Loading...
HomeMy WebLinkAboutVAIL VILLAGE FILING 13 BLOCK 2 LOT 21 (2)TOWN OF VAIL DEPARTMENTOF COMMI.JNITY DEVELOPMENT 75 S.FRONTAGEROAD vArL, co 81657 970-479-2138 NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES ADD/ALTSFRBUILDPERMIT PETMit #: BO3-0294 Job Address: 2425 BALD MOUNTAIN RD VAIL Status . . . : ISSUED Location.....: 2425 Bald Mtn Rd Applied . . : lOlOll2OO3 Parcel No...: 210103301005 Issued . .. : t0rc3n003 ProjectNo : VQ.503-O')<o€ Expires...: O3/3tlZO04 owNER CONlir, in[JIE cox t0/oL/2003 phone: 109 T'PPER HOOK RD KATONAH, NY 1053 5 L,icense: COMIRACTOR SAWATCH IJAIID eO. rlre. n/OL/20O3 phone: (970) -749-9738 P.O. BOX 1298 EDWARDS EO 81532 License:629-B APPTJICANT SAWATCH LAIID CO. rNC. to/oL/20o3 phone: (9701 -748-e738 P-O. BOX 1298 EDWARDS CO 8L632 License: 629-8 Description:re-roof and repaint sane for sanre Occupancy: Type Construction: Valuation: $25,000.00 Add Sq Ft 0 Fir€plec€ Information: Resf idBd: Y # ofGas Appliances: 0 # of Cas Logs: 0 # of Wood Pella: 0 **|*|****.t*.'|*l.{.t'|*|*t***'t**'l*'}*.t.ll||+|+lltli|i**|.*'ttl*|t*.*t|+l Building--"> $391.25 Restuarant Plan Review--> Plan Cbeck---> S?54 .31 DRB Fee-------+ Inv€stigntion-> $0.00 Recreation Fe€--> Will Call--> 93 . 00 Clean-up Deposit--> $0.00 Totsl Calcrlated Fees-> $648 .56 $o . o0 Additional Fees-> $75 . oo $0 , 00 Total permil Fe€_--_> Sz23 . SG $0.00 Payments-----;' S?23 .56 TOTAL FEES---> S5{8 .55 BAlrt{CE DUE----->$0.00 Approvals:Item: 05100 BUIIJDIIIIG DEPARII4EIIT LO/OL/2OO3 DF Action: AP Item: 05400 PIJANNIITG DEPARII,IEIW IIEM: O55OO FIRE DEPARTMENT Item; 05500 P{,'BLIC WORKS ..'*.'l.||.||||l|.ll|l|.l.tti|||iltt'.*.!*.{......||..l.*.!}t|l.'l|'|. See page 2 of this Document for any conditions that may apply to this permit. PACE 2{.*{.:|'|+'l+********|t*:}***+++*'},t't*|t*'tl'{.:tt***'*|:}tt*1.'t*{!'t*'**+t|:t*+*:}****!t|t{!|****lt*|t!*:3+**+******** CONDMONS OF APPROVALPermit#:803-0294 asofl0-03-2003 Status: ISSUED '|',|t*'}'t|.*'}'}*tf*''t't.'|*'}***l.*'}'}l'**||'t****{t!r'i*|t*'}!t*++*+**'t!t|*|tt{.{t'r**'t'ft*|tl.*+++++**| Permit Type: ADD/ALT SFR BLJILD PERMIT Apptied: lOlOtDOl3Applicant SAWATCH LAND CO. INC. Issued: t0/03/2003(970>748-8738 To Expire: 03Rt/2004 Job Address: 2425BALD MOUNTAIN RD VAIL Location: 2425Bald Mtu Rd ParcelNo: 210103301005 Description: re-roof and repaint same for same *l.*l.*|*'}'t**t}***{t!t*|t*********'i|t'lt***:t*!t*!t't*'t:t{t!t***Conditions**,t*!ttt:|,}l''t't**l.!t**:l|'tlt**{'**{t*lt*'}*'tll:}**+***** Cond: 12 (BLDG.): FIELD INSPECTIONS ARE REQUIRED To CHECK FOR coDE COMPLIANCE. Cond: 16 @LDG.): SMOKE DETECTORS ARE REQUIFJD IN ALL BEDROOMS AND EVERY STORY AS PER SEC.3IO.9.I OF TTIE 1997 UBC. DECLARATIONS I hereby acknowledge that I have read this application, filled out in full the information requircd, completed an accurate plot plan, and state tlut all the information as required is cor€ct. I agree to comply wiflr the information and plot plan, to comply with all Town ordinances and state laws, and to build this structure according to the towns zoning and subdivision codes, design review approved, uniform Building code and other ordinances ofthe Tovm applicqhle thereto. REQUESTS FOR INSPECTION SHALL BE MADE TWENTY.IOUR HOIjRS TN ADV AT OLJR OFFICE FROM 8:fi) AM - 4 PM. CTOR FOR HIMSELF AND OWNER ***1.***{'**+****ta**+++***+**'}'}**+ff++'}+**t't**tt+****'t**t*+*****+++*lrl|t'***t***trtl'af+fta+***** TOTIVN OF VAIL, COLORADO Sratemertl'***+flf*lt**l+{,**al**l'}******i****ll':}lr*t*'}*++**{r****llr*'}t'}**flfl***a**'}'}****+atta++*ir*'3't**a* Statement Number: R030004S32 Amount: gZ23.56 tO/03/2OO}]-0:2? AM Pa:ment Method: Check Init: KF Notation: # 3135 Sawat,ch Land Company Permit No: 803-0294 Tl'pe: ADD,/AL,T SpR BUITD pER"tvtIT Parcel No: 2101033 010 05 Site Address: 2425 BALD MOInixrATN F.D VAIIr IJocatlon: 2425 Bald Mtn Rd Total Feea: 1723.56Thia Palment.: $723,56 Tot,al AIJ: pmts: S7z3 -55 Balance: 90.00*l'lt*,f**+**|||*'i**tt!,*'il.l*'r++*****tf{.r}**atf**{ri***1rtt1!i***tt**++f***{.**'}****t}*{'*t**t *tt+**** ACCOI,JNTITEMLIST Account Code DescriDtion Current Pmts BP OO1OOOO31111OO BUILDING PERI.IIT FEES CL OO1OOOO3123OOO CONTMCTOR LICENSES PF OO1OOOO31I23OO PLAN CHECK FEES I,lC OO1OOOO31128OO I.IILL CALL INSPECTION FEE 391.25 75 .00 254.3r 3.00 tl 75 APPLICATION WILL NOT BE ACCEPTED IF INCOMPLETE OR UNSI CTOR IN eB-o3u8 '<ttz COMPLETE VALUATIONS FOR BUILDI ITNG PERM Labor & Materials BUTLDING: $ L3, OT1) - Ot,ELECTRICAL: $OTHER: $ PLUMBING: $MECHANICAL: $rorAL:$ %,uaD -u<) f,p"r""th Assessors Office at 970-328-8640 or visit Parcel # I"LLotfrtsloos b 7-lolo3zol 0 0{ *"'*s"U*/Vvl*o /()^r,th b"ir*Job Address: az6 e*w yrN^R1 . Legal Description Lot:71 Block: /Fittng: /3,ft=subdivision: I 16r, / U / h,K Owners Name:Address:Phone: v ArchitecVDesigner:Address:Phone: Engineer:Address:Phone: Detailed description of -work:furrt{ a k-jY"trt k+rt€ ,/r, */'tK- WorkClass: New() nOOition{ ) Remodet ( ) Repair( ) Demo( ) Other( ) WorkType: Interior( ) Exterior( ) Both( )Does an EHU exist at this location: Yes ( ) No ( ) Type of Bldg.: Single-family ( ) Two-family/\) Multi-famity ( ) Commerciat ( ) Restaurant ( ) Other ( ) No. of Existing Dwelling Units in this building: 7-c-No. of Accommodation Units in this buildino: No/Type of Fireplaces Existinq: Gas Appliances ( ) Gas Loss ( ) Wood/Pellet ( ) Wood Burninq ( No/Type of Fireplaces Proposed: Gas Appliances ( ) Gas Loqs ( ) Wood/Pellet ( ) Wood Burninq (NOT ALLOWED) Does a Fire Alarm Exist: Yes ( ) No (Does a Fire Sprinkler System Exist: Yes ( ) No ( ) ******************l*******************FOR OFFICE USE ON Ly********rir************rt*******!r***** \Wail\data\cdev\FORMS\PERMITS\BLDGPERM.DOC 07 t26t2002 tl Questions? Call the Building Team at 479-2325 Department of Community Development Proiect Name: Project Address; This Checklist must be amoleted before a Buildins Permitaooliation is arcepted. All pages of application is complete Has DRB approval obtained (if required) Provide a copy ofapproval form Condominium Association letter of approval attached if project is a Multi-Family complex Complete site plan submitted Public Way Permit application included if applicable (refer to Public Works checklist) Staging plan included (refer to Public Work checklist) No dumpster,oarkino or material storaoe allowed on roadwavs and shoulderc without written aooroval Asbestos test and results submitted if demolition is occuning Architect stamp and signature (All Commercial and Multi family) Full floor plans including building sections and elevations(S sets of plans for Multi-Family and Commercial Buildings) Window and door schedule Full structural plans, including design criteria (i.e.loads) Structural Engineer stamp and signature on structural plans (All Commercial and Multi Family) Soils Report must be submitted prior to footing inspection Fire resistive assemblies specified and penetrations indicated tr u o o o o tr o u o o D o D cl o Smoke detectors shown on olans Applicant's Signature: Date of submittal: (fu \Wail\data\cdev\FORMS\PERMITS\BLDGPERM.DOC Received By: 04toa2003 If this permit requires a 1lpwn of Vail Fire Department Approval, Engineer's (Public Works) review and approval, a Planfiing Depaftment review or Health Department review, and a review by the Building Depaftmentf the estimated time for a total review will take as long as three (3) All commercial (large or sinall) and all multi-family permits will have to follow the above mentioned maximum requirbments. Residential and small projects should take a lesser amount of time, However, if resipential or smaller projects impact the various above mentioned depaftments with regard tolnecessary review, these projects may also take three (3) weeks to review and approve. Every attempt will be made py this depaftment to expedite this permit as soon as possible. I, the undersigned, understfnd the plan check procedure and time frame. I also understand that if the permit is not picked up by the expiration date, that I must still pay the plan check fee and that if I fail to do so it niay affect future permits that I apply for. weeks. Agreed to by: HOW DID WE RATE WITH YOU? Toum ofVailSurvey Community Development Department Russell Fonest, Director, (e70) 479-213s Check allthat applies. 1. Which Deparbnent(s) did you contact? Building _ Environmental _ Housing_ AdminPlanning DRB PEC Was your initial contact with our staf immediate no one available ? lf you were required b wait how long was it before you were helped?_ 4.Was your project reviewed on a timely basis? Yes / No lf no, why not? Was this your first time to file a DRB app_ PEC app Bldg Permit_ N/A Please rab $e performance of he staffpenon who assisted you:54321Name: (knowledge; responsiveness, availability) Overall efiectiveness of the Front Service Counter. 5 4 3 2 Whatis the besttime of day for you to use the Front Service Counter? 9. Any comments you have which would allow us to better serve you nexitime? Thank you for taking the time to compleie this survey. We are commitbd b improMng our service. L 8. wHEN | *Rusttc wAy pERMrr. rs REqUTRED PLEASE REAg AND CHECK OFF EACH OF THE FOLLOWING QUESTIONS REGARDING THE NEED FOR A "PUBUC WAY PERMIT": NO o D o o Works at 479-2L98. I HAVE READ AND ANSWEREDiALL THE ABOVE QUESTIONS. Contractor Signature Job or Project Name: Date Signedi require the use of the Right-of-Way, easements or NO NO_ Is any drainage work bping done that affects the Right-of-Way, easements, or public property? YES NO ---r-u o Is a "Revocable Right-ff-Way Permit" required? Is the Right-of-Way, e{sements or public property to be used for staging, parking or fencing?YES_ NO_L If answer is NO, is a pdrking, staging or fencing plan required by Public Works?YES_ NO___J_ If you answered YES to any of ]these questions, a "Public Way Permif'must be obtained. "Public Way Permit" applicatiorfs may be obtained at the Public Work's office or at Community Development (a sample is attafhed). If you have any questions please call Leonard Sandoval in Public F:/everyondforms/bldperm4 Company Name APPLICATION FOR TOWN OF VAIL PUBLIC WAY PERMIT pw+:lr-[rlr Par6er#:[ [ [ f - I I I - I I - I f I le- Brds.Permit#'E !':,[ [ n I 1.Job Name Streel Address fl n n - T] (lrunknowncall L_l t_-l L_, i , 479_Zl gB ext.0) zipClty Phone # 3, 4. Start Date Work is for 1ctrcte onel Other ComDletion Date Water Sewer Gas Electric Telephone (P6rmit Expiralion Date) CATV Landscaping Temp. Site Access 5.Trench-width (min.4') Bond Amount $ ALL MATERIAL, EQUIPMENT, AND TBAFFIC JOB IS STARTED. 7.Rubber out-riggers are required on Asphalt surfaces underneath the A signature below indicates a signatures are obtained, permittee necessary Town of Vail signatures. ST BE ON THE JOBSITE BEFORE THE working on asphalt. al all times. utility locations and approvals. Once all utili$ company application through the Public Works otfice to obtain the up to one week to process. Depth Total SF $ Tolal LF $ Permil Fee Total Permit Fee $ Public Service Natural Gas Group (1-800-922-1587) Public Service Company (1 U.S. West (1 -800-922-1 987) TCI Cablevision of the Rockies (1-800-922-1987) Eagle River Water & Sanitation District (970-476-7480, ext. 114) Holy Cross Electric Company (1-800-922-1987) Town of Vail Electricians (970-479-2158) Town of Vail Inigation (970-479-2158) Town of Vail Public Works Construction lnspector (970-479-2198) THERE WILL BE NO TOTAL STREET CLOSURESI A construction traffic control plan must be approved by the Public Works Department prior to issuance of the permit. ': All excavation must be done by hand within 18" of utilities - (Senate Bill 172), 11. Permiflee must contact Public Works Departm€nl at 479-2198 24 hours oriolto commencino of work. Failure to notify lhe Town will result in lodeiture of bond money. Scheduled inspections which are not ready may result in the Town charging the contractor a reinspection fee. 12. I certify that I have read all chapters of Title 8 - Public Ways and Property, of tlre Vail Municipal Code and all utility company agreements, signed by me, and will abide bythe same, and that all utilities have been notified as required. 9. 10. Conkactor's Signature of Agresment Prinl name clearly ATTACH PLAN OF WORK, INCLUDING CONSTFUCTION TRAFFIC CONTROL PLAN Show streets with names, buildings, and location of cuts. USE DASH LINES FOR CUT. Date of Signature White - Public Works Yellow - Contractor PUBLIC WORKS AND THE PUBLIC WAY PERMIT PROCESS How it relates to Building Permits: > Fill out the attached check list with the Building Permit Application. If yes was answered to any of the questions then a "Public Way" permit is required. You can pick up an application at either Community Development, located at 75 South Frontage Road or Public Works, located at 1309 Elkhorn Drive. utilities prior to signing application. Some utility companies require up to 48 hours notice to schedule a locate. > A construction traffic control/staging plan must be prepared on a separate sheet of paper, An approved site plan may also be used. This plan will show locations of all traffic control devices (signs, cones, etc.) and the work zone, (area of construction, staging, etc.). This plan will expire on November lst and will need to be resubmitted for consideration for approval through the winter. Be aware that your resubmission for winter may be denied depending on the location of construction. i Sketch of work being performed must be submitted indicating dimensions (length, width and depth of work). This may be drawn on the traffic control plan or a site plan for the job. be scheduled for the Town of Vail electricians and irrigation crew. The locates take place in the morning, but may require up to 48 hours to peform. > The Public Work's Construction Inspector will review the application and approve or deny the permit. You will be contacted as to the status and any requirements that may be needed. Most permits are released within 48 hours of being received, but please allow up to one (1) week to process. i As soon as the permit is approved, the Building Department will be notified, allowing the "Building Permit" to be released. Please do not confuse the "Public Wav Permit" with a "Building Permit". i NOTE: The above process is for work in a public way ONLY. Public Way Permits are valid only until November 15th. A new Public Way Permit is required each year if work is not complete. Re-application each November 15th does not mean an automatic nenewal. I have read and understand the above. Signature F:/everyone/forms/bldperm5 Date Signed DRAINAGE AND CULVERT INSPECTIONS ARE REOUIRED BY PUBLIC WORKS! Please read and check off each of the items below: o The Town of Vail Building Department has developed the following procedures to ensure that new construction sites have adequately established proper drainage from building sites along and adjacent to Town of Vail roads or streets. a The Town of Vail Public Works Department will be required to inspect and approve drainage adjacent to Town of Vail roads or streets and the installation of temporary or permanent culveds at access poinb from the road or street onto the construction site. Such approval must be obtained prior to any requests for inspection by the Town of Vail Building Department for footings, temporary electrical or any other inspection. Please call Leonard Sandoval at479-2L98 to request an inspection from the Public Work Department. Allow a minimum of 24 hour notice. o Also, the Town of Vail Public Works Department will be approving all final drainage and culveft installation with resulting road patching as necessary. Such approval must be obtained prior to any Final Ceftificate of Occuoancy issuance. Agreed to by: Print Name Project Name: Date Signed: F:/er/eryoneforms/bldperm6 Signature read and check off each of the items below. (cc coDE 5- of complete text are available upon request) s UnlaMul deposits: -IO: DEPOSITS ON PUBLIC WAYS PROHIBITED to subsection C thereof, it is unlawful for any person to litter, track or deposit, or cause to be littered, tracked or deposited, sand, gravel, rocks, mud, dirt, snow, ice, or any other debris or material upon any street, sidewalk, alley or public place, or any portion thereof, o Notice; Abatement: The Director of Public Works may notiry and require any person who violates or causes another to violate thp provision of subsection A hereof, or who has in the Director's employment a person who violates or capses another to violate the same, top remove such sand, gravel, rocks, mud, dirt, snow, ice or any other debris or material within twenty four (24) hours after receipt of said notice by the Director of Public Wprks. In the event the person so notified does not comply with the notice within the period of time hdrein specified, the Director of Public Work, or other authorized agent, may cause any such sand, gravfl, rocks, mud, dirt, snow, ice, debris or any other material to be removed from any street or alley at tlhe expense of the notified. o Summons and Penalty: i As an alternative to the notice for removal provided in subsection B above, any person who violates or causes another to violate the same, may be issued a summons to appear before the Municipal Court of the Town for said violations, and upon being found guilty of a violation hereunder be punished as provided in Section 1-4-1 of this code. D Notice and Penalty: It is unlawful for any person to fail or refuse to comply with the notice of the Director of Public Works as provided in subsection B hereof, and any such person shall, in addition to payment of the expense of lemoval incurred by the Director of Public Work, as provided in subsection B hereof, upon being found guilty of a violation hereunder, be punishable as provided in Section 1-4-1 of this Code. (1997 Code: Ordinance 6 (1979). CODES 7-3A-1 AND 7-3A-3: PARKING OBSTRUCTING TRAFFIC & IMPOUNDMENT AUTHORIZED o No person shall park any vEhicle upon a street or at any other place within this Municipality in such a manner or under such conditions as to interfere with the free movement of vehicular traffic or proper street or highway maintenahce. (Ord. 2(1958) 5 1) o Whenever any police officer finds a vehicle attended or unattended, standing upon any portion of a street or upon any place Within this Municipality in such a manner as to constitute a violation of any section of this Atticle, or left unattended for a period of twenty four (24) hours or more and presumed to be abandoned under the bonditions prescribed by Colorado Revised Statutes section 42-4-1102, as amended, the officer shall require the vehicle to be removed or cause it to be removed and placed in storage in the nearest garage or other place of safety designated or maintained by this Municipality, and the charges for towing anf storage of such vehicle shall be charged to the owner of the vehicle in addition to a ten dollar (910) impoundment charge. (Ord. 2(1968) g 3: Ord. 2S(1981) g 1) I have read and will comply with tl]re above code provisions: Print Name Position or Relationship to ProjectJ Date Signed: F:/everyone/fomrlbldpernrT Signature TO}{A'M Vait 2003 Vail Village and Lionshead Village Construction Hours Information Handout ! ., Problem Statement Vail Village and Lionshead Village are invaluable assets to the community. Thousands of people come to Vail each year to sightsee, recreate, shop and to enjoy everything the Vail Valley has to offer. The community and merchants rely upon our guest to generate' revenue. Our summer/winter guests expect a pleasant experience while in Vail. To insure that all of the proposed construction has as little negative impact on the community and on our guesl as possible, the Town of Vail finds it imperative to create and implement the Vail Village and Lionshead Village Construction Hours Handout. It would be inesponsible for the Town of Vail, the Construction Contractors and the Merchants, to not actively participate to minimize the impact of construction in the Vail and Lionshead Village areas. The following givens are intended to provide the basic foundation by which construction will be completed in the Villages: . The public's health, safety and welfare shall be honored at all times. . Adequate pedestrian, loading/delivery, vehicle, and emergency vehicle access and circulation shall be maintained. o Roadways and pedestrian walkways shall be kept clean and free of dirt and debris. . All construction deliveries, equipment, tools and materials entering the Vail Village and Pedestrian areas must go through Check Point Charlie. All Lionshead construction activity must go to the Vail Police Department for a parking permit. Do not use delivery zones for construction parking, refer to approved staging plan or make other anangements for parking. . The hours of Outside Construction Activity shall be as follows: - April 15 - June 20 & September 8 - November 14, 7 a.m. until 7 p.m., seven days a week. June 2O-September 5. work must end bv 4:00 p.m. on Fridavs. November 14 - April 15, 2OO4 work allowed within daylight hours only. - Deliveries shall be restricted to the hours of 7 a.m. to 11:30 a.m. on Gore Creek Drive and 7 a.m. to 8:30 a.m. on Bridge Street. - Special delivery permits must be requested in advance, from Public Works in conjunction with Code Enforcement at Checkpoint Charlie. - No construction activity shall occur on Saturday or Sunday between June 21 & September 7. Givens No outside con$truction activity shall occur on the following dates: Friday, February 14, Saturday, FebruarylS, Sunday, February 16, and Monday, February t7. (President's Weekend) Saturday, I'Iiay 2a, Sunday, May 25 and Monday, May 26 (Memoriat Dav) Friday, July 11, Saturday, July 12 and Sunday, Juty i3. (Vail Arts Festival) Thursday, July 3, Friday, July 4, Saturday, July S and Sunday, July 6. (lndependence Davl Saturday, August 30, Sunday, August 31, and Monday, September i. (Labor Dalv Weekend). t '. Friday, Spptember 12, Saturday, September 13, Sunday, September i4 in (Lionshedd) and then on Saturday, September 20 and Sunday, September 21. (Vail Villale) - (October Fest) Thursday, November 27, fihanksqivinq Dav) Friday, November 28, Saturday, Novembe( 29 and Sunday, November 30. Thursday,] December 25, Friday, December 26, Saturday, December 27, Sunday, Decembe{ 28. {Christmas Dav Holidav} Monday, December 29, Tuesday, December 30, Wednesday December 31, Thursday panuary 1. (New Year 2004) Friday January 2, Saturday January 3 and Sunday January 4, 2004. No Work allowed the entire week of the Christmap/New Year Holiday. The Town of Vail Nqise Ordinance has been waived by the Town Manager from 7a.m. - 7p.m. for construction activities from April 15 through June 20, and from September 8 through Novembei 14. The Noise Ordinance shall be in effect and strictly regulated from June 20 througlh September 5 and November 15, 2003 to April 15, 2004 All construction sitqs will be required to obtain an Approved Construction-Staqinq Plan from the Touln of Vail Public Works Department in conjunction with Code Enforcement. (The ppproved staging/parking plan is required to be on-site at all times). The Town of Vail rgserves the right to amend the Vail Village and Lionshead Village Construction Hours fiegulations at anytime should abuses or problems arise. I j . The Three-Strike Rule will (Written warning)f Step 3. violations are resdlved). The following expectations are Lionshead Village Construction be enforced. Step 1. (Written warning), Step 2. (Construction site will be Red Tagged until all established to insure the success of the Vail Mllage and Hours Plan: . Full and complete cooperation and understanding from all parties involved in the construction activityl in regards to this plan. . Strict adherence afid compliance with the requirements outlined in the construction pran. . Respect and consiQeration for the affected interests and parties. lf you have any questiQns, Please contact the Town of Vail Public Works Department (Gonstruction Inspecfor) or the Vail Police Department (Code Enforcement Officer)970-479-2198 970-476-7603 tl Vail2003 Staging / Parking Plan Information Ihe:Staginq/ Parkinq Plan Philosophv- ls a very important step in the building process. Striking a balance between safe public access and giving construction projects room to build is becoming iicreasingly challenging, for us tq peet all the needs of those who will be impacted by construction projecis. The factls, there is less room to build in the Town of Vail Developing a creative Staging Plan is a must. Staging in the Town of Vail Public Right of Way is a privilege, not a given right. We take into account when we review and approve staging / parking plans, impactsbn neighborhoods, tourism, business and the traveling public along with your right to build. TOIriNf'FVAN I Contractor is nsible for all subcontractors and all construction ac to the ryilgQggroigct The staging plan will be enforced according to the Approved Set oi euilding and Staging Plans. You are required to keep a copy of theApproved staging plan on site. Two staging /parking plans are required, a summer and winter. Summer staging plans expire on November 1, and winter staging plans expire on April 15. (Note: There is no on street parkinq in the winter season and all materials, equipment. etc must be 10' off the edqe of asphalt). Enforcement of all staging / parking plan is as follows. A) Staging / Parking Plans to scale required. B) Once the plan is approved, they will be held to complete compliance. C) We will use a 3 step and you're out, process. Step One- Verbal and written warnings as to the staging plan violation, then have contractor sign and date field memo warning. Step Two- Police Department issue tickets and tows or public works writes second written warning to all violators who have been notified under step one and who are still in violation of the approved Staging / Parking Plan. The Town of Vail Chief Building Official will call the contractor and notify them, the next time any violation happens, the building department will red tag the construction site for 48 hours. Step Three- lf still in violation after step two, a 48 hour Red Tag will be issued to the project site. lf you have any Questions, Please contact the Town of Vail Construction lnspector at97O-479-2198 \Vail\data\cdev\FORIVIS\PER M ITS\BLDGPERM. DOC 03/04i2003 tt Requirements for an Acceptable Staqinq Plan t is preferred that and Approved Site Plan is used to draw a staging plan, but a hand drawn plan may be used ts long as it is dawn to scale and is neat and legible. l.) The Staging Plan must show the following: (a) Show all parking that is required for the job site. (lncluding construction equipment). (b) Show the location of all material that will be staged on site. (c) Show the location of all dumpsters and port-o-john that are to be on site. (d) lf a fence is required, then show the location of the fence and describe the material used for the fence. (e) lf trees and / or vegetation is required to be protected, then show how this will be done. (f) lf this staging plan is for a Demo Permit, then show staging for dump trucks and all related equipment. lf the Town of Vail Right of Way area is needed for staging, then a Traffic Control Plan is required in conjunction with the staging plan. (g) Please provide and show an Erosion Control Plan. (h) No equipment, vehicles, materials are allowed on Town of Vail Right of Way in the Winter Staging PIan. i.) lf work needs to occur in the right of way, then add a Traffic Control Plan to the staging plan showing the rllowing: (a) The work zone (area that is to be performed) (b) Traffic Control Devices (warning, signs, cones, flaggers, etc.) (c) Distances that all devices will be set up from the work zone. Also show all dimensions of work being performed in the right of way. All traffic control plans must conform to the MUTCD manual.(Manual of Uniform Traffic Control Devices) .) This plan will be reviewed by Public Works and if Necessary the Police, Fire, and Community Development )epartment. Once the staging plan is approved, it will be registered with the departments listed above and 'nforced. .) The Village and Lionshead area have outside construction restrictions, please become familiar with the Vail 2003, Vail Village and Lionshead Construction Hours handout. /AiI\dAtA\CdCV\FORMS\PERIVIITS\BLDGPERM.DOC 03ro4t2003