HomeMy WebLinkAboutTIMBER FALLS CONDOMINIUMS UNIT 1003TOWNOFVAIL DEPARTMENT OF COMMLTO]Y DEVELOPMENTTsS.FRONTAGEROAD , , rr
VAIL, Co 816s7 . fl r\'\ -c\ . -\ r970-479-2138 ,\r - ,^'\__
NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES '3\I .-, \C
\ADD/ALTMFBUILDPERMIT Permit #:802-0049 '.--{- i.,. \ tt-'c :-,
|ob Address.: 4514 MEADOW DR VAIL Status.....: ISSUED
Location......: 4680 MEADOW DR #103 TIMBER FALIS BLDG Applied...: 04/03/2002
Parcel No....: 210112302003 Issued ...: 04/10/2002
Project No...: Expires...: 1,0/07 /2002
or{NER MCCANN, iIA}irENE B. O4/O3/20O2 Phone:
46 W CIIEYENNE MOUNTAIN BIJVD
COI,ORADO SPRINGS CO
809 06
License:
CoMIRACTOR BROIiIN-WOLTN CONSTRUCTTON 04/03/2OO2 Phone: 970-949-4L85
P.O. BOX 70r.
VAIL, CO
8r.658
License: 100-A
APPLICAIflI BROWN-WOLIN CONSTRUCTION 04/03/2OO2 Phonez 97O-949-4L86
P.O. BOX 701
vArrr, co
8155 8
L,icense: 100-A
Desciption:
REDO FRYWALL AND CEILING DAMAGED BY ELAKY SINK ABOVE.
REAPINT, REBL'ILD SLIDER-GLASS PANEL
Occupancy: Rl Multi-Family
Type Construction:
Type Occupancy: ??
Valuation: $5,000.00
Fireplace Inlormation: ResFicted: Y
AddSqFt 0
# of Gas Appliances: 0
Wood Peller ***r* FEE SUMMARY
# of Cas l,ogs: 0 # of
$0 - 00 Total Calculated Fees-> $159 . 7sBuilding--->
Plan Check-->
lnvestiga tion->
will call->
995 . oo Restuarant Plan Revicw->
$61- 75 DRB Fee..--.___>
$0.00 RecreationFee-------->
S3 . oo Clean-up Deposit->
$0 . 00 Additiornl Fees->s0. oo
$o.oo Total Permit Fee--> $159.7s
S0.00 Payments-> $159-?5
TOTAL FEE$___-_--_> Sl se . ? 5 BALANCE DUE->$0. oo
Approvals:I€e'm: 05100 BUII-,DING DEPARTMEMI
o4/o9/2oo2 ,rRM Action: AP
Item: 05400 PLANNING DEPARTMENT
IIem: 05600 FIRE DEPARTMEIflT
Itemr 05500 PIIBLIC WORKS
See page 2 of this Document for any conditions that may apply to this permit.
DECLARATIONS
I hereby acknowledge that I have read this application, filled out in fuIl the information required completed an
accurate plot plan, and state that all the inforuration as required is correct. I agree to comply with the infonnation and
plot plan, to comply with all Town ordinances and state laws, and to build this stmcftrre according to the towns zoninp
and subdivisioncodes, design review approved Uniform BuildingCode and other ordinances of the Town applicable
thereto.
REQI,JESIS FOR INSPECNON SHALL BE MADE TWENTY-FOUR HOURS IN ADV
PM.
Send Clean-up Depoeit To: N/A
OR AT OUR OFFICE FROM 8:(tr AM - 5
OFOWNEROR CONTRACTOR FOR HIMSELF AND OWNET
PAGE 2
Permit #:802-0049
CONDITIONSOF APPROVAL
as of 0410-2002 Status: ISSLIED
PermitType: ADD/ALTMFBUILDPERMIT Applied: M/03/2002
Applicant BROWN-WOLINCONSTRUCTION Issued: M/10/2002
970-9494186 ToExpire: 10/07/2002
fob Address: 4514 MEADOW DR VAIL
Location: 4680 MEADOW DR #103 TIMBER FALIS BLDG
Parcel No: 27071?302003
Description:
REDO FRYWALL AND CEILING DAMAGED BY ELAKY SINK ABOVE.
REAPINT, REBUILD SLIDER-GLASS PANEL
Conditions:
Cond: L2
(BLDG.): FIELD INSPECTIONS ARE REQLIIRED TO CHECK FOR CODE
COMPLIANCE.
Cond:14
(BLDG.): ALL PENETRATIONS IN WALTS,CEILINGS,AND FLOORS TO
BESEALED WITH AN APPROVED FIRE MATERIAL.
Cond:16
(BLDG.): SMOKE DETECTORS ARE REQUIRED IN ALL BEDROOMS AND
EVERY STORY AS PER SEC.310.6.1 OF THE 7997 IuB,C.
Cond: 1
(FIRE): FIRE DEPARTMENT APPROVAL IS REQUIRED BEFORE ANY
WORK CAN BE STARTED.
v
1,
I"E
97 O - 47 9 - 2149 (Inspectiorc)
**************************************FOR OFFICE USE ONLY*{************************************
of Construction:
fio'tt'"{r
mvN0FuAILly
75 S. Frontage Rd.
Vail, Colorado 81657 ffiJ :TIN etc.!
General Contractor:
Browt-(;Jat,u 6*:I. 7<-
Town of Vail Reg. No.:
/oc- *)wrwL'"*"^Y:Tyy"* 8,"-t w V
7-at \r
COMPTETE VALUATI PERMIT & Materials
BUILDING: $ 5 OOlry ELEcrRrdtrl/e OTHER: $
()
PLUMBING: $ iI n MECHANIfiL: $To'rAL: S 5,mr> 9
For Parcel # Contad Assessors Office at 9.
Parcef # &)Ct t^3oaO03
(application will not be accepted without parcel numbe
UAIE ROUTEDz 117 t t7
L^-- ^,.- J-
rob Name: /11c Co"n^ fci ltnsl.2o,, )no oo3tl6fia il4qlo- -Dr. , dn* Va;(
Lesaf Description ll r-ot, T'4ff6i5'#1 **lfFtffi , Fhas<14 flsuuaiui"ion,
z?1119$J"*9tl,o n, n, ttle a n n naareV,
"u$,vt*,,c[, r f: " h/q[L 6 t ld' ll Phone: j f] - Sea -1 6 t \
Architect/Designer: 1). {Address:Phone:
Ensineer: 71J A.Address:Phone:
'fliff)T,lil.r7ll'5!;,:7^""''t'1) )a'tTz) ? t'u/ <'iE about'tf ',d.-
WorkClass: New() Addition( ) Remodel( ) Repair($ oemo( ) Other( )
Work Type: Interior fi) Exterior ( ) Both ( )Does an EHU exist at this location: Yes ( ) No ( )
Typeof Bldg.: Single-family( ) Two-family( ) Multi-familyfi) Commercial ( ) Restaurant( ) fther( )
No. of Exlsting Dwelling Units in this building:No. of Accommodation Units in this building:
No/Tyoe of Fireplaces Existinq: Gas Appliances ( ) Gas Loqs ( ) Wood/Pellet ( ) Wood Burning (
No/Tvoe of Fireplaces Prooosed: Gas Appliances ( ) Gas Loqs ( ) Wood/Pellet ( ) Wood Burning (NOT ALLOWED)
Does a Fire Alarm Exist: Yes ( ) No ( )Does a Fire Sprinkler System Exist: Yes ( ) No ( )
F:/everyone/forms/bldgperm
RE0'D APR .2200?
I0l{'N 0F l,'il[
Questions? Callthe Building Team at 479-2325
Department of Community Development
Project Name:c Cann
ProjectAddress: l,rh
This Checklist must be comnleted before a Buildina Permit aoolication is
accepted,
All pages of application is complete
Has DRB approval obtained (if required) Provide a copy of approval form
Condominium Association letter of approval attached if project is a Multi-Family complex
Complete site plan submitted
Public Way Permit application included if applicable (refer to Public Works checklist)
Staging plan included (refer to Public Works checklist) No dumpster,parkino or material storaoe
allowed on roadways and shoulders without written aooroval
Asbestos test and results submitted if demolition is occurring
Architect stamp and signature (All Commercial and Multi family)
Full floor plans including building sections and elevations(4 sets of plans for Multi-Family and
Commercial)
Window and door schedule
Full structural plans, including design criteria (ie.loads)
Structural Engineer stamp and signature on structural plans (All Commercial and Multi Family)
Soils Report must be submitted prior to footing inspection
Fire resistive assemblies specified and penetrations indicated
Smoke detectors shown on olans
Types and quantity of fireplaces shown
&,1,
o
D
o
o
B
o
B
o
tr
o
tr
B
D
o
o
a
/hk6^,*Applicant's Signature:
Date or submittat: 1!/t'-
F:/everyone/forms/bldperm2
Received By:
tr
/:\-
A{,{,\'r-rz\t+/.J
wNEvmY
HOW DID WE RATE WITH YOU?
Town of Vail Survey
Community Development Departnent Russell Fonest, Director,
(970) 47s.213e
Check allthat applies.
1. Which Deparhnent(s) did you contact?
Building _ Environmental_ Housing_ AdminPlanning DRB PEC
2. Wasyourinitialcontactwithourstaffimmediate slow or
no one available ?
3. lf you were required to wait how long was it before you were
helped?
4. Was your project reviewed on a timely basis? yes / No
lf no, why not?.
5. Was this your first time to fle a DRB app-_ PEC app_ ;
Bldg Permit _ ttUA
6. Please rate the performance of the staff person who assisted you:54321Name:
(knowledge, responsiveness, availability)
7. Overall efiectiveness of the Front Service Counter. 5 4 3 2 1
L What is the best time of day for you to use the Front Service
Counter?
9. Any comments you have which would allow us io beter serve you
next time?
Thank you for taking the time to compleie this survey. We ue
committed b improving our seMce.
MWNOF
WHEN A *PUBLIC WAY PERMIT" IS REQUIRED
PLEASE READ AND CHECK OFF EACH OF THE FOLLOWING QUESNONS REGARDING THE NEED FOR A
"PUBUC WAY PERMIT":
Is this a new residence?YES NO
o
o
n
tr
D
Does demolition work being peformed
public propefi? YES
Is any utility work needed? YES
Is the driveway being repaved?
require the use of the Right-of-Way, easements or
NO
YES
NO
NO
Is a different access needed to the site other than the existing driveway? YES_ NO
Is any drainage work being done that affects the Right-of-Way, easements, or public property?
YES
Is a "Revocable Right-of-Way Permit" required? YES NO
Is the Right-of-Way, easements or public property to be used for staging, parking or fencing?
If answer is NO, is a parking, staging or fencing plan required by Public Works?
YES NO
If you answered YES to any of these questions, a "Public Way Permit" must be obtained.
"Public Way Permit" applications may be obtained at the Public Work's office or at Community
Development (a sample is attached). If you have any questions please call Leonard Sandoval in Public
Works at 479-2t98.
I HAVE READ AND ANSWERED ALL THE ABOVE QUESTIONS,
Contractor Signature
Job or Project Name:
Date Signed:
NO
NO
F:/everyone/forms/bldperm4
Company Name
How it relates to Building Permits:
Fill out the attached check list with the Buildinq Permit Aoplication,
If yes was answered to any of the questions then a "Public Way" permit is required. you
can pick up an application at either Community Development, located at 75 South Frontaqe
Road or Public Works, located at 1309 Elkhorn Drive.
Notice sign-offs for utility companies. ALL utilities must field verify (locate) respecflve
utilities prior to signing application. Some utility companies require up to 48 hours notice to
schedule a locate.
A construction traffic control/staging plan must be prepared on a separate sheet of paper.
An approved site plan may also be used. This plan will show locations of all traffic control
devices (signs, cones, etc.) and the work zone, (area of construction, staging, etc.). This
plan will expire on November lst and will need to be resubmitted for consideration for
approval through the winter. Be aware that your resubmission for winter may be denied
depending on the location of construction.
Sketch of work being peformed must be submitted indicating dimensions (length, width
and depth of work). This may be drawn on the trafficcontrol plan ora site plan forthe job.
Submit completed application to the Public Work's office for review. If required, locates will
be scheduled for the Town of Vail electricians and irrigation crew. The locates take place in
the morning, but may require up to 48 hours to perform.
The Public Work's Construction Inspector will review the application and approve or deny
the permit. You will be contacted as to the status and any requirements that may be
needed, Most permits are released within 48 hours of being received, but please allow up
to one (1) week to process.
As soon as the permit is approved, the Building Department will be notified, allowing the
"Building Permit" to be released. Please do not confuse the "Public Way Permit" with a
"Buildinq Permit",
Permits are valid only until November 15th. A new Public Way Permit is required
each year if work is not complete. Re-application each November 15th does not
mean an automatic renewal.
I have read and understand the above.
Signature
F:/everyone/forms/bldperm5
Date Signed
BUILDING PERMIT ISSUANCE TIME FRAME
If this permit requires a Town of Vail Fire Department Approval, Engineer's (Public Works)
review and approval, a Planning Department review or Health Department review, and a review
by the Building Department, the estimated time for a total review will take as long as three (3)
weeks.
All commercial (large or small) and all multi-family permits will have to follow the above
mentioned maximum requirements. Residential and small projects should take a lesser amount
of time. However, if residential or smaller projects impact the various above mentioned
departments with regard to necessary review, these projects may also take three (3) weeks to
review and approve.
Every attempt will be made by this depaftment to expedite this permit as soon as possible,
I, the undersigned, understand the plan check procedure and time frame. I also understand
that if the permit is not picked up by the expiration date, that I must still pay the plan check fee
and that if I fail to do so it may affect future permits that I apply for.
Agreed to by:K,"lot) 6nne- r3*-^f B,*^ - La)a t'''^, G"). T"-
Project v1" ", lhcCann C"'f ,ns Rnfr'n
Date:
//
F:everyone/forms/bldperm3
APPLICATION
FOR TOWN OF VAIL
PUBLIC WAY PERMIT 19
-
O--, Trrrr-rPW#:J --'l-r-l - - I
Parcer#:I I [ [ I I n - I I - ! [ [
Brdg.Permito,E f I'I I I I
1,Job Name Stroet Address n n i-r - |-l ttt unknown callLl LJ t--J | | 479-213e ext.o)2.Excavating Contrsctor Name Mailing Address TOV Contraclor's License Number FEQUIRED
()
Phone #zipCity
3.
4.
Start Date
Work is for (circte one;
Other
Comoletlon Date
Water Sewer Gas Electric
(Permit Expiration Date)
Telephone CATV Landscaping Temp. Site Access
Trench-width
(min.4')
Bond Amount $
6. ALL MATERIAL, EQUIPMENT, AND TRAFFIC
JOB IS STARTED,
7.
8.
Bubber out-riggers are required on
Asohalt su rfaces underneath the
A signature below indicates a
signatures are obtained, permittee
necessary Town of Vail signatures.
ST BE ON THE JOBSITE BEFORE THE
working on asphalt.
at all times.
utility locations and approvals. Once all utility company
application through the Public Works office to obtain the
up to one week to process.
Depth
Total SF $
Total LF $
Permit Fee Total Permit Fee $
Public Service Natural Gas Group (1-800'922-1987)
Public Service Company (1
U.S. West (1 -800-922-1 987)
TCI Cablevision of the Rockies (1-800-922-1987)
Eagfe River Water & Sanitation District (970-476-7480, ext. 114)
Holy Cross Electric Company (1-800-922-1987)
Town ot Vail Electricians (970-479-2158)
Town of Vail lrrigation (970-479-2158)
Town of Vail Public Works Construction Inspector (970-479-2198l.
L THERE WILL BE NO TOTAL STREET CLOSURESI A construction traffic control plan must be approved by the
Pub|icWorksDepartmentpriortoiSSuanceofthepermit.
1 0. All excavation must be done by hand within 1 8" of utilities - (Senate Bill 172)'
1 l. Permiilee must contact Public Works D€oartment at 479-2198 24 hours prior to commencing of work, Failure to notify
the Town will result in forfeiture of bond money. Scheduled inspections which are not ready may result in the Town
charging the contractor a reinspection fee.
12. I certity that I have read all chapters of Title 8 - Public Ways and Property, ol the Vail Municipal Code and all utility
company agreements, signed by me, and will abide by the same, and that all utilities have been notified as required.
Contractor's Signature ot Agroement Print name clearly
ATTACH PLAN OF WORK, INCLUDING CONSTRUCTION TRAFFIC CONTROL PLAN
Show streets with names, buildings, and location of cuts. USE DASH LINES FOR CUT.
Date of Signature
White - Public Works
Yellow - Contractor
DRAINAGE AND CULVERT INSPECTIONS ARE REOUIRED BY PUBLIC WORKS!
Plcase read and check off each of thc items below:
a The Town of Vail Building Department has developed the following procedures to
ensure that new construction sites have adequately established proper drainage
from building sites along and adjacent to Town of Vail roads or streets.
The Town of Vail Public Works Depaftment will be required to inspect and approve
drainage adjacent to Town of Vail roads or streets and the installation of temporary
or permanent culvefts at access points from the road or street onto the construction
site. Such approval must be obtained prior to any requests for inspection by the
Town of Vail Building Department for footings, temporary electrical or any other
inspection. Please call Leonard Sandoval at479-2198 to request an inspection from
the Public Works Department. Allow a minimum of 24 hour notice.
Also, the Town of Vail Public Works Department will be approving all final drainage
and culvert installation with resulting road patching as necessary. Such approval
must be obtained prior to any Final Ceftificate of Occuoancy issuance.
Agreed to by:
Project Name:
Date Signed:
Print Name
F:/everyone/forms/bldperm6
Signature
Please read and check off each of the items below.
(Copies of complete text are available upon request)
CODE 5-2-10: DEPOSITS ON PUBLIC WAYS PROHIBITED
q Unlawful deposits: Subject to subsection C thereof, it is unlawful for any person to litter, track or
deposit, or cause to be littered, tracked or deposited, sand, gravel, rocks, mud, dirt, snow, ice, or any
other debris or material upon any street, sidewal( alley or public place, or any portion thereof.
tr Notice; Abatement: The Director of Public Works may notifo and require any person who violates or
causes another to violate the provision of subsection A hereof, or who has in the Director's employment
a person who violates or causes another to violate the same, top remove such sand, gravel, rocks, mud,
dirt, snow, ice or any other debris or material within twenty four (24) hours after receipt of said notice
by the Director of Public Works. In the event the person so notified does not comply with the notice
within the period of time herein specified, the Director of Public Works, or other authorized agent, may
cause any such sand, gravel, rocks, mud, dirt, snow, ice, debris or any other material to be removed
from any street or alley at the expense of the notified.
o Summons and Penalty: As an alternative to the notice for removal provided in subsection B above,
any person who violates or causes another to violate the same, may be issued a summons to appear
before the Municipal Court of the Town for said violations, and upon being found guilty of a violation
hereunder be punished as provided in Section 1-4-1 of this code.
D Notice and Penalty: It is unlawful for any person to fail or refuse to comply with the notice of the
Director of Public Works as provided in subsection B hereof, and any such person shall, in addition to
payment of the expense of removal incurred by the Director of Public Works, as provided in subsection B
hereof, upon being found guilty of a violation hereunder, be punishable as provided in Section 1-4-1 of
this Code. (1997 Code: Ordinance 5 (1979).
CODES 7-3A.T AND 7-3A-3: PARKING OBSTRUCTING TRAFFIC & IMPOUNDMENT AUTHORIZED
u No person shall park any vehicle upon a street or at any other place within this Municipality in such a
manner or under such conditions as to interfere with the free movement of vehicular traffic or proper
street or highway maintenance. (Ord. 2(1968) 5 1)
D Whenever any police officer finds a vehicle attended or unattended, standing upon any ponion of a
street or upon any place within this Municipality in such a manner as to constitute a violation of any
section of this Article, or left unattended for a period of twenty four (24) hours or more and presumed to
be abandoned under the conditions prescribed by Colorado Revised Statutes section 42-4-1102, as
amended, the officer shall require the vehicle to be removed or cause it to be removed and placed in
storage in the nearest garage or other place of safety designated or maintained by this Municipality, and
the charges for towing and storage of such vehicle shall be charged to the owner of the vehicle in
addition to a ten dollar ($10) impoundment charge. (Ord, 2(1968) g 3: Ord. 28(1981) 5 1)
I have read and will cornply with the above code provisions:
Print Name
Position or Relationship to Project:
Date Signed:
F:/everyone/tbrnrs,/bldpernrT
Signature
Yail2002
Vail Village/Lionshead Construction Hours Handout
Problem Statement
The Vail Village and Lionshead are invaluable assets to the community. Thousands of
people come to Vail each year to sightsee, recreate, shop and to enjoy the Vail Valley.
The community and merchants rely upon the summer/winter tourism to generate
revenue. Our summer/winter guests expect a pleasant experience while in Vail.
To insure that all of the proposed construction has as little negative impact on the
community and on our guest as possible, the Town of Vail finds it imperative to create
and implement the Vail Village/Lionshead Construction Master Plan. Maps of the Village
and Lionshead are included to show areas of construction being affected by this plan.
It would be irresponsible for the Town of Vail, the Construction Contractors and the
Merchants, to not actively participate to minimize the impact of construction on the Village
and Lionshead areas.
Givens
The following givens are intended to provide the basic foundation by which construction
will be completed in the Village:
. The public's health, safety and welfare shall be honored at all times.
o Adequate pedestrian, loading/delivery, vehicle, and emergency vehicle access and
circulation shall be maintained.
Roadways and pedestrian walkways shall be kept clean and free of dirt and debris.
All construction deliveries, equipment, tools, materials, etc. to the Village must go
through Check Point Charlie. All Lionshead construction activity must go to the Vail
Police Department for a parking permit. Do not use delivery zones for construction
parking, refer to approved staging plan or make other arrangements for parking.
The hours of Outside Construction Activity shall be as follows:
- April 15 - June 21 & September 9 - November 15,7 a.m. until 7 p.m., seven days
a week. Between June 22 -Seplember 6 work must end bv 4:00 p.m. on Fridavs.
November 15 - April 15, 2003 work allowed within daylight hours only.
- Deliveries shall be restricted to the hours of 7 a.m. to 11:30 a.m. on Gore Creek
Drive and 7 a.m. to 8:30 a.m. on Bridge Street.
- Special delivery permits must be requested in advance, from Public Works in
conjunction with Code Enforcement at Checkpoint Charlie.
- No construction activity shall occur on Saturday or Sunday between June
22 & September 6
No outside "on"rlfion activity shall occur on the follilrg dates:
Friday, February 15, Saturday, February 16, Sunday, February 17, and Monday,
February 18. (Presidents Weekendl
Saturday, May 25, Sunday, May 26 and Monday, May 27 (lIemo{glgql
Friday, June 28, Saturday, June 29 and Sunday, June 30. (Vail Arts Festival)
Wednesday, July 3, Thursday, July 4. Friday, July 5, Saturday, July 6 and
Sunday, July 7. (lndependence Dav)
Saturday, August 31, Sunday, September 1, and Monday, September 2
(Labor Dav).
Friday, September 13, Saturday, September 14, Sunday, September 15 in
(Lionshead) and then on Saturday, September 21 and Sunday, September 22.
(Vail Village) - (October Fest)
Thursday, November 28, (Thanksqivinq Dav) Friday, November 29, Saturday,
November 30 and Sunday, December 1.
Wednesday, December 25, Thursday, December 26, Friday, December 27
Saturday, December 28, Sunday, December 29. (Christmas Day Holidav)
Monday, December 30, Tuesday, December 31 , Wednesday January 1,
(New Year 20031 No Work allowed the entire week of the Christmas/New Year
HolidaY
. The Town of Vail Noise Ordinance has been waived by the Town Manager from 7a.m.
- 7p m. For construction activities from April 15 through June 21, and from September
9 through November 15. The Noise Ordinance shall be in effect and strictly regulated
from June 22 through September 8 and November 15 to April 15, 2001
o All construction sites will be required to obtain an Approved Construction-Staqinq
Plan from the Town of Vail Public Works Department in conjunction with Code
Enforcement. (The approved staging/parking plan is required to be on site at all
times).
. The Town of Vail reserves the right to amend the Vail Village/Lionshead Construction
Plan regulations at anytime should abuses or problems arise.
r The Three-Strike Rule will be enforced. Step 1. (Written warning), Step 2.
(Written warning), Step 3. (Construction site will be Red Tag until all issues are
resolved).
Expectations
The following expectations are established to insure the success of the Vail
Village/Lionshead Construction Master Plan;
r Full and complete cooperation and understanding from all parties involved in the
construction activity in regards to this plan.
r Strict adherence and compliance with the reouirements outlined in the construction
Plan.
. Respect and consideration for the affected interests and parties.
lf you have any question, Please contact the Town of Vail Public Works Department
(Construction lnspector) or Vail Police Department (Gode Enforcement Officer)970479-2198 970-476-7603
TOlffN OF VAIL
Vail2002 Staging / Parking Plan Information
The Stasine / Parkins Plan Philosonhv- Is a very important step in the building
process. Striking a balance betrveen safe public access and giving construction projects
room to build is becoming increasingly challenging, for us to meet all the needs of those
who will be impacted by construction projects. The fact is, there is less room to build in
the 'fown of Vail.
Developing a creative Staging Plan is a must. Staging in the Town of Vail Public Right of
Way is a Privilege, not a given right. We take into account when we review and approve
staging / parking plans, impacts on neighborhoods, tourism, business and the traveling
public along with your right to build.
The General Contractor is resnonsible for all subcontractors and all construction
activitv relatine to the buildine proiect. The staging plan will be enforced according tc)
the Approvcd Set of Building and Staging Plans. You are required to keep a copy of the
Approved Staging Plan on site.
Two staging /parking plans are required, a summer and winter. Summer staging plans
expire on November l, and winter staging plans expire on April 15. (Note: There is no on
street parkins in the winter season and all materials. equipment. etc must be 10' off the
edge ofasphalt).
Enforcement of all staging / parking plan is as follows.
A) Staging / Parking Plans to scale required.
B) Once the plan is approved, they will be held to complete compliance.
C) We will use a 3 step and you're out, process.
Steo One- Verbal and written warnings as to the staging plan violation, then have
contractor sign and date field memo warning.
Step Two- Police Department issue tickets and tows or public works writes second
written warning to all violators who have been notified under step one and who are still
in violation of the approved Staging / Parking Plan. The Town of Vail Chief Building
Official will call the contractor and notify them, the next time any violation happens, the
building department will red tag the construction site for 48 hours.
Step Three- If still in violation after step two, a 4!-houI&d-f4g will be issued to the
proiect site.
If you have any Questions, Please contact the Town of Vail Construction Inspector at
970-479-2198
F:\cdev\FORMS\PERMITS\Staging-Parking.doc
o
Requirements for an Acceptable Staging Plan
It is preferred that and Approved Site Plan is used to draw a staging plan, but a hand
drawn plan may be used as long as it is dawn to scale and is neat and legible.
1.) The Staging Plan must show the follorving:
(a) Show all parking that is required for the job site. (lncluding construction
equipment).
(b) Show the location of all material that will be staged on site.
(c) Show the location ofall dumpsters and port-o-john that are to be on site.
(d) If a fence is required, then show the location of the fence and describe the
material used for the fence.
(e) Iftrees and / or vegetation is required to be protected, then show how this will be
done.
(f) If this staging plan is for a Demo Permit, then show staging for dump trucks and
all related equipment. If the Town of Vail Right of Way area is needed for
staging, then a Traffrc Control Plan is required in conjunction with the staging
plan.
(g) Please provide and show an Erosion Control Pian.
(h) No equipment, vehicles, materials are allowed on Town of Vail Right of Way in
the Winter Staging Plan.
2.) If work needs to occur in the right of way, then add a Traffic Control Plan to the
staging plan showing the following:
(a) The work zone (area that is to be performed)
(b) Traffic Control Devices (waming, signs, cones, flaggers, etc.)
(c) Distances that all devices will be set up from the work zone. Also show all
dimensions of work being performed in the right of way. All tralfic control plans
must conform to the MUTCD manual.(Manual of Uniform Traffic Control
Devices)
2.) This plan will be reviewed by Public Works and if Necessary the Police, Fire, and
Community Development Department. Once the staging plan is approved, it will be
registered with the departments listed above and enforced.
3.) The Village and Lionshead area have outside construction restrictions, Please become
familiar with the Vail 2002. Vail Villase and Lionshead Construction Hours handout.
F:\cdev\FORMS\PERMITS\Staging-Parking.doc
era -ea -ev-
EMSL AnaI fnc.,om&rytrkl 7uO
Prlrlnc A29 755'1920 Fa: O25) 755'I9tg
Atfr.: Jolut Morken
l|orteo Dtytdl
P.o- Bo,(3461
Vail, CO 81658
POLARIZED LrGHT lttrcnoscoPY FLIO
Perfomcd by EPA 500/R-f,n16 Method'
ProJGcft Unn 1003, TimbliCltl
srlCr
T'ratr4t
Aswrgfits
Tuesday, Iiardr26,2ffi2
RefNumbs: BR(rZ6/I
r{ot{-Asrlq8q9
Fbns X Norllbnt
D*T4B\go*'
ca !r r: For dl duiorrr, ifr,ogrutE !.rngt€ dty iaF.d hb ]aranrtst, si b ffi runp|6' dt coltpo'l€{d b # rorsrtblx
A!to, 'f oa bycrl' rrb.5 B n mbs d tcpnEru 3lbt46'
. Ny rffTlea.nallEort !t EIIP 196.1 fisrod
4d&44/
-
r', Aperyd
Sbnatory
htfrJ t!-Il- lrr || l !tr!E trrltlt. 'Drr r-rylGrctrr: Gt' ar .|itr t|} r'a:ts I
s!rn-. trGc al3F r- -* ffi-I<i; trd=;d ifi t+l+ D CA'FIE'' lt"G-trrrsttb
6. brr*. nr rOor nq rur,ril&-',*r5 rrqnr6rt--i tg1dt frr69rnnrf tqLt"dltgr#5
irqiqtrrttut.,atlr'..o ro ffiffiiiE gog q*Tfut rrfrtrrtyl tu'*ttFfi"E'EdtrFr'tr
tanlg - rt1fi1 otF) F aa6 f* '-rpnfif'lrss-ErnoFOnr'^t,*t'd aAr!lt7!{'gsoGilr UeOi0ie66)
arJf zvf z99tL La. L J .
O9l12l2W. ?it;,tl
az.t , iJJL ro)EFEI- .r| | Lrt tqlrJE
EIi6LAnldcr$hr-
&hCVrYouisttil|, ntF
YfrhTililTG
Srrrt
h*
atnrE
?frR*ts
hiln$h*
PiidItrrffilc
l-Aft azlos
PE&
rEl t4,St*---rrg=hrr5!t
.TT'IIAnI'UIID
I E{f- frs
Rozh
CUAIN Or CUSTOIDY
Ydot)uJtl
ffir.llare
ttn*
ts*'(Issn
n[nt'l||lcrhtff
tiraarO1rJ
Jrfr Hrb
r''4r.Ln,
lrarllx
tf.G
ll|na.LL, llrh!!:F tb lf I * alrrrHn fr b llrnar..lt lr'Fr rfr t' ltt.r F- -Dilh }}-DL e*
ffi#7*.'r*,.'.Ary*; m,E oeHnnlnrr Fi hft",r,'''rre4o8HAF'/TWA u nmu TeIr;D2ok [J prUrau
HFIW*rt ffir'rqrurrr)EPAnohCorri [oinonson _tf/}l+iilYSSorriffh.tcd firrmrtoe(ffincts)Nystgt-4ll,MNoB&nm*rt Iw$ttt.t Dg*lalroi.r^dod;
Erryry.rrySFr
LJ ASIilD575545fir
E Wipoqdldrrr
TD
LJ Aft$t
U 8flfhrXlo$H7500
BPA 100.1gPAlo,z
rrrTg l9EJ
t€fr5rllrrgtr !
r-d*r
bl|ral
tl*
tlr
lhgj-/7.-ov /;70 o"n
/OilYal*1=Unfu{JIk {e rl, t(^^ o loA oe
erf -91 +grt- 1-. 4.,^ 'uJr LarNa gt tat .4L., t Jrra luJrttrlb@lEl GrrEL rtrrJ! t\|{EEtrl r'q-rlr(fl-rr{I;
l,ffiL
('J, l,rIfit
EfffiLAnfidcr[hg ArbGtbr
CIAIN OFCTISTODY
b.L
eouf*/6/trhf tWU l/arl 'a3,rt'm6#atth//, ca
Flcqu.sEd lnspcct Drb: Wednced.y, try 0E, 2002lntt cfoil Ar€.: CDSlbAddncr:'t5l{ TAI'OW DR VAIL
TITBERFALL BIDG IO UNIT I(Fs
APrItlnbnn lbn
Rcou..!d lnro.c0q|(cl
Itrm; Cll BlDg€lrcebod(1{.llR{U*G BROUYT+UVOLT.J OONBIRT,CTr)NCoilinrt: s9.gl66
^-,ei9,IS:
coAr/ts
lnrEctronHlfbnt
Rcqu..hdTlm3: 0t300AtPlut : 97(}9.19-tt66
Eilnd* DFLoRES r
ftil,ff qP{n€ Dla: AF SnbTlDG: AF S[!n|!t rtSTEDCo|EtTyti: _ocqe**,y (Ee: h?Am: CDCmi* rcCAt$l.J^lGtGB.ADDlcr* BRffI$WOINCOiISTRUCnON Plm: 9?o,909-itEoCriit cbn BRqYT$Mlt"lrlCOfilSTRt,cTFil Plron : 97&9€{t86Drcc'Fn: EEPel FRWYAT ArD CELI'|o DAI|AOED BY ELIKY 8|N( AEOlrE. REAPI.IT, REH.|D Sl,"IER€l.tSg. PATGL
hil 5{t Eu}efB*thnbm: dl BLDeshr$octi,htlhn: !D BL"DeFhd
ThrEp:
t
REPT131 Run Id.: 1565