HomeMy WebLinkAboutVAIL VILLAGE FILING 1 BLOCK 5C LOT B C WALL STREET BUILDING UNIT 30610-30-2007
4.17 o, In"p""tl:ll,F?$lF?ffifo'tins P"s" 60
Requectod lnspect Dato: Wodn*day, October 3'1, 2007- Insoodion Area: JRIII
Slto Addrcsr: l0 WALL ST VAIL
WALL STREET BUILDING UNIT 306
A/P/D lnformatlon
Contraclor:
Description:
Item: 200
Item:310
Item: 315Item: 320Item: 330
Item: 340Item: 390
Activitv: M074152
Const TwrS:ol^frier EUGENE
Tvoe: B-MECH SubTvpe: AMFOccuoah'cv: Use:
& NORA E:
Status: ISSUED
Insp Area' JRM
Reouested Ineoection(sl P ^
ftem: 390 MEGH-Flnal \fbt Requ€stedrlmo: o1:30PM
Reouestor: Larrv- Fahev ' /' Phone: (314) 471-9693
Coniments: g.ill 6all (314) 471-9693, mech. elec. and plumbing all scheduled for today, fire'and'alarm on
Thurs
Assigngd..To: JMONDRAGON _ Entered By: DGOLDEN K- Action: Tim€ E&:
>h*J
Inspectlon Hlstorv
UMBING & HEATING Phone: 970-949-1926
WALSTREET BLDG UNIT 306INTERIOR REMODEI-RELOCATE DRYER VENT
SHAHN Action: AP APPROVED
REPTl31 Run Id: 7189
1-00-l?#07 ln"p""$4F",{luF:t neeotfing e"g" ot
Roquostod lnspoc{ Dato: Wednesday, Octobsr 31, 2007' InsDection Aroa: JRll
Slte Addncs: 10 WALL ST VAIL
WALL STREET BUILDING UNIT 306
A/PID Informatlon
Contractor
Activitv: P07-0040
Const TvoS:ol^iisn EUGENE
Type: B-PLMB
& HEATING
SubTgne: AMF
Phone: (970)94$1926
Status: ISSUED
lnsp Area: JRM
Descliption: WALL STREET BLDG UNIT 3OS'RELOCATE WAHER AND DRYER PIPES
Requested fnspec{ton(s} FU, f
It€m: 290 PLM&'Flnal | lv z oouottod Tlms: 02:00 PM
Reouestoc Lanv- Fahev Phone: (314) 471-9693
Coniments: will 6all (314t 471-9693, mech. elec. and plumbing all scheduled for today, fire and?larm on
Thurs
Assigngd.To: JMONDRAGON _ Entered By: DGOLDEN K- Action: Time Exp:
5/*"/
Insoec{on Hlstorv
ID.W.V. * Aooroved "lnsDgcton shahn Action:
FLOW TEST FOR NEW WASHER BOX,M/ater * Aooroved "Insoector: shahn " Action:
STREET PRESSSURE
Item: 210Item: 220
Item: 230
Item: 240Item: 25OItem: 200Item: 29O
AP APPROVED
AP APPROVED
REPTl31 Run Id: 7L89
Requ$Fd Inspoct 9ato: ltl.gdnerday, Octobor 3't,2007' Insoocllon Area: SH
Slte Address: 10 WALL ST VAIL
WALL STREET BUILDING UNIT 3OO
A/P/D lnformatlon
Insoec.tlon Hlstont
Activitv: E074120
Const Tvo6:
O,rfien EUGENE
Tvoe: B-ELEC
OccuDah'cv:
& NORAE:
Contracton
Description:
SubTgne: AMF
WASHER
uNrT 306 |
Action: AP APPROVED
Action: AP APPROVED
Status: ISSUED
Insp Area: SH
OF MISC. ELECTRICAL
Requostod Insoec{lon(s} n - - -
ftcm: 190 ELEGFtnal {-reS Requestedrime: 09:o0AM
Reouestor: Larw- Fahev -'' Phone: (314) 471-9693
Coniments: qill tiall (314) 471-9693, mech. €l€c. and plumbing all scheduled for today, fire and'alarm on
Thurs
Assigngd..To: SHAHN _ Enlered By: DGOLDEN K- Action: Time Exp:
* ADDrov€d *
SHAHN
* Aooroved *
SHAFIN
REPTl31 Run Id: 7189
ll,lso#07 ln"e""$g,tF"dlF",ilkPotting P"g" o+
Requested Insoect Dato: Frlday, November 16, 2007' lnsooc-tlon Area: JP
Slto Address: 10 WALL ST VAIL
WALL STREET BUILDING UNIT 306
A/P/D Information
Contractor:
Description:
Reouested lnso6c'tion(s)
lnso€c'tion Hlstorv
Item: 226Item: 30
Item
Item
Item
Item
Item
Item
Activitv: 807-0038
Const Tvo6:
Ofl?ier: EUGENE
Tvoe: A-MF
Occuoahbv:
& NORA E:
SubTvoe: AMF
U'se: VA
Status: ISSUED
Insp Area: JP
22
50
60
70
535
90
Insoector: shahn Action: NO NOTIFIED
INFORMED GC THAT ENTRY DOOR CLOSER TO BE FUNCTIONAL AT FINAL.
Reouestor: FAHEY.EUGENE
Coniments: Fire and Alarm are
Item: 90 BLDG-Flnal Rsouestod Tlme: 0l:30 PM
sstor: FAHEY.EUGENE Phone: (314)471-9693
rents: Fi_re and Alarm are scheduled for 8:00 AM, needs to get back to home town so ban final be in
afiemoo
rd To: GDENCKLA Entered Bv: DGOLDEN KAssionedTo: GDENCKLA- Action: Time Exo:
Comment: INFC,RIIIEITGSTHAT ENTRY DOO
Phone: (636)227-5155
306 INTERIOR REMODEL-REMOVE SPIML STAIR, RELOCATING WASHER
i KNEE WALL WITH BALLASTERS
Entered By: DGOLDEN K
FCIOSEFTO BE FUNCTIONAL AT FINAL.
Fr w,rt- nf f L.,=J
S{-,-/
Action:
O FRAMING.
BACKBOXED.
Action:
* Aooroved "SHAHN Action:
DN DENIED
AP APPROVED
AP APPROVED
REPTl31 Run Id: 724L
OWNER
TOWN OF VAIL FIRE DEPAR'TMENT
75 S. FRONTAGE ROAD
VAIL, CO 81657
970-479-213s
APPIJICANT ACME ALARM COMPANY
P.O. BOX 883
RTFLE
co 81550
License: 154-S
CONTRACTOR ACME ALARM COMPANY
lllectrical-*-*-->
l)RB fee----->
InvcJtrgation---->
Will Call-:--->
09/07/2007 Phone: 970-625-3398
09/O7/2007 Phone: 970-625-3398
VAIL FIRE DEPARTMENT
NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES
ALARM PERMIT Permit #: 407-0086 EOI - Oo 3g
Job Address: l0 WALI, ST VAIL Status . . . : ISSUED
Location.....: WALL STREET BUILDING IJNIT 306 Applied . . : 09107/2007
Parcel No...: 210108222006 Issued . . | 09/1712007
Project No , ?13 JO I - 6OG L\ Expires . .: 03/15/2008
EUGENE G. FAHEY & NORA E. FAO?/07/2007
]-51 CLARKSON EXECUTIVE PARK
EIJLISV]LLE
MO 63011
p.o. Box 883
RIFLE
co 81550
License: 154 -S
Desciption: WALSTREET BLDC UNIT 306 INTERIOR REMODEL RELOCATE AND
INSTALLTION OF DEVICES
Valuation: $2,950.00
***l.* '|,t *,1'l * *,1. * *:l *
90.00
$0.00
$0.00
$o. oo
Total Calculated Fees->
Additional Fees------>
Total Permtt Fee----->
Pa)'rnents----------->
$342.63
$0.00
s342 .63
F342 .63
l Ol Al. FI-ll-lS-> $342.63 BALANCE DUE-----> $0.00
Annrnvals'
Item: 05500 FIRE DEPARTMENT
O9 / 72 / 200'7 mvaughan ACt10n: AP
F******t***t**t * * * l * * r. * * t * i, * t * + + * * it * + * * + * t,l * * t *
't'
* | * *,t * * t,t * * * * * t,t 't,t * * *:t f*t'l *tl'f*,t +* 'l t * *:a,t * * * * *:a * * t'l**:t*'l'|tt*'l,t** tt+,1
CONDII]ONS OF APPROVAL
ilil*ilJ,t'***i*|t+'},t***.***,.i.1.|*:l''t',1+*'}|t+i+*+*'r****|*******|'|**t|***'i*
I hereby acknowledge that I have read this application, filled out in full the information required, completed an accurate plot plan,
and state that all the infbrmalion as required is correct. I agree to comply with the information and plot plan, to comply with all
Town ordinances and state laws, and to build this structure according to the towns zoning and subdivision codes, design review
approved, Intemational Building and Residential Codes and other ordinances of the Town applicable thereto.
REQUESTS FOR INSPECTION SHALL BE MADE IWENTY.FOUR HOI.IRS IN ADVANCE BY 2ll5 FROM E:00 AM - 5 PM.
- -;-OF OWNER OR CONTRACTOR FOR HIMSELF AND OWNER
*ll*f*t*+*l***i * * * * * * ** * * * * *'i*{'**{'***l't'** * * *'tt***'t*{(.* * *'t i' *'t{'ti*'a*'t{"t't'tt*{t * f*{ { 'i 't*rt*t****+**
TOWN OF VAIL. COLOMDO Statement
ll**'i*l**lll**l *'r** | l* ** | *****tr*t*t*tt******l'***t{' ***{'{'t"a{'**********t*tttittt*tt*tt*attttt*
st,atement Nunber: R070001855 AmounE: $342.53 Og/t7/2OO709:15 Alrl
Palzment Method: Check Init: DDG
Not,at,ion: Acme A1arm
8059
Permit No: A07-0085 ?ype: AIJARII PERI.|IT
Parcel No: 2LOj.-O82-2200-6
Site Address: 10 WAIJL ST VAIL .
IJocat,ion: VIALL STREET BUILDING ITNIT 305
Total FeeE: 9342.53
This Pa)ment: $342.63 TotaL AIJIJ Pmts3 5342.63
Balance: $0. 00
* * i*l'*{' *****++*aa***{'*lt**t*ttf *at**+** * * * * * * * * *a f* * * * * * * * * | * 'rrr*i*t*t*** +* t*'ta**aa* ** *** ***
ACCOUNT ITEM LIST:
Account Code Description Current Pmts
BP OO1OOOO31111OO FIRE ALARM PBRMIT FEES I.10.63
PF 00100003112300 pr,AN CHECK FEES 232,00
TOWN OF VAIL DEPARTMENT OF COMMUNITY DEVELOPMENT
75 S.FRONTAGEROAD
VAIL, CO 81657
970-479-2138
NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES
ELECTRICAL PERMIT
Job dddress: 10 WALL ST VAIL
Location.....: WALL STREET BUILDING UNIT 306
ParcelNo...: 210108222006
ProjectNo' ?RC6l -oOQ'(
ov\rNER EUGENE G. FAHEY & NORA E. EA07/05/20O7
].5]- CLARKSON EXECUTIVE PARK
EI-,L,ISVILI-,E
MO 530LL
APPLICANT SHEARON ELECTRIC
P.O. BOX 43
AVON
co 8L620
License: 121-E
CONTRACTOR SHEARON ELECTRIC
Permit #: E07-0120
3o ? -oostr
Status...: ISSUED
Applied. . : 0710512007
Issued..: 08120/2007
Expires. .: 02/16/2008
07/05/2007 Phone: 970-949-5456
07 /05/2007 Phone: 970-949-6456
P.O. BOX 43
AVON
co 8r-620
License: 121-E
Desciption: ELECTRICAL FOR TF{E RELOCATION OF WASHER AND DRYER,
RELOCATION OF MISC, ELECTRICAL IN WAY OF STAIRS-WALLSTREET
BLDG I.JNIT 306INTERIOR REMODEL
Valuation: $0.00 Square feet: t000
* * + i * :l +* + t r *a t t t'r l r ** *'* r,rt'* * t :t'r'r t *
Elect cal-----> $51.75 Totalcalculated Fe€s-> $54 .75
DRB Fe€------> 90 . 0o Additional Fe€s-------> I0 . 00
lnvesligation-> 90.00 Total Permil Fee-._-> $54 .75
Will Call---> 93. OO Payme nts--------;' $54. ?5
TOTAL FEES-> 9s4 . ?5 BALANCE DUE----> $o.00
i * + a,t * * a *:l ** * *t *:t
Approvals:Item: 06000 ELECTRICAL DEPARTMENT
07 /O5/2OO7 shahn Action: AP
a l + + + *,i a+,i a**a t* a l t:i a*t:r ***+r +a r*a
CONDITIONS OF APPROVALCond: l-2
(BLDG.): FIEI-,D fNSPECTIONS ARE REQUIRED TO CHECK FOR CODE COMPLIANCE,
+,l t * +ri i *,t *,l t t * t t *
DECLARATIONS
I hereby acknowledge that I have read this application, frlled out in full the information required, completed an accurate plot plan,
and state that all the information as required is correct. I agree to comply with the information and plot plan, to comply with all
Town ordinances and state laws, and to build this structure according to the towns zoning and subdivision codes, design review
approved, Intemational Building and Residential Codes and other ordinances ofthe Town applicable thereto.
REQUESTS FOR INSPECTION SHALL BE MADE TWENTY-FOUR HOURS IN ADVANCE BY TELEPHONE AT 47}2149 OR AT OUR OFFICE FROM 8;OO AM .4 PM.
SIGNATURE OF O OR CONTRACTOR FOR HIMSELF AND OWNER
**** * **a*tittia+{' {' t+aaaati*+ll*tt*+tr{ra{{' {' {' * *{' {' **t*'i*ltt**+*{'+{a'a+****++i'+t+atttl+**+*ila*a**l
TOWNOFVAIL, COLORADO Stat€ment
* *X* * * * *a+**++1* * * +talrl|tl'*{'**11++++++* f, * * * * + + {** * {***ttlltl+{'+*+****ta+**+++i*****llrrtalt**
Statement Number: R0?OOo16o6 Amolrrt: $54.75 08/20/2OO7O2:11 PM
Palrment Method: Check Init: DDG
Permit No: Eo7 - 012 o l}pe: EL,ECTRICAL, PERMIT
Parcel No! 2LOL-082-2200-6
Site Addreee: 10 WAfit-, ST VAIL
L,ocation: WAIJr STREET BUIIJDING ttNIT 306
NoEation: shearon 3789
This Payment 3
EP 00100003111100
}Ic 00100003112800
$s4 .7s
Total Fees :
Total ALL Pmts :
Balance:
s54.75
$54.7s
90. oo
*+++a**++*++***t*r**rrttrr****++**+**+*+t+*+at+*a*aa*attt*tttta*******all*aaaaalllllllaa*at*
ACCOI.JNT ITEM LIST:
Account Code Description Current PmtE
EI.,ECTRI CAJ, PERMIT FEES
WII,L CAIJIJ INSPECTION FEE
>L. ta
3 .00
oo6r
=€-tz 0
75 S. Frontage Rd.
Vail, Colorado 81657
bo7 - oo 3fCONTRACTOR INFORMATION
Sntanao.{ tl&rzt<Town ofVail Reg. No.:Contact and Phone #'s:
E-Mail Address:
Contractor Signature:
COMPLETE SQ. FEET FOR NEW BUITDS and VALUATIONS FOR AtL OTHERS (Labor & Materials)
AMOUNT OF SQ Fr rN STRUCTURE: 7 p6O ll emCrmClL VALUATTON: 5 $, ZhD -
Asses*rc Office at 97O-328-8640 or visit
* * ** * * * ** * * * ** * ** * * * ** * ** * * rr *:r ** r. * rr **** FOR OFFICE USE ONLY* * ** *
/
51,7 5
\WAiI\dAI8\CdCV\FORMS\PERMITS\ELECPERM.DOC
o
0
Amendment to the 1999 N.E.C. Town of Vail Ordinance 10-1-6.
o Overhead services are not allowed in the Town of Vail.
a Underground seryices have to be in conduit (PVC) from the transformer to the electric meter, main disconnect
o
o
switch and to the first electrical distribution circuit breaker panel.
The main disconnect switch shall be located next to the meter on the exterior wall of the structure easilv
accessible.
All underground conduits are required to be inspected before back-filling the trench.
In mulU-family dweiling units, no electrical wiring or feeder cables shall pass from one unit to anober. Common
walls and spaces are accepted.
NM Cable (Romex) is not allowed in commercial buildings or structures exceeding three (3) stories.
No use of aluminum wire smaller than size #8 will be permitted with the Town of Vail.
TOWN OF VAIL ELECTRICAL PERMIT GUIDELINES
All installations of exterior hot tubs or spa's require a DRB approval from planning. This application will
not be accepted without a copy of the DRB approval form attached (if applicable).
If this permit is for installation of an exterior hot tub or spa on a new elevated platform or deck over
30" above grade, you must also obtain a building permit.
If this permit is for installation of an exterior hot tub or spa on any existing deck or elevated platform,
a structural engineer must review the existing condition and verifo that it will support the added
concentrated load. Please provide a copy of the structural engineers wet stamped letter or drawing
with this application.
If this is a remodel in a multi-family building with a homeowners association, a letter of permission
from the association is required.
o If this permit is for a commercial space, two (2) sets of stamped drawings are required.
I have read and understand the above.
Signature Date Signed
If you have any questions regarding the above information or have additional questions,
please contact the Town of Vail Electrical Inspector at97O-479-2147. The inspector can be
reached on Tuesday, Thursday and Friday mornings behreen the hours of 8am and 9am. You
may also leave a voice mail and the inspector will call you back.
TOWN OF VAIL FIRE DEPARTMENT VAIL FIRE DEPARTMENT
75 S.FRONTAGEROAD
VAIL, CO 81657
970479-2135
NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES
SPRINKLER PERMIT PCrMit #: FO7-0066
3o1-6ostr
Job Address: l0 WALL ST VAIL Status. . . : ISSUED
Location.....: WALL STREET BUILDING LINIT 306 Applied . . : 07/25/2007
Parcel No...: 210108222006 Issued . . : 08/14/2007
ProjectNo : -PRTO'1 - OCC1 Expires. .:
OI,'INER EUGENE G. FAHEY & NORA E, FAOT/25/2007
161 CLARKSON EXECUIIVE PARK
ELLfSVILLE
MO 6301_1
APPLICANT EUGENE G, FAHEY & NORA E. FAOT/25/2OO7
].6]. CIJARKSON EXECUTIVE PARK
ELIJISVILLE
MO 5301L
CONTRACTOR FIRE SPRINKLER SARVICES 07/25/2007 Phone: 800-875-3105
015]. PONDEROSA DRIVE
GLENWOOD SPRINGS
co 815 01
License:456-S
Desciption: Wall Street Bldg Unit 306 interior remodel - add I
sprinkler and relocate I sprinker head and piping around
stairway
Valuation: $5,000.00
t **'a * 'l t,l *'t *** *,l,l l * 'l:t * *,| * ** * * * * * l*:a
Mechanical--> $0.00 Resnrarant Plan Review.+ 9o.oo Total Calculated Fees--> S562.50
Plan Check--> g3so.oo DRB Fe€-------> So.oo Additional Fees----> $0.00
Inv€stigation> $O.Oo TOTAL FEES---> 9562.s0 Total Permit Fee-----> 9s52.50
Will Call--> $O . oo Payme nts------------> $562 . 50
BALANCE DUE-----> $o. oo
r rr'il + l l*t l 'lr'l t+ l
Item: 05100 BUIIJDING DEPARTMETiIr
Item: 05600 FIRE DEPARTMENT
O8/1,4/2OO7 MLV Action: AP
CONDITION OF APPROVALCond: 12
(BLDG.): FIELD INSPECTIONS ARE REQUIRED TO CHECK FOR CODE COMPLIANCE.
t a +,t 't t*:t t i i t il t+t
DECLARATIONS
I hereby acknowledge that I have read this application, filled out in full the information required, completed an accurate plot plan,
and state that all the information as required is correct. I agree to comply with the information and plot plan, to comply with all
Town ordinances and state laws, and to build this shucture according to the towns zoning and subdivision codes, design review
approved, International Building and Residential Codes and other ordinances ofthe Town applicable thereto.
REQUESTS FOR INSPECTTON SHALL BE MADE TWENTY-FOUR HO IN ADVANCE BY TELEPHONE AT 479-2I35
FROM 8:00 AM - 5 PM.
SIGNATURE OF OWNER OR CONTRACTOR FOR HIMSELF
* * * *'l'|'lt * rr * * * !t * ** * *'lt'l {' 't*'l't'l* I * * * ** * * * * ****** {' {t'tr* * * * * * 'l * * 'r * * 't 'l ** {' 'l * 'l 'l 'l * * {' tl {*****'l{r*'l{'********
TOWN OFVAIL, COLORADO Statement
*****'r*'l**************{'{r'l'l'lt*t*i*t**i*f't't* ******'t{'ff't'tff* 't 't 't 't't***'l'l't'l**********'l'lt'l*'t'l******st,aternent, Iilumber: R070001515 tunoullt': $552 .50 08/74/200709:30 A,lt
Payment, Method: Check Init: DDG
Nouation: Fire Sprinkler
3990
Pernit No: F0?-0065 Tlpe: SPRINKITER PERMIT
Parcel No: 2I0L-082-2200-6
Sit.e AddreEs: 10 I{AIJL ST VAIL,
Location! WALL STREET BUIIJDXNG I,NIT 306
ToEaI Fees: $552.50
This Paltment: $552,50 Togal AL,[, Pmts: $562.50
Balance: $o. oo
til{. 't 't 'r'r {.rr r * * * *!l 'lt * * * * * * * * *r | | | | | I I | | * I { t + { { { + * { t t *t****t{*+t*ataaart+al**aaaaaaaaaaar.*r* * | *
ACCOI.'NT ITEMLIST:
Account, Code DeEcription Current Pmta
BP OO].OOOO31111OO SPRINKI,ER PER"I,IIT FEES 2L2.5O
PF 00100003x.12300 prJAN cHEcK FEES 350.00
W-Mt
. A- Colorado Registered Engineer's stamp or N.I.C.E.T. Level III (min)
stamp.. Equipment cut sheets of materials.
a
a
a
Hydraulic calculations.
A State of Colorado Plan Registration form.
by a Registered Fire Protection Contractor.
RMATION ':4
AI-ARM PERMIT (Labor & Materials)
5r.lr."rl tE',t tl'
Fire Sprinkler Contractor:
Fire Sprlnkler Services,
Contact and Phone #'s:
AL- 379-3276 970-928-9163
IF
Sprinkler: g 5,000
Contact Assessorc Office at 97O-328-8640 or visit for Parcel #
Parcef # 21010A222006
lob Name: l0 I,/a11 srreer unl-t 306 JobAddress: 10 wal1 srreet unir 306, Vail
Lesat Description ll r_ot: ll etocr: ll rinng:Subdivision:
Owners Name: Errg"rr"Fahey Address::i'.:+ii'-E:"'3*"3'B?in ll Phone:
Engineer: ll eaaresst Phone:
Detailed Location of work: (
l0 I,/a11 Street Unlt 306, Vail
Detai|eddescriptionofwork:'dditi"""f1'p'ink1erandre1ocatroffi
piping around stalrlray.
WorkCtass: New() j99tion( ) Remodet(x) Repair( ) Retro_Rt( ) other( )
-I
Typeof Bldg.: Single-family( ) Two-family( ) Multi-family(x) Commerciat ( I nestaurant( ) otnert I
No. of Existing Dwelling Units in this building:No. of Accommodation Units in this buildino:
Does a Fire Alarm Exist: yes ( ) N- -Does a Fire Sprinkler System Exist: Yes (X ) No ( )
************************FOR OFFICE USE ONLy*************************************
\\Vai l\data\cdev\FORMS\PERMITS\SPRKpERM.DOC o't t26t2002
TOWN OF VAIL DEPARTMENT OF COMMUNITY DEVELOPMENT
75 S. FRONTAGEROAD
VAIL, CO 81657
w0-479-2138
NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES
ADD/ALT MF BUILD PERMIT Permit #: 807-0038
Project #: ?? ?rSOl - oOGt{
Job Address.: l0 WALL ST VAIL Status.....: ISSUED
location......: WALL STREET BUILDING UNIT 306 Applied...: 03l0ll2W7
Parcel No....: 210108222006 Issued ...: O4lO2l2N7
Expires...: 0912912C07
owNER EUGENE G. FAHEY & NORA E. FAO3/0L/2007
151 CI,ARKSON EXECUTIVE PARK
ELI-,ISVItLB
MO 63011
APPI,ICANT EUGENE G. FAHEY & IIOBA E. FAO3/OL/20O7
1.61. CLARKSON EXECUTIVE PARK
ELLISVILLE
MO 53011
CoNTRACTOR FAHEY, EUGENE O3/OT/20O7 Phone: (636') 227-5]-55
161 CI,ARKSON EXECUTIVE PARK
EI-,IJISVILIJE
MrssoltRr 53 011
License: 883 -B
Desciption:
WAI.STREET BLDG UNIT 306INTERIOR REMODEL-REMOVE SPIRAL
STAIR, RELOCATING WASHER AND DRYER, REPLACING KNEEWALL
WITH BALLASTERS
Occupancy: R-2
Type Construction: VA
Valuation: $14,500.00 Revision Valuation: ?? Toal Sq Ft Added: 0
r{.1*i,+1.:t EEF cIrMMApv :f***'}*:*rt:t**'}lt******tt:t:*:r:t**1i{***1.1.***r**+*t*****l+*:l
Building--- > S251.25 Resu[rant Plan Review-- >
Plan Check-- > s153 .31 Recreation Fee--------->
Investigation- >
Will Call--- >
FEE SUMMARY ***********'|lt!r:*:.:r*:.r*:r******d***1.1.*:i:ar{.*+{.td.:lL*:r***d(******lr*
so . oo Total Calculated Fe€s*> S417 . 55
go. oo Additiorut Fees--------->$0.00
S4l'1.56 Total Permit Fee-----> 9417.s6
Payments------------- > $41?.55
$o. oo TOTAL FEES------->
$3.00
BALANCE DUE.......-. >90.00
Approvals:
ItEN: O51OO BUIIJDING DEPARTT{ENT
o3/23/2oo7 jplano Action: AP
ITEMs O54OO PI.,ANNTNG DEPARruEIT
O3/OL/2oo7 JS Action: AP
Item: 05500 FIRE DEPARTMEI{T
03/08/2007 mcgiee Action: AP Provide fire
***{..'.*{.**t:*?'1}*?x-1:-1-***-j'l|-.--:*l-*--P:i-i-;.f;':-'l:-f--1:-"-k-Sl-ii}-g-?3;-+,l't+*'|t+lt**'*{r*:l'}*+**l(*******.****
See Conditions page of this Document for any conditions that may apply to this permit.
DECLARATIONS
I hereby acknowledge that I have read this application, filled out in full the information required, completed an accurate plot
plan, and state ttnt all the information as required is correct. I agree to comply with the information and plot plan, to comply
with all Town ordinances and state laws, and to build tbrs structure according to the towns zoning and zubdivision codes, design
review approved, Intemational Building and Residential Codes and other ordinances of the Town applicable thereto.
REQIJESTS FOR INSPECTION SIIALL BE MADE TWENTY-FOUR HOURS IN ADVANCE BY TELEPTIONE AT OR AT OUR OI'FICE IIOM 8:00
AM-4PM.
SIGNATURE OF OWNER CONTRACTOR FOR HIMSELF AND OWNEF
***1.*,t ****,t(,t **********:t******,1****!t*'t*,t **,r*****{.****,1.'l.t *,F*******{.****r**1.****4.*1.*******************{.***t(*
CONDITIONS OF APPROVAL
Permit #: 807-0038 x of 0442-2C07 Status: ISSUED
:*i(,l1.'.**l{.d('.*{.,t.{.*l**l{.*{.**'.'.*****:t**i(**.***!t(*!t(***!t*!t*,t.**{.!t.'|.,**,r**.***i.t,t.*'.****
Permit Type: ADD/ALT MF BUILD PERMIT Applied: 03l0ll2W
Applicant: EUGENE G. FAHEY & NORA E. FAHEYTRUSTEFS Issued:
04/ozt2n7
To Expire: Wl29l2N7
Job Address: 10 WALL ST VAIL
Location: WALL STREET BUILDING UNIT 306
Parcel No: 2lOlO8222W6
Descripion:
WAI-STREET BLDG UNIT 306INTERIOR REMODEL-REMOVE SPIRAL
STAIR, RELOCATING WASHER AND DRYER, REPLACING KNEE WALL
WITH BALLASTERS
,r*'r*rr**r.r.**.*rl.*'r*'r***:1.***,**********:*****i.*'1.*i.*{.*Conditions. ********:*:t***,r***{.*{.*1.*****{.:F:F*******,t*******
Cond: 12
(BLDG.): FIELD INSPECTIONS ARE REQLnRED TO CHECK FOR CODE
COMPLIANCE.
Cond: 14
(BLDG.): ALL PENETRATIONS IN WALLS, CEILINGS, AND FLOORS TO
BE SEALED WITH AN APPROVED FIRE MATERJAL.
Cond: I
(FIRE): FIRE DEPARTMENT APPROVAL IS REQUIRED BEFORE ANY
WORK CAN BE STARTED.
Cond:40
(BLDG): (MFR/COMM) FIRE ALARM REQLnRED PER NFPA 72.
* +** * * * *+ * * * * ** * * * * * * * * * *********.***,1*** ****tt' +*+* * *t** * * ** ** ***'****** * * * ******************'1.'i*
TOWN OF VAIL, COLORADO Statement
'*'i***************+**+**+*+**+*+*+**+*+*++* *********+* **********,ft,t******************+i.**{.'1.***
Statement Nurdber:
Payment Method:
115I
R070000399 Amouni: 9417.56 04/02/200702252 PM
Check Init: DDG
Notation: Nonz LLC/FaheY
Balance: $0.00
{.**{.****************+***i+++++*+++++++*++++***tl'+tttt*****+++++*'}*f***+*+*++************+*+*
ACCOUNT ITEM LIST:
Account code
BP 00100003111100
PF 00100003112300
wc 00100003112800
BUIIJDING PERMIT FEES
PI-,AN CHECK FEES
WII,IJ CAIJIJ INSPECTION FEE
i4].7 .s6
i4t7 -s6
Current Pmts
257.25
153 .31
3.00
Permit No: B07-003I TIT)e: ADD/AL,T MF BUILD PERMIT
Parcel No: 2I0L-082-2200-6
Site Address: 10 WALL ST VAIIJ
I,ocation : WAI.,I, STREET BUILDING I'NIT 3 O 6
Tota1 Fees:
This Palment:$417. s5 Total A]JIj Pmts :
Description
200t
Scope of Work : Wallstreet Bldg #306
MainFroor, 'sozoosS
o Demolish or move existing spiral staircase (depending on whether
ents
o Demo enclosure move washer/dryer to loft area
o Install spiral stair washer/dryer previously existed
o Move bathroom door wall to the left approximately 8 to 12 inches
o Reinstall washer/dryer in loft closet
8e4tio;, /O Sf,
-jz_Z-tnternatlonal Eulldrg Codriffinabnal Resideiiial
Code validity ot permlt The banme or gnardng ot a permir sir: I
nol be c:r:irued to be a permlt for. otat ainoval ol, any violaticn ol
8ny ol t: r p rovisions ol lhle code or ol any oher ordlnancs ot the
lurisd;c:.: . Pcrmits presun{ng to ghra aidtodty b vlolale or cancel the
povisici:' i: this cod6 of o0r9r OfdnuE6 d hofui&dlcdon shall not be
valid. Ti: . i::uanceof a pennil basld on cqEtruc{on documentrs and
oher d:if, chall not pr€t/€nt he hdldhg dlcirl lrom regulrlng the
@rrection of errors in tho clrlsfucuon doqmot|b and othel data. The
Demolish knee wall in loft and install new balusters in loft
Move bathroom door and wall to the left approximately 8 to 12 inches
APPROVED
Community Development Drepadment
Building Safety and Inspecton Services f59ru,t-g Y?,a*,rs
t2ao^.rrE-@
&€<rP.rcAL
F-o,'+6rvCr
,/ Fh,Ntc,r.t-
ftBE 4t*t^'
building off icial is alsotuthodzed to prevont ocepancy or uso of a
drudure whcre in vi@tEn\this code or of any ollreiordinances ol
lhis jurisdiction.
PI-ANSE)(AMINER:
Loft Area:
. Demolish loft closet
fcAuru(-p p/r.,r.i1hJc5 txrb r ctrr€-
6ns6u6r- gfA\q D66 ^IsI-fe€f- C.ug(.srs\-- &rD€-
o
o
{,P5-5Puer.;c6,L
3,23 4
KRM"or=uLrANrs, rNc.
P.O.Box4572
Vail, Colonado 4165E|
[97O] 949-93S IFAx 949-1577
TO:
DATE:
PROJECT:
RECORD
Gene Fahey
161 Clarkson Parkway
St. Louis, MO 63011
2t26t2007
Wall Steet Bldg. #306 Remodel
!nn I neenuervorEs ffi neseoruse l) ct-ANFtcATToMcHANGE
I was informed of a remodel for unit #306 which will be identical to the remodel design of unit #303. This report
is based on replicating a previous remodel and on a visual observation of the condition of ttre previous unit
specified without disturbing any of the finish/construction materials, and does not represent design review, a
code compliance check, or slructural analysis beyond the scope indicated.
The spiral staircase is moving a short distance towards the halhr€y wall within an approximate g'-4'space. The
new opening to be created in the upper floor fiaming is approximately 5'-4" x 5'-4'. To accomplish fris, a 4x8
beam must be removed, and a new header will have to be placed at the edge of the opening to support the
existing and new 2x tongue and groove flooring as shown below. All new headers/beams shall consist of (2)-
2x8's (or a 4x8) Doug Fir f2 or better. All new hangers for these beams shall be Simpson LUS26-2. Also, the
doors for each of the bathrooms (main & upper level) and, hence, the adjacent walls must be moved. These
walls may be moved, but contact us if the upper floor joists/purlins are spliced on the main floor wall.
Also, the walls at the edge of the upper floor will be removed and replaced with a railing system. These walls
appear to be non-load bearing and may be removed.
Please call with any questions or if actual framing conditions for unit #306 vary trom unit #303.
KRM Consultants. lnc.
Tim Hennum, P.E.
S'G'I'ED..
Tim D. Hennum,
REVIHIIED:
JOBNUMBER: 0702-24
.1
J
sx$
ri,
Lt (z)-z^e,. 'COPYTO:
0
..1 Ron Preston, Architect
P.O. Box 1596 Eagle, CO 81631
1.01E; -AII"$ffiETOEE
PENIFMT@FE*2OS3IBC
-ndwomrmgffinalc.m
SYSTEMASREQUIRmfi)
MEET@DE.
.REWORKELECTRICAL
TTIRUOUTTOIIffiET@DE.NEW 5' DIA STAIR-INSTALL PER
MANT FACTT RER'S REC0IIIMENDATIONS.
Urdt 306-Eahey
WaIl StreetVail, Co
MAIN I.E\TEL
-l?Ei;:s"
Tlts/w
#o602
REMOVEE)flSTING
AII{D II,IFII,L FITOR.PER
STRUCTTJRALREFCRT{
lORSMAIN.
AAFflrrtr ttl-a-t-
urvri4 gooFl
TOREMAII{STOWN
solrD. -*___-"- @
ffiffi
* I- n ?rne -l .P
ffi't t7 t,! f /'r.
Ron Pregton, Ardtitect
P.O. Box 1595 Eagle, Co 81631
NOTE:
-PATCI{ANDRNPAIRAI,L
E)qSfING CONSTRUCTION AS
NECESSARY.
-AILFIMffiSTOBE
sEI-F-CfrrnSyo$nIER
ttnit 306-frhsyr
WaIl Street B-fdq.Vail, CO
L/Ls/07
#0602
R.I OCCUPANCY
5' DIA STAIR.INSTALL PER
MANT]FACTT'RER'S RECOMMENDATIONS.
NEW 42" HIGH GT'ARDRAIL PER
CODEAT.DOWNER
a0:-REIOCATE SIiIOKE DETECTOR
PERCODE.
Ftr- --- l
i'a-\ I i
LOFT
F==
;1
_-r-l#
:l
ail,
t iii--^tll.f-**oo*ExrsrrNcsrArR
...- \i l-rt -1ff;-.4 ; ANDINFTLLFTooRpER/ iiii \( i"-\,.'/ il srRUcnrRALREPoRr'o6o7-rr
tll t- -r -:
NEW
PI.IJMBINGBOX
A]iDFOWERFOR
WASIIER/DRYER
LorT
MAINTAIN I-HOUR
SEPARATIONAT
PARIYWAII,PER
C1ODE.
tsATII* ?/"
E)flSTINGWALTSTOBE
REMOVED SHOWNDASITED.
OPtt{ ro
beLohl
RENIO\|EE {STING
WAI,LS A}.ID REFLACE
WTNTNEW42"HIGII
GUARDRAILPERCODE
AIID OWNER(4" SPACE I!{A:(.).
ffinffi*\
*I- n arnc -14
"k!"t#:r
htit]*:F
P
c 3406
'"rU7A
;w T'PPER I.E\TELffi
3ab
75 S. Frontage Rd.
Vail, Colorado 81657
GoNTRAGTOR INFORMATIgN
o 4€^t (6ne
COMPLETE VALUATIONS FOR BUILDING PERMIT Labor & Materiqls
BUILDING: s trcpO"L ELECTRICAL: $ /dyo oc
OTHER: $
ruJn,'Biltc. $ .1{rf9 W
E^- E q,.aal :lI llanlaal Assessors Office at 970-325'5640 p4 v!9it
--J
-
lP"afPdr$ .4 tnt rr? n t t ntn/| /''o/ 08 222 OOc
li
robN"E7o.^,tr 6tre,t (Arsot \
-I
'\iot\fr' ktee, t-, 4 3a 6 .
Lesal DeJription fl rot: fi 'llencx SCllriti"srVA,/ U,l/+.* |/,s"bd''|tun
A(Phone:42t-tt7 ,e-
Arc
I
'nonho-3zg- t??
Eng wtn V-ni lruri A
I
Detailed descriPtidn ol worl(: / /
/h"unr4 SErtlS+r+ rB /Ps/rcih'o tt)a'lo/Vtt'^ ' /4//'0""g fi'^ao ' Un//u/u dl
. r tf 1,
Work Class: New ( ) nOOilion ( ) ne'YoOef ffi
Work Tvoe: Interior M Exterior ( ) Both ( )"n.O*. "n EHU exist at this location: Yes ( ) No ( )
@ty ( ) Mutti-famity () Commercial ( ) Restaurant ( ) other( )
tto. of E*i.ting Dwelling Units in this building: j No. of Accommodation Units in this building:
Noffype of fir"Pf"ce. gxi.tl
rra/T'na a{ Fironlaneq Prnnosed: Gas Aooliances ( ) Gas Logs ( ) Wood/Pellet ( ) Wood Burning (NQT ALLOWED)
ffiYes() No()
r
,/4
2R
OF
lin trre
i1il FEB
--I9wtrtF:\cdev\FoRMS\Permits\Buil din g\buildinqiermiL DOC Page 1 of 16
t-t
Questions? Call the Building Team at 479-2325
Depaftment of Community Development
Project Name:
Project Address:
r' This Checklist must be ampleted hefore a Buildina Permit aooliation is
aaaept€ld.
a
o
o
D
o
o
X
D
o
o
r\
o
o
o
o
1 O't pages of application is complebe
Has DRB approval obtained (if requked) Provide a copy of approval form
Plan Check Fee requircd at submittal for projecb valued over 9100,000.00 (see attached fee
schedule)
Complete site plan submitted
Public Way Permit application included if applicable (refer to Public Works checklist)
Staging plan included (refer to Public Works checklist) No dumpster,parkino or material storaoe
allowed on roadwavs and shoulders without written aooroval
Asbestos test and results submitted if demolition is occuning
Architect stamp and signature (All Commercial and Multi family)
Full floor plans including building sections and elevations(3 seb for remodels, 4 sets of plans for SFR
and Duplex, 5 sets of plans for Multi-Family and Commercial Buildings)
Window and door schedule
Full structural plans, including design criteria (i.e.loads)
Structural Engineer stamp and signature on structural plans (All Commercial and Multi Family)
Soils Report must be submitted prior to footing inspection
Fire resistive assemblies specified and penetrations indicated
Smoke detectors shown on plans
Types and quantity of fireplaces shown
Applicant's Signature:
Date of submittal:
Received By:
F: \cdev\FORMS\Permits\Buildinq\buildingjermit.DOC Page 2 of 16 021091200s
PLAil CHECK FEES TABLE
Depaftnent of Community Develognent
Building 9fety and Inffiion fuiie
75 sf,utt F,onbge R@d
Vail, @londo 81657
9704n'2138
FN( 970-4n-2452
www.uailgov.am
Plan check fees are required for projects with a valuation over $100,000, at the time of Building permit
submittal. Please use the table below to calculate your plan check fee total.
$100,000-$150,000 Multiply by
$150,001-$250,000 Multiply by
$250,001-$400,000 Multiply by
$401,000-$750,000 Multiply by
$750,001-$1,000,000 Multiply by
.0055 of Valuation Total
.005 of Valuation Total
.0045 of Valuation Total
.004 of Valuation Total
.0035 of Valuation Total
ValuaUons over $1,000,000 will be calculated by the Town of Vail Building Department.
If you have any fufther questions, please contact the Town of Vail Building Department at970-479-2L28.
F:\cdev\FORI'IS\Permib\Building\buildingJrermit. DOC Page 3 of 16 021091200s
ASBESTOS TESTING REQUTREM ENTS
THE TOWN OF VAIL AND STATE OF COLOMDO DEPARTMENT OF PUBUC HEALTH REQUIRE ASBESTOS TESIING
ANY TIME WHEN MORE THAN 160 S.F. OF MATERIAL WILL BE DISTURBED OR REMOVED.
AN ASBESTOS TEST AND REPORT IS REQUIRED TO BE SUBMITTED WITH YOUR BUILDING PERMIT APPUCATION
FOR ALL REMODEL, ADDMON OR OTHER PROJECTS INVOLVING ANY DEMOLTTION OR REMOVAL OF BUILDING
MATERIAIS THAT MAY CONTATN ASBESTOS. BUTLDTNGS CONSTRUCTED AFTER OCTOBER la 1988 THAT HAVE
NO ASBESTOS CONTAINING MATERI,AIS ARE E(EMPT.
A COPY OF THE REPORT MUST BE SUBMITTED WITH YOUR BUILbING PERMIT APPUCATION
. I have included the asbestos test and report with my building permit application
applicant signature
OR
clate
o I certiff my project will not disturb or remove more than 160 s.f. of building material. The construction
plans submitted with my application clearly indicate this information. fl-his will be verified during plan
review, and will delay your project if found to be inaccurate)
applicant signature
OR
date
o The building was constructed after OcLober 12, 1988. The date of construction was
fu!*-,tapprrcant sgnature U date
original @nsbudion date
%W,w"/J*4*f"/ffi /frf
F:\cdw\FORMS\Permits\Building\buildingjermilDOC Page 4 of 16 02109/200s
BUILDING PERMIT ISSUANCE TIME FRAME
If this permit requires a Town of Vail Fire Department Approval, Engineer's (Public Works) review and approval,
a Planning Department review or Health Department review, and a review by the Building Department, the
estimated time for a total review will take as long as three (3) weeks.
All commercial (large or small) and all multi-family permits will have to follow the above mentioned maximum
requirements. Residential and small projects should take a lesser amount of time. However, if residential or
smaller projects impact the various above mentioned deparUnents with regard to necessary review, these
projects may also take three (3) weeks to review and approve.
Every attempt will be made by this department to expedite this permit as soon as possible.
I, the undersigned, understand the plan check procedure and time frame. I also understand that if the permit
is not picked up by the expiration date, that I must still pay the plan check fee and that if I fail to do so it may
affect tuture permib that I apply for.
oate: &22-O7
F : \cde\r\FoRI"IS\Permits\Bui ldinq\buildi nglrermit. DOC Pag€ 5 of 15 0zls.,./200s
WHEN A *PUBLIC WAY PERMTT" rS REQUTRED
PLEASE READ AND CHECK OFF EACH OF THE FOLLOWING QUESTIONS REGARDING THE NEED FOR A
"PUBLIC WAY PERMIT":
o Is this a new residence?YES Nq
Does demolition work being performed require the qg5z.of the Right-of-Way, easements or
public property? YES_NO /'
o Is any utility work needed? YES_NO
Are there any improvements being done to the driveway? YES _NO_
Is a different access needed to the site other than the existing driveway? YES NO_
o Is any drainage wor( bging-done that affects the Right-of-Way, easements, or public property?YES_ NO_ x_
o Is a "Revocable Right-of-Way Permif'required? YES- NO )(
o Is the Right-of-Way, eapDents or public property to be used for staging, parking or fencing?YES_ NO_ _z_//\
If answer it NO, is a parkjyp, staging or fencing plan required by Public Works?YES NO \,//\
If you have answered YES to any of these questions, a "Public Way Permif' must be obbined.
"Public Way Permif'applications may be obtained at the Public Works office or at C.ommunity Development (a sample is
attached). If you have any questions please call Leonard Sandoval in Public Works at 970-479-2L98.
5'prrz
PRI #:__-
F:\cdev\FoRMS\Permib\Building\tuilding$ermit.DOC
I HAVE BEAD AND ANSWEREg ALLTHE
Contractbr Signature
Job or Project nu ., (rl
Page 7 of 16
How it relates to Building Pemits:
Fill out the attached check list with the Building Permit Application.
If yes was answered to any of the questions then a "Public Way'' permit is rcquired. You can pick up an
application at either Community Development located at 75 South Frontage Road or Public Works, located at
1309 Elkhom Drive.
Notice sign-offu for utility companies. ALL utilities must field veriff (locate) respective utilities prior to signing
application. Some utility companies require up to 48 hours notice to schedule a locate.
A construction traffic control/staging plan must be prepared on a separate sheet of paper, An approved site plan
may also be used. This plan will show locations of all traffic control devices (signs, cones, etc.) and the work
zone, (area of construction, staging, etc.). This plan will expire on November 1" and will need to be resubmitted
for consideration for approval through the winter. Be aware that your resubmission for winter may be denied
depending on the location of construction.
Sketch of work being performed must be submitted indicating dimensions (length, width and depth of work).
This may be drawn on the taffic control plan or a site plan for the job.
Submit completed applicaUon to the Public Works office for review. If required locates will be scheduled for the
Town of Vail electricians and irrigation crew. The locates take place in the morning, but may require up to 48
hours to peform.
The Public Works Construction Inspector will review the application and approve or deny the permit. You will be
contacted as to the status and any requirements that may be needed. Most permits are released zl8 hours of
being received, but please allow up to one (1) week to process.
As soon as the permit is approved, the Building Department will be notified, allowing the "Building Permit" to be
released. Please do not confuse the "Public Way Permif'with the "Building Permit".
NOTE: The above prooess is for work in a public way ONLY. Public Way Permits are valid only until
November 15th. A new Public Way Permit is required each year if work is not complete. Re-
application each November 15ft does not mean an automatic renewal.
understand the above.
z- 22,-a -7
Date,6ignedSignature
tutflf0f
read and%
F:\cdev\FoRMS\Permib\Building\buildingJrermit.DOC Page 9 of 16 o2lwl2o0s
DRAINAGE AND CULVERT INSPECTIONS ARE REQUIRED By PUBLIC WORKS!
Please read and check off eact of the items below:
The Town of Vail Building Departnent has developed the following procedures to ensure that new constuctjon
sites have adequately established proper drainage from building sites along and adjacent to Town of Vail roads or
streeB.
The Town of Vail Public Works Departnent will be required to inspect and approve drainage adjacent to Town of
Vail roads or sUeets and the installation of temporary or permanent culverts at access points ftom the road or
street onto the construction site. Such approval must be obtained prior to any requests for inspection by the
Town of Vail Building Departnent for footings, temporary electical or any other inspection. Please call Leonard
Sandoval at970479-2L98 to request an inspection from the Public Work Departrnent. Allow minimum of 24
hour noUce.
Alsq the Town of Vail Public Works DeparuTent will be approving all final drainage and culvert installation with
resulting road patching as necessary. Such approval must be obtained prior to any Final Certificate of Occupanry
issuance.
Agreed to by:
Project Name:
Date Signed:
Page 10 of 16
66nt
F:\cdev\FORMS\Permib\Building\buildingjermit.DOC 0z0s/200s
*m
MATERIAL STORAGE AND CONSTRUCTION PARKING
Please read and check off each of the items below.
(Copies of complete te>G are available upon request)
CODE 5.2.10: DEPOSITS ON PUBUC WAYS PROHIBITED
Unlawful deposits: Subject to subsection C thereof, it is unlawful for any person to litter, track or deposit, or cause to
be littered, tracked or deposited, sand, gravel, rocks, mud, di( snow, ice, or any other debris or material upon any
street sidewal( alley or public place, or any portion thereof.
Notice; Abatement: The Director of Public Works may notify and require any person who violates or causes another
to violate the provision of subsection A hereof, or who has in the Director's employment a person who violates or
causes another to violate the same, top remove such sand, gravel, rocks, mud, dirt, snow, ice or any other debris or
material within twenty four (24) hours after receipt of said notiae by the Director of Public Works. In the event the
person so notified does not comply with the notice within the period of time herein specified, the Director of Public
Works, or other authorized agent, may cause any such sand, gravel, rocK, mud, dirt, snow, ice, debris or any other
material to be removed from any street or alley at the expense of the notified.
Summons and Penalty: As an alternative to the notice for removal provided in subsection B above, any person
who violates or causes another to violate the same, may be issued a summons to appear before the Municipal Court of
the Town for said violations, and upon being found guilty of a violation hereunder be punished as provided in Section
1-4-1 ofthis code.
Notice and Penalty: It is unlawful for any person to fail or refuse to comply with the notice of the Director of Public
Works as provided in subsection B hereof, and any such person shall, in addition to payment of the expense of removal
incurred by the Director of Public Work, as provided in subsection B hereof, upon being found guilty of a violation
hereunder, be punishable as provided in Section 1-4-1 of this Code. (1997 Code: Ordinance 6 (1979).
CODES 7.3A.I AND 7.3A.3: PARKING OBSTRUCTING TRAFFIC & IMPOUNDMENT AUTHORIZED
No person shall park any vehicle upon a street or at any other place within this Municipality in such a manner or under
such conditions as to interfere with the free movement of vehicular tmffic or proper street or highway maintenance.
(ord. 2(1e68) $ 1)
Whenever any police officer finds a vehicle attended or unattended, standing upon any portion of a street or upon any
place within this Municipality in such a manner as to constitute a violation of any section of this Article, or left
unattended for a period of twenty four (24) hours or more and presumed to be abandoned under the conditions
prescribed by Colorado Revised Statutes section 42-4-1102, as amended, the officer shall require the vehicle to be
removed or cause it to be removed and placed in storage in the nearest garage or other place of safety designated or
maintained by this Municipality, and the charges for towing and storage of such vehicle shall be charged to the owner
of the vehicle in addition to a ten dollar ($10) impoundment charge. (Ord. 2(1968) $ 3: Ord. 28(1981) 5 1)
I have read and will comply with the above code provisions:
Position or Relationship to Project:
Dale Signed: o'/./-0 'f-r-
F:/everyoDeformsibldp€rm7
F:\cdeV\FORMS\Permits\Building\buildingJermiLDOC Page 11 of 16 04091200s
Vail 2006
Vail Construction Hours Policy
Information Handout
Problem Statement
The Vail Village and LionsHead Village are invaluable assets lo the community. Thousands of
people come to Vail each year to sightsee, recreate, shop and to enjoy everything the Vail Valley
has to offer. The community and merchants rely upon our guests to generate revenue. Our
summerfuvinter guests expect a pleasant experience while in Vail.
To insure that all of the proposed construction has as little negative impact on the community and
on our guest as possible, the Town of Vail finds it imperative to create and implement the Vail
Village and LionsHead Village Construction Hours Handout.
It would be irresponsible for the Town of Vail, the construction contractors and the merchants, to
not actively participate to minimize the impact of construction in the Vail and LionsHead Village
areas.
The Vail Village Streetscape Project will continue through 2006. lmprovements scheduled
for 2006 wil! be concentrated along Gore Creek Drive west of the Children's Fountain, Gore
Greek Promenade and around the frontage of the Mill Greek Gourt Building. Additional
streetscape improvements are scheduled to begin along East Meadow Drive.
All construction projects and/or remodels within the Vail Village Gore Area should contact
Scott Bf uhm, Town of Vail Streetscape Coordinator, at97O477-U18 for further information.
Givens
The following givens are intended to provide the basic foundation by which construction will be
completed in the villages:
. The public's health, safety and welfare shall be honored at all times.
. Adequate pedestrian, loading/delivery, vehicle, and emergency vehigle access and circulation
shall be maintained.
o Roadways and pedestrian walkways shall be kept clean and free of dirt and debris.
. All construction deliveries, equipment, tools and materials entering the Vail Village and
pedeskian areas must go through CheckPoint Charlie. All LionsHead construction activity
must go to the Vail Police Department for a parking permit. Do not use delivery zones for
construction parking; refer to approved staging plan or make other anangements for parking.
r The hours of outside construction activity shall be as follows:
- April 15 - June 23 & September 5 - November 17, 7:00 a.m. until 7:00 p.m., seven days a
week.
June 30 thru September 1, work must end by 4:00 p.m. on Fridays.
November 13 - April 15,2OO7 work allowedwithin daylight hours only.
- Deliveries shall be restricted to the hours of 7:00 a.m. to 11:30 a.m. on Gore Creek Drive
and 7:00 a.m. to 8:30 a.m. on Bridge Street'
- Special construction delivery permits must be requested in advance from Public Works in
conjunction with Code Enforcement at Checkpoint Charlie.
- No construction activity shall occur on Saturday or Sunday between June 26 and
September 3.