HomeMy WebLinkAboutB02-0210TOWN OF VAIL DEPARTMENT OF COMMUNITY DEVELOPMENT
75 S. FRONTAGEROAD
vAtL, co 8t657
970479-2138
NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES
ADD/ALT MF BUILD PERMIT Permit #: 802-0210
Job Address.: 4207 COLUMBINE DR VAIL Status.....: ISSUED
Location......: 4207 COLUMBINE Applied...: 0710312002
Parcel No....: 210112217001 Issued...: 07/0312002
Project No...: Expires...: 12130/2002
owNER DAVTS, DON O7/O3/2O02 Phone:
159 I,AMPIJIGHTER IJN
POIITE VEDRA BEACH FIJ
32082
I-,icenge:
CONTRACTOR TCC CONTRACTORS, rNC. 07/O3/2OO2 Phone: 970-949-0530
P.O. BOX 1822
AVON, CO
81.620
L,i.cense: 540-B
APPLTCANT TCC CONTRACTORS, rNC. 07/O3/20O2 Phone: 970-949-0630
P.O. BOX 1822
AVON, CO
81620
License: 540-B
Desciption:
REROOF SAME FOR SAME
Occupancy:
Type Conshuction:
Type Occupancy: ??
Valuation: $15,354.00
Fireplace lnformation: Restricted: Y # ofGas Appliances: 0
Add Sq Ft 0
# ofGas Lngs: 0 f of Wood Pellet: 0
FEE SUMMARY +*aa**araa**a,tr*.**artrarar**rrraa+llt:lt*r*ti''r*"r*'ttl*'rltI't 't*la*la'r'l t*i a|.{ all aa t
Building--> 5205.00 Restuarant Plan Review-> 9O.OO Total Calculsted Fees-> $391.25
Plan Check--> $133 - 25 DRB Fee---------> 9s0. OO Add l'onal Fees-----> 5113 . ?s
Investigation-> SO. OO R€crcation Fe€---------> $0 . OO Total Permit Fee-._-> $505 . OO
Will CdL_> S3 . oo Clean-up Depnsit-----> So.0o Payments----'-.._2 $505 ' oo
TOTAL FEES------> 5391.25 BALANCE DUE--> $0. Oo
Approvals:Iiem: 05100 BUIIJDING DEPARTMENI
o7/o3/2oo2 DF Action: AP
Item: 05400 PLANNING DEPARIT{ENI
Item: 05600 FIRE DEPARTI{EI{Ir
Iten: 05500 PtBLIC WORKS
** at**at't,tt*:' aatl
See page 2 of this Document for any conditions that may apply to this permit.
DECLARATIONS
I lrereby acknowledge that I have read this application, filled out in full the informdion required, completed an accurate plot ptarl
and state that all the information as required is corect. I agree to comply with the infonnation and plot plan, to comply wilh all
Town ordinances and state laun, and to build this stuc'hn€ according to dre towns zoning and subdivision codes, design rpview
approved, Uniform Building Code and other ordinances ofthe Town applicable thereto.
REQUESTS FOR INSPEC'nON SHALL BE MADE TWENW-FOUR HOURIT tN ADvAl.lCE BY TELEPHONE AT 479-2138 OR AT OUR OmcE FRoM t:m AM - 5 PM.
Sond Clcanrry Depooit To: N/A
SIGNATURE OF OWNER OR CONTRACTOR FOR HIMSELF AND OWNEI
PAGE 2
,}*{.'|******!t+++'l*'t'}*******'i'},|.'}'|**!i****+*:|.,**!t.**tt****{.**:}**,}**:*****.t**'.*{.****:t*********!*,f***:t!t*:|.,|!t.'}*******
CONDITIONS OF APPROVAL
Permit#:802-0210 asof07-22-2002 Status: ISSUED
*'*'}'|t,}'|,|t'}{C****:i***:f:i*,*:|{t'|.'t!t*******,}*'.****,|.**:}******'t**,i*******'}***,}***:t,t******t*'|.'l!fl|||.*'}*****
Permit Type: ADD/ALT MF BUILD PERMIT
Applicant: Tcc CONTRACTORS, INC.
970-949-0630
Job Address: 4207 COLUMBINE DR VAIL
lncation: 4207COLUMBINE
ParcefNo: 2l0ll22l700l
Description:
REROOF SAME FOR SAME
Conditions:
Cond: 12
(BLDG.): FIELD INSPECTIONS ARE REQUIRED TO CHECK FOR CODE
COMPLIANCE.
Cond: l4
(BLDG.): ALL PENETRATIONS IN WALLS,CEILINGS,AND FLOORS TO
BE SEALED WITH AN APPROVED FIRE MATERIAL.
Cond: l6
(BLDG.): SMOKE DETECTORS ARE REQUIRED IN ALL BEDROOMS AND
EVERY STORY AS PER SEC.3IO.6.I OF THE 1997 UBC.
Cond: I
(FIRE): FIRE DEPARTMENT APPROVAL IS REQUIRED BEFORE ANY
WORK CAN BE STARTED.
Applied: 07/03/2002
fssued: 07103D002
To Expire: 12'/3012002
i f,*'t * t +***t* +:t* f{' * * | lt * * t t1* | * ++ * f t**t t + * **{' t '} ** f1+t * | lt * * * ++ + ***** * * + *t i t i lt** I *{' *'} '}*** * ++*
TOWN OF VAIL, COLORADOCopy Reprinted on07-22-2002 at 14:05:11 07/22/2002
Statem€nt
+ri ++ +* ** *** ******** * t* * * * ** t | * **+ ** * *+ * ** +t+ * a*a *a* * * * ** i ****** **+** * * ** f * * i{' 'f ** *+ *:t***f * *++
Statsement Number: R00000255? Anor.rnts: $505.00 07/03/2OO2L2zQ2 PNI
Palment Method: Check Init: DF
Notation:CHECK # 7362
Permit. No3
Parcel No:
Site Addreee :
Locat,ion:
This PaymenE:
BO2-02L0
2ro17_2217 00I
4207 COI,{JII{BINE
4207 COLI'MBINE
ssos.00
TypE : ADD/AI,T MF BUII,D PERMIT
DR VAIIJ
Total Fees:
ToEal AIJL Pnts :
Balarce:
Cunrent Pmts
$50s.00
$sos.0o
$o. oo
+ +** +**+ + * + *+ + * + +* ***+ + ***+****++** * ++* * * * *+ +** * **t * * + *+ * ** * **** * ** *** ** + + * t* * * * *+ * * * **** ***
ACCOIJNT ITEM LIST:
Account Code
00100003111100
00100003112200
00100003112300
00100003112800
Descri ption
BP
DR
PF
tJC
BUILDING PERI4IT FEES
DESIGN RTVIEI,J FEES
PLAN CHECK FEES
hJILL CALL INSPECTION FEE
205.00
50.00
247 .00
3.00
APPLICA
tl
*tL
NVt uFYtrlly
75 S. Frontage Rd.
Vail, Colorado 81657
ail}:{uired for etc.!/
.t/
General Contractor:
Tcc co^,r n^(\oFS tr.rc
Town ofVail Reg. No.:Contact and Phone #'s:-q1n \QIt- 8a?q
ContractorSiSnature.
/:/Czo ^ {-, -,
KrrnrvALUATroNs FoR BUTLDTNG pERMrr (tabor & Materiats)P q XW
BUILDING-g;ff,f!$f ELECTRICAL: $oTHER:$\15 ^ Rr-Ppoli
PLUMBING: $MECHANICAL: $rorAl:$ \5,3*'-
For Parcel # Contad Assessots Office at 970-328-8640 or visit
--tD)-l'1 -oot
UABrl.lt-tG*oRll Cot"tsoS
Owners Name: [\6Hsur <ur.P
work:)F
WorkClass: New( ) Addition( ) Remodel( ) nepairld Demo( -) fther()d QgR gh
Does an EHU exist at this location: Yes ( ) No ( )Work Type: Interior ( ) Exterior,() Both ( )
Type of Bldg.: Single-family ( ) Two-family ( .) MultFfamilylO Commercial ( ) Restaurant ( ) Other ( )
No. of Accommodation Units in this building:No. of Existing Dwelling Units in this building:
Wood Burninq (NOT ALLOWED
Does a Fire Sprinkler System Exist: Yes ( ) NoDoes a Fire Alarm Exist: Yes ( ) No
Other Fees:
I Fees:
Publlc Wav Permit Fee:
F:/everyoneformtbldgperm
of Constructionr By:
iion-off:
***************r**********************FoR oFFICE USE ONLY**************************************
IOMffi
Questions? Call the Building Team at 479-2325
Department of Community Development
Project Name:
Project Address:
This Checklist must be ampletd beforc a Building Permit apoliation is
acePfud.
All pages of application is complete
Has DRB approval obtained (if required) Provide a copy ofapproval form
Condominium Association letter of approval attached if project is a Multi-Family complex
Complete site plan submitted
Public Way Permit application included if applicable (refer to Public Works checklist)
Staging plan included (refer to Public Works checklist) No dumpster,parklnq or materaal storaqe
allowed on roadwavs and shoulderc without written aooroval
Asbestos test and results submitted if demolition is occurring
Architect stamp and signature (All Commercial and Multi family)
Full floor plans including building sections and elevations(4 sets of plans for Multi-Family and
Commercial)
Window and door schedule
Full structural plans, including design criteria (ie.loads)
Structural Engineer stamp and signature on structural plans (All Commercial and Multi Family)
Soils Report must be submitted prior to footing inspection
Fire resistive assemblies specified and penetrations indicated
Smoke detectors shown on olans
Types and quantity of fireplaces shown
o
o
tr
tr
o
D
D
o
o
u
o
o
o
a
tr
o
Applicant's Signature:
Date of submittal: l/o'
Cot l\ottrt,t
- Cqsr !A{1,
F :/everyone/forms/bldperm2
Received By:
X$.f^A[$d,l
nndvRY
HOW DIDWE RATE WITH YOU?
Town of Vail$rvey
Community Development Deparlnent Russell Forest Director,
(970)179-213e
Gheck allthat applies.
1. Which Departnent(s)did you contact?
Building _ Environnental_ Housing_ AdminPlanning DRB _ PEC _
, a rlt-- ..^,.- :-:|:-l ---,!-r ---:rL ^..- ^^-t! !-- - r. r2. Was your initial conbct with our staff immedide slow _or
no one available ?
3. lf you were required b wait, how long was it befure pu were
helped?_
4. Was yor project revierved on a timely basis? Yes / No
lf no, why no(?-
5. Was this your first lime to fle a DRB app_ PEC app_ ;,BldgPermit_l,i/A |' :i
6. Please rate fie performance of fre staffpenon who asisbd you:54321Name:
(knowledge; responsiveness, availability)
7. Overall efiecliveness ofthe FrontServiceCounter. 5 4 3 2 1
8. What is the bestlime of day for you b use fie Front Service
Counter?
9. Any commenb you have which ruould allow us to better serve you
nexttinre?
Thank you for taking tre time to compleb this survey. We are
conunified b irproving our service.
rumv0F
WHEN A'PUBLIC WAY PERMIT" IS REQUIRED
PTEASE READ AND CHECK OFF EACH OF THE FOLLOWING QUEST]ONS REGARDING THE NEED FOR A
"PUBUC WAY PERMIT":
o
o
o
D
-"K
require thq ugp of the Right-of-W-Way, easements or;J5E
'o x.*ox
Is a different access needed to the site other than the existing driveway? YES- tO V
Is any drainage work b;:ing done that affects the Right-of-Way, easemenG, or public property?
YES NO , )a
Is a "Revocable Right-of-Way Permit" required? YES- NO_K
Is the Right-of-Way, eqsements or public property to be used for staging, parking or fencing?
YES_ tO -_
Yr"fl"r t *Rb'*E|<'.o, stagins or fencing plan required by Public Works?
If you answered YES to any of these questions, a "Public Way Permit" must be obtained.
"Public Way Permit" applications may be obtained at the Public Work's office or at Community
Development (a sample is attached). If you have any questions please call Leonard Sandoval in Public
Works at 479-2L98.
I HAVE READ AND ANSWERED ALL THE ABOVE QUESNONS.
Is this a new residence?
Does demolition work being
public property?
Is any utility work needed?
YES
performed
YES
Is the driveway being repaved?
F :/everyone/forms/bldperm4
Company Name
PUBLIC WORKS AND THE PUBLIC WAY PERMIT PROCESS
How it relates to Building Permits:
If yes was answered to any of the questions then a "Public Way" permit is required. You
can pick up an application at either Community Development located at 75 South Frontage
Road or Public Works, located at 1309 Elkhorn Drive.
utilities prior to signing application. Some utility companies require up to 48 hours notice to
schedule a locate.
) A construction traffic control/staging plan must be prepared on a separate sheet of paper.
An approved site plan may also be used. This plan will show locations of all traffic control
devices (signs, cones, etc.) and the work zone, (area of construction, staging, etc.). This
plan will expire on November 1st and will need to be resubmitted for consideration for
approval through the winter. Be aware that your resubmission for winter may be denied
depending on the location of construction.
and depth of work). This may be drawn on the traffic control plan or a site plan for the job.
be scheduled for the Town of Vail electricians and irrigation crew. The locates take place in
the morning, but may require up to 48 hours to perform.
> The Public Work's Construction Inspector will review the application and approve or deny
the permit. You will be contacted as to the status and any requirements that may be
needed. Most permits are released within 48 hours of being received, but please allow up
to one (1) week to process.
F As soon as the permit is approved, the Building Departrnent will be notified, allowing the
"Building Permit" to be released. Please do not confuse the "Public Way Permit" with a
"Building Permit".
F NOTE: The above pr(rcess is for work in a public way ONLY. Public Way
Permits are valid only until November 15th. A new Public Way Permit is required
each year if work is not complete. Re-application each November 15th does not
mean an automatic renewal.
I have read and underctand the above.
+l)' ^
Date Signed
BUILDING PERMIT ISSUANCE TIME FRAME
If this permit requires a Town of Vail Fire Department Approval, Engineer's (Public Works)
review and approval, a Planning Department review or Health Department review, and a review
by the Building Department, the estimated time for a total review will take as long as three (3)
weeKs.
All commercial (large or small) and all multi-family permits will have to follow the above
mentioned maximum requirements. Residential and small projects should take a lesser amount
of time. However, if residential or smaller projecG impact the various above mentioned
departments with regard to necessary review, these projects may also take three (3) weeks to
review and approve.
Every attempt will be made by this department to expedite this permit as soon as possible.
I, the undersigned, understand the plan check procedure and time ftame. I also understand
that if the permit is not picked up by the expiration date, that I must still pay the plan check fee
and that if I fail to do so it may affect future permits that I apply for,
Agreed to by:SzeA urD^rrK
Project Name:.fhOrpu^r C4rDaS
o"r"' \lzf a+
F: everyone/forms/bldperm3
PW*:I T'N T T T
APPLlcArloN parcer*,!nII-InX-[!-!II Alh
FOR TOWN OF VAIL
PuBLIcWAYPERM|T le- Brds.Permito,E I X'I I II ?Umvffi/
1.Job Name Street Addrsss I ll ll l-l | (lf unknown callL_' t_J r_J | | 479.2139 ext. 0)
A9 Phone f
4.
Start Dato
Work is for (cird6 one) Water
Comdetion Date
Sewer Gas Electric
(Permit Explration Date)
Telephone CATV Landscaping Temp. Site Access
Other
Trench-width
(min.4')
Bond Amount $
ALL MATEBIAL, EQUIPMENT, AND TRAFFIC
JOB IS STARTED.
Bubber out-riggers are required on
Asohalt surfaces undernealh the
A signature below indicales a
signatures are obtained, permittee
necessary Town of Vail signatures.
BE ON THE JOBSITE BEFORE THE
working on asphalt.
at all times.
utility locations and approvals. Once all utility cornpany
application through the Public Works ofiice to obtain the
up to one week to process.
Depth
ToralsF $
Total LF $
Permit Fee Total Permit Fee $
6.
7.
8.
Public Service Natural Gas Group (1'80O'922-1987)
Public Service Company (1
U.S. West (1-800-922-1987)
TCI Cablevision of the Rockies (1-800'922'1987)
Eagle River Waler & Sanitation District (970-476-7480, ext. 114)
Holy Cross Electric Company (1-800-922-1987)
Town of Vail Electricians (970-479-2158)
Town ol Vail lrrigation (970-479-2158)
Town of Vail Public Works Construction Inspector (970'479'2198)
9. THERE WILL BE NO TOTAL STREET CLOSURESI A construction trafiic control plan must be approved by the
Public Works Department prior to issuance of the permit'
10. All excavation must be done by hand within 18'of utilities - (Senate Bill 172)'
Permittoe must contact Public Works Department et 479-2198 24 hours prior to commencing ol work. Failure to notity
the Town will result in forfeiture of bond money. Scheduled inspections which are not ready may result in the Town
charging the contractor a reinspection lee.
I certify that I have read all chapters of Title 8 - Public Ways and Property, of the Vail Municipal Code and all utility
company agreemenls, signed by me, and will abide by lhe same, and that all utilities have been notified as required.
11.
12.
ATTACH PLAN OF WORK, INCLUDING CONSTBUCTION TRAFFIC CONTROL PLAN
show streets with names, buildings, and location ol cuts. USE DASH LINES FOR CUT.
Whit€ - Public Works
Yellow - Contractor
ruMYOF
pRAINAGE AND CULVERT INSPECTIONS ARE REQUIRED BY PUBLIC WORKS!
Please read and check off each of the items below:
o The Town of Vail Building Depaftment has developed the following procedures to
ensure that new construction sites have adequately established proper drainage
from building sites along and adjacent to Town of Vail roads or streets.
o The Town of Vail Public Works Department will be required to inspect and approve
drainage adjacent to Town of Vail roads or streets and the installation of temporary
or permanent culverts at access points from the road or street onto the construction
site, Such approval must be obtained prior to any requests for inspection by the
Town of Vail Building Department for footings, temporary electrical or any other
inspection. Please call Leonard Sandoval at479-2198 to request an inspection from
the Public Works Department, Allow a minimum of 24 hour notice.
Also, the Town of Vail Public Works Department will be approving all flnal drainage
and culveft installation with resulting road patching as necessary. Such approval
must be obtained prior to any Final Cedificate of Occupancv issuance.
(1
Agreed to by: LZIA (II\N:R
Project Name:
Date Signed:
F:/everyone/forrns/bldperm6
Please read and cfreck off each of the items below.
(Copies of complete text are available upon request)
CODE 5-2-10: DEPOSITS ON PUBLIC WAYS PROHIBITED
o UnlaMul deposits: Subject to subsection C thereof, it is unlawful for any person to litter, track or
deposit, or cause to be littered, tracked or deposited, sand, gravel, rocks, mud, dirt, snow, ice, or any
other debris or material upon any street, sidewalk, alley or public place, or any portion thereof.
o Notice; Abatement: The Director of Public Works may notiff and require any person who violates or
causes another to violate the provision of subsection A hereof, or who has in the Director's employment
a person who violates or caus$ another to violate the same, top remove such sand, gravel, rocks, mud,
dift, snow, ice or any other debris or material within twenty four (24) hours after receipt of said notice
by the Director of Public Works. In the event the person so notified does not comply with the notice
within the period of time herein specified, the Director of Public Works, or other authorized agent, may
ciruse any such sand, gravel, rock, mud, dirt, snow, ice, debris or any other material to be removed
from any street or alley at the expense of the notifled.
o Summons and Penalty: As an alternative to the notice for removal provided in subsection B above,
any person who violates or causes another to violate the same, may be issued a summons to appear
before the Municipal Court of the Town for said violations, and upon being found guilty of a violation
hereunder be punished as provided in Section 14-1 of this code,
a Notice and Penaltyr It is unlawful for any person to fail or refuse to comply with the notice of the
Director of Public Works as provided in subsection B hereof, and any such person shall, in addition to
payment of the expense of removal incurred by the Director of Public Works, as provided in subsection B
hereof, upon being found guilty of a violation hereunder, be punishable as provided in Section 1-4-1 of
this Code. (1997 Code: Ordinance 6 (1979).
CODES 7.3A.I AND 7.3A.3: PARKING OBSTRUCTING TRAFFIC & IMPOUNDMENT AUTHORIZED
o No person shall park any vehicle upon a street or at any other place within this Municipality in such a
manner or under such conditions as to interfere with the free movement of vehicular traffic or proper
street or highway maintenance. (Ord, 2(1958) 5 1)
o Whenever any police offlcer finds a vehicle attended or unattended, standing upon any portion of a
street or upon any place within this Municipality in such a manner as to constitute a violation of any
section of this Article, or left unattended for a period of twenty four (24) hours or more and presumed to
be abandoned under the conditions prescribed by Colorado Revised Statutes section 42-4-1102, as
amended, the officer shall require the vehicle to be removed or cause it to be removed and placed in
storage in the nearest garage or other place of safety designated or maintained by this Municipality, and
the charges for towing and storage of such vehicle shall be charged to the owner of the vehicle in
addition to a ten dollar ($10) impoundment charge. (Ord. 2(1968) g 3: Ord. 28(1981) I 1)
I have read and will comply with the above code provisions:
Print Name
Position or Relationship to Project:
Date Signed:
F:/everyone/forms/bldpemrT
Signature
IO}l,NM
Yail2002
Vail Village/Lionshead Construction Hours Handout
Problem Statement
The Vail Village and Lionshead are invaluable assets lo the community. Thousands of
people come to Vail each year to sightsee, recreate, shop and to enjoy the Vail Valley.
The community and merchants rely upon the summer/winter tourism to generate
revenue. Our summer/winter guests expect a pleasant experience while in Vail.
To insure that all of the proposed construction has as little negative impact on the
community and on our guest as possible, the Town of Vail finds it imperative to create
and implement the Vail Village/Lionshead Construction Master Plan. Maps of the Village
and Lionshead are included to show areas of construction being affected by this plan.
It would be irresponsible for the Town of Vail, the Construction Contractors and the
Merchants, to not actively participate to minimize the impact of construction on the Village
and Lionshead areas.
Givens
The following givens are intended to provide the basic foundation by which construction
will be completed in the Village:
o The public's health, safety and welfare shall be honored at all times.
. Adequate pedestrian, loading/delivery, vehicle, and emergency vehicle access and
circulation shall be maintained.
r Roadways and pedestrian walkways shall be kept clean and free of dirt and debris.
. All construction deliveries, equipment, tools, materials, etc. to the Village must go
through Check Point Charlie. All Lionshead construction activity must go to the Vail
Police Department for a parking permit. Do not use delivery zones for construction
parking, refer to approved staging plan or make other arrangements for parking.
. The hours of Outside Construction Activity shall be as follows:
- April 15 - June 21 & September 9 - November 15, 7 a.m. until 7 p.m., seven days
a week. Between June 22 -september 6 work must end bv 4:00 p.m. on Fridavs.
November 15 - April 15, 2003 work allowed within daylight hours only.
- Deliveries shall be restricted to the hours of 7 a.m. to 11:30 a.m. on Gore Creek
Drive and 7 a.m. to 8:30 a.m. on Bridge Street.
- Special delivery permits must be requested in advance, from Public Works in
conjunction with Code Enforcement at Checkpoint Charlie.
- No construction activity shall occur on Saturday or Sunday between June
22 & September 6
No outside construction activity shall occur on the following dates:
Friday, February 15, Saturday, Februaryl6, Sunday, February 17,and Monday,
February 18. (Presidents Weekend|
Saturday, May 25, Sunday, May 26 and Monday, May 27 (Memorial Dav)
Friday, June 28, Saturday, June 29 and Sunday, June 30. (Vail Arts Festival)
Wednesday, July 3, Thursday, July 4. Friday, July 5, Saturday, July 6 and
Sunday, July 7. (lndependence Dav)
Saturday, August 31, Sunday, September 1, and Monday, September 2
(Labor Dav).
Friday, September 13, Saturday, September 14, Sunday, September 15 in
(Lionshead) and then on Saturday, September 21 and Sunday, September 22.
(Vail Village) - (October Fest)
Thursday, November 28, (Thanksqivinq Dav) Friday, November 29, Saturday,
November 30 and Sunday, December 1.
Wednesday, December 25, Thursday, December 26, Friday, December 27
Saturday, December 28, Sunday, December 29. (Christmas Dav Holidav)
Monday, December 30, Tuesday, December 31, Wednesday January l,
(New Year 20031 No Wo* allowed the entire week of the Christmas/New Year
Holiday.
The Town of Vail Noise Ordinance has been waived by the Town Manager from 7a.m.
- 7p.m. For construction activities from April 15 through June 21, and from September
9 through November 15. The Noise Ordinance shall be in effect and strictly regulated
from June 22 through September 8 and November 15 to April 15, 2001
All construction sites will be required to obtain an Approved Construction-Staqinq
Plan from the Town of Vail Public Works Department in conjunction with Code
Enforcement. (The approved staging/parking plan is required to be on site at all
times).
The Town of Vail reserves the right to amend the Vail Village/Lionshead Construction
Plan regulations at anytime should abuses or problems arise.
The Three-Strike Rule will be enforced. Step 1. (Written warning), Step 2.
(Written warning), Step 3. (Construction site will be Red Tag until all issues are
resolved).
The following expectations are established to insure lhe success of the Vail
Village/Lionshead Construction Master Plan:
. Full and complete cooperation and understanding from all parties involved in the
construction activity in regards to this plan.
. Strict adherence and compliance with the requirements outlined in the construction
Plan.
. Respect and consideration for the affected interests and parties.
lf you have any question, Please contact the Town of Vail Public Works Department
(Construction Inspector) or Vail Police Department (Code Enforcement Officer)
970479-2198 970476-7603
T|wN0FvAil,
Vail 2002 Staging / Parking Plan Information
The Staeine / Parkine PIan Philosophv- Is a very import.ant step in the building
process. Striking a balance between safe public access and giving construction projects
room to build is becoming increasingly challenging, for us to meet all the needs of those
who will be impacted by construction projects. The fact is, there is less room to build in
the Town of Vail.
Developing a creative Staging Plan is a must. Staging in the Town of Vail Public Right of
Way is a Privilege, not a given right. We take into account when we review and approve
staging / parking plans, impacts on neighborhoods, tourism, business and the traveling
public along with your right to build.
The General Contractor is responsible for all subcontractors and all construction
octivitv relatine to thle buildine proiect. The staging plan will be enforced according to
the Approved Set ofBuilding and Staging Plans. You are required to keep a copy ofthe
Approved Staging Plan on site.
Two staging /parking plans are required, a summer and winter. Summer staging plans
expire on November l, and winter staging plans expire on April 15. (NqI9:--IhgI9! n9.-94
street parkins in the winter season and all materials. equipment. etc must be 10' offthe
edee ofasphalt).
Enforcement of all staging / parking plan is as follows.
A) Staging / Parking Plans to scale required.
B) Once the plan is approved, they will be held to complete compliance.
C) We will use a 3 step and you're out, process.
Step One- Verbal and written warnings as to the staging plan violation, then have
contractor sign and date field memo waming.
Step Two- Police Department issue tickets and tows or public works writes second
written waming to all violators who have been notified under step one and who are still
in violation of the approved Staging / Parking Plan. The Town of Vail Chief Building
Official will call the contractor and notify them, the next time any violation happens, the
building department will red tag the construction site for 48 hours.
Step Three- If still in violation after step two, a 48 hour Red Tas will be issued to the
project site.
If you have any Questions, Please contact the Town of Vail Construction Inspector at
970-479-2198
F:\cdev\FORMS\PERMITS\Staging-Parking.doc
Requirements for an Acceptable Staging Plan
It is prefened that and Approved Site Plan is used to draw a staging plan, but a hand
drawn plan may be used as long as it is dawn to scale and is neat and legible.
1.) The Staging Plan must show the following:
(a) Show all parking that is required for the job site. (Including construction
equipment).
(b) Show the location of all material that will be staged on site.
(c) Show the location ofall dumpsters and port-o-john that are to be on site.
(d) If a fence is required, then show the location of the fence and describe the
material used for the fence.
(e) Iftrees and / or vegetation is required to be protected, then show how this will be
done.
(f; If this staging plan is for a Demo Permit, then show staging for dump trucks and
all related equipment. If the Town of Vail Right of Way area is needed for
staging, then a Traffic Control Plan is required in conjunction with the staging
plan.
(g) Please provide and show an Erosion Control Plan.
(h) No equipment, vehicles, materials are allowed on Town of Vail Right of Way in
the Winter Staging PIan.
2.) If work needs to occur in the right of way, then add a Traffic Control Plan to the
staging plan showing the following:
(a) The work zone (area that is to be performed)
(b) Traffic Control Devices (waming, signs, cones, flaggers, etc.)
(c) Distances that all devices will be set up from the work zone. Also show all
dimensions of work being performed in the right of way. All traffic control plans
must conform to the MUTCD manual.(Manual of Uniform Traffic Control
Devices)
2.) This plan will be reviewed by Public Works and if Necessary the Police, Fire, and
Community Development Department. Once the staging plan is approved, it will be
registered with the departments listed above and enforced.
3.) The Village and Lionshead area have outside construction restrictions, Please become
familiar with the Yail2002,Vail Village and Lionshead Construction Hours handout.
F :\cdev\FORMS\PERMITS\Staging-Parking.doc
TO\^TNOF VAIL
75 S. FRONTAGE ROAD
VAIL,CO 81557
970-479-2138
OWNER DAVIS, DON
159 ITAMPLIGHTER IJN
POI{|:TE VEDR;A BE;ACH FI,
32082
License:
CONTRACTOR TCC COI{TRACTORS, TNC.
P.O. BOX 1822
AVON, CO
8152 0
License: 540-8
APPLICAIIT TCC CO}ITR,ACTORS, I}IC.
P.O. BOX r.822
AVON, CO
4t620
I-,icenge: 540-B
Desciption:
REROOF SAME FOR SAME
Occupancy:
Type Construction:
TypeOccupancy: ??
Valuation: $15,354.00
Fireplace Inforrration: Restrkted: Y
Building->
Plan Check->
Investigation->
Will Call-->
DEPARTMENT OF COMMUNITY DEVELOPMENT
NOTE: THIS PERMIT MUST BE IIOSTED ON JOBSITE AT ALL TIMES
ADD/ALT MF BUILD PERMIT
|ob Address.: 4207 COLTIMBINE DR VAIL
Location......: 420TCOLL]MBINE
ParcelNo....: 21011221700't
Project No...:
Permit #: 8024210
Status.....: ISSUED
Applied...: 07/03/2002
Issued...: 07/03/2002
Expires...: 12/30/2002
0
0 # ofGastogs: 0
Total Calculated Fees->
Additional Fees->
Total Permit Fee.-.--->
o7/03/2002 Phone:
o7/03/2002 Phone:970-949-0630
o7/03/2oo2 Phone:970- 949- 053 0
AddSqFt:
# of Gas Appliances:
Wood Pelleh *r*** FEE SUMMAIiY
5205.00 Restuarant Plan Review->
S133.25 DRB Fe€-->
$0.00 R€creationFee--.-.-->
S3.00 Clean-upDeposit--->
'foTAL FEES---->
$0.00 Paymente----__>
3391.25 BALANCE DLTE->
$0. oo
$s0.00
$0.00 9505.00
950s.00
90.00
Approvals:I€em: 05100 BUIIJDING DEPART!{ENI
o7/03/2002 DF
Itemr 05400 PIJA INING DEPARTMENT
Item: 05500 FIRE DEPARTMENP
Item: 05500 PUBIJIC WORKS
0[v*cYur il4W,,,J)
tio'
$391.25
Action: AP
)\ .W
*^'
PAGE 2
Permit #: B;02-02]J
CONDITIONSOF APPROVAL
as of 07-03-2002 Status: ISSUED
PermitType: ADD/ALTIvIFBUILDPERMIT Applied: 07/03/2m2
Applicant TCCCONTRACTORS,INC, Issued: 07/03/2002
970-949-0630 To Expire: l2/30/2m2
fob Address: 4207 COLLIMBINE DR VAIL
Location: 42O7COLUMBINE
Parcel No: 210772277007
Description:
REROOF SAME FORSAME
Conditions:
Cond:12
(BLDG.): FIELD INSPECTIONS ARE REQI.NRED TO CHECK FOR CODE
COMPLIANCE.
Cond: 14
(BLDG.): ALL PENETRATIONS IN WALIS,CEILINGS,AND FLOORS TO
BESEALED WITH AN APPROVED FIRE MATERIAL.
Cond:15
(BLDG.): SMOKE DETECTORS ARE REQUIRED IN ALL BEDROOMS AND
EVERY STORY AS PER SEC.310.6.1 OF THE 1997 UBC.
Cond:1
(FIRE): FIRE DEPARTMENT APPROVA,L IS REQTIIRED BEFORE ANY
WORKCAN BESTARTED.
See page 2 of this Document for any conditions that may apply to this permit.
DECLARATIONS
I hereby acknowledge that I have read this application, filled outin fulltheintromrationrequired completed an
accurate plot plan" and state that all the infomration as required is correcl I agree to comply with the infonnation and
plot plan, to comply with all Town ordinances and state laws, and to build this structure according to the towns zoning
and zubdivision codes, design review approved, Unifonn Building Code and other ordinances of the T<rwn applicable
thereto.
REQUESISFOR INSPECIION SFTALLBE MADE TWENTY-FOURHOURS IN ADVANCE BYTELEPHONE
PM.
Serd Clearlup Deposit To: N/A
ORATOUR OFFICE FROM 8:(X)AM- 5
OR CONTRACTOR FOR HIMSELF AND OWNET
t'**** * * | +++ltt******l* f +{'f:}t}'}**'}*l** + * + i++i'} * *:ta l' ** * *{' 'l **f*+ ***+* t + + ++**+** * * * ** ***** | * ******
TOWN OF VAIL, COLORADOCopy Reprinted on 07-03-21[2 at 12:10:07 07103/2002
Statement
+t 't + ****** ** **+ + * + +t'i'arlr**** * l** * * a++*+ + +t * +l' + *+ +t +* +*+ * * * ** * + + ++ +***** ********++ +**+*** ** * + *
Stsatement Number: R000002557 Amount: $505.00 07/03/2OOZL2:O2 PVI
Palment Method: Check Init: DF
Notsatsion: CHECK * 73 52
Permit, No: 802-0210 Type: ADD/AIT MF BUIITD PERMIT
ParceL No: 2LOLL22LIOOI
Sitse Addreee: 420? COITI'MBINE DR VAIL,
Location: 4207 COITIJI,IBINE
Togal Fees: S505.00
ThiE Pa)rment: $505.00 ToEaI ALL Pmts: 9505.00
Balance: $0.00
* ++ * * *f **tf + +ft l* * * ** *** * * * * * * * * * * * * * *i * * t * + ** * *t * !t * *** 'l** * t * * *+ * * a * * ** *** ++ * * f ** * * * * **'*1,+ * *
ACCOUNT ITEM LIST:
Account Code Descriotion Current Pmts
BP OO1OOOO31111OO BUILDING PERMIT FEES
DR OO1OOOO31122OO DESIGN REVIEI"J FEES
PF OOiOOOO31123OO PLAN CHECK FEES
t"lc OO1OOOO31128OO WILL CALL INSPECTION FEE
205. 00
50 .00
247 .00
3.00