HomeMy WebLinkAboutVAIL DAS SCHONE FILING 1 BLOCK E LOT 12 AROSA TOWNHOUSES UNIT 1TOWN OF VAIL DEPARTMENT OF COMMTINIry DEVELOPMENT
75 S,FRONTAGEROAD
VAIL, CO 81657
g',t0479-2t38
NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES
ADD/ALTMFBUILDPERMIT PCTMit #: BO3-035I
Job Address.: 2607 AROSA DR VAIL Status.....: ISSUED
Location......: 2607 AROSA DR (AROSA TOWNHOMES) Applied...: ll/12/2003
Parcel No....: 210314204016 Issued ...: ll/13/2003
Project No...: Expires...: 05/1112004
owNER ISIDOR EISENMAIIN LL/L2/2OO3 Phone:
2607 A AROSA
VAIIJ CO
816s7 -4205
Iricense:
CONTRACTOR ISIDOR EISENMANN tL/L2/2003 Phone: (97o) 328-2664
PO Box 419 7
Eagle Colorado
81531
License z 295-T'
AppIrICAtiIT ISIDOR EISENMAI.IN LL/L2/20O3 phone: (970) 32a-2664
PO Box 4197
Eagle Colorado
8163 L
License:295-L
Desciption:
REPLACE FAILED BRICKWALL UNDER NEW GUIDELINES & REMOVING
TREES
Occupancy: R3 Single Family Residence
TypeConstruction: VN TypeVNon-Rated
Type Occupancy: ??
Add Sq Ft: 0Valuation: 54.800.00
Fireplace Infomalion: Restricted: Y # of Gas Appliances: 0
Building-> $111.25 Restuarant Plan Review-->
# of Gas Log: 0 # of wood Pellet: 0
FEE SUMMARY .'rt't+*.'tr+.t'l*:r**:.***'**.r:r:rt'rt
go. oo Total Calculat€d Fe€s-> $185. 56
$0. 00 Addilionsl Fees-> s50. 00
SO. OO Total Permit Fee----> 5236. 56
90. 00 Pal'ments-----> 5236 . 56
$0.00
Plan Check->
lnvestigalion->
Will Call--->
$72.3L DRB F€e-----.....->
90 - 00 Recleation Fe€-------->
$3 . 00 Clean-up Depo5il..-....->
TOTAI- FEES__-_> S185.56 BALATICE DUE--->
Approvals:IEem: 05100 BUIITDING DEPARTMENT
LA/A3/2OO3 JRNI ACIiONI AP APPROVED BY E.E.
Item: 05400 PLANITIIIG DEPARTMENT
IICM: O55OO FIRE DEPARII{E}TT
Item: 05500 PITBLIC WORKS
a*l +tt*:l:tl *att+:tl 'ta,l la*:r:|:tir lt *r *:l | * a* lt+r +a* * a* lt*t'ill iat I *:l*'l *t *a* t++l
See page 2 of this Document for any conditions that may apply to this permit.
DECLARATIONS
I hereby acknowledge that I have read this application, filled out in full the information required, completed an accurate plot plan,
and state that all the information as required is correct. I agree to comply with the information and plot plan, to comply with all
Town ordinances and state laws, and to build this structure according to the towns zoning and subdivision codes, design review
approved, Uniform Building Code and other ordinances of the Town applicable thereto.
REQUESTS FOR INSPECTION STI,ALL BE MADE TWENTY-FOUR HOIru IN ADVANCE BY 479-2149 OR AT O{JR OFFICE FROM 8:m AM - 4 PM.
SIGNATI]RE OF OWNER OR CTOR FOR HIMSELF AND OWNEF
PAGE 2
**t*******:f*++*:*!**{.'|***:***:t+*****!*lt:td.'}*'}**+**'}!i*'|t***,t*'t'|t:t't**'*'}*'}****'t**:t*:t,}!*,$**'|.!|.'*********
CONDITIONS OF APPROVAL
Permit #: 803-0351 as of I l-13-2003 Status: ISSUED
{.*'*'t,|t{.********,i{i****;f,***'!{.,*{.!t************'}:}*,t*,t*!t!t,}!t***,}**,}*'t'*'l!**:|,|t|t*****,t*,**|i***********
Permit Type: ADD/ALT MF BUILD PERMIT Applied: llll2l2l03
Applicant: ISIDOR EISENMANN Issued: ll/13/2003
(970) 328-2664 To Expire: O5llll2004
Job Address: 2607 AROSA DR VAIL
Location: 2607 AROSA DR (AROSA TOWNHOMES)
ParcelNo: 210314204016
Description:
REPLACE FAILED BRICKWALL UNDER NEW GUIDELINES & REMOVING
TREES
Conditions:
Cond: 12
(BLDG.): FIELD INSPECTIONS ARE REQUIRED TO CffiCK FOR CODE
COMPLIANCE.
Cond: l4
(BLDG.): ALL PENETRATIONS IN WALLS,CEILINGS,AND FLOORS TO
BE SEALED WITH AN APPROVED FIRE MATERIAL.
Cond: l6
(BLDG.): SMOKE DETECTORS ARE REQUIRED IN ALL BEDROOMS AND
EVERY STORY AS PER SEC.3IO.9.I OF THE I997 UBC.
Cond: I
(FIRE): FIRE DEPARTMENT APPROVAL IS REQUIRED BEFORE ANIY
WORK CANBE STARTED.
* * * + * * t t * * + + ** * * * * * f t + t 'f
lt + * + + * * * *** * * * ** * * * * * * + * * * * ** * * * * * * ** * + + * * * + * * * * * t,l '! * * a * + + * + {. * * * t:1.:} *
TOWN OF VAIL, COLORADO Statement
'l' * * '* * * * * * * ** * * * + * * * {. * * '* * * ****** * * * * * + * + * * + * + * rl' t * * * * t * * * * * * * * * * * * ***ttt* * * * * * * * * * * 't + * * * * * * * * *
Statement Number: RO3OO05124 Amount: $236.55 LL/L3/200304:39 PM
Palment Method: Check rnit: DDG
Notation: Eagle
Development & InveatmenE CorD 1021
Permit No: 803-0351 Type ! ADD,/ALT MF BUILD PERMIT
Parcel No: 2103]-42040L6
Site Address: 2607 AROSA DR VAIL
IJocation: 2507 AROSA DR (AROSA TOWNHOMES )
Total Fees: $236 .55
This Payment: $236.56 Total ALL Pmts: $236.55
Balance: $0.00
* * f+ * * * +*** ++t** +t f + + *'t '** *'t{'* * **** * * * *** * * * *t * * ** * *'}{i* + + +t * * * ** * + + ++ * * * * ** f * + +* * * * ** * *** * * * *
ACCOIJNT ITEM LIST:
Account Code Description Current Pmts
BP OO1OOOO31111OO BUILDING PERI'1IT FEES
CL OO1OOOO3123OOO CONTRACIOR LICENSES
PF OO1OOOO31123OO PLAN CHECK FEES
hJC OO1OOOO31128OO WILL CALL ]NSPECTION FEE
111 .25
50.00
72.31
3.00
' -' 'r' ' .'l
rrp APPL,.A''NW,LLN.?Ail$-#I
I I
-- APPLrcArroN wrLL No' "ttJr=.jo":,t#tffi3.01a?-q_ffi._
75 S. Frontage Rd.
Vail, Colorado 81657
Buildi
TOR INFORMATION
General Cpntractor:
ESidor Eisen yytartlt 'H^t Vail F 1e9. No.:
I\ '
Contact and Phone #'s:
rqrb) e2s zDl f
Email address:
Contractor Signature: _d / 2il'zld'm fiz///4/4'd'4(
COMPLETE VALUATIONS FOR BUILDING PERMIT Labor & Materials
BUILDING: S 37 0p- oo ELECTRICAL: $orHER: $ I t 0O. oa [-ab-y
PLUMBING: $MECHANICAL: $rorAl:s 4 8pe, oa
For Parcel # Contact Assessors Otlice at 970-328-8640 or visit
m*ffi Lto3tq2oL/Dtl
Job Name: fl* ph " " e t#yy d/z/'{i u4/4 ,ooo*r, 2607 Flro sa f)r Va' L- 9/6t7
LesatDescription ll t-ot: // ll etocr: f ll rltins:Subdivision: ITrosa To*n AooneS
Phone:
ArchitecUDesigner:Address:Phone:
Engineer:Address:Phone:
Work Class: newil Addition ( ) Remodel 1j/ Reoan ( ) D".91_I_ jth"t! l
Work Type: Interior ( ) \ Exterior 1p Both ( )Does an EHU exist at this location: Yes ( ) No (. )
t----.a-
Type of Bldg.: Single-family ( ' ) Two-family (l) Multi-family ( ) Commercial ( ) Restaurant ( ) Other ( )
No. of Existing Dwelling Units in this building: lJ F No. of Accommodation Units in this building:
No/Tvpe of Fireplaces Existinq: Gas Appliances ( ) Gas Logs ( ) Wood/Pellet ( ) Wood Burning (X)
No/TVpe of Fireplaces Proposed: Gas Appliances ( ) Gas Logs ( ) Wood/Pellet ( ) Wood Burning (NOT ALLOWED)
Does a Fire Alarm Exist: Yes (y) No (ToeseEieEFrrnkler System Exist: Yes ( ) t'lo (f)
******s***************l*t**tt**FoR OFFICE USE ONLY**************#.*'r*!!,.**|lt********
\\VAiIWAtA\CdEV\FORMS\PERMITS\BLDGPERM.DOC 07 t26t2002
tl
Questions? Callthe Building Team at 479-2325
Depaftment of Community Development
Ptoject Name:
Project Address:
This Chdrlist must be ampleW befote a Building Petmit application is
arcobd.
All pages of application is complete
Has DRB approval obtained (if required) Provide a copy of approval form
Condominium Association letter of approval attached if project is a Multi-Family complex
Complete site plan submitted
Public Way Permit application included if applicable (refer to Public Works checklist)
Staging plan included (refer to Public Works checklist) No dumoster,oarkino or material storaoe
allowed on roadwavs and shoulderc without written aooroval
Asbestos test and results submitted if demolition is occurring
Architect stamp and signature (All Commercial and Multi family)
Full floor plans including building sections and elevations(s sets of plans for MultFFamily and
Commercial Buildings)
Window and door schedule
Full structural plans, including design criteria (i.e,loads)
Structural Engineer stamp and signature on structural plans (All @mmercial and Multi Family)
Soils Report must be submitted prior to footing inspection
Fire resistive assemblies specified and penetrations indicated
Smoke detectors shown on plans
Types and quantity of fireplaces shown
o
o
E
o
D
o
tr
D
o
o
o
o
tr
o
D
Applicant's Signaturer
Date of submittal:
\WaiIUata\cdev\FORMS\PERM ITS\BLDGPERM.DOC
Received By:
04t02t2003
BUILDING PERMIT ISSUANCE TIME FRAME
If this permit requires a Town of Vail Fire Department Approval, Engineerb (Public Works)
review and approval, a Planning Depaftment review or Health Depaftment review, and a review
by the Building Depaftment the estimated time for a total review will take as long as three (3)
weeks.
All commercial (large or small) and all multi-family permits will have to follow the above
mentioned maximum requirements. Residential and small projects should take a lesser amount
of time, However, if residential or smaller projects impact the various above mentioned
departments with regard to necessary review, these projecls may also take three (3) weeks to
review and approve.
Every attempt will be made by this department to expedite this permit as soon as possible.
I, the undersigned, understand the plan check procedure and time frame, I also understand
that if the permit is not picked up by the expiration date, that I must still pay the plan check fee
and that if I fail to do so it may affect tuture permits that I apply for.
Agreed to by:
Print name
Project Name:
Date:
F: everyone/forms/bldperm3
Signature
HOW DIDWE RATE WITH YOU?
Tom ofVailSurvey
Community Development Departnent Russell Fomst Director,
(970)179.2139
Check allthat applies.
1. Which Departnent(s) did you contact?
Building _ Environmenhl_ Housing_ Admin
Planning DRB _ PEC
Was your inilial conbct wifrr our s1aff immediate
no one available ?
slow 0r
o.
7.
8.
3. lf you were required to wait how long was it before you were
helped?_
4.Was your project revienred on a timely basis? Yes / No
lf no, why not?
Was this yourfirstlime to file a DRB app_ PEC app_
Bldg Permit_ t',I/A
Please rate the performance of &re staf person who assisted you:54321Name:
(knowledge; responsiveness, availability)
Overall effectiveness of the Front Service Counter. 5 4 3 2
What is the best time of day for you to use fie Front Service
Counter?
9. Any comments you have which would allow us to betbr serve you
nexttime?
Thank you for taking fie time to complete this survey. We are
committed b improving our seMce.
TVWT{-OF
WHEN A'PUBLIC WAY PERMIT" IS REQUIRED
PLEASE REAO AND CHECK OFF EACH OF THE FOLLOWING QUESTIONS REGARDING THE NEED FOR A
"PUBLIC WAY PERMIT":
Is this a new residence?
Does demolition work being
public property?
YES NO
performed require the use of the Right-of-Way, easements orYES NO
Is any utility work needed? YES
Is the driveway being repaved?
Is a different access needed to the site other than the existing driveway? YES- NO
Is any drainage work being done that affects the Right-of-Way, easements, or public property?
YES
Is a "Revocable Right-of-Way Permit" required?YES
Is the Right-of-Way, easements or public property to be used for staging, parking or fencing?YES NO
If answer is NO, is a parking, staging or fencing plan required by Public Works?
YES_ NO_
If you answered YES to any of these questions, a "Public Way Permit" must be obtained.
"Public Way Permit" applications may be obtained at the Public Work's office or at Community
Development (a sample is attached). If you have any questions please call Leonard Sandoval in Public
Works at 479-219A.
I HAVE READ AND ANSWERED ALL THE ABOVE QUESTIONS.
Contractor Signature
Job or Project Name:
Date Signed:
NO
NO
F :/everyone/forms/bldperm4
Company Name
APPLICATION
FOH TOWN OF VAIL
PUBLIC WAY PERMIT
pw*:rl-nnrl
PATCEI#:T T T !' N T [ - T !' I T T
le- Brds. Permit#,8 n I'I I f I
Job lGme
Excavalin g Contraclor Name
Stro€t Address n n n-Tl (lf unknowncallLJ LJ r"_J | | 479-2138 axl.o
Maillng Address TOV Contractof's License Number REQUIREO
Phofle #ziqCity
4.
Start Date
Work is for (circte one)
Completion Dato
Water Sewer Gas Electric Telephone
(Permit Expkatlon Date)
CATV Landscaping Temp. Site Access
Other
Trench-width
(min.4')
BondAmount $
ALL MATERIAL, EQUIPMENT, AND TRAFFIC
JOB IS STARTED,
7.Rubber out-riggers are required on
Asohalt surfaces underneath the
L A signature below indicates a
signatures are obtained, permittee
necessary Town of Vail signatures.
BE ON THE JOBSITE BEFORE THE
working on asphalt.
at all times.
utility locations and approvals, Once all utility company
application through the Public Works office to obtain the
up to one week to process.
Depth
TotalsF $
llotal LF $
Permit Fee Total Permit Fee $
Public Service Company (1-800-9
Public Service Natural Gas Group (1-800-922-1587)
U.S. West (1 -800-922-1 987)
o
10,
11.
12.
ATTACH PLAN OF WORK INCLUDING CONSTRUCTION TFAFFIC CONTROL PLAN
Show streets with names, buildings, and location of cuts. USE DASH LINES FOR CUT.
TCI Gablevision of the Rockies (1-800-922-1987)
Eagle River Water & Sanitation District (970-476-7480, ext. 114)
Holy Cross Electric Company (1-800-922-1987)
Town of Vail Electricians (970-479-2158)
Town of Vail lrrigation (970-479-2158)
Town of Vail Public Works Construction Inspector (970-479-2198)
THERE WILL BE NO TOTAL STREET CLOSURESI A construction traftic control plan must be approvod by the
Public Works Department prior to issuance of the permit,
All excavation must be done by hand within 18'of utilities - (Senate Bill 172)'
Permittee must contact Public Works Departmenl at 479-2198 24 hours Drior to commencing of work. Failure to notify
the Town will result in lorfeiture ol bond money. Scheduled inspections which are not r€ady may result in the Town
charging the contractor a reinspection fee.
I certify that I have read all chapters ol Title 8 - Public Ways and Property, of the Vail Municipal Code and all utility
company agreements, signed by me, and will abide by the same, and that all utilities have been notified as required.
White - Public Works
Yellow - Contractor
PUBLIC WORKS AND THE PUBLIC WAY PERMIT PROCESS
How it relates to Building Permits:
Fill out the attached check list with the Building Permit Aoplication.
If yes was answered to any of the questions then a "Public Way" permit is required. You
can pick up an application at either Community Development, located at 75 South Frontage
Road or Public Works, located at 1309 Elkhorn Drive.
Notice sign-offs for utility companies. ALL utilities must field verifo (locate) respective
utilities prior to signing application. Some utility companies require up to 48 hours notice to
schedule a locate.
A construction traffic control/staging plan must be prepared on a separate sheet of paper.
An approved site plan may also be used. This plan will show locations of all traffic control
devices (signs, cones, etc,) and the work zone, (area of construction, staging, etc.). This
plan will expire on November lst and will need to be resubmitted for consideration for
approval through the winter. Be aware that your resubmission for winter may be denied
depending on the location of construction.
Sketch of work being performed must be submitted indicating dimensions (length, width
and depth of work). This may be drawn on the traffic control plan or a site plan for the job.
Submit completed application to the Public Work's offlce for review, If required, locates will
be scheduled for the Town of Vail electricians and inigation crew. The locates take place in
the morning, but may require up to 48 hours to perform.
The Public Work's Construction Inspector will review the application and approve or deny
the permit. You will be contacted as to the status and any requirements that may be
needed. Most permits are released within 48 hours of being received, but please allow up
to one (1) week to process.
As soon as the permit is approved, the Building Department will be notified, allowing the
"Building Permit" to be released. Please do not confuse the "Public Way Permit" with a
"Building Permit".
NOTE: The above process is for work in a public way ONLY. Public Way
Permits are valid only until November 15th. A new Public Way Permit is required
each year if work is not complete. Re-application each November 15th does not
mean an automatic renewal.
I have read and understand the above.
Signature
F:/everyone/forms/bldperm5
Date Signed
DRAINAGE AND CULVERT INSPECTIONS ARE REQUIRED By PUBLTC WORKS!
Please read and check off each of the items below:
o The Town of Vail Building Department has developed the following procedures to
ensure that new construction sites have adequately established proper drainage
from building sites along and adjacent to Town of Vail roads or streets.
The Town of Vail Public Works Department will be required to inspect and approve
drainage adjacent to Town of Vail roads or streets and the installation of temporary
or permanent culvefts at access points from the road or street onto the construction
site. Such approval must be obtained prior to any requests for inspection by the
Town of Vail Building Department for footings, temporary electrical or any other
inspection. Please call Leonard Sandoval at479-2798 to request an inspection from
the Public Works Depaftment. Allow a minimum of 24 hour notice.
Also, the Town of Vail Public Works Depaftment will be approving all flnal drainage
and culveft installation with resulting road patching as necessary. Such approval
must be obtained prior to any Final Certificate of Occuoancv issuance.
Agreed to by:
Print Name
Project Name:
Date Signed:
F:/everyone/forms/bldperm6
Signature
Please read and check off each of the items below.
(Copies of complete text are available upon request)
CODE 5-2-10: DEPOSITS ON PUBUC WAYS PROHIBITED
s Unlavvful deposits: Subject to subsection C thereof, it is unlawful for any person to litter, track or
deposit or ctruse to be littered, tracked or deposited, sand, gravel, rock, mud, dit, snow, icg, or any
other debris or material upon any street sidewal( alley or public place, or any portion thereof.
o Notice; Abatement: The Director of Public Works may notifo and require any person who violates or
causes another to violate the provision of subsection A hereof, or who has in the Director's employment
a person who violates or @uses another to violate the same, top remove such sand, gravel, rocks, mud,
dirt, snow, ice or any other debris or material within twenty four (24) hours after receipt of said notice
by the Director of Public Worls, In the event the person so notified does not comply with the notice
within the period of time herein specified, the Director of Public Works, or other authorized agent, may
cause any such sand, gravel, rocks, mud, dirt, snow, ice, debris or any other material to be removed
from any street or alley at the expense ofthe notified.
tr Summons and Penalty: As an alternative to the notice for removal provided in subsection B above,
any person who violates or @uses another to violate the same, may be issued a summons to appear
before the Municipal Court of the Town for said violations, and upon being found guilty of a violation
hereunder be punished as provided in Section 14-1 of this code,
o Nofce and Penalty: It is unlawful for any person to fail or refuse to comply with the notice of the
Director of Public Works as provided in subsection B hereof, and any such person shall, in addition to
payment of the expense of removal incurred by the Director of Public WorK, as provided in subsection B
hereof, upon being found guilty of a violation hereunder, be punishable as provided in Section 14-1 of
this Code. (1997 Code: Ordinance 6 (1979).
CODES 7.3A.I AND 7-3A-3: PARKING OBSTRUCTING TRAFFIC & IMPOUNDMENT AUTHORIZED
D No person shall park any vehicle upon a street or at any other place within this Municipality in such a
manner or under such conditions as to intefere with the free movement of vehicular traffic or proper
street or highway maintenance. (Ord. 2(1968) 5 1)
r Whenever any police officer finds a vehicle attended or unattended, standing upon any portion of a
street or upon any place within this Municipality in such a manner as to constitute a violation of any
section of this Article, or left unattended for a period of twenty four (24) hours or more and presumed to
be abandoned under the conditions prescribed by Colorado Revised Statutes section 424-1102, as
amended, the officer shall require the vehicle to be removed or cause it to be removed and placed in
storage in the nearest garage or other place of safety designated or maintained by this Municipality, and
the charges for towing and storage of such vehicle shall be charged to the owner of the vehicle in
addition to a ten dollar ($10) impoundmentcharge. (Ord. 2(1968) $ 3: Ord. 28(1981) 5 1)
I have read and will comply with the above code provisions:
Print Name
Position or Relationship to Project:
Date Signed:
F:/everyone/forms/bldpermT
Signature
TO!I'NM
VaiI 2003
Vail Village and Lionshead Village Construction Hours
Information Handout
Problem Statement
Vail Village and Lionshead Village are invaluable assets to the community. Thousands of
people come to Vail each year to sightsee, recreate, shop and to enjoy everything the
Vail Valley has to offer. The community and merchants rely upon our guest to generate
revenue. Our summer/winter guests expect a pleasant experience while in Vail.
To insure that all of the proposed construction has as little negative impact on the
community and on our guest as possible, the Town of Vail finds it imperative to create
and implement the Vail Village and Lionshead Village Construction Hours Handout.
It would be irresponsible for the Town of Vail, the Construction Contractors and the
Merchants, to not actively participate to minimize the impact of construction in the Vail
and Lionshead Village areas.
Givens
The following givens are intended to provide the basic foundation by which construction
will be completed in the Villages:
o The public's health, safety and welfare shall be honored at all times.
. Adequate pedestrian, loading/delivery, vehicle, and emergency vehicle access and
circulation shall be maintained.
r Roadways and pedestrian walkways shall be kept clean and free of dirt and debris.
r All construction deliveries, equipment, tools and materials entering the Vail Village
and Pedestrian areas must go through Check Point Charlie. All Lionshead
construction activity must go to the Vail Police Department for a parking permit. Do
not use delivery zones for construction parking, refer to approved staging plan or
make other arrangements for parking.
r The hours of Outside Construction Activity shall be as follows:
- April 15 - June 20 & September 8 - November 14,7 a.m. untilT p.m., seven days
a week. June 20-September 5, work must end bv 4:00 p.m. on Fridavs.
November 14 - April 15,2004 work allowed within daylight hours only.
- Deliveries shall be restricted to the hours of 7 a.m. to 11:30 a.m. on Gore Creek
Drive and 7 a.m. to 8:30 a.m. on Bridge Street.
- Special delivery permits must be requested in advance, from Public Works in
conjunction with Code Enforcement at Checkpoint Charlie.
- No construction activity shall occur on Saturday or Sunday between June
21 & September 7.
No outside construction activity shall occur on the following dates:
Friday, February 14, Saturday, February15, Sunday, February 16, and Monday,
February 17. (President's Weekend)
Saturday, May 24, Sunday, May 25 and Monday, May 26 (Memorial Day)
Friday, July 11, Saturday, July 12 and Sunday, July 13. (Vail Arts Festivat)
Thursday, July 3, Friday, July 4, Saturday, July 5 and Sunday, July
(lndependence Davl
Saturday, August 30, Sunday, August 31 , and Monday, September l.
(Labor Dav Weekend).
/ a Friday, September 12, Saturday, September 13, Sunday, September l,f in
(Lionshead) and then on Saturday, September 20 and Sunday, September 21.
(Vail Village) - (October Fest)
Thursday, November 27, {Thanksqivinq Dav) Friday, November 28, Saturday,
November 29 and Sunday, November 30.
Thursday, December 25, Friday, December 26, Saturday, December 27, Sunday,
December 28. (Christmas Dav Holidavl
Monday, December 29, Tuesday, December 30, Wednesday December 31,
Thursday January 1. (New Year 20041 Friday January 2, Saturday January 3 and
Sunday January 4, 2004. No Work allowed the entire week of the
Christmas/New Year Holiday.
The Town of Vail Noise Ordinance has been waived by the Town Manager from 7a.m.
- 7p.m. for construction activities from April 15 through June 20, and from September
8 through November 14. The Noise Ordinance shall be in effect and strictly regulated
from June 20 through September 5 and November 15, 2003 to April 15, 2004
All construction sites will be required to obtain an Aporoved Construction-Staqino
Plan from the Town of Vail Public Works Department in conjunction with Code
Enforcement. (The approved staging/parking plan is required to be on-site at all
times).
The Town of Vail reserves the right to amend the Vail Village and Lionshead Village
Construction Hours regulations at anytime should abuses or problems arise.
The Three-Strike Rule will be enforced. Step 1. (Written warning), Step 2.
(Written warning), Step 3. (Construction site will be Red Tagged until all
violations are resolved).
The following expectations are established to insure the success of the Vail Village and
Lionshead Mllage Construction Hours Plan:
. Full and complete cooperation and understanding from all parties involved in the
construction activity in regards to this plan.
. Strict adherence and compliance with the requirements outlined in the construction
plan.
. Respect and consideration for the affected interests and parties.
lf you have any questions, Please contact the Town of Vail Public Works Department
(Construction lnspector) or the Vail Police Department (Code Enforcement Officer)
970479-2198 970475-7603
TOWN OFVAIL
ll
Vail 2003 Staging i Parking Plan Information
fhe Staqinq / Parkinq Plan Philosophv- ls a very important step in the building process. Striking a balance
between safe public access and giving construction projects room to build is becoming increasingly
challenging, for us tg meet all the needs of those who will be impacted by construction projecis. The factlj,
there is less room to build in the Town of Vail.
Developing a creative Staging Plan is a must. Staging in the Town of Vail Public Right of Way is a Privilege,
not a given right. We take into account when we review and approve staging / parking plans, impacts bn
neighborhoods, tourism, business and the traveling public along with your right to build.
The General Contractor is responsible for all subcontractors and all construction activitv relatina to the
l\ildtlg-Wiect The staging plan will be enforced according to the Approved Set of Building and Staging
Plans. You are required to keep a copy of the Approved Staging Plan on site.
Two staging /parking plans are required, a summer and winter. Summer staging plans expire on November 1,
and winter staging plans expire on April 15. (Note: There is no on street parkinq in the winter season and all
materials. equipment, etc must be 10' off the edoe of asohalt).
Enforcement of all staging / parking plan is as follows.
A) Staging / Parking Plans to scale required.
B) Once the plan is approved, they will be held to complete compliance.
C) We will use a 3 step and you're out, process.
Step One- Verbal and written warnings as to the staging plan violation, then have contractor sign and date
field memo warning.
Step Two- Police Department issue tickets and tows or public works writes second written warning to all
violators who have been notified under step one and who are still in violation of the approved Staging / Parking
Plan. The Town of Vail Chief Building Official will call the contractor and notify them, the next time any
violation happens, the building department will red tag the construction site for 48 hours.
Step Three- lf still in violation after step two, a 48 hour Red Tag will be issued to the project site.
lf you have any Questions, Please contact the Town of Vail Construction Inspector at 970-479-2198
\\Vail\data\cdev\FORMS\PE RM ITS\BLDGPERM. DOC 03/04t2003
tl
Requirements for an Acceptable Staqinq Plan
It is preferred that and Approved Site Plan is used to draw a staging plan, but a hand drawn plan may be used
as long as it is dawn to scale and is neat and legible.
1.) The Staging Plan must show the following:
(a) Show all parking that is required for the job site. (lncluding construction equipment).
(b) Show the location of all material that will be staged on site.
(c) Show the location of all dumpsters and port-o-john that are to be on site.
(d) lf a fence is required, then show the location of the fence and describe the material used for the fence.
(e) lf trees and / or vegetation is required to be protected, then show how this will be done.
(f) lf this staging plan is for a Demo Permit, then show staging for dump trucks and all related equipment. lf
the Town of Vail Right of Way area is needed for staging, then a Traffic Control Plan is required in
conjunction with the staging plan.
(g) Please provide and show an Erosion Control Plan.
(h) No equipment, vehicles, materials are allowed on Town of Vail Right of Way in the Winter Staging Plan.
2.) lf work needs to occur in the right of way, then add a Traffic Control Plan to the staging plan showing the
following:
(a) The work zone (area that is to be performed)
(b) Traffic Control Devices (warning, signs, cones, flaggers, etc.)
(c) Distances that all devices will be set up from the work zone. Also show all dimensions of work being
performed in the right of way. Alltraffic control plans must conform to the MUTCD manual.(Manual of
Uniform Traffic Control Devices)
3.) This plan will be reviewed by Public Works and if Necessary the Police, Fire, and Community Development
Department. Once the staging plan is approved, it will be registered with the departments listed above and
enforced.
4.) The Village and Lionshead area have outside construction restrictions, please become
familiar with the Vail 2003, Vail Village and Lionshead Construction Hours handout.
M^A ^9 u?&
d^u^Z % t-es-qDNL'^ I t--flTu n6 0u'
Pn"nrus-
\WailWata\cdev\FORMS\PE RM ITS\BLDGPERM.DOC 03/04/2003
Design Review Board
ACTION FORM
Departrnent of Community Development
75 South Frontage Road, Vail, Colorado 81557
tel: 970.479.2L39 faxt 970.47 9.2452
web: www.ci.vail.co.us
Project Name: Ellefson exterior changes DRB Number: DR8030493
Prcject Description:
Replace o<isting decks with new, west side of duple& same-for-same, to comply with building
codel new flooring ofdecks to be redwood.
Pafticipants:
OWNER ELLEFSON, TASHINA 11/03/2003 Phone:
2607 A AROSA
VAIL CO
816574205
License:
APPUCANT DOUGLAS SMIUANIC 11/03/2003 Phone:
2607 AROSA
VAIL CO
81657-4205
License:
ProjectAddressz 2607 AROSA DRVAIL Location:
2507 AROSA DR (AROSA TOWNHOMES)
Legal Description: Lot: 12 Block: E Subdivision: AROSA TOWNHOUSES
Parcel Number: 21031420,()16
Comments: seeconditions
BOARD/STAFF ACTION
Mouon By: Action: STAFFAPR
Second By:
Vote: Date of APProvalz LLlO6l2003
Conditions:
@nd:8
(PLAN): No changes to these plans may be made without the written consent of Town of
Vail staff and/or the appropriate review committee(s).
C,ond: 0
(P|-AN): DRB approval does not constitute a permit for building. Please consult with
Town of Vail Building personnel prior to construction activities.
Cond: CON0006220
New decks to be same-for-same, without bottom railing, so as to match deck on east
side not yet being replaced
Entry: 11/06/2003 By: ee Action: AP
Cond: CON0006221
New decks must not incorporate colors, as indicated on the original application
Entry: IL10612003 By: ee Action: AP
Planner: Elisabeth Eckel DRB Fee Paid: i20.00