Loading...
HomeMy WebLinkAboutB23-0275TO\^/N OF VAIL DEPARTMENT OF COMMLINITYDEVELOPMENT 75 S. FRONTAGEROAD VAIL, CO 81557 970-479-2138 NOTE: THIS PERMIT MUST BE POSTED ON TOBSITE AT ALL TIMES ADD/ALT SFR BUILD PERMIT permit #:Br03-O275 Job Address: 4405 COLUMBINE DR VAIL Starus . . . : ISSLiED Location.....: 4405 columbine dr Applied . . : 09/17/2003 ParcelNo...: 210112201020 Issued...: 09/17/2003 Project No : Expires . ..: 09/15/2004 owNER BRODZIAK, .IANE M. - BOSSACK,O,/17/2OO3 phone: 4406 COIi[t{BIl{E DR VAII, EO 81657 L,icense: CoNTRACTOR TCC COTITRACTORS, INC. 09/L7/2003 phone: P.O. BOX 1822 AVON, CO 81620 I-,icense: 540-B APPLICAI{E BRODZIAK, iTANE M. - BOSSACK, O9/1.7/2OO3 PhONC: 4405 COIJ'}4BINE DR VAIIJ CO 81657 I-,icense: Description:re-rolof existing asphalt with standing seam metal roof Occupancy: Type Construction: Valuation: $8,000.00 Add Sq Ft 0 Fireplace Infomntion: Restricdi y #ofGasAppliarces:0#ofcaslogs:0#of woodPelleL0**{*******'r**'{4**r*H***j}*a*******J'ffi****r****l*:r***#*|l Buildjng-> $153 .25 Restuarant Plan Review-> Plan Check-> 999.51 DRB Fee--> S0. oo Total Calculated Fees-> $255 .85 $0 . oo Additional Fees-> Investigation-> Will Call--> S0. 00 ftgcreation Fee-..-> $3 . 00 Clean-uP DeFosit-> s0.00 90 . 00 Toial Permit Fes--> $255. 85 $0. 0o > $25s. 86 TOTAL FEES--> S2ss. s5 BALANCE DUE--> S0 .00 Approvals:Ite.m: 05100 BUII,DING DEPARTMEIfl| o9/17/2oD3 dt Action: Ap Item: 05400 PLANNING DEPARTMEMT Item: 05500 FIRE DEPARTMEMI Item: 05500 PITBLIC WORKS See page 2 of this Document for any conditions that may apply to this permit. PAGE 2 #**!t**{i*{i********rt**r*rlt|lts*****liHrffi****'t#********tr******ri**i**rr***********,rr:t*.*'***************** CONDITIONSOF APPROVAL Pennit#: B/J34275 asof 0177-2003 Status: ISSUED ***tt**rHr**rB*i**r******iH*!t{'**!ffi **!* PermitType: ADD/ALTSFRBUILDPERMIT Apptied: 09/77/20flg Applicant BRODZIAKJANEM.-BOSSACK,DENNISL. Issued: 09/17/2003 ToExpire: 03/75/2004 ]ob Address: 4406 COLTIMBINE DR VAIL Location: 11405 columbine dr ParcelNo: 210772201,020 Description: re-roof existing asphalt with standing seam metal roof *{nhhbtstrffi********!****ri**rr******************** conditiorrs **********rffi****!H*********lit*********** Cond:12 (BLDG.): FIELD INSPECTIONS ARE REQUIRED TO CHECK FOR CODE COMPLIANCE. Cond:16 (BLDG.): SMOKE DETECTORS ARE REQUIRED IN ALL BEDROOIV{S AND EVERY STORY AS PER SEC.310.9.1 OF THE 197 UBC. DECLARATIONS I hereby acknowledge that I have read this application, filled out in fult the information required, completed an accurate plot plan, and state that all the information as required is correct. I agree to comply with the information and plot plan, to comply with all Town ordinances and state laws, and to build this strucfure according to the towns zoning and zubdivision codes, design review approve4 Unifonn Buitding Code and other ordinances of the Town applicable thereto. REQUESIS FOR INSPECflON SHALL BE MADE TWENry-FOUR HOURS IN ADVANCE BY TELEPHONE AT 479-2149 OR AT OUR OFFICE FROM 8:00 AM - 4 PM. OR CONTRACTORFOR HII{SELF AND OU.TNEF ?Vffi3-o*o ll APPLICATION WILL NOT BE ACCEPTED IF INCOMPLETE OR UNSIGNED Project #: Buildinq Permit#:sTpers#%ffi NGP OMPLETE VALUATIONS FOR BUILDING PERMIT Labor & Materials TVWN0FWn 75 S. Frontage Rd. Vail, Colorado 81657 BUILDING:$ PLUMBING: $ For Parcel # Contact *f.t t**:H.tH.*t*********'F***FOR OFFICE USE ONLy*"****+****r**********r|*****ffi**** Assessors Office at 970-328-8640 or visit P,c#d#Jtol ta&o t oao Job Name:JobAddress: 44ob Crlu*b,n )r LegalDescription ll Lot: lZ llatocx: I Fitin-jQ1*ho.rt t\ - /.ISubdivision: 1jt c*- owners *"t"L lafv- \rA>r,\.J Address: SA-XI4_.-Phone:11ln1 pL 4 ArchitecVDesigner:Address:Phone: Engineer:Address:Phone: Detailed descriptigp of work: {a-/ - QYAV WorkClass: New() Addition( ) Remodel ( ) Repair( ) Demo( ) Other( ) WorkType: Interior( ) Exterior( ) Both( )Does an EHU exist at this location: Yes ( ) No ( ) Type of Bldg.: Single-family ( ) Two-family ( ) Multi-famity ( ) Commercial ( ) Reslaurant ( ) Olher( ) No. of Existing Dwelling Units in this building:No. of Accommodation Units in this building: No/Type of Fireplaces Existinq: Gas Appliances ( ) Gas Loqs ( ) Wood/Pellet ( ) Wood Burninq ( No/Type of Fireplaces Proposed: Gas Appliances ( ) Gas Loos ( ) Wood/peilet ( ) Wood Burninq (NOT ALLOWED) Does a Fire Alarm Exist: Yes ( ) No (Does a Fire Sprinkler System Exist: Yes ( ) No ( \WailUata\cdev\FORMS\PERMITS\BLDGPERM. DOC 07 t2612002 tl Questions? Call the Building Team at 479-2325 Department of Community Development Project Name: Project Address: This Che*list must h omnteted heforc a Building Petmit aoplication is acephd, All pages of application is complete Has DRB approval obtained (if required) Provide a copy of approval form Condominium Association letter of approval attached if project is a Multi-Family complex Complete site plan submitted Public Way Permit application included if applicable (refer ho Public Work checklist) Staging plan included (refer to Public Works checklist) No dumoster.oarkinq or material storaqe allowed on roadways and shoulders without written aooroval Asbestos test and results submitted if demolition is occurring Architect stamp and signature (All Commercial and Multi family) Full floor plans including building sections and elevations(S sets of plans for Multi-Family and Commercial Buildings) Window and door schedule Full structural plans, including design criteria (i.e.loads) Structural Engineer stamp and signature on structural plans (All Commercial and Multi Family) Soils Report must be submitted prior to footing inspection Fire resistive assemblies specified and penetrations indicated Smoke detectors shown on plans Types and quantity of fireplaces shown o o u tr tr e o o o trl D ! n B D Applicanfs Signaturer Date of submittal: \Wail\data\cdev\FORMS\PERM ITS\BLDGPERM.DOC Received By: 04t02t2003 HOW DIDWE RATE WMH YOU? Town of Vail Survey Community Development Departnent Russell Fonest Director, (970)479-213e Check allthat applies. 1. Which Departnent(s)did you contac0 Building _ Environmental_ Housing_ Adrnin Planning DRB PEC Was your inilial contact with our staff immediate no one available ? lf you were required b wait, how long was it before you were helped?_ 4.Was your proj,ect revieJr/ed on a timely basis? Yes / No lf no, why not? Was this your first time to fle a DRB app- PEC app Bldg Permit_ IVA Please rate the performance of fie stafiperson who assisted you:54321Name: (knowledge; responsiveness, availability) Overall efiectiveness of he Front Service Counter. 5 4 3 2 What is the best time of day for you to use fie Front Service Counter? 9. Any comments you have which would allow us to beter serve you nexttime? Thank you for hking the lime to complete this survey. We are commitbd b improving our seMce. slow ,t i or t. L APPLICATION FOR TOWN OF VAIL PUBLIC WAY PERMIT 19 PW*:TN ITTN PATCEI#:I T T [' T T T - f, T' X I T Brds. Permiin,E I I -I I n I , 1,Job Name Excavaling Contraclor Name Street Address -l Tl I-l - n (tf unknowncallLll ll I | | 479-2138 ext.02.Mailing Address TOV Contraclor's Lhense Number REOU]RED zipCity Phong # 4. Slart Date Work is for lcircte one) Water Completion Date Sewer Gas Electric (Permit Explra{on Date) Telephone CATV Landscaping Temp. Site Access Other 5.Trench-width (mln.4') Bond Amount $ 6, ALL MATERIAL, EQUIPMENT, AND TRAFFIC JOB IS STARTED. 7.Rubber out-riggers are required on Asphalt surfaces underneath the 8.A signature below indicates a signatures are obtained, permittee necessary Town ol Vail signatures. Permit Fee working on asphalt. at all times. up to one week to Process. Depth TotalSF $ TotalLF $ Total Permit Fee $ BE ON THE JOBSITE BEFORE THE utllity locations and approvals. Once all utility company ng application through the Public Works otlice to obtain the Public Service Natural Gas Group (1-800-922-19871 Public Service Company (1 U.S. West (1 -800-922-1 987) TCI Gablevision of the Rockies (1-800-922-1987) Eagle River Water & Sanitation District (970-476-7480, exl 114) Holy Cross Electric Company (1-800-922-1987) Town of Vail Electricians (970-479-2158) Town of Vail lrrigation (970-479-2158) Town of Vail Public Works Construction Inspector (970'479'2198) 9. THERE W|LL BE NO TOTAL STREET CLOSURESI A construction trafiic control plan must be approved by the Public Works Department prior to issuance of the permit. All excavation must be done by hand within 18" of utilities - (Senate Bill 172).10, 11.Pennittee must contact Public Works Department at 479-2198 24 hours Brior to commencing of work. Failure-to notify the Town will result in torletture of bonO rnon-y. Scheduled inspections which are not ready may result in the Town charging the contractor a reinspection fee. 12. I certity that I have read all chapters of Title I - Public Ways and Property, of the Vail Municipal Code and all utility company agreements, signed by me, and will abide by the same, and that all utilities have been notified as required. Contractor's Signalure ol Agreement Prlnt name clearly ATTACH PLAN OF WORK, INCLUDING CONSTRUCTION TRAFFIC CONTROL PLAN Show streets with names, buildings, and location of cuts. USE DASH LINES FOR CUT. Date of Signature White - Pub'ic WorkE Yellow - Contractor pRATNAGE ANp CULVERT INSPECTIONS ARE REQUTRED By PUBLTC WORKS! Please read and check off each of the items below: u The Town of Vail Building Depaftment has developed the following procedures to ensure that new construction sites have adequately established proper drainage from building sites along and adjacent to Town of Vail roads or streets. u The Town of Vail Public Works Department will be required to inspect and approve drainage adjacent to Town of Vail roads or streets and the installation of temporary or permanent culverts at access points from the road or street onto the construction site. Such approval must be obtained prior to any requests for inspection by the Town of Vail Building Depaftment for footings, temporary electrical or any other inspection. Please call Leonard Sandoval at 479-2198 to request an inspection from the Public Works Depaftment. Allow a minimum of 24 hour notice. u Also, the Town of Vail Public Works Department will be approving all final drainage and culveft installation with resulting road patching as necessary. Such approval must be obtained prior to any Final Ceftificate of Occupancy issuance. Agreed to by: Print Name Project Namer Date Signed: F:/everyone/forms/bldperm6 Signature TOI4'NM Vail2003 Vail Village and Lionshead Village Construction Hours Information Handout r $ Problem Statement Vail Village and Lionshead Village are invaluable assets to the community. Thousands of people come to Vail each year to sightsee, recreate, shop and to enjoy everything the Vail Valley has to offer. The community and merchants rely upon our guest to generate revenue. Our summer/winter guests expect a pleasant experience while in Vail. To insure that all of the proposed construction has as little negative impact on the community and on our guest as possible, the Town of Vail finds it imperative to create and implement the Vail Village and Lionshead Village Construction Hours Handout. It would be irresponsible for the Town of Vail, the Construction Contractors and the Merchants, to not actively participate to minimize the impact of construction in the Vail and Lionshead Village areas. Givens The following givens are intended to provide the basic foundation by which construction will be completed in the Villages: . The public's health, safety and welfare shall be honored at all times. . Adequate pedestrian, loadingidelivery, vehicle, and emergency vehicle access and circulation shall be maintained. r Roadwavs and pedestrian walkways shall be kept clean and free of dirt and debris. . All construction deliveries, equipment, tools and materials entering the Vail Village and Pedestrian areas must go through Check Point Charlie. All Lionshead construction activity must go to the Vail Police Department for a parking permit. Do not use delivery zones for construction parking, refer to approved staging plan or make other arrangements for parking. . The hours of Outside Construction Activity shall be as follows: - April 15 - June 20 & September 8 - November 14,7 a.m. until 7 p.m., seven days a week. June 2O-September 5, work must end bv 4:00 p.m. on Fridavs. November 14 - April 15,2004 work allowed within daylight hours only. - Deliveries shall be restricted to the hours of 7 a.m. to 11:30 a.m. on Gore Creek Drive and 7 a.m. to 8:30 a.m. on Bridge Street. - Special delivery permits must be requested in advance, from Public Works in conjunction with Code Enforcement at Checkpoint Charlie. - No construction activity shall occur on Saturday or Sunday between June 21 & September 7. tl Vail 2003 Staging / Parking Plan lnformation IheSlagtnl / Parking Plan Philosophv- ls a very important step in the building process. Striking a balance between safe public access and giving construction projects room to build is becoming increasingly challenging, for us tg meet all the needs of those who will be impacted by construction projecis. The factls, there is less room to build in the Town of Vail Developing a creative Staging Plan is a must. Staging in the Town of Vail Public Right of Way is a Privilege, not a given right. We take into account when we review and approve staging / parking plans, impacts on neighborhoods, tourism, business and the traveling public along with your right to build. TOlfrNOFVAN The General Co is responsib lefor all subcontractors and all construction activifit relatina to the buildinq proiect. The staging plan will be enforced according to the Approved Set of Building and Staging Plans. You are required to keep a copy of the Approved Staging Plan on site. Two staging /parking plans are required, a summer and winter. Summer staging plans expire on November 1, and winter staging plans expire on April 15. (Nq!e: There is no on street parking in the winter season and all materials. equipment, etc must be 10' off the edqe of asphalt). Enforcement of all staging / parking plan is as follows. A) Staging / Parking Plans to scale required. B) Once the plan is approved, they will be held to complete compliance. C) We will use a 3 step and you're out, process. Step One- Verbal and written warnings as to the staging plan violation, then have contractor sign and date field memo warning. Step Two- Police Department issue tickets and tows or public works writes second written warning to all violators who have been notified under step one and who are still in violation of the approved Staging / Parking Plan. The Town of Vail Chief Building Official will call the contractor and notifo them, the next time any violation happens, the building department will red tag the construction site for 48 hours. Step Three- lf still in violation after step two, a 48 hour Red Tag will be issued to the project site. lf you have any Questions, Please contact the Town of Vail Construction Inspector at 970479-2198 \\Vail\data\cdev\FoRMS\PER|\illTS\BLDGPERM. DOC 03/0412003