HomeMy WebLinkAboutVAIL VILLAGE FILING 12 BLOCK 2 LOT 1 COMMONtl
TVWI|WY/,IL
75 S. Frontage Rd.
Vail, Colorado 81657
APPLICATION WILL NOT BE ACCEPTED IF INCOMPLETE OR
Separate Permits are required for electrical, plumbing, mechanical, etc.!
CONTRACTOR INFORMATION
General Contractor:
V',.t+"t- (-a,n *tnlr-) T ,^.
Town of Vail Reg. No,:
ilL{-B
Contact and Phone #'s:
(gos)zzq 4\tra c+JeU,
Contractor Signature: I
tt4
ALUATIONS FOR BUILDING PERMIT & Materials
BUILDING: $ELECTRICAL: $orHER: $ 330,M
PLUMBING: $MECHANICAL: $rorAl: s ,73O,pA
COMPLETE V
For Parcel Conbct
************!r*************************FoR oFFICE USE ONLY*****r.******'r*************************
F :/everyone/forms/bld gperm
yoe of Construction:
#Assssorc at 970-328-8640 or visit
:ourfrrp: FJ,,J fi{',{ lb
ilti/:.qp lor.g,or,uz rs Assnio" Ltlo ll robAddress: 3nq BelI,], I b H
L.egal Description Lot iZ ll ai*r' !, ll ririne' Voi l{;lta6e
ll ruuai"i"ion,
Architect/Designer:Address:Phone:
Engineer:Address:Phone:
Detaired description orwork: f.a.nslotcliat of tacF .All mifi6a"tbn fu ftiet,
WorkClass: lrtew$ Addition( ) j.emodel( ) Repair( ) Demo( ) other( )
Work Type: Interior ( ) Exterior (y') Both ( )Does an EHU exist at this location: Yes ( ) No ( )
Type of Bldg.: Single-family ( ) Two-family ( ) Mutti-family ( ) Commercial ( ) Restaurant ( ) Other (yf
No. of Existing Dwelling Units in this building:No. of Accommodation Units in this building:
Noflypeof FireplacesExisting: GasAppliances( ) GasLms( ) Wood/Pellet( ) WoodBurning( )
Noflype of Fireplaces Proposed: Gas Appliances ( ) Gas Loqs ( ) Wood/Pellet ( ) Wood Burninq (NOT ALLOWED)
DoesaFireAlarmExist: Yes( ) No( ) ll DoesaFireSprinklerSystemExist: Yes( ) No( )
.Al,E,f I 200f
IO[/.M4IL{. DEU DEPT
Questions? Call the Building Team at 479-2325
Department of Community Development
Project Name:
Project Address:
r' This cheeklist must be omoleted before a Buildina permit application is
D
o
D
tr
a
D
acepted.
All pages of application is complete
Has DRB approval obtained (if required) provide a copy of approval form
condominium Association letter of approval attached if project is a Multi-Family complex
Complete site plan submitted
Public way Permit application included if applicable (refer to public works checklist)
Staging plan included (refer to Public Works checklisJ) No dumpster,parkinq or material storaoe
allowed on roadways and shoulders without written aoproval
Asbestos test and results submitted if demolition is occurrino
Architect stamp and signature (All Commercial and Multi fa;ily)
Full floor plans including building sections and elevations(4 sets of plans for Multi-Family and
Commercial)
Window and door schedule
Full structural plans, including design criteria (ie.loads)
Structural Engineer stamp and signature on structural plans (All Commercial and Multi Family)
Soils Report must be submitted prior to footing inspection
Fire resistive assemblies specified and penetraticins indicated
Smoke detectors shown on olans
Types and quantity of fireplaces shown
a
tr
o
tr
o
o
Applicant's Signature:
Date of submittal:
lrrJ"ll
a
tr
F:/E/eryone/forms/bldperm2
Received By:
tt
HOW DID'JYE RATE WITH YOU?
(e7o)
Town ofVafl Survey
o.-! rate the performance
Devebpment Departnent Russell Fonest Director,
39
Check alltbat appfies.
1. Which pepartnent(s) did you conhct?
Auildin$ _ Environmental_ Housing_ Admin
'..',
Pleasp rate the performance of tre staiff person who assisted you:5li 321Name:
(knoufledge; responsiveness, availability)
5li
kno4
Thank ydu br hking ttre time to complete this survey. We are
Planni$ , DRB _ PEC _
2. Was y{ur inilial conbct witr our sbff immediate_ slow or
no onejavailable__ __?
3. lf you fere required b wait how long was it bebre you were
helpe{
4. Was ypur proj,ect revieued on a timety basis? Yes / ltlo
lf no, fhy not?
5. Was $is yourfirstlimeb fte a DRB app_ pEC app_
Bldg Permit_ l,l/A
commitdd b improving our seruice.
!
D
o
o
o
o
WHEN A *PUBLIC WAY PERMIT" IS REQUIRED
PLEASE READ AND CHECK OFF EACH OF THE FOLLOWING QUEfiONS REGARDING THE NEED FOR A
"PUBLIC WAY PERMIT":
o Is this a new residence? YES No)L
Does demolition work being performed rgquire the use of the Right-of-way, easements or
public property? YES r,/ NO_
Is any utility work needed? YES_ NO
Is the driveway being repaved? yES- NO r,/
Is a different access needed to the site other than the existing driveway? yESr/_ NO
Is any drainage work laing done that affects the Right-of-Way, easements, or public property?YES- No-rZ-
D
f.|
Is a "Revocable Right-of-Way Permit" required?YES NUL
Is the Ri9|t-of-Way, easements or public property to be used for staging, parking or fencing?YES r/ NO_
If answer is NO, is a parking, staging or fencing plan required by Public Works?YES NO
If you answered YES to any of these questions, a "Public Way Permit" must be obtained.
"Public Way Permit" applications may be obtained at the Public Work's office or at Community
Development (a sample is attached). If you have any questions please call Leonard Sandoval in Public
WorK at 479-2L98.
I HAVE READ AND ANSWERED ALLTHE ABOVE QUESTIONS.
Contractor Signature Company Name
rob or project *u."t B-*TrElA flrnro,,rn s ktn .
Efr{/.rDate Signed:
F :/everyone/f orms/bldperrn4
U
How it relates to Building Permits:
Fill out the attached check list with the Building permit Apolication.
If yes was answered to]any of the questions then a "Public Way" permit is required. You
can pick up an applicatipn at either Community Development, located at 75 South Frontage
Road or Public Works, ldcated at 1309 Elkhorn Drive.
Notice sign-offs for utility companies, ALL utilities must field verify (locate) respective
utilities prior to signing lapplication. Some utility companies require up to 48 hours notice to
schedule a locate. l
A construction traffic cQntrol/staging plan must be prepared on a separate sheet of paper.
An approved site plan inay also be used. This plan will show locations of all traffic control
devices (signs, cones, etc.) and the work zone, (area of construction, staging, etc.). This
plan will expire on Ndvember 1st and will need to be resubmitted for consideration for
approval through the iryinter. Be aware that your resubmission for winter may be denied
depending on the locatlon of construction.
Sketch of work being ]performed must be submitted indicating dimensions (length, width
and depth of work). This may be drawn on the traffic control plan or a site plan for the job.
Submit completed appfication to the Public Work's office for review. If required, locates will
be scheduled for the Town of Vail electricians and irrigation crew. The locates take place in
the morning, but may fequire up to 48 hours to pefform.
The Public Work's Cohstruction Inspector will review the application and approve or deny
the permit. You willl be contacted as to the status and any requirements that may be
needed. Most permi$ are released within 48 hours of being received, but please allow up
to one (1) week to process.
As soon as the permit is approved, the Building Depaftment will be notified, allowing the
"Building Permit" to be released. Please do not confuse the "Public Way Permit" with a
"Building Permit". ]
NOTE: The abo{e process is for work in a public way ONLY. Public Way
Permits are valid ofrly until November 15th. A new Pubiic Way Permit is required
each year if work is not complete. Re-application each November 15th does not
mean an automatid renewal.
I have read and understand the above.
,,,t,t,,F->
Signature
F:/everyone/forms/bldperm5
Ibltqlot
Date Signed
U
BUILDING PERMIT ISSUANCE TIME FRAME
If this permit requires a Town of Vail Fire Department Approval, Engineer's (Public Works)
review and approval, a Planning Department review or Health Department review, and a review
by the Building Department, the estimated time for a total review will take as long as three (3)
weeKs,
All commercial (large or small) and all multi-family permits will have to follow the above
mentioned maximum requirements. Residential and small projects should take a lesser amount
of time. However, if residential or smaller projecLs impact the various above mentioned
departments with regard to necessary review, these projects may also take three (3) weeks to
review and approve.
Every attempt will be made by this department to expedite this permit as soon as possible.
I, the undersigned, understand the plan check procedure and time frame. I also understand
that if the permit is not picked up by the expiration date, that I must still pay the plan check fee
and that if I fail to do so it may affect future permits that I apply for.
Print name
Signature
F:everyone/forms/bldp€rm3
hroor.frr^ SssltF6tl d4'tigufio'r
APPLICATION
FOR TOWN OF VAIL
PUBLIC WAY PERMIT 19
-
t_,
PW#: L,l I.IfTt]
,Parcer#:If If 'nII'II III
Brds.Permit*,8 n I'f ! I n
1.Job Nam6 Streot Address n n n-[l (lfunknowncall
LJ L_J t_J | | 479.2139 ext. 0)2.Excavating Conlraclor Name Mdllng Address TOv Conlractor's License Number REOUIREo
{.,
zipCityState Phone #
4. Work is lor 1circte one; Waler
Other
Completion Dale
Sewer Gas Electric Telephone CATV Landscaping
Start Date (Permit Expiration Date)
Temp. Site Access
Trench-width
(min,4')
Bond Amount $
6. ALL MATERIAL, EQUIPMENT, AND TRAFFIC
JOB IS STARTED.
7.Rubber out-riggers are required on
Asphalt surfaces undemeath tlle
A signature below indicates a
signatures are obtained, permittoe
necessary Town of Vail signatures.
BE ON THE JOBSITE BEFORE THE
working on asPhalt.
al all times.
utility locations and approvals. Once all utility company
application through the Public Works office to obtain the
up to one week to process.
Depth
Total SF $
Total LF $
Permit Fee Total Permit Fee $
Public Service Gompany (1-800-
Public Service Natural Gas Group (1-800-922-19871
U.S. West (1 -800-922-1 987)
TCI Cablevision of the Rockies (1-800-922-1987)
Eagle River Water & Sanitation District (970-476-7480, ext. 114)
Holy Cross Electric Company' (1 -800-922- 1 987)
Town of Vall Electricians (970.479-2158)
Town of Vail lrigation (970-479-2158)
Town of Vail Public Works Construction Inspector (970-479-2198)
9, THERE WILL BE NO TOTAL STREET CLOSURESI A construction trafiic control plan must be approved by the
Pub|icWorksDepartmentpriortoissuanceo'thepermit.
10, All excavation must be done by hand within 18" of utilities - (Senate Bill 172),
11 . Permittee must contacl Publib-Works Department at 479-21 gB 24 hours prior to commencino of work. Failure to notity
the Town will result in forleiture of bond money. Scheduled inspections which are not ready may result in the Town
charging the contractor a reinspection fee.
12, I certify that I have read all chapters ot Title 8 - Public Ways and Property, of the Vail Municipal Code and all utility
company agreements, signed by me, and will abide by the same, and that all utilities have been notified as required.
Contractor's Signature of Agreement Pdnt name clearly
ATTACH PLAN OF WORK, INCLUDING CONSTBUCTION TRAFFIC CONTROL PLAN
Show streets with names, buildings, and location of cuts. USE DASH LINES FOR CUT.
Date ol Signature
White - Public Works
Yellow - Contractor
IUfrY0F
DRAINAGE AND CULVERT INSPECTIONS ARE REOUIRED BY PUBLIC WORKS!
Please read and check off each of the items below:
q The Town of Vail Building Department has developed the following procedures to
ensure that new construction sites have adequately established proper drainage
from building sites along and adjacent to Town of Vail roads or streets.
s The Town of Vail Public Works Department will be required to inspect and approve
drainage adjacent to Town of Vail roads or streets and the installation of temporary
or permanent culverts at access points from the road or street onto the construction
site. Such approval must be obtained prior to any requests for inspection by the
Town of Vail Building Department for footings, temporary electrical or any other
inspection. Please call Leonard Sandoval at479-2198 to request an inspection from
the Public Works Depaftment. Allow a minimum of 24 hour notice.
Also, the Town of Vail Public Works Department will be approving all final drainage
and culveft installation with resulting road patching as necessary. Such approval
must be obtained prior to any Final Certificate of Occupancv issuance.
B,sr*\ $o ll<, Fla,^,r-..,,,r u, $srourr;rp"'t ?oc'flltu M-'+'Epli
-" | |wH/ol
Agreed to by: ctn.<'*rr A. €Lt'r
Print Name
Project Name:
Date Signed:
F:/everyone/forms/bldperm6
Signature
Please read and check off each of the items below.
(Copies of complete text are available upon request)
CODE 5-2-10: DEPOSITS ON PUBLIC WAYS PROHIBITED
o Unlawful deposits: Subject to subsection C thereof, it is unlawful for any person to litter, track or
deposit, or cause to be littered, tracked or deposited, sand, gravel, rocks, mud, dirt, snow, ice, or any
other debris or material upon any street, sidewalk, alley or public place, or any portion thereof.
o Notice; Abatement: The Director of Public Works may notify and require any person who violates or
causes another to violate the provision of subsection A hereof, or who has in the Director's employment
a person who violates or causes another to violate the same, top remove such sand, gravel, rocks, mud,
dirt, snow, ice or any other debris or material within twenty tour (24) hours after receipt of said notice
by the Director of Public Works. In the event the person so notified does not comply with the notice
within the period of time herein specified, the Director of Public Works, or other authorized agent, may
cause any such sand, gravel, rocks, mud, dirt, snow, ice, debris or any other material to be removed
from any street or alley at the expense of the notified.
tr Summons and Penalty: As an alternative to the notice for removal provided in subsection B above,
any person who violates or causes another to violate the same, may be issued a summons to appear
before the Municipal Court of the Town for said violations, and upon being found guilty of a violation
hereunder be punished as provided in Section 1-4-1 of this code.
o Notice and Penaltyl It is unlawful for any person to fail or refuse to comply with the notice of the
Director of Public Works as provided in subsection B hereof, and any such person shall, in addition to
payment of the expense of removal incurred by the Director of Public Works, as provided in subsection B
hereof, upon being found guilty of a violation hereunder, be punishable as provided in Section 1-4-1 of
this Code. (1997 Code: Ordinance 5 (1979).
CODES 7-3A.1 AND 7-3A-3: PARKING OBSTRUCTING TRAFFIC & IMPOUNDMENT AUTHORIZED
o No person shall park any vehicle upon a street or at any other place within this Municipality in such a
manner or under such conditions as to interfere with the free movement of vehicular traffic or proper
street or highway maintenance. (Ord. 2(1968) 5 1)
o Whenever any police officer finds a vehicle attended or unattended, standing upon any portion of a
street or upon any place within this Municipality in such a manner as to constitute a violation of any
seqtion of this Article, or left unattended for a period of twenty four (24) hours or more and presumed to
be abandoned under the conditions prescribed by Colorado Revised Statutes section 42-4-1102, as
amended, the officer shall require the vehicle to be removed or cause it to be removed and placed in
storage in the nearest garage or other place of safety designated or maintained by this Municipality, and
the charges for towing and storage of such vehicle shall be charged to the owner of the vehicle in
addition to a ten dollar ($10) impoundment charge. (Ord. 2(1968) g 3: Ord, 28(1981) 5 1)
I have read and will comply with the above code provisions:
Position or Relationshin 10 Proiect:
Dare signed: t* / r.1 lOr
F:/everyone,/forms,/bldpermT
L\p++<r [.8 b"--
Department of Public Works & Transportation
1309 Elkhorn Drive
Vail, Colorado 81657
970-479-2t 58
Fax: 970-479-2 I66
www. ci.vail.co.us Vail 2001 Staging / Parking Plan Information
The Staeins / Parkine PIan Philosoohv- Is a very important step m the building
process. Striking a balance between safe public access and giving construction projects
room to build is becoming increasingly challenging, for us to meet all the needs of those
who will be impacted by construction projects. The fact is, there is less room to build in
the Town of Vail.
Developing a creative Staging Plan is a must. Staging in the Town of Vail Public Right of
Way is a Privilege, not a given right. We take into account when we review and approve
staging i parking plans, impacts on neighborhoods, tourism, business and the traveling
public along with your right to build.
The Generul Contractor is resoonsible for all subcontractors and all construction
activitv relatine to the huildins oroiect. The staging plan will be enforced according to
the Approved Set of Building and Staging Plans. You are required to keep a copy of the
Approved Staging Plan on site.
Two staging /parking plans are required, a suulmer and winter. Summer staging plans
expire on November 1, and winter staging plans expire on April 15. (Note: There is no on
street parkine in the winter season and all materials. equipment. etc must be l0' offthe
edge ofasphalt).
Enforcement of all staging / parking plan is as follows.
A) Staging / Parking Plans to scale required.
B) Once the plan is approved, they will be held to complete compliance.
C) We will use a 3 step and you're out, process.
Step Ong- Verbal and wriffen wamings as to the staging plan violation, then have
contractor sign and date field memo warning.
Step Two- Police Department issue tickets and tows or public works writes second
written warning to all violators who have been notified under step one and who are still
in violation of the approved Staging / Parking Plan. The Town of Vail Chief Building
Official will call the contactor and notifo them, the next time any violation happens, the
building department will red tag the construction site for 48 hours.
Step Three- If still in violation after step two, a 48 hour Red Tas will be issued to the
proj ect site.
If you have any Questions, Please contact the Town of Vail Construction Inspector at
970-479-2198
{g *".t uor ro
Requirements for an Acceptable Staging Plan
It is preferred that and Approved Site Plan is used to draw a staging plan, but a hand
drawn plan may be used as long as it is dawn to scale and is neat and legible.
l.) The Staging Plan must show the following:
(a) Show all parking that is required for the job site. (Including construction
equipment).
(b) Show the location of all material that will be staged on site.
(c) Show the location of all dumpsters and port-o-john that are to be on site.
(d) If a fence is required, then show the location of the fence and describe the
material used for the fence.
(e) If trees and / or vegetation is required to be protected, then show how this will be
done.
(0 If this staging plan is for a Demo Permit, then show staging for dump tucks and
all related equipment. If the Town of Vail Right of Way area is needed for
staging, then a Traffic Conhol Plan is required in conjunction with the staging
plan.
(g) Please provide and show an Erosion Control Plan.
(h) No equipment, vehicies, materials are allowed on Town of Vail Right of Way in
the Winter Staging Plan.
2.) If work needs to occur in the right of way, then add a Traffic Control Plan to the
staging plan showing the following:
(a) The work zone (area that is to be performed)
(b) Traffrc Control Devices (waming, signs, cones, flaggers, etc.)
(c) Distances that all devices will be set up from the work zone. Also show all
dimensions of work being performed in the right of way. All traffrc control plans
mtrst conform to the MUTCD manual.(Manual of Unifonn Traffic Control
Devices)
2.) This plan will be reviewed by Public Works and if Necessary the Police, Fire, and
Comniunity Development Department. Once the staging plan is approved, it will be
registered with the departments listed above and enforced.
3.) The Village and Lionshead area have outside construction restrictions, Please become
familiar with the Vail 2000. Vail Villaee and Lionshead Construction Hours handout.
IOI'IIN
.,---\ t t
ffiffiomnY va'2ool
Vail Village/Lionshead Construction Hours Handout
Problem Statement
The Vail Village and Lionshead are invaluable assets to the community. Thousands of
people come to town each year to sightsee, recreate, shop and enjoy Vail. The
community and merchants rely upon the summer/winter tourism to generate revenue.
Our summer/winter guests expect a pleasant experience while in Vail.
To insure that all of the proposed construction has as little negative impact on the
community and on our guest as possible, the Town of Vail finds it imperative to create
and implement the Vail Village/Lionshead Construction Master Plan. Maps of the Village
and Lionshead are included to show areas of construction being affected by this plan
It would be irresponsible for the Town of Vail, the construction contractors and the
merchants, to not actively participate to minimize the impact of construction on the
Village and Lionshead areas.
Givens
The following givens are intended to provide the basic foundation by which construction
will be completed in the Village:
. The public's health, safety and welfare shall be honored at all times.
r Adequate pedestrian, loading/delivery, vehicle, and emergency vehicle access and
circulation shall be maintained.
Roadways and pedestrian walkways shall be kept clean and free of dirt and debris.
All construction deliveries. equipment, tools, materials, etc.to the Villaqe must qo
throuoh Check Point Charlie. All Lionshead construction activitv must qo to the Vail
Police Department for a parkinq permit. Do not use deliverv zones for construction
parkinq, refer to approved stagino plan or make other arranoements for parkinq.
The hours of Outside Construction Activity shall be as follows:
- April 15 - June 21 & September 7 - November 15, 7 a.m. until 7 p.m., seven
days a week. Between June 22 -September 7 work must end bv 4:00 o.m. On
Fridavs. November 15 - April 15,2002 work allowed within daylight hours only.
- Deliveries shall be restricted into the Village from 7 a.m. until 11:30 a.m. on Gore
Creek Drive and 7 am to 8:30 am on Bridge Street.
- Special delivery permits must be requested in advance, from Public Works in
conjunction with Code Enforcement at Checkpoint Charlie.
- No construciion activity shall occur on Saturday or Sunday between June 23 &
September 16
- Vail Village area only, No outside construction activity allowed September
14, 15, 16, due to the 2001 World Mountain Bike Races.
a
It It
- No outside construction activity shall occur on the following dates:
Friday, February 16, Saturday, Februaryl7, Sunday, February'18, and Monday,
February 19. (Presidents Weekend)
Saturdayl May 26, Sunday, May 27 and Monday, May 28 (Memorial Dav)
Saturday, June 30 and Sunday, July 1. (Vail Arts Festival)
Tuesday, July 3, 12:00 PM thru Wednesday, July 4. (Ege@grc-Day)
Saturdayl July 7 and Sunday, July 8. (Work allowed 7:00*11:59 AM on Tuesday
moming Qnly).
SaturdayJ September I, Sunday, September 2, and Monday, September 3
(Labor Dav)
Friday, $eptember 7, Saturday, September 8 and Sunday, September I
{October Fest} Lionshead.
Thursdayf November 22, {ThanksqivinE Davl Friday, November 23, Saturday,
Novembdr 24 and Sunday, November 25
Friday, December 21, Saturday, December 22, Sunday, December 23, and
Monday, December 24, and Tuesday December 25 (Christmas Dav)
Friday, Dfcember 28, Saturday, December 29, Sunday, December 30, Monday,
Decembefi 31 , and Tuesday January 1 , 2002 {New Year 2002}
The Town of Vail Noise Ordinance has been waived by the Town Manager from
7a.m. - 7p.m. For construction activities from April 15 through June 21, and from
September 7 through November 15. The Noise Ordinance shall be in effect and
strictly regulated frQm June 22 through September 4 and November 15 to April 15,
2001
'All construction sites will be required to obtain an Approved Construction-Staoinq
Plan from the Town of Vail Public Works Department in conjunction with Code
Enforcement. (The approved staging / parking plan is required to be on site at
all times).
The Town of Vail re$erves the right to amend the Vail Village/Lionshead Construction
Plan regulations at dnytime should abuses or problems arise.
The Three-Strike Rule will be enforced. Step 1. (Verbal warning), Step 2.
(Written warning), Step 3. (A 48 hour Red Tag will be issued to the site).
Expectations
The following are established to insure the success of the Vail Village/
Lionshead Master Plan:
. Full and complete cooperation and understanding from all parties involved in the
construction activity in regards to this plan.
r Strict adherence anH comoliance with the reouirements outlined in the constructionplan. i
. Respect and consideration for the affected interests and parties.
lf you have any questio$, Please contact the Town of Vail Public Works Department
(Construction lnspectdr) or Vail Police Department (Code Enforcement Officer)970-,479-2198 970476-7603
/J=
ocoN
co
IT
{r,(J
aJLtfr,
v,Ftfo
C)
c)ut(g
n
-
II
r
IT
(g
<=
lelw(.,>
tUm
t04-
/qIOI<
/ uu:llI
\(/)\
';z 'o
,.u( I
o
|-IoN
\\\\'\\---l
. ,"' '_ \-\.// A\ _...
.01_- -...\_--
f;\<\o(i\ L[ll\?\tU\ol
F
-o
II
{do,5
,lt- -.rlr,aF
-o(J
T'(uoFr-r'aer-o
!Ir
\( il
)\ O
g
s
E
I
tIt
B
TOW\:
BOW \=
tBW =
li'14 L1
84Jil
{\
Bu ilt
Flow Line
Sheet Revision
^,/\^{--)l \ffi
YENTEn COMPATilSS E{C.
203(XlW.Hiihrsy72
Arvd., CO 800ft
Phmq 303-2794458
Fu:303-27$0$t
www.lrcat€r.cm
Booth Creek As Builts
Frj..t
EoothChc.Lfdr
Dctr: grrt!Nownbcr{2lXll l.f 1
TOWN OFVAIL DEPARTMENT OF COMMI.JNITYDEVELOPMENT
75 S.FRONTAGEROAD
VAIL, CO 81657
970-479-2t38
NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES
ADD/ALTCOMMBUILDPERMT PErMit #: BOI.O244
OvfNER BOOTH FALLS HOMEOITNERS ASSOC0S/15/2001 Phone:
c/o susAr.I FlRrTz
PO BOX 356
vA,rl, co 91658
Lricense:
AppITIeANI YEMTER COMPAI{IES, INC. O8/L512001 Phone: 303-279-4458
2O3OO STATE IIIGIIVf,AY 72
ARVADA, CO
8 0007
Lieense:
CoNTRACTOR YBCIER COMPAIiITES, rNC. 08/L5/2OOL Plrone:
2O3OO STATE HIGHWAY 72
ARVAD,jA, CO
80007
l,ieense: 114-B
Desciption:
CONSTRUCT A ROCK FALL MITIGATION WALL
Occupancy: Ul
TypeConstruction: VN TlpeVNon-Rated
Type Occupanry: ??
Valuation: $330.000.00 Add Sq Ft: 0
Firoplace Inforrnation: Rostricted: # ofGas Applianc.eg: 0 # ofcas l'g3: 0 . . . . . - - -{ of. Wood-Pellet 0
''||||||''|l|it||*!'|'|ii|.|,....'''|||i||***.*'|t|'++.t'|ll*|'||||l'|lli'||||Builrting----+ S1,E6o.oo R€&rsrard Pla! Rcview-> $o.oo Tol.al Calorlatod Foes.-> 32'942'oo
Plltl Check-> S1,O?9.00 DRB Foc-> $2oo.oo Additional Fees----> 9O'Oo
fnvrsigation-> so.oo R€cl.eauon Fe€.----> so.oo Total P€nnii Fee---> 52,942'OO
Wilt Cb ----> 93 . oo Clcan-up Depocit-> 90 . oo Prlm€nls--> $2, 9i!2 ' oo
TOTAL FEES--> 52, 9.2 . oo BALAIICE DUrE--> 90 . 00
It||||lltlIlaa'lllltrtall||tt'ttat'l**ll
Approvals:Itimr 05100 BUILDING DEPARTMENT
os/24/2OO! CDAVTS AcEion: AP sEE coNDrTroNs
LISTED ON PERI'{IT PLA}IS
It,EM: O54OO PI,ANNING DEPARTMENT
09105,/2001 RF Action: AP Approwed wittr
conditions from DRB meeting on 8/2O/OI
Item: 05500 FIRE DEPARII'IEIflI
IE,em: 05500 PIIBIJIC WORKS
o9/0s/2oot rK
way Permit
Action: AP Requires Public
ilffiffi;'-#ffiffiffiffiffiil;#;i;ffiffi;#
DECLARATIONS
I hereby acknowledge that I have read this application, filled out in full the information required, completed an accurate plot plan, and
state that all the information as requircd is correct. I agree to comply with the information and plot plan, to comply with all Town
ordinances and state laws, and to build this structure according to the bowns zoning and subdivision codes, desip reviw approvd
Uniform Building Code md other ordinances of the Town applicable thereto.
REQTJESTS FOR INSPECTTON SHALL BE MADE TWENTY-FOT'R HOLIRS AT 479-213S oR AT OUR OffiCE FROM 8:00 AM - 5 Pli'L
Send Cl€0-up Depodt To:
OF OWNER ORCONTRACTORFORHIMSELF AND OWNE
A)
Jg
>F{
b6;
=\3FE:
lrl
FEolr-
v,I|!
Eoo
EI
;fLt;.i
.|Il
bb\0 fioL
#fit;3<z --3ft=HE0aoa<o-octo
8b00
8490
8480
8460
bb[0
Oc\.+a
rblr-
C)
E
3
|r-)<.rc
O.sl-.{-
@
I
t
t
i
I!
E$F-lld)fiRl-rl-
V3<e
3s
sg
tud
LrJF<2.2Ld>>E
tdH;m
fi= sHs tr
uH 6P5 E'h
2sE2e+oXd :re
a EH fig;
E E? EEI
z.?ae sE
;p,E
=*
oz.td()
trlJ
JoEFz.o()
z.o
Qox.
Ld
-l
f
Edv
I
I
I
I
I
I
t
I
I
I
t
I
I
t
I
t
t
I
I
BUILDING PERMIT SUBMITTAL FOR BOOTHFALLS HOMEOWNERS
ASSOCIATION ROCKFALL MITIGATION WALL
IIIIIITTIIITIIIIIIIIIITIIIT
Prepared for
Town of Vail
Boothfalls Homeowners Association
August'14,2001
A *nm.!!oED
AlYreffiffffiW
Yenter Companies, Inc.
20300 West Highway 72
Arvada, Colorado 80007
T0.WN OF IlAIL
CcmmunihT D cpment
lartment
Building Safety & r.rsPection
Serviceg
Sectlon 106.4.3, Unlforu Bulltllog Codcr Valldlty of PermiL 'l'he issuanco
or granting of a permit or apprwal of PboE rpecifications and computatioru
shatl not be construed to bc a pcrnit fc' oc m appoval of' any violation of
any of the provisions of this codc c of toy otb odinancc of thc jurisdictior
Permits prcsuming to givc ouehority o rblaa or cancel thc ptovisions of this
code or other ordinances of tb jurirdicrim $all nu bc valid.
The issuance of a permit bascd oo plns, spccifications and other data shall
not prevenr the building ofricial from thereafter requiring the corrcction of
Gnors in srid plens, specifications and other data, or from prevcnting building
reunder rvhcn ur violation of this code or cf
INITIAT'
? - 5-c., Iu^ii::--j-L-
I
t
I nne
\
tt
TABLE OF COMEI\ITS
Section
Drawings
Construction Means & Methods
t Material Specifications
I
Required Letters
I
I
I
t
t
I
I
I
I
t
T
T
T
ttt
I
t
I
I
t
I
I
I
I
I
t
T
I
I
I
I
t
I
SECTION
EROSION CONTROL LEGEND
SILT FENCE
(EROST0N
coNTROL)
LIMITS OF
EXCAVATION
NOTES;
DISTURBED GROUND TO BE RESEEDED. SEE
LANDSCAPE PLANS FOR SEED MIX.
TOPOGRAPHY INFORMATON PROVIDED BYr
JERRY GREVEN
VAIL, COLORADO
YENTIR COMPANIES. INC.
)-fl \
r\ln=lR
AA PRO,iECT: Bq)TH FAIIS FORlRE!ili BlffilER
PREPARED FOR: TOWI{ 0F VAL
DRAIN BY: CLT / SlBDAIE: rucUST Z 2OO1
t a ll)cote: I
oooot
I
I
T
I
I
EROSION CONTROL LEGEND
SILT FENCE
(EROSTON
coNTROL)
LIMITS OF
EXCAVATION
NOTES:
DISTURBED GROUND TO BE RESEEDED. SEE
LANDSCAPE PLANS FOR SEED MIX.
TOPOGRAPHY INFORMANON PROVIDED BY
JERRY GRE\EN
VAIL, COLORADO
-4**-/**'
f/r/', ..Sccle: 1" :
"\
I
-z&
\\
?r?82
\\\
,20
\
*g
o
BP"-oz
\\\\\\\\
k)
YENTER COMPANIES, INC.
ARVADA. COLORADO (303) 279-4458AA
)-a l\|-E)
PROJECT: BOOlll FALIS FffiIBESS BARRIER
PREPAREo FOR: TOTI{ OF VAIL
ORAlltl BY: CLT / SIB
DAIE: AUCUST 7, 2OOl
20'
8420
I
T
I
I
t
I
T
t
I
I
I
I
I
I
I
Stoging Areo
8+7
8500
6490
8480
84-10
8460
8+50
ufl &.avallAU 40 60 80 100 120
84
DATUM ELEV
8445.00
GROUP A
SECTINN EXIST
20 40 60 80 100 120 140
8530
8520
8510
8500
8490
8480
8470
8460
8450
D[18 ETfm,@gh P-*
8490
8480
8470
8460
8450
8440W
-t E6flG n 20 40 60 80 100 120
20 40 60 80 100 120 140
8+70
8460
8450
8440
84J0
unv EXv"-FAE-
8520
8510
8500
8490
84EO
8470
8460
8459
unfl Eaf_*E@-
E .Etr ne'|ti I 20 40 60 80
8460
8450
8440
ag-uLttg,u
20 40 60 80 100 120 140 -t Eatrrr n 20 40 60 80ddrEnGTIT '
'./
v
YENTER COMPANIES, INC.
enOCCr, B0OIH F tlli FffiTRESi EARRIER
PREPARED FoR: T0Wl{ S VAIL
DRAIII{ BYl cLT / SIB
DAIE: AUGUST 7, 20O
Not to Scole
Wooden
Stoke
On Site
Moteriol
6" Min.
Embedment
Erosion Control Detoil
\
Specifications:
Standad load bearing concrek masonary units that
are earth tone in color fc the Aont and sidcs.
Geosynthetic Reinforcement :
AI4OCO 2006 q equivalent
x'u:
Greil{arSoil
Pla*ic Inde* less thgn f
l6s rhnn 25% passing #2ql sieve
lmo/6 passing 200nm siev€ size
Coopsctim will be 92o/o of stfidstd'prcctor
(AASrrror-99).
Dimensims arp nominal.
Comoocied Gronulsr Fill
Amoco 2006 Geosynthetic
Reinforcement
Split-Foced Concrete Block:
15 lb buff on visible woll foces,
stondord CMU block on others
Fortress Barrier
(tlrpical)
Choin Link
Rock Fence
YENTTR COMPANIES, INC.
ARVADA. COLORADO (J05) 279-4458
PROJECT: BOOTH FALLS FORTRESS BARRIER
PREPARED FOR: TOWN OF VAIL
DRAIIN BY: CLT
DATE: AUGUST 7,2OO1