Loading...
HomeMy WebLinkAboutBIGHORN 5TH ADDITION BLOCK 3 LOT 5 LEGALTOWN OF VAIL DEPARTMENTOF COMMTJNITYDEVELOPMENT 75 S.FRONTAGEROAD VAIL, CO 81657 970-479-2138 NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES ADD/ALTSFRBUILDPERMT Permit #: B,02-0272 Job Address: 5148 GORE CR VAIL [,ocation.....: 5148 GORE CIRCLE ParcelNo...: 209918203003 ProjectNo | ?p1p2-O(?? ovitNER coNNEI_,Ly, MICEAEIJ & SAI_'LY O8/2L/2002 phone: 5148 MAIN GORE CIR VAIIJ CO 816s7 Lricense; COrflTR,ACTOR HORN BROS. ROOFING 7717 W. 5TH AVE, Suite E Lrakewood, Co 802!4 Lricense: 708-B APPIJICANT HORN BROS. ROOFTNG 7717 W. 6TH AVE, Sui.te E Lakewood, Co AO214 License: 708-B o8/2L/2oo2 Phone: (303) 274-L1L7- o8/2L/2002 Phone: (SOg) 274-L7.L7. Description: REMOVE CEDAR,INSTA]-,L ICE/WATER SHIELD. INSTAIIJ NEW VAI-'I'EY METAI-,. INSTATI., GERARD ROOFI}IG TECHNOI-,OGIES Occupancy: Type Construction: Valuation: $18,100.00 Add Sq Ft 0 Fireplace Information: Restricted: Y # ofGas Appliances: 0 # ofGas Logs: 0 #of WoodPellet 0 Building---> $23s.00 R$hrarant Plan Review-> $0.00 Total Calculat€d Fe€s-> $390.75 Plan Check-> 5152 . ?5 DRB Feo----> 50.00 Additional F€€s----> 90.00 Investigation-> $0.00 Recrcation F€€ - -> $0. 00 Totol Permit Fee-.> $390. ?5 Will Cdl-__> S3 .00 Clcan-up Depo6it--> go. oo Pryrnents.---> S390. ?5 TOTAL FEES---> S3e0.rs BALANICE DUE--> $0.00 Stafus...: ISSUED Applied. . : 08121n002 Issued. .. : Q8/21/20Q2 Expires...: 02/17/2003 Approvals:Item: 05100 BUII-,DING DEPARTMENI O8/2L/2OO2 DF Action: AP IEem: 05400 PIJANNIIIG DEPARTMENT Item: 05500 FIRE DEPARTMENT Item: 05500 PUBLIC WORKS See page 2 of this Document for any conditions that may apply to this permit. DECLARATIONS I hereby acknowledge that I have read this applicafion, filled out in firll the information required, completed an accurate plot plan, and state that all the information as required is conect. I agree to comply with the information and,ptot plan, to cornply with all Town ordinances and state laws, and to build tlris stucture according to the towns zoning and subdivision codes, dssign review approved, Uniform Building Code and other ordinances of the Town applicable thereto, REQIJESTS FOR INSPECTION SHALL BE MADE TWENTY-F1f,UR HOURS IN ADVANCE BY TEIEPHONE AT 479-2138 OR AT OUR OFFICE FROM 8:00 AM - 5 PM. Send Clean-up Depoeir To: N/A OF OWNER OR CONTRACTOR FOR HIMSELF AND OWNER PAGE 2********'t'****,}{.*'t**i.,tlt*'}{.{t******,t.'**:t****,t.*4t****+*:}****,t**'t**************{.**{.,t*:f'}:*'#'|('t**:|!{t|** CONDITIONS OF APPROVAL Permit #: 802-0272 as of 08-21-2002 Status: ISSLIED {.**'t***{t't*'|t*{.'|.t**1.'|.*{.'}***,N.*:t.,.****t&*!t.***+**********{'*,t.!l,|(,}*!t.'F**'t!|tlt Permit Type: ADD/ALT SFR BUILD PERMIT Applied: 0gl2t/2002 Applicant: HORN BROS. ROOFING Issued: 08Dl/2002(303)274-llll To Expire: 0A17/2003 Job Address: 5 148 GORE CR VAIL Location: 5148 GORE CIRCLE ParcelNo: 209918203003 Description: REMOVE CEDAR,INSTALL ICVWATER SHIELD. INSTALL NEW VALLEY METAL. INSTALL GERARD ROOFING TECHNOLOGIES ****{.,F*,l*:**'|,*'|''t4.t|.'.*'t***+*************t$:t***,***,t*:tt:t'8Conditionsi{t*********'l.*+{.+:t.*+**'t.*$1.*'|*+**l.*t,********+ Cond: 12 @LDG.): FIELD INSPECTIONS ARE REQUIRED TO CHECK FOR CODE COMPLIANCE. Cond: 16 (BLDG.): SMOKE DETECTORS ARE REQUIRED IN ALL BEDROOMS AND EVERY STORY AS PER SEC.3IO.9.1 OF THE 1997I.JBC. * * * * * * * * + * * * * * * * + * * * * * * * * + 'l * * * * * * r' * * * * * * r' * *** **f t ** | t * t + $ * * * * ** t t * * f * ** + ** ** **** * * * * * * * **** * TOWN OF VAIL, COLORADO Statement * * * * i * t * * * +* * ** ***** **** * * t * 'l' * * * * + t * * * +*** t * a +f *f + +f*+* + +* * *+ + f{'** +** * * I * t t * * * * *** **** * * * * ** Statement Number: . R000002913 Amount I 9390.75 Oe/2t/200208r56 AM Payment Method: Check IniE: DDG Notation: Rocha 3074 Permit No: BO2-0272 Type 3 ADD/Ar,T SFR BUILD PERMIT Parcel No: 209918203 003 Sit.e AddreEE: 5148 GORE CR VAIL, LocaCion: 5148 GORE CIRCLE Total Feea: $390,75 This Payment: $390.?5 Total AL,L Pmt6: $390,75 Balance: $0.00,3********'****+*+******+***f+*****l'*********,**la***t*t**'i*t*'tt *. *+ i. ***** ** * ** * ** ***'t( * tt '* * * **** ACCOUNT ITEM LIST: Account Code DescniDtion Cument Pmts BP OO1OOOO31111OO BUILD]NG PERMIT FEES 235.00 PF 00100003112300 PLAN CHECK FEES 75?.75 l.lc OO1OOOO31128OO WILL CALL INSPECTION FEE 3.OO 6^q6-"7# ILDI fort> INFORMATION ll APPLICATION $''@tr){rn Permit#: MWIIOPVAIL 75 S. Frontage Rd. Vail. Colorado 81657 Phone#'s: 3o3.22<l'o-{E ltla8o.4 3o3.8A.1,, lg.l'""(,odte,t COMPLETE VALUATIONS FOR BUILDING PERMIT (Labor & Materials BUILDING:$ELECTRICAL:$Ortre*,$ lg, lorl S PLUMBING: $MECHANICAL: $TOTAL:$ For Parcel # Contact Assessors Office at 970-328-8640 or visit Wrlteao3ooj Job Name: Pt:Kz f'.n tlX c-L JobAddress: St y I e"e, 6,<"lt LegalDescription ll lot 5 Bbck: 3 Firins: gshfjifB- ll t"4rySlg Owners Name: rh' €p1';?lg r<%,t&<elL Phone:*ro,-ll6J,bs3 ArchitecVDesigner:Address:Phone: Engineer:Address:Phone: ic lJ') 5^ A'I,tlt uta)-riii;{ rat Workc|aSs:New()Addition()Remode|()Repair()D" WorkType: Interior( ) Exterior( ) Both( )boes an EHU exist at this location: Yes ( ) No ( )_ Type of Btdg.: Single-family (7$ Two-family ( ) Multi-family ( ) commercial ( ) Restaurant ( ) other( ) No. of Existing Dwelling Units in this building:No. of Accommodation Units in this building: NoffvpeofFireplacesExisting:GasAppllances()GasLogs()Wood/Pellet()WoodBurning(): No/Tvpe of Fireplaces ProPosed; Toes aTireTiErm exlst Yes ( ) No (@Yes() No() *******ri******ffi1*i!*s*s**rkr*FoR OFFICE USE ONlY******rffittr****i**l*****f.ftft** 7,lr RE0D AUU 2O ZOOZ 0712612002 \\Va ilBata\cdev\FORMS\PERMITS\BLDGPERM.Doc \ffIozo\5\ o U u tr u o D tr Questions? Call the Building Team at 479-2325 Department of Community Development Project Name:+ S,.t/ Project Address: / This Cheklist murt be omoletd beforc a Buildino Permit application is acepted. All pages of application is complete Has DRB approval obtained (if required) Provide a copy of approval form \ A??eetJ tr tr D D tr o LI Condominium Association letter of approval attached if project is a Multi-Family complex Complete site plan submitted Public Way Permit application included if applicable (refer to Public Works checklist) Staging plan included (refer to Public Works checklist) No dumoster,oarkinq or material storaqe allowed on roadwavs and shoulders without wriften approval Asbestos test and results submitted if demolition is occurring Architeci stamp and signature (All Commercial and Multi family) Full floor plans including building sections and elevations(4 sets of plans for Multi-Family and Commercial) Window and door schedule Full structural plans, including design criteria (ie.loads) Structural Engineer stamp and signature on structural plans (All Commercial and Multi Family) Soils Report must be submitted prior to footing inspection Fire resistive assemblies specified and penetrations indicated Smoke detectors shown on plans Types and quantity of fireplaces shown Applicanfs Signature: Date of submittal: F:/everyone/forms/bldperm2 Received By: BUILDING PERMIT ISSUANCE TIME FRAME If this permit requires a Tpwn of Vail Fire Department Approval, Engineer's (Public Works) review and approval, a Planlning Department review or Health Department review, and a review by the Building Department, the estimated time for a total review will take as long as three (3) weeks. All commercial (large or sfinall) and all multi-family permits will have to follow the above mentioned maximum requirpments. Residential and small projects should take a lesser amount of time. However, if residential or smaller projects impact the various above mentioned departments with regard to necessary review, these projects may also take three (3) weeks to review and approve. Every attempt will be made by this department to expedite this permit as soon as possible. I, the undersigned, understand the plan check procedure and time frame. I also understand that if the permit is not picked up by the expiration date, that I must still pay the plan check fee and that if I fail to do so it ftay affect future permits that I apply for. Agreed to by: Print narlne rrrt""r* Project Name: Date: F : everyone/forms/bldperm3 /ffi."\E4/ NtN0FWnll HOW DIDWE RATE WITH YOU? Toum ofVailSurvey Community Dwelopment Deparfnent Russell Fones! Director, (970)47e-2139 Check alf that applies- 1. Which Department(s) did you contacg Building _ Environmental_ Housing_ AdminPlanning DRB _ PEC _ ' i:' 2. Wasyourinitialcontactwithourstafiimmediate_slow_or ''r i 'l ' no one available___r_? 3. lf you were required to wait, how long was it before you were helped?_ 4. Was your projixt revieued on a timely basis? Yes / No lf no, why no? 5, WasfiisyourfirstlimebfileaDRBapp_pECapp_ i. :l Btdg Permit_ l,t/A | : 6. Please rate fie performance of he staffperson who assisted you:5432lName: (knowledge, responsiveness, availability) 7. Overall efiectiveness of the Front Service Counter. 5 4 3 2 1 8. What is the best time of day.for you to use fre Front Service Counter? 9. Any comments you have which would allow us to beter serve you nexttime? Thank you for taking the lime to complete this survey. We are committed b improving our service. ruri|J0F WHEN A*PUBLIC WAy PERMIT" rS REQUIRED PLEASE READ AND CHECK OFF EACH OF THE FOLLOWING QUEMONS REGARDING THE NEED FOR A "PUBUC WAY PERMIT": Is this a new residence? Does demolition work being public property? YES performed require the use of the Right-of-Way, easements or Is any utility work needed? YES Is the driveway being repaved? Is a different access needed to the site other than the existing driveway? YES_ ls any drainage work Seing done that affects the Right-of-Way, easements, or public poIs any drainage work or public property? YES NO Is a "Revocable Right-of-Way Permit" required? NO, NO NO NO Is the Right-of-Way, ebsements or public property to be used for staging, parking or fencing?YES_ NO____r_ If answer is NO, is a parking, staging or fencing plan required by Public Works?YES NO If you answered YES to any of these questions, a "Public Way Permit" must be obtained, "Public Way Permit" applications may be obtained at the Public Work's office or at Community Development (a sample is attached), If you have any questions please call Leonard Sandoval in Public Works at 479-2198. I HAVE READ AND ANSWERED ALL THE ABOVE OUESTIONS. Contractor Signature Job or Project Namer Date Signed: F:/everyone/forms/bldperm4 Company Name APPLICATION FOR TOWN OF VAIL PUBLIC WAY PERMIT 19 pw*:I[-fIIr PATCEI#:T f, N I T N T' N T. T T T Brds. Permit#,8 [ I'I I n I 1.Job Name Str€st Address I ll ll l- | (llunKnown carlLJ I rLl LJ 479-2136 6*1.91 ApCity Phone # 4. Start Date Work is for (circte onel Completion Date Water Sewer Gas Electric (Permit Explration Date) Telephone CATV Landscaping Temp.SiteAccess Other c.Trench-width (min,4'I Bond Amount $ ALL MATERIAL. EOUIPMENT. AND TRAFFIC JOB IS STARTED. 7.Rubber out-riggers ere required on Asphalt surfaces underneath the A signature below indicates a signatures are obtained, permittee necessary Town of Vail signatures. BE ON THE JOBSITE BEFORE THE working on asphalt. at all times. utility locations and approvals. Once all utility company application through the Public Works office to obtain the up to one week to process. Depth Total SF $ Total LF $ Permit Fee Total Permit Fee Public Seruice Company (1-800- Public Service Natural Gas Group (1-600-922-1987) U.S. West (1 -800-922-1 987) TCI Cablevision of the Rockies (1-800-922-1987) Eagle River Water & Sanitatlon District (970-476-7480, ext. Holy Cross Electric Company (1'800-922-1987) Town of Vail Electricians (970-47S-2158) Town of Vail Inigation (970-479-2158) Town of Vail Public Works Construction Inspector (970-479-2198) 9. 10. 11. 12. THERE WILL BE NO TOTAL STREET CLOSURESI A construction traffic control plan must be approved by the Public Works Department prior to issuance of the permit, All excavation must be done by hand within 18" of utilities - (Senate Bill 172). Permittee must contact Public Works Deoarlmeni at 479-2198 24 hours prior to commencing of work. Failure to notify lhe Town will result in forfeiture of bond money. Schecluled inspections which are not ready may result in the Town charging the contractor a reinspection fee. I ceftity that I have read all chapters of Title 8 - Public Ways and Property, of the Vail Municipal Code and all ulility company agreements, signed liy me, and will abide by the same, and that all utilities have been notified as required. Contractor's of Agreemont namg clsarly ATTACH PLAN OF WORK, INCLUDING CONSTRUCTION TRAFFIC CONTROL PLAN Show streets with names, buildings, and location of cuts. USE DASH LINES FOR CUT. Date ol Signature White - Public Works Yellow - Contractor How it relates to Building Permits: Fill out the attached che[k list wth the Buitding permit Aoptication. If yes was answered to any of the questions then a "Public Way" permit is required. You can pick up an applicatifn at either Community Development, located at 75 South Frontage Road or Public Works, lQcated at 1309 Elkhorn Drive. Notice sign-offs for uti companies. ALL utilities must field verifo (locate) respective utilities prior to signing schedule a locate. pplication. Some utility companies require up to 48 hours notice to A construction traffic staging plan must be prepared on a separate sheet of paper. An approved site plan devices (signs, cones, also be used. This plan will show locations of all traffic control .) and the work zone, (area of construction, staging, etc.). This plan will expire on lst and will need to be resubmitted for consideration for approval through the er. Be aware that your resubmission for winter may be denied of construction.depending on the Sketch of work being must be submitted indicating dimensions (length, width and depth ofwork). Th may be drawn on the traffic control plan or a site plan for the job. Submit completed to the Public Work's office for review. If required, locates will be scheduled for the T of Vail electricians and irrigaUon crew. The locates take place in ire up to 48 hours to peform.the morning, but may The Public Workt Inspector will review the application and approve or deny the permit. You will needed. Most permits contacted as to the status and any requirements that may be released within 48 hours of being received, but please allow up to one (1) week to As soon as the permit "Building Permit" to be "Building Permit". approved, the Building Department will be notified, allowing the Please do not confuse the "Public Way Permit" with a D NOTE: The above is for work in a public way ONLY. Public Way Permits are valid until November 15th. A new Public Way Permit is required each year if work is mean an automatic complete. Re-application each November 15th does not I have read and understa the above. Date Signed IJJ/MIAF DRAINAGE AND CULVERT TNSPECTTONS ARE REqUTREp By PUBLTC WORKS! Please read and check off each of the items below: a The Town of Vail Building Department has developed the following procedures to ensure that new construction sites have adequately established proper drainage from building sites along and adjacent to Town of Vail roads or streets. n The Town of Vail Public Works Department will be required to inspect and approve drainage adjacent to Town of Vail roads or streets and the installation of temporary or permanent culverts at access points from the road or street onto the construction site, Such approval must be obtained prior to any requests for inspection by the Town of Vail Building Depaftment for footings, temporary electrical or any other inspection. Please call Leonard Sandoval at 479-2198 to request an inspection from the Public Works Depaftment. Allow a minimum of 24 hour notice. o Also, the Town of Vail Public Works Department will be approving all final drainage and culvert installation with resulting road patching as necessary. Such approval must be obtained prior to any Final Ceftificate of Occupancy issuance. Agreed to by: Print Name Project Name: Date Signed: F:/everyone/forms/bldperm6 Signature read and check off each of the items below. of complete text are available upon request) CODE 5-2.10: DEPOSITS ON PUBLIC WAYS PROHIBITED Unlawful deposits: SuO;ec{ to subsection C thereof, it is unlawful for any person to litter, track or deposit, or cause to be littdred, tracked or deposited, sand, gravel, rocks, mud, dift, snow, ice, or any other debris or material upon any street sidewal( alley or public place, or any portion thereof. Notice; Abatement: The Director of Public Works may notiff and require any person who violates or causes another to violate thp provision of subsection A hereof, or who has in the Director's employment a person who violates or causes anodrer to violate the same, top remove such sand, gravel, rocks, mud, dirt, snow, ice or any other debris or material within twenty four (24) hours after receipt of said notice by the Director of Public Wprks. In the event the person so notified does not comply with the notice within the period of time hQrein specified, the Director of Public Work, or other authorized agent, may cause any such sand, gravdl, rocks, mud, dirt, snow, ice, debris or any other material to be removed from any street or alley at the expense ofthe notified. Summons and Penalty: As an alternative to the notice for removal provided in subsection B above, any person who violates or causes another to violate the same, may be issued a summons to appear before the Municipal Court of the Town for said violations, and upon being found guilty of a violation hereunder be punished as prrovided in Section 1-4-1 of this code. Notice and Penalty: It it unlawful for any person to fail or refuse to comply with the notice of the Director of Public Works as;Provided in subsection B hereof, and any such person shall, in addition to payment of the expense of incurred by the Director of Public Works, as provided in subsection B hereof, upon being found ilty of a violation hereunder, be punishable as provided in Section 1-4-1 of this Code. (1997 Code:nce 6 (1979), coDEs 7-3A-1 AND 7-3A-3:OBSTRUCTING TRAFFIC & IMPOUNDMENT AUTHORIZED a No person shall park any upon a street or at any other place within this Municipality in such a as to interfere with the free movement of vehicular traffic or propermanner or under such street or highway maintenance. (Ord. 2(1968) g 1) D Whenever any police officeq finds a vehicle attended or unattended, standing upon any portion of a street or upon any place wifhin this Municipality in such a manner as to constitute a violation of any section of this Article, or left unattended for a period of twenty four (24) hours or more and presumed to be abandoned under the cpnditions prescribed by Colorado Revised Statutes section 42-4-1102, as amended, the officer shall rfquire the vehicle to be removed or cause it to be removed and placed in storage in the nearest garagf or other place of safety designated or maintained by this Municipality, and the charges for towing and storage of such vehicle shall be charged to the owner of the vehicle in addition to a ten dollar ($10) impoundment charge. (Ord. 2(1968) g 3: Ord. 28(1981) S 1) I have read and will comply with thd above code provisions: Print Name Position or Relationship to Project: Date Signed: F:/everyone/form s/bld perm T Signature Vail 2002 Vail Village/Lionshead Construction Hours Handout The Vail Village and Lionshead are invaluable assets to the community. Thousands of people come to Vail each year to sightsee, recreate, shop and to enjoy the Vail Valley. The community and merchants rely upon the summer/winter tourism to generate revenue. Our summer/winter guests expect a pleasant experience while in Vail. To insure that all of the proposed construction has as little negative impact on the community and on our guest as possible, the Town of Vail finds it imperative to create and implement the Vail Village/Lionshead Construction Master Plan. Maps of the Village and Lionshead are included to show areas of construction being affected by this plan. It would be irresponsible for the Town of Vail, the Construction Contractors and the Merchants, to not actively participate to minimize the impact of construction on the Village and Lionshead areas. Givens The following givens are intended to provide the basic foundation by which construction will be completed in the Village: . The public's health, safety and welfare shall be honored at all times. o Adequate pedestrian, loading/delivery, vehicle, and emergency vehicle access and circulation shall be maintained. r Roadways and pedestrian walkways shall be kept clean and free of dirt and debris. . All construction deliveries, equipment, tools, materials, etc. to the Village must go through Check Point Charlie. All Lionshead construction activity must go to the Vail Police Department for a parking permit. Do not use delivery zones for construction parking, refer to approved staging plan or make other arrangements for parking. . The hours of Outside Construction Activity shall be as follows: - April 15 - June 21 & September 9 - November 15,7 a.m. until 7 p.m., seven days a week. Between June 22 -September 6 work must end bv 4:00 p.m. on Fridavs' November 15 - April 15, 2003 work allowed within daylight hours only' - Deliveries shall be restricted to the hours ot7 a.m. to 11:30 a.m. on Gore Creek Drive and 7 a.m. to 8:30 a.m. on Bridge Street. - Special delivery permits must be requested in advance, from Public Works in conjunction with Code Enforcement at Checkpoint Charlie. - No construction activity shall occur on Saturday or Sunday between June 22 & September 6 No outside activity shall occur on the following dates: Friday,15, Saturday, February16, Sunday, February 17, and Monday, February Saturday, 8. {Presidents Weekend} 25, Sunday, May 26 and Monday, May 27 (Memorial Davl Friday,28, Saturday, June 29 and Sunday, June 30. (Vail Arts Festival) Wed Sunday, July 3, Thursday, July 4. Friday, July 5, Saturday, July 6 and Z.(hCependence Day) Saturday,31, Sunday, September l, and Monday, September2 13, Saturday,September 14, Sunday, September 15 in September 21 and Sunday, September 22.and then on Saturday, ) - {October Fest) November 28, ffihanksqivinq Davl Friday, November 29, Saturday, 30 and Sunday, December 1. December 25, Thursday, December 26, Friday, December 27 Saturday,28, Sunday, December 29. {Christmas Dav Holidavl Monday,30, Tuesday, December 31, Wednesday January I, No Work allowed the entire week of the Christmas/New Year Holiday. . The Town of Vail Ordinance has been waived by the Town Manager from 7a.m. o The following Village/Lionshead Con o Full and complete construction activity s are established to insure the success of the Vail Master Plan: ration and understanding from all parties involved in the regards to this plan. r Strict adherence plan. compliance with the requirements outlined in the construction r Respect and lf you have any q for the affected interests and parties. , Please contact the Town of Vail Public Works Department (Gonstruction I ) or Vail Police Department (Code Enforcement Officer) Friday, (Vail Thursday, N - 7p.m. For construotion activities from April 15 through June 21 , and from September 9 through Novembef 15. The Noise Ordinance shall be in effec{ and strictly regulated from Ju-ne 22 througtp September 8 and November 15 to April 15, 2001 All construction sitep will be required to obtain an Approved Construction-Staqinq Plan from the Towit of Vail Public Works Department in conjunction with Code Enforcement. (The {pproved staging/parking plan is required to be on site at all times). The Town of Vail re$erves the right io amend the Vail Villagellionshead Construction Plan regulations at afiyiime should abuses or problems arise. The Three-Strike frule will be enforced. Step 1. (Written warning), Step 2. (Written warning), $tep 3. (Construction site will be Red Tag until all issues are resolved). i Expectations 970-479-2198 970476-7603 Ir Vail2002 Staging / Parking Plan Information The Stasine / Parkine Plan Philosonhv- Is a very important step in the building process. Striking a balance between safe public access and giving construction projects room to build is becoming increasingly challenging, for us to meet all the needs of those who will be impacted by construction projects. The fact is, there is less room to build in the Town of Vail. Developing a creative Staging Plan is a must. Staging in the Town of Vail Public Right of Way is a Privilege, not a given right. We take into account when we review and approve staging / parking plans, impacts on neighborhoods, tourism, business and the traveling public along with your right to build. The Genersl Contractor is resnonsiblc for all subcontractors and all construction activitv relatine to the buildins oroiect. The staging plan will be enforced according to the Approved Set of Building and St^ging Plans. You are required to keep a copy of the Approved Staging Plan on site. Two staging /parking plans are required, a sunmer and winter. Summer staging plans expire on November 1, and winter staging plans expire on April 15. (NSIgJb.erejS ng-AI street parkins in the winter season and all materials. equipment. etc must be 10' off the edge of asphalt). Enforcement of all staging / parking plan is as follows. A) Staging / Parking Plans to scale required. B) Once the plan is approved, they will be held to complete compliance. C) We will use a 3 step and you're out, process. Step One- Verbal and written wamings as to the staging plan violation, then have contractor sign and date field memo warning. Step Two- Police Department issue tickets and tows or public works writes second written waming to all violators who have been notified under step one and who are still in violation of the approved Staging i Parking Plan. The Town of Vail Chief Building Official will call the contractor and notiff them, the next time any violation happens, the building department will red tag the construction site for 48 hours. Step Three- If still in violation after step two, a 48 hour Red Tae will be issued to the project site. If you have any Questions, Please contact the Town of Vail Construction Iaspector at 970-479-2t98 TOIflN|'FVAIL F:bdev\IFORMS\PERMITS\Staging-Parking.doc tl Requirements for an Acceptable Staging Plan It is preferred that and Approved Site Plan is used to draw a staging plan, but a hand drawn plan may be used as long as it is dawn to scale and is neat and legible. l.) The Staging Plan must show the following: (a) Show all parking that is required for the job site. (Including construction equipment). (b) Show the location of all material that will be staged on site. (c) Show the location ofall dumpsters and port-o-john that are to be on site. (d) If a fence is required, then show the location of the fence and describe the material used for the fence. (e) Iftrees and / or vegetation is required to be protected, then show how this will be done. (0 If this staging plan is for a Demo Permit, then show staging for dump trucks and all related equipment. If the Town of Vail Right of Way area is needed for staging, then a flraffic Control Plan is required in conjunction with the staging plan. (g) Please provide and show an Erosion Control Plan. (h) No equipment, vehicles, materials are allowed on Town of Vail Right of Way in the Winter Staging Plan. 2.) If work needs to occur in the right of way, then add a Traffic Control Plan to the staging plan showing the following: (a) The work zone (area that is to be performed) (b) Traffrc Control pevices (waming, signs, cones, flaggers, etc.) (c) Distances that all devices will be set up from the work zone. Also show all dimensions of work being performed in the right of way. All traffic control plans must conform to the MUTCD manual.(Manual of Uniform Traffrc Control Devices) 2.) This plan will be reviewed by Public Works and if Necessary the Police, Fire, and Community Development Department. Once the staging plan is approved, it will be registered with the departments listed above and enforced. 3.) The Village and Lionshead area have outside constuction restrictions, Please become familiar with the Vail 2002. Vail Villase and Lionshead Construction Hours handout. F :\cdev\FORMS\PERMITS\SIaging-Parking.doc