Date: 11-24-2014
Town of Vail
Com. Dev
Joe Batcheller
RE: List of changes to approved plans items
Joe,
The Town of Vail requested revisions to the Change to approved plans in an email copy clipped into
this letter.
The email read:
Tom Kassmel and I have reviewed the grading plan for Hoyt -Young. The following will be needed
before DRB approval can be granted:
1. Provide a Floodplain Use permit for this grading
2. The face of the eastern wall needs to be 2' from the property line
3. Show previously approved grades on the plan
4. A Revocable Right -of -Way permit is needed (this can be a condition of approval)
Let me know if you have any questions.
Best -
Joe Batcheller
Town Planner
Community Development
ITEMS OF CHANGE from PREVIOUSLY SUBMITTED PLANS
Item #1 and item #4:
The appropriate Floodplain Use permit and Revocable Right -of -Way permits shall be revised by the
general contractor to reflect the changes shown in the site plan.
Item #2
The Boulder wall is shown more than 2'-0" away from the east property line. The Owner would like to
be on record stating that the Owner is giving up no right of use to the area between the boulder wall
and the east property line.
Item #3
The previously approved contours of (78)28' and (78)26' have been added to the sheet A1.0 in
Thank you,
Jeffrey P Manley AIA