Loading...
HomeMy WebLinkAboutVAIL VILLAGE FILING 1 BLOCK 7 LOT 19 (3)TOWN OF VAIL DEPARTMENT OF COMMTJNITY DEVELOPMENT 75 S.FRONTAGEROAD VAIL, CO 8I657 970479-2138 NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES ADD/ALT SFR BUILD PERMIT Permit #: B,07-0147 Project # PRJ07-0205 Job Address: 324 BEAVER DAM RD VAIL Status. . . : ISSUED Location.....: UNIT'B' Applied..: 05/2112007 Parcel No...: 210107113011 Issued . .. : 05/2412007 Expires . ..: 'll/20/2007 OWNER BROWN CH]LDREN IJIJC O5/2L/2OO7 58OO E STANFORD DR ENGLEWOOD co 80111 APPLICANT TCC CONTRACTORS, rNC. 0s/2L/2007 phone: 970-328-2340 P.O. BOX 2l_23 EAGLE co 8r-631_ License: 540-B CONTRACTOR TCC CONTRACTORS, INC. OS/2t/Zooi phone: 970-328-2340 Y,V. l5V2\ ZLZS EAGLE co 8153 r- License: 540-B Description:SIDE 'Br DUPLEX RE-ROOF Occupancy: Type Construction: Valuation: $15,440.00 Revision Valuation: $0.00 Total Sq Ft Added: 0 'r t * *,i ** * * *,i * 'i t +,t i Building----> Plan Check--> Investigation-> wilt ca --> $265.25 Restuarant Plan Review-> $ 172.41 R€ocation Fee-------> $0.00 ToTAL FEES_-___-__> $3.00 $0.00 Total Calculaled Fees-> $0.00 Additional Foes----> $440.66 Total Permit Fee--> Pa'T nents-------> BALANCE DUE---> $440,66 $0.00 $440.66 $440.66 $0.00 Approvals:Item: 05100 BUTLDING DEPARTMENI 05/2r/2OO7 JS Action: AP Item: 05400 PLANNING DEPARTMENT 05/2I/2OO7 JS Action: AP at't't+r.t+t,t*,ti+,i,t*+***i*t,t*,i*+tt+*:i+t:i+,iata:tl|+*,r:it,t+:f:'ttt++l++ta+:lil++*rtr!itt+atr:ta++:r**a*rtrr:r*,t,t**t See the Conditions section of this Document for any that may apply. DECLARATIONS I hereby acknowledge that I have read this application, filled out in full the informalion required, completed an accufete plot plan, and state thd all the information as required is correct. I agree to comply with the information and plotplaq to comply with all Town ordinances and state laws, and to build this structufe according to the towns zoning and subdivision codes, dos{p review 'spprcved, Intemafional Building and Residential Codes and other ordinances of the Town applioable thereto. REQUESTS FOR INSPECTION SHI{.LL BE MADE TWENTY-FOUR HOURS fN ADVANCE !Y TELEPEONE AT {79-2149 OR AT OUn OFffCT FROM Sr00 AM.'{ Plt{, OR CONTRACTOR FOR HIMSELF AND +*'it't*'t,|.'}'i***,|.,|t|''|,|*****+*+**********{.*'t,t.f'|.,t*'.t***{t,}'t'}*'t*'|++*'|'{t't*{('}:t'|t****{t**t+*+||t*******i** CONDITIONS OF APPROVAL Permit #: 807-0147 as of 05-24-2007 Status: ISSUED *!t|*:}t*'|'!t*:|.'t*:t(**,t'|'**{.**********{.f**:|t'f**'t(!t'tt!t('t.*'|***,f**+**'|.+**t*******{.*l**{t'tt**'}*t}++******** Permit Type: ADD/ALT SFR BUILD PERMIT Applied: O5Dln007 Applicant: TCC CONTRACTORS, INC. Issued: 05/2412007970-328-2340 To Expire: 1112012007 Job Address: 324 BEAVER DAM RD VAIL Location: UNIT'B' ParcelNo: 21010711301I Description: SIDE'B' DTJPLEX RE-ROOF **:t *'1.**,r ** ******lr**!t*'t**:**:f .1.***:t:lr*{.'}!t*+**'l*+*it* ** conditions * 'tr *****++*{r'i***'t**.t*!t'r+**+'t++***** *:t:i*:t*++++ Cond: 12 (BLDG.): FIELD INSPECTIONS ARE REQUIRED TO CHECK FOR CODE COMPLIANCE. Cond: 16 (BLDG.): (sFR) SMOKE DETECTORS ARE REQUIRED PER SECTION R313 OF THE 2OO3 IRC. * ***ta'tiarr***talaaaraa+**taaaaara*r**rl**ir*f atrt***a* *ra**r ** ***rf ***ttf f +tttttt+*t**+*+irf, TOWNOFVAIL, COLORADO setement * **ll***rl'}llll****t*|t'}tltt*******tttttt**t**af,tttl**t t * * * + + + t t + | | t * + * * * | * * | | * a * * * * | | * a | | * a *gtatemenu Nunber: RO70OOO789 Amount: $440.66 OS/24/ZOO703:18 pM PaymenE Method; Check 4531 Initr DDG NoEation: TCC contsractors Permit No3 Parcel Nor Site Address l Location: ghiB Payment : BO7 -0L47 2101- 071- 13 01- 1 324 BBAVER DEII I'NIT I B I 9440.55 TPE ! ADD/AIJT SI'R BUII'D PERI.IIT RD VAIIJ Total Feeg.: TOtAl AIJIJ PMTS: Balance: * t{.4**lt*'l*|l** * * * 'l' *'}'l'l f 'l * * * {' * {' ***'l'lt* *'} * '}*rr*:ri*t*** **t't*!r 'r * * f* ***'f t++{.**+*'t*'t********t**t'tt a ACCOI.]NT ITEMLIST: Account Code Description $440.56 ${40.65 $0, 00 Current Pmta 265.25 r72.4L 3.00 BP 0010 000 31Lt t 00 PF 00100003112300 wc 00100003112800 BUTIJDING PERMIT FEES PIJNI CHECK FBES WIIJIJ CALL INSPECTION FEE APPLICATION WILL NOT BE ACCEPTED IF INCOMP s-Boz cvvT "parate Permits are required EietecIffi, pmuing, rnecEZiiGt, etc.t 7 75 S. Frontage Rd. Vail, Colorado 81657 q0.uL CONTRACTOR IN FORMATION coNtfLEIr VALUATTONS FOR BUtLDtNG pER 6/oa LETE OR UNSI Project #: Buildinq pe 4EE 52,8-23Llo ntractor Signature: MIT Labor & Materials BUILDTNG:S l€ 4{D. o o ELECTRICAL: $OTHER: g PLUMBING: g MECHANICAL: $roTAL:$ / s- 4 //a. ao For Parcel # Cantact Cou .,Assessors Office at 970-32g-g640 or visit Job Name: Legal Description Filing:S u bd ivision: Ear?car /t* DaF% pa?F wotkCl.s' N"*() A R"rnodut ( ) Repair( ) Demo( ) ethere-f Work Type: lnterior ( ) Exterior 1,.,f eotn 1 I Does an EHU exist at this location: yes ( ) No ( Type of Bldg.: Single-famity ( ) Two-familv Multi-family ( ) Commercial ( ) Restaurant ( ) Other ( ) No. of Existing Dwelling Units in this buildinq:No. of Accommodation Units in this buildino: Noffvpe of Fire ,_GasApp]Elggs( ) Gas Logs ( J Wood/peilet ( ) Wood Burni OT ALLOWEDDoes a Fire Alarm Exrst es( ) No( | **************************************FOR OFFICE USE O NLy*************rr**********************+* o,2lp 56 Jra tl Questions? Call the Building Team at 479-2128 Buildinq Permit Submittal Checklist Department of Community Development Project Name: d (ot, Mz/cd Project Address: 3a f 6a7Va/L DeU eal t/rtil- e a This Checklist must be completed before a Buildino Permit application is accepted. o n tr D o o { lll pages of application is complete o a D D a o B a D a Has DRB approval obtained (if required) Provide a copy of approval form Condominium Association letter of approval attached if project is a Multi-Family complex Plan Check Fee required at submittal for projects valued over $25000.00 (See attached Construction Fee Schedule for calculations) Complete site plan submitted Public Way Permit application included if applicable (refer to Public Works checklist) Staging plan included (refer to Public Works checklist) No dumpster,parkinq or material storaqe allowed on roadwavs and shoulders without written aoproval Asbestos test and results submitted if demolition is occurring Architect stamp and signature (All Commercial and Multi family) Full floor plans including building sections and elevations(4 sets of plans for SFR and Duplex, 5 sets of plans for Multi-Family and Commercial Buildings) Window and door schedule Full structural plans, including design criteria (i.e.loads) Structural Engineer stamp and signature on structural plans (All Commercial and Multi Family) Soils Repoft must be.submitted prior to footing inspection Fire resistive assemblies specified and penetrations indicated Smoke detectors shown on plans Types and quantity of fireplaces shown I have read and understand the above listed submittal requirements: Applicant's Signature: (, Date of submittal: F:\Users\JSuther\newBLDCPERM DOC Received By: 07 t28t2004 ll If this permit requires a Town review and approval, a Planni Vail Fire Department Approval, Engineer's (Public Works) Department review or Health Department review, and a review by the Building as three (3) weeks. the estimated time for a total review will take as lonq All commercial (large or small) and all multi-family permits will have to follow the above mentioned maximum rec Residential and small oroiects should take a lesser amount of time. However, mentioned deoartments with residential or smaller projects impact the various above to necessary review, these p@ecls may take five (5) weeks to review and Every attempt will be made this department expedite this permit as soon as I, the undersigned, understa d the plan check procedure and time lrame. I also understand that if the permit not picked up by the expiration date, that I must still pay fail to do so it may affect future permits that I apply for.the plan check fee and that if I Agreed to by:4rCtfr?c Print name Signature Project Name:'s6il 5/r"/a7 FlUsersUSuther\newBLDGPERM.DOC 07128t2004 WHEN A "PUBLtr WAY PERMIT" XS REQUIRED PI.EASE READ AND CHECK OFF EACH OF THE FOLLOWING OUESTIONS REGARDING THE NEED FOR A "PUBLrc WAY PERMTT": o 0 o o a n Is any dminage work being done that affecb the Right-of-Way, easemenb, or public property?YES NO v' Is a "Revocable Right-of-Way Permit" required?YE5 NO 't' Js the Rrght-oFWay,/semenE or public property to be used for sbging, parking or fencing? If answer is NO, is a payking, sbging or fencing plan required by Public WorK?YES NO ./ if you answered YES to any of these question5, a "P ublic Way Permit" must be obbined. "P ublic Way.Permit" applications may be obtained at the Public Work's office or at Community Development (a sample is atbched). If you have any questjons please call Leonard Sandoval in Public Worla at 479-2198. I HAVE READ AND ANSWERED ALL THE ABOVE OUESTIONS. TC? &atril+ Contractor Signafure b this a new residence?YES Does demolition work being performed require the use gf the Right-of-Way, easemenE or public property? YES-' NO ,." Is any utility work needed? YES_ NO ,.t' Are here any improvemenE being done to the driveway ? YES NO Is a different access needed to the site otrer than the exisdnq drivewav? YES No t"-t- NO Job or P roject Name: Date Signed: /at ztta) f/rz/0, Ft\Users\JSuther\newBLDGPERM.DOC F. /awanrnna /fnrmq /hldrorr4 Company Name 07 t28/2004 ll MWNOF ECTION lease read and check off each of the items below: Building Depaftment has developed the following procedures to ensure that new have adequately established proper drainage from building sites along and of Vail roads or sLreets. s The Town of Vail Public Works Depaftment will be required to inspect and approve drainage adjacent to Town of Vail roads or streets and the installation of temporary or permanent culvefts at access points from the road or street onto the construction site, Such approval must be obtained prior to any requests for inspection by the Town of Vail Building Department for footings, temporary electrical or any other inspection. Please call Leonard Sandoval at479-2798 to request an inspection from the Public Works Department. Allow a minimum of 24 hour notice. n Also, the Town of Vail Public Works Department will be approving all final drainage and culveft installation with resulting road patching as necessary. Such approval must be obtained prior to any Final Certificate of Occupancy issuance. Agreed to by: Project Name: Date Signed: The Town of Vail construction sites adjacent to Town Signature F:\Users\JSuther\newBLDGPERM.DOC 07128t2004 lt MATER.IAL STORAGE AND CONSTRUCTION PARKING Please read and check off each of the items below. (Copies of compleE text are available upon request) CODE 5-2-10: DEPOSffS ON PUBLD WAYS PROHIBITED n Unlawful deposiE: Subject to subsecb'on C thereof, it is unlawful for any person to litter, track or depmit or cause to be littered, tracked or deposited, sand, gravel, rocks, mud, dirt, snow, ice, or any oher debris or material upon any stree! sidewalk, alley or public place, or any portion thereof. E Notice; Abatement: The Director of Public Works may notify and require any penon who violates or causes another to violate the provision of subsection A hereof, or who has in tre Director's employment a pe6on who violates or causes another to,violate the same, top remove such sand, gravel, rocks, mud, dirt, snow, ice or any odrer debris oi material within twenty four (24) hours after receipt of said notice by be Director of Public Worts. In the event the person so notified does not comply with the notice within the period of time herein specified, the Director of Public WorK, or other authorized agent, may cause any such sand, gravel, rocls, mud, dirt, snow, ice, debris or any other material trc be removed from any street or alley at the expense of the notifieo. D Sumrnons and Penalty: As an alternaflve to the notice for removal provided in subsection B above, any peFon who violates or causes another to violate fre same, may be issued a summons to appear before he Municipal Court of the Town for said violations, and upon being found guilg of a violation hereunder be punished as provided in Section 14-1 of this code. a Notice and Penalty: It is unlawful for any person to fail or refuse to comply with the notice of the Director of Public Works as provided in subsection B hereof, and any such person shall, in addition to payment of the expense of removal incurred by the Director of Public Work, as provided in subsection B hereof, upon being found guilty of a violation hereunder, be punishable as provided in Section 14-1 of th'rs Code. (1997 Code: Ordinance 6 (1979). CODES 7-3A-1 AND 7-3A-3: PARKING OBSTRUCTING TRAFFrc & Ii,IPoUNDMENT AUTHORZED o No person shall park any vehicle upon a sfieet or at any other place within this Municipality in such a manner or under such conditions as to interfere with the free movement of vehicular traffic or proper street or highway maintenance. (Ord. 2(1968) g 1) o Whenever any police officer flnds a vehicle attended or unattended, sbnding upon any portion of a sbeet or upon any place within his Municipality in such a manner as b constitute a violation of any section of this Article, orleft unattended fora period of twenty four (24) hours or more and presumed to be abandoned under he conditions prescribed by Colorado Revised Sbtutes section 42-4-1102, as amended, the officer shall require the vehicle to be removed or cause it to be removed and placed in storage in he nearest garage or otfrer place of safety designated or mainhined by ftis Municipality, and the charges for towing and storage of such vehicle shall be charged to the owner of he vehicle in addition to a ten dollar ($10) impoundmentcharge. (Ord.2(1968) $ 3: Ord. 28(1981) 5 1) I have read and will comply with the above code provisions: Positir-rn or Relationship to Project: BltiBdigt8rdreAnewBLDGPERM.DOC 07 t28t2004 2. 3. 4. 6. 7. d. F:\UsersuSuTher\newBLDGPERM.OOC 07 tzanou tl Town of Vail Survey Community Development (970) 47s-213e Check all that apply Date: 1. Which Department(s) did Admin Was this your first time to fi Bldg Permit Overall effectiveness of th What is the best time of partment Russelt Forr'est, Director, contact? Building_ EnvironmentalDRB PEC Housing_ our staff immediate slow or no one availableWas your initial contact w lf you were required to how long was it before you were helped? Was your project reviewed a timely basis? Yes/No lf no, why not? a DRB app PEC app A Please rate the of the staff person who assisted you: s 4 3 21 (5 is hish) responsrveness, (knowledge, Front Service Counter. 5 4 3 21 (5 is high) for you to use the Front Service Counter? 8. What comments do you which would allow us to better serve vou next time? Thank you for taking the time complete this survey. We are committed to improving our service,