Loading...
HomeMy WebLinkAboutVAIL VILLAGE FILING 1 BLOCK 5D LOT N O GATEWAYTOWN OF VAIL DEPARTMENT OF COMMUNIry DEVELOPMENT 75 S. FRONTAGEROAD VAIL, CO 81657 970-479-2138 NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES ADD/ALTCOMMBUILDPERMT Permit #: 802-0145 Job Address: 12 S FRONTACE RD EAST VAIL Status . . . : ISSUED Location.......: 12 VAIL ROAD #500 Applied . . : 05/14/2002 ParcelNo....: 210108264015 Issued...: 0513012002 Project No . : PRI02-0152 Expires . . .: 1l/26/2002 owNER MOI'MTATN OWNERS r-,p 05/L4/2002 Phone: c/o srEpHEr,I rJEwrs, sroLJTz t'tGMT 725 CONSHOHOCKEN STATE RI) BAI,A CYNWYD PA 19004 Li.cense: coMrRAcToR sRE BUTT,DERS, rNC O5/L4/2OO2 Phone: PO Box 6376 Vail, Co 81558 I-,icense: 703 -b APPr.,ICAIillf SRE BUIT,DERS, rNC 05/]-4/2002 Phone: 970-376-L535 PO Box 5375 VaiI, Co 815 58 License: Desciption: REMODEL OFFICE SPACE Occupancy: Type Construction: Type Occupancy: ?'l Valuation: $21,000.00 Fireolace lnformation: Restricted:# ofGas Appliances: 0 Add Sq Ft 0 # of Gas togs: 0 # of Wood Pellet 0 FEE SUMMARY +aar*tt'ia+'r*ji*a*{a:}*}a:r*++a,a*r:tar*aa'r'ar*a*araa!.a'r*a***:r***'l SO. OO Total Calculated Fees-> $423 .75Building-> $255. 00 Restuarant Plan Review-> Plan Check--> $155.?5 DRB Fee----------> $o.oo Additional Fees----> $0'00 Inyestigation-> $0.00 R€qeation Fee------> $0. OO Tolal Pemit Fee---'-> $423.75 will call---> 93 . 00 clean-up Deposit----> $0. oo Payments------------1 9423 .75 TOTAL FEES------> 5423 .'t5 B{ANCE DUE----> S0. 00 Approvals:Ttem: 05100 BUII-,DING DEPARTMENf O5/3\/2OO2 1c for arRM Action: AP Item: 05400 PLATiINING DEPARTMEI\I| IICM: 05600 FIRE DEPARTMEMT Item: 05500 PUBL,IC WORKS +t + lt rl +*'i'tt *'tt *t See page 2 of this Document for any conditions that may apply to this permit. DECLARATIONS I hereby acknowledge that I have read this applicatioq filled out in firll the information required, completed an accurate plot plan, and state that all th information as required is conect I agee to comply with the information and plot plaq to comply with all Town ordinances and state laws, and to build this stnrcture according to the towns zoning and subdivision codes, design review approved, Uniform Building Code and other ordinances ofthe Town applicable thereto. REQUESTS FOR INSPECTION SHALL BE MADE TWENTY-FOUR HOURS IN ADVANCE BY TELEPHONE AT 479-2138 OR AT OUR OFFICE FROM 8:OO AM - 5 PM. Scrd Clcrl-up Dcpocit To: N/A OF OWNER ORCONTRACTOR FOR HIMSELFANDOWNET PAGE2 *|**t'|'|'|'i**t*****,t**|**{t****lt:t*:|'*:t,|t|'t*+***{!*:i:|t'|t*'}'t'}*||!,|t*'itlt*'i*'|!t'}:|t CONDITIONS OF APPROVAL Permit #: 802-0145 as of 05-3G2002 Status: ISSUED tlil**|*****'}|**{.'*+'t*'|**:}*!i,t{t**'}{t***,t**'}+'|,t**+**|'l*|'t**'l*l+'l+{.*:***:lt}***'**'|,t{'*********l*,}{.*l'}lt********** Permit Type: ADD/ALT COMM BUILD PERMT Applied: 05114D002 Applicant: SRE BUILDERS, INC lssued; 05/30n002 970-3'1G1536 To Expire: 11/2612002 Job Address: l2 S FRONTAGE RD EAST VAIL localion: l2 VAIL ROAD #500 ParcelNo: 210108264015 Description: REMODEL OFFICE SPACE Conditions: Cond: I (FIRE): FIRE DEPARTMENT APPROVAL IS REQ{.JIRED BEFORE ANY WORK CAN BE STARTED. Cond: 12 (BLDG.): FIELD INSPECTIONS ARE REQUIRED TO CHECK FOR CODE COMPLIANCE. ***aafftltlt'}a'**lt'l**l*t'tlr*fti*l*'i*'i*'}+'it*fl*f*'lal*a+*++*t*f**{'t}*f**ff+l+*a***aaa*aaaflt+l+*+ TOWNOFVAIL, COTORADO Statem€nt ++f, **l* a | *t**+t**r*la I ftf* al'|f* *l'lfl* 't **fa* * | | f'}* *a"t+ ** t * +r* + *'|'+* +*{t** * **+a ***** **tt'l f * * * * a* Suaeements llunber: R000OO2{85 Amorrnt: $423.75 05/30/2OO2L2:30 PH Paltmeng uethod: Check lait: L,C lilouatLon3 *1435/SRE Buildere Pemit No: 802-0t45 r!r[)e: ADD/ALT C1CMM BIIIITD PERUT Parce1 llo: 210108254015 SiTE Mdrcgg: 12 S FROIITAGE RD EAST VAII. IJocat,Lon: 12 \ZAIIT ROAD #500 . Total Fees: #423.75 Thia Palment: $423.?5 Total AIJL PntE: $423.75Balance: 50.00 Ittaftltfttttftttttiaaft*t*+t*a*tttta*'i*+rttfttaa*'}t**+ratttttr+{r+tftarrli'tt*tf'lltf+atfttt*l ACCOTJNTITEM LIST: Account Code DescniDtion Current Pmts BP OO1OOOO31111OO BUILDING PERMIT FEES 255.00 PF 00100003112300 pLAr{ CHECK FEES 165.75 l.lc 00100003112800 I|ILL CALL INSPECTIoN FEE 3.00 ^"'+tl&e;l6iTrfirw MVNOPVAIL 75 S. Frontage Rd. Vail, Colorado 81657 -47912149 mechanical. etc.! ulA-an .Il,*.lortact qnd Phone #'s: lfTa ) 37G -/sse COMPLETE VALUATIONS FOR BUILDING PERMIT Labor & Materials Contad Assessorc at 97O-328-8640 visit F:/everyoneforms/bldgperm BUILDING: $ [pOOO.o O ELECTRICAL: $ | ),64ar. a,z OTHER: $ ftr.a- - /{oo. o'.t PLUMBING: $ /SOo, oo MECHANICAL: $ 3 OoO.at rorAl: $ :)1.(tgo.o,, will not be accepted without parcel Job Name: Hlgafu{^n, g$Ua Job Address: Q. lf\tv (,ol p jh . Saa Su"oanl s({." Spact -- WorkClass: New() Addition( ) Remodel!,zJ Repair( ) Demo( ) Other( ) 'Work Type: lnterior \,.J Exterior ( ) Both ( )Does an EHU exist at this location: Yes ( ) No Typeof Bldg.: Single-family( ) Two-family( ) Multi-famif( ) Commercial ( ) Restaurant( ) Other@tmy14fr>,Jt6 No. of Existing Dwelling Units in this,building: U No. of Accommodation Units in this building: of : Gas Aooliances ( ) Gas Wood rrlk iances( ) GasLoos( ) Wood/Pellet( ) WoodBurninq(NOT Does a Fire Alarm Exist: YesJ/ ) No ( )Does a Fire Sprinkler System Exist Yes **************************************FOR OFFICE USE ONLY************************************** Department of Community Development tlProiect Name: ffrJl r;n Sf ' Project Address: /S fa; / ,(4 ..+<. So o Questions? Call the Building Team at 479-2325 This Chekh'st must be omoletcd hefore a Buildino Permit appliation is arcpted. All pages of application is complete Has DRB approval obtained (if required) Provide a copy of approval form Condominium Association letter of approval attached if project is a MultFFamily complex C.omplete site plan submitted Public Way Permit application included if applicable (refer to Public Works checklist) Staging plan included (refer to Public Works checklist) No dumoster,oarkinq or material storaoe allowed on roadwavs and shoulders without written aooroval Asbestos test and results submitted if demolition is occurring Architect stamp and signature (All Commercial and Multi family) Full floor plans including building sections and elevations(4 sets of plans for Multi-Family and Commercial) Window and door schedule Full structural plans, including design criteria (ie.loads) Structural Engineer stamp and signature on structural plans (All Commercial and Multi Family) Soils Report must be submitted prior to footing inspection Fire resistive assemblies specified and penetrations indicated Smoke detectors shown on plans Types and quantity of fireplaces shown ) ^/, Applicantt Signature: 4+T aU-- Date of submittal: o o o o o o o o o tr D o tr o o F:/everyone/forms/bld perm2 Received By: ffiS5{ri nntwvtnll HOW DID WE RATE WfrH YOU? Town of Vail Survey Community Dwelopment Departnent Russell Fonest Direstor, (970)179-213e Check allthat applies. 1. Which Departnent(s) did you conhct? Building _ Environmenbl_ Housing_ AdminPlanning DRB _ PEC 2. Was your initial conbct with our stiafi immediate_ dow _or , ' ' ' no one available ? 3. lf you were required b wait, how long was it bebre you were helped?_ 4. Was your project reviewed on a timely basis? Yes / No lf no, why not? 5, Was his yourfirst{ime to file a DRB app- PEC app ; Bldg Permit_ l,l/A ! 6. Please rate fie performance of tre sffiperson who assisbd you: 54321Name: (knowledge; responsiveness, availabiirty) 7. Overall efectiveness oftre FrontService Counter. 5 4 3 2 1 8. What is the best time of day for you b use he Front Service Counter? 9. Any commenb pu have which would allow us to beter serve you nexttime? Thank you br hking the fme to complete this survey. We are . commifrd b inproving our seMce. WHEN A'PUBLIC WAY PERMIT" IS REQUIRED PLEASE READ AND CHECK OFF EACH OF THE FOLLOWING QUESNONS REGARDING THE NEED FOR A "PUBLIC WAY PERMIT": o Is this a new residence? YES NO o Does demoliUon work being performed require the use of the Right-of-Way, easements or public property?YES NO o o o o Is any utility work needed? YES Right -Way, easements, or public property? YES NO o B Is a "Revocable Right-of Permit"red? Is the Right-of-Way,or public property to be used for staging, parking or fencing? If answer is NO, is a parking, YES NO ing or fencing plan required by Public Works? If you answered YES to any of these questions, a "Public Way Permit" must be obtained. "Public Way Permit" applications may be obtained at the Public Work's office or at Community Development (a sample is attached). If you have any questions please call Leonard Sandoval in Public Works at 479-2L98. I HAVE READ AND ANSWERED ALL THE ABOVE QUESTIONS. Contractor Signature Job or Project Name: Date Signed: Is the driveway being repaved? Is a different access needed to site other Is any drainage work being done ng driveway? YES_ NO NO F :/everyone/forms/bldperm4 Company Name TumlaF PUBLIC WORKS AND THE PUBLIC WAY PERMIT PROCESS How it relates to Building Permits: If yes was answered to any of the questions then a "Public Way" permit is required. You can pick up an application at either Community Development, located at 75 South Frontage Road or Public Works, located at 1309 Elkhorn Drive. Notice sign-offs for utility companies. ALL utilities must field verify (locate) respective utilities prior to signing application. Some utility companies require up to 48 hours notice to schedule a locate. A construction traffic control/staging plan must be prepared on a separate sheet of paper. An approved site plan may also be used. This plan will show locations of all traffic control devices (signs, cones, etc.) and the work zone, (area of construction, staging, etc.). This plan will expire on November 1st and will need to be resubmitted for consideration for approval through the winter. Be aware that your resubmission for winter may be denied depending on the location of construction. Sketch of work being performed must be submitted indicating dimensions (length, width and depth of work). This may be drawn on the traffic control plan or a site plan for the job. )> Submit completed application to the Public Work's office for review. If required, locates will be scheduled for the Town of Vail electricians and irrigation crew. The locates take place in the morning, but may require up to 48 hours to perform. > The Public Work's Construction Inspector will review the application and approve or deny the permit. You will be contacted as to the status and any requirements that may be needed. Most permits are released within 48 hours of being received, but please allow up to one (1) week to process, ) As soon as the permit is approved, the Building Department will be notified, allowing the "Building Permit" to be released. Please do not confuse the "Public Way Permit" with a "Building Permit". ) NOTE: The above process is for work in a public way ONLY. Public Way Permits are valid only until November 15th. A new Public Way Permit is required each year if work is not complete. Re-application each November 15th does not mean an automatic renewal. I have read and understand the above. Signature F:/everyone/forms/bldperm5 Date Signed BUILDING PERMIT ISSUANCE TIME FRAME If this permit requires a Town of Vail Fire Depaftment Approval, Engineer's (Public Works) review and approval, a Planning Department review or Health Department review, and a review by the Building Depaftment, the estimated time for a total review will take as long as three (3) weeks. All commercial (large or small) and all multi-family permits will have to follow the above mentioned maximum requirements. Residential and small projects should take a lesser amount of time. However, if residential or smaller projects impact the various above mentioned departments with regard to necessary review, these projects may also take three (3) weeks to review and approve. Every attempt will be made by this department to expedite this permit as soon as possible. I, the undersigned, understand the plan check procedure and time frame. I also understand that if the permit is not picked up by the expiration date, that I must still pay the plan check fee and that if I fail to do so it may affect future permits that I apply for. Agreed to by: Project Name: oate, Shfl,L F:everyone/form/bldperm3 APPLICAflON FOR TOWN OF VAIL PUBLIC WAY PERMIT 19 pw*:In-InIf PATCEI#:T T I T' T N N' N T - T T N Brds.Permt#:E ! I'f n I I 1.Job Nams Excaveiing Contractor Name Stresl Address n n n- [l (tf unknowncatl L-J | | | | I | 479-21g8ext.0 2.Maillng Address TOV Contractor's Licanse Numbor REOUIRED ApCity Phone # 4. Slart Date Work is for (cird6 one) Waler Other ComDledon Dale Sewer Gas Electric (Permit Explration Dats) Telephone CATV Landscaping Temp. Site Access 5. Trench-width (min,4') Depth TotalSF $ Total LF $ Bond Amount $ ALL MATERIAL, EOUIPMENT, AND TRAFFIC JOB IS STARTED. 7.Rubber out-riggers are required on Asphalt surfaces undemeath lhe A signature below indicates a signatures are obtained, permittee necessary Town of Vail signatures. BE ON THE JOBSITE BEFORE THE working on asphalt. at all times. utility locations and approvals, Once all utility comPany application lhrough the Public Works ofiice to obtain the up to one week to process. Permit Fee Total Permit Fee $ Public Service Natural Gas Group (1'800-9?2.'19871 Public Service Company (1 U.S. West (1-800-922-1 987) L 10. 11. 12. TCI Gablevision of the Rockies (1-800'922-1987) Eagle River Water & Sanitation District (970'476-7480, eril. 114) Holy Cross Elestric Company (1-800-922-1987) Town of Vail Electricians (970-479-2158) Town of Vail lrrigation (97G479-2158) Town of Vail Public Works Construction lnspector (970-479-2198) THERE WILL BE NO TOTAL STREET CLOSURESI A construction traffic control plan must be approved by the Public Works Department prior to issuance ol the permit. All excavation must be done by hand within 18" of utilities - (Senate Bill 172)' permittee musl contact Publlc Works Department at 479-2198 24 hours prior to commencing of work. Failure to notify tne fown witt result in forfeiture ol bond money. Scheduled inspections which are not ready may result in the Town charging the contractor a reinspection fee. I certify that I have read all chapters of Title I - Public Ways and Property, ol the Vail Municipal Code and all utility company agreements, signed by me, and will abide by the same, and that all utilhies have been notified as r€quired. Contrac,tor's Slgnature of Agreement ATTACH PLAN OF WORK, INCLUDING CONSTRUCTION TRAFFIC CONTROL PLAN show streets with names, buildings, and location of cuts. USE DASH LINES FOR CUT. Prlnt nam6 cloarly Date of Signature White - Public Workg Ysllow - Contractor DRATNAGE AND CULVERT INSPECTIONS ARE REqUIRED By PUBLIC WORKS! Please read and check off each of the items below: o The Town of Vail Building Department has developed the following procedures to ensure that new construction sites have adequately established proper drainage from building sites along and adjacent to Town of Vail roads or streets. s The Town of Vail Public Works Depaftment will be required to inspect and approve drainage adjacent to Town of Vail roads or streets and the installation of temporary or permanent culvefts at access points from the road or street onto the construction site. Such approval must be obtained prior to any requests for inspection by the Town of Vail Building Depaftment for footings, temporary electrical or any other inspection. Please call Leonard Sandoval at479-2198 to request an inspection from the Public Works Department. Allow a minimum of 24 hour notice. u Also, the Town of Vail Public Works Department will be approving all final drainage and culveft installation with resulting road patching as necessary. Such approval must be obtained prior to any Final Ceftificate of OccuBancv issuance. Agreed to by: Print Name Project Name: Date Signed: F:/weryoneforms/bldperm6 Signature Please read and check off each of the items below. (Copies of complete te)C are available upon request) CODE 5-2-IO: DEPOSITS ON PUBLIC WAYS PROHIBITED o Unlawful deposits: Subject to subsection C thereof, it is unlawful for any person to litter, track or deposit, or cause to be littered, tracked or deposited, sand, gravel, rocks, mud, dirt, snowr ice, or any other debris or material upon any street, sidewalk, alley or public place, or any portion thereof. o Notice; Abatement: The Director of Public Works may notiff and require any person who violates or causes another to violate the provision of subsection A hereof, or who has in the Director's employment a person who violates or causes another to violate the same, top remove such sand, gravel, rocks, mud. dirt, snow, ice or any other debris or material within twenty four (24) hours after receipt of said notice by the Director of Public Works. In the event the person so notified does not comply with the notice within the period of time herein specified, the Director of Public Works, or other authorized agent, may cause any such sand, gravel, rocks, mud, dirt, snow, ice, debris or any other material to be removed from any street or alley at the expense of the notified. a Summons and Penalty: As an alternative to the notice for removal provided in subsection B above, any person who violates or cruses another to violate the same, may be issued a summons to appear before the Municipal Couft of the Town for said violations, and upon being found guilty of a violation hereunder be punished as provided in Section 1-4-1 of this code. o Notice and Penalty: It is unlawful for any pe6on to fail or refuse to comply with the notice of the Director of Public Works as provided in subsection B hereof, and any such person shall, in addition to payment of the expense of removal incurred by the Director of Public Works, as provided in subsection B hereof, upon being found guilty of a violation hereunder, be punishable as provided in Section 14-1 of this Code. (1997 Code: Ordinance 6 (1979). CODES 7-3A-I AND 7-3A.3: PARKING OBSTRUCTTNG TRAFFIC & IMPOUNDMENT AUTHORIZED o No person shall park any vehicle upon a street or at any other place within this Municipality in such a manner or under such conditions as to interfere with the free movement of vehicular traffic or proper street or highway maintenance. (Ord. 2(1968) I 1) o Whenever any police officer finds a vehicle attended or unattended, standing upon any poftion of a street or upon any place within this Municipality in such a manner as to constitute a violation of any section of this Article, or left unattended for a period of twenty four (24) hours or more and presumed to be abandoned under the conditions prescribed by Colorado Revised Statutes section 42-4-1102, as amended, the officer shall require the vehicle to be removed or cause it to be removed and placed in storage in the nearest garage or other place of safety designated or maintained by this Municipality, and the charges for towing and storage of such vehicle shall be charged to the owner of the vehicle in addition to a ten dollar ($10) impoundment charge. (Ord, 2(1968) $ 3: Ord. 28(198i) 5 1) I have read and will comply with the above code provisions:SJer4,, t €/>/t Prinr Name / Sisnature6.-e4 O","lnrb-Position or Relationship to Project: Date Signed: , r/ rrL , F:/everyone/form lt ld perm 7 I0I4'NM Vail 2002 Vail Village/Lionshead Gonstruction Hours Handout Problem Statement The Vail Village and Lionshead are invaluable assets to the community. Thousands of people come to Vail each year to sightsee, recreate, shop and to enjoy the Vail Valley. The community and merchants rely upon the summer/winter tourism to generate revenue. Our summer/winter guests expect a pleasant experience while in Vail. To insure that all of the proposed construction has as little negative impact on the community and on our guest as possible, the Town of Vail finds it imperative to create and implement the Vail Village/Lionshead Construction Master Plan. Maps of the Village and Lionshead are included to show areas of construction being affected by this plan. It would be irresponsible for the Town of Vail, the Construction Contractors and the Merchants, to not actively participate to minimize the impact of construction on the Village and Lionshead areas. Givens The following givens are intended to provide the basic foundation by which construction will be completed in the Village: . The public's health, safety and welfare shall be honored at all times. . Adequate pedestrian, loading/delivery, vehicle, and emergency vehicle access and circulation shall be maintained. r Roadways and pedestrian walkways shall be kept clean and free of dirt and debris. o All construction deliveries, equipment, tools, materials, etc. to the Village must go through Check Point Charlie. All Lionshead construction activity must go to the Vail Police Department for a parking permit. Do not use delivery zones for construction parking, refer to approved staging plan or make other arrangements for parking. . The hours of Outside Construction Activity shall be as follows: - April 15 - June 21 & September 9 - November 15,7 a.m. until 7 p.m., seven days a week. Between June 22 -September 6 work must end bv 4:00 p.m. on Fridavs. November 15 - April 1 5, 2003 work allowed within daylight hours only. - Deliveries shall be restricted to the hours of 7 a.m. to 11:30 a.m. on Gore Creek Drive and 7 a.m. to 8:30 a.m. on Bridge Street. - Special delivery permits must be requested in advance, from Public Works in conjunction with Code Enforcement at Checkpoint Charlie. - No construction activity shall occur on Saturday or Sunday between June 22 & September 6 - No outside construction activity shall occur on the following dates: Friday, February 15, Saturday, February16, Sunday, February 17, and Monday, February 18. (Presidents Weekend) Saturday, May 25, Sunday, May 26 and Monday, May 27 (Memorial Dav) Friday, June 28, Saturday, June 29 and Sunday, June 30. (Vail Arts Festival) Wednesday, July 3, Thursday, July 4. Friday, July 5, Saturday, July 6 and Sunday, July 7. (lndependence Dav) Saturday, August 31, Sunday, September 1, and Monday, September 2 (Labor Dav). Friday, September 13, Saturday, September 14, Sunday, September 15 in (Lionshead) and then on Saturday, September 21 and Sunday, September 22. (Vail Village) - (October Fest) Thursday, November 28, fihanksqivinq Davl Friday, November 29, Saturday, November 30 and Sunday, December 1. Wednesday, December 25, Thursday, December 26, Friday, December 27 Saturday, December 28, Sunday, December 29. (Christmas Dav Holidav) Monday, December 30, Tuesday, December 31, Wednesday January l, (New Year 2003) No Work allowed the entire week of the Christmas,/New Year Holiday. . The Town of Vail Noise Ordinance has been waived by the Town Manager from 7a.m. - 7p.m. For construction activities from April 15 through June 21, and from September 9 through November 15. The Noise Ordinance shall be in effect and strictly regulated from June 22 through September I and November 15 to April 15, 2001 . All construction sites will be required to obtain an Aoproved Construction-Staqinq Plan from the Town of Vail Public Works Department in conjunction with Code Enforcement. (The approved staging/parking plan is required to be on site at all times). . The Town of Vail reserves the right to amend the Vail Village/Lionshead Construction Plan regulations at anytime should abuses or problems arise. o The Three-Strike Rule will be enforced. Step 1. (Written warning), Step 2. (Written warning), Step 3. (Construction site will be Red Tag until all issues are resolved). Expectations The following expectations are established to insure the success of the Vail Village/Lionshead Construction Master Plan: o Full and complete cooperation and understanding from all parties involved in the construction activity in regards to this plan. r Strict adherence and compliance with the requirements outlined in the construction plan. . Respect and consideration for the affected interests and parties. lf you have any question, Please contact the Town of Vail Public Works Department (Construction Inspector) or Vail Police Department (Code Enforcement Officer) 970479-2198 970476-7603 TOItrN OFVAIL Vail2002 Staging / Parking PIan Information The Stasine / Parkins Plan Philosonhv- Is a very important step in the building process. Striking a balance between safe public access and giving construction projects room to build is becoming increasingly challenging, for us to meet all the needs of those who will be impacted by construction projects. The fact is, there is less room to build in the Town of Vail. Developing a creative Staging Plan is a must. Staging in the Town of Vail Public Right of Way is a Privilege, not a given right. We take into account when we review and approve staging i parking plans, impacts on neighborhoods, tourism, business and the traveling public along with your right to build. The General Contractor is resoonsible for all subcontractors and all construction sctivitv relatins to the buildins nroiect. The staging plan will be enforced according to the Approved Set of Building and Staging Plans. You are required to keep a copy of the Approved Staging Plan on site. Two staging /parking plans are required, a summer and winter. Summer staging plans expire on November l, and winter staging plans expire on April 15. QjSIe:-ThgIgjl nq-q! street parkinq in the winter season and all materials. equipment. etc must be l0'off the edee ofasphalt). Enforcement of all staging / parking plan is as follows. A) Staging / Parking Plans to scale required. B) Once the plan is approved, they will be held to coniplete compliance. C) We will use a 3 step and you're out, process. Step One- Verbal and written wamings as to the staging plan violation, then have contractor sign and date field memo warning. Sten Two- Police Department issue tickets and tows or public works writes second written waming to all violators who have been notified under step one and who are still in violation of the approved Staging i Parking Plan. The Town of Vail Chief Building Official will call the contractor and notify them, the next time any violation happens, the building department will red tag the construction site for 48 hours. Sten Three- If still in violation after step two, a 48 hour Red Tae will be issued to the project site. If you have any Questions, Please contact the Town of Vail Construction Inspector at 970-479-2t98 F:\cdev\FORMS\PERMITS\Stagi ng-Parking.doc Requirements for an Acceptable Staging Plan It is prefened that and Approved Site Plan is used to draw a staging plan, but a hand drawn plan may be used as long as it is dawn to scale and is neat and legible. l.) The Staging Plan must show the following: (a) Show all parking that is required for the job site. (Including construction equipment). (b) Show the location of all material that will be staged on site. (c) Shbw the location of all dumpsters and port-o-john that are to be on site. (d) If a fence is required, then show the location of the fence and describe the material used for the fence. (e) Iftrees and / or vegetation is required to be protected, then show how this will be done. (0 If this staging plan is for a Demo Permit, then show staging for dump trucks and all related equipment. If the Town of Vail Right of Way area is needed for staging, then a Traffic Control Plan is required in conjunction with the staging plan. (g) Please provide and show an Erosion Control Plan. (h) No equipment. vehicles, materials are allowed on Town of Vail Right of Way in the Winter Staging Plan. 2.) If work needs to occur in the right of way, then add a Traffic Control Plan to the staging plan showing the following: (a) The work zone (area that is to be performed) (b) Traffic Control Devices (waming, signs, cones, flaggers, etc.) (c) Distances that all devices will be set up from the work zone. Also show all dimensions of work being performed in the right of way. All traffic control plans must conform to the MUTCD manual.(Manual of Uniform Traffic Control Devices) 2.) This plan will be reviewed by Public Works and if Necessary the Police, Fire, and Community Development Department. Once the staging plan is approved, it will be registered with the departments listed above and enforced. 3.) The Village and Lionshead area have outside construction restrictions, Please become familiar with the Yatl2002, Vail Village and Lionshead Construction Hours handout. F:\cdev\FORMS\PERMITS\Staging-Parking.doc