HomeMy WebLinkAboutVAIL LIONSHEAD FILING 3 BLOCK 2 LOT 1 ENZIAN COMMONTOWN OF VAIL DEPARTMENT OF COMMUNIry DEVELOPMENT
75 S. FRONTAGEROAD
VAIL. CO 81657
970-479-2138
NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES
ADD/ALTMFBUILDPERMIT Pennit #: 804-0130
Job Address.: 705 W LIONSI{EAD CR VAIL Status.....: ISSUED
Location......: 705 W. LIONSHEAD CIRCLE Applied...: 06/02/2004
Parcel No....: 210106305001 Issued ...: 06/07/2004
Project No...: :Df)-.-'' rr _,</\q /- Expires...: 12/0412004PtrOLr 6o1q
owNER ENZTAN AT VAIrJ INC 06/02/2004 phone:
c/o oAKToN-KOSrarER CORP
772L N KOSTNER AVE
SKOKIE
rrr 50075
Li.cense:
CONTRACTOR BERMUDEZ IIIASONRY 06/02/2004 Phone: (970) 2L6-10O9
334 24 Road
Whitewater, Colorado
41527
License:677-S
APPTTTCANT BERMITDBZ MASOIIRY 06/02/2004 Phone: o70) 2L5-7009
334 24 Road
Wtritewater, Colorado
41527
License t 677 -S
Desciption:
INSTALL ROCK ONTO LOWER FRONT EAST WALL OF BUILDING AND
AROUND CORNERS TO MATCH EXISTING CHIMNEYS
Occupancy:
Type Construction:
Type Occupancy: ?2
Valuation: $24,500.00
Fireplace Information: Restricted: Y # ofGas Appliances: 0
Add Sq Ft 0
# ofGas Logs: 0 # of Wood Pellel 0
FEE SUMMARY i+*:t:t.ar*t+:lt:i***t***tr*a*trt'r++t+'ta:rr'r'a*'l*{'}irll*r:}*t*'}t***t'rt
SO. OO Tolal Calculated Fees-> 5648.56Building--*> 5391.25 Restuarant Plan Review-->
Plan Check-> $254 . 31 DRB Fe€-------> SO . O0 Additional Fees---'-> $0. 00
Investigation-> g0 .00 Recreation Fee--> $0. OO Total Permil Fee----> S548 . 56
Will Call--> $3 . oo Clean-up Deprosil-> $0. oo Pa)'ments-------> $648 . 56
TOTAL FEES_-> 5548 . 56 BAI,{NCE DUE-------+ S0 . 00
Approvals:IEem: 05L00 BUIIJDING DEPARII,IENT
06/07/2004 ,JRN! Action: AP
ftem: 05400 PLANNING DEPARTIUENT
06/03/2004 warren Action: AP
Item: 05600 FIRE DBPARTI{ENI
Item: 05500 PITBLIC WORKS
tla'tatallt*ta*aal
See page 2 of this Document for any conditions that may apply to this permit.
DECLARATIONS
I hereby acknowledge thaf I have read this application, filled out in full the information required, completed an accurate plot plan,
and state that all the information as required is correct. I agee to comply with the information and plot plan, to comply with all
Town ordinances and state laws, and to build this structure according to the towns zoning and subdivision codes, design review
approved, Uniform Building Code and other ordinances of the Town applicable thereto.
REQUESTS FOR INSPECTION SHALL BE MADE TWENTY.FOUR HOURS IN ADV 479-2149 OR AT OUR OFFICE FROM 8:00 AM - 4 PM.
CTOR FOR HIMSELF AND OWNET
PAGE2
***'i*****rt*******'l**'t**'|!t***l!t!******************tt**l**l**l***!t*****:i****'t**'**:i**:tl':t*'l'f **'t***'lr'**,f *'t**!t**
CONDITIONS OF APPROVAL
Permit #: 804-0130 as of 06-07-2004 Status: ISSUED
*'t'|i'|****:|****'il':i'}**t*||**'|*'|**'t****'i*t'f**:}**'t'|,t'}***:|'|*:|'|**'||'***,t*{.'t{.!t***+**f!**t,i*:i*:|'}*{.*{.*+************
Permit Type: ADD/ALT MF BUILD PERMIT Applied: 06102/2004
Applicant: BERMUDEZ MASONRY Issued: 06/07/2004
(970)216-7009 To Expire: l2/04n004
Job Address: 705 W LIONSHEAD CRVAIL
l.ocation: 705 W. LIONSHEADCIRCLE
ParcelNo: 210106305001
Description:
INSTALL ROCK ONTO LOWER FRONTEASTWALLOF BUILDING AND
AROUND CORNERS TO MATCHEXISTING CHIMNEYS
Conditions:
Cond: 12
(BLDG.): FIELD INSPECTIONS ARE REQUIRED TO CHECK FOR coDE
COMPLIANCE.
Cond: 14
@LDG.): ALL PENETRATIONS IN WALLS,CEILINGS,AND FLOORS TO
BE SEALED WITH AN APPROVED FIREMATERJAL.
Cond: 16
@LDG.): SMOKE DETECTORS ARE REQUIRED IN ALL BEDROOMS AND
EVERY STORY AS PER SEC.31O.9.I OF THE 1997I]BC.
Cond:1
(FIRE): FIRE DEPARTMENT APPROVAL IS REQTIIRED BEFORE ANY
WORKCAN BE STARTED.
** ** ****+ ** * **** * * * *i a' 'i +'t* +tt* *+*** * +t+ * + + +* +ri *{rl' *'} 't'l + + +t +** * t* * * * +t + * * * ** * * * ** * * * t* l. * * ***** *
TOWN OF VAIL. COLORADO Statement
** * i * * * * **+ +* 'it* *** ** + * *** +*** * * a * *** * * +*** * * * * * ** * t * *** *t * I + + + + 't * * * t I * * + * * * + + * * * * * + * * + * * * * +
Statement Nudber: R0400059?0 Arnount: $548.56 06/07/2OO403:30 PM
Pal.ment Method: Check Init: DDc
Notation: Enzian
Homeowners 3380
Permit No: 804-0130 Tlpe: ADD,/ALT MF BUILD PERMIT
Parcel No3 2101053 05 001
Site Addresg: 705 W LIONSHEAD CR VAfL
Location: 705 Vf. IJIONSHEAD CIRCIJE
Total Feee: $548.56
This Pa)rment: $648 .56 Total ArJIr Etnts: $648 .55
Balance: $0.00
* ** * * * * * * * * * * t + + * *,1' 'i *,1' ** * * * * * * * * * +* * * + * +'l' '! + f t + + +** * * ** * * * * * * + + * + * *** + + * * * * * * * * * **** * * + * * + + * *
ACCOUNT ITEM LIST:
Account Code DescriDtion Current Pmts
BP OO1OOOO31111OO BUILDING PERHIT FEES 39I.25
PF 00i00003112300 PLAN CHECK FEES 254.31
WC OO1OOOO31128OO W]LL CALL INSPECTION FEE 3.OO
-
P
TVW0FYtn
75 S. Frontage Rd.
Vail, Colorado 81657
fl tynra
APPLICATION WLL NOT BE ACCEPTED IF INCOMPLETE OR UNSIGN
Project #:
CONTRACTOR INFORMATION
ical. etc.!
o<1-603L
6cl fzr(30
tl
General Contractor:
Re.eno&c-z frtqscstr:
Town of Vail Reo. No.:
GT.( - S Contact and Phone #'s:
m;"ti(t \il;;d;. q1 oA G -roeq
Email address:
FOR BUILDING PERMIT Labor & Materials
BUTLDTNG:$ ?{ 5oo "g ELECTRICAL: $OTHER: $
PLUMBING: $MECHANICAL: $TOTAL:$
COMPLETE VALUATIONS FO
For Parcel # Con
**********!r**tr*****r*****r****FoR oFFlcE usE oNLy******************r***sss*****r
Other Fees:
DRB Fees:..
Puhlic Wav )ermil Fee:
tarCt c Assessors Office at 970-328-8640 or visit
Parcel #a\o \OG3oS65q>\_o\D-.
Job Name: Qatr-. C*.S";."i\Lt$s- St oo-Job Address:\o 5 (O. k,o*&Jc,,.
Legal Description Lot: I ll ao"t' I riring\te.t.i[Subdivision : t^,r".r tL o-o.Q
offi.\ffi3' c.*0c"^r**oJl Ad8"fB .^D. (.;*'L,-TCi. V^.( l[e4e{"c - \B sc,
ArchitecVDesigner: n4e,Address:none:
Engineer: AZrq Address:Phone:
Detailed description of work: Anu{".\\ Coc_kr.
bq.\ &,-.,'q o'& et-o.ro.&- c-otrcra-F g
o*o Lqr.rrg.- Feon\ c-abG <ro.. (( ot.to sno(-& c-i,., s\..^-1 c-\.-o-..n-1r.
WorkClass: New( ) Addition( ) Remodet 67{aepaul 1 Demo( ) Other( )
Work Type: Interior ( ) Exterior (yf eotn ( )Does an EHU exist at this location: Yes ( ) No (u{
Type of Bldg.: Single-family ( ) Two-family ( ) Multi-family (vf Commercial ( ) Restaurant ( ) Other ( )
No. of Existing Dwelling Units in this building: t ?,r No. of Accommodation Units in this building:
No/TypeofFireplacesExisting: GasAppliances( )Gast-oqs(v/Wood/Pellet( )WoodBurninq( ) \L
Noffype of Fireplaces Proposed: Gaq Appliances ( ) Gas Loqs ( ) Wood/Pellet ( ) Wood Burninq (NOT ALLOWED)
Does a Fire Alarm Exist Yes (v[ No (Does a Fire Sprinkler System Exist: Yes ( ) No (Vf
\\Vail\data\cdev\FORMS\PER M ITS\BLDGP ERM.DOC 07t26t2002
tl
Questions? Call the Building Team at 479-2325
Department of Community Development
Project Name:
Project Address:-(O€ L49. L..o-cL oo&
/ This Cheklirt must be omoleted before a Building Permit apoliation is
aceoted.
{ att pug"rof application is complete
{ ;tas DRB approval obtained (if required) Provide a copy of approval form
o/ Condominium Association letter of approval attached if project is a Multi-Family complex
y'Complete site plan submitted
{ /blic Way Permit application included if applicable (refer to Public Works checklist)
6/ Staging plan included (refer to Public Works checklist) No dumoster,oarkino or material storaoe
Asbestos test and results submitted if demolition is occurring
a,./$shitect stamp and signature (All Commercial and Multi family)
qlfull floor plans including building sections and elevations(s sets of plans for Multi-Family and
fmmercial Buildings)
d/ Window and door schedule
o/f uttstructural plans, i ncluding design criteria (i.e. loads)
a,{tructural Engineer stamp and signature on structural plans (All @mmerdal and Multi Family)
Applicant's Signature:
Date of sub
\Vail\Cata\cdev\FORMS\PERM ITS\BLDGPE RM. DOC
Received By:
04t0212003
BUILDING PERMIT ISSUANCE TIME FRAME
If this permit requires a Town of Vail Fire Department Approval, Engineer's (Public Works)
review and approval, a Planning Depaftment review or Health Department review, and a review
by the Building Department, the estimated time for a total review will take as long as three (3)
weeks.
All commercial (large or small) and all multi-family permits will have to follow the above
mentioned maximum requirements. Residential and small projects should take a lesser amount
of time. However, if residential or smaller projects impact the various above mentioned
departments with regard to necessary review, these projects may also take three (3) weeks to
review and approve.
Every attempt will be made by this department to expedite this permit as soon as possible.
I, the undersigned, understand the plan check procedure and time frame. I also understand
that if the permit is not picked up by the expiration date, that I must still pay the plan check fee
and that if I fail to do so it may affect future permits that I apply for.
Agreed to by:
Project Name:
Date:5 -es -ox
F:everyondforms/bldperm3
WHEN A "PUBLIC WAY PERMIT" IS REQUIRED
PLEASE REAS AND CHECK OFF EACH OF THE FOLLOWING QUESNONS REGARDING THE NEED FOR A
"PUBLIC WAY PERMIT":
o Is this a new residence?YES No t/
tr
D
D
g
B
Is the driveway being repaved?
Is a different access needed to the site other than the existing driveway? YES- NO-{
,rfi J\2",he Risht-of-way, easements or
C.,"t o.-b-Ro-kToFtL'r
Is any drainage work leing done that affects the Right-of-Way, easements, or public property?
YES NO V
o
o
Is a "Revocable Right-of-Way Permit" required? YES NO ,,/
Is the Right-of-Way, gnsements or public property to be used for staging, parking or fencing?
YES NO T1
ilrl'*"'' *Rb''ufl'n'
If you answered YES to any of these questions, a "Public Way Permit" must be obtained'
"Public Way Permit" applications may be obtained at the Public Work's office or at Community
Development (a sample is attached). If you have any questions please call Leonard Sandoval in Public
Works at 479-2L98.
Does demolition work being
public property?
Is any utility work needed?
peformed requ
YES
YES
s\"'{)
':j
NO
staging or fencing plan required by Public Works?
ANSWEBEp ALL THE ABOVE QUESTIONS.
::gdt\.$A. \2rrz-'.q"*
c-lob or Project Name: $.o* Qon..0o... n*--*- \\o..-
t. Date Signed:
Q-.-'^&.,''--l..t'-*I HAVE. (soJAx
5 -2-{-o{
F :/everyone/forms/bldperm4
Company Name
PUBLIC WORKS AND THE PUBLIC WAY PERMIT PROCESS
How it relates to Building Permits:
Fill out the attached check list with the Building Permit Application.
If yes was answered to any of the questions then a "Public Way" permit is required. You
can pick up an application at either Community Development, located at 75 South Frontage
Road or Public Works, located at 1309 Elkhorn Drive.
Notice sign-offs for utility companies. ALL utilities must field verifo (locate) respective
utilities prior to signing application. Some utility companies require up to 48 hours notice to
schedule a locate.
A construction traffic control/staging plan must be prepared on a separate sheet of paper.
An approved site plan may also be used. This plan will show locations of all traffic control
devices (signs, cones, etc.) and the work zone, (area of construction, staging, etc.). This
plan will expire on November 1st and will need to be resubmitted for consideration for
approval through the winter. Be aware that your resubmission for winter may be denied
depending on the location of construction.
Sketch of work being performed must be submitted indicating dimensions (length, width
and depth of work). This may be drawn on the traffic control plan or a site plan for the job.
Submit completed application to the Public Work's office for review. If required, locates will
be scheduled for the Town of Vail electricians and irrigation crew. The locates take place in
the morning, but may require up to 48 hours to peform.
The Public Work's Construction Inspector will review the application and approve or deny
the permit. You will be contacted as to the status and any requirements that may be
needed. Most permits are released within 48 hours of being received, but please allow up
to one (1) week to process.
As soon as the permit is approved, the Building Department will be notified, allowing the
"Building Permit" to be released. Please do not confuse the "Public Way Permit" with a
"Building Permit".
NOTE: The above process is for work in a public way ONLY. Public Way
Permits are valid only until November 15th. A new Public Way Permit is required
each year if work is not complete. Re-application each November 15th does not
mean an automatic renewal.
5 - >\-Ot
I have read and u
F :/everyoneforms/bldperm5
Date Signed
pRATNAGE AND CULVERT INSPECTTONS ARE REQUTRED BY PUBLTC WORKS!
Please read and check off each of the items below:
in"Town of Vail Building Department has developed the following procedures to
ensure that new construction sites have adequately established proper drainage
from building sites along and adjacent to Town of Vail roads or streets.
{ne Town of Vail Public Works Depaftment will be required to inspect and approve
drainage adjacent to Town of Vail roads or streets and the installation of temporary
or permanent culvefts at access poinb from the road or street onto the construction
site. Such approval must be obtained prior to any requests for inspection by the
Town of Vail Building Department for footings, temporary electrical or any other
inspection. Please call Leonard Sandoval at479-2L98 to request an inspection from
the Public Works Department. Allow a minimum of 24 hour notice.
{ Also, the Town of Vail Public
and culveft installation with
must be obtained prior to any
Works Department will be approving all final drainage
resulting road patching as necessary. Such approval
Final Certiflcate of Occupancy issuance,
Agreed to by
Project Name:
Date Signed:
F:/everyoneforms/bldperm6
5 -"-s -@\
- }{-*r-
MATERIAL STORAGE AND CONSTRUCTION PARKING
Please read and check off each of the items below.
(Copies of complete text are available upon request)
CODE 5.2-10: DEPOSITS ON PUBLIC WAYS PROHIBITED
s/ UnlaMul deposits: Subject to subsection C thereof, it is unlawful for any person to litter, track or
deposit, or cause to be littered, tracked or deposited, sand, gravel, rocks, mud, dirt, snow, ice, or any
other debris or material upon any street sidewalk, alley or public place, or any portion thereof.
e. ruotice; Abatement: The Director of Public Works may notiff and require any person who violates or
causes another to violate the provision of subsection A hereof, or who has in the Director's employment
a person who violates or causes another to violate the same, top remove such sand, gravel, rocks, mud,
dift, snow, ice or any other debris or material within twenty four (24) hours after receipt of said notice
by the Director of Public Works. In the event the person so notified does not comply with the notice
within the period of time herein specified, the Director of Public Works, or other authorized agent, may
cause any such sand, gravel, rocks, mud, dirt, snow, ice, debris or any other material to be removed
from any street or alley at the expense of the notified.
h/Sum-ons and Penalty: As an alternative to the notice for removal provided in subsection B above,
any person who violates or causes another to violate the same, may be issued a summons to appear
before the Municipal C.ourt of the Town for said violations, and upon being found guilty of a violation
hereunder be punished as provided in Section 1-4-1 of this code.
b./Uotice and Penalty: It is unlawful for any person to fail or refuse to comply with the notice of the
Director of Public Works as provided in subsection B hereof, and any such person shall, in addition to
payment of the expense of removal incurred by the Director of Public Works, as provided in subsection B
hereof, upon being found guilty of a violation hereunder, be punishable as provided in Section 1-4-1 of
this Code. (1997 Code: Ordinance 6 (1979).
CODES 7-3A-L AND 7-3A-3: PARKING OBSTRUCTING TRAFFIC & IMPOUNDMENT AUTHORIZED
&/No person shall park any vehicle upon a street or at any other place within this Municipality in such a
manner or under such conditions as to interfere with the free movement of vehicular traffic or proper
street or highway maintenance. (Ord. 2(1968) 5 1)
d/Wheneuer any police officer finds a vehicle attended or unattended, standing upon any portion of a
street or upon any place within this Municipality in such a manner as to constitute a violation of any
section of this Article, or left unattended for a period of twenty four (24) hours or more and presumed to
be abandoned under the conditions prescribed by Colorado Revised Statutes section 42-4-1102, as
amended, the officer shall require the vehicle to be removed or ctruse it to be removed and placed in
storage in the nearest garage or other place of safety designated or maintained by this Municipality, and
the charges for towing and storage of such vehicle shall be charged to the owner of the vehicle in
addition to a ten dollar ($10) impoundment charge. (Ord. 2(1968) $ 3: Ord. 28(1981) 5 1)
I have repd and will comply with the above code provisions:
Position or Relationship to Project:
Date Signed:5 -r-rS -O{
F :/everyone/forms/bldpennT
DESTINATION RESORTS
610 WEST LIONSHEAD CIRCLE
VAIL. COLORADO 81657 - 5293
TELEPHONE (970) 476-1350
EAX(970\ 476-1617
May25,2OO4
Town of Vail
Planning Department
75 S. Frontage Rd.
Vail, CO 81657
Re: Stone Facing @ Enzian Condominiums
To Whom lt May Concem:
Please letthis letter senre as authorizatbn firorn the Enzian Condominium
Association for stone to be installed onto east lorer wall and comers of the
buiHing to match the existing chimneys.
Please let me knor if you have any questions or require anything further.
Enzian Condominium Ass. lnc.
Sincerely,
A Iowe Enterprises Company
Lii;At- 0ESC'llitr0rt
[i.Ut\tr l- U',lL COU00l,lll]lU S,
^CCOIil)t.tC
TO trt[ Col.lt)()lt Jtulijl.r^p nticorioto oEcEM8[n ,t, ]974 It BOOI( 2J7 AT FACE 675.
i/\r.ln ^s 0a.l:[.rE0 AND DEScnrS€D tfr ltrE oo Dot.l]r.luril oEcl.AnAnol
iridCORO€o t\€c€u0€rl 4. l9?4 tF goor( 2J7 T PAC€ 07i, /.S ,\ltaltoEoilty t)ocuut:lT REcon0ED J^liu^ny Jo. 1!78 [,] 8OO( ?66 AT P CE Jl7ii)r LE ri[r]onr)s oF rr|E cLEtK |D r?luoDo:r ?|: E \Jt.E co,xt.tco,-urADf.
^.1 .'?
jr,'
\
PA|'?I ('F LOT Ialccr 2
iitfP ]:,1 0 ilm,l f:I{'l' L0 Cti'l'IC !,1
r't lv r), rt T j,r r/'a .t t rlTVJJ!v J. !J. J. \rrl..t- lJ
lriFno\Erl€N l Loc lroN cESrtFtcA rE
I hs..by cdlily ll|€t llrb lhpfo\€!trcnt LoroLioo Certiricote eos
Drcpor.d l.r E.zlen Coniominiun) As$ociotion o|rd Lond ]itla
Gu.ronic. Cor'ponli lll^T lflrs ls NOI 4 LANU SUtlvEY PLA| ori
rlrPROl€HENT 5U8!EY PLIT, ood lhot lt ls nol lo lre .eli.(l upon
lcr tl|. catobllthrl6nl ol l.nc€. bdilding!, .r oth.r luluro
I lurthe. coilily thol thc nnprov.ur.nt..n tlr. obole dBdibcd
p..c.l o^ lll. dol., Augu!l 4. 2000. .iccpt Jlilit, connacl,ohs, cr.
cxlircly dill';n lhc bounoo:i.. o. lh6 Do-c.|, ctccpl o! inorn, ll'cl
lh.f. ort no €tcroo.hncnt! lpon lh. dclcribcd pr.dri.G by
hprov.mrotr .n ony ddjoi'ri"g prdrisos. .xclpt os lidrccted, dnd
ihot t[o,i ir no
^PPAriEllf
!!id.n.c or lian or dny.dsom.nt
ti:,
.q
\ ,:-
3)
4)
l\. lcao, d.scriptjon ond rcco,d cdrcncil illo.hotton ore boscCupon thc Condomlnbrn Uop or Er.ior l von ConiloDli'riLnnsord ALTA litl! Cn.nrtnt.trt No- V2-a675r-2 lumishld by Londlltl. Cuorot.. Crhpotry, dot.dt Jury Jl, ?OOO-
Irnp'oEn.^t l*o:ion! d,d d|)psrotrl dcod In,.r orc D.r.d upon
rlrc nPnunlotrtt slro{n hu'..n.
EnrioD At v.i CodohnrtuDrr d. !!bje.l to Po,ktng qnd Ac.(Eosmcht os r.cddld on th. Cordd,i' unr Mop ,D_Boot ?J7
'lhit Jnop k r. urdot. ol Jol rd, r,unkct &
^5soct(ta$,
rnc.,
Job No. 9Jl8J lo lhow lpccillc btp.oEtrr.trG. inclrdinq U,cpttking cotrliqurolion. ot lh. r.1|!c5l of Er:ion Codotr;,ni .
Found Ll.nudEnl
rF Rcbd & | 12' ,\run,nrn
ti.,
Ll0rlSflEAD ll.ll.r LLC
Found Llonutrro.t
t5 n.bor & r t/2" Atln'nMn
coD PlS rl0827
Soulherly l-ine
Lot 1, Blocl< 2
lS'rg,s.r"p
-^"t
i
to
'\{
r{\
tal
Y
I
i"
T
Euitding B
ENAr'J{
i_ot 1
ELOIC( 2
ra.., i11.,i-;i;"';-'"'
l'o' out
p-A
i)>-r-
]
12"
"""'
oa
1
ART
L0 u
P/\li l- of
1_Ot 1
.,'9nb
RECEIVED u,gsr
ir.'f.'! u 1 2uii4
LII.IE T^ELE
L .{E LEI.JGTH BEAtirfrG
L1 16.9r s57'56'00"w
L2 19.42-s20'00'00"w
r-3 40.4'l s69'44'54"E
L4 s23'03'00'E
r.50 N66'57',O0"E
L6 44.32 s23'03'00"E
l-7 8. B2 N07'10 r 2"w
LB 28.55 NBJ'OJ'J3"W
cUnlelLrt_t
CURVE LEI'IC
'I'I
RA0rus rAt'rGEl.lt cr.l0t?0 BEAnlr'/G utL lA
c1 7.1t3 5.00 4 98 7.06 N24',52'-27"\t 89 4.4.'5,1."c2 2-5 AO r 50.00 12.5J 24.97 N18 03'1S"Fc.l 6.1 7 4.00 Lii9 5.5B 568'58',1J'W 38'2310"c,l 16J.70 137.18 9J.18 1 5,1.1 6 N5B'J7'48"E 68 22'20"c5 20.91 289.00 10.4
"o
20,9 N8915'54"S/
0{t ziQ.22 150.00 1,t4.7A 2AB.28 l!48:50 J9"E 87 56'15"()';150.01 J650.00 75.02 1srJ.00 l!5 17'41"\1 2'21'1 )"
oFFfcE C0
JoJurscil, iiut r ll el
& Asso cia l.os, Ltc,
r 6t tGg
itu
'Woll
Overhong
Elevotor
Building A
CONDOMINIUMS
lonter
Porking Stripe -(Tlpicot) -Y
}(
Concrete
Porking
o.*o\ l-t-' 'n\Ko's
. "./gbb. "
4rb"".p
*{l
Tef ephirne
Pedestol
Page r ot
trfi
l: ii-
.::.,:l_v
fi I e.,,E:DCMi I 00MSDCFDSC003
95. JpG
4/2r/2004
Page I of I
4121/2004fi le:/iE:\DCIM\t 00MSDCF\DSC003 98. Jpc
q"fh(
,LbodQ.*=-\cs.rr
G**k
S torco \*n
fQ*o-\. Ft*uL"t*'q
I
a', ll '
lJ
.l*
VJ'"\n.* * Y,\" -
S**o c-o* rs
\ro'\rn\
L*\
l-'+*-l
| ""-t
lr.
q
i-=n-:"r'!
B0Nt W|IITE R.ro.r.8e$ONEWliITI
R.t4.8/
l::.
;:
SlLVtRMtlAtl-l(* n.61].ri8
(R = Rdlxfonce [= lmittonce)
Vclues ore overoged minimol v0rion(e bef'ret
CHARCOAL GMY
t.
,:, ., : ,.,,''i ,.1.. ,-,'." .'..,.:'::.- ,_,, - , :. , , , : :- :,-., .' ' .: .
MEDlUi4 fioi,,Aro BRONII I tr.i.lt
BRA|\DYWINE
RIGAI RED
S}|IRWOOD GRTEN
America's Choice8-0,,t#-?f,t1"3"7 A-- fu*hfu*t*oT m*lol muffi dlirg Produe*s
I
z:trt rtr trf trq.tlrt:E =E E E
PAINTED STEEL
and ALUMINUM
HYLAF SOOOIM/
KYNAB 5OT
Custon Colors
Availahle
Drrk Bron?e
Extrr Dcrk Bllnzc
Mamard BroNn
iuedium (Roman) Irorze
trIrtte Black
Ch"a.""lC.{t
Cittscape
Slatc Gray
Stone \lhitc
Bone Whit€
Tropicrl Patina
Shenvood Grcen
tlafll0rd ureen
I{emlock Grcc! '".' l
Pslina Grcen
Dark IYt
Teal
R€al Blue
Electricnhe
Award Blue
Sk"! Blue
Brrndyrvine
Regal Rcd
Colonial Red
Terra Co!t!
Bam Red
X Chssic Copper
* Silverl{etallic
* ChampaSn€ tr{ctallic
lYhitcnvhite
Dark Bronzenvhite
Dark Bronze/Medium Brunzc
Krven rl:tc|i-/llnltc
I"*t'Avtttt"
RedAYhile
Blue/White
PeF6i Blue/While
GreerL/Whitc
Yellovwhite
OrangeAhite
Autumn Brown^rylite
KYNAR = Hylar 5000 /
Kynar 500
SMP = Siliconized
Modified
Polyester
POLY = Polyester
* = Premium
Color
+
+++++
+++++
+++++
++++
+++++
+
++
+++
tt+
++
+++++
+++
++
++++
+++
+++t+
+t+
+++t++
+++++
+++++
++++++
+++++
++
+
++
+
++
t
+++++
++
+
+
+
+++
++
+++
++?
t
++++
++++
+++
-t J't t; I l.--1-l(-lJ:
C0lL and SHEET
rUirrorPolish
Brurhed Srtin
+++++
+
+
+t+++
@ @ nrl tll fil lI 1r
++++
++++++
++++++
+
+
+
+++
++++
++.'
++++
+++
+++++.+
++++++
++++++
++++++
++++
++
++
+
++++
++<t
+
?+++
++++
++
++++
+
+
+
++++
++++
C0lL and S
CllL and SHEET
COIL ANODIZED
ClearSntin
!Iediun Bronze
D!rkBronzc
Extaa Darkllronzc
Black
t+++
?
BATCH ANODIZED
Clc!.Satin
trledium Bronzr
Dark Bronze
Extra Dark Bronze
Block
t++++
+++++
+++++
+++++
+++++
t++++
7.03 DK
[----Note:Tiltm
TOWN OF VAIL DEPARTMENT OF COMMI.JNIry DEVELOPMENT
75 S.FRONTAGEROAD
VAIL. CO 81657
970-479-2138
NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES
ADD/ALTMFBUILDPERMIT PCTMit #: BO4-OI2I
Valuation: $67,230.00
Fireplace Information: Restricted: Y
Status.....: ISSUED
Applied...: 05/26/2004
Issued ...: 0512712004
Expires...: 1l/23/2004
05/25/2004 Phone:
AddSqFt 0
# ofcas Logs: 0 # of Wood Pellet: 0
FEE SUMMARY lll{trtllt*'t.tt*:t***a't*a'rtt+'r+tr*atr*'t.rrt*+:}++*l:r*raar'rrl'*atr'}:r
S0.00 Total Calculated Fe€s-> 91,273.09
So. oo Additional Fees-----> S0.00
S0.00 Total permit Fee__> 91,223.09
$0. OO Palments-.--.-.> $1,273 . 09
Job Address.: 705 W LIONSHEAD CR VAIL
Location......: 705 W. LIONSHEAD CIRCLE
ParcelNo....: 210106305001
ProjectNo...: prfDt\ - AVD.J
O$INER ENZIAIiI AT VAIL INC
c/o oAKToN-KOSTNER CORP
772L N KOSTIIER A\/E
SKOKIE
IIJ 50076
License:
eoNfRAeToR western waterproofing Co. Irto'/26/2004 Pbone: 303-354-5200
3595 Moline Unit 116
Aurora, CO
8 0010
License:. 295-A
APPr.,rcAriE western waterproofing co. rno5/26/2oo4 Phone: 303-354-5200
3595 Moline Unit 1-15
Aurora, CO
I0010
License: 295-A
Desciption:
REPAIRENZIAN CONCRETE WALKWAY DECKS TO BE PUTBACK AS
EXISTING
Occupancy:
Type Construction:
Type Occupancy: ?2
# ofGas Appliances: 0
Building----> $769 .75 Restuarant Plan R€yiew->
Plan check---.> s500.34 DRB Fee-_-.-.-_-->
Investigation->
Will Ca[------>
S0.00 ftgqeation Fc€->
$3 .00 Clean-uP Delnsit->
TOTAL FEES-> 51,273 . 09 BAr AI\ICE DUE-->so. o0
Approvals:Item: 05100 BUILDING DEPARTMENT
05/26/2004 JS Action: AP
Item: 05400 PLANNING DEPARTMET.IT
ftem: 05500 FIRE DEPARTMENT
Item: 05500 PUBIJIC WORKS
See page 2 of this Document for any conditions that may apply to this permit.
DECLARATIONS
I hereby acknowledge that I have read this application, filled out in full the information required, completed an accurate plot plan,
and state that all the information as required is correct. I agree to comply with the information and plot plan, to comply with all
Town ordinances and state laws, and to build this structure according to the towns zoning and subdivision codes, design review
approved, Uniform Building Code and other ordinances ofthe Town applicable thereto.
REQUESTS FOR INSPECTION SHALL BE MADE TWENTY-FOUR HOURS IN ADV AT 479-2149 OR AT OUR OFFICE FROM 8:00 AM - 4 PM.
HIMSELFANDOWNET
PAGE 2
**'l* **** i * * l* * {. *
'lr
* * *'t *'l *:l't '1.:i** | * **** 't*lr** * * * *** * * f tt} rt* | 't* | *lr * * * * ** {r * * l. * 'i!t* 1.* l. *
'}
* 't * * * 'f '} f * * * * !* !t *:* * * !t i !t * *'1.*
CONDITIONS OF APPROVAL
Permit#: 804-0121 asof05-27-2004 Status: ISSUED
'}*'i|:t:t{t'tt'}*{t:t'}'|t{t{.!*****'|*.i|*:}{t'|t|'|t**:}|*,}*,*****dt*****'f|!t'||,|'}t'|:**{.*'t*!}'t+*********
Permit Type: ADD/ALT MF BUILD PERMIT
Applicanl Westem Waterproofing Co. tnc.
303:364-6200
Job Address: 705 W LIONSHEAD CRVAIL
Location: 705 W. LIONSIIEAD CIRCLE
ParcelNo: 210106305001
Description:
REPAIRENZIANCONCRETE WALKWAYDECKS TO BE PUT BACKAS
EXISTING
Conditions:
Cond: 12
@LDG.): FIELD INSPECTIONS ARE PGQLJIRED TO CIIECK FOR CODE
COMPLIANCE.
Cond: 14
@LDG.): ALL PENETRATIONS IN WALLS,CEILINGS,AND FLOORS TO
BE SEALED WITH AN APPROVED FIRE MATERIAL.
Cond: 16
(BLDG.): SMOKE DETECTORS ARE REQTIIRED IN ALL BEDROOMS AND
EVERY STORY AS PER SEC.3IO.9.I OF TI{E 1997 UBC.
Cond: I
(FIRE): FIRE DEPARTMENT APPROVAL IS REQUIRED BEFORE ANY
WORKCANBE STARTED.
Applied: 05n6n004
Issued: 0527/2004
To Expire: lll23/2004
'r.
r.* *+**+**'********+**'t*'t****{'**************'t***rt'*+**********'}*r!*'i********** *********+****+t+
TOWN OF VAIL, COLORADO Statement
** * *'++* ** * * * ** * * * ** + **+* + * + ll * * * t* * t* * ****** a** * f** ** +** **** t + +* lr * * *** * * * **** *+* * * * ** * * ** * * *
Statement Number: RO4OOO59O8 Amount: 5L,273.09 05/27/200408:44 A!1
Payment Method: Check Init: LC
Notation: #337QlEnzLart
Permit No: 804-0121 Type: ADD,/AIT MF BUILD PERMIT
Parcel No: 210105305001
Site Addreas: 705 l{ LIONSHEiAD CR \fAIL
I-,ocation: 705 lf. ITIONSHEAD CIRCLE
Total Feea: iL,273.09
This Payment: 5L,273.09 Total AIJIJ Pmta: $L,273.09
Balance: $0.00
+ + f,* + * * **** **+* * r+ + * I ++* * * ++ + + * ** !t ** * *+***i!*t +*+ + f++ * * *****{t!t+f* ***+{. +f +* t * * ** * * **+ + + + f* * *l +
ACCOT]NT ITEM LIST:
Account Code Descriotion Cunrent Pnts
BP OO1OOOO31111OO BUILDING PERMIT FEES 769.75
PF 00100003112300 PLAN CHECK FEES s00.34
t^lc 00100003112800 I'JILL CALL INSPECTI0N FtE 3.00
APPLICATION WILL NOT BE ACCEPTED IF INCOMPLETE OR UNSI
Project #:
Bu Permit #:
PPL
-at&
ilgry REcEtvEn
antcat. etc.!
TOWTIOF
75 S. Frontage Rd.
Vail, Colorado 81657
CONTRACTOR INFORMATTON
0)e*-tsr S, ; G;i(i.;t- t": {sor - 6aoo
Email address:
BUILDING: $OTHER: $
PLUMBING: $MECHANICAL: $
COMPLETE VALUATIONS FOR BUILDING PERMIT Labor & Materials
For Parcel # Contact
\4
Assessors Office at 970-328-8640 or visit
P;?.riiF.|J ?*\o \o% 'jos oo \ - () \>-
Job Name: Eqar** Q^q"L*.....re " Q."-L.r.Job Address:\OSIJ .k*"rL"*& C. ic
L"s1?"""ripti*Jl r-ot: t ll erock: ?. ll riri"fi1L.o&F.\,ro ll sroaiui=ion, L_,oo*Lo &
SHl,TRtgE ^".,*tnoti* \asod:sHi:':'"''Address:Phone:
€gifolF.o r-..o.\*.{{Rl'sr..*"oo*b...P4fl".'.rr.'
DetSiIed dfSdription o4'!ilcrk:
WorkClass: New( ) Addition( ) Remodet( ) Repair(Vf Demo( ) Other( )
Work Type: Interior ( ) Exterior tyf eotn i)Does an EHU exist at this location: Yes ( ) No ( )ffi
No. of Existing Dwelling Units in this building: t ?_No. of Accommodation Units in this buildino:
No/TypeofFireplac nces(VGasLogs( )Wqod/peilet( )WoodBurning( ) \a
l{o/Tvpe of Fireplac nces ( ) Gas Logs ( ) wood/Pellet ( ) wood Burning (NoT ALLoWED)
Does a Fire Alarm Exist: yes (vf -No (Does a Fire Sprinkler System Exist:
^Yes
( ) No (F
******+t*ss***$*********FOR OFFICE USE ONL ;-\z
PlannerEiqnVff:
\\Vail\data\cdev\FORMS\PERMtTS\BLDc pERM.DOC 07t26t2002
IOI4'NT)
Design Review Board
ACTION FORM
Deparfnent of Community Development
75 Sorrth Frontage Road, Vail, Colorado 81657
tel: 970.479.2L39 fayc 97 0.479.2452
rr/eb: wwwci.vail,co. us
prorect Nane: DRB Number: DRBo4o193
Prciect Descriptlon:
REPAIR ENAAN CONCREIE WALIO/I/'AY DECKS TO BE PUT BACK AS DCSNNG
Par{clpants:
OWNER ENZI,AN AT VAIL INc 05/2412004 Phone:go oAKroN-KosrNER CORP
7721 N KOSTNER AVE
SKOKIE
rL 60076
Llcense:
APruCANT ENZIANATVAILINC 0Sl24l2N4 phone:
C/O OAKTON-KOSTNER CORP
7721 N KOSTNER A\E
SKOKIE
rL 50076
License:
ProJectAddrcos: 70SWUONSHEADCRVAIL tocadon:
705 W. UONSHEAD CIRCLE
l€gal Description: Lot: 1 Block Subdivlslon: ENZIAN AT VAIL CONDO
Parcel l{umber: 210106305001
Comments: see condltions
BOARD/STAFF ACTION
Itlotlon By: Action: sl.AFFApR
Second BylVote: Date of Apprcvalt 0Sl26lZ0Oa
Condltions:
Cond:8
(PIAN): No changes to these plans may be made without the written consent of Town of
Vail staff and/or the appropriate review committee(s).
Cond:0
(PLAN): DRB approval does not constitute a permlt for building. Please consult with
Town of Vail Bullding personnel prior to construction activities.
Cond;201
DRB approval shall not become valid for 20 days followlng the date of approval.
@nd:202
Approval of this project shall lapse and become void one (1) year followlng the date
of ffnal approval, unless a buildlng permit ls issued and construction is commenced
and is diligenfly pursued toward completion.
Planner! DRB Fee paid: $25o.oo
tl
I0l{'fi,m
Questions? Call the Building Team at 479-2325
Department of Community Development
Project Name:
Project Address:
/ This Checklist must fu ampleted before a Euildina Permit apnlication is
raceoted..-.-<-g AX pages of application is complete
6 n"rone approuar obtained (if required) Provide a copy of approval form "- Y* g" <*r-r\
6 Conaominium Association letter of approval attached if project is a Multi-Family complex -
V Complete site plan submitted
. \ Public Way Permit application included if applicable (refer to Public Works checklist)
\ Sbaging plan included (refer to Public Works checklist) No dumpster,parkino or material storaoe
allowed on roadwavs and shoulderc without written aoproval
\ lsUotos test and results submitted if demolition is occurring
\r.r Architect stamp and signature (All Commercial and Multi family)
\ futt floor plans including building sections and elevations(s sets of plans for MulU-Family and- Commercial Buildings)
\ winOo* and door schedule
f{Full structural plans, including design criteria (i.e.loads)
I 4 Structural Engineer stamp and signature on structural plans (All Commercial and Multi Family)
\Nr,t
.)$ Soits Report must be submitted prior to footing inspection
\ nre resistive assemblies specified and penetrations indicated
\ smoke detectors shown on plans
\ rvp"r and quantity offireplaces shown
Applicant's Signature:
\\VailUata\cdev\FoRMS\PERMITS\BLDGPERM. DOC
Date of submitta l:
-
I
Received By:
04l02noo3
ffi
IOI{AIi,Fl/AILHd
I, (print name)
description)
JOINT PROPERW OWNER
WRTTTEN APPROVAL LETTER
a joint owner of property located at (address/legal
provide this letter as written approval of the plans OateO t\at-'0' 3 ..>oo\ which have
been submitted to the Town of vail community Development Department for the proposed improvements
to be completed at the address noted above. I understand that the proposed improvements include:
I further understand that minor modiflcations may be made to the plans over the course of the review
oiocess to ensure compliance with the Town's applicable codes and regulations.
Page 2 of 12102107/02
IURT$0t'
BUILDING PERMIT ISSUANCE TIME FRAME
If this permit requires a Town of Vail Fire Department Approval, Engineer's (Public Works)
review and approval, a Planning Depaftment review or Health Depaftment review, and a review
by the Building Depaftment, the estimated time for a total review will take as long as three (3)
weeks.
All commercial (large or small) and all multi-family permits will have to follow the above
mentioned maximum requirements. Residential and small projects should take a lesser amount
of time. However, if residential or smaller projects impact the various above mentioned
departments with regard to necessary review, these projects may also take three (3) weeks to
review and approve.
Every attempt will be made by this department to expedite this permit as soon as possible.
I, the undersigned, understand the plan check procedure and time frame. I also understand
that if the permit is not picked up by the expiration date, that I must still pay the plan check fee
and that if I fail to do so it may affect future permits that I apply for.
Agreed to by:
Date:5-ar- o.t
F:everyone/forms/bldperm3
Q..\.r
WHEN A *PUBLIC WAY PERMIT" IS REQUIRED
PLEASE READ AND CHECK OFF EACH OF THE FOLLOWING QUESNONS REGARDING THE NEED FOR A
"PUBUC WAY PERMIT'':
B
o
o
o
q
o
Is this a new residence? YES NO t/
NO 'rr
Is any drainage work b,eing done that affects the Right-of-Way, easements, or public property?
YES NO V
o
o
Is a "Revocable Right-of-Way Permit" required? YES NO "/
Does demolition work being performed require the uyl of the Right-of-Way, easements or
public propety? YES_ NO t/
Is any utility work needed? YES
Is the driveway being repaved?YES NO \a
Is a different access needed to the site other than the existing driveway? YES
If answer is NO, is a p/i
YES NO V
C*o,. .,-t g-*\ o\ s\..s*t^....\)'.
No_{
Is the Right-of-Way, gasements or public property to be used for staging, parking or fencing?
YES NO !/
ng, staging or fencing plan required by Public Works?
If you answered YES to any of these questions, a "Public Way Permit" must be obtained.
"Public Way Permif'applications may be obtained at the Public Work's office or at Community
Development (a sample is attached). If you have any questions please call Leonard Sandoval in Public
Works at 479-2L98.
I HAVE READ AND ANSWERED ALLTHE ABOVE QUESTIONS.
Job or Project Name:
Date Signed:5->\-o\
F :/everyone/forms/bldperm4
APPLICATION
FOR TOWN OF VAIL
PUBLIC WAY PERMIT 19
PW*:T['ITTT
PATCEI#:T T T T' T T T - T T. I T T
Brds. Permito'E I tr, I I I I
1.Job Name
Excavating Contractor Neme Mailing Address
Street Address n n n-[l (llunknowncarl
Ll L-l L-l I | 479-2138 ext. 0
TOV Contractor's License Number BEQUIRED2.
Phone #zipCity
4.
Slarl Date
Work is lor lcircte one;
Other
Complation Date
Water Sewer Gas Electric Telephone CATV Landscaping
(Permit Expiralion Dal6)
Temp. Site Access
Trench-width
(min.4')
Bond Amount $
ALL MATERIAL, EQUIPMENT, AND TRAFFIC
JOB IS STARTED.
Rubber out-riggers are required on
Asphalt surfaces underneath the
A signature below indicates a
signatures are obtained, permittee
necessary Town of Vail signatures.
ST BE ON THE JOBSITE BEFORE THE
working on asphalt.
at all times.
utility locations and approvals. Once all utility company
application through the Public Works office to obtain the
up to one week to Process.
Depth
Toral sF $
Total LF $
Permit Fee Total Permit Fee $
6.
7.
Public Service Company (1
Public Service Natural Gas Group (1-800-922-15871
U.S. West (1-800-922-1 987)
TCI Cablevision of the Rockies (1-800-922-1 987)
Eagle River Water & Sanitation District (970-476-7480, ext.
Holy Cross Electric Company (1-800-922-1987)
Town of Vail Electricians (970-479-2158)
Town of Vail lrrigation (970-479-2158)
Town of Vail Public Works Construction lnspector (970'479'2198)
9. THERE WILL BE NO TOTAL STREET CLOSURESI A construction traffic control plan must be approved by the
Public Works Department prior to issuance of the permit.
1 O. All excavation must be done by hand within 18" of utilities - (Senate Bill 1 72).
1'l . permitte€ must contact Public Works Department at 479-2198 24 hours prior to commencing of work. Failure to notity
'heTffiy.scnedutedinspectionswhicharenotreadymayresu|tintheTowncharging the contractor a reinspection fee. (
12. I certify that I have read all chapters of Title 8 - Public Ways and Propefi of the Vail Municipal Code and all utility
company agreements, signed by me, and will abide by the same, and that all utilities have been notified as reguired.
Contractor's Signature of Agr€ement
ATTACH PLAN OF WORK,INCLUDING CONSTRUCTION TRAFFIC CONTROLPLAN
show streets with names, buildings, and location of cuts. usE DASH LINES FOR CUT.
Print name clearly Dato of Signature
White - Public Works
Yellow - Contractor
PUBLIC WORKS AND THE PUBLIC WAY PERMIT PROCESS
How it relates to Building Permits:
Fill out the attached check list with the Building Permit Apolication.
If yes was answered to any of the questions then a "Public Way" permit is required. You
can pick up an application at either Community Development, located at 75 South Frontage
Road or Public Works, located at 1309 Elkhorn Drive.
Notice sign-offs for utility companies. ALL utilities must field verifo (locate) respective
utilities prior to signing application. Some utility companies require up to 48 hours notice to
schedule a locate.
A construction traffic control/staging plan must be prepared on a separate sheet of paper.
An approved site plan may also be used. This plan will show locations of all traffic control
devices (signs, cones, etc.) and the work zone, (area of construction, staging, etc.). This
plan will expire on November lst and will need to be resubmitted for consideration for
approval through the winter. Be aware that your resubmission for winter may be denied
depending on the location of construction.
Sketch of work being pefformed must be submitted indicating dimensions (length, width
and depth of work). This may be drawn on the traffic control plan or a site plan for the job.
Submit completed application to the Public Work's office for review. If required, locates will
be scheduled fortheTown of Vail electricians and irrigation crew. The locates take place in
the morning, but may require up to 48 hours to perform.
The Public Work's Construction Inspector will review the application and approve or deny
the permit. You will be contacted as to the status and any requirements that may be
needed. Most permits are released within 48 hours of being received, but please allow up
to one (1) week to process.
As soon as the permit is approved, the Building Department will be notified, allowing the
"Building Permit" to be released. Please do not confuse the "Public Way Permit" with a
"Building Permit".
NOTE: The above process is for work in a public way ONLY. Public Way
Permits are valid only until November 15th. A new Public Way Permit is required
each year if work is not complete. Re-application each November 15th does not
mean an automatic renewal.
5 ->\ -O\
and understand the above.
Date Signed
DRAINAGE AND CULVERT INSPECTIONS ARE REOUIRED BY PUBLIC WORKS!
Please read and check off each of the items belowr
A"Town of Vail Building Department has developed the following procedures to
ensure that new construction sites have adequately established proper drainage
from building sites along and adjacent to Town of Vail roads or streets.
{muTown of Vail Public Works Depaftment will be required to inspect and approve
drainage adjacent to Town of Vail roads or streets and the installation of temporary
or permanent culverts at access points from the road or street onto the construction
site. Such approval must be obtained prior to any requests for inspection by the
Town of Vail Building Department for footings, temporary electrical or any other
inspection. Please call Leonard Sandoval at479-2798 to request an inspection from
the Public Works Department. Allow a minimum of 24 hour notice.
{ Also, the Town of Vail Public Works Department will be approving all final drainage
and culveft installation with resulting road patching as necessary. Such approval
must be obtained prior to any Final Ceftificate of Occuparrcv issuance.
Agreed to by:
Project Name:
Date Signed:5 -a\ -o\
F:/everyone/forms/bldperm6
*r\o{crr- G>----\.--
MATERIAL STORAGE AND CONSTRUCTION PARKING
Please read and check off each of the items below.
(Copies of complete te)ft are avaihble upon request)
,/ CODE 5-2-10: DEPOSITS ON PUBLIC WAYS PROHIBITED
/ Unla*ful deposits: Subject to subsection C thereof, it is unlawful for any person to litter, track or
deposit, or cause to be littered, tracked or deposited, sand, gravel, rocks, mud, dirt, snow, ice, or any
other debris or material upon any street, sidewalk, alley or public place, or any portion thereof.
q,/ Notice; Abatement: The Director of Public Works may notify and require any person who violates or
causes another to violate the provision of subsection A hereof, or who has in the Director's employment
a person who violates or causes another to violate the same, top remove such sand, gravel, rocks, mud,
dirt, snow, ice or any other debris or material within twenty four (24) hours after receipt of said notice
by the Director of Public Works, In the event the person so notified does not comply with the notice
within the period of time herein specified, the Director of Public Works, or other authorized agent, may
cause any such sand, gravel, rocks, mud, dift, snow, ice, debris or any other material to be removed
from any street or alley at the expense of the notified.
o/ Summons and Penalty: As an alternative to the notice for removal provided in subsection B above,
any person who violates or causes another to violate the same, may be issued a summons to appear
before the Municipal Court of the Town for said violations, and upon being found guilty of a violation
hereunder be punished as provided in Section 1-4-1 ofthis code.
c/ Notice and Penalty: It is unlawful for any person to fail or refuse to comply with the notice of the
Director of Public Works as provided in subsection B hereof, and any such person shall, in addition to
payment of the expense of removal incurred by the Director of Public Works, as provided in subsection B
hereof, upon being found guilty of a violation hereunder, be punishable as provided in Section 1-4-1 of
this Code. (1997 Code: Ordinance 5 (1979).
CODES 7-3A-r AND 7-3A-3: PARKING OBSTRUCTING TRAFFIC & IMPOUNDMENT AUTHORIZED
d No person shall park any vehicle upon a street or at any other place within this Municipality in such a
manner or under such conditions as to interfere with the free movement of vehicular traffic or proper
street or highway maintenance. (Ord. 2(1968) 5 1)
Whenever any police officer finds a vehicle attended or unattended, standing upon any portion of a
street or upon any place within this Municipality in such a manner as to constitute a violation of any
section of this Article, or left unattended for a period of twenty four (24) hours or more and presumed to
be abandoned under the conditions prescribed by Colorado Revised Statutes section 42-4-1102, as
amended, the officer shall require the vehicle to be removed or cause it to be removed and placed in
storage in the nearest garage or other place of safety designated or maintained by this Municipality, and
the charges for towing and storage of such vehicle shall be charged to the owner of the vehicle in
addition to a ten dollar ($10) impoundment charge. (Ord. 2(1968) $ 3: Ord. 28(1981) 5 1)
I have read and will comply with the above code provisions:
Position or Relationship to Project:
Date Signed:s ->\-o\
F:/evcryone/fomrs/bldpennT
Vail 2004
Vail Village and Lionshead Village Construction Hours
Information Handout
Problem Statement
The Vail Village and Lionshead Village are invaluable assets to the community. Thousands of people
come to Vail each year to sightsee, recreate, shop and to enjoy everything the Vail Valley has to offer.
The community and merchants rely upon our guest to generate revenue. Our summer/winter guests
expect a pleasant experience while in Vail.
To insure that all of the proposed construction has as little negative impact on the community and on our
guest as possible, the Town of Vail finds it imperative to create and implement the Vail Village and
Lionshead Village Construction Hours Handout.
It would be irresponsible for the Town of Vail, the Construction .Crcntractors and the Merchants, to not
actively participate to minimize the impact of construction in the Vail and Lionshead Village areas.
New for 2004-2006 will be the Vail Village Streetscape lmprovement Project. Work to include all
utility related improvements, streetscape, drainage, snowmelt systems and landscaping.
All Construction projects and/or remoddts within the Vail Village Core Area should contact Scott
Bf uhm Town of Vail Streetscape Coordinator at 970477-3418 for fu,rther information. i,,.,
ri:.1i'-': " ::." : '.::t:
Givgns ,..t '.-,11, , .,,. ,'r' : ' 1,, ,, ..-,.,.'- 'i
AI COnSITUCUOn Oe VeneS, equtpment, IOOTS ano matenats enlenng rne va[ vurage anq re(resuiarl
areas must go through Check Point Charlie. All Lionshead construction activity must go to the Vail
Police Department for a parking permit' Do not use delivery zones for construction parking, refer to
approved stagilg qfan ol make othelgrralgements for p,elki1rS:
:1,-.,: ..., , ir '
, -_ , ,1,., '!'.1- r:::t .'r.
The following givens are intended to provide the basic foundation by which construction will be completed
in the Villages: .". 'ti.:;, ,:,. -,.::, : r, .: .,.:-:. . i..,r i. r,, .'t .,. , 't:.. ::.;
. The public's health, safety and welfare shall be honored at all tirnes'i
,....: l"rr.
:,. Adequate pedestrian, loading/delivery, vehicle, and emergency vehicle access and circulation. shall
be maintained.
- . t',..-.
' -'' l: ::: ''' """ '- '+
. Roadways and pedestrian walkways shall be kept clean and free of dirt and debris.
' ''' :': '
. All conskuction deliveries, equipment, tools and materials entering the Vail Village and Pedestrian
. The hours of Outside Construction Activity shall be as follows:
- April 15 -June 18 & SeptemberT - November 19,7 a.m. until 7 p.m., seven days a week.
June 18 thru September 10, work must end by 4:00 p.m. on Fridays.
November 13 - April 15, 2005 work allowed within daylight hours only.
Deliveries shall be restricted to the hours of 7 a.m. to 11:30 a.m. on Gore Creek Drive and 7 a.m.
to 8:30 a.m. on Bridge Street.
Special Construction delivery permits must be requested in advance, from Public Works in
conjunction with Code Enforcement at Checkpoint,Charlie.
No construction activity shall occur on Saturday or Sunday between June 19 and
September 5.
No outside construction activity shall occur on the following dates:
Saturday, February 14, Sunday, February 15, and Monday, February 16.
(President's Weekend)
Saturday, May 22, Sunday, May 23 and Monday, May 24 (Memorial Dav)
Friday, June 25, Saturday, June 26 and Sunday, June 27. (Vail Arts Festival)
Friday, July 2, Saturday, July 3 and Sunday, July 4 and Monday July 5.
(lndependence Day)
Saturday, September 4 , Sunday, September 5 , and Monday, September 6.
(Labor Day Weekend).
Friday, September 10, Saturday, September 11, Sunday, September 12 in (tionsheac!)
Saturday, September',t8 and Sunday, September 19. at (y3!! Vlllggd - (October Fest)
Thursday, November 25, ffhanksqivinq Dav) friday, November 26, Saturday, November 27 and
Sunday, November 28. ..1,'r"'
rt )t -' .,,
Friday, December 24, Saturday, December 25, Sunday,.December 26.
(Christmas Dav Holidav) .:,, ....-'.r1.;'... ,,it.," 1-..-' r'.,,. ,.,..i:,r.i.,..i i'i-: ',r .;t1 :,,. -il,l..t -
,i.1,;:'.1.'i,;-- " .ll-, :, r: r':l ,l
Friday, December 31, Saturday;;January 1. (New,Year 20051 Sunday January 2,2005. No Work
allowed the entire week of the'Christmas/tlew Year Holiday within the TOV right of way':' |,, ,.,
The Town of Vail Noise Ordinance has been waived by the Town Manager from 7a.m. - 7p.m. for
construction activities from April 15 through-June 18, and from September 7 through November, 19
The Noise Ordinance shall be in effect and'stricUy regulated from June 19 through September6 and
November13'2004toApri|15,2005.:':;i:1,.,.....'::-.l.....l
1f,." -'t!',.' -'. All construction sites will be requiied to obtain in Approved Constiuction-Stao ino Plan from the Town
of Vail Public Works Department -.in conjunction with Code Enforcement. (The approved
staging/parking plan is required tO be on€ite'at all !!mes).,...,.-,,. . ,.
Expectations
The following expectations are established to insure the success of the Vail Village and Lionshead Village
Construction Hours Plan:
. Full and complete cooperation and understanding from all parties involved in the construction activity
in regards to this plan.
o Strict adherence and compliance with the requirements outlined in the construction plan.
r Respe,ct and consideration for the affected interests and parties.
lf you have any questions, Please contact the Town of Vail Public Works Department
(Construction Inspector) or the Vail Police Department (Code Enforcement Officer)
970-479-2198 970.476-7603
T0wN0FvAtt,
Vail 2004 Staging / Parking Plan Information
The Staeine / Parkine Plan Philosophv- Is a very important step in the building
process. Striking a balance between safe public access and giving conshuction projects
room to build is becoming increasingly challenging, for us to meet all the needs of those
who will be impacted by construction projects. The fact is, there is less room to build in
the Town of Vail.
Developing a creative Staging Plan is a must. Staging in the Town of Vail Public Right of
Way is a Privilege, not a given right. We take into account when we review and approve
staging / parking plans, impacts on neighborhoods, tourism, business and the traveling
public along with your right to build.
The General Contractor is resoonsible for all subcontractors and. all construction
activitv relatins to the buildine oroiect. The staging plan will be enforced according to
the Approved Set of Building and Staging Plans. You are required to keep a copy of the
Approved Staging Plan on site.
Two staging /parking plans are required, a summer and winter. Summer staging plans
expire on November 1, and winter staging plans expire on April 15. (Note: There is no on
street parking in the winter season and all materials. eouipment. etc must be 10' off the
edee ofasphalt).
Enforcement of all staging / parking plan is as follows.
A) Staging / Parking Plans to scale required.
B) Once the plan is approved, they will be held to complete compliance.
C) We will use a 3 step and you're out, process.
Sten One- Verbal and written wamings as to the staging plan violation, then have
contractor sign and date field memo waming.
Step Two- Police Department issue tickets and tows or public works writes second
written warning to all violators who have been notified under step one and who are still
in violation of the approved Staging / Parking Plan. The Town of Vail Chief Building
Official will call the contractor and notify them, the next time any violation happens, the
building department will red tag the construction site for 48 hours.
Step Three- If still in violation after step two, a 48 hour Red Tag will be issued to the
project site.
If you have any Questions, Please contact the Town of Vail Construction Inspector at
970-479-2t98
Requirements for an Acceptable Staging Plan
It is prefened that and Approved Site Plan is used to draw a staging plan, but a hand
drawn plan may be used as long as it is dawn to scale and is neat and legible.
1.) The Staging Plan must showthe following:
(a) Show all parking that is required for the job site. (Including construction
equipment).
(b) Show the location of all material that will be staged on site.
(c) Show the location of all dumpsters and port-o-john that are to be on site.
(d) If a fence is required, then show the location of the fence and describe the
material used for the fence.
(e) Iftrees and / or vegetation is required to be protected, then show how this will be
done.
(f) If this stagiag plan is for a Demo Permit, then show staging for dump trucks and
all related equipment. If the Town of Vail Right of Way area is needed for
staging, then a Traffrc Control Plan is required in conjunction with the staging
plan.
(g) Please provide and show an Erosion Contol Plan.
(h) No equipment, vehicles, materials are allowed on Town of Vail Right of Way in
the Winter Staging Plan.
2.) If work needs to occur in the right of way, then add a Traffic Control Plan to the
staging plan showing the following:
(a) The work zone (area that is to be performed)
(b) Traffic Control Devices (warning, signs, cones, flaggers, etc.)
(c) Distances that all devices will be set up from the work zone. Also show all
dimensions of work being performed in the right of way. All traffrc control plans
must conform to the MUTCD manual.(Manual of Uniform Trafftc Control
Devices)
2.) This plan will be reviewed by Public Works and if Necessary the Police, Fire, and
Community Development Department. Once the staging plan is approved, it will be
registered with the departments listed above and enforced.
3.) The Village and Lionshead area have outside construction restrictions, please become
familiar with the Vail 2004. Vail Villase and Lionshead Construction Hours handout.
All deck repairs to be put back as existing.
boyle engineering, inc.
cfossro6ds shopping center
i 43 e. m€6dow drive suite 390 vail, coloricjo 81657
97 0i47 6-917 0
tax 9'7 0l4l 6-4383
March 3,2004
Mr. Geoff Wright
Vail Landmark Propefties
610 West Lionshead Circle
Vail, Colorado 8'1657
Subject: Enzian Deck Repairs
Enzian Condominiums
Vail, Colorado
qqe-&'w*s&* *u*
.:i' ,,,r,.,,,-,,,.,:l''l-: PRoPEMIES
'' GeoffteY S' r'Vtight
General Mlnager
610 \V- Lionshead Circle ' \hil, CO 81657
. ls?o\4i6'r350'Iax(9?0){?5'1617 .'
Toll-Free (800) 322'\'.{IL (s215)
s-q'$'.destinltionresortsvail'com .: *
ionhotels'com fqE':;!f'^'ll?'|gru righd.gdeshnat
Dear Geoff:
I
At your request, I have prepared the following specifications and guidelines for the repair of the exterior
decks at the Enzian Condomiurns. Also included in this repori are details for the concrete repair and
replacement, and the replacement of deterioraied rail uprights. I am not including the scope of the
areas to be addressed since this is akeady deflned in the report prepared by Martin and Marlin
Consulting Engineers on September 8, 2003.
REMOVAL OF EXISTING CONCRETE AND SUR.FACE PR=PARATION
1. The contractor shall be responsible for confining, colleciing and ciisposing of the broken
concrete and other waste materials that result from the removal operations.
2. Prior to concrete removal work, all elernents depending on the concrete to be repaired for their
support may require shoring.
3. The limiis of concrete removal shall be saw cut.
4. Newly exposed sound concrete shall be roughened by light sandblasting and cleaned by
blowing away loose material with a compressed air jet
5. The contracior shall determine that all unsound ccncrete has been removed by soundihg ihe
final prepared sufr aces.
6. Exposed reinforcement to remain shall be thoroughly cleaned by sandblasting to remove all
rust and unsound concrete.
7. All existing surface coating shall be prepared for the surfaces to receive the new top coating
system in all ai'eas where the concrete is not being repaired or replaced.
B. All sound concrete surfaces shall be cleaned by shot blasting or sandblasiing to remove
surface contaminants. Follow this process by cleaning with a compressed air jet. The air jet
shall be concentrated at cracks, construction joints and repair patch perimeter jntedaces to
insure that contaminants are removed from these crevices
9. lf prepared surfaces become cortamineted after cleaning, they shall be redone at coniractor's
expense prior to applying the sealer.
o Page2
REPAIR TO GROUND LEVEL DECK OUTSIDE EDGE
1. Contractor shall remove traffic coating on east retaining walls adjacent to grounJ level decks, '
and traffic coating system on decks for a distance of six inches back from the retaining walls.
2. Removal of haffic coating system around base plates of deck rails shall be incorporated into
this process.
3. Prep concrete substrate and concrete
Coating" section of this report.
retaining wall per items 4. through 7. in the "Trafiic
4. Provide a /z inch bead of sealant around all post bases and rigidly connect to the substrate.
Tool the sealant to form cove and allow to cure before overcoating with traffic coating.
5. Apply heavy duty pedestrian traffic coating system to the six inch strip of deck and down the
face of retaining wall 4" per the recommendations in the "Trafflc Coating" section of this report
and the detail aitached to this report.
CONCRETE MIX REQUIREMENTS
1. Concrete shall attain 5000 psi minimum compressive strength in 28 days.
2. Aggregate shall be T." minimum normal weight aggregate.
3, Maximum water to cement ratio to be 0.40.
4. Maximum slump to be 6".
5. Air entrainment to be between 5o/o and 7 .1ok.
6. Cement to be Type L
7. A mid-range water reducing admixture shall be included in the concrete mix.
8. An air-entrainment admixture shall be included in the concrete mix.
9. Reinforce concrete with Inforce fibermesh fibers. Burn-off all fibers protruciing above concrete
prior to applying traffic coating.
10. Concrete shall be finished with a double steel trowel finish, followed by a light hair broom finish.
1 1 . Concrete curing shall be done with either a sodium silicate base curing compound or wet
curing. No other curing method will be acceptable.
12. New concrete should not be coated for at leasi 28 days to permit it to cure and dry out.
Concrete shall be tested using the ASTM D 4263-83 patch test method for residual moisture
after the 28 day curing period and before apply the trafiic coating. Contractor may obtain a
description of this patch test method from Boyle Engineerihg, Inc. if not familiar with the
procedure.
13. lf concrete surfaces to receive traffic coating become contaminated by excessive foot traffic
prior to applying coating, they shall be cleaned by acid washing at the contractor's expense
prior to applying the coating.
March 3, 2004
. Page 3
STEEL FORM DECK
March 3, 2004
1. New form deck shall be installed in all locations where deteriorated conci"ete is removed.
2. Form decking shall be galvanized and match existing form decking. lt is assumed that existing
decking is 1 n' galvanized 26 gage "Tufco/' standard rib decking.
3. New form decking shall lap a minimum of 4" over existing decking. Concrete shall be
removed in a manner to expose this minimunn amount of existing decking.
4. New form deck shall be secured to supporting structural steel with puddle welds and welding
washers per the manufacturer's recommendations.
SEALANTS
1. Contractor shali prepare surfaces, install backup material and apply specified sealant per
specifications in this section.
2. Use one-cornponent polyurethane low-modulus, non-sag sealant on walls and cove beads at
traffic coating. Approved products are Tremco Dymonic "Pecora Dynatrol 1", Sonneborn
"Sonolastic NP-1", Sika "Sikaflex 1 a" or "Sikaflex 1 5 LM".
3. Use two-component polyurethane self-leveling sealant for horizontal concrete surface joints.
Approved products are Tremco 'THC 900", Pecora "Dynatred", or Sika "Sikaflex - 2C SL".
4. Clean and prime all sealant joints with a primer recommended by the sealant manufacturer.
5. Provide a sealant backer rod backup material for all sealants Rod shall consist of
compressible rod stock of closed cell polyethylene foam, jacketed polyurethane foam, butyl
rubber foam, neoprene foam or other flexible permanent, durable non-absorptive material as
recommended by sealant manufaciurer for compatibility with sealant used.
6. Provide polyethylene tape or other bond breaker tape as recommended by sealant
manufacfurer on the bottom of joint between concrete and steel screed angle so sealant does
not achieve three sided adhesion and performs propedy.
7. Prepare joints to receive sealant in a good workmanlike manner which meets the
recommendation of the seaiant manufacturer, Clean both corrcrcte and steel thoroughly in ""
locations where sealant is to be applied, Metal shall be cleaned to a "bright white" conditron.
All sufaces shall be free of any old seaiant, contaminants and impurities which are deirimental
to bonding or adhesion of primers or sealant. Joints shall be prepped adjacent to edge angle
for entire length shown on report prepared by Martin and Martin on September 8, 2003.
B. Apply primer to both concrete and metal prior to applying sealant per manufacturer's
recommendations. Allow primer to dry prior to applying sealant,
L Use joint backing to control depth of joint. Joint backing should compfess 25% when inseded
into joint.
10. Apply sealants neatly and in a good workmanlike manner per manufacturer's instructions. Fill
joints to a depth equal to 75% of joint width. Total depth of sealant shail be between 3i8" and
5/8". Joint backing shall be installed to control sealant depth accordingly. Depth of sealant
must not exceed width of joint. New sealant shall be installed adjacent to edge angle for entire
length shown on report prepared by Martin and Martin on September 8, 2003.
o Page 4 March 3, 2004
11. Apply sealant using a gun with proper size nozzles. Use sufficient pressure to fill all voids and
joints soiid to backup material, with complete wetting of all joint bond surfaces.
12. Applied sealant shall form a full, smooth, uniform bead, free of ridges, wrinkles, sags, air
pockets and embedded impurities,
13. After joint has been completely filled with sealant, neatly tool joint sealant to eliminate air
pockets or voids, and to provide a smooth, slightly concave, neat appearing finish, with sealant
surface slightly below adjoining surfaces. Wetting of finished surface will not be allowed.
1 4. Protect adjacent surfaces from sealart material.
15. Cure sealants in compliance with manufacturer's instructions, to obtain high-early bond
strength, internal cohesive strength and sudace durabiliiy. Protect joint sealers during
construction period so that they do not become damaged or deteriorate.
TRAFFIC COATING
Contractor shall furnish all labor, material and equipment necessary to complete the
application of heavy duty pedestrian traffic coating system to all areas of decks as indicated on
drawings prepared by Martin and Martin Consulting Engineers on September B, 2003.
Furthermore, the contractor shall apply the traffic coating system to all other areas determined
to be in need of replacement by a joint decision between the engineer and contractor Curing
the construction process.
Contractor shall submii evidence that his existing company has a minimum of five years
continuous successful experience in applying the specified irafric coating system with his bid.
Furthermore, contractor shall provide a Cedificate of License issued to him by the coaiing
system manufacturer.
Traffic coating system shall be 3M Traffic Topping Scotch-Clad Brand Deck Coating System
"P" /nadectrian r rcrna\
The top surface of the substrate shall be inspected and treated in strict accordance with
manufacturer's recommendations to remove laitance, loose material, grease, oil and other
contaminants which could afrect the bond with the membrane prior to application. Existing
coating to receive new topping shall also be prepped per manufacturer's recornmendations
prior to applying new coaiing system. lf concrete surfaces to receive traffic coating become
contaminated by excessive foot trafiic prior to applying coating, they shall be cleaned by acid
washing at the contractor's expense prior to applying the coating.
New concrete should not be coated for at least 28 days to permit it to cure and dry out.
Concrete shall be tested using the ASTM D 4263-83 patch test method for residual moisture
after the 28 day curing period and before apply the traffic coating. Contractor may obtain a
description of this patch test method from Boyle Engineering, Inc. if not familiar with the
procedure. Concrete surface shall be free of ridges and sharp projeciions, and damaged
areas of concrete shall be resiored to match adjacent areas. Prime all concrete and metal
surfaces at 3M's recommended rate, and allow primer to completely dry, but do not apply
primer more than eight hours prior to applying traffic coating.
Rout or saw cut all cracks and joints exceeding 1/16 inch in width and fill with sealant. Rout
and/or clean all expansion, control, and construction joints to be covered with deck coating
system and fill with sealant.
1.
3.
I
5.
6.
. Page 5 N'larch 3, 2004
7. Apply 20 mii dry film thickness of non-flowing type coating over all flashings, sealant coves and
rigid corners. Extend coating two inches beyond flashing onto adjacent Ceck surface. Extend
coating material four inches above the top of the flashing and terminate in a straight line.
Extend coating 1 % inches on each side of all cracks, expansion joints and construction joints.
B. Provide a /z inch bead of sealant at all post bases that project through deck coatings and
rigidly connect to the substrate. Tool the sealant to form cove and allow to cure before
overcoating with traffic coating.
9. Install deck coating materials in strict conformance with all safety and weather conditions
required by manufacturer, product literature, Material Safety Data Sheets, and/or local, state
and federal rules and reoulations.
10. Apply traffic coating materials when rain is not anticipated within eight hours following
applicatjon, when substrate sur*ece temperatures are between 40 and 110 degrees F. Oper
fires and spark producing equipment are not and will not be in application area until vapors
have dissioated.
1'l . Post "No Smoking" signs in area and for at least eight hours following application period.
12. Provide and maintain pedestrian barricades and trafFic control at coatrng areas during
instailation and curing period.
13. The environmenial temperature and humidity will determine the time necesszrv io kec. thc
traffic off the material for a successful application.
'14. Provide an evenly spread silica carbide non-slip aggregate into the top surface and back-rolled
in as recommended by 3M.
15. Contractor shall submit one Maintenance Manual to owner uoon comoletion of installation of
traffic coating system. Manual shall include recommendations for periodic inspections, care
and maintenance, lt shall also identify common causes of damage with instructions for
temporary patching untii permanent repair can be made.
16. Submit two copres of wrjtten warranty. Completed traffic coating installation shall be
guaranteed jointly and severally, on a single document, by manufacturer and appljcator,
against defects of materials and workmanship, including, but not limited to, watertightness.
color fastness, and delamination of system from substrate, for a period of two years, beginning
with date of substantial completion of the project.
SOFFIT AND FASCIA REPAIRS AND REPLACEMENT
1 . Contractor shall be responsible for repair and/or replacemenl of existing exterior soffits that are
removed or damaged during the construction process at his own expense.
2. Soffit repair/replacement shall consist of installing the framing necessary to supporl soffit
material, installing "greenboard" soffit material, applying a stucco flnish to match lhe existing
soffits in the building, and painting to match existing color on the building.
3. Fascia repair/replacement shall consist of installing the framing necessary to suppoft fascia
material, installing 'greenboard" fascia material, applying a stucco finish to match the existing
fascras in the building, and painting to match existing color on the building.
o Page 6 lvlarch 3, 2004
BIDDING INSTRUCTIONS
1. Contractors shall provide a fixed fee price for the project which includes repair and/or
ranrcnamanr ^r ^-'ncrete and/or formdeck and replacement and/or repair of traffic coatinoq| |v, v| |v| | l |\'/gv\ €ll |l
system based upon the areas shown on the report issued by Martin and Martin Consulting
Engineers on September 8, 2003, these specifications and the details attached to this report.
2. Contractors shall include in theif fixed fee price for the project the replacement of six upper
deck rail posts and base plates per the detail aftached to this report. Furihermore, conrracror
shall include in their fixed fee price the repair of four ground level deck rail posts per the detail
attached to this repori. Contractor shall provide a price per post for replacement or repair of
additional deck rail posts beyond the basic numbers noted above that might be deemed
necessary during the demolition process, Determination of any additional post replacement
will be made jointly with the structural engineer during the demolition process.
3. Contractor shall provide a price per square foot number for any additionai concrete
replacement work that might be deemed necessary during the demolition process that
exceeds the basic area described in the Martin and Martin report. Determination of any
additional areas will be made jointly with the structural engineer during the demolrtion process.
4. Contractor shall provide a price per square foot for complete replacement of the traffic coating
system in areas other than locations where concrete is being replaced. These locations and
the exlent of the repairs shall be jointly determined by the engineer and the contractor during
the construction process.
5. The contractor shall be responsible for completing and submitting all forms required for the
building permit. The condominium association will pay all application fees due with the
submittal.
6. The contractor shall submit his bid to Geoff Wright at the Landmark Building in Vail, Colorado
by 5 p.m. on March 26,2004.
7 . The anticipated construction schedule is as follows: Work shall commence on or after Aoril '19.
2004. Work shall be completed by 5 p.m. on June 25, 2004.
This completes the description of the scope of work for replacement of the Enzian Condominrums
damaged decks. lf you, or any of the bidders on the project, have any questions or comments on these
items feel free to give me a call.
PresrCent
SHEET NO.
Et1
boyle engineeing. inc.
143 e. mgodcw drive suiie 390
crossroods trlogping cenlef
voil, colorodo 81657
9701a7 6-2170 OATE
"orru^',ro",
AY1 ?
-
DArE
I r-1 l*M+
oboyle gngineering, inc.
I43 e. meodow dive suile 3m
crossroocb shoppho center
voil. cclorodo 81657
97OlA7 6-2170
SHEET NO.
"^r"u rro ,"-JAE-- o^r,4- 4-o*
CHECK€D BY
boyle enginoedng hc.
ld3 e. m€odow drive s$e 390
cross.ads lhopring cgntgr
vo[ colorodo 8]657
97OtA762t7O
AttzlNl 6*Po Ylrnr Jv19
SNEEINO.LOF
"or"uurro"r-
1-EE-- oo',r 4-4'o 4
CHECKED BY DATE
;Ir"r.:
$ .'t
i$r9*l
)uoM 0007
opuJoloc 'ltBn
sunlutuloprroc l.tutzrrl
l_l
,:iX;::;:l;X'lLW4'
Atti'v
2,
cJwdt
;' -/U r..l
L,I.4;l
u)"
I
I
-./
,
d
e/
0,
V
)I
'.
cc
tJ
'\
I
il+',
.-, , - {.r'" t,
d',t/
''A-J.' ,r{i 1.. Y. ,' i\ '1,
tr'- | ..r'.f\ /<
")'-
,l
a
t+'{,t
t4>(f. r1
UJ U
I
'sIr.r lil
g: hlu'l li I
{s Lsl
I
(sl
(Ll
d,l
<ul;lJI
Qzt)
.'
u, (t
"tola
d
t':
ti
:9
l-xb
3es
(rtsi:
B"-P
g:H
* lEl
9'l
I
LJI8l..1
t:
I
st
;l
ll
:+
IJ;l
:ii;tl
:ilFI
F
',i:fr;;-;;;:i.iii;:t:tlhfu F
)uoM 800e
oprr.roloc 'llBA
sunlulwopu0l uutzilq L__l lBss'$
CI
il ;a
o lcl
E! lf Iu'i lii IJ- tslira l{l
$
n-
N
0
;i
0)J
I
I
I
;it?
r!:
llU',ICEO;II
)uoM 0002
opuJol()o 'ltHn
sriltltutu.topuoS uBlzu:l rt
xv
$
it
Iv
0
C)
l"r-i(n
_rtElr_.
t:!
TL
.l
a,
oJ