINGS / STEEL _tr UNDERGROUND
tr ROUGH / D.W.V.
tr ROUGH/WATER
tr FOUNDATION / STEEL
tr FRAMING
r-r ROOF & SHEEB - PLYWOOD NAILING tr GAS PIPING
tr INSULATION tr POOL/ H. TUB
E€neernocK NAIL tr
tr
tr FINAL
-
tr FINAL
ELECTRICAL:
tr TEMP. POWER
MEGHANIGAL:
tr HEATING
tr ROUGH T1 EXHAUST HOODS
tr CONDUIT tr SUPPLY AIR
tr tr
F F,INAL tr FINAL
tr DISAPPROVED tr REINSPECTION REQUIRED
ONS:
-l :-Q. -\r I
J--.,:
a
IL'i,,Jri.j;
-
DATE INSPECTOR
trrp.|n!ry/u6n
,,! \:1,,,,'/,
PERMIT NUMBER OF PROJECT
,1'.!. n3 ,i .)t4
READY FOR
LOCATION:
JOB
INSPECTION:MON TUES
INSPECTION REOUEST
AM
t /',t FRI UR
TOWN OF VAIL
i.l.
BUILDING:
tr FOOTINGS / STEEL
PLUMBING:
tr UNDERGROUND
tr ROUGH / D.W.V.tr FOUNDATION / STEEL
tr FRAMING tr ROUGH/WATER
n ROOF & SHEER - PLYWOOD NAILING tr GAS PIPING
tr INSULATION
-tr SHEETROCK NAIL
tr
tr FINAL FINAL
ELECTRICAL:
tr TEMP. POWER
MECHANICAL:
T1 HEATING
tr ROUGH tr EXHAUST HOODS
tr CONDUIT
tr tr
tr g F|NAL FINAL
tr DISAPPROVED tr REINSPECTION REQUIRED
CTIONS:ONS:
"=,, / :ri 'INSPECTOR DATE
l -',it,,( r O
PERMIT NUMBER OF PROJECT
DATE JOB NAME
INSPECTION REQUEST
TOWN OF VAIL
READY FOR
LOCATION:
.:-1!.
TNSPECTTON: i'MON) TUES WED THUR FRI PM
BUILDING:
tr FOOTINGS / STEEL tr UNDERGROUND
tr ROUGH / D.W.V.
tr ROUGH/WATER
tr FOUNDATION / STEEL
n ROOF & SHEER " PLYWOOD NAILING tr GAS PIPING
tr POOL/ H. TUB
ELEGTRIGAL:
tr TEMP. POWER tr HEATING
tr EXHAUST HOODS
tr SUPPLY AIR
ED
I CORRECTIONS:
tr DISAPPROVED tr REINSPECTION REQUIRED
PERMIT NUMBER OF PROJECT
|1,\iJt-t/,: .r '" "/{ { JOB NAME
INSPECTION
TOWN OF
".- t ['_J 7--1*'1 ..,7...1.;"t- 1 i_
REQUEST
VAIL
DATE
READY FOR
LOCATION:
INSPECTION:AM U
BUILDING:
tr FOOTINGS
tr FOUNDATI
tr FRAMING
PLUMBING:
/ STEEL
ON / STEEL
tr UNDERGROUND
tr ROUGH / D.W.V.
tr ROUGH/WATER
tr
tr
tr
tr
ROOF & SHEER
PLYWOOD NAILING
INSULATION
SHEETROCK NAIL
-
tr GAS PIPING
tr
tr
tr FINAL tr FINAL
ELEGTRICAL:
tr TEMP. POWER
MECHANICAI.:
tr HEATING
EI ROUGH tr EXHAUST HOODS
tr CONDUIT tr SUPPLY AIR
tr tr
tr FINAL tr FINAL
tr APPROVED
CORRECTIONS:
tr DISAPPROVED tr REINSPECTION REQUIRED
DATE INSPECTOR
-,-1,'V y''t'{ 'r{ 'rr PERMrrNluym
o,
INSPECTION
TOWN OF
REQUEST
VAIL
JOB NAME
I
I
\ -\l/\ r. \
- . | ,! \ttJ
t. >r WED THUR FRI AM ,,/PM.\(,
CALLER ..-':)--READY FOR
LOCATION:
INSPECTION:MoN ( ruE:-,
DATE q./ ? r', / fj.
BUILDING:
tr FOOTINGS / STEEL tr UNDERGROUND
tr ROUGH / D.W.V.
tr ROUGH/WATER
tr FOUNDATION / STEEL
tr FRAMING
r-1 BOOF & SHEER - PLYWOOD NAILING tr GAS PIPING
tr INSULATION tr POOL/ H, TUB
tr FINAL
tr ROUGH tr EXHAUST HOODS
tr CONDUIT tr SUPPLY AIR
."..it j
-EI APPROVED
I CORRECTIONS:
t] DISAPPROVED tr REINSPECTION REQUIRED
DATE
-1 \jr-l
€-.. Li J 1j'"
P
o
SPE
ttt
DATE 5/I /K,Jf, JOB NAME
READY FOR
LOCATION:
INSPEGTION:tF"=' wED
IN
THUR FRI
CTION REQUEST
TOWN OF VAIL
AM PM
tr FOUNDATION / STEEL
PLUMBING:
tr UNDERGROUND
tr HOUGH / D.W.V.
tr FRAMING tr ROUGH/WATER
n ROOF & SHEER - PLYWOOD NAILING tr GAS PIPING
tr INSULATION tr POOL/ H. TUB
tr SHEETROCK NAIL
tr ROUGH tr EXHAUST HOODS
tr SUPPLY AIR
PROVED
CORRECTIONS:
tr DISAPPROVED tr REINSPECTION REQUIRED
I
PE tNs CTION
TOWN OF
REOUEST
VAIL
l.l
READY FOR INSPECTION:It l-
'o"ollfl*',,\L-iltr"l
CALLER
TUES
I'
THUR WED
1,-.
i,{'
'f.-PM
//-'c')tt
BUILDING:
tr FOOTINGS / STEEL
PLUMBING:
tr UNDERGROUND
tr ROUGH / D.W.V.tr FOUNDATION / STEEL
tr FRAMING tr ROUGH / WATER
n ROOF & SHEEB " PLYWOOD NAILING
tr INSULATION tr POOL/ H. TUB
tr SHEETROCK NAIL
ELEGTRICAL:
tr TEMP. POWER tr HEATING
tr EXHAUST HOODS
tr SUPPLY AIR
APPROVED
CORREGTIONS:
tr DISAPPROVED tr REINSPECTION REQUIRED
I
INSPECTION REQUEST
TOWN OF VAIL
DArE s/t{r / a.r{ JoB NAME \A{..s\,^ \-\,, \.\ ._\o,q,n,.,-"., .., r,u..:,.
READY FOR
LOCATION:
INSPECTION:MON
\l' \1 .; ..: t;
CALLER
TUES THUR FRI PM AM
-::-i-
WED
PERMIT NUMBER OF PROJECT
BUILDING:
tr FOOTINGS / STEEL
PLUMBING:
tr UNDERGROUND
tr ROUGH / D.W.V.tr FOUNDATION / STEEL
tr FRAMING tr ROUGH/WATER
n ROOF & SHEER - PLYWOOD NAILING tr GAS PIPING
tr INSULATION tr POOL/ H. TUB
tr SHEETROCK NAIL tr
tr tr
tr FINAL tr FINAL
ELECTRIGAL:
tr TEMP, POWER
MEGHANIGAL:
tr HEATING
tr ROUGH tr EXHAUST HOODS
tr CONDUIT tr SUPPLY AIR
tr &
tr tr,ftNAL FINAL
n tr DISAPPROVED tr REINSPECTION REQUIRED
RRECTIONS:
DATE
o
SPE ,, I ',.CTION
TOWN OF PERMIT NUMBER OF PROJECT
READY FOR INSPECTION:
IN
CALLER
TUES WED THUR FRI
REQUEST
VAIL
JOB NAME t .1,- | -,,- -
{9}j .-\AM ",iPM .,r \*'
BUILDING:
tr FOOTINGS / STEEL
T] FOUNDATION / STEEL
PLUMBING:
tr UNDERiGROUND
-tr ROUGH / D.W.V.
tr ROUGH/WATER
-tr GAS PIPING
tr POOL/ H. TUB
n
Fl
tr FINAL
MECHANICAL:
tr HEATING
tr EXHAUST HOODS
tr SUPPLY AIR
-
T] FRAMING
n ROOF & SHEER - PLYWOOD NAILING
tr INSULATION
tr SHEETROCK NAIL
tr FINAL
tr
tr
ELECTRICAI-:
tr TEMP. POWER
dlnouan
tr CONDUIT
tr
tr FINAL tr FINAL
F Aeenoveo=- ,-'(:-i't] DISAPPROVED tr REINSPECTION REQUIRED
CORRECTIONS:
--t '
DATE INSPECTOR
READY FOR INSPECTION:
t'"
INSPECTION REQUEST
TOWN OF VAIL
",,-" 't
,l.'
r{il) PM
CALLER
'ql*. lyTl.s
BUILDING:
tr FOOTINGS / STEEL
PLUMBING:
tr UNDERGROUND
tr ROUGH / D.W.V.tr FOUNDATION / STEEL
tr FRAMING tr ROUGH / WATER
1r ROOF & SHEEB - PLYWOOD NAILING tr GAS PIPING
tr INSULATION
-
tr POOL/ H. TUB
tr SHEETROCK NAIL
tr_
tr FINAL tr FINAL
ELECTRICAL:
tr TEMP. POWER
MEGHANIGAL:
tr HEATING
tr ROUGH tr EXHAUST HOODS
tr CONDUIT tr SUPPLY AIR
tr
.tr frNAL tr FINAL
tr DISAPPROVED tr REINSPECTION REQUIRED
ONS:
/5lc-, {.r
a
INSPECTION REQUEST
TOWN OF VAIL
- t (>
frlL"r AeG)
/ rir r-l.s'l it f ;- i .-? !
f ,f {" t'l,J*ti i.d 1 o)
PERMITt'tUffi
sa1= -.' '.-t ,: /,j'.*' JoB NAME P!''e;tt .-,It
READY FOR INSPECTION:
CALLER
MON TUES WED THUR
\J
coRnEcrroruSi-
LOCATION:4F / o cft? rl rr: -f * ,::,-, A- .' ,:--, ,-
. -:1, " -i t-,s;71'&) ,?-.r.-,,..LL :i J i',t t,, tr-,41-1r" , gr 51..t--.'-.'it, ' . q. r-r- f\,, ,:,
BUILDING:
tr FOOTINGS / STEEL
PLUMBING:
tr UNDERGROUND
tr ROUGH / D.W.V.tr FOUNDATION / STEEL
tr FRAMING tr ROUGH/WATER
f-r ROOF & SHEER - PLYWOOD NAILING tr GAS PIPING
tr INSULATION T] POOL / H. TUB
tr SHEETROCK NAIL tr
tr tr
tr FINAL tr FINAL
ELECTfiTGAL:
tr TEMP.. POWER
MECHANICAI.:
tr HEATING
HrnoucH . ,tr EXHAUST HOODS
tr coNDUlT r_tr SUPPLY AIR
rt
tr tr
tr FINAL tr FINAL
(ieenoveo o,{*tr DISAPPROVED tr REINSPECTION REQUIRED
INSPECTOR
PERMITNUM
.- f 1 .2 ( I:,:, :'!h / {,DATE -''\ -',1 ,'"' JOB NAME
READY FOR IN
LOCATION:
IN CTION REOUEST , TOWN gF" VA|L
.{:'' y'11,,',.;,. ,,''!.:'t 7,'.
o
SPE
CALLER
MON
'd./:;
ta
THUR t.
t t .:.1- t
fuL)
BUILDING:
tr FOOTINGS / STEEL tr UNDERGROUND
tr ROUGH / D.W.V.
tr ROUGH / WATER
tr FOUNDATION / STEEL
tr GAS PIPING
tr INSULATION tr POOL / H. TUB
ELEGTRICAL:
tr TEMP. POWER
tr SUPPLY AIR
tr APPROVED
CORRECTIONS:
tr DISAPPROVED E] REINSPECTION REQUIBED
DATE INSPECTOR
,o
a{ f "rl r.l rt
PERMIT NUMBER OF PROJECT
o
INSPECTION REQUEST
VAIL TOWN OF
JOB NAME
READY FOR
LOCATION:
INSPECTION:[,tor.r fffi-1weo rHUR FRI AM PM
aaft slzt l*a
CALLER
BUILDING:
tr FOOTINGS / STEEL
PLUMBING:
tr UNDERGROUND
tr ROUGH / D.W.V.tr FOUNDATION / STEEL
Frmeurruo tr ROUGH/WATER
fl'noor & sHEER " PLYWOOD NAILING tr GAS PIPING
tr INSULATION
tr SHEETROCK
tr POOL/ H. TUB
NAIL tr
E]
tr
tr
tr FINAL FINAL
ELECTRICAL:
tr TEMP, POWER
MECHANICAL:
tr HEATING
tr BOUGH tr EXHAUST HOODS
tr CONDUIT tr SUPPLY AIR
tr tr
tr FINAL tr FINAL
tr DISAPPROVED tr REINSPECTION BEQUIRED
in 9rhErt/ven
,>- y"(, (
PERMIT NUMBER OF PROJECT IN
Txun FRI
CTION
TOWN OF
REQUEST
VAIL -_ j
t,/::=&'---7--
o
SPE
JOB NAME f ',1n ir,.r .L DATE
LOCATION:
l-;1
READY FOR INSPECTION:MON
CALLER @
I t /r.
7-, gq r.€7 [ ,.- 1;-'v ] ,:: '-t-.tt ' i\iJk"+.
BUILDING:
tr FOOTINGS / STEEL
PLUMBING:
tr UNDERGROUND
tr FOUNDATION / STEEL
tr FRAMING
n ROOF & SHEER - PLYWOOD NAILING tr GAS PIPING
tr INSULATION
tr SHEETROCK
tr POOL/ H. TUB
NAIL F
tr tr
tr FINAL tr FINAL
GH / WATER
ELECTRICAI-:
tr TEMP. POWER
MECHANICAL:
tr HEATING
tr ROUGH tr EXHAUST HOODS
tr CONDUIT tr SUPPLY AIR
tr tr
tr FiINAL
#tr FINAL
tlu tr DISAPPROVED tr REINSPECTION REQUIRED
CORRECTIONS:
:,L.\ +
INSPECTOR
IN
I
SPECTION
TOWN OF
1:j. ,. i;.r-\
REQUEST
VAIL
i\,i..',.t
CALLER
READY FOR
LOCATION:
INSPECTION:MON THUR FRI i@r eM
,i it:,j-'.
BUILDING:
tr FOOTINGS / STEEL
PLUMBING:
tr UNDERGROUND
tr ROUGH / D.W.V.tr FOUNDATION / STEEL
tr FRAMING T] ROUGH / WATER
r-r ROOF & SHEER - PLYWOOD NAILING tr GAS PIPING
tr INSULATION tr POOL/ H. TUB
tr SHEETROCK NAIL tr
tr tr
tr FINAL tr FINAL
ELEGTRICAL:
tr TEMP, POWER
MECHANICAL:
tr HEATING
tr tr
tr FINAL tr FINAL
tr APPROVED
CORRECTIONS:
tr DISAPPROVED tr REINSPECTION REQUIRED
DATE INSPECTOR
\
lJt' . ,1,,. .,
PERMIT NUMBER OF PROJECT
INSPECTION REQUEST
DATE
._ 'fl, ro,NAME
READY FOR
LOCATION:
INSPECTION:
CALLER
TUES MON WED THUR ifnt --
i Ail*'1 nr'a
TOWN OF VAIL
BUILDING:
tr FOOTINGS / STEEL
PLUMBING:
tr UNDERGROUND
tr FOUNDATION / STEEL tr ROUGH / D.W.V.
tr ROUGH / WATER tr FRAMING
- ROOF & SHEER
" pLYWooD NAtLtNG tr GAS PIPING
tr INSULATION
tr SHEETROCK
tr POOL/ H. TUB
NAIL tr
tr tr
tr tr FINAL FINAL
ELEGTRICAL:
tr TEMP. POWER
MECHANICAL:
tr HEATING
tr EXHAUST HOODS
tr SUPPLY AIR
tr
tr FINAL
tr APPROVED
CORRECTIONS:
tr DISAPPROVED tr REINSPECTION REQUIRED
DATE INSPECTOR
PERMIT N OF PROJECT
DATE {
READY FOR INSPECTION:
l
INSPECTION
TOWN OF
5
REQUEST
VAIL
JOB NAME
MON
LOCATION:
.. --;t:,r-ruEs weo ( fiuil
BUILDING:
tr FOOTINGS / STEEL tr UNDEBGROUND
tr ROUGH / D.W.V.
tr ROUGH / WATER
tr FOUNDATION / STEEL
tr FRAMING
n ROOF & SHEER " PLYWOOD NAILING tr GAS PIPING
tr INSULATION tr POOL/ H. TUB
tr SHEETHOCK NAIL
ELECTRICAL:
tr TEMP. POWER tr HEATING
tr ROUGH
tr CONDUIT
tr EXHAUST HOODS
tr SUPPLY AIR
tr DISAPPROVED tr REINSPECTION REQUIRED
INSPECT
tr I i.Iilr'
PERMIT NUMBER OF PROJECT
DATE
-INSPECTION
.t TOWN OF
I .!:r 1, t i._ ,; _
REQUEST
VAIL
\1tts1
READY FOR
LOCATION:
INSPECTION:
JOB NAME
MON
, . i...{
CALLER
TUES
J (:?i .-il I (.. ,
BUILDING:
tr FOOTINGS / STEEL
PLUMBING:
tr UNDERGROUND
tr ROUGH / D.W.V,tr FOUNDATION / STEEL
tr FRAMING tr ROUGH / WATER
,-, ROOF & SHEEH " PLYWooD NAtLtNG tr GAS PIPING
tr INSULATION tr POOL/ H. TUB
tr SHEETROCK NAIL
ELEGTRICAL:
tr TEMP. POWER tr HEATING
tr ROUGH tr EXHAUST HOODS
tr CONDUIT tr SUPPLY AIR
' +'1""-
tr DISAPPROVED tr REINSPECTION REQUIRED
DATE INSPECTOB
-trF-\
,or, '7t'l-.-,
JoB NAME
!
INSPECTION:MON AM FRI READY FOR
LOCATION:
PEFMIT NUMBEB PROJECT IN CTION REQUEST
TOWN OF VAIL
'{
o
SPE
TUES (WeO=l.r rUUn
CALLER
BUILDING:
tr FOOTINGS / STEEL
PLUMBING:
tr UNDEBGROUND
tr FOUNDATION / STEEL tr ROUGH / D.W.V
tr FRAMING tr ROUGH/WATER
n ROOF & SHEER " PLYWOOD NAILING tr GAS PIPING
tr INSULATION
tr SHEETROCK
tr POOL/ H. TUB
NAIL tr
tr
tr
tr
tr FINAL FINAL
MECHANIGAL:
tr HEATING
a-fioucu=\nli}!!1.tr EXHAUST HOODS
tr CONDUIT tr SUPPLY AIR
tr tr
tr FINAL tr FINAL
ifl.r.:'t
Itr APPROVED
CORRECTIONS:
tr DISAPPROVED tr REINSPECTION REOUIHED
DATE INSPECTOR
o o
INSPECTION REQUEST
READY FOR
LOCATION:
INSPECTION:
JOB NAME
MON
CALLER
TUES WED (-;M) FRI .*.-==-4"
MBER OF PROJECT
BUILDING:
E|-,,!F€OTINGS / STEEL
PLUMBING:
tr UNDERGROUND
tr ROUGH / D.W.V.tr FOUNDATION / STEEL
tr FRAMING tr ROUGH/WATER
n ROOF & SHEEB - PLYWOOD NAILING tr GAS PIPING
tr INSULATION tr POOL/ H. TUB
tr SHEETROCK NAIL tr
tr tr
T] FINAL tr FINAL
ELECTRICAL:
T] TEMP. POWER
MECHANICAL:
tr HEATING
tr BOUGH tr EXHAUST HOODS
tr CONDUIT tr SUPPLY AIR
tr tr
tr FINAL tr FINAL
fo tr DISAPPHOVED tr REINSPECTION REQUIRED
GORRECTIONS:
o
INSPECTION
TOWN OF
REQUEST
VAIL PERMIT NUMBER OF PROJECT
NAME
READY FOR INSPECTION:| ---'.---TUES WED THUR ".. FRI AM PM
BUILDING: P q,
tr FOOTINGS / STEEL
tr FOUNDATION / STE
n ROOF & SHEER " PLYWOOD NAILING
tr INSULATION
tr SHEETROCK
tr HEATING
tr EXHAUST HOODS
tr SUPPLY AIR
tr DISAPPROVED tr REINSPECTION REOUIRED
GORRECTIONS:
INSPECTOR
PERMIT NUMBER OF PROJECT
, . , ,,-/..f' ,l JoB NAME
a
INSPECTION REQUEST
TOWN OF VAIL
- .- L.- .,1 t1- . J
AM
DATE
READY FOR INSPECTION:
CALLER
r-tra6*rlr-r TUES \+.-'-}..J
-r J1,,1," e,r, s
t'WED THUR FRI
i-
6 i', !.t v,.]
tr FOUGH/WATER
tr GAS PIPING
tr POOL / H. TUB
tr SHEETROCK NAIL
tr HEATING
tr EXHAUST HOODS
tr CONDUIT tr SUPPLY AIR
'Ei eppnoveo ./'tr DISAPPROVED tr REINSPECTION REQUIRED
GORREGTIONS:
o
PE rNs CTION REOUEST
TOWN OF VAIL
READY FOR INSPECTION:
LOCATION:
?,-l I :-l .tf
PERMIT NUMBER OF PROJECT
tr FOOTINGS / STEEL T] UNDERGROUND
tr ROUGH / D.W.V.tr FOUNDATION / STEEL
tr FRAMING BOUGH / WATER
rr ROOF & SHEER
"TPLYWOOD NAILING GAS PIPING
Q INS-ULATION POOL / H. TUB
tr ROUGH tr EXHAUST HOODS
tr CONDUIT E] SUPPLY AIR
-rfi'Fenoveo
CORRECTIONS:
tr DISAPPROVED
.i,"fr"
Tlr*. ..-{Z-,--,?, !
,/:,-
{r
tt
-F,,r'k.r.
IN
o
SPE PERMIT NUMBER OF PROJECT
DATE ..
JOB NAME
INSPECTION:MON
:\
CTION REQUEST
TOWN OF VAIL
-----a- AMr PM READY FOB
LOCATION:
CALLER
TUES WED
BUILDING:
tr FOOTINGS / STEEL
PLUMBING:
trFOUNDATION / STEEL
tr UNDERGROUND
tr ROUGH / D,W,V.
I] ROUGH / WATER tr FHAMING
11 ROOF & SHEER - PLYWOOD NAILING tr GAS PIPING _
tr INSULATION
tr SHEETROCK
tr POOL/ H. TUB
NAIL tr
E]tr
tr tr FINAL FINAL
ELECTRICAL:
tr TEMP. POWER
MECHANICAL:
tr HEATING
tr ROUGH tr EXHAUST HOODS
tr CONDUIT tr SUPPLY AIR
tr E
tr4rNAL tr FINAL
OVED tr DISAPPROVED tr BEINSPECTION REQUIRED
OTIONS:
DATE I 'r,
IN
€€ *;
o
SPE
CALLER i;
MON TUES WED
,"? <:2 t t
.t-:'.>\ L- -jl.--/i L-
PERMIT NUMBER OF PROJECT
ZA /- -<-DATE J.. 'I JOB NAME
CTION REQUEST
TOWN OF VAIL
i'. r----Tit-; ftL,F
I AM_! PM
-l 4r\
READY FOR
LOCATION:
INSPECTION:
BUILDING: PLUMBTNG:
tr FOOTINGS / STEEL tr UNDEFGROUND
-
tr FOUNDATION / STEEL tr ROUGH / D.W.V.
tr FRAMING tr ROUGH / WATER
- ROOF & SHEER u PLYWOOD NA|LING tr cAs PTPING
tr INSULATION
-
tr POOL / H. TUB
tr SHEETROCK NAIL tr
Fl r'l
tr FINAL tr FTNAL
ELECTRICAL: MEGHANIGAL:
tr TEMP. POWER T] HEATING
-U ROUGH tr EXHAUST HOODS
tr CONDUIT tr SUPPLY AIR _
g ' --.' -- t -r',n
tr FINAL tr FINAL
tr DISAPPROVED tr REINSPECTION REQUIRED
--l
DATE INSPECTOR
t
INSPE PERMIT NUMBER OF PROJECT
DATE 'O/n'.,a*€-t:-g.r,r,.*
ruEs duilo-_.r t"r*
CTION
TOWN OF
L,-ii t.--1,*:l
REQUEST
VAIL
READY FOR
LOCATION:
INSPECTION:
JOB NAME
MON FRI AM
BUILDING:
tr FOOTINGS / STEEL
tr FOUNDATION / STEEL
PLUMBING:
tr UNDERGROUND
tr FRAMING
n ROOF & SHEER - PLYWOOD NAILING
tr INSULATION
tr SHEETROCK NAIL
tr FINAL
tr
tr
tr ROUGH / D,W.V.
tr ROUGH/WATER
-tr GAS PIPING
tr POOL/ H, TUB
t-l
t-1
tr FINAL _--.;
MEGHANIGAL:
tr HEATING
tr EXHAUST HOODS -
-
tr SUPPLY AIR
-
r'l
tr FINAL
ELECTRICAL:
tr TEMP. POWER
tr ROUGH
tr CONDUIT
tr FINAL
tr APPROVED
CORRECTIONS:
tr DISAPPROVED tr REINSPECTION REQUIRED
DATE INSPECTOR
o
SPE PER IT NUMBER OF PROJECT
DATE
IN
TUES WED THUR FRI
CTION REQUEST
TOWN OF VAIL
READY FOR
LOCATION:
INSPECTION:
JOB NAME
MON
F-- - I l I /tr-{- \.|' 1,..
BUILDING:
tr FOOTINGS / STEEL
PLUMBING:
tr UNDERGROUND
tr ROUGH / D,W.V.T] FOUNDATION / STEEL
tr FRAMING tr ROUGH/WATER
n ROOF & SHEER " PLYWOOD NAILING tr GAS PIPING
tr INSULATION tr POOL/ H. TUB
tr SHEETROCK NAIL tr
E n--- i ,,:r=; E
tt.!EI-EINAL l -.:"-r. 1 -r \ . ..,r (- -"' E FINAL
ELECTRICAL:
tr TEMP. POWER
MECHANICAL:
tr HEATING
tr ROUGH tr EXHAUST HOODS
tr CONDUIT tr SUPPLY AIR
tr tr
tr FINAL tr FINAL
OVED
]TIONS:
tr DISAPPROVED tr REINSPECTION BEQUIRED
P tN- I l;.-' 1,1":. L..l
i' --:,,
).,-:-it'.'
DATE INSPECTOR
PERMIT NUMBER OF PROJECT
oor= .:._ f ij 1 ,f:JOB NAME \
IN
\.'3r ', J,, , ,,
-+:-;- ._l
CALLER * !\ t'i'^-
TUES WED THUR i FRI .
I
SPE {i -:'
INSPECTION: MON
CTION
TOWN OF
REQUEST
VAIL
READY FOR
LOCATION:
AM iPM -*--.
BUILDING:
tr FOOTINGS / STEEL
PLUMBING:
tr FOUNDATION / STEEL
tr UNDERGROUND
tr ROUGH / D.W.V.
tr ROUGH / WATER tr FRAMING
,- ROOF & SHEEH " PLYWooD NAILING tr GAS PIPING
tr INSULATION
tr SHEETROCK
tr POOL/ H. TUB .
NAIL tr
tr
tr FINAL
ELECTRICAL:
tr TEMP. POWER
MEGHANICAL:
tr HEATING
tr ROUGH tr EXHAUST HOODS
T] CONDUIT t] SUPPLY AIR
tr tr
tr FJNAL lltrr'rnr-
t
tr REINSPECTION REQUIRED 'PROVED
RECTIONS:
tr DISAPPROVED
i.
INSPECTOR
\o
INSPECTION REQUEST
TOWN OF VAIL
tr REINSPECTION REQUIRED
CALLER
READY FOF
LOCATION:
PM AM
tr APPROVED
CORREGTIONS:
DISAPPROVED
BUILDING:
tr FOOTINGS / STEEL tr UNDERGROUND
tr ROUGH / D.W.V.
tr ROUGH/WATER
tr FOUNDATION / STEEL
tr FRAMING
n ROOF & SHEER " PLYWOOD NAILING tr GAS PIPING
tr INSULATION tr POOL/ H. TUB
tr SHEETROCK NAIL
tr FINAL
tr HEATING
tr EXHAUST HOODS
tr CONDUIT tr SUPPLY AIR
DATE INSPECTOR
tNsilcfloN'-, TOWN OF
REQUEST
VAIL
DATE
READY FOR
LOCATION:
JOB NAME
INSPEGTION:
CALLER
TUES WED THUR FRI AM PM
PERMIT NUMBER O PROJECT
BUILDING:
E] FOOTINGS / STEEL
PLUMBING:
tr UNDERGROUND
tr ROUGH / D.W.V.tr FOUNDATION / STEEL
tr FRAMING cl
tr
ROUGH / WATER
n ROOF & SHEER - PLYWOOD NAILING GAS PIPING
tr INSULATION _t] POOL / H. TUB
tr SHEETROCK NAIL
ft_
tr
n
Q-FINAL t ,''..- .,/, t:i .FJINAL
ELEGTRIGAL:
tr TEMP. POWEH
MECHANICAL:
T] HEATING
I] ROUGH tr EXHAUST HOODS
tr CONDUIT
tr_
tr SUPPLY AIR
tl
tr FINAL ,@"nrunl
!-t IOVED
GTIONS:
tr DISAPPROVED tr REINSPECTION REQUIRED
TION REQUEST
OF VAIL
'ta. ' \ '., \'
CALLER
READY FOR
LOCATION:
INSPECTION:i'.MON THUR FRI
(- - :
PERMIT NUMBER OF PROJECT
DArE\ -j;\),:B:: JoB
BUILDING:
tr FOOTINGS / STEEL tr UNDERGROUND
-
tr FOUNDATION / STEEL tr ROUGH / D.W.V.
tr FRAMING tr ROUGH/WATER
n ROOF & SHEER - PLYWOOD NAILING
-tr INSULATION tr POOL / H. TUB
tr TEMP. POWER
-
T1 HEATING
tr CONDUIT tr SUPPLY AIR
-
tr DISAPPROVED tr REINSPECTION REQUIRED
CORRECTIONS:
INSPECTOR ...
crNEERr NG [BR$ LrANrs,t LETTERON TMNNSNfl OTTAL
P.O. Box 5740
AVON, COLORADO 81620
(303) e49.U9r
tr Shqp drawings
tr Copy .of letter
E Plans [J Specifications
GOPIES oArE,NO.DESCRIPTION
4lq/at trttlL #tLthL.{.'1- Yr''-7 tr7 vl L
l--=---..--.--'--
F, n . L. li tr € uarJ-'
THESE ARE TRANSMITTED as ch'ocKd below:
E For approval
E For your use
E As requested
tr Approved as subrnltted
tr Approved as notd
tr Returned lor corrections
tr Resubmit-copies lor approval
tr Subnit-copies for distribution
E Retu rn
-corrected
prints
19- tr PRINTS RETURNED AFTER LOAN TO US
REMARKS
COPY TO-rt? (qrc +Lp SIGNEDT
o o
\
F
3
b
U 2 a
n
F o
$
TL
o
"F
at
.i
6\T
5s i*
$.?
io
$+AF
$f,l-
fi
TL
$
3
ul ul su
vr Lis { S. o t.rIF
$iF$
$i*3
I o 2
t
'}t
d
a
$.\F
=V \
7.
ri ur L
I
I
-'l
\ -T'
$ (L p$
$o
u1 \il-tr?
B$
=-
r SlJbdisry ol Jat R Slnlh f,Og. Co,
SELEETIG'N TIVFG|FIMATIGIN
supplemer the llre
a8 an audnary Inlol connectlon lo
daslgn ls ueed on
gradg.
LETTERING AVAILABLE:
AUTO. SPKR.
STANDPIPE
DRY STANDPIPE
AUTO. SPKB. STANDPIPE
Fsfer to page 5.6 lor spgclal lgttoring
VARIATION:
Addltlonal length stesve, Specffy
SPEc|Ff thread and
waler supply. Free standing
It s Pipod vsrucany through
Chsck Valvo
Ball Drlp on Chock Vslvo
Opllonal Floor Sump
TWG!.WAY E|FIAEiEi ElctEIY WITH CLAPFEFIEi
'Flg. slzo 676f .,..-..... ........,.,4 x2W 5762.... ...4'r3"576it...... ,exzry
5764 . .. . . . . . . . . . . . . . . . . . . . . . o-x g,
OPTIONAL FINISHES!
-B Pollshed Brass .
-C loyqh Chrome ptated Eody;
Pollshed Chrome plated Trim -D Polished Chromg plated
Ovsrall Helshtt 24"
2:wX, Radlus of eody Swtns: 7%"
2-Way
2-Way
' SPECIFY thread and letterlng
0
THFIEE.WAY BFIASiS Etc'trtY I^|ITH CLAFPEFTEi
Slze .( xZW .,,.......6Px
-C lo.Tqh Chrome plated Body;
Pollshed Chrome pldted Trlm
-D Pollshad Chrome plated
Badlus of Body Swlng: B"
SPECIFY rhr€ad and lettering
Page 5-9 NOTEI A$AYS INDICATE HOSE TIIREAD FEQUIREMENTS
,t,
T€raaente, Suite 200
1100 Sbut Sheet
Dms, Colrrado 80204
(flB)6?370m
ArchiHule
Planning
Lands&pe tuchitedure
Interior Arrchitectrne
*ea 4' &#€,
Atft ft-'t,nx
n Seracuse Lawler Wong Staudr
21 January 1988
Ii!r. Gary Murrain Vall Building Department
75 South Frontagie Road
VaiJ-, Colorado 81657
Dear Mr. Murrain:
For confirmation of our meeting on 19 January 1988,cross corrid,or d,oors serving as a single entry when two questrooms are rented ag one suite need not be fire rated since aJ.1 guestroom entrys off of corridors are 2O-minute rated. Also, dead-end corridors can not exceed 20 feet if the cross corridor doors are to remain non-rated.
Thank you for your time and consideration in addressing this issue with me.
Sincerely,
SERACT'SE I,AWLER a Professional
ABR:mlz
EncLosure:
cc;- Phil Harris - GEJCC
Frank Freyer - V.V.Jim Bessinger - BSB
8sll11-cA
WONG STRAUCH
Corporation
Xerox copy of partial Terrace Wing floor plan initialed as approved by
Gary l{urrain on 19 January 1988.
B. Russell,
Principal-
AIA
:'?ffi;'t
-11
ovAt
a W rri
nNEdl,aJllse'
tlv
?hfle$
lJu I
I 1-
I
I
o I h+.
Architecltre
Plorning
LoMscope Archit€cfure
Interlor Architecture
Eneoi LPyle,AlA
VirePresident
7 ![ay 1987
Tenocerfre, &.rite300
l'l@SlcnJtSlreet
DerverQclorodo@04
(303)623-7031
l{r. @ry lt[urrain (}rLef E[riLding Of ftclaL
Comunlty DeveLognent Vallr CO 81557
REn
Garyr
flre folLoslng Lteros eumar,lze n1z understandlng of our telephone
dlscusslons on 29 April and 4 *lay 1,987 regarding the 4th LeveL
suEpended ceillng and the one hour roof, system.
01.. only one suspended ce_lllng. (5/8" tcypsu{n Boardr 1lrpe x) is
regulreel oyer the 4th Level Unlts r lncludlng baths and corridors. '
02. ltre roof , as pLaRnedr ls proteeted by 2-L/24 Tlpe l( Glpsum
tsoard layers on the bar Joists and sprayed deck Elsewtrere,
with bep"le and cgLunns ricelving sprayed flreproofing (excluding dormerEl.
03. Dormer framing above the nain roof ls protected by one layer 5/8' Xlpe X Gl4l. Board (furred or hung).
04. tdo bath fan firb dampers an9 requlred (in ceil.lrg or at .ertefior. dormer, satl) .eince.the rmf ls separately protected.
05. lhe bath fan duct ls sheet metal constructl.on.
rtre confLictss on the drawings concernlng iteng Ir 2r and 4 above
wi.tl. be clarifled. by Archit,ecf,s Supplementary Instructions-.'
I have asked Czossroads Enterprises, Inc. to send you Infornation
on Cafco DCrlF byr U,S.:Mineral Products Co. that w€ are proSroslng
a!
f,r. frr$ tiur.f*ttr
? llv sFl hgr tr :
ttrfrttf,,
|ImaBt r{fflr &
l&l/.'h'
elrf f,rr*-hpr Itr'ffin lE35 Hra
lrsll]r stt
rb -.srL
.,' f.l''': ": .''4;-1,.*: '
Slrrrtt
-{n, ,'
4e*4 'frfu'.,
t
l' -
TBr
FFOltr
DATEI
REI
.
In rrr*onr*,to tlfr f,lun thr foll!il**Fl c*arFntrr
h€ol& tn ths frll:ka rqulpped rr Eutt{tf{ rt l il$tlrr''@fdr rt slx
OF
C*wtty.ef thrm g*tlan*per ii,n6r +eat frlt, on dntsr rp-ctfig. ol . 62*.X3,.,,,. tn
*:
...i
,)
E- ,/'
Tonn of Vall
76 S. Frontage Road Vall, Colorado 81667
PIan anaLyslE based ou the 1985 Unlforn BulldLng Code
ProJect Id: PLAZA lflNc PHASE 1
Address: CA$CADE VILL'AGE Date: Aprll 15, 1987
Coutractor! Gl.E. JoHllgON
ocaupancy: R1,A3,82 ArchltEct: RODIA DESIGN GROUP
Tylte of Const: II-FR EngLneer: RICSABD IIEINGARDT
Plaas Eramtaer: GARY MURRAIN
NOTE:The code ltens llsted tn this relrort are aot lntended to be a compLete llstlne of aLl posslble code requlrements ln the 1985 I!BC. It Is a gulde to selected sectl.ons of ttre code.
TIPE OE'CONSTBUCTION:II-Its Sprlnkler systen for area Lncrease
SSPARATION
DIRS TION BOTINDARY ANEA INCREASE FINE FBOTECTION
NORTH Bulldtng EAST Bulldlng 33.0 Feet 13.0 Feet 0.0 Feet
SOUTE Property llne 96.0 Feet 96.0 Feat I|EST Property Llne 20.0 Feet 20.0 Eeet
Area lncreased L9.26 % for open area on 2 sldes.Allowable area l-ncreased for sprlnkler systen.
FL NA}18 OCC ANBA ALLOWED A,/A OCC LOAD NEQ'D EXITS EXIT TIDTE
,4/ee ll ,{a#/nJ,e,,"*
0.0 Feet
4 Hotel/lfotel Rn R1 2AE24 LO4278 O.2O 104 2 2.AS TOTAT, 2OEZ4 LO4276 O.2O 104( 104) 2 2.A8( 2.0S)3 lloteL/lrlotEl Rn Rl 30676 LO4?TA A.29 153 2 3.Oo
TOTAJJ 30676 LO4278 0.25 163( U06) Z 3.06( 4.10)2 HoteLtTlotel tu Rl 31030 10rt276 0.30 166 2 3.10
TOTAL 31030 104276 0.30 156( 268) 2 3.10( 6.16)1 Hotel/Motel tu R1 24BSZ tO4278 O.Z4 L2.4 2 2.45 1 DLnlns Roon Ag 3000 104e76 0.03 2AO 2 4.OO 1 Retatl Sales tu 82 4800 139151 0.03 160 2 3.20
TOTAL 32882 108261 0.30 4E4( 600) 2 9.69( 12.00)B HoteL/Motel tu R1 40976 104276 0.39 e06 Z 4.LO
TOTAL
BUILDING TOTAL
40976 104276 0.39 e06( 600' 2 4.10( 12.00)116111 210756 0.56 E97 * NOTE: Indlcates that thls occupancy ls not aLLowed on thLs floor-Table 6-D
S NOIE: IndLcates that thls occupancy Ls aa accesEo4r area-Sec. 33A2. (a) exc.
REQUIRED OCCI'PANCY SEPARATIONS A3-Rl t hr B2-R1 t hr
ALl glaalng ln hazardous locatlons (see sectloa 6406.(d)) ls requlred to be of safety glazlng naterlal. -- Sea. 6406,
HANDICAP REQUIREMENTS ;
HandlcaB accesg Ls regulred to thLs bulldtng. -- Sec. 3301.(e) and Table 33-A If a ranp Ls used for haadlcap access, the nar s1oIle ls 1:12. -- Sea 330?.(c)If, water fountalns are provl.ded, one uust have a slrout wlthln 33 lnahes of the floor and up-front controLs. -- 9ec. 611.(c)
TOIT,ET FACILITIES:1. All doornvays leadlng to a tollet room for handLcapped are regulred to
Brovlde 32 lnches clear wldth. -- Sec. 511.(a)
!. Provlde {4 lnches clear on each slde of doonrays. -- Bec. 611.(a) 1.3. Provlde a 60 tnch dlaneter claar area wLthtn the tollet roon(s).-- Sea.611. (a)2.4. Provlde a clear area 42 lnchEs wl.de and 4E laoheE 1on6 la front of at least one water closet. If tn a oonpart[ent and door is oa the sLde,provlde a alear access wldth of 34 LncheE. Door may not eacroach loto clear ar€a, -- Sec. 611. (a)3.6. A 48 inch accesE rvldth ls requLred to the handlcap couDartnent.-- Sec. 611. (a)3.6. Grab barg are requLred behlnd 'nd on one slde or on bottr sldes of
handlcap water closet. Slde bar ts requLred to be 42 lnches Long (nLn) and
Exbend 24 Lnches ln front of water closet. Rear bar ls to be 24 inches
Long la a roon or 36 laahes long ln a compantnent. Bars are to be 33 lnches to 36 Lnches above the floor. -- BEc. 511. (a)4.7. Provtde a clear area uader at Least one lavatory, 3O lnahes wtde X 29 inches hleh X 17 lnahes deep niulmun. -- Seo. 611. (b)1.8. The bot'ton of one mlrror, oFenlng of a towel flxturer flrrfl dlsposaL flxture ls requlred to be wtthLn 40 laches of the fLoor. -- Seo. 611.(b)2.&3.R-l EA}TDICAP NEQUIREX.IENT9 :
IF there is uore than 20 uaLts oa the ELte, handlcaB rrnits arE regulred.21 through 99 unlts on slte-oae unlt
100 & olrer-oDe, plus one for each addltLonal 100 unlts of fractlon thereof AII doors ln the 'nlt ar€ reguLred to Frovide 32 lnches clear wldth.
ToL1et facLlltles Ln these unLts are requtred to conDly wlth Sec. 611.
These regulrements are Xpr Seo. 1213.
The 60 lnch clear area ls aot requlred nlthtn units. -- Sec. 611.(a)1,
o
EXTERIOR WAj.,I., FINE RATINGS AND OPENING PROTECTION
NORTH EAST SOUTE WEST
OCC BRC NON.BRG OPNC BRG NON-BRCI OPNC BRG NON-BRG OPNG BRG NON.BRG OPNC I{Att I{AIJIJ PROT I{Att WALL PROT WA"IJIJ WALI, PROT WAIJIJ llAlt PBOT A3 .4hr Zbr Frot 4br 4hr NOP 4hr Ohr None 4hr thr None
BZ Zlw Zhr Prot 4hrr 4hr NOP z]nt Ohr None Zhr thr None
81. ?lrll. zhr Prot 4hr 4hr NOP zhr Ohr None zhr thr None
The erterlor waLts are resulred to be of NONCO!tsltSTIBtE naterlal.
None -- No flre protectloa regulrements for openl-ags.Frot -- OpenLngs are to be protected wlth X/4 lrt flre aEsenblles.
5O? of the area of the wall narLmun. Sec 604. (b)
NOP -- Openlngs are not permitted ln thls wall.tfi -- These nalLs may be required to have a Barapt waLl 30 lnches
above the rooflng. The parapet nall lE requLred to have the same fire ratlnE as the wall. See seotLon 1709. for detalls and erceptlons.
OTSffi BUILDING ELE!,IENTS Table 17-A EIEMENT MATMIAL FIRE RATING NOTES AT D EXCEPTIONS InterLor Bearl.ng wall NONCO!tsUSTIBLE 2 hr Interlor nonbrg walI NONCOMBUSTIBLE t hr.$tructural Frane NONCOMBUSTIBLE 2 hr Exterlor Struct Frame See footnote *1 $haft Euclosure NONCOMBUSTIBLE 2 hr Floor/Celling Asaenbly NONCOMBUSTIBTE 2 hr
Roof,/CelLlng Assenbly NONCOMBUSTIBLE t hr. Sec. 1906.,1806.Stalrs NONCOMBUSTIBI'E NOIIE Ssc. 1905.
F@TNOTE9;1) MLnlnun on erterl.or sl.de aleo based on extErlor brg. naLl regulremeats.
Based on sectlon 3202. (b)
The rooflug oD thls bull.dl-ng ls to be flre retardant.
See Eeotl.ou 3203. (e) and IGBO research reBorts for reguLrements.
EXIT NOTE9:
Stalrways eonnectlng 3 or nore fl.oors are requlred to be ln exl.t, enclosures
Ttre wallE of the enclogure are requlred to bE 2 hr flre assenblLes.
The openlngs lnto the erLt enclosure are requlrad to ba t t/Zbc assemblLes.
A connectlon to the exterlor ls requl.red wtth the sane flrE Brotectlon as the exlt enclosure. -- Sec. 3309. (d)
A barrLer Ls requlred at grade level. -- Sec. 3309. (e)At least one stalnray ls regulred to extend to the roof unless roof slope ls
Sreater than 4:12. -- Sec. 3306.(o)
ThE sDace under the Etal-rs (Enclosed or not) nay not be used for any EurxtoEg.-- Sea. 3309. (f)
See section 3309. for addttlonaL lnfomatLon.
The marinum rlse of a stel, ls ? lncbes and the nlnLnum rua ls 11 lnches. -- Sec. 3306. (c)
The mlnLnum wldth of a stalrway Ls 36 lnches, 44 Lnehes lf the
occuBant load ls greater thaD 60. -- Sec. 3306.(b) See section
3303- (bl shen onnrroent 'land lq rrran*-ar then 183
ADDITIONAT REQUIREMENTS BASED OH OCCUPANgY
For A3 occupancy
Aa autonatlc fire-extlngulshlng system Ls requlred in -- Sec.3802. (c)2.
An autonatic Eprlnkler systen Ls requl.rEd ln enclosed below or over a stalrwqy. -- Sec. 8802. (c)4.Floor-lst Occupancy-DLnlng Boon Extt aigus are requLred fron all areas serrrlng aa or more. -- Sec, 3314. (a)
GorrLdors servlng err occupant load of 30 or more have thr aonstructlon and rated openings -- Sec.ExLts are reguLred to be separated by llZ of to}lie
ar€a. -- Sec. 3303. (c)
Doors are required to swlag ln -- Sec. 3304. (b)
ExLt doors are requlred to have
the basement.
usable space
nalu door. -- Sec. 3318. (a)
The capactty of this area Ls required to be p,osted at 200 occupants.-- Sec. 3302. (c)
For BZ occupFncy In al-l areas cuEtonarlly occupied by humans, provLde aatural, or artlf,laal Llsht and vent,llat,loa. -- Sec. ?0F.X'loor-lst Occupancy-Retall SalEs h Ertt EtgEs are reguLred fron all areas seryLng an occuxrant load of 50 o! nor€. -- Eea. 3314. (a)
CornLdors gewLng an occupant load of 80 or Dors are requlred to have thr constructlon and rated openlngs -- 9ec. 3305. (e)A(h)Erlts are requLred to be sexrarated by t/2 of, the di.agonal of thls area. -- Sea. 3303. (c)
Doors are regul.red to srl.ag Ia the dlrection of erlt frou thls area.-- Sec. 3304. (b)
For Rl oscunrancy
Storage and Laundry rooms used La conmon br tenants to be separated by a one hour ocaupaacy aeparatLoa. -- 9ec. 1202. (b)
A flre alann systen may be requl.red ln thls bulldlng. -- 8ea.
120e. (b)
Provlde a wlndow or door to the extert.or frou every roou used for
sleeBlng.Awlndowuust provlde a clear oD€a area of E.7 Eq.ft., a clearhetght of 24 lncheE, and a clear wldth of 2O lnchEs(nlnlmnm). -- 9ea. tZA4.
A11 habltabLe rooms requLre extertor glazed opeaLngs equal to 1A% ot
more of the floor area. (nln 10 se.f,t. ) -- gec. 1206. (a)
AIl. habttable roons requl.re an oBeaable er0erlor openLngs egual to 6%or Eore of, the floor area..(ula 6 sq.ft.) -- Sec. 1206.(a)
Tbe nlnlnrrn ceLllng ln a habltable strace ls 7 feet 6 lnahes except
kLtchens, halls, and baths may have a celllng hetght of 7 feet. --
Sec. -- 1207. (a)
FLoor-BS!{T Occupancy-Hotel/}lotel Rn Exlt slgUs are rEqulred fron alL areas sernLng en
or &or€. -- 9ec. 3314. (a)
Corrl.dors servLng aa ocaupant load of, 10 or nore
have thr coastruct,lon and rated openlngs -- Ses.ExltE are requlred to be seFarated by t/2 of l}re area. -- Sea. 3303. (c)
D,oorg are regul.red to swl.ng ln the dLrectlon of erj.t from thLs area.-' Sec. 3304. (b)
occuf,rant load of 50
are requlred to
3306. (s)&(h)
dlagoaal of thls
the dLrectlon of erlt fron thls area.
panic hardware. See erceptLoa for
occupant Load of 60
are reguired to
3306. (s)&(h)
dLagloaal of thls
I
L E l ;rrrr-1 et Oaarrrrnnnv-Flntal /M;rtal Tltm
E"rlt slEns "re requlred fron alL areas serrrLug an oacupant Load of 60
' '3:"lii3;,-;"3ii;"t:ltlnanr
load or 10 o"'o"1"" reeurrea to have thr oonstructlon and rated opeuings -- Sec. 3305. (e)&(h)Erlte are reguLred to be seBarated by L/2 of the dLagonal of thls area. -- Sec. 3303. (c)
Doors are regulred to swl.ng ln thE dLreotlon of exLt fron thls area.-- Sec. 3304. (b)
Floor-2nd Occupancy-Hotel/t{otel fu Extt stgns are requLred fron all areaE senrLng an occupant load of 60 or more. -- Sec. 3314. (a)
Corrldors Eerrring an occuBant load of 10 or more ars requLred to have thr constructton aad rated oErenlngs -- Sec. 9306. (e)&(h)Exlts are requLred to be seBarated by 1/2 of thE dlagonal of thls ar€a. -- Sec. 3303. (c)
Doors are requl.red to swLn6 in the dLrectlon of erlt from thLs area.-- 9Ec. 3304. (b)
l'Loor-3rd Occupancy-HoteL4{otel Rn Exlt sLgns are requl.red f,ron alL areas senlng an occuxrant load of 60 or more. -- Sec. 3314. (a)
Corrldors EervlnEi an occupant toad of 10 or tnorg are regul.red to have thr constructlon and rated oDenlngE -- Sec. 3306. (e)A(h)Erlts are requLred t'o be segarated by t/2 of the dlagonal of thls area. -- Sec. 3303. (c)
Doors are requtrEd to swl.ng in the dLreation of exlt frou thts area.-- Sec. 3304. (b)
FLoor- tlth OecuBancy-Botel,/Hotel fu Exlt stens are requl.red f,ron all areas sernrlng an oocupaat load of 60 or more. -- Sec. 3314. (a)
Corridors sernrLng rq occupant load of 10 or more are reguLred to have thr constructlon and rated oEpnlngs -- Sec. 3306. (C)&(h)Exlts are requLred to be seDarated by L/2 of the dlagonal of thls area. -- Sec. 3303. (c)
Doors are required to swLng ln the dlrectlon of erlt fron thls area.-- Sec. 3304. (b)
April L5, L987
In addition to tb.e a special J.nspector of work:
1. CONCRErE!
/t"/./ f{,ffi*
SPECIAIJ INSPECTIONS
inspections required, the onner shall enpl.oy during construction on the fol-lorrlng elpes-
Ixrrilg the takinq of test specinens and pLacing of all reinforced concrete.
2.RETNFORCING STEEL AND PRESTRESSING STEEL:A. Ouring prestressed concrete.
B. Durl-ng placing of reinforcing steel , placlng of tendons and prestressing steel for all conciete required to have special- enspection by ften No.1.
EXCEPIION: lltre specJ.al J-nspector need not be present during entire reinforcing steel- and prestressing steel-placing operatJ_ons, provided he has inspected for conformance wLth the approved plans, prior to the closing of forns or the delivery of concrete to the jobsite.
WELDING3 Erctile noment-reslstLng steel frames. As required by Sectlon 2722 (fr.
B. A11 structural welding, l_nctudinq welding of reinforcinlf steel .'
EXCEPTIONSs (L). When welding is done in an
fpproved fabricatorrs shop. (2't. When approved by the buildi.ng official, singl_e-pass fillet wel-ds when stressed. to less than 50 percent of allowable stresses and floor and roof deck welding and welded studs uhen used for structural
diaphragnn or composite systens may have periodLc inspections in'accordance with seltLon gbe (e) .For perLodic inspectJ.on, the lnspector shali check qualifications of welders it the Etart of work and then make flnal inspection of all welds for compl.iance prior to conpletion of welding.
Page 1 of 4
4.IIIGII-STRENGW BOIJTfNG: Ihrring aI1 bolt Lnstallations @ns.
EXCEPIIONS: (1). 1ilre special inspector need not be present during the entlre Lnstallatlon and tigbtening operation, provl-ded he has:
A. Inspected the surfaces and bott tlpe for confornance to plans and specifications prior to start of bolting.
B. And w111, upon sompletl-on of all bolting,verify the mininum specified bolt tension for to percent of the bolts for each connection with a nLninun of two bolts per connection.
(2r. In bearing-tlrye connections when tlrreads are not required by design to be excluded from the shear plane, inspection prior to or during lnstallation wiII not be required.
STRUgrURArJ UASON& DurJ.ng preparation of masonry @9 and iriciirg of arl- ma=onry'units, pJ-acenent of ieinfoicement, inspection oi grout gpace, funnediateLy prior to closing of cleanouts, and during all grouting operations.
5.
of
6.
7.
When cast-in-place CLass
EXCEI{IION: The specLal inspections may be 'mlEAn-E an intliat lnspeition to check the deck surface and pLacement of reinforcing. The special J-nspector shall supenrise the preparation of compression test specimens during this initial_inspection.
8.
9.PfLING, DRILLED PIERS AND CAfSSONS: During driving n of cist-in-ptace drilled pLles or caissons. See Items Nos. 1 and 3 for concrete and reinforcing steel J.nspection.
During earthwork excavations, gracling and filling operations
inspectio'n to satisfy'requirenents of chapter 29 and Chapter 70 (Appendlix).
STRUETURAL MASONRY:
REINFORCED GYPST]M CONCRETE:
B glpsum concrete J.s being mixed and pl_aced.
FIIJLs Duri.ng the appLlcation
as part of a fil-l. when used
SPRAY-APPLIED FIREPROOFING: As reguired by U.B.C.
43-8.
INSUI,ATING CONCRETE insulatlng
L0.
Page 2 of 4
A.SPECIAL INSPEerOR. The special inspector shall be a qualified person who shal_l demonstrate his competence, to the satisfactLon of the buil-ding official , for inspection of tlre partJ.culai tlpe of constrrrction or operation requiiing speciaL lnspectJ.on,
DTITIES AIID RESPONSIBII,ITIES OF TFIE
SPECIAIJ INSPECTOR. (t). The specl_a]_inspector shall observe the work assigned for confornance sLth the approved desigm drawings and specifications.
(2). llhe special l-nspector shall furnish 5-nspection reports to the building official , the engineer or architeit of record, and other deslgnated, persons. AIt discrepancies shall be brought to the innediate attention of the contractor for correctLon, if uncorrected, to the proper
desigm authority and, to the bullding officiaL.
(3). llhe speciaL inspector shaLl submit a final slgned report stating whether the work requiring special inspection was, to the best of hls knowledge, in.confornance with the approved plans and specifications
and the applicabl-e srorkmanship provision Like manor.
PERIODIC SPECIAIJ fNSPECTION. Some inspectlons may be made on a periodLc basis and satLsfy the requirements of contlnuous inspection, provided this periodJ-c
scheduled inspection is performed as outlined l-n the project plans and specifications and approved by the building offlcial.
APPROVED FABRICAIORS. Speclal J.nspections shalL not be required where the work is done on the prenisesr of a fabricator registered and approved by the building official to perfor:m such work without special inspectLon. The certificate of registration shaU be subject to revocation by the buil-ding officlal if it is found that any sork done pursuant to the approval is in violation. The approved fabrLcator
EhalL subnLt a Certificate of Compliance that the work waE perforued in accordance
wLth the approved plans and speclfications
B,
c.
D.
Page 3 of 4
ffifffi*
to the bullding officiaL and to the
engLneer or architect of record. [he approved fabricatorrs qualJ.fLcations shaLL be contingent on conplJ.ance with the following.
(1). Ttre fabricator has developed and subnitted a detal-led fabrication proceduraL
manual reflecting key quaLity control procedures whl-ch will provide a basls for inspection control of sorloanshJ-p and the fabrl-cator plant.
(21 . VerifLcation of the fabricatorrs quality control capablJ-itJ.es, plant and personnel as outLined in the fabricatLon procedural nanual shall be by an approved
inspectl-on or quality controL agency.
(3). Periodic plant Lnspections shall be conducted by an approved inspection or quality control agency to monitor the effectiveness of the quality control program.
(4). rt shalL be the responsLbtltty of the inspection or quality control agency to notify the approving authority i.n writing of any change to the proceduraL manual .
Any fabricator approval nay be revoked for
Just cause. Reapproval of the fabricator shall be contingent on compliance sith qualtty control procedures during ttr'e past
( Year-
Chief Buil ding 0fficial
Town of Vai I
Page 4 of 4
r o,2
a 2.3
f l.tl
r 4.3 (4)
r t-a'
TERRACE WING -PIJIZA PIIASE 1 PI"AN C.HECK
3/26/87
Page 2
3. The elevators ln the Terrace Wlng sha11 be equipped nith
A.N.S.I. Phase II recall; primary fLoor being at grade anil
secondary aL the baseuent, and eooke presurizatioo subJect
to a moke tseet by Tono of, Val1, tnstalled ln confor:nance
I.C.B.O. staodards. Both the recalI and presurlzation shaLl
actlvated upon any geueral alarn condition.
A 6.6 tocation of, ce1L1ng fLxtures, enoke detectons erd fire sprinkler
heads sha1l be cordinated between the trades.
M 1.1 fire l.ocation of the F.D.C.ts for the Terrace Wlag and Plaza
Phbee II and a nen fire hydrent shaLl be instdLled at the s
south eod of the oatgrcourae.
ALL work to be peefomed iA the existing Westin va1ve room,
boiler roon and 6MC building sho11 not affect the status
of the flre alarn or sBrinkler systems.
M 2.1 A 4rr fLoor drain w111 be proviiled
M 2.3 Fire eprinklers shalL be del-ete<l froo ttre el-ectr.leal rooms.
Systeo snoke detectors shaLl be installed.
M 3.1 Fuel vent shalL be in conformance tnith N.F.P.A. Standard 30,
rith ninlnum vent slze if 3 cn. mlnlnum inside dlameter,
Located at least 3i6 n above grade, vented upuards or outwards
from tbe building and no lese than 1.5 m fron any opening.
M 4.1 The fire dirupers and iaetallation wilL be revleved by the
Butldtng Departneot.
M 5.L The nater nai.n shaLL be lnsta11ed according to A.W.tl.A. and
1oca1 Jurisdiction requirements.
M 5.2 Fire eprl4kLer syaten sha11 be revlewed at time shop ilrawings
are subnitted f;or revlew.
NOTE : The fourth fLoor residertal unlts aod corridor shall be
proteeted by a vet pipe f,ire epri.nkler dysten. l4lnqr
EfegFEI0Sg ffAy be granted for proteg0lon of the vlndons.
The fire hose cablnete shall be lneide the stai,rcase ofl stairs
L and 2 in the Terrace WLng.
M 6.1 Remote $rltches shaLL be provided at the FAP. Restoratioo of
fan uoits ehal-l be by nanual control by buildiog personnel.
Vl 6.2 Flre hose cablness shaLl be Cl.ass IlI . See note on M 5.2
I
tsr
t
v..,
i
i'
t
F.
F
i
t
F,
t.
i .li , -t"
;
I
i
t
I
t.
i
i
I
I
I
.
ffi flllF * FfiAE[ FHASE lr.,f[l[*
tr€r ths #48{iB-}."!
*Iff,ercnt nceqrles
; ilE'each lourrl of ilre
Sodl Firc lbpcrment'rc$rit*rtlt
ce,ltnb printer to.be iatrsfisad r
h progr*d to.rl@t { Aettcf'rd'ffi'l
4sBtion , ae.alrpfu*rd by tf9;$ntl,-{@tr..hffi
!*F bpca
l[liestary eoEtace'$'ttEb,
cl{y the 1trit6al.,F@,
A 4,3
D tdg'
equipoat s&#a
I e.I
il'*J
; t,,1
Fire eprink&dr d*gn
Firc Hffi rlt,l ,tp"
Aadlbnltty lc a
f]lqff . cmrnta rcflct,th;
ndmlfy q eiolf,tiwe of, t*re lhif
A.t&truced tf trh Tom
asthp.t& r'66idtrr, ers@irt .{*f
tc cqly dth sseh rsqrdrEilrtt;
twr
*F"Spd[4$iy
of ffi*ie 6rm ths apprcrcd pLanr
dd
+/&
,t e 6 &e I s @
8'* z
la /g)
7z4
T-crrt o,-tl,
ts-G 49
5.gF----e
ra;;E
2
CL*J-n&12
o8l _7_ar-d?:L_
DRr>T.^3ao
ea ,Do 6
ca.a.o"ti *-T"--
T0+6,9-
7tn{
@
.t
rj t,
I
@
.,
@ dddd
- -(ora'a
dr.tD
- -< gs,oaa )
h/
./
P.O. Bo( 2139
Cdsado Sgingr Colorado 8CEX)I
TdephonE (301D 473-5321
3f0 S. Forncen$ Sfeet 80St4
Mr. Frank B. Freyer III Vail Ventures, Ltd.
1000 South Frontage Road ltest
Suite 200 Vail, Colorado 81657
RE: I,JESTIN HOTEL : TERMCE I{ING ADDITION AND
-
PLAZA BUILDING PHASE I
VAIL, COLORADO
Dear Frank:
He are p'leased to submit our proposal to provide al'l necessary labor_and
materiais to construct the Teira|e l{lng Addition and the Plaza Bui'ldingt __.
Phase I, llestin Hotel, Vall, Colorado ior the Guaranteed Maximun Prlce (Gl{P)
of sEVEI MILLION, SEVEN HUNDRED NINETY THoUSAND, THREE HUNDRED SIXTY EIG]IT AND
N0/100 DOLLARS ($7,790,368.00) includlng a Contingency and Fixed Fee as
fol I ows :
Direct Costs $5,645'269.00 ''
General Condltions 514,846.00 ' Pre-Purchased Steel & Drawings 56'020.00
lJarranty Reserve -&5ffi
Contractor ContingencY ee#fe3''fF
Performance & Paynent Bond
GUARANTEED MAXIMUM COST
General Contractor Flxed Fee
TOTAL GUARANTEED MAXIMUM PRICE
299,630.00*
$77Td',36'EE0
* Any and all savings from the Guaranteed Maximum Cost shal] be totally
reverted to the 0wner's account.
GUARANTEED MAXIMUM CoST BREAKD0LIN
please refer to the attached cost breakdown of our Guaranteed Maximm Prlce by
Specification Section and Bid lten.
DESIGN DOCUMENTS \-
for Terrace Uing Addition dated
March 20, 1987n PrePared-bY SLP
dated March 3, 1987' Addendum
2 dated March 2l, 1987.
Our Gl4P is based on Plans and Specifications
February 23, 1987" and Addendum No. I dated
Architects, and the P'laza Building, Phase I
No. I dated March 20, 1987, and Addendum No-
EEJITHIlSEN
I{ESTIN HOTEL
vAIL, C0L0RAD0
GUARANTEED MXIMUM PRICE @
TERRACE
I.IING
PLAZA BUILDING
PHASE I TOTAL
1000
2A70
2200
25'lt
25]8
3300
3600
4400
5120
6100
6200
7240
.7255
76]0
7900
8'l 10
8210
8305
8314
8410
8710
926"1
9310
9900
10800
12690
13052
13200
14240
1456'l
15000
15500
'15000
16000
455,072 $
'16,440
155,210
I9,495
9,865
593,6i18
3,22O
17,3'16
7't6,045 .|71,634
197,465
225,378
77,739
280,574
10,9T3
32,412
154,047
683
125,727
99,079
65,287
918,015
70,453 .|46,019
I3,970
478
l0,7lB
35,875
174,6'14
4,001
626,493
ll I ,249
24,700
424,942
53'-6rFo5'
65,020 4,27t1-w
59,774
13,170
?2,877
8,770
90"189
464
2,349
156,260
40,595
36,244
49,601
I6,829
77,516
3,289
18,20]
29,442
15,548
23,057
I6,376
204,367 '16,'150
26,051
,,rr-?
::
123,757
28,577
$ 5'14,846
29,6'10 '178,087
'19,495
l8,635
584,'137
3,684
'19,655
872,305
212,229
233,709
274,979
94,568
358,090
14,202
50,613 .l83,489
683
141,275
122,136
81 ,663
1,122,382
86,603 ' 172,070
l6,582
478 ' '10,748
35,875
'174,5'14
4,00.|
750,250
139,826
24,700
498,800
I5,086
7;r6-0;n3
66,020 -tS€O,
_ae7d€3
GENERAL CONDITIONS $
SELECTIVE DEMOLITION
EARTHI{ORK
ASPHALT PAVING
INTERLOCKING PAVERS
CONCRETE
GROUT
STONE
STRUCTURAL STEEL
ROUGH CARPENTRY
FINISH CARPENTRY
EXTERIOR INSULATION & FINISH
FIRE PROOFING
SHEET METAL ROOFING
JOINT SEALERS
STEEL DOOR & FM}IES
!{00D D00Rs
ACCESS D00RS
FRENCH DOORS
ALUMINUM ENTRANCES, GLASS
FINISH HARDI,IARE
GYPSUM BOARD
CEMT.IIC TILE, RESILIENT
PAINTING, Vl.|C, GUARDS
TOILET ACCESSORIES & PARTITIONS
FLOOR MAT
SAUNAS
SPA EQUIPMENT
ELEVATORS
LAUNDRY CHUTE
MECHANICAL
FIRE PROTECTION
SEl,lER
ELECTRICAL
TEMPOMRY STAIR TOI{ER
SUBTOTAL
PRE-PURCHASED STEEL & DRA}JINGS
I,'ARRANTY RESERVE
CONTRACTOR CONTINGENCY
PERFORMANCE & PAYI4ENT BOND
GUARANTEED MAXII4UM COST
GENERAL CONTRACTOR FIXED FEE
TOTAL GUARANTEED MAXIMUM PRiCE
73,858
l5,086 ry
-J=2;€--e&',+g*-4458-
Tzr4T',r6',il8,58l:---
$T753;O97
ffi6@
251,049
92"555 SF
$70.52lSF
@o-;7T , I 299'630vdno*$@
16,3'14 SF
$77.42/SF
$W
o o
0"d",zU
f,ofu'
fi?, Kaa
/3f,8zL /7zQ M =
3?6,ffi'/ /t*o
' 3(?,1 tt */ l"-' x
,,{i*,{"
)-
blilso'r_,w '45
7 K'7 t6o
#?vc 1 ! zr-or 7SS6zo_
sh"J' (R"f*4'-*)
i*" Z *Or' r b iQ Srr'sea'ctre4tt P^i *
e-//;-)@
6c 8'- /?
&v
v,.,-3(?,J*a
7,168 aao
I
ir
i" --
Froject Idr ti n ho't,el Addresgl ca=c de viLlage
Tewn of Vai I 75 G. Frontage Road Vallo trolorado 81657
Flan analyeis based on the t9AE Uniform Burilding trode
terrace wi ng
Datel Flarch EIu |SAT Eontractorl E. r. johnson
Architectr slp Engineerl richard weingardt
FL ans E:t arnl ner I gary murFai n
trccupancyl Fl
Type of Esnst
F3
I T-FR
NETEIThe c
Listing of a gelected sec
items lieted in this report are not intended to be a comptete I possible code requirementE in the lFAg UBC. It ie a guide tB ions of the cede,
TYFE OF CTTNST
DIREtrTItrN
NORTH Fr EAST Frap
EEIUTH Fr
4 Hotel /Plot
TtrTAL 3 Hotel /l"lot
TtrTAL 3 Ha,tel, /FlBt
TT]TAL
1 Hotel,/l{ot I Retai L Sa
TT]TAL F Hotel /l.lot
TOTAL
BUILDINE * NBTE!# NtrTEr
REAUIRED Er3-Rl I h
Al. 1 glaring
be cr{ safet
ty I ine ty Line ty l ine
TIENIII-FR Sprinkler eystem {or area increaee
SEPARATION
ARY
ITJEST seF at l nn blaL l
5{t 7. E ot Area i ncrea
Al lowabLe ar a i ncFeaBed
AREA INCREA5E FXRE FROTECTION
3{t".:t FEet 3r:r,O Feet ?tlt).o Feet lf-ro.{r Feet
g.:r,Cr Feet 9{l.{r F€et tl.0 Feet O. dr Feet
oFen aFea cln 2 eldes,for sprinkler system.
AREA ALLBWED A/A fItrtr LOAD REE'D EXITS EXIT hJIDTH
lFm Rt
I Rtn Rl
I Rrn Rl
LRm Rl
eg Rm EI
I Rrn Rl
tEs&4
lSB&4
toAEr)
a(r680
3r-t596
E068Cl
1350?
5458
LASbT
t6sa7
t &9.r7
74'tSI
1345311 tl, l{t 6S
134556 r-r. l(r 69 ( 6?) ?
1.3435t1 r). tE 1C,3
1.3455t1 t], l5 I CtS ( l Sg ) 3
t 34F5{r 0" lE t.l3
1S4S5{r O. 15 1$3( 17?) I
1.3?
1..3? ( 1. S9)t,07
?..17 ( ?,.76'
2.Q7
2.$7 l .3.45)
1..T5
.t.64
4.59 | 6, F4)
1.69
1.4?( 6.94)
134E5(t Ct.lcr 6B
17988.1 0..1.T 183
.:
l4E*d18 S.13 t4?t 3!7) ?
13455qr rl. Lf, a5
13455Cr .:t. 13 €5( gl7) ?
e74155 rJ.37 5?6 TtrT
Ind
Ind
cates that thiE ctrtrLrpancy is nst allawed on this {toor-Table E-D cates that this occLrpancy iB an atrcessoFy area-Sec. 3103. (a) exc.
AhItrY SEFARATItrNS
in harardoure L ocati ong gla?ing material . --
(gee section 54O6. (d) ) ie required to gec,54{t6"
,I-
Ii l. NtrRrH
T]Ctr FRE NtrhI_EREi I{ALL I,{ALL F3 3hr thr
EAST
BRE NtrN_EFE trFNE
hOALL NALL FRtrT 3hr Cthr None
EFUTH
ERE NT]N_SRG OPNG
ITIALL ITJALL FRtrT lhr Clhr None
WEST
ERE NT]N_EIR6 OFNEi
NALL U'ALL FRT]T
s. td. s. td. s. rr.
s. hl. s. br. s. hl.RT
None --Frot --
NOF
tF --
EXTEFIOR r] rine RATrN6s AND CIFENiURrlTECTrflN
TlFNG
FFtrT
None
thr None lhr l:,hr None ?hr i.rhr- None
The exterior walLe are required to he o{ NoNEtrltlEUgrIELE material .No fire pratectien reguirementg {or openinqe,trpenings are to be protected r+tth 3/4 hr {ire aesernblies.
5t:t7. a+ the area gf the wal 1 manimlrm. Sec. Fr:r4. (b)
Bpenings are not per-rnitted in this wal1,
Thege u,la l. ls may he requi red to have a parapet wall 3{r incheg above the roofing" The parapet waLl is required to have the sarne {ire rating as the wal 1. See gection t7{:t9. for details and exceptions,
slt3pe is
pLlrptrEe.
T]THER EUILDIN6 ELEI,IENTS ELEFIENT T"IATERIAL FIFE RATINE NtrTEs AND EXtrEFTItrNS Interior Bearing waLl NONtr0]{BUSTIFLE ? hn Interior nenbrg waLl NUNtrEI{SUETIELE I hr Structtrral Frame NONtrOI1BUETIBLE I hr Entericr Strurct Frame NtrNCOI"IBUSTIFLE Bee exterior bearing Hal 1-17-A Ftnote *1 Shaft Encloeur-e NIINCOI"IEUSTIBLE ? hr Floor Aseemhly NtrNCOI'IFUETIFLE i hr Roof As=embLy NIINtrOI'IBUETIFLE j. hr Stai rs NIINCtrI|EUSTIBLE
Faged on gection $tC)3" (b)
The raof ing on this hr-ril,ding is to be {ire retardant.
See section .33CrS. te) and ItrFO regearch reporte for requirement6.
EXIT NtrTESc
Stairways connecti ng 3 or more f l,eor6 are required to be in enit enclssuree The walla of the encLogLrFe are required to be ! hr {ire asgembl ieg.The openings into the enit enclosure are nequired to be I 1/3hr assemhlies.A connecti en to the exterior ie required urith the same fire protection ae the enit encloELrFF. -- Sec. 33t19. 161
A harrier is required at grade Level . -- Sec. SES9. (e)
At least one stairway is reqr-rlred ts extend to the rtrB+ unlees Fclc'+greater than 41 1?. -- Eiec. S*tl&. (o)
The space urnder the stairs (enclosed er not) may net be ursed {er any
-- Siec. f,31:r?. (f )
See eection S3{t?. {or additional informatlon,
The mar:irnum rise of a step is 7 incheE and the minimum inches. -- Eec. 33O6, (c)
The minimum width of a gtairruay is 36 inchesu 44 inches trccupant Load is greater than 50. -- €ec" 33fi&" (b) $ee
3I{:t3. (h) urhen occupant load ie greater than 1€l3.' Frovide a guard rail where drop off is greater than E{r
-- Eec. 3. tt6. (p)
eo1id trerE clF
rnn is 11
i{ the
Eecti trn
i nches.
Sec. 17tt3.
handi cap
3S{t4.. (i) {er
l"lirninum height=4? incheso mauirnum opening siEe-6 inches. -- Sec,
1711.
The minimnm headroorn is 6 {t.- A inches.Frovide a gelf-closing, L 3/4 inch thich:o
nsncarnbust i b l. e doer between baeernent and Frovide a Landing withtn I inch (1/l lnch
let story. --at doorg wlth
Sec gecti on accesg) o{ the threshol,d, -- Eiec, 33$4. th}Etre Fequiremente.
-The- - ma."l i murn -travel di stanc-e jr -tfiJ.1i--bu"ifdilg, i s _ SQrr-{r'pt -_:: See,
.13il3. (d)
"orir"^"'FEourRe',rehrrsr
O O tfrnfiicap aEceBs ia required to,thie buildtng. -- Sec. SS{r1.. (e}
If a ramp tg ueed for handicaF acce6*! th€ rnaN slope ia tl13.If water fountains are providedo one must have a spor-rt withln
t,he Sloor and up-+ront contrsl,E. -- Sec. 31. 1. (c,
T0ILET FAtrlLITIESr l" AlI doeruuays leading to a toilet room fer handicapped are nequined to provide 3? lnches clear width. -- Sec, 5lt. (a)
E, Frovide 44 incheg clear on eash eide of doorways. -- tiec" Etl"(a) 1"S. Frovlde a 60 tnch diarneter clear a!'ea lcithin the toitet noom(sl'.
-- Sec"511" (a)?.
4, Frovide s clear area 42 inches wide and 48 inchee long in {ront of at leaet one water eloeet" If in a compartment and door ig on the side,provide a clear actretei width of 34 tnches. Doer nay not encroach irtto clear aFea. -- Sec. 51.1 . (a)S,g. A 4B inch access width io requlned to the handicap cornpartment,
-- Sec. 511. (a)3.
6. Grab bars are required behind and on .one eide or trn both 6ides sf
handicap water cloeet. Eidq,, bar ie required to be 42 lnchee long (min) and
eNtend 14 inchee in -front df. water cl,oeet" Rear bar ia to be !4 inchee long in a room or *6 tncheE long in a compartment. Bars are to be .33
incheg to -TB incheg abgve the floor. -- Sec. 5It. (a)4.
7" Provlde a clear area under at led6t one lavatony. 30 lnchea wlde X ?9
inchee high X 17 incheg deep nrinfnrum; -- Bec. 511" tb' 1.E. The bottorn o{ one mirroro.opening of a towel fistr-rre, and diepoeal {iNture is required to be c'rlthtn 4S inchee o{ the {l,srsr. -- Sec. 511. (b)?.&5.
R-l HANDItrAF REAUIREI.IENTBT j
IF there is more than !0 unlts an the siten handicap unlts are required.El through ?? unit,s on 6ite-one unit
1{,O & sver-t]ner pLus one {or each edditional l.ltl unite s{ fraction thereo{AlI doore in the unit are requlred to provide S? lnchee clear width.Toilet {acilitiee in theee units are requlred to cenrply with Eiec. 511.
Theee requiremente are per Bec. 1313.
The 6O inch clear arFa ie not required wlthin unitg. -- Bec. 811.(a)1.
and Table S$-A
-- 5ec 3.307; (c)
SS incheg of
ADdTTT0NAL RE0UIRE|'iENTE O=o trN trtrcuFANtry
Fiirr F3 occr.lpancy In all areag customari ly occupied by humans, provi de natural or artifical light and ventiXation. -- Setr, 7.18,Floor-lgt Occupancy-Retail €al.ee Rm Exit gigns are required f rorn alL areas servinE an c:r more, -- Sec. 3314" (e)
Dorri dors gerving an occugrant load of SLT oruTttrr e have lhr constructi on and rated opening6 -- Eiee"Exits are reguired to be separated by 1./i of the
occupant load of 5Q
are required ts
I3(:,5. (g)&(h)
diagonal e{ thie area, -- Sec. .5S{t.1, (c)
Doors are required to ewlng in the direction o{ exit {rom this area,-- Sec. 3.104. (b)
Fsr Rl ctccLrpancy
Sterage and lallndry rotrrns urged in comnon by tenante to be seFarated hy a one hour occurpancy eeparatien. -- Sec. l3{,I. (bt
A fire alarm system may be requtred in this building. -- Eec.t3(,3. (b )
Fr{xvide a window cr dtror to the enterior {ronr every room used 4or
eL eepi ng.
A windew murst provide a clear open area e{ F;7 eq.{t.o a clear height o{ 14 incheen end a cLear width nf ?Ct incheg(minimlrm). -- Sec. 13114,AlI habitable reoms require exteri or glaaed openi nge equal to I r:r7. ctr rnore o{ the f Loor aFea. (rnin Lfr eq. {t. ) -- Eiec" l2CrE. (a)
AlI hehitable reems requir-e an openable exteri or openings equal te E%or lnc,re o{ the {loor area. (min E eq.ft.) -- Sec. tEeF. (a)
The rninirnurn ceiLing in a habitable space is 7 feet 6 inches except l:ltchensn halls, and bathe may have a celling height of 7 feet, --sec" -- 13tf7. 1";
FLoor-F€l'lT Gccupancy-Hotel, /l"lotel Rm Enit eignE are required from slI areas gerving an occupant load 61f 5r-r otr metre. -- 5etr. 3.314. (a)
trorridors gerving an trtrcupant load o{ t r:r Br mtrre are required ttr have thr construction and rated openinEe -- Sec. S3flg. {g}&(h)Exitg are required to be eeparated hy 1/? e{ the diagonal of this aFea" -- Sec. 8.103" (c)
Doorg are required to suring in the direction of exit {rem this area,-- Eiec. 35{4. (b)
Floon-1st Eccupancy-Hotel,/Plotel Rrn Euit eigns aFE requrired {rem atl areae serving an citrcupant I ead of 5tl {]r m.3re. -* Sec" 3314" (a)
Eorridors serving an trctrLipant lead of 1[r crr mere are nequired to have lhr construction and rated openlnEs -- Sec" .3.TOE. {g}&(h)E*its are required ttr be eeparated by 1/3 ef the diaEonal of this area, -- 5ec. 33tlt3. (c)
Doors are required to ewing in the dlrection of eutt .from thle area"-- sec. 35r-t4. tb)
Fl oor-3nd Occlrpancy-Hetel /HoteL Rro Exit sigrrE are required {rem all areae eervi nE an occupant lctad o+ 5(:t clr lntrre. -- Eiec, 3.114. (al
Corridore eerving an cltrtruFant l oad o{ l(t or ntrFe aFr reqLlired to have thr construction and rated trpening€r -- Sec. SSO5. (g),$(h)
Enltg are required tcl be eeparated by t/l o{ the diagonal o{ thls area" -- Sec. S3*. . {c}
Doore are requi.red tcr ewinE in the direction ef exit from this area.
-- €iec. 3f,r-r4. {b}Floor-3rd Occupancy-Hetel./Flotel Rm Exit signs aFe reqr-rired from alL area,E eerving an or rnotre" -- Eiec. 3314" (a)
Corridsrg serving an EtrcuFant 1trad crf t{t have Lhr congtruction and rated openinEs Enits are required te be eeparated by tr'?
clr more
-- Sec.
of the
eccupant load e{ E(t
are required to
3St15" (g)&(h)
di agonal, of thi s
,4ee",4 /k/'/
E/dj &"*ird
flre deparlmenl
lnwn
.t2 rsst meados drlve
tall oolorado 81857
(30:tr 476-2t00
IHRAffi lrllG - UESTIN HOTEL Ptl\N CHECK I
, idBng- i{ri'iaa -.-'r5r'Jira.rJ*;a3 _.
3/6/87 by Fire lturshal McGee
PLans
SIIEET NOTES
A 0.2
A 2.3
A 2.4
A 4.3 (4)
A 2.5
Do not obstruct fire hydrant at corner
Iabel alL nechanlcaL/storage roon doore
Cautlon : Provide adaquate access to valves at standpipes
( especlally at mld-corridor across fron elevator )
Note : Corner unlts (68/88) briLl need flre aLarm speaker at
each 1evel
C,aution : frostlng of smoke detector at vestlbuLe (107)
Zorie each retaLl space seperately
Laundry chute - sprlnklers subJect to revLew. ; instalL lsolation
valve and/or seperate rlser
Questlon locat,ton of handtcapped unite on second floor, selectlon
of .fLre annuncLatlon devices (A/V) , and safe transition
!o elevator ( lack of snoke controL ), Recomnend a
static air presure of .5 - .4 tt w,c. w,/ renote gwltch
.ar F,C.C.
Note : locatlon of cabinet heaters ln relatlon to snoke
. detectors and sprinkler heads
Queg3ion locaLion nf FDG at Terrace
What ls scope of work in CMC, Westin valve room and boiler roon f
Provide fLoor drain to acconadate 2tr naln draln at fuLl flow
fron fLre sprlnkJ.er system
Check fire sprinklers and snoke detectors in electric room (65)
Where ls new fuel oil vent going ? See lIIf, 79 & NFPA .
Locatlon of FDC le lncorrect.
Questlon plane of flre dampers - see ICBO repoct
A 6.6
M l.l
M 2.1
M 2.3
M 3.1
M 4.1
t t*t
t3.t ",*'il1.1 .
'::iz
.-1
r 5'.1 .:.'
0tt10
qPD: -
0'S
totu'
;i:
tIla ]
rat9ts
1r Et Or€tnsce 3, Ser!.sr g3-"i:
.-a'
ii
I
l.
o
lnttn
42 wgol moador drlve
Y.li, colorrdo 8165j1
(303) 476-Zltxr
PLAZA PIIASE 1 - PLAN CHECK - 3/IL/87
by McGee, Fire ltarshal
o
Rre departmenl
A 4.2
D 1.04
M 1.1
t4 2.t
M 4.1
e 2.1
Questlon W-17 exterior waLl *tt type x sheetrock
Questlon C-4 2 - t type x rock
No cooking or heat producing equi.pnent or appliances are
allowed
Question Fire Hydrant N.I.C. ?
Question 6rt flre lioe subJect to revlen & N.I.C. ?
Lower 1evel nechanical plan unclear on origin, path or
ternination of fire llnes.
Question fire deetctlon and remote swl_tch ar FCO for ff-12
Change FIIC-I fron L$'r to 2*" w/ Natlonal Standaril threads
Flre Protetclon General Note #8, assumed J.00 psl, Ls not
acceptabLe. FleLd veriflcation is required
QuestLonalbe audibility in _16 series
I ai I
ile244"4k,-Yhssz
Cart{eftna(
"&-kn-.
\ATVexruR,ES, -
Itear Kristan,
SDD4 ryas anended 1o l9g4 to reflect at that tine the l:::}:ry:nr prosratr for Cascade Vtltage. -io"ioa"j ro tn.r ameodneot were the Terrace and the pt6.za uiog addit1008 to the Westio Eotel. ?!9 fgrrgce
'iog-destgn has rinained geoerally rhe :3pg 1" rhar approved arrhough-rlere-has been a ieoucrron 10 rhe GRFA fron 55,000 square feer r,o ii,iti-iqi;;; ;";; aad a reducrion in retail fron 6r399 square feet to Sr6Ofi square-ieet.
A naJor design nodlflcattoo has been nade to the pLaza urog.The approved butlding has been-divided io to tbree separare proJecrs: l) Plaza O0nference cenrer, 2) pLaii-iing .Addttion ro erlstiug east ring of Eesri.n Horel aoi gi Buriarol ,g". The previously aPPlgvgg Plaza l{tng contalned-+o g"""i'.oorns, 15 resldentLal condoninluns, -l9r50O square tEet of retaff/oEii"I "p."" and 9r500 square feet of neetiog -faciltttes.
The reylsed plau ts ae follows:
* Plaza lflng Addirlon (pbase I)
January 22, f987
Ms. Kristan Prltz
Town Plaoner
Towa of Vatl
Box 100 Vatl, C0 81652
- 22 guest rooms (7,680 GRFA)
- 2 hospltallty suites (I,650 square feet)
- 1r100 square feet of retail
Two guest roo's ln .he westtn wltl be renoved to provlde corrldor accesE to the Terrace wrng resuritrJ in a net addttlon of 20 guest roona fn the Ft.r.-Wirgl
* PLaza Conference Center (phase II)
- 8,400 square feet, of neetlng factl.ittes
- 1r140 square feet of retall
'.::.ltir'
^. r l.-'i ..,;i{1,
1000 south Fronlage Road west, Vail, cotorado g1657 0 303/ 476-6602
Ms. Krist,an Prit,z
Jaouary 22, 1987
Page 2
* Bulldlog 'C'
The addition of cascade village chal.rllft sith lts required support facilltles 1..e. restrooms, tlcket nlodous, etC.requtres the developBent of an approprlate progran for this bulJ.ding. Geaerally, -the birtldiag program lncludes 20,000 square feet of retal.l,/conmerclal, 5;000 square feet of chairlift support aad 40r000 square feet of resldeatlal. rt Ls also expected t,hat sone parlitng u1.11 be included. An analysis of the market will.- be nad'e in the trext four nooths which nill result lt e detalled;.progran for tbis buildlog.The progran_analyois n111 also inclide the llansfr.eld viliage and Cosgriff sltes. .
r would propose that the srrll4 be anended based upoo the narket research and result,iog progran deveJ.opneot. The tining souLd be durl.ag the early euurer of 1987.
Parking for both the Terrace Wl.ng anil tvo phaees of plaza l{lng w111 be acconmodated io the Cascide Villagi parklng
structure. The Terrace lfing guest roons wtll iequlre td2 spacea aad Lts reta1l 19 spaces. The Plaza l{tng addtridn rill reqirire 16 spaces for guest roons aod 4 apaces for ietatl. Tbe pLaza
conference ceaEer will requtre- 70 spacea for neetlog facilLtLes and four (4) for ret,ail.
-The-tota'l parklng requlred for the Terrace/pLaza (excluding retail o_f 27. spaces)-expansl.on tot,aLs 188 spaces aod ls entireli.acconnodated ln LeveLs 1 and 2 of the struclure. ConnLtneats to Level l and 2 to dare lgrql 115 epacee resultlng in a total of 303
:!1.::. .Applylng the L2.52 credl.r for nultiple-purpose parking results ln a oer asstgned parlcing of 265 epaies,- Tie twi levei.acconnodate 272 spacea_leavlng a-ourplus oi 7 spaces to apply t,o the 24 apaces (87.52 of 27) r6quired.
Level 3 bas been allocated a total of 96 spaEes for the GMC Bulldtng. Applytng the credir of L2.SZ resuftE'if " o.r requirement of 84 spaces whlch wtll_ be Lncreased by 17 to acconnodate the retall ta the Terrace/plaza expansion. LeveL 3 has a capacity of 1.49 space'. conplerton of tire r""r..e7il;;"-expanston wtll resuLt ln 49 addrtional epaces avallable for the Bulldlng trCrt deveLopnent.
b* lrldffi Jrmrt llr Pt1c't .
I c'rulltrct d
$|t *rl
r*/rl
f,*rLao
75 soulh frontage road
vall, colorado 81657
(303) 476-7000
April 8, 1985
,Jere Walters
% Montane Corporation
1000 South Frontage Road West
Suite 200 Vail, Colorado 81657
Re: Cascade Villa
Dear Jere,
olflcs ol commrmlly devclopment
uilding DRB Submittal
I have tried to call you several times, but I.understand that you are a -bit under the weather. I thought that I should write you a letter to infonn
you as soon as possible of the addit'iona'l jnformation we will need for the
Terrace Building DRB submittal. This informtion includes:
1. The proposed 'landscaping plan. I understand that you are refem'ing
to the irevious landlcape-plan' I would like a copy of-that plan for
the subinittal. The laniscipe plan should be at the sca'le of one inch
equa'ls 20 feet and should show specific locations of planting areas'
pavingn retainage, etc.
2. A topographic survey should be submitted. hlhi]e reviewing the plans'
Petei and-I had queltions concerning the existence of a ski lift easement,
the corner of thd building that is 'located on the sewer easement, and
the property 'llne indicated in the center of your s'ite plan.
3. A more detailed site plan is needed at a scale of at least one inch
equals 20 feet. The iite plan should clearly show the locations of
ldndscaped areas, service areas, decks, patios, walkways, bui'lding
outline, etc.
4. A height analysis is necessary. The site plan together with the s!ryey
wj]l a]]ow you to do this stu-dy. One the east elevation of the build'ing
it is difficu'lt to detennine if the building is actually under or over
7l feet.
5. The submittal should also jnclude a list of square footage calculations.- The list shou'ld show the number of accormodation units, number of dwe'l ling
units, and GRFA totals.
e lerrace
,lere l{al ters
Plaza Building
Page Two
4/8/85
Kristan Pritz
Town Planner
KP: br
Once we receive this informat'ion, we will be ab'le to schedule the project fo! g De9ig1 Review Board meeting. As soon as I receive tne comptLte-submittal, I will route the proposal to other Town departments. 'The
other departments may need additional information. However, it should not hold up your review.
Please call me if you have any further questions,
Sincerely,