HomeMy WebLinkAboutB23-0275TO\^/N OF VAIL DEPARTMENT OF COMMLINITYDEVELOPMENT
75 S. FRONTAGEROAD
VAIL, CO 81557
970-479-2138
NOTE: THIS PERMIT MUST BE POSTED ON TOBSITE AT ALL TIMES
ADD/ALT SFR BUILD PERMIT permit #:Br03-O275
Job Address: 4405 COLUMBINE DR VAIL Starus . . . : ISSLiED
Location.....: 4405 columbine dr Applied . . : 09/17/2003
ParcelNo...: 210112201020 Issued...: 09/17/2003
Project No : Expires . ..: 09/15/2004
owNER BRODZIAK, .IANE M. - BOSSACK,O,/17/2OO3 phone:
4406 COIi[t{BIl{E DR
VAII, EO
81657
L,icense:
CoNTRACTOR TCC COTITRACTORS, INC. 09/L7/2003 phone:
P.O. BOX 1822
AVON, CO
81620
I-,icense: 540-B
APPLICAI{E BRODZIAK, iTANE M. - BOSSACK, O9/1.7/2OO3 PhONC:
4405 COIJ'}4BINE DR
VAIIJ CO
81657
I-,icense:
Description:re-rolof existing asphalt with standing seam metal roof
Occupancy:
Type Construction:
Valuation: $8,000.00 Add Sq Ft 0
Fireplace Infomntion: Restricdi y #ofGasAppliarces:0#ofcaslogs:0#of
woodPelleL0**{*******'r**'{4**r*H***j}*a*******J'ffi****r****l*:r***#*|l
Buildjng-> $153 .25 Restuarant Plan Review->
Plan Check-> 999.51 DRB Fee-->
S0. oo Total Calculated Fees-> $255 .85
$0 . oo Additional Fees->
Investigation->
Will Call-->
S0. 00 ftgcreation Fee-..->
$3 . 00 Clean-uP DeFosit->
s0.00
90 . 00 Toial Permit Fes--> $255. 85
$0. 0o > $25s. 86
TOTAL FEES--> S2ss. s5 BALANCE DUE--> S0 .00
Approvals:Ite.m: 05100 BUII,DING DEPARTMEIfl|
o9/17/2oD3 dt Action: Ap
Item: 05400 PLANNING DEPARTMEMT
Item: 05500 FIRE DEPARTMEMI
Item: 05500 PITBLIC WORKS
See page 2 of this Document for any conditions that may apply to this permit.
PAGE 2
#**!t**{i*{i********rt**r*rlt|lts*****liHrffi****'t#********tr******ri**i**rr***********,rr:t*.*'*****************
CONDITIONSOF APPROVAL
Pennit#: B/J34275 asof 0177-2003 Status: ISSUED
***tt**rHr**rB*i**r******iH*!t{'**!ffi **!*
PermitType: ADD/ALTSFRBUILDPERMIT Apptied: 09/77/20flg
Applicant BRODZIAKJANEM.-BOSSACK,DENNISL. Issued: 09/17/2003
ToExpire: 03/75/2004
]ob Address: 4406 COLTIMBINE DR VAIL
Location: 11405 columbine dr
ParcelNo: 210772201,020
Description:
re-roof existing asphalt with standing seam metal roof
*{nhhbtstrffi********!****ri**rr******************** conditiorrs **********rffi****!H*********lit***********
Cond:12
(BLDG.): FIELD INSPECTIONS ARE REQUIRED TO CHECK FOR CODE
COMPLIANCE.
Cond:16
(BLDG.): SMOKE DETECTORS ARE REQUIRED IN ALL BEDROOIV{S AND
EVERY STORY AS PER SEC.310.9.1 OF THE 197 UBC.
DECLARATIONS
I hereby acknowledge that I have read this application, filled out in fult the information required, completed an
accurate plot plan, and state that all the information as required is correct. I agree to comply with the information and
plot plan, to comply with all Town ordinances and state laws, and to build this strucfure according to the towns zoning
and zubdivision codes, design review approve4 Unifonn Buitding Code and other ordinances of the Town applicable
thereto.
REQUESIS FOR INSPECflON SHALL BE MADE TWENry-FOUR HOURS IN ADVANCE BY TELEPHONE AT 479-2149 OR AT OUR OFFICE FROM 8:00 AM - 4
PM.
OR CONTRACTORFOR HII{SELF AND OU.TNEF
?Vffi3-o*o ll
APPLICATION WILL NOT BE ACCEPTED IF INCOMPLETE OR UNSIGNED
Project #:
Buildinq Permit#:sTpers#%ffi
NGP
OMPLETE VALUATIONS FOR BUILDING PERMIT Labor & Materials
TVWN0FWn
75 S. Frontage Rd.
Vail, Colorado 81657
BUILDING:$
PLUMBING: $
For Parcel # Contact
*f.t t**:H.tH.*t*********'F***FOR OFFICE USE ONLy*"****+****r**********r|*****ffi****
Assessors Office at 970-328-8640 or visit
P,c#d#Jtol ta&o t oao
Job Name:JobAddress: 44ob Crlu*b,n )r
LegalDescription ll Lot: lZ llatocx: I Fitin-jQ1*ho.rt t\ - /.ISubdivision: 1jt c*-
owners *"t"L lafv- \rA>r,\.J Address: SA-XI4_.-Phone:11ln1 pL 4
ArchitecVDesigner:Address:Phone:
Engineer:Address:Phone:
Detailed descriptigp of work:
{a-/ - QYAV
WorkClass: New() Addition( ) Remodel ( ) Repair( ) Demo( ) Other( )
WorkType: Interior( ) Exterior( ) Both( )Does an EHU exist at this location: Yes ( ) No ( )
Type of Bldg.: Single-family ( ) Two-family ( ) Multi-famity ( ) Commercial ( ) Reslaurant ( ) Olher( )
No. of Existing Dwelling Units in this building:No. of Accommodation Units in this building:
No/Type of Fireplaces Existinq: Gas Appliances ( ) Gas Loqs ( ) Wood/Pellet ( ) Wood Burninq (
No/Type of Fireplaces Proposed: Gas Appliances ( ) Gas Loos ( ) Wood/peilet ( ) Wood Burninq (NOT ALLOWED)
Does a Fire Alarm Exist: Yes ( ) No (Does a Fire Sprinkler System Exist: Yes ( ) No (
\WailUata\cdev\FORMS\PERMITS\BLDGPERM. DOC 07 t2612002
tl
Questions? Call the Building Team at 479-2325
Department of Community Development
Project Name:
Project Address:
This Che*list must h omnteted heforc a Building Petmit aoplication is
acephd,
All pages of application is complete
Has DRB approval obtained (if required) Provide a copy of approval form
Condominium Association letter of approval attached if project is a Multi-Family complex
Complete site plan submitted
Public Way Permit application included if applicable (refer ho Public Work checklist)
Staging plan included (refer to Public Works checklist) No dumoster.oarkinq or material storaqe
allowed on roadways and shoulders without written aooroval
Asbestos test and results submitted if demolition is occurring
Architect stamp and signature (All Commercial and Multi family)
Full floor plans including building sections and elevations(S sets of plans for Multi-Family and
Commercial Buildings)
Window and door schedule
Full structural plans, including design criteria (i.e.loads)
Structural Engineer stamp and signature on structural plans (All Commercial and Multi Family)
Soils Report must be submitted prior to footing inspection
Fire resistive assemblies specified and penetrations indicated
Smoke detectors shown on plans
Types and quantity of fireplaces shown
o
o
u
tr
tr
e
o
o
o
trl
D
!
n
B
D
Applicanfs Signaturer
Date of submittal:
\Wail\data\cdev\FORMS\PERM ITS\BLDGPERM.DOC
Received By:
04t02t2003
HOW DIDWE RATE WMH YOU?
Town of Vail Survey
Community Development Departnent Russell Fonest Director,
(970)479-213e
Check allthat applies.
1. Which Departnent(s)did you contac0
Building _ Environmental_ Housing_ Adrnin
Planning DRB PEC
Was your inilial contact with our staff immediate
no one available ?
lf you were required b wait, how long was it before you were
helped?_
4.Was your proj,ect revieJr/ed on a timely basis? Yes / No
lf no, why not?
Was this your first time to fle a DRB app- PEC app
Bldg Permit_ IVA
Please rate the performance of fie stafiperson who assisted you:54321Name:
(knowledge; responsiveness, availability)
Overall efiectiveness of he Front Service Counter. 5 4 3 2
What is the best time of day for you to use fie Front Service
Counter?
9. Any comments you have which would allow us to beter serve you
nexttime?
Thank you for hking the lime to complete this survey. We are
commitbd b improving our seMce.
slow ,t i
or
t.
L
APPLICATION
FOR TOWN OF VAIL
PUBLIC WAY PERMIT 19
PW*:TN ITTN
PATCEI#:I T T [' T T T - f, T' X I T
Brds. Permiin,E I I -I I n I
, 1,Job Name
Excavaling Contraclor Name
Street Address -l Tl I-l - n (tf unknowncallLll ll I | | 479-2138 ext.02.Mailing Address TOV Contraclor's Lhense Number REOU]RED
zipCity Phong #
4.
Slart Date
Work is for lcircte one) Water
Completion Date
Sewer Gas Electric
(Permit Explra{on Date)
Telephone CATV Landscaping Temp. Site Access
Other
5.Trench-width
(mln.4')
Bond Amount $
6, ALL MATERIAL, EQUIPMENT, AND TRAFFIC
JOB IS STARTED.
7.Rubber out-riggers are required on
Asphalt surfaces underneath the
8.A signature below indicates a
signatures are obtained, permittee
necessary Town ol Vail signatures.
Permit Fee
working on asphalt.
at all times.
up to one week to Process.
Depth
TotalSF $
TotalLF $
Total Permit Fee $
BE ON THE JOBSITE BEFORE THE
utllity locations and approvals. Once all utility company
ng application through the Public Works otlice to obtain the
Public Service Natural Gas Group (1-800-922-19871
Public Service Company (1
U.S. West (1 -800-922-1 987)
TCI Gablevision of the Rockies (1-800-922-1987)
Eagle River Water & Sanitation District (970-476-7480, exl 114)
Holy Cross Electric Company (1-800-922-1987)
Town of Vail Electricians (970-479-2158)
Town of Vail lrrigation (970-479-2158)
Town of Vail Public Works Construction Inspector (970'479'2198)
9. THERE W|LL BE NO TOTAL STREET CLOSURESI A construction trafiic control plan must be approved by the
Public Works Department prior to issuance of the permit.
All excavation must be done by hand within 18" of utilities - (Senate Bill 172).10,
11.Pennittee must contact Public Works Department at 479-2198 24 hours Brior to commencing of work. Failure-to notify
the Town will result in torletture of bonO rnon-y. Scheduled inspections which are not ready may result in the Town
charging the contractor a reinspection fee.
12. I certity that I have read all chapters of Title I - Public Ways and Property, of the Vail Municipal Code and all utility
company agreements, signed by me, and will abide by the same, and that all utilities have been notified as required.
Contractor's Signalure ol Agreement Prlnt name clearly
ATTACH PLAN OF WORK, INCLUDING CONSTRUCTION TRAFFIC CONTROL PLAN
Show streets with names, buildings, and location of cuts. USE DASH LINES FOR CUT.
Date of Signature
White - Pub'ic WorkE
Yellow - Contractor
pRATNAGE ANp CULVERT INSPECTIONS ARE REQUTRED By PUBLTC WORKS!
Please read and check off each of the items below:
u The Town of Vail Building Depaftment has developed the following procedures to
ensure that new construction sites have adequately established proper drainage
from building sites along and adjacent to Town of Vail roads or streets.
u The Town of Vail Public Works Department will be required to inspect and approve
drainage adjacent to Town of Vail roads or streets and the installation of temporary
or permanent culverts at access points from the road or street onto the construction
site. Such approval must be obtained prior to any requests for inspection by the
Town of Vail Building Depaftment for footings, temporary electrical or any other
inspection. Please call Leonard Sandoval at 479-2198 to request an inspection from
the Public Works Depaftment. Allow a minimum of 24 hour notice.
u Also, the Town of Vail Public Works Department will be approving all final drainage
and culveft installation with resulting road patching as necessary. Such approval
must be obtained prior to any Final Ceftificate of Occupancy issuance.
Agreed to by:
Print Name
Project Namer
Date Signed:
F:/everyone/forms/bldperm6
Signature
TOI4'NM
Vail2003
Vail Village and Lionshead Village Construction Hours
Information Handout
r $ Problem Statement
Vail Village and Lionshead Village are invaluable assets to the community. Thousands of
people come to Vail each year to sightsee, recreate, shop and to enjoy everything the
Vail Valley has to offer. The community and merchants rely upon our guest to generate
revenue. Our summer/winter guests expect a pleasant experience while in Vail.
To insure that all of the proposed construction has as little negative impact on the
community and on our guest as possible, the Town of Vail finds it imperative to create
and implement the Vail Village and Lionshead Village Construction Hours Handout.
It would be irresponsible for the Town of Vail, the Construction Contractors and the
Merchants, to not actively participate to minimize the impact of construction in the Vail
and Lionshead Village areas.
Givens
The following givens are intended to provide the basic foundation by which construction
will be completed in the Villages:
. The public's health, safety and welfare shall be honored at all times.
. Adequate pedestrian, loadingidelivery, vehicle, and emergency vehicle access and
circulation shall be maintained.
r Roadwavs and pedestrian walkways shall be kept clean and free of dirt and debris.
. All construction deliveries, equipment, tools and materials entering the Vail Village
and Pedestrian areas must go through Check Point Charlie. All Lionshead
construction activity must go to the Vail Police Department for a parking permit. Do
not use delivery zones for construction parking, refer to approved staging plan or
make other arrangements for parking.
. The hours of Outside Construction Activity shall be as follows:
- April 15 - June 20 & September 8 - November 14,7 a.m. until 7 p.m., seven days
a week. June 2O-September 5, work must end bv 4:00 p.m. on Fridavs.
November 14 - April 15,2004 work allowed within daylight hours only.
- Deliveries shall be restricted to the hours of 7 a.m. to 11:30 a.m. on Gore Creek
Drive and 7 a.m. to 8:30 a.m. on Bridge Street.
- Special delivery permits must be requested in advance, from Public Works in
conjunction with Code Enforcement at Checkpoint Charlie.
- No construction activity shall occur on Saturday or Sunday between June
21 & September 7.
tl
Vail 2003 Staging / Parking Plan lnformation
IheSlagtnl / Parking Plan Philosophv- ls a very important step in the building process. Striking a balance
between safe public access and giving construction projects room to build is becoming increasingly
challenging, for us tg meet all the needs of those who will be impacted by construction projecis. The factls,
there is less room to build in the Town of Vail
Developing a creative Staging Plan is a must. Staging in the Town of Vail Public Right of Way is a Privilege,
not a given right. We take into account when we review and approve staging / parking plans, impacts on
neighborhoods, tourism, business and the traveling public along with your right to build.
TOlfrNOFVAN
The General Co is responsib lefor all subcontractors and all construction activifit relatina to the
buildinq proiect. The staging plan will be enforced according to the Approved Set of Building and Staging
Plans. You are required to keep a copy of the Approved Staging Plan on site.
Two staging /parking plans are required, a summer and winter. Summer staging plans expire on November 1,
and winter staging plans expire on April 15. (Nq!e: There is no on street parking in the winter season and all
materials. equipment, etc must be 10' off the edqe of asphalt).
Enforcement of all staging / parking plan is as follows.
A) Staging / Parking Plans to scale required.
B) Once the plan is approved, they will be held to complete compliance.
C) We will use a 3 step and you're out, process.
Step One- Verbal and written warnings as to the staging plan violation, then have contractor sign and date
field memo warning.
Step Two- Police Department issue tickets and tows or public works writes second written warning to all
violators who have been notified under step one and who are still in violation of the approved Staging / Parking
Plan. The Town of Vail Chief Building Official will call the contractor and notifo them, the next time any
violation happens, the building department will red tag the construction site for 48 hours.
Step Three- lf still in violation after step two, a 48 hour Red Tag will be issued to the project site.
lf you have any Questions, Please contact the Town of Vail Construction Inspector at 970479-2198