Loading...
HomeMy WebLinkAboutPOTATO PATCH CLUB CONDOMINIUMS COMMON 2·~.:.J ~~~Jel f~~~CLJr-~~-:S1J~ TOWN OF VAIL 75 '5.FRllNTAGE ROAD VAIL,CO 81657 970-479-213X •Vlu-(of ~t-vfa... DEPARTMENT OF COMMUNI'DEVELOPMENT ~0 NOTE:THIS PERMIT MUST BE POSTED ON JOBSITEAT ALL TIMES 05/03/2001 Phone:476-9492 05/03/2001 Phone:970-476-2958 950 POTATO PATCH DR VAIL POTATO PATCH CLUB #30 210106306030 ADD/ALT MF BUILD PERMIT Job Address.: Location : Parcel No : Projcct No : OWNER WALTER PATRICK GRAMM Po Box 2154 Vail,Co 81658 License: CONTRAcrOR BOYMER CONSTRUCTION POBOX 1001 VAIL CO 81658 Pennit #:BO 1-0 105 Status : Apphcd : Isslled ' Expires : ISSUED 05/03/2001 0511712001 1111312001 License:152-8 APPLICANT BOYMER CONSTRUCTION POBOX 1001 VAIL CO 81658 License:152-B Desciplion: Remove bay Window and convert space to deck;infill al kitchen and dining. 05/03/2001 Phone:970-476-2958 Occupancy: Type Construction: Type Occupancy: Valuation: RI Muhi-f'amily VIHR 'l'! $108.700.00 Add Sq Fl:22X Fireplace lnfonnalion:Restricted:Y Ii ofC""Appliances.:0 HofG.u 1.0,,:0 #of Wood Pellct:0 •••••uu ••••..••..fFJ~:SUMMARy •••••• Iluilding->5776.00 RcstuarnnlPlanRel'iew->$0.00 TotaICalculall:dFc.:s->$1,451.80 Plan Checlc->5504.40 ORO Pee :>$100.00 AdditiOllaIFccs-->$0.00 Investigalion.>$0.00 RccrcationFcc __$68.40 TotwPcnn;IFcc--->$1,451.80 WiJlC.U-->53.00 Ckmn.up/)q>o>it____$0.00 Pv.}11w:nlS-;:.$1,451.60 TUTALFEES >$1,451.60 BALANCE DUE->$0.00................................................................................................................................................. Approvals: Item:05100 BUILDING DEPARTMENT 05/09/2001 JRM Action:AP Item:05400 PLANNING DEPARTMENT 05/10/2001 bg Action:APPR Item:05600 FIRE DEPARTMENT Item:05500 PUBLIC WORKS .................................................__.. Se~page'2 of this Document for any conditions that may apply to this permit. DECLARATIONS I hereby acknowledge that I have read this application,filled out in fuJI the information required,completed an accurate plot plan,and state that all !.he infonnation as required is correct.I agree to comply wi!.h the infonnation and plot plan,to comply with all Town ordinances and state laws,and to build this struclurc according to the lawns zoning and subdivision codes,design review approved, Uniform Building Code and other ordinances of the Town applicable lhereto. REQUESTS FOR INsrECTION S~IALL BE MADE TWRNTY·FOUR HOURS IN An Sl:nd Clean-up IJer-it To:N!A NF.AT 479·2138 OR AT OUR orncr.FROM 8:00 AM -~PM. CTOR FOR IllMSELF AND OWNE ••PAGE2••••*••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••• Permit #:BOI-0105 CONDITIONS Of APPROVAL as of 05-17-2001 Status:ISSUED •••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••• Permit Type: Applicant: Job Address: Location: Parcel No: AOD/ALT Mf BUILD PERMIT BOYMER CONSTRUCTION 970-476-2958 950 POTATO PATCH DR VAIL POTATO PATCH CLUB #30 210106306030 ApplIed: Issued: To Expire: 05/03/2001 05/17/2001 1111312001 Description: Remove bay window and convert space to deck:infill at kitchen and dining. Conditions: Condo 12 (BLDG.):HELD INSPECTIONS ARE REQUIRED TO CHECK fOR CODE COMPLIANCE. Cond:14 (BLDG.):ALL PENETRATIONS IN WALLS,CEILINGS,AND fLOORS TO BE SEALED WITH AN APPROVED fiRE MATERIAL. Cond:16 (BLDG.):SMOKE DETECTORS ARE REQUIRED IN ALL BEDROOMS AND EVERY STORY AS PER SEC.31O.6.1 Of THE 1997 UBC. Cond:J (fIRE):fiRE DEPARTMENT APPROVAL IS REQUIRED BEfORE ANY WORK CAN BE STARTED. ••••••••••••••••••••••••••~••••••••••••••••••*•••••••••*••••••~•••**••••••••••••••••• TOWN OF VAIL,COLORADO SlilTcment ~.....••..•••••••••••••••.....................•••..•••.............................••••••••• Statement Number: Payment Method: R000000774 Check Amount:$1,451.80 05/17/200108:53 AM Init;OF Notation:CHECK #965 GRAMM Permit No: Parcel No; Site Address: Location; B01-0105 Type:ADD/ALT MF BUILD PERMIT 210106306030 950 POTATO PATCH DR VAIL POTATO PATCH CLUB #30 Total Fees;$1,451.80 This Payment:$1,451.80 Total ALL Pmts;$1,151.80 Balance:$0.00••••••••••••••••••••••••••••••••••••*••••••••••••••••••••••••••••••••••••••••••••••••••••••• ACCOUNT ITEM LIST: Account Code BP 00100003111100 OR 00100003112200 PF 00100003112300 RF 11100003112700 we 00100003112800 Description 8UILDING PERMIT FEES DESIGN REVIEW FEES PLAN CHECK FEES RECREATION FEES WILL CALL INSPECTION FEE Current PInts 776.00 100.00 504.40 68.40 3.00 Of ..0 lOS- OTHER:$ TOTAL:S • ONS FOR BUILDING PERMIT Labor &Materials MECHANICAl:$ ElECTRICAl:$ TOWN OF VAIL BUILDING PERMIT APPUCATION Separate Penn its arc required (or clcctri~l,plumbing,mecbanical,etc.! APPLICATION WIll NOT BE ACCEPTED IF INCOMPLETE OR UN!jrlj(llj;[h (J 7_ ProJect #:r...K,lI>1-(X?= Building Permit #:_...,,-_.,-_ 970-479-2149 (Inspections) • tractor Si nature: PLUMBING:$ BUILDING:$ 75 S.Frontage Rd. Vail,Colorado 81657 .'\ For Parcel #Conti/et Ea Ie Coun Assessors Office at 970-328-8640 or visit www.ea t.Gun .com Parcel #2../0 1-O(".~-Db -o:so (application will not be accepted without parcel number) ***** NOT ALLOWED yes ()No (<-Y' Phone: Phone: Subdivision: Job Address' s WoodlPellet Wood Bumi Does a Are Sprinkler System Exist: """"'=~~,-.;..-... ) Filing: MUlti-family { Date Received: I T of Construction: OCCU Grou Address' Ad ess: Lot: Work Class:New ()Remodel (~Repair ( Work Type:Interior ()Exterior ()Both (vr No.of Existing Dwelling Units In thiS building: Norr No of Are laces Prooosed:Gas A iances ( Does •Fire Alarm Exist:yes (No () Type of Bldg.:Single-family ()Two-family { legal Description Owners Name: .....••..••..····*****··············***·**·FOR OFfICE USE ONL Y··******** public Way permit Fee: F:J_ Iother Fees:DRB Fees: ,.•• Questions'Call the Buildin9 Team at 479-2325 Building Permit Submittal Checklist Department of Community Development Project Name: Project Address: C:£I\M ('v\e4~~\j").fu-JC& \blal:IP 1\::>..1""12 1-(('"I lAg.*~) ./This Checklist must be completed before a Building Permit application is accepted. r5'All pages of application is complete r!f"Has DRB approval obtained (if required)Provide a copy of approval form ~Condominium Association letter of approval attached if project is a Multi-Family complex I:)Complete site plan submitted o Public Way Permit application included if applicable (refer to Public Works checklist) o Staging plan included (refer to Public Works checklist)No dumpster,parking or material storage allowed on roadways and shoulders without written approval o ..Asbestos test and results submitted if demolition is occurringvArchitectstampandsignature(All CommerCial and Multi family) ~FuJI floor plans Including building sections and elevations(4 sets of plans for Multi-Family and Commercial) ~Window and door schedule ~ulI structural plans,including design criteria (ie.loads) ~tructural Engineer stamp and signature on structural plans (All Commercial and Multi Family) o Soils Report must be submitted prior to footing inspection CI Fire resistive assemblies specified and penetrations indicated <9/Smoke detectors shown on plans ~TYpeS and quantity of fireplaces shown Applicant's Signatur .4-~Lj~:::1~l'l,""","!1<~C_--------- Date of 5Ubmittal:~ Received By:_ F:{everyone/fonns/bidpermZ •••• HOW DID WE RATE WITH YOU? Town 01 Vail Survey Community Development Department Russell Forrest,Director, (970)479·2139 Check .11 that appfies. 1.Which Department(s)did you contact? Building _Environmental _Housing_Admin_ Planning __ORB PEC _ 2.Was your initial contact wilh our staff immediate__slow __or no one available ? 3.If you were required to wait,how long was it before you were helped?_ 4.Was your project reviewed on a timely basis?Yes I No Ilna,why not?_ 5.Was lt1is your first time ID file a ORB app __PEC app __ Bldg Permit N1A 6.Please rate the per/onnanee of lt1e staff person who assisted you: 54321 Name:__,,-,,-_ (knowledge,responsiveness,availability) 7.Overall effectiveness of lt1e Front Serlice Counter.54321 8.What is lt1e best time of day for you to use lt1e Front Service COunter?_ 9.Any comments you have which would allow us ID belter serve you nexttime?·_ Thank you for taking lt1e time to complete this survey.We are commilted ID improving our serviee. •• WHEN A "PUBLIC WAY PERMIT"IS REQUIRED PLEASE READ AND CHECK OFF EACH OF THE FOLLOWING QUESTIONS REGARDING THE NEED FOR A "PUBUC WAY PERMIT": Is this a new residence?YES __NO/ Is any utility work needed?YES,_ YES __ Does demolition work being performed require the use of the Right-of-Way,easements or public property?YES,___NO /'" NO ,..-/ NO/"15 the driveway being repaved? o o a Is a different access needed to the site other than the existing driveway?YES __NO ./' u Is any drainage work beJ.pg done that affects the Right-of-Way,easements,or public property? YES NO-,/=--- o Is a "Revocable Right-of-Way Permit"reqUired?YES~_NO/ o Is the RiQht-of-wa/ments or public property to be used for staging,parking or fencing? YES NO If answer is NO,is a parking,staging or fencing plan required by Public Works? YES NO--.:.//_ If you answered YES to any of these questions,a "Public Way Permit"must be obtained. "Public Way Permit"applications may be obtained at the Public Work's office or at Community Development (a sample is attached).If you have any questions please call Leonard Sandoval in Public Works at 479-2198. I HAVE READ AND ANSWERED ALL THE ABOVE QUESTIONS. Date Signed: F:/everyolle/fonns/bldperm4 •• PUBLIC WORKS AND THE PUBLIC WAY PERMIT PROCESS How it relates to Building Permits: ~Fill out the attached check list with the Building Permit Application. If yes was answered to any of the questions then a "Public Way"permit is required.You can pick up an application at either Community Development,located at 75 South Frontage Road or Public Works,located at 1309 Elkhorn Drive . .,Notice sign-offs for utility companies.ALL utilities must field verify (locate)respective utilities prior to signing application.Some utility companies require up to 48 hours notice to schedule a locate. >-A construction traffic control/staging plan must be prepared on a separate sheet of paper. An approved site plan may also be used.This plan will show locations of all traffic control devices (signs,cones,etc.)and the work zone,(area of construction,staging,etc.).This plan will expire on November 1st and will need to be resubmitted for consideration for approval through the winter.Be aware that your resubmission for winter may be denied depending on the location of construction. ;.Sketch of work being performed must be submitted indicating dimensions (length,width and depth of work).This may be drawn on the traffic control plan or a site plan for the job. Y Submit completed application to the Public Work's office for review.If required,locates will be scheduled for the Town of Vail electricians and irrigation crew.The locates take place in the morning,but may require up to 48 hours to perform. .....The Public Work's Construction Inspector will review the application and approve or deny the permit.You will be contacted as to the status and any requirements that may be needed.Most permits are released within 48 hours of being received,but please allow up to one (1)week to process. ;;..As soon as the permit is approved,the Building Department will be notified,allowing the "Building Permit"to be released.Please do not confuse the "Public Way Permit"with a "Building Permit". >-NOTE:The above process is for work in a public way ONLY.Public Way Permits are valid only until November 15th.A new Public Way Permit is required each year if work is not complete.Re-application each November 15th does not mean an automatic renewal. Signature /; F:/e'leryoneJformS/bid 5 ~{)J Date IgnOO •• BUILDING PERMIT ISSUANCE TIME FRAME If this permit requires a Town of Vail Fire Department Approval,Engineer's (Public Works) review and approval,a Planning Department review or Health Department review,and a review by the BUilding Department,the estimated time for a total review will take as long as three (3) weeks. All commercial (large or small)and all multi-family permits will have to follow the above mentioned maximum requirements.Residential and small projects should take a lesser amount of time.However,if residential or smaller projects impact the various above mentioned departments with regard to necessary review,these projects may also take three (3)weeks to review and approve. Every attempt will be made by this department to expedite this permit as soon as possible. I,the undersigned,understand the plan check procedure and time frame.I also understand that if the permit is not picked up by the expiration date,that I must still pay the plan check fee and that if I fail to do so it may affect future permits that I apply for. Agreed to by:-f\~"1 M""li:f2=_ Print nart1e Q,~~~,gnaturv Project Name:~/Vl crn-'St 'flZ}-Y--Ji.-. Date:41...:c·?2",",q~().Ll _ F:everyooe/fomls/bldperm3 APPLICATION FOR TOWN OF VAIL PUBLIC WAY PERMIT 19 __ .---.J D-D 0]0• parcel.'0 =0-C CC-00 -I 0 LJ Bldg.pennrt#,!m 0 0-0 0 0 J 1.Job Name 2.excavating contractor Name Sireat Address Mailing Address OO n 0 (If unknown calfL-479-2138 e);t.0) TOV CorrtrllG1o(s lJcen5e NUmD8f REQUIRED Stale Zlp 3.Stan Date (permit ExpIration Date) 4.Work Is for (citde one)WaterSewer Gas Electric Telephone CATV Landscaping Temp.Site Access Othe'_ Depth _ Total SF $_ Total LF $_ TOlal Pennit Fee $,_ ST BE ON THE JOBSITE BEFORE THE en working on asphalt. otected al all times. utility locations and approvals.Once all utility company ling application through the Public Works office to obtain the ow up to one week 10 process. Length _ 6.ALL MATERIAL,EQUIPMENT,AND TRAFFIC CO JOB IS STARTED. 7.Rubber out-riggers are required on excav Asphalt surfaces underneath the buc a 5.Trench-width,_ (min.4') Bond Amount $_ 8.A signature below indicates a (elli signatures are obtained,permittee necessary Town of Vail signatures. Public ServIce Company (1-800-922 Public Service Natural Gas Group (1-800-922-1987)~~~_ U.S.West (1-800-922-1987)~_ TCI Cablevlslon of the Rockies (1-800-922-1987)_ Eagle River Waler &Sanitation District (970-476·7480,ext.114)_ Holy Cross Electric Company (1·800·922-1987)_ Town of Vall Electricians (970-479-2158)_ Town of Vail Irrigation (970-479-2158) Town of Vail Public Works Construction Inspector (970-479-2198) 9.THERE WILL BE NO TOTAL STREET CLOSURESI A construction traffic control plan must be approved by the Public Works Department prior to issuance of the permit. 10.All excavation must be done by hand within lS"of utilities -(Senate Bill 172). 11.Permittee must contact public Works Deoartment at 479-2198 24 hours prior to commencing of work.Failure to notify the Town will result in forfeiture of bond money.Scheduled Inspections which are not ready may result in the Town charging the contractor a reinspection fee. 12.I certify that I have read all chapters of Title 8-Public Ways and Property,of the Vail Municipal Code and an utility company agreements,signed by me,and will abide by the same,and that all utilities have been notified as required. ATTACH PLAN OF WORK,INCLUDING CONSTRUCTION TRAFFIC CONTROL PLAN Show streets with names,buildings,and location of cuts.USE DASH LINES FOR CUT. Contraetew's Sigrulture of Agreement Prlm rwne cIearty Date CIt Signature Whrt8 -Public Worts YeUew -Coolractot •• DRAINAGE AND CULVERT INSPECTIONS ARE REQUIRED BY PUBLIC WORKS! Please rt:ld and check ofT each uf the items below: u The Town of Vail Building Department has developed the following procedures to ensure that new construction sites have adequately established proper drainage from building sites along and adjacent to Town of Vail roads or streets. o The Town of Vail Public Works Department will be required to inspect and approve drainage adjacent to Town of Vail roads or streets and the installation of temporary or permanent culverts at access points from the road or street onto the construction site.Such approval must be obtained prior to any requests for inspection by the Town of Vail Building Department for footings,temporary electrical or any other inspection.Please call Leonard Sandovai at 479-2198 to request an inspection from the Public Works Department.Allow a minimum of 24 hour notice. o Also,the Town of Vail Public Works Department will be approving all final drainage and culvert installation with resulting road patching as necessary ..Such approval must be obtained prior to any Final Certificate of OCcupancy issuance. Ag reed to by: Project Name: Date Si9ned: F;/everyone/forms/bldperm6 •• MATERIAL STORAGE AND CONSTRUCTIQN PARKING Please read and check off each of the items below. (Copies of complete text are available upon request) CODE 5-2-10:DEPOSITS ON PUBUC WAYS PROHIBITED :J Unlawful deposits:Subject to subsection C thereof,it is unlawful for any person to litter,track or deposit,or cause to be littered,tracked or deposited,sand,gravel,rocks,mud,dirt,snow,ice,or any other debris or material upon any street,sidewalk,alley or public place,or any portion thereof. o Notice;Abatement:The Director of Public Works may notify and require any person who violates or causes another to violate the provision of subsection A hereof,or who has in the Director's employment a person who violates or causes another to violate the same,top remove such sand,gravel,rocks,mud, dirt,snow,ice or any other debris or material within twenty four (24)hours after receipt of said notice by the Director of Public Works.In the event the person so notified does not comply with the notice within the period of time herein specified,the Director of Public Works,or other authorized agent,may cause any such sand,gravel,rocks,mud,dirt,snow,ice,debris or any other material to be removed from any street or alley at the expense of the notified. o Summons and Penalty:As an alternative to the notice for removal provided in subsection B above, any person who violates or causes another to violate the same,may be issued a summons lo appear before the Municipal Court of the Town for said violations,and upon being found guilty of a viola lion hereunder be punished as provided in Section 1·4-1 of this code. :J Notice and Penalty:It is unlawful for any person to fail or refuse to comply with the notice of the Director of Public Works as provided in subsection B hereof,and any such person shall,in addition to payment of the expense of removal incurred by the Director of Public Works,as provided in subsection 8 hereof,upon being found guilty of a violation hereunder,be punishable as provided in Section 1-4-1 of this Code.(1997 Code:Ordinance 6 (1979). CODES 7-3A-l AND 7-3A-3:PARKING OBSTRUCTING TRAFFIC 8t IMPOUNDMENT AUTHORIZED o No person shall park any vehicle upon a street or at any other place within this Municipality in such a manner or under such conditions as to interfere with the free movement of vehicular traffic or proper street or highway maintenance.(Ord.2(1968)§1) o Whenever any police officer finds a vehicle attended or unattended,standing upon any portion of a street or upon any place within this Municipality in such a manner as to constitute a violation of any section of this Article,or left unattended for a period of twenty four (24)hours or more and presumed to be abandoned under the conditions prescribed by Colorado Revised Statutes section 42-4-1102,as amended,the officer shall require the vehicle to be removed or cause it to be removed and placed in storage in the nearest garage or other place of safety designated or maintained by this Municipality,and the charges for towing and storage of such vehicle shall be charged to the owner of the vehicle in addition to a ten dollar ($10)impoundment charge.(Ord.2(1968)§3:Ord.28(1981)§1) I hllve read and will comply wilh the above code provisions._12.'Wllvt6(2/tE-l~am, 6 19natu PositIon or Relationship to Project Date S'gocd,1=1"'"'74 t!) FJcycryoneiformslbldperm 7 TOWNOFVAIL 75 's,FRONTAGE ROAD VAIL,CO 81657 970-479-2138 NOTE: DEltTMENT OF COMMUNITY DEVELOP.IT THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TlMES 05/03/2001 Phone:476-9492 950 POTATO PATCH DR VAIL POTATO PATCH CLUB #30 210106306030 ELECTRlCAL PERMIT Job Address: Location : Parcel No : Project No : OWNER WALTER PATRICK GRAMM Po Box 2154 Vail,Co 81658 License: Pennit #: StaLus ...: Applied,.: Issued ..: E;'(pires ..: EOI-ll086 ISSUED 05/0312001 0511712001 1111312001 CONTRACTOR F.D.TAYLOR ELECTRICAL 861 SHEKEL LANE BRECKENRIDGE.CO 80424 License:242-E APPLICANT P.O.TAYLOR ELECTRICAL 861 SHEKEL LANE BREC1CENRIDGE,CO 80424 License:242-E 05/03/2001 Phone:970-453-0726 05/03/2001 Phone:970-453-0726 Dcsciption: Valuation: ELECTRICAL FOR REMODEL $8,200,00...................................................................... Eloctrical-> ORB FcO----> 1l11'WIiiQtion-__> WillC.U-> TOTAL FEES-> $162.00 $0.00 $0.00 $3.00 $1&5.00 FEE SUMMARY . TQUJ C.I~'\II.lcl.l F~..'lI->$165.00 Addili ...".l f~_:'$0.00 Total Pennit Fee-->$165.00 P.ymom>--->$165.00 IlAI..A.~CEDUf__>$0.00................................................................................................................................................. Approvals: Item:06000 ELECTRICAL DEPARTMENT 05/09/2001 JRM Action:AP................................................................................................................................................. CONDITIONS OF APPROVAL Coad:12 (BLDG.):FIELD INSPECTIONS ARE REQUIRED TO CHECK FOR CODE COMPLIANCE ..................................................................................................................................................... DECLARATIONS I hereby acknowledge that I have read this application,filled out in full the infonnation required,completed an accurate plot plan,and state that all the information as required is correct.I agree to comply 'With the information and plot plan,to comply with all TO\\ll ordinances and state laws,and to build this slructure according to I.he towns zoning and subdivision codes,design re\·iC\v approved, Uniform Building COOe and olher ordinances ofl.hc To\\n applicable thereto. REQUESTS FOR INSPECTION SHAll.BE MADE TWENTY·FOlJR HOURS IN ADVA.'ICE BY n:u:PHO~E AT 479-2131 OR AT OUR omCE FROM 8:00 AM·5 PM. ••••••••••••••••••••••••••4IIt •••••••••••••••••••••••••••••••••••~•••••••••••••••••••••• TOWN OF VAlL,COLORADO Statement ••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••• Statement Number: Payment Method: R000000775 Amount:$165.00 Check 05/17/200108:56 AM Init:OF Notation:CHECK #965 Permit No: Parcel No; Site Address: Location: EOI-0086 "rype:BLECTRICAL PERMIT 210106306030 950 POTATO PATCH DR VAIL POTATO PATCH CLUB #30 Total Fees:$165.00 This Payment:$165.00 Total ALL Pmts:$165.00 Balance:$0.00 •••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••• ACCOUNT ITEM LIST: Account Code EP 00100003111400 we 00100003112800 Description TEMPORARY PC/;IER PERMITS WIll CAll INSPECTION FEE Current PInts 162.00 3.00 TOWN OF VAIL ELECTRICAL PERMIT APPUCATION APPUCATIO&LL NOT BE ACCEPTED IF INCOMPL~RUN~I 1/~ PrOJect #:~..-=-'-l.D.L\Oc/-=-::!L.:I::,--- Building Permit #:_ Electrical Permit #: 970-479-2149 (Inspectl"7."o-n-s):---- r 7S S.Froatage Rd. Vail,Colorado B1657 CONTRACTOR INFORMAnON Contact and Phone #'5:,...Town of Vail Reg.No,; -E: E k:al Contractor: COMPLETE SQ.FEET FO BUILDS and VALUAnONS FOR ALL OTHERS (Labor"Materials) IAMOUNTOFSQ FTIN STRUCTURE:7-z'o;bt?IELECTRICALVALUA110N:$~,.?ea2 I i Job Add Remadel (;...,--Repair ()Temp Power ()Other () )Both (...r--Does an EHU exist at this location:Yes ()No ( Detal Work Class:New () Work Type:Interior () Engl Job Name: Contact Ie Coun AS9'SSm'S Office at 970-328-8640 or visit www.ea le-coun.c for Parall # Parcel #(Required if no bldg.permit #is provided above)'Z-J Cl -~-oG,.- Type of Bldg.:SOngle-famoly ()Duplex ()Mulb-family (....,....Commeroal ()Restau"mt()Other ( No.of Exisbng Dwelling Units in this building:~No.of Accommodation Units In this bUilding: IS this rmil for a hot tub:Yes Does a Fire Mann Exist:Does a Fire Sprinkler System Exist:Yes ()No (~ Date Received:other Fees: DRBFeM: Planner n-off: ****.*****"••••*•••••************FOR OfFICE USE ONLY··*****··*******·****** F:/f!'.MYOne/rorms/eIeqJerm TOWN OF VAIL 75'S.FRONTAGE ROAD VAIL,CO 81657 970-479-2138 DEtRTMENT OF COMMUNITY DEVELOP.T NOTE:THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES PLUMBING PERMIT Pennit #:POI-0029 Job Address: Location : Parcel No : Projccl No : 950 POTATO PATCH DR VAIL POTATO PATCH CLUB #30 210106306{)30 Status ...: Applied ..: Issued ..: Expires ..: ISSUED 05/03/2001 051\712001 111\3/2001 05/03/2001 Phone:476-9492OWNERWALTERPATRICKGRAMM Po Box 2154 Vail,Co 81658 License: CONTRACTOR WHITE WATER PLUMBING &HEATIOS/03/2001 Phone:970-328-3708 POBOX 4290 EAGLE,CO 81631 License:l04-P APPLICANT WHITE WATER PLUMBING &HEATIOS/03/2001 Phone:970-328-3708 POBOX 4290 EAGLE,CO 8163l. License:l04-P Desciption: Valualion: INTERIOR REMODEL PLUMBING $14,500.00 Fireplace Information:RCllUiL1cd:11 /I orGas Applianc":17 /I orOilll Logs:n If of Wood Pallet:?1 tUt IIEE !\UMMARY .. Plumbing-->$225.00 Rcauaranl Plan Review-::-$0.00 TOlal Calcullllcd fees->$284.2S I'I:\nCh"k->$56.25 DRBFee :>$0.00 Ado:!ilionalFCC5 >$55.00 InVl'llliplion->$0.00 TOTAL FEES >$28 •.25 ToellfennitFco '>$339.25 Will CIlII-:;.$3.00 PI>menU :>$339.2S UAlANCEDUE->$0.00 ............................................................................................................................n . Item:05100 BUILDING DEPARTMENT 05/09/2001 JRM Action:AP Item:05600 FIRE DEPARTMENT CONDITION OF APPROVAL Cond:12 (BLDG.):FIELD INSPEcrIONS ARE REQUIRED TO CHECK FOR CODE COMPLIANCE ...................................................................................................................................................... DECLARATIONS I hereby acknowledge that I have read this application,filled out in full thc information required.completed an accurate plot plan.and state that all the infonnation as required is correct I agree to comply with the information and plot plan.to comply with all Town ordinances and state laws.and to build this structure according to the to"ns zoning and subdivision codes,design review approved. Unifonn Building Code and other ordinances of the T0\\11 applicable lhereto. •REQUESTS f'OR INSPECTION SHALL BE MADE TWENTY-FOUR HOURS IN AD •HONE AT 479-2138 OR AT OUR OFFICE FROM 8:00 AM -5 PM. ..........................~~. TOWN OF VAll.,COLORADOCopy Reprinted on 05-17-2001 ~t 08:59:35 05/17/2001 Slall"wcnl •••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••• Statement Number: Payment Method: R000000776 Check Amount:$339.25 05/17/200108:59 AM Init:DF Notation:CHECK #965 Permit No: Parcel No: Site Addregg: Location: POI-0029 Type:PLUMBING PERMIT 210106306030 950 POTATO PATCH DR VAIL POTATO PATCH CLUB #30 Total Fees:$339.25 This Payment:$339.25 Total ALL Pmts:$339.25 Balance:$0.00 •••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••• ACCOUNT ITEM LIST: Account Code CL 00100003123000 PF 00100003112300 PP 00100003111200 WC 00100003112800 Description CONTRACTOR LICENSES PLAN CHECK FEES PLUMBING PERMIT FEES WILL CAlL INSPECTION FEE Current Pmts 55.00 56.25 225.00 3.00 •• ..-_............... O'.,, i~0<::.~ ;::0-5 ~"0 •N-~m0- ~ en il~-.D C> ..i :ll N ,. ;: N ;: .D ~~~N -:li N .D '. Ii ~!".... f'"N '",. 0 ~0>. .D /.).•'",. ()~\Uen I,']"?, r-iP '~F1,1} o -~c_J)I >'}f 1:1 0 <D en!J '"'"!I.!B ....o<I ~j • APPUCATIO.LL NOT BE ACCEPTEO IF INCOMP~~~~Jll\:r01 _C4 +- Building Permit #:]30 eQI115:: Plumbing Permit #:-:-:-----:__-., 970-479-2149 (Inspections) 75 S.Frontage Rd. Vall,Colorado 81657 CONTRACTOR INFORMATION Town of Vail Reg.No.:Contact and Phone ,'s: I y-32-8-~ COMPL~.iIJ"LUATIONFOR PLUMBING PERMIT (Labor &Materials) IPLUMBING:$)~_,.5w~=~~~~__~_~~~~~~~....J1 Phone: Subdivision: Phone: Job Address' LegalOesaiption Owners Job Name: Contact Ea Ie Coun Assessors Office at 970-328-8640 or visit www.a fe-coun .com for Parcel # Parcel #(Required if no bldg.permit #is provided above)?-JO(-Oc..,;-Ot,- Work Class:New ()A:ddition (Alteration ()Repair ()Other () Type of Bldg.:Single-familv ()Duplex ()Multi-family (Commercial ()Restaurant ()Othec () No.of existing Dwelling Units in this building:-z..,...No.of Accommodation Units In this building: Is this a conversion from a wood burning fireplace to an EPA Phase U device?Yes ()No ~ **·····································FOR OFFICE USE ONly····································· f/~ormsIplmbperm •• HOW DID WE RATE WITH YOU? Town of Vail Survey Community Developmenl Departmenl Russell Forrest,Director, (970)479.2139 Check all Ihat appfies. 1.Which Department(sj did you contact? Buiiding _Environmental __Housng __Admin __ Planning __ORB PEC _ 2.Was your initial contact with our staff immediate_slow __or no one available ? 3.If you were required to wait how long was ~before you were he!ped?_ 4.Was your project reviewed on a timely basis?Yes I No If no,why nol?_ 5.Was tIlis your first time to file a ORB app __PEC app __ Bldg Penni!NJA 6.Please rate the performance of the staff person who assisted you: 5 4 321 Name:--77=,--------- (knowledge,responsiveness,ava~ability) 7.Overall effectiveness of the Front Sef"Jice Counter.54321 8.What is tile best time of day for you to use tile Front Service Counter?_ 9.Any comments you have which would allow us to better serve you nexl time?-.,._ Thank you for taking tile time to complete tIlis survey.We a-e committed to improving our service. ,•• TOWN OF VAIL 75 S.FRONTAGE ROAD VAIL,CO 81657 970-479-2138 DEPARTMENT OF CO~1UNITY DEVELOPMENT NOTE:THIS PERMIT MUST 8E POSTED ON JOBSITE AT ALL TIMES ADD/ALT MF BUILD PERMIT Permit #:B97-0092 Job Address: Location ...: Parcel No ..: Project No.: 950 POTATO PATCH DR POTATO PATCH CLU8 CONDOS 2nJ 063 06 018 PRJ97-0055 Status ...: Applied ..: Issued ...: Expires ..: ISSUED 05/02/1997 05/12/1997 11/08/1997 APPLICANT MINICK CONSTRUCTION POBOX 4018,VAIL CO 81658 CONTRACTOR MINICK CONSTRUCTION P0 80X 4018,VAIL CO 81658 OWNER GLENN JOHN H &ANNA C 7208 EAGLE RIDGE PL,8ETHESDA MD 20817 Phone:3038275924 Phone:3038275924 Description: REDO 2ND LEVEL BATH/BEDROOM CONVERT HEAT 81,900 Occupancy:Rl Type Construction:V I-HR Type Occupancy: valuation: Multi-Family Type V 1-lIour Add Sq TOV/Comm.Dev. Clean-up Deposit Refund approved ~~~~~__ amount ;)So,/ date 2.-l rw l QI Ft:--"-t fireplllce JnfOflMtion:Rl!stricted:'Of Gos Logs:NOf VoodjPallet: ***~**********************.**.******.********•••**********FEE SUHMARY ..ttit •••t ••_••••t ___**••_._.****.**_ eu1lding----->650.00 RestU6rant PLan Review-->.00 TotBL Calculated fl!l!S--->1,325.50 Plan Check--->422.50 DRB Fee---------------->.00 Additional Fees-------->.00 Investigation>.00 Recreation fee-------->.00 TotaL Per.it fee------->1,325.50 Will CaLl---->3.00 Clean-Ur Deposit-------->250.00 Pay~ents---------------->1,325.50 TOTAL fEES----------->1,325.50 BALANCE DUE-----).00 ***~~*********************************************~**~*************************~~***.**.********.***.******************.********.. Item:05100 BUILDING DEPARTMENT 05/12/1997 CHARLIE Action:APPR CHARLIE Item:05400 PLANNING DEPARTMENT 05/12/1997 CHARLIE Action:APPR N/AItem:05600 FIRE DEPARTMENT 05/12/1997 CHARLIE Action:APPR N/A Item:05500 PUBLIC WORKS 05/12/1997 CHARLIE Action:APPR N/A Dept: DAVIS Dept: Dept: Dept: BUILDING Division: PLANNING Division: FIRE Division: PUB WORK Division: ......***..********.**.****.************************************************.**********************•••**....*.******************'*kt See Page 2 of this Document for any conditions that may apply to this permit. DECLARATIONS 1 hereby acknowledge that I have read this application,filled out in fuLL the infor.ation required,c~pleted an accurate pLot plan,and state that all the inforeation provided as required is correct.1 agree to co.ply with the 1nfor.ation and plot plan, to ca.ply ~ith all Town ordinances and state laws,and to build this structure according to the Town's zoning and subdivision codes,design review approved,Unifor.Building Code and other ordinances of the Town applicable thereto. REQUESTS fOR INSPECTIONS SHALL BE ftADE TWENTY-fOUR HOURS IN ADVANCE BY TELEPHONE AT 4 Send Clean-Up Deposit To:"INNICK CONSTRUCTJON SIGHATU , •• ******************************************************************************** CONDITIONS Permit #:B97-0092 as of 05/16/97 Status:ISSUED ******************************************************************************** Permit Type:ADD/ALT MF BUILD PERMIT Applicant:MINICK CONSTRUCTION 3038275924 Job Address: Location:POTATO PATCH CLUB CONDOS UNIT #18 Parcel No:2101-063-06-018 Description: REDO 2ND LEVEL BATH/BEDROOM CONVERT HEAT Applied:05/02/1997 Issued:05/12/1997 To Expire:11/00/1997 Conditions: 1.FIELD INSPECTIONS ARE REQUIRED TO CHECK FOR CODE COMPLIANCE. 2.ALL PENETRATIONS IN WALLS,CEILINGS,AND FLOORS TO BE SEALED WITH AN APPROVED FIRE MATERIAL. 3.SMOKE DETECTORS ARE REQUIRED IN ALL BEDROOMS AND EVERY STORY AS PER SEC.1210 OF THE 1991 UBC. 4.FIRE DEPARTMENT APPROVAL IS REQUIRED BEFORE ANY WORK CAN BE STARTED. .:"'\ ••**************************************************************** TOWN OF VAIL,COLORADO Statemnt **************************************************************** Statemnt Number:REC-0275 Amount: Payment Method:CHECK Notation:#192 1,325.50 05/16/97 11:24 Init:CD ---------------------------------------------------------------- ADD/ALT MF BUILD PER 1,325.50 Permit No: Parcel No: Site Address: Location: This Payment B97-0092 Type:A-MF 2101-063-06-018 950 POTATO PATCH DR POTATO PATCH CLUB CONDOS UNIT Total Fees: Total ALL Pmts: Balance: t IB 1,325.50 1,325.50 .00 **************************************************************** Account Code 01 0000 41310 01 0000 41332 01 0000 22002 01 0000 41336 Description BUILDING PERMIT FEES PLAN CHECK FEES CLEANUP DEPOSITS WILL CALL INSPECTION FEE Amount 650.00 422.50 250.00 3.00 ---------------------------------------------------------------- •• TOWN OF VAIL DEPARTMENT OF COMMUNITY DEVELOPMENT 75 S.FRONTAGE ROAD VAIL,CO 81657 970-479-2138 NOTE:THIS PERMIT MUST 8E POSTED ON J08SITE AT ALL TIMES MECHANICAL PERMIT Permit #:M97-0066 Job Address : Location : Parcel No : Project Number: 950 POTATO PATCH DR POTATO PATCH CLU8 CONDOS UNIT 2101-063-06-018 PRJ97-0055 Status ...: Applied ..: Issued ...: Expires ..: ISSUED 05/02/1997 05/02/1997 10/29/1997 APPLICANT VALLEY WIDE MECH.&ELECTRICAL I POBOX 50BO,AVON CO 81620 CONTRACTOR VALLEY WIDE MECH.&ELECTRICAL I POBOX 5080,AVON CO 81620 OWNER GLENN JOHN H &ANNA C 7208 EAGLE RIDGE PL,BETHESDA MD 20817 Phone:3039491747 Phone:3039491747 Description: CONVERT ELEC HEAT TO NAT.GAS Valuation:12,000.00 rlfl!'ptaee Infor_tion:Reurieted:~Of Ga~Appl i.lces:rOf wood/pallet: **n •••tH-t.*********H-t:U.H-t.*'.HfrtU **U••FEE SUIlPlARY ************UH-t:H il ***<iltH ••••****************** KeU1&nicllt-->21,0.00 Re~tuarent Plan Rc:v1eIt""-:>.00 Total Calcutau:d fees-->303.00 Plan Check-->60.00 DRB ree---->.00 AdditiOflllI rHS---->.00 Jnvutigation>.00 TOTAL FEES-------)303.00 Total Per.it Fee------>303.00 Yilt (011-->3.00 Pay.enl$-------------->303.00 BALANCE DUE------------->.00 •••Uilfr*'*.U**H:UUuU*llUU******************************,*Hlirlllill.IIIU.IU****.*************'*U UI**II**Hlll . Division: Division:BUILDING FIRE It;m:05100 BUILDING DE\'ARTMENT Dept: 05 02/1997 CHARLIE Act1on:APPR CHARLIE DAVIS Item:05600 FIRE DEPARTMENT Dept: ,CONDITION OF APPROVAL 1.FIELD INSPECTIONS ARE REOUIRED TO CHECK FOR CODE COMPLIANCE. 2.COMBUSTION AIR IS REQUIRED PER SEC.607 OF THE 1991 UMC. 3.INSTALLATION MUST CONFORM TO MANUFACTURES INSTRUCTIONS AND TO APPENDIX CHAPTER 21 OF THE 1991 UMC. 4.GAS APPLIANCES SHALL BE VENTED ACCORDING TO CHAPTER 9 AND SHALL TERMINATE AS SPECIFIED IN SEC.906 OF THE 1991 UMC. 5.ACCESS TO HEATING EQUIPMENT MUST COMPLY WITH SEC.505 AND 703 OF THE 1991 UMC. 6.BOILERS SHALL BE MOUNTED ON FLOORS OF NONCOMBUSTIBLE CONST. UNLESS LISTED FOR MOUNTING ON COMBUSTIBLE FLOORING. 7.PERMIT~PLANS AND CODE ANALYSIS MIUST BE POSTED IN MECHANICAL ROOM PKIOR TO AN INSPECTION REQUEST. 8.DRAINAGE OF MECHANICAL ROOMS CONTAINING HEATING OR HOT-WATER SUPPLY BOILERS SHALL BE EQUIPPED WITH A FLOOR DRAIN PER SEC. 2119 OF THE 1991 UMC. ******************************************************************************** DECLARATIONS I hereby acknowledge that I have reed this applicati?",filled out in full the infor.ation required,ca.pleted an accurate plot ••plan,and stotc thot oll the infor~Dtion provided os required is correct.I agree to co~ly with the inforMation and plot plen, to co~Ly with all Town ordinances and state laws,and to build this strueture according to the Town',zoning and subdivision codes,design review approved,Uni10r.8uilding Code and other ordinances of the Town applicable thereto. AT OUR OffICE FROM 8;00 A~~;OO PH /2.4/, REQUESTS FOR IHSPECTlotlS SHAll 8E IlAOE lWENn'-FOUR HOURS IN ADVANCE BY TElEPHOtIE AT 479-2138 OR ------,,~wi1qSIGNATUREOfOWNERORCONTRACTORFORHI"SElF AHO OUHER '."... ••**************************************************************** TOWN OF VAIL,COLORADO Statemnt **************************************************************** Statemnt Number:REC-0275 Amount: payment Method:CHECK Notation:#192 303.00 05/16/97 11:25 Init:CD ---------------------------------------------------------------- MECHANICAL PERMIT 303.00 Permit No: Parcel No: Site Address: Location: This Payment M97-0066 Type:B-MECH 2101-063-06-018 950 POTATO PATCH DR POTATO PATCH CLUB CONDOS UNIT Total Fees: Total ALL Prnts: Balance: U8 303.00 303.00 .00 **************************************************************** Account Code 01 0000 41312 01 0000 41332 01 0000 41336 Description MECHANICAL PERMIT FEES PLAN CHECK FEES WILL CALL INSPECTION FEE Amount 240.00 60.00 3.00 ---------------------------------------------------------------- .,.~ •• TOWN OF VAIL DEPARTMENT OF COMMUNITY DEVELOPMENT 75 S.FRONTAGE ROAD VAIL,CO 81657 970-479-2138 NOTE:THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES PLUM8ING PERMIT Permit i:P97-0048 Job Address: Location ...: Parcel No ..: Project No.: 950 POTATO PATCH DR POTATO PATCH CLUB CONDOS 2101-063-06-018 PRJ97-0055 Status ...: Applied ..: Issued ...: Expires ..: ISSUED 05/02/J997 05/02/1997 10/29/1997 APPLICANT VALLEY WIDE MECH.&ELECTRICAL I POBOX 5080,AVON CO 81620 CONTRACTOR VALLEY WIDE MECH.&ELECTRICAL I POBOX 5080,AVON CO 81620 OWNER GLENN JOHN H &ANNA C 7208 EAGLE RIDGE PL,BETHESDA MD 20817 Phone:3039491747 Phone:3039491747 Description:PLUMBING FOR REMODEL valuation:10,000.00 *******,************************ffI",*.",*,UiI*********rtU***FEE SUtmARY ..tt*************«u*************'*lit U '**tit *'*itI '*u-u.~* Pluebing----->150.00 Re~tuarant Plan Review-->.00 Total Calculattd Fees--->190.50 Plan (heck--)37.50 TOTAL FEES-----------)190.50 Additional fees---->.00 Jnvestigation>.00 Total Per.it fee------)190.50 \lill '811--)3.00 Pllr-nts------------)190.50 BALMCE llue---------->.00 **"*******.******U***..***.iU*"***.****.***********'***'****a-t ....tiIH.***......***************til*********.*****H******************** Item:05100 BUILDING DEPARTMENT Dept:BUILDING Division: 05/02/1997 CHARLIE Action:APPR CHARLIE DAVIS Item:05600 FIRE DEPARTMENT Dept:FIRE Division: CONDITION OF APPROVAL 1.FIELD INSPECTIONS ARE REQUIRED TO CHECK FOR CODE COMPLIANCE ..."," ***H**************************************************~************A****************************************H******************* DECLARATIONS I hereby atknowledge that I have read thi,applitation,filled out in full the inforaation required,t~pleted an atcurate plot plan,and state tnat all the infor.-tion provided as required i,torrett.I agree to ta.pty with the infor.ation and plot plan, to tonply with all Town ordinances end state laws,and to build this strutture atcording to the Tawn's zoning and subdivision codes,design review app~ed,Unifor.Building Code and other ordinante.of the Tawn applicable thereto. REOUESTS FO~INSPECTIONS SHALL BE KADE TYENTY-FOUR HOURS R OFFICE FROH 8:00 ~5:00 PH SIGNATURE 0 OWNER OR ONTA TOR FOR HI"ELf AND ~ER ••**************************************************************** TOWN OF VAIL,COLORADO Statemnt ******************************************************+**+****** Statemnt Number:REC-0275 Amount: Payment Method:CHECK Notation:#192 190.50 05/16/97 11:25 Iolt:CD PLUMBING PERMIT 190.50 Permit No: Parcel No: Site Address: Location: This payment P97-0048 Type:B-PLMB 2101-063-06-018 950 POTATO PATCH DR POTATO PATCH CLUB CONDOS UNTI Total Fees: Total ALL Pmts: Balance: U8 190.50 190.50 .00 **************************************************************** Account Code 01 0000 41311 01 0000 41332 01 0000 41336 Description PLUMBING PERMIT FEES PLAN CHECK FEES WILL CALL INSPECTION FEE Amount 150.00 37.50 3.00 •• TOWN OF VAIL DEPARTMENT OF co~mUNITY DEVELOPMENT 75 S.FRONTAGE ROAD VAIL,CO 81657 970-479-2138 NOTE:THIS PEffi~IT 11UST BE POSTED ON JOBSITE AT ALL TIMES ELECTRICAL PERMIT Permit #:E97-0072 Job Address: Location ...: Parcel No ..: Project No.: 950 POTATO PATCH DR POTATO PATCH CLUB CONDOS 2101-063-06-010 PRJ97-0055 Status ...: Applied ..: Issued ...: Expires ..: ISSUED 05/02/1997 05/02/1997 10/29/1997 APPLICANT OLD ELECTRIC Phone:3038275918 P0 BOX 490,MINTURN CO 81615 CONTRACTOR OLD ELECTRIC Phone:3038275918 POBOX 490,MINTURN CO 81645 OWNER GLENN JOHN H &ANNA C 7208 EAGLE RIDGE PL,BETHESDA MD 20817 Description:ELECTRICAL FOR REMODEL Valuation:3,100.00 ************,,*11*******************.*'••••"*****************FEE SUttXARY **H.....*******'*********"******************************** Electriul--) DRB Fee --> Investigation> Vill tall---) TOTAL fEES--> 72.00 .00 .00 3.00 75.00 Total Calculated fees--) Additiotlal Fets--------) Total Per.it Fee------> Pay.ents-------------> BALANCE DUE-------> 75.00 .00 75.00 75.00 .00 Item:06000 ELECTRICAL DEPARTMENT 05/02/1997 CHARLIE Action:APPR FOR Item:05600 FIRE DEPARTMENT Dept: ERNST Dept: BUILDING FIRE Division: Division: ***.*****.*....***.***.***.**.*.***.*••**.*.****.*****.********.************.****************************************************' 1.FIELD INSPECTIONS ARE CONDITION OF APPROVAL..."~ REQUI~ED TO CHECK FOR CODE COMPLIANCE., ***.*****...**********...***.*********************......**************...******.*************.**.........*"***••*******...***************•• DECLARATIONS 1 hereby acknowledge that I have read this application,fill~out in full the infor~tion required,ea.pleted an accurate plot plan,and state that all thl!':infor_tioo provided as required h correct.I agree to cOllply w1th the infor_tion and plot plan, to ca-ply with all Town ordinances and state laws,and to build this structure according to the Town's zoning and subdivision codes,design review approved,Unlfora Building Code and other ordinances of thl!':Tawn applic_ble thereto. REOUESTS FOR INSPECTIONS SHALL BE MADE TVENTY-FOUR HOURS IN ADVANCE BY TELEPHONE AT 479-2138 OR AT OUR OFFICE FROM 8;00 Aft 5:00 PH SIGNATURE OF OR CONTRACTO OR H ELF ANO OWNER ••***************.******.*******************************--*-_._._- TOWN OF VAlL,COLORADO Statemnt ******************************************************---*.-•••• Statemnt Number:REC-0275 Amount: Payment Method:CHECK Notation:'192 75.00 05/16/97 11:25 Init:CD ELECTRICAL PEID4IT 75.00 Permit No: Parcel No: Site Address: Location: This Payment E97-0072 Type:B-ELEC 2101-063-06-018 950 POTATO PATCH DR POTATO PATCH CLUB CONDOS '18 Total Fees: Total ALL Pmts: Balance: 75.00 75.00 .00 ******************************************************------*-_. Account Code 01 0000 41313 01 0000 41336 Description ELECTRICAL PEr04IT FEES WILL CALL INSPECTION FEE '.-"'\ Alnount 72.00 3.00 PER>IIT ,_.~.Cont8ct Eagle County Assess<A,Office ..~.'at 970-328-8640 for Parcel If'TOWN OF VAIL CONSTRUCTIdP' PARCEL ,:2../01 0'-3 af,1?If!PERMIT APPLICATION FORMDATE:_ tL APPLICATION MUST BE FILLED OUT COMPLETELY OR IT MAY NOT BE ACCEPTED ~••**••••••••*.***••••*••••••*PERMIT INFORMATION *****•••*.****•••*.***••••••• [,y-Building [<J?Plumbing [~ectrical []-Hechanfcal []-Other _ Job Name:CLelo/tl/REA t?lf C-Job Address:'l5D .t?pj,4cd<&~~A!"","",r -#I'i? Legal Description:Lot Block Filing SUBPIYISlQN: Owners Name:S£,v ;:;<;-0/C L<:iV/!/Address:'lSi Re!Spvo,ren<1'0 dt'F Ph.'t7,-5¥t"? ___________,Ph.'t)<.-·W~ CO!V vgT ELEcrU ro Ct.s 1fS4-7= 0' Architect:pIERrE YFCfieasK=/fJ.¥.Address: I General Description:£E....pp 'J,.,,}Lrw(JJ""wM i&1f?J- Work Class:[]-NeW [~lteration []-Additional []-Repair [)-Other _ Number of Dwelling units:Number of Accommodation Units: Town of Vail Reg.NO._ Phone Number: Contractor: Plumbing Contractor:1~~7' Address:41 t,(t'tercqte Mechanical Address: ~mber and Type of Fireplaces:Gas Appliances__Gas Logs__Wood/Pellet ~•••••••••••••••••••••••••••••};~~;(LUS(~~••••••••••••••••••••••••••••••••• BUILDING:$a IJaO ELECTRICAL:$00./(J()OTHER:$;---,==---- PLUMBING:$!fI,D'rr,MECHANICAL:$IJ""0 TOTAL:,It!Pea ~••••***••**********•••*****CONTRACTOR INF~RMATION ••*******•••*.************* "eneral Contractor:M \/VlCI<Co ....Sr-Town of vail Reg.NO.:2.y<! Address:Oaf=.'to/it Ohk 897-60 'lJ.-~hone Number:8)7-s:t£?i-- 1 II9-G Electrical Contractor:OLo E't.:-crBr(I!'C(J-OO own of vail Reg.NO.'=6J2 Address:,BOb 4ft?l"J'yT4q"""CC;w Phone Number:8.22-.)"!;i::'y Town of Vail Reg.NO.1P_ljO Phone Number:t1"fQ -t 74".,, ******************************** BUILDING PERMIT FEE: PLUMBING PERMIT FEE: MECHANICAL PERMIT FEE: ELECTRICAL FEE: OTHER TYPE OF FEE: DRB FEE: FOR OFFICE USE ******************************* BUILDING PLAN CHECK FEE: PLUMBING PLAN CHECK YEE: MECHANICAL PLAN CHECK FEE: RECREATION FEE: CLEAN-UP DEPOSIT: TOTAL PERMIT FEES: TYPE GROUP SQ.FT.VALUATION BUILDING: SIGNATURE: ZONING: SIGNATURE: Comments: XCLEAN UP DEPOSIT REFUND TO: •• GENERAL CONDITIONS: GLENN REMODEL POTATO PATCH CLUB #18 VAIL.COLORADO • Symbols and room numbers listed below correspond to sheet A 1.0.Existing floor plans.A 1.1- A 1.3 are also supplied and should be field verified. All existing electric heat devices are to be removed throughout the unil.Appropriate hot water. ,base-board heating system is to be installed.All associated work due to demolition of the existing mechanical system and installation of the new sySlCrn is 10 be included in this remodel. (!)UATH: DEMO- Remove existing wall separating storage room and bath.Remove existing flooring material and prepare floor as required for new tile.Remove existing door to storage room and protect during new construction. NEW CONSTRUCfION· Relocate tub and fixtures at bath as indicated.Prepare walls as required for new wall tile at tub. Install new toilet as indicated on drawings.Install new vanity with double sinks as indicated. 0CLOSET: DEMO- No modifications required at this area.Remove existing flooring.Protect existing during new construction. Q)CLOSET: DEMD· No modifications required at this area.Remove existing flooring.Protect existing during new construction. @:JnEDROOM, DEMO- Remove existing wall separating Bedroom and Loft.Remove and protcct cxisting Bedroom door. Remove existing flooring. NEW CONSTRUCTION· Add new Bedroom wall as indicated on drawings.Re·install Bedroom door as shown,Prepare floor as required for installation of new flooring. ®BATH, DEMO- Remove existing vanity.Remove existing toilct and protect tile floor and tub surround. n1-_- Remove ex.isting .)'·0_. ~• ••I• •• NEW CONSTRUCTlON- Install toilet as indicated on plan.Install new shower with bench as indicated.Install glass shower enclosure.Install tile flooring and tile walls at shower.Install pocket door as shown. (?)LAVATORY ROOM: DEMO- ,Remove existing linen closet and pocket door.Remove existing shelf and rod and protect Remove existing flooring. NEW CQN$TRUCTION- Install vanity with double sink as indicated on plan.Add partition wall between La\'.Room and ,Closet as indicated on plan.Add new door as shown.Install new flooring. (2)cWSET: DEMO- Remove existing flooring. NEW CONSTRUCTION- Modify rod and shelf and re-install.Install new nooring. (!)IALl.JSTAIR: DEMO- Remove existing wall.(see also demo notes at room #4)Remove existing flooring. NEW CONSTRUCTION· Add stair balustrade and newel post as shown.Install new flooring. ®LINEN, DEMO- Remove existing flooring. NEW CONSTRUCTION- Install door as indicated.Provide (6)six adjustable shelves with brackets.lnsmll new flooring. @JBUNK ROOM, DEMO- Remove existing partition wall as indicated.(sec also demo notcs al room #4)Remove existing flooring. NEW CONSTRUCTlON- Install new separation wall and door between Bunk room and Hall/Stair as indicated.Install new by-pass window (6'-6"w x 4'-O"h)as shown.Provide double closet cabinet as shown.Provide T.Y.cabinet as show.Provide built-in bunk beds and ladder as shown.Install new flooring. .DIVISION 1:GENERAL Rr.eREMENTS A.Reference Standards:• I.Worle shall be pcrfonned io accordance with the 1991 Edition of the Unifonn Building Code,all codes and regulations of the Town of Vail,Colorado,and other applicable stale and local codes.All work shall be done in accordance with A.I.A. Document A20 I,General Conditions of the Contract for Construction,1981 Edition. B.Coordination: I.Contractor shall field verify all exact locations and sizes of existing utilities as required prior to begiMing work.All utilities shall be installed and modified per the utility company requirements and recommendations. 2.Mechan~cal work and electrical work are to be done 00 a design·build basis, Contractor shall coordinate fully between these contractors and all other portions of the work.These drawings are schematic and show intent only.The contractor is responsible for preparing and providing any additional drawings and infonnation required by slate or local officials. 3.Contractor shall be responsible for all field engineering required for the project. 4.Contractor shall coordinate with architect on all portions of the woric and shall obtain architect's approval ofall items prior to ordering. S.Contractorshall coordinate and install all sleeves or prepare for all penetrations as required.Any cutting and/or patching required due to a lack of coordination shall not be considered an extra cost. C.Penn its: I.Contractor shall be responsible for applying for and obtaining all required pennits and utility taps. 2.Owner shall be responsible for payment of all penn its and tap fees. D.Insurance: I.Contractorshall carry Contractor Liability Insurance,Worker's Compensation. Insurance,and other insurance's in amoWlts required by state and local jurisdictions. E.Temporary Services: I.Contractor shall be responsible for maintaining temporary services such as power, light,heat,enclosures,water,sanitary facilities,erosion and sediment control, temporary construction fencing,tree and plant protection,and trash removal adequate to meet requirements of local jurisdictions,maintain safety of the site,and maintain quality,for the dwation of construction. F.Quality Control: I.Contractor shall maintain quality control over supplies.manufacturers,products, services.site conditions and workmanship to produce the quality level specified in all cases. 2.All products shall be.installed strictly per manufacturer's recommendations and/or standard trade council guidelines. • 3.Commencement ofworke previous work indicates that installer has reeed the previous work and agrees it is acceptable as a substrate for his work. 4.When shop drawings or cut sheets are required,obtain architect's written approval of submittal before proceeding with work. 5.All contractors are responsible for repairing or replacing any disturbed or damaged materials during the scope of this project. G.Substitutions: J.Specific brands and models of products are specified to set a standard of quality. Contractor may propose alternate brands for the architect's approval,which are of similar or higher quality to that specified in all cases. 2.Contractor must obtain written approval of proposed alternate for the architect before proceeding with any substitution. H.Submittals: I.Shop drawings are required under some divisions of the work and are specified in the individual sections.When required,submit one sepia and three blue line prints for the architect's approval. 2.Cut sheets are required when proposing an alternate and when required in any individual section of the specification.Provide five copies of each. I.Mock-up Panels and Samples: 1.Mock-up panels or 53ITlpies shall be supplied for the architect's approval when called for in the individual specification sections.Mock-ups and samples shall be actual samples ofthe work showing color,texture,finish and/or pattern to be obtained.If a product has a range of colors,textures,etc.,provide an adequate amount of samples to be representative of the full range. 2.Mock-ups and samples may be incorporated into the building upon meeting architect's approval. J.Project Close-out: I.At the end of the project,contractor shall provide owner with maintenance manuals, product literature,special tools and warranties for all mechanical and electrical equipment,appliances and other manufactured products. 2.At the end of the project,contractor shall provide owner with an instructional walk-through of all mechanical,electrical and specialty items,explaining stan up and shut down procedures,and maintenance procedures. K.Final Cleaning: t.Contractor shall clean the entire project,such that the owners may occupy the project without hindrance.This includes,but is not limited to,cleaning and polishing all floors,walls,windows,appliances, fixtures and fittings. DlVISlQN 2:SITE WORK A.N/A •DIVISION 3,CONCRETE A.N/A DIVISION 4:MASONRY A.NJA DIVISION 5:METALS A.NlA DIVISIQN 6:WOOD AND PLASTICS A.Rough c.rpentry: 1.All framing lumber shall meet or exceed the following specifications: a.All headers,beams,joists,and horizontal framing fb -1,250 PSI and "c -1,600,000 b.All posl,studs,plates,sleepers,furring,and bridging lb·1,000 PSI "E"•1,600,000 c.Machine bolts -ASTM A307 d.Lag boilS -fed.spec.fF-f-l-J (galv.at ext.locations) e.Nails·common fed.spec FF-F-l-I (galv.al ext locations) 2.Stud Sil.tS are 2 x 6 &2 x 4 as indicated on Drawings. • 3.All headers shall be two 2x lO's for 2x4 walls and three 2x 10's for 2x6 walls, unless otherwise shown on structural plans. 4.PeneU1llions of major structural members shall be discussed with ArchilecliEngineer prior to drilling,and shall follow Manufacturer's recommendations. 5.Dimensions for framing shall be per Architectural drawings. 6.Provide firestopping as required by code. B.Finish Carpentry: 1.Exterior Trim: N/A 2.Interior Trim: a.All interior trim to match existing.Stain and finish as approved. 3.Wood Flooring: NlA C.Custom Casework: 1.Custom casework will be of various slyles,sizes.,species and finishes as chosen by Owner. ••2.All Architectural wood work shall conform to A WI custom grade standards. Substrates shall be 45 lb.density industrial grade fiber board. 3.Provide shop drawings and samples for Owner/Architect review and approval. E.Countcrtops: I.All countertops are to match existing unless noted otherwise.and are to be approved by DIVISION 7:THERMAL AND MOISTURE PROTECTION A.Sheet Membrane Waterproofing: 1.Wnterproofmg for all shower pans shall be Chloraloy 240 by Noble Co"Grand Haven,Michigan.Install per Manufacturer's recommendations for shower pan lining. B.Vapor Barrier: t.Provide minimum 6 mil polyethylene sheet at exterior framed walls and roof/ceiling. Lap joints and tape to seal. C.Building Insulation: 1.Exterior framed 5 In"walls to be insulated with R·19 fiberglass ban. 2.All walls,floors,and ceilings of bathrooms and bedroom walls and floors shall be insulated with 3 1/2"thick Sound Attenuation Ban Insulation by U.S.Gypsum ifnot insulated under Sedions I through 5 above. D.Joint Sealers: I.Provide joint sealers of the following types: a.Inlerior.Acrylic Latex,Pecora AC-20. b.Bathlubs,showers and other wet areas:Silicone,General Electric Sanitary 1700. 2.Colors to be selected by Architect from Manufacturer's standard colors.Provide color samples. 3.Provide sealers in the following locations: a.Around bathtubs,showers and lavatories. b.Joints at penetrations of walls.,decks and floors by pipes and other services and equipment. c.Penetrations of exterior walls. d.Open joints between dissimilar materials. 4.Provide two (2)coats of clear non-yellowing/water repellent coating on all interior floor masonry.Standard ofperfonnance:Chemical Products Corp.:CP-250. Provide 5 year labor and material warranties. owner. •DIVISION 8,POORS AND WINDOWS A.EXlerior Doors:NI A O.Interior Doors: 1.Interior doors shall match existing with finish as chosen by Owner. C.Windows:. I.All windows shall match existing.Refer to drawings for sizes and types. • 2.All glazing shall be manufactured for installation at 9,300 feel above sea level.With hardware to match exisdng. 3.Provide full shop drawings for all windows. D.Glazing: 1.All exterior glazing shall be 5/8"clear insulated glazing,tempered where required by code and where nOled on drawings. 2.Refer to Architectural Drawings for sizes and general description. 3.All interior glazing shall be 1/4"clear plate glass,tempered where required by the V.B.C.and/or where noted on drawings.Mirrors shall be 1/4"clear plate glass with polished beveled edges. DIVISION 9:FINISHES A.Gypsum Board: I.Provide 5/8"gypsum board at interior walls and ceilings. 2.Provide 1/2"glass mesh mortar board by Durock at all walls in tub and shower surrounds and built-in shower benches. 3.Provide 5/8"water resistant "W.R."gypsum board at all moist locations which will receive tile. 4.All gypsum board walls to be taped,sanded and textured.Texture shall match existing. j.Provide a U.S.G.200 B metal trim at all locations where drywall abuts dissimilar surfaces. B.Tile: I.All tile will be provided and installed by Contractor.Follow recommendations of the Tile Council of America (T.C.A.)for tile installations as follows: a.Tile walls shall be installed as follows: i.Shower and tub surrounds and shower benches over glass mesh mortar board:T.C.A.W-244 (use latex-portland cement mortar and groul). II.Other tiled walls over "W.R."gypsum board:T.e.A.W-243. b.Tile floors shall be installed as follows: I.Shower pans over sheet membrane waterproofing:T.e.A.F-121. 2.All tile shall be selected by Owner. 3.Provide an allowance Ofe>o per sq.ft.(installed)for12"x 12"marble e Contractor shall list the total cost of this allowance based on the drawings provided. 4.Provide an allowance of$IO.OO per sq.ft.(installed)for all ceramic tile and tilebase. Contractor shaUliSI the total cost of this allowance based on the drawings provided. C.Carpet: I.All carpet and pad shall be provided and installed by Contractor and selected by Owner. 2.Provide an allowance of$40.00 per sq.yd..Contractor shall list the tolal cost of this allowance based on the drawings provided. D.Painting: I.General Contractor.prior to painting any surface,shall completely mask,remove,or otherwise adequately protect all items in contact with painted surfaces but not scheduled to receive paint.Surfaces to receive paint or other surface treatments shall be thoroughly cleaned,free:from dirt.,oil,and all other foreign substances.Spot prime all exposed nails and other metals which are to be painted with emulsion paints,using a primer recommended by the manufacfUrer of the coating system. When applying paint,allow sufficient drying time between coats,and do nOI apply paint in areas where dust is being generated.Painting schedule is as follows: a.Finish #I: Primer. Finish: b.Finish #6: Primer: c.Finish #7: Primer: Finish: Painted wood interior,except wood to receive natural finish. Alkyd Enamel Undercoat (2 coats)Alkyd Eg-Shel Enamel Drywall receiving vinyl wall covering (I coat)Primer·Sealer All other drywall Primer·Sealer (2 coats)Alk.yd Flat or Eg-Shel d.Finish #9:Doors and other nanual wood finishes Stain:Oil based Primer:Sander Sealer Finish:(2 coats)urethane varnish 2.All wood surfaces to receive paint shall have a moisture content of 12%%d or less. 3.Color and sheen shall be chosen by Owner.Provide three samples of each finish on actual sample to be finished. E.Requirements: I.NFPA 90A shall govern where applicable.Materials shall meet ASTM E·84 standard for smoke development of SO or less,and a name spread of 2S or less. mV.SION 10:SPECIALTIES A.Bath Accessories: I.Bath accessories shall be as chosen by Owner and provided and installed by Contractor.••2.Provide an allowance of $500.00 per bathroom. DIVISION 11:EQUIPMENT None required DIVISION J2:FURNISIUNCS None required DIVISION 13,SPECIAL CONSTRUCTIQN , None required DIVISION 14,CONVEYING SYSTEMS None required DIVISION IS,DESIGN-BUILD MECHANICAL REQUIREMENTS A.Intent: I.The intent of this design-build specification is solely for the purpose of defining guidelines and responsibilities of the Design-Build Contractor (D.B.C.)for the design and construction of all mechanical systems required. B.General Requirements: I.All requirements of the "General Conditions oflhe Contract for Construction~,AlA Document A20 1·1981 apply to this section. 2.The Design-Build Contractor (D.B.C.)shall be hired by and be under the direction of the General Contractor.The General Contraclor shall have ultimate responsibility for coordination of all portions of the work;especially between various Design-Build Contractors,and between Design-Build Contraclors and all other contractors. 3.The D.B.C.shall assume full responsibility for the generation of design parameters, design,documentation,installation of the mechanical system,and placement oCthe mechanical system into operation.The mechanical content and sufficiency of the wori;remains solely the responsibility of the D.B.C.The D.B.C.shall coordinate with the General Contractor and all other applicable subcontractors to minimize problems and to facilitate the construction ofa complete and functioning system according to the design parameters agreed to by the Owner. 4.If the General Contractor contracts the mechanical systems to mort than one D.B.C., it shall be the responsibility of the General Contractor 10 coordinate between individual Design-Build contractors to assure that the provisions oflhis se<:tion are fully carried oul. 5.The General Contractor shall be responsible to schedule subminals (including adequate review and revision lime),and to ensure that required subminals are received on time to avoid delays of the work.The Architect and his consultants shall review submittals in a timely manner to help avoid sueh delays. C.Quality Assurance:•• I.All work shall be designed and executed in accordance with the current edition ofthe Unifonn Building Code (USC)and all other applicable state,local and/or public utiliry codes and regulations. 2.The design,methods of construction and materials of the mechanical system shall be in accordance with the current edition of the following applicable regulations, references and standards: a.Uni(onn mechanical Code (UMC) b.Unifonn Plumbing Code (UPe) c.American Sociery of Heating,Refrigeration,Air Conditioning Engineers (ASHRAE) d.American Sociery of Mechanical Engineers(ASME) e.American Sociery for Testing Materials (ASTM) f.Factory Mutual Laboratories (FM) g.National Electrical Manufacturers'Association (NEMA) h.National Fire Protection Association (NFPA) i.Sheet Metal and Air Conditioning Contractors National Association (SMACNA) j.Underwriters Laboratories,Inc.(UL) k.American National Standards Institute (ANSI) I.American Society of Plumbing Engineers (ASPE) 3.The design and perfonnance characteristics shall confonn to all professional standards and practices 8S established by the current editions of the following references and standards: a.American Society of Heating,Refrigeration,Air Conditioning Engineers (ASHRAE). b.American Society of Plumbing Engineers (ASPE) 4.The D.S.C.shall be a contractor,licensed in the jurisdiction where the project is located to perfonn the portions of the work he intends to complete.Both the Professional Engineer retained by the D.B.C.and the Professional Engineer (P.E.) retained by the Architect shall be licensed in the state where the project is located. S.The D.S.C.shall guarantee all materials,workmanship and the successful operation of all equipment and apparatus installed for a period of one (I)year from the date of the final acceptance of the entire work..The D.B.C.shall repair or replace any part of the system which may show defect during that time. D.Design-Build Process Outline: I.The D.B.C.shall survey the project and discuss with the Owner.Architect,General Contractor,and all applicable subcontractors the function and control of the system with regard to the building program.The D.S.C.shall develop and present to the Owner,Architect,and Gee Contractor.the design parameters along wite first cost,energy costs and applicable alternatives.The D.D.C.shall revise the design parameters until acceptable to the Owner and shall receive written approval of tile filial design parameters prior to proceeding with design and documentation. 2.The D.S.C.shall design the systems to achieve the approved design parameters. During the design phase the D.D.C.shall coordinate with all design professionals whose work interfaces with the mechanical systems in order to produce a complete and functioning system appropriate for the use and design intent of the project. 3.Thc 0.8.1=.shall develop construction documents including drawings,specifications and equipment submittals relating to the mechanical won.:.These drawings shall define the scope of work and level of perfonnance with respect to design parameters as well as construction procedure and responsibility.The D.D.C.shall retain a Professional Engineer (p.E.)to review the construction documents and produce a peer review report stating that in the P.E.'s opinion the design parameteD will be met by the system as designed.This peer review report shall bear the license stamp oCthe P.E..The D.B.C.shall then submjt these construction documents with copies of the approved design parameters and peer review report,for the General Contractor's review and comment. 4.Upon review,the General Contractor shall forward the construction document submittal to the Architect.The Architect will forward the construction document submittal to the P.E.retained by the Architect for concurrent review and comment. The Architect shall review the construction document submittal for coordination of woril:relating to architectural constraints and intent only.The Architect shall return the reviewed documents with the P.E.'s and Architect's comments,to the General Contractor for forwarding to the D.8.C..The D.B.C.shall not start construction prior to receiving and responding to reviewed drawings. S.The P.E.retained by the D.D.C.shall also be retained to inspect the mechanical systems and prepare a written review at the rough·in stage and again al final completion.The D.D.C.shall forward a copy of these written reviews through the General Contractor to the Architect.The D.B.C.shall perfonn any and all additions and modifications required by the reports.Upon final completion,the D.D.C.shall certify,in writing,that aJl mechanical systems are installed per code,contract documents,and industry standards. 6.Prior to receiving final payment,the D.B.C.shall provide the Owner with the Project Close..out Documents,a written copy ofthe one-year warranty,and a final walk· through to explain operation and maintenance of the system to the Owner's satisfaction. E.Submittals: I.The construction document submittal shall include five (~)copies of all mechanical design documents including drawings.specifications,material and equipment product data andany other infonnation necessary to thoroughly define the system and demonstrate that the system will meet the design parameters.This submittal shall also contain the approved design parameters and the stamped peer review repon. 2.The Project Close oot Documents shall contain: a.All manufacturers'product data,listing model numbers and specific infonnation for each piece of equipment in the mechanical system. b.Complete detailed instructions covering operation,lubrication.general maintenance.and the repair of all equipment for plumbing,heating and ventilating systems. c.Temperature control diagram with sequence of operation for all systems. ••The above information shall be typewritten and bound in a loose leaf binder for the Owner's use.Two (2)copies shall be submitted. 3.As-Built Drawings:Provide one (I)set of complete As-Built Drawings.Drawings shall be submitted on reproducible mylar.Drawings shall accurately show the mechanical system as constructed.complete in all respects. F.Mechanical Systems Outline: I.The following outline of basic systems to be included is presented as a starting point from whi~h the D.B.C.is to begin developing the actual design parameters.The outline is not intended to be a complete and comprehensive list of systems.Alternate and/or additional systems and/or products may be suggested by the D.D.C.in meetings and discussions with the Owner and Architect to meet the design panunet~rs. a.Hot water baseboard heating system. i.Natural gas fired ii.High efficiency equipment with electronic ignilion iii.Automatic set back thennosw b.Domestic hot and cold water,waste and vent systems,as required for remodel. c.Natural gas piping to mcchanical equipment. d.Exhausl fans,duets and caps. G.Plumbing Fixture and Fittings: I.Models and Manufacture~as chosen by Owner. DIYISION 16;DESIGN-BUILD ELECfRICAL REOUIREMENTS A.Intent: I.Thc intent of this design-build specification is solely for the purpose of defining guidelines and responsibilities of the Design-Build Contractor (D.B.C.)for the design and construction of all electrical systems. B.General Requirements: I.All requirements of the "General Conditions of the Contract for Construction",A.I.A.Document A201-1987 apply to this section. 2.The Design-Build Contractor shall be hired by and be under the direction of the General Conln1ctor.The General Contractor shall have ultimate responsibility for coordination of all portions of the wone;especially between various Design-Build Contractors,and between Design-Build Contractors and all other contractors .. 3.The D.B.C.shall assume full responsibility for the generalion of design parameters,design.any required documentation,installation of the electrical syslem,and placemenl of the electrical system into operation.The electrical conlent and sufficiency of the work remains solely the responsibility of the D.B.C ..The D.D.C.shall coordinate with the General Contractor and all other applicable subcontractors to minimiu problems and 10 facilitate Ihe construction ofa complete and functioning systems according to the design parameten agreed to by the Owner. ••4.If the General Contractor contracts the electrical system to more than one D.S.C.,it shall be the responsibility of the General Contractor to coordinate between individual Design·Build Contractors to assure that the provisions of this section are fully carried out 5.The General Contraclor shall be responsible to schedule submittals (including adequate review and revision time),and to ensure that required submittals are received on time to avoid delays of the work.The Architect and his consultants shall review submittals in a timely manner to help avoid such delays" C.Quality Assurance: I.All work shall be designed and executed in accordance with the current edition afthe Unifonn,Building Code (VBC)and all other applicable state,local,and/or public utility codes and regulations. 2.The design,methods of constnlction and materials of the elecbical system shall be in alXOrdance with the cu~nt edition ofthe following applicable regulations,references and standards: a.National Electrical Code (NEC) b.American Society for Testing materials (ASTM) c.Factory Mutual Laboratories (FM) d.American Society of Heating,Refrigeration,Air Conditioning Engineers (ASHRAE) e.National Electrical Manufacturers'Association (NEMA) f.National Fire Protection Association (NFPA) g.Underwriters Laboratories,Inc.(UL) h.American National Standards Institure (ANSI) 3.The design and performance characteristics shall conform to all professional standards and practices as established by the current editions of the following references and standards: a.Institute of Electrical and Electronics Engineers. 4.The D.B.C.shall be a contractor,licensed in thejurisdicrion where the project is located to perform the ponions of the work he intends to complete. 5.The D.B.C.shall guarantee all materials,workmanship and the successful operation of all equipment and apparatus installed for a period of one (I)year fonn the date of the final acceptance of the entire work.The D.B.C.shall repair or replace any part of the system which may show defect during that time. D.Design-Build Process Outline: I.The D.B.C.shall survey the project and discuss with the Owner,Architect,General Contractor and all applicable subcontractors the function and control of the system with regard to the building program.The D.B.C.shall develop and present 10 lIle Owner,Architect,and General Contractor,the design parameters along with the first cost,energy costs and aable alternatives.TIle D.B.C.shall revise the_gn parameters until acceptable to the Owner and shall receive written approval of the final design parameters prior to proceeding with design and documentation. 2.The D.B.C.shall design the systems to achieve the approved design parameters. During the design phase the D.B.C.shall coordinate with all design professionals whose work interfaces with the electrical systems in order to produce a complete and functioning system appropriate for the use and design intent of the project. 3.The D.B.C.shall develop eonstruction documentsincluding drawings.specifications and equipment subminals relating to the electrical work.These drawing shall define the scope of work and level of pcrfonnance with respect to design parameters as well as construction procedure and responsibility.The D.B.C.shall retain a Professional Engineer (p.E.)to review the eonstruction documents and produce a peer review report Slating that in the P.E.'s opinion the design parameters will be met by the system 8;S designed.This peer review report shall bear the license stamp of the P.E.. The D.B.C.shall then submit these construction documents,with copies of the approved design parameters and peer review report,for the General Contractor's review and comment. 4.Upon review the General Contractor shall forward the construction document submittal to the Architect.The Architect will forward the construction document submittal [0 the P.E.retained by the Architect for concurrent review and comment. The Architect shall review the construction document submittal for coordination of work relating to architectural constraints and intent only.The Architect shall return the reviewed documents with the P.E.·s and Architect's comments,to the General Contractor for forwarding to the D.B.C..The D.B.C.shall not start construction prior to receiving and responding to reviewed drawings. 5.The P.E.retained by the D.B.C.shall also be retained to insptCtthe electrical systems and prepare a written review Bllhe rough-in stage and again al final completion.The D.B.C.shall forward a copy of these written reviews through the General Contractor to the Architect.The D.B.C.shall perfonn any and all additions and modifications required by the reports.Uponfinal completion,the D.B.C.shall certify in writing that all electrical systems are installed per code,contract documents,and industry standards. 6.Prior to receiving final payment,the D.B.C.shall provide the Owner with the Project Close-out Documents,a written copy of the one-year warranty and a final walk· through to explain operation and maintenance oCthe system to the Owner's satisfaction E.Submittals: I.The construction document submittal shall include five (5)copies of electrical design documents including drawings.specifications,material and equipment product data andany other infonnation necessary to thoroughly define the system and demonstrate that the system will meet the design paramete~.This suhminal shall also contain the approved design parameters and the stamped peer review report. 2.The Project Close-out documents shall contain: a.All Manufacturers'product data,lisling model numbers and specific infonnation for each piece of equipment in the electrical !ioystem. b.Complete detailed instructions covering operation,lubrication,general maintenance and the repair of all equipment for the electrical systems. The above infonnation shall be typewritten and bound in a lose leaf binder for the Owner's use.Two (2)~shall be submined.• 3.As-Built Drtlwings;Provide one (I)set of complcte As-Built Drawings.Drawings shall be submitted on reproducible mylar.Drawings shall accurately show the electrical systems as constructed,complete in all respects. F.Electrical Systems Outline: I.The following outline of basic systems to be included is presented as a starting poilu from which the D.B.C.is to develop the actual design parameters.The outline is not intended,to be complete and comprehensive list of systems.Alternate and/or additional systems and/or products may be suggested by the D.D.C.in meetings with the Owner and Architect to meet the design parameters. a.Power for convenience outlets,mechanical and electrical equipment and specialty equipment. b.Lighting system including interior lighting and switched outlets. c.Telephone and television systems including wiring and outlets. d.Provide 2()1'/.%d additional capacity for future use over and above the requirements listed herein. e.The following specialty items may be added at the Owner's request: i.Security system ii.Audio-Visual system f.Trenching and backfilling for all underground electrical installations. g.Power and control wiring for heating,ventilating,plumbing,etc. 2.The schematic electrical drawings should be used by the D.B.C.in conjunction with the outline above to develop the design parameters.The drawings ore schematic in nature and are issued to provide an indication of the intended system and scope only. G.Fixture Schedule 1.Refer to the schematic electrical drawings. • ., April 4.1997 • Monroe &Newell Fngt~Inc... • I I, I I Pierce Seger\>e1g Associates, 1000 s.Fiontage Road Vail,co 11657 •Attn;Mr.Ron Kirkham Ro:Glenn Remodel.Pototo .Patch Club, Unit U.Vail,CO.(M&:N#3S7B) Gentlemen: As rcqucstod,Moaroo 0&N.w.U Engineers,Inc.has reviewed the plans prepared by _dat<d -March 10.1m for muodeling of1he project The .""c:tural work requited is ",""oval ofthe second floor load bearing wall adjac:ent to the stairs.' This C&Il be acecmplished as foUows: I.The load beoringwaU should be lqllaccd with a3-14"V.L.beam belowlhe "",fjolst. Fasten"altcmalc roofjoiSts tothc ncwbcam.with Simpson In.S eUps OQ 000 udc. 2.The beam sboolld be IUppC>ltN 00: a)A stud pack of3-2x6 at the exterior wall. b)A 6.6 wood oolumn from lhemofto the'sccood level atthe top of the stq>s. c)A 3-2><4 eoluum at the edge of the Opetling at the stair landing. d)Fasten oolum..to beam with Simpson A34 angles 00 two aides.. 3.Provide a 406 wood column dir<etly below the 6.6 eobmm in 2b above fronl the second level to the main floor .level.Provide solid blocking at the seeond level floor and at the main floor level to ~c existing column below.... lil$CT1,lne. ,. • • @:JBEDROOM .. "> •>{< " ;., .'" ,,~ - " '" 1;..1<1 ::'1'"c,..w.....l"..:t==~~~"0 JG~ 1;z..~""'OY'l!.O --.;..~~Cfl'"60.l"lJe.~-----~-.~_,.-; "TV !!IE..N (' F;:.~r.:O J -+ I '"r~--"'-.'",~"'Io,.,. ."f"01L.I!;.r -u ~'l'(<l ~<'~ac frL~-Z2\:)< :i'-~~t ~'-'~"f~~~~~~iU=~O==~:-.-{~8,(,STAIYIj.'; .l')........,,~".,1O.>f1.:tr6t l,..J,(......~f ~\..~UN ;...r...,...""~~UK '-!-=:E~:::=:t:;;r;::::::;1r-*--H-+-tD","+~~;;.,,:;;,~=[l .':'"®BUNK ROOM 0 I "'"0~I •I •~ I '. ,-;\1. ,CLOSET ----=-.:1 .'.•0 ~ !I• . j PROPOSED REVISIONS TO SECOND FLOOR SCALE:1/4'-1'-0"• •,., "l. lie I .. ,. l'i=POTATO PATCH CLUB RBVISION:lob No.21017,00 'Sheet: Scgcrbcrg &UNIT #18Assoclates 0.."""Al,OArchilcctBREMODEL 'P.C.A.I.A.VAIL,COLORADO Dole:3/10/97 EXISTING SECOND FLOOR //rr==~~lF~--:-l:::-====--------,i ! .....rrO~e:--../i-, !L._~ L(--~-J '-', -l...,j =E:COr::1 _~::--1\-:'.=il I I (...•,:...r~r""~"+'41 c I "",..T !I I I0)-1 -I..:J ':..--4 FfiC1>-lJ,!.t:;~.::~",-=I "~e rc I '\~LL I \L .~~~-.~i I I I I n ",""L.I \,_ ",'0I!~~ -I I t:-t.o:.>&,..,-I -.--==$F~fI __ ii:-r--I Ii,,'=__:c-----.J,~,_1..1.J Ii .1 ~I SCALE:1/4"-1'-0' • - Pi=POTATO PATCH CLUB REVISION:lob No.21017.00 <Sheet: S¢gaborg &UNIT #18Associates Dn.wp.:Al.IAIcllltcctBREMODEL ;p,e,A.I.A.VAIL,COLORADO;~3/10/97 Io " o -.,.,..o (e.",~ - • (- ~..-==--';;-;",,,..,, ,'I, I ..----.....I I L.-o L.-Q:'G."" II III _II [\.....,n I I1:~r[)L1 --!llru:. i J--, IIII -.Jl ( I -l u ~ WVIN~/blNI~ j L:1,,~ I' --.J I 'I K.I-r<-"E.N I/Y iii----01, I r- r-III~ I 1:-I il IIu~~~~~J EXISTING MAIN FLOOR SCALE:1/4'-1'-0' lie Pion»POTATO PATCH CLUB I REVISION:Ilob No.21017.00 }Sheel: S¢gorberg &UNIT #18 \A"oclate, Drawp.:Al.2Archit<ctB REMODEL i P .C.A.l.A.VAIL,COLORADO Dole:3/10/97.. - 6t""oRA"-1a. /' 01 --_ ~N~ ///'I ~l~-JQ.1-0l 0 rll I~"0 ./ / '"~ ~A2.At;~ , • lie lie 1 • ~R."""" 1\ {"l!:.O~.'-."'" EXISTING LOWER FLOOR SCALE:1/4'-1'-0" lie '. .... Pieroo POTATO PATCH CLUB REVISION:lob No,21017.00 .<sheet: Soge<borg &UNIT #18Assoclales 0<>"",A1.3ArchilA:<>tB REMODEL p,e,A.l.A.VAIL,.COLORADO DolG:3/10/97 .. • • / il ~ .~<=Or:1 _ ]~- t:.~f?b""L.---. , r'..I...oo...-r..-.., I, .......,-ORA6e.. -~.--~---~ (.--. l ] -n ~" ~ r·,, I- j •j I ~~l i r-- _r,.I.i---=-d~=::1r--=-:--:_'.-L EXISTING SECOND FLOOR .,...._...._. -r\"--.--~-.. 'O.,:... r- , L._ I,II.~ I ,, I,'" :"<.0,-".,.'€-I l-II-l !,~-,'\:,..-_'I;=n Ii I ~lJjt=::::::======J -I ~,\ I --1 --_.-- SCALE:1/4'-1"0" , 1•,, . Pien:o POTATO PATCH CLUB RBVlSION:lob No.21017.00 'Sheet: Sogatorg &UNIT #18Associates Dn....-n.:AI.IAIcllltoctBREMODEL p.e.A.I.A.VAIL,COLORADO Do!<:3/10/97 1,··i III -_. 4-I ~I~""-6- c:.l-:::>-.Js'-,i ~.;o'!.6 -0 r'1I.~ . " @)BEDROOM \ I PROPOSED REVISIONS TO SECOND FLOOR SCALE:1/4'-1'-0' , • . I Pim:o POTATO PATCH CLUB REVISION:lob No.21017.00 'Sheet: Segorl>orj;& Associates UNIT #18 Dnwn;A1.0•Archi""tB REMODEL P.C.A.l.A.VAIL,COLORADO !l<:G:3/10/97 I I , . -2 J• ~.I, <;;I o 'cl.Y' ~ --------- ~....I'""'o v I -C> 1 ~'I ..\~I I~'-IT),, ."'.'-L I -"'I 'I.~_~Kr:w,....I"-:;0._.1-"" t;'.-:;;'...II 'Ii"h ~ ,-, r"'9 R7 \I""f"''''''fj..1{1 I~':111 '\I It-----, /"j ~ ,, 1 i 1. I \ I·, "II J I~ j I , I I -", --t, I I i EXISTING LOWER FLOOR SCALE:1/4"'1'-0' - Piecco POTATO PATCH CLUB REVI.5/0N:lob No,21017,00 'Sheet: Scgerbcrs ,.."UNIT #18AssoclCltes Dnl,vm:Al.3 I ArchitoctB REMODEL I P.C.A.J.A.VAIL,COLORADO ~3/10/97 .I • I__.J ----- I p'§'j=~-- II ?L--(;:)aG.:r:_ I,, I •I IF~='--':==:=J II -Ir-- 1_'-_- , ••• 1 £{"jI~0•tv,l/•j s'"':/, EA"'l-' 01 0 I I, J 1•, 1 1 1 EXISTING MAIN FLOOR •I REVISION:Sheet:Pi=POTATO PATCH CLUB lob No.21017.00 SogorlJerg &UNIT #18Associates [)nlwu:A1.2An:hilocts REMODEL P.C.A.I.A.VAIL,COLORADO Il<!c:3/10/97 05/09/97 FRI 13:27 ~~~I 970 476 ~608 ••PS:\VAIL •IiII002 C/o Vall Homt:Rt:ntals,Inc. 143 EaSI Meadow Drive.5ulfe 397 V.II.Colorado ,81657 30]-476·2221 FAX 476-2684 May 7,1997 Roc Kirkham Picrt.e,Segcrberg &Associates 1000 S.frontage Road West,#300 Vail,CO 81657 RE:POUlto Pat~h Club Condomimwn Unit illS. r am "Tiling to inform you lhaJ ilie Potato Pilch Club Coodominiwn Association is aware that JohD and Anna Olenn ~in the proce:ss of applying for a pennit to ranodellbc:ir unit.The Anodation does not:have any problem with the remodel u il does not have merier changes.Should you have any quesnons..please do not htsilatc 10 eall.Thank you. Slocaely. ;)''7 ~/30...--- Lony O.Barnes MIJ'lI,gjng Agent •• - 0 '"0 0 0~••§~0 0 0 0 0 0 ~~ ~< ""t< , a~,,,~0 0 0 0 0 0 ~~~0 0 0 0 •0 ~•M M 0 0 " ~~0 0 0,.0 0 0 ~~0 0 0 0 ""0 M ••f '"0 "~~•""""'0 0 0.,0 0 0 , "f~8~0 0 0 ""0~•M "•"~9•% •'""••0 0 <, "0 0 "0 M ~, <•""••0 •••~-G, """, ",0 """•••"">0 •", "0 0 , .~"0 J 0 0 M 1 "0•"%O.0 0 o ,"0 "00 0 0 "t •"••0Ho_ M i 0 ._0 ~•0'•~".~0 ,~"0 >"M "-•"g .-0"•000"00 %•,~8 '.g H 0'"N"< M"e _0 "~='""0 "e..-J 0 l:l~g 0 -•~8 % H "0 0 0 ~!~"••H "~M B J ~~~8 i ~J "0 g •"•••0 0 • TOWN OF VAIL 75 S.FRONTAGE ROAD VAIL,CO 81657 970-479-2138 DEPARTMENT OF COMMUNITY DEVELOPMENT NOTE:THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES ADD/ALT MF BUILD PERMIT Permit #:B97-0056 Job Address:950 POTATO PATCH DR Location ...:POTATO PATCH CLUB #6 Parcel No ..:2101-063-06-006 Project No.: Status ...: Applied ..: Issued ... Expires ..: ISSUED 04/17/1997 04/17/1997 10/14/1997 APPLICANT ROWE CONSTRUCTION Phone:3034765420 4275 EAST COL~IBINE WAY,VAIL CO 81657 CONTRACTOR ROWE CONSTRUCTION Phone:3034765420 4275 EAST COLUMBINE WAY,VAIL CO 81657 OWNER GUINNESS JOI-IN &CHRISTIANE -JT 3354 DORCHESTER RD,SHAKER HEIGHTS OH 44120 Description: ADD WINDOW AND DOOR Occupancy:Rl Type Construction:VN Type Occupancy: l-1ulti-Family Type V Non-Rated Valuation: Fireplote InfDraalion:Re5tricted: 1,500 'or Ga$Appliances: Add Sq Ft: lor Gas logs:1I0f WOOd/pallet: ******.*_**************************************************FEE SUH~ARY **************t******************************************* 8uilding----->50.00 RestlUlrant Plan Revlew->.00 Total Calculated Fees---)105.50 Plan Check--->::52.50 DRB fee-------------)20.00 Additional feet---------).00 Investigation>.00 Recrelltion Fee--------->.00 Totlll Per.it Fee------->105.50 llill Cllll---)3.00 Cleall-Up Deposit-----).00 Payllents---------------)10'5.50 TOTAL FEES----------->105.50 BALANCE DUE-------------).00***H,******,*,****,*,*,*,****,*,************,*,************,**************h*h*"****........**'***h****'*****'*******'******************'*u********* Item:05100 BUILDING DE~ARTMENT Dept:BUILDING Division: 04/17/1997 DAN Actlon:APPR Degt:PLANNING Division:Item:05400 PLANNING DEPARTMENT 04/17/1997 DAN Action:APPR DIRK APPROVE Item:05600 FIRE DEPARTMENT Dept:FIRE Division: 04/17/1997 DAN Action:APPR N/AItem:05500 PUBLIC WORKS Dept:PUB WORK Division: 04/17/1997 DAN Action:APPR ******'**********'**********'*'**'***********'*'*'*'*'**'I********'****'*********'***********'*tt**,*,*,*****************,************************,** See Page 2 of this Document for any conditions that may apply to this permit. DECLARATIONS 1 hereby llcknowledge that 1 hllve relld this application,f1lled out in full the 1nfor.ation required,ca-pleted an accurate plot plln,8nd state that all the information provided as required is correct.I agree to comply with the inforeat;on end plot plan, to comply with all Town ordinances and state laws,and to build this structure 8ccording to the Town'.zoning and subdivision codes,design review approved,Unifor.Building Code and other ordinances of the Town applicable thereto. REOUESTS FOR INSPECTIONS SHAll BE MDE T\lENTY-FOUR liOURS IN ADVANCE BY TEL~1~K"~API 5:00 PH Send elNn-Up Deposit To:SIGNATURE OF OlItlER OR CONTRACTOR FOR HIKSElF AMD OllNER ******************************************************************************** CONDITIONS Permit t:B97-0056 as of 04/18/97 Status:ISSUED ******************************************************************************** Permit Type:ADD/ALT MF BUILD PERMIT Applicant:ROWE CONSTRUCTION 3034765420 Job Address: Location:POTATO PATCH CLUB .6 Parcel No:2101-063-06-006 Description: ADD WINDOW AND DOOR Applied:04/17/1997 Issued:04/17/1997 To Expire:10/14/1997 Conditions: 1.FIELD INSPECTIONS ARE REQUIRED TO CHECK FOR CODE COMPLIANCE. 2.ALL PENETRATIONS IN WALLS,CEILINGS,AND FLOORS TO BE SEALED WITH AN APPROVED FIRE MATERIAL. 3.SMOKE DETECTORS ARE REQUIRED IN ALL BEDROOMS AND EVERY STORY AS PER SEC.1210 OF THE 1991 UBC. **************************************************************** TOWN OF VAIL,COLORADO Statemnt **************************************************************** Statemnt Number:REC-0261 Amount: Payment Method:CHECK Notation:#3863 105.50 04/18/97 08:32 Init:CD Permit No:B97-0056 Type:A-MF ADD/ALT MF BUILD PER Parcel No:2101-063-06-006 Site Address:950 POTATO PATCH DR Location:POTATO PATCH CLUB 16 Total Fees:105.50 This Payment 105.50 Total ALL Pmts:105.50 Balance:.00 **************************************************************** Account Code 01 0000 41310 01 0000 41331 01 0000 41332· 01 0000 41336 Description BUILDING PERMIT FEES DESIGN REVIEW FEES PLAN CHECK FEES WILL CALL INSPECTION FEE Amount 50.00 20.00 32.50 3.00 PERMIT G _ Architect: **Colltact Eagle County Assessors Office , s"c 970~328-8640 for pare!l I.TOWN OF VAIL CONSTRUCTION PARCEL',.1,1t'I ak3(16tJo k>PERMIT APPL1;<;ATh?N FORM DATE:'4k?L!i,z APPLICATION MUST BE FILLED OUT COMPLETELY OR IT MAY NOT BE ACCEPTED~******~**********************PERMIT INFORMATION *****~*******************•••* ~-Building [l-Plumbing []-Electrical [J-Mechanical (]-Other __~~__ JOb Name:~'~Jt(Ih"'t!;;:-~Ze$5JObAddr~s~:q~'4J!J4J~JJ" Legal Descnphon:Lot Block F,l1ng Fb..fzP.~~~ Owners Name,Ibt<i,t/tllp "5 Address:(lit2l?ede'2",,,,lLRI?J~h.1?(,-OI40 _----;-,..-_Address:,Ph._ /f General Description:IJ 2~d,(2<1)t 17/)(1 t-__-:~---_------_--.'work Class:[]-NeW D<{-Alteration []-Additional [J-Repair []-other _ Number of Dwelling units:Number of Accommodation Units: ~mber and Type of Fireplaces:Gas Appliances Gas Logs Wood/Pellet ~*********************************VALUATIONS *****.*.************************* BUILDING:$I,»'OO,CO EIoECTRICAL:$____OTHER:$_------- PLUMBING:$-MECHANICAL:$TOTAL:$_ ~***********••*.***.*.*..TION .*.************••***.*.****~eneral Contractor:~Town of Vail Reg.NO.II~-~ Address,1:2..-~Phone Number:4&-542.0 Electrical Contractor: Address: Plumbing Contractor: Address: Mechanical Contractor: Address: **••***•••••••**••••••••••***••* BUILDING PERMIT FEE: PLUMBING PERMIT FEE: MECHANICAL PERMIT FEE: ELECTRICAL FEE: OTHER TYPE OF FEE: ORB FEE::zoo 0$5Z'? Town of Vail Reg.NOo _ Phone Number: Town of Vail Reg.NOo _ Phone Number: Town of Vail Reg.NOo _ Phone Number: FOR OFFICE USE ••••**.*••**•••******••••••**** BUILDING PLAN CHECK FEE: PLUMBING PLAN CHECK TEE: MECHANICAL PLAN CHECK FEE: RECREATION FEE: CI.EAN-UP DEPOSIT: TOTAL PERMIT FEES: TYPE GROUP SQ.FT.VALUATION BUILDING: SIGNATURE: ZONING:;:;z5ii'EJ24¢- SIGNATURE: Comments:-------------------'l,.\----------- (CLEAN UP DEPDSIT REFUND TO: town of vai 75 soulk frontage road vall,coloudo 81657 (303)479-21.38 or 479-2139 office of community dev~lopment TO: ,, FROM: DATE: SUBJECT: ALL CONTRACTORS CURRENTLYL REGISTERED WITH THE TOWN OF VAIL TOWN OF VAIL PUBLIC WORKS/COMMUNITY DEVELOPMENT MARCH 16,1988 CONSTRUCTION PARKING &MATERIAL STORAGE In summary,Ordinance No.6 states that it is unlawful for any person to litter,track or deposit any soil,rock,sand,debris or material,inclUding trash dumpsters,portable toilets and workmen vehicles upon any street,sidewalk,alley or pUblic place or any portion thereof.The right-ot-way on all Town of Vail streets and roads is approximately 5 ft.off pavement. This ordinance will be strictly enforced by the Town of Vail Public Works Department.Persons found violating this ordinance will be given a 24 hour written notice to remove said material. In the event the person so notified does not comply with the notice within the 24 hour time specified,the Public Works Department will remove said material at the expense of person notified.The provisions of this ordinance shall not be applicable to construction,maintenance or repair projects of any street or alley or any utilities in the right-a-way. To review Ordinance No.6 in full,please stop by the Town of vail Building Department to obtain a copy.Thank you for your cooperation on this matter. \ 7S aoult'!frontage road vall,colorado 81657 (303)479-2138 or 479-2139 office of community development I BUILDING PERI·iIT ISSUANCE TINE FRANE If thts permtt requires a Town of Vail Fire Department Approval. Engineer"s (Public Works)review and approval.a Planning Department .review or Health Department review.and a review by the Building Department.the estimated time for a total review may take as long as three weeks. All commercial ('large or small)and all multi-family permits will have to follow the above mentioned maximum requirements.Residential and small projects should take a lesser amount of time.However.if residenttal or smaller projects impact the various above mentioned departments with.regard to necessary review,these projects may also take tne three week period. Every attempt will be made by this department to expedite this. pcnnH as sQon as possible. I.the undersigned.understand the plan check procedure and time frame. >l ~44ProjectName ~Date id~!.Z~as turned into the Community Developm~nt Departme~t. \ • TO: FROM: DATE: RE: MEMORANDUM ALL CONTRACTORS TOWN OF VAIL PUBLIC WORKS DEPARTMENT MAY 9,1994 WHEN A "PUBLIC WAY PERMlr'IS REQUIRED Job Name;...,'~~~"""'",,",o9<ll.-_ Date :~'H:.LJ.+~7.---,----,---,----,----: Please an wer the following questionnaire regarding the need for a "Public Way Permit": 1)Is this a new residence? 2)Is demoiition work being performed that requires the use of the right of way,easements or public property? 3)Is any ·utility work needed? 4)Is the driveway being repaved? 5)Is different access needed to site other than existing driveway? 6)Is any drainage work being done affecting the right of way,easements, or public property? 7)Is a "Revocable Right Of Way Permit" required? 8)A.Is the right of way,easements or public property to be used for staging, par1<ing or fencing? B.If no to 8A,is a par1<ing,staging or fencing plan required by Community Development? If you answered yes to any of these questions,a "Public Way Permit"must be obtained. "Public Way Permit"applications may be obtained at the·Public Wor1<'s office or at Community Development.If you have any questions please call Charlie Davis,the Town of Vail Construction Inspector,at 479-2158. I have read and answered all the abOjUestions, (),~P ..><2 ~Z::.L Job Name Contractor's Signature Dale '. '1 D J ~ I oS "I-- 2:e.~'" ~0 - J \., , j I i I I -, ;,..- :.:. ,-, I I \ ..IF .if) / , bd I '1, CI J !~ I i ~ , ,IF i l ~<'•- !2-I-' =>i. '.Tlml ill!.iiI'iI I!IT ...11'II l ;I i I!I I; .I,11 01 I. ll I d II'I:I(lit iii i if II"'I ,, .['.,;:I I!.'" .''III'i';;iII'I!''II :I I ..I j ~,I !I .. .,l I'II'!:!'i!II ".' .. ,I•I it I I Ii ...I !!~:II '.;:.:.:.~:.- I!'t!I .I l!l '' 1;'.:~i '.~ •.. ._.-- ,2 , \,' I i·I ,' i I• •u • '.'~t·,·• I CHECK REQUEST, PREPARED BY:/!-c.>.k;!,s,..«,j DATE:'1/'1 /'17 VENDOR NAME:PI'J1-Z O~}"eC-<:..£1.--0 / <0 0 6118VENDORNUMBER: DESCRIPTION OF EXPENSE:CLEAN UP DEPOSIT REFUND FOR BP #1J9(-05.~r NAME OF JOB:(J'ra;n sA.&/hA,~r +,I-<.-cL..o...u-..c.« •ACCOUNT NUMBER:01 0000 22002 AMOUNT OF REFUND:1%/<2<>.0 0 DATE APPROVED:?1--J.-7'7 /" APPROVAL SIGNATURE:IJ •0._~(-, •• TOWN OF VAIL 75 S.FRONTAGE ROAD VAIL,CO 81657 970-479-2138 DEPARTMENT OF COMMUNITY DEVELOPMENT NOTE:THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES nDD/ALT MF BUILD PERMIT Permit t:B96-0364 Job Address: Location ...: Parcel No ..: Project No.: 950 POTATO PATCH DR POTATO PATCH TH UNIT 2101-063-06-029 Status ... t 29 Applied .. Issued ... Expires .. ISSUED 12/13/1996 12/13/1996 06/11/1997 APPLICAN'f PINYON BUILDERS Phone:3038275793 POBOX 96,HINTURN CO 81645 CONTRACTOR PINYON BUILDERS Phone:303B275793 POBOX96,MINTURN CO 81645 OWNER GRAMS HAMMER PEPI 231 E GORE CREEK DR,VAIL CO 81651 Description: REPAIR FIRE DAMAGED UNIT Occupancy:Rl Type Construction:V I-HR Type Occupancy: Multi-Family Type V I-Hour valuation: Fireplace Info~tion:Re~tricted: 10,000 1I0t Gas Appl iances: Add Sq Ft: 1I0t Gn Logs:M01 Wood/Pallet: ****~****************.************************************FEE SUMMARY ****.*******.************************~***************** SU1lding-----)'45.00 Re$luarant Plan Review-->.00 Total Calculated Fees---)342.25 Pll'll'l Check--->94.25 DRB Fee----------------->.00 Additional Fee'------>.00 lrwestigl!ltion>.00 Reere"tion Fee------>.00 Total Pernrit Fce------->342.25 will Call---->3.00 Clean-Up Deposit------->100.00 Pay.ents--------------->342.25 TOTAL FEES----------->342.25 BALANCE OUE----------->.00 ~*************...*******************i*******************.*••*.*********ti**••****.********************************************** Item:05100 BUILDING DE~ARTMENT De~t:BUILDING Division: 12/13/1996 CHARLIE Act~on:APPR CHARLIE DAVI Item:05400 PLANNING DEPARTMENT Dept:PLANNING Division: 12/13/1996 CKARLIE Action:APPR N/A Item:05600 FIRE DEPARTMENT Dept:FIRE Division: 12/13/1996 CHARLIE Action:APPR N/A Item:05500 PUBLIC WORKS Dept:PUB WORK Division: 12/13/1996 CHARLIE Action:APPR N/A See Page 2 of this Document for any conditions that may apply to this permit. DECLARATlOHS I hereby acknoYledge that I kave read this application,filled out in full the ;nfor..tion required,ca.pleted an accur.te plot plan,and state tkat all the infoNiation p~ided as required is correct.I agree to cc.ply with the infor..tion and plot plan, to co-ply with all Town ordinances and state laws,and to build this structure according to thc Town's zoning and subdivision codes,design review approved,Unitor.Building Code and other ordinanccs of the Town app cable thereto. REQUESTS FOR INSPECTIONS SHALL BE MADE l1IEtHY-fOUR HOURS IN ADVANCE BY TELEPHONE Send Clean-Up DlIpOsh To:PINYON BtlIlDERS Wl~ji,,\::~cY R OFfICE FROH 8:00 A/'I 5:00 PM OWNER OR CONTRACTOR FOR HIMSELf AND OWNER ".•• ******************************************************************************** CONDITIONS Permit #:B96-0364 as of 12/13/96 Status:ISSUED ******************************************************************************** Permit Type:AOD/ALT MF BUILD PER}lIT Applicant:PINYON BUILDERS 303B275793 Job Address: Location:POTATO PATCH TH UNIT 129 Parcel No:2101-063-06-029 Description: REPAIR FIRE DAMAGED UNIT Applied:12/13/1996 Issued:12/13/1996 To Expire:06/11/1997 Conditions: 1.FIELD INSPECTIONS ARE REQUIRED TO CHECK FOR CODE COMPLIANCE. 2.ALL PENETRATIONSIN WALLS,CEILINGS,AND FLOORS TO BE SEALED WITH AN APPROVEO FIRE MATERIAL. 3.SMOKE DETECTORS ARE REQUIRED IN ALL BEDROOMS AND EVERY STORY AS PER SEC.1210 OF THE 1991 UBC. 4.FIRE DEPARTMENT APPROVAL IS REQUIRED BEFORE ANY WORK CAN BE STARTED. 5.5/B"TYPE X SHEET ROCK IS REQ'D THROUGHOUT UNIT •• ••*********************************************************'**** TOWN OF VAIL,COLORADO Statemnt *""*****************************'*****'**'*""*************** Statemnt Number:REC-0238 Amount: Payment Method:CHECK Notation:16069 342.25 12/13/96 11:16 Init:CD ADD/ALT'MF BUILD PER 342.25 Permit No: Parcel No: Site Address: Location: This Payment B96-0364 Type:A-MF 2101-063-06-029 950 POTATO PATCH DR POTATO PATCH TH UNIT #29 Total Fees: Total ALL Pmts: Balance: 342.25 342.25 .00 *******************'****'*******'******************************* Account Code 01 0000 41310 01 0000 41332 01 0000 22002 01 0000 41336 Description BUILDING PERMIT FEES PLAN CHECK FEES CLEANUP DEPOSITS WILL CALL INSPECTION FEE Amount 145.00 94.25 100.00 3.00 -PERl-lIT ~ Job Name:LJrb-mSAG-""1'1~r ~t/).).5 APPLICATION MUST BE FILLED OUT COMPLETELY OR IT HAY NOT BE ACCEPTED ~•••••••••••••••••••••••••••••PERMIT INFORMATION •••••••••••••••••••••••••••• [)-Building [)-Plumbing [)-Electrico.l [)-Mechanfcal ,\/i-Other ~"'D .'?c+..-I--re.'hJ,e~·'11:z.~ F/~t'Job Address:9.st..jL,.d S~vJ51o",<:f2-/. .*.Contac~Eagle County Assessors Office ",8(-.970-328-8640 for Parcele TOWN OF VAIL CONSTRUC"JAN.IrARcn 1:,.::...-_PERMIT APPLICATION FO'!!! ,..DATE:p-;a-'1(. Legal Description:Lot Block,_ Owners Name:'Yt'I'/"tJC(id'Y'l~~G""'~~r F iling ..SU\.LBOlD"I"V....l ..S Il.JQIJ:N,,'_ Archi teet:...!..IJ::.;..~!t-.:-_Address:_Ph._ . General Description:-!.F:..!.I':.r~c'-_1)~4"-!"'~<'-j~<'-_])Q.!<!'"'",~D~__"'7•._ Work Class:[J-New [)-Alteration []-Additional [J-Repair [xi-other D,.",D Number of Dwelling Units:I Number of Accommodation units:AlA-- ~er and Type of Fireplaces:G~~p:iances Gas Loqs Wood/Pellet ~~7i?Ai£.'J.~t::.••............................ BUILDING:$ELECTRICAL:$OTHER:$/0/0=.o~ PLUMBING:$MECHANICAL:$TOTAL:$_ ~.**•••*********••••~****••CONTRACTOR INFORMATION ••••••••••••*••••••••*•••••"~neral Contractor:'YI"-'j!1'J "Bkl{J.~r>Town of Vail Re~NO.,,,.-__ .Address:'P.D.B.,(ql...i'I,;§+..rl'!Phone Number:~~-S7"l3i. Electrical Contractor: Address: Town of Vail Reg.NoL~(.;; Phone Number: Plumbing Contractor: Address: Town of Vail Reg.NO,,_ Phone Number: Mechanical Contractor: Address: Town of Vail Reg.NOo _ Phone Number:'_ ***.***•••••••••***.**••••••**** BUILDING PERMIT FEE: PLUMBING PERMIT FEE: MECHANICAL PERMIT FEE: ELECTRICAL FEE: OTHER TYPE OF FEE: ORB FEE: FOR OFFICE USE •••••••*****••••••••••••••••••• BUILDING PLAN CHECK FEE: PLUMBING PLAN CHECK j"EE:-======MECHANI CAL PLAN CHECK FEE:_ RECREATION FEE: CLEAN-UP DEPOSIT: TOTAL PERMIT FEES: TYPE GROUP Comments: SQ.FT.VALUATION BUILDING: SIGNATURE: ZONING: SIGNATURE: XCLEAIl UP DEPOSIT llEFDHD roo '. town 01 vai 75 south fronlilllJt"road vall,c:olorado 81557 (303)479-2138 or 479-2139 • office ot community development TO: FROM: DATE: SUIl."ECT: ALL CONTRACTORS CllRRENTL'lL REG:ISTDU:!)W:ITH THE TOWN OF VA:IL TOWN OF VA:IL PUBL:IC WORKS/CO!llllJN:ITY DEVELOPlIJ:NT MARCH 16,1988 CONSTRUCT:ION PARKING &MATER:IAL STORAGE In summary,Ordinance No.6 states that it is unlawful for any person to litter,track or deposit any soil,rock,sand,debris or material,including trash dumpsters,portable toilets and workmen vehicles upon any street,sidewalk,alley or public place or any portion thereof.The right-at-way on all Town of Vail streets and roads is approximately 5 ft.off pavement. This ordinance will be strictly enforced by the Town of Vail Public Works Department.Persons found violating this ordinance will be qiven a 24 hour written notice to remove said material. In the event the person so notified does not comply with the notice within the 24 hour time specified,the Public Works Department will remove said material at the expense of person notified.The provisions of this ordinance shall not be applicable to construction,maintenance or repair projects of any street or alley or any utilities in the right-a-way. To review Ordinance No.6 in full,please stop by the Town of Vail Building Department to obtain a copy.Thank you tor your cooperation on this matter. ~e~~CknOWledged by: ~~/),.J(\~ "{!...,J.,.."J.r~osition/Relationship to Project (i.e.contractor,owner) ~11--I~-'i1­ "'Da't.e 75 south tronwgr ro.d ....11.colorlldo 11657 (303)479-2138 or 479-2139 • office of community de.,elopment BUILDING PERt·lIT ISSUANCE TIME FIWIE If th,s perm,t requires e Town of Vail fire Department Approval, Engineerl-s lPublic Works)review and approval.a Planning Department review or Health Department review,and a review by the Building Department.the estimated time for a total review may take as long as three weeks. All commerdal narge or small)and all multi-family permits will have to follow the abOve mentioned maximum requirements.Residential and small projects should take a lesser amount of time.However.if residential or smaller projects impact the various above mentioned departm~nts with regard to necessary review.these projects ~y also take the three week period. Every attempt will be made by this department to expedite this . pC!nni't as soon as possible. I.the undersigned,understand the plan check procedure and time frame, )t,,(}~F "'" Project Name .,..I/-.-n -'i(.. Oa te Work Sheet was turned into tile Conmuni ty DeveloOfn°'lt Department, •MEMORANDUM•ALL CONTRACTORS TOWN OF VAIL PUBLIC WORKS DEPARTMENT MAY 9,1994 WHEN A "PUBLIC WAY PERMlr'IS REQUIRED ... ..TO: FROM: DATE: RE: , JobName:~F-... Date:(1-'I"-<;<- Please answer the following questionnaire regarding the need for a "Public Way Permit": 1)Is this a new residence? 2)Is demolition work being perfonmed that requires the use of the right of way,easements or public property? 3)Is any utility work needed? 4)Is the driveway being repaved? 5)Is different access needed 10 sHe other than existing driveway? YES NO X X >( X ;( *-6)Is any drainage work being done affec1ing the right of way,easements, or public property? 7)Is a "Reyocable Right Of Way Permit" required? 8)A..Is the right of way,easements or public property to be used for staging, parking or fencing? B.If no to 8A,is a parking,staging or fencing plan required by Community DeYelopment? If you answered yes 10 any of these questions,a "Public Way Penmlf"must be obtained. "Public Way Penmlf"applications may be obtained at lhe Public Work's office or at Community Deyelopment ff you have any questions please cail Charlie Davis,the Town of VailConstruc1ion Inspecior,at 479-2158. I have read and answered all the above questions,, Job Name Contrac1or's Signature I L -(3 -7 .. Dale •• PUBLIC WORKS PERMIT PROCESS How it relates to Building Permits: 1)RII out our check list provided with a building permit application. If yes was answered to any of the above questions then a "Public Way"is required.You can pick up an application at either Community Deveiopment. located at 75 S.Frontage Road or Public Works,located at 1309 Vail Valley Drive. 2)Notice sign offs for utility companies.All utilities must field verify (locate) respective utilities prior to signing application.Some utility companies require up to a 48 hour notice to schedule a locate. 3)A construction traffic controVstaging plan must be prepared on a separate sheet of paper.An approved site plan may aiso be used.This plan will show locations of all traffic control devices(signs,cones,etc ..)and the work zone,(area of Construction,Staging,etc ..).This pian will expire on OCI.15th.and will need to be resubmitted for approval through the winter. 4)Sketch of work being performed must be submitted indicating dimensions (length, width &depth of work).This may be drawn on the traffic control plan or a site plan for the job. 5)Submit completed application to the Public Works's office for review.If required, locates will be scheduled for the Town of Vail Electricians and Irrigation crew.The locates take place in the morning but,may require up to 48 hours to perform. 6)The Public Work's Construction Inspector will review the application and approve or disapprove the permit.You will be contacted as to the status and any that may needed.Most permits are released within 48 hours of being received,but please allow up to one week to process. 7)As soon as the permit is processed.a copy will be faxed to Community Development allowing the "Building Permit"to be released.Please do not confuse the "Public Way Permit"with a "Building Permit"to do work on a project itself. NOTE: •The above process is lor work In a public way only. •Public Way Permits ara valid only until November 15th. •A new Public Way Permit is required each year"work is not complete. '.••L::::::~:; TOWN OF V.4IL 75 Soulh Fromoge Road Vail,Colorado 81657 303-479·2138/479-2139 FAX 303-479-2452 Depanmenr a/Communiry Dt'velopmem INFORMATION NEEDED WHEN APPLYING POR A MECHANICAL PERMIT 1.HEAT LOSS CALCULATIONS. 2.TO SCALE FLOOR PLAN OF MECHANICAL ROOM WITH EQUIPMENT DRAWN IN TO SCALE,WITH PHYSICAL DIMENSIONS AND BTU RATINGS OF ALL EQUIPMENT IN MECHANICAL ROOM. 3.SHOW SIZE AND LOCATION OF COMBUSTION AIR DUCTS,FLUES, VENT CONNECTORS AND GAS LINES. 4.NOTE WHETHER ELEVATOR EQUIPMENT WILL ALSO BE INSTALLED IN MECHANICAL ROOM. FAILURE ro PROVIDE THIS IIlFORMATION WILL DELAY YOUR PERMIT. ..•• ************************************************************~******************* CONDITIONS Permit #:B96-0364 as of 12/13/96 Status:ISSUED ******************************************************************************** Permit Type:ADD/ALT MF BUILD PERMIT Applicant:PINYON BUILDERS 3038275793 Job Address: Location:POTATO PATCH TH UNIT 129 Parcel No:2101-063-06-029 Description: REPAIR FIRE DAMAGED UNIT Applied:12/13/1996 Issued:12/13/1996 To Expire:06/11/1997 Conditions: 1.FIELD INSPECTIONS ARE REQUIRED TO CHECK FOR CODE COMPLIANCE. 2.ALL PENETRATIONS IN WALLS,CEILINGS,AND FLOORS TO BE SEALED WITH AN APPROVED FIRE MATERIAL. 3.SMOKE DETECTORS ARE REQUIRED IN ALL BEDROOMS AND EVERY STORY AS PER SEC.1210 OF THE 1991 UBC. 4.FIRE DEPARTMENT APPROVAL IS REQUIRED BEFORE ANY WORK CAN BE STARTED. 5.5/8"TYPE X SHEET ROCK IS REQ'D THROUGHOUT UNIT •• ~***.****************************************************-*---*- TOWN OF VAIL,COLORADO Statemnt*_w*wk_.******_*****__*****.*__**k •__ Statemnt Number:REC-0238 Amount: Payment Method:CHECK Notation:'6069 342.25 12/13/96 11:16 loit:CD ADD/ALT MF BUILD PER 342.25 Permit No: Parcel No: Site Address: Location: This Payment B96-0364 Type:A-MF 2101-063-06-029 950 POTATO PATCH DR POTATO PATCH TH UNIT 129 Total Fees: Total ALL Pmts: Balance: 342.25 342.25 .00 ----------*-------*----***-*--*-----*****-----*-_.-._-**********Account Code 01 0000 41310 01 0000 41332 01 0000 22002 01 0000 41336 Description BUILDING PERMIT FEES PLAN CHECK FEES CLEANUP DEPOSITS WILL CALL INSPECTION FEE Amount 145.00 94.25 100.00 3.00 •TOWNOFVAIL 75 S.FRONTAGE ROAD VAIL,CO 81657 970479-2138 ••DEPARTMENT OF COMMUNITY DEVELOPMENT NOTE:THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES ADD/ALT COMM BUllD PERMT Permit #:Boo-0333 Job Address: location : Parcel No : Projecl No .: 950 POTATO PATCH DR VAIL POTATO PATCH CLUB UNITS 43 &44 210106.106043 Starns ...: Applied ..: Issued : Expires : FINAL 11/27/2000 12/18/2000 11/06/2001 Phone:970-328-0436 TOV/Comm.Dev. Clean-up Deposit Refund approved amount date BI Type V Non-Rated Occupancy:B1 Type Construction:VN Type Occupancy:?? Desciption: CONVERT RESTAURANT TO OFFICE SPACE OWNER GASTHOF GRAMSHAMMER INC 11/27/2000 Phone: %GRAMSHAMMER PEPI 231 E GORE CREEK DR VAIL CO 81657 License: APPLICANT BILL JOSEPH &ASSOCIATES INCll/27/2000 Phone:970-328-0436 P.O.BOX 4509 EAGLE,CO 81631 License:572-B CONTRACTOR BILL JOSEPH &ASSOCIATES INCll/27/2000 P.O.BOX 4509 EAGLE,CO 81631 License:572-B Valuation:$389,000.00 Add Sq Fl:o Fireplace lnfunnation:Restricted:It of Gas Appli,mces:0 It of Gas logs:0 /I of ",Iood PcUct:0········"""••..•••••••••"""•••..••••••••••FEE SUMMARY ** Building->$1,896.00 Rcstuaranl Plan Rl'View->$0.00 Total Cakulatcd Fe-es->$3.831.40 Plan Check->$1,232.40 ORB Fee >$200.00 Additional Fees-->$0.00 lnvestigilti(m->$0.00 Recreation Fee >$0.00 Total Permit Fee------------>$3.331.40 WiliCall->$3.00 Cli'an-up Deposit-->$500.00 Payments >$3.831.40 TOTAL FEES >$3,831.40 BALo\NCE OUE-->$0.00......................................................................................................................................-. Approvals: Item:05100 BUILDING DEPARTMENT 12/14/2000 CDAVIS Action:AP SEE CORRECTIONS ON FIELD PLANS OS/23/2001 CDAVIS Action:AP REVISIONS FOR SHADESCREEN APPROVED ALSO CHANGE FOR GUARD RAIL DETAIL APPROVED Item: Item: Item: 05400 PLANNING DEPART~NT 11/30/2000 BRENT OS/22/2001 BRENT 05600 FIRE DEPARTMENT 11/28/2000 mcgee/mlv 05500 PUBLIC WORKS 12/05/2000 LS Action:AP Action:APCR Action:AP Action:AP • REVISIONS APPROVED. ,~~,~,,. See page 2 of this Document for any conditions that may apply to this permit. DECLARATIONS I hereby acknowledge that I have read this application,filled out in full the information required,completed an accurate plot plan,and stale Ulal all the information as required is correct.I agree to comply with the information and plot plan,to comply with aU Town ordinances and state laws,and to build this structure according to the towns zoninf and subdivision codes,design reViel\'approved,Uniform Building Code and other ordinances of the Town applicable thereto. REQUESTS FOR INSPECTION SHALL BE MADE nvENTY-FOUR HOURS IN ADVANCE BY TELEPHONE AT 479-2138 OR AT OUR OHlef FROM 8:00 AM •5 PM. Send Clean-up ~po5il To:BILLJOSEPI I &ASSOC. SIGNATURE OF OWNER OR CONTRACTOR FOR HIMSELF AND OWNEF •PAGE 2 • Permit #:BOo-0333 CONDITIONS OF APPROVAL as of 11-20-2001 Status:FINAL Permit Type:ADD/ALT COMM BUILD PERl\1T Applicant:BI LL JOSEPH &ASSOCIATES INC. 970-328-0436 Job Address:950 POTATO PATCH DR VAIL Location:POTATO PATCH CLUB UNITS 43 &44 Parcel No:210106306043 Description: CONVERT RESTAURANT TO OFFICE SPACE Conditions: Cond:1 (FIRE):FIRE DEPARTMENT APPROVAL IS REQUIRED BEFORE ANY WORK CAN BE STARTED. Cond:12 (BLDG.):FIELD INSPECTIONS ARE REQUIRED TO CHECK FOR CODE COMPLIANCE. Applied:11/27/2000 Issoed:12/18/2000 To Expire:11/06/2001 Building Safety &Inspection Services Division Community Development Department 75 Smtih Frontage Road Vail,Colorado USA 81657 TOWN OF VAIL CERTIFICATE OF OCCUPANCY TIus cenificale is issued pursuant 10 the requirements of the Unifonn Building Code as adopted by the Town of Vail certifying thal 31lhe Lime of issuance.this structure was found 10 be substantially in compliance ,nth the Various ordinances of the town regulating building consLrnclion or lise for the (ollo\\ing:• Name and description of project:POTATO PATCH CLUB OFFICES Address of project:950 POTATO PATCH OR Owner llame and address: Occupancy Group(s):B-1 BWIH CREEK MGT,m Typc(s)of Constnlction"VON Pennit Numbcr(s):BOO-0333 Gar)'cial 0~)O( Oat NOTE:The building ollicilll mll~.in \\Tiling,suspend or revoke 11 certificate of occupancy ISSued wHk:r tho.:pro~isions of lhls code ",tko"lIen:r the certificate IS issued 10 error,or 011 the basis of IIlcorrect IOfoolllllon supplied.or when it is dCl.Coniuoo thaI th~building or structure Of ponlOn thereof IS in violalloll of ony ordinance or rcgullliion of this code.• •• •• ANEIJNG ,PARTtAL.INSPf not- ~EA3 TO Bf CO'r..C ~I·PROVE ""roR, I '''''-'E .tIofl N'~\lE ~_.NSP'"l10N ""0 , /~c5D G Vl ~ "'"~ !y QfI...,~,.L/ 1),»)£t <l II Iv t.(/JOYj'1 'fcY--') 7 17 ... , • ••• r , ~.•. .<... '..:. "..~ t.~", {.1:'l,J ~..." o ~~~ .:.....-;~ \. ..';.!.",~.. ~...... ........ \ <>- ( .0 .)t~~ ----....-_..,. c, L"),'Qe lY- / \.. .. ,?nn no 7·000,00 ?'00 00 PERMIT FEES PERMIT NO.003885 BUILDING Z ELECTRICAlQ ~PLUMBING~ ~c MECHANICAl> TOTAL VALUATION I n III IV f) ABEHlftM C.R.FA.CROUP partition and closeti install ceiling fans and lighting TYPE J.TYPE OF CONSTRUCTION 2.OCCUPANCY GAOUP DIVISION 02 2.3 .. GENERAL DESCRIPTION OF WORK :Build wall o PLUMBI~GoFOUNDATIONo NOTE -COpy OF PERMIT TO BE KEPT ON JOB$ITE CONSTRUCTION PE_.R::.:M.:..:.IT~~~:::.:::.~_---.....DATE 5/23/89 ,1 GI BUILDING GI ELECTRICALoMECHANICAL TO BE FILLED OUTCOMPlETELY PRIOR TO ISSUANCE OF PERMIT TYPE OFPERMIT JOB NAME:Evershade Remodel ~:::!:r~:12~2[~~~~~l:j~~~wtjE~LE~C~T~·'~CAl.~====t==~4~3~'~O~O==j-5 p.NEW(I AlTERATIDH(X)AOomONAI..{)REPAIR (I PlUMBING owa.UNG UNITS __ACCOMMCXlA,TION lJNITS __ LEGAL DESC. OWNER LOT BL""----1 FILING Potatot Patch Club '41 NAME Paul Eyersbade MNbAOPRE~2334 Underwood CITY Houston,TX 7~-668-316 v 0_'BUILDING PERMIT 90.00 ~ PlAHCHECK 4"'nn ~<::ll.;!.;I MECHANICAl ARCHITECT fEltR.,""--_ W,!,II WpRfSS CITY "'. QNINO &BUILDING NOTES:_ ..J~~2!ris 5/24/89 _ UILDING OFFICIAl 1f...Tt _Bets.,L.Rosolack 2124/89 _ =ONING ADMINiSTRATOR ---DATE -- BLASTING ST.CUT ADDITIONAL PERMITS NEEDED: !..!i ROO<';;;TY;;P;;,E=:b~EL~EC~.~db=;=1 =GA=sd:~~~~1--------+-------1t.::=___TOTAL PERMITFEES 17'no '<.iOFSOlAAWOOO HEAT FIBM Shearon Electric ELECTRICAL CONTRACTOR TOWN OF VAll REO.NO.121-£ TEL'949-6456 GENERAL FIRM Timber Wolf Enterprise CONTRACTOR TOWN Of VAIL REO.NO.193 B TJ:V",476-3154 PARKING OEMO FIRM MECH.NICAL CONTRACTOR TOWN OF VAil REG.NO. TEL'" OTHER I,F.::'":;:"'--_ TOWN OF VAIL.REG.NO. CONTRACTOR TELE. I hereby acknowledge that I have read this application,tuted out In full the Information required. completed an accurate plot plan.and state that all the information provided 8S required is correct.I agree to comply with the Information and plot plan,to comply with all Town ordinances and state laws,and to build this structure according to the Town's zoning and subaivislon codes,design review approved,Uniform Building Code and other ordinan~J3"t e Town applicable thereto. I,~.b,~/V,ff-If'././7/7....(. &<H.r(,/A./.tv ...J r-'"SIGNATURE OF OWNER OR CONTRACTOR FOR HIMSELF.#,.~~,AND THE OWNER. NOTE -COPY OF PERMIT TO BE KEPT ON JOBSITE IIit'"c..~CONSTRUCTION PERMIT\,DATE 5 19 89 PERMIT NO.003878,...•lin ftl 1.TYPE OF CONSTRUCTION I II III IV() depertment of community development 2.OCCUPANCY GROUP ABEHI~M BUILDING 2600.00 z ELECTRICAl 1400.00 TO BE FILLED OUT COMPtETELvPRIOR TO ISSUANCE OF PERMIT DIVISION ()22a34 0 GENERAl DESCRIPTION OF WORK;~PlUMBING 0TYPEOFPERMITKITCHENREMODEL~ ~ ~BUILDING 0 PLUMBING ADDITION OF 91 s.f.GRFA ~MECHANICAl.0 ELECTRICAl 0 FOUNDATION TOTAL 5000.00 0 MECHANICAL 0 PERMITFEESTYPEGROUPG.R.F.A.VALUATION LEGAL LOT -~~,.,V R-1 91 s ....f ~30 "on BUILDING PERMIT 72.00 ~'f!DESC.FILI,~I·PLAN CHECK '6 no JOB NAME:,.,.nn t<-""7~ Alpinhoef '11 ELECTRICAl f!.I.'F OWNER NAME Mr.Paul Hoff NEW!I ALTERATION ()ADDITIONAl.(I REPAIR (I PlUMBING rt?t MAllADQBEss 3190 South Monrow DWELLING UNITS __ACCOIolMOlJro\TlON UNITS __MeCHANICAl CITY Denver PH.757-3600 HEIGHTINFT __NO.FlREPlACES --RECREATtOfIl FEE 27.00 ~ARCHITECT FIRM Owner INSULATION:TYPE THOCKNESS R-VAllUE DESIGN BEVIEW BOARD 0 V~~I I I MalL AQ[)f!E$S CLEAN-UP DEPOSIT 100.00 CITY PH.USE TAX IINB INC.TOTAL PERMIT FEES 279.00 GENERAL FIRM ITYPEElEC.GAS CONTRACTOR toWN QF VAIL REG.NQ,OF TOTAl PERMIT FEES T<O'1-458-5995 ""-AA WOODHEAT Joe No~r18 5/22/89 FIRM Hallmark Electric ADDITIONAL PERMITS NEEDED:None UQOlNGOFF1ClAl ------""ATE ----- ELECTRICAL 1.!i INITIAL =:..Krlsta1LPrit:.!..____51.13~9_-- CONTRACTOR TOWN OF VAIL.REG,NO.S1 CUT OHING ADMINISTRATOR DATE TELE.,_"'0_"no BLASTING ZONING &BUILDING NOTES:all work is interior FIRM None PARKING nn UM" PLUMBING TOWN Of VAIL.REg.NO. this Dermit.Addition f 91 .n.f-. CONTRACTOR OEh40 of GRFA -no addtnl.parking reqd. T!=t F.Uni~1a".~"Pcacos. fiRM None I hereby acknowledge that I have read this application,filled out In full ten armat on required, MECHANICAL completed an accurate plot plan.and state that all the information provided as required is correct., TOWN Of VAll REG,NO.agr••tD cDmply with the InfDrmatlDn and plot Pla~with all Town ordinance.and .tateCONTRACTORlaws,and to build this structure according to the Town's onlng and S~18ion codes,design TElE.review approved,Uniform Building Code and other or I nces 0 i'2 8PPll~}lile thereto. OTHER FIRM None TOWN Of VAIL.REG.NO.~GNATURE OF 9WNE"OR CONTRACTOR FOR HIMSElF CONTRACTOR JELE. AND THE OWNER. NOTE -COPY OF PERMIT TO BE KEPT ON JOBSITE 4/30/84~CONSTRUCTION PERMIT •• ,'.DATE ,PERr.l(.T NO.001678, "••,- 1.1••III I.TYPE OF CONSTRUCTION 11I1I1lZ department of community development 2.OCCUPANCY GROUP ABEHIR BUILDING 18,000,00 DjVISION J 2 Za(!}4 Z ELECTRICAL d<n no TO BE FILLED OUT COMPLETELY PRIOR TO ISSUANCE OF PERMIT a GENERAL DESCRIPTION OF WORK :~PLUMBING TYPE OF PERMIT move bedroom wa 11 and raise roof ~ ~ ~MECHANICAL~BUILDING 0 PLUMBING > ~ELECTRICAL 0 FOUNDATION 0 MECHANICAL 0 TYP,GROUP G.A FA VALUATION PERMIT FEES LEGAL lOT BlK V R-3 153 18 000.00 BUILDING PERMIT l?Q ,n DESC.FlUNG Potato Patch Club 64 ,<;" ,-JOB NAME'SLIFER PLAN CHECK (Rod)Residence RemodE ELECTRICAL 35.00 ~OWNER NAME Rod Sl ifer NEW()ALTERATION (X ADDITIONAL {I REPAIR (I PLUMBING MAIL ADDRESS 950 Red Sands tc DWELLING UNITS __ACCOMMOOATIQNUNITS __MECHANICAL Vail ,Co.476-1266 ~~CITY PH.HEIGHT IN FT.NO.FIREPLACES RECREATION FeE 45.90 ARCHITECT FIRM Baldwin &Assoc,INSULATION:TYPE THICKNESS R-VALLUE DESIGN REVIEW BOARD MAILADpRESS 1000 S.Frontage FLOOR CLEAN·UP DEPOSIT 100.00 ~Ci'- CITY Vail 476-4433 EXT.WALLS 150.00 ~PH.USE TAX Duddy-Viele Const.ROOF ~~::J-GENERAL FIRM 188A TYPE ELEC.X ""TOTAL PERMIT FEES $523.65CONTRACTORTOWNOFVAllREG.NO.OF Vail •Co.476-3082 SOLAR WOOD ,u~~;r~J'~.~-2/,.3""~TElE.HEAT FIRM White River Electric ADDITIONAL PERMITS NEEDED:BU LDINGOFFICIAL DATE ELECTRICAL 145E '-!i INITIAL _SI Krista,,-Prit~___~2'y84 __ CONTRACTOR TOWN OF VAil REG.NO ST.CUT CB ONING AOMINISTRATOR OATE TElE_949-0220 BLASTING CB ONING a BUilDING NOTES:i nteri or 1ayout fIRM PARKING CB needed wall sections and roof sections PLUMBING TOWN OF VAll REG.NO. needed floor clan needed.materials to CONTRACTOR DEMO B matcn eX1Stln9 unn. TELE. fIRM I hereby acknowledge that I have read this application,filled out in full the information required, MECHANICAL completed an accurate plot plan,and state that all the Information provided as required is correct.I CONTRACTOR TOWN Of VAll REG.NO.agree to comply with the information and plot plan,to comply with all Town ordinances and state laws,and to build this structure according to the Town's zonir~ltand subdivision codes,design TELE.review approved,Uniform Building Code and other~nan~~he T01'n applicable thereto. OTHER fiRM return clean up to://-,,:~ TOWN OF VAil REG.NO.Rod Slifer 950 Red Sandstone,SIGNATUR~.~.~OWNE~CONTRACTOR FOR HIMSElf CONTRACTOR TEtE,Vail,81657 AND THE OWNER. ..""~"'~;J • r • 60~ NOTE -COPY OF PERMIT TO BE KEPT ON JOBSITE 9/12/86,-~CONSTRUCTION PERMIT,DATE 002..••PERMIT NO . 11111 III 1.TYPE OF CONSTRUCTION I II III IV V department of community development 2.OCCUPANCY GROUP "BEHIRM BUILDING 4000.00 DIVISION 122.34 Z ELECTRICAL 500.00 TO BE FILLED OUT COMPLETELY PRIOR TO ISSUANCE OF PERMIT 0 GffEERAL OE~IPTI~N OF WORK:~PLUMBINGTYPEOFPERMITewporeexenSlOn~ ~ Extend living c MECHANICAL~BUILDING 0 PLUMBING room > ~ELECTRICAL 0 FOUNDATION 65%of GRFA added TOTAL 4500.00 0 MECHANICAL 0 TYPE GROUP G.A.FA VALUATION PERMITFEES ~GAl lOT BlK.V R-3 65%4500.00 BUILDING PERMIT 72.00 ESC.FlUNG Unit 25,Potato Patch 36.00PLANCHECK JOB NAME:SLIFER RESIOENCE ELECTRICAL 45.00 OWNER NAME Rod Slifer NEW(I ALTERATION ()ADDITIONAL {I REPAIR (I PLUMBING ~Q MAllADDBESS c/o Slifer Real MECHANICAl ~~ CITY Vail 81657 PH47~:t121 OWElUNGUHtTS __ACCOMMOOATfONUNITS __~ HEIGHT IN FT.__NO.FIREPLACES --RECREATION FEE 119.50 ....1' ARCHITECT FIRM INSULATION:TYPE THICKNESS R-VALLUE DESIGN REVIEW BOARD ~"d fOLoaR 100.00 C MAil ADDRESS CLEAN·UPOEPOSlT (1~EXT WALLS CITY PH..USE TAX ROOF ..~ GENERAL FIRM Nelson-Zeeb Const.Co. CONTRACTOR 170-A TYPE ELEC.GAS TOTAL PERMIT FEES 372.50TOWNOFVAllREG.NO.OF 949-5152 SOLAR WOOD TELE.HEAT _Gar1..!1u.!:.rai,,--____J/]2/86 ____ FIRM i~ew Electri c ADDITIONAL PERMITS NEEDED:BUILDING OFFICIAL OAT' ECTRICAl IlOE-I05X !."-INITIAL Kristan Pritz 9/12 86 TOWN OF VAIL REG.NO,1---------------CONTRACTOR ST.CUT ONING ADMINISTRATOR DATE TELE.949-4651 BLASTING ONING &BptLOING NOTES:d ORB plansFIRMapprovaperapprove PLUMBING PARKING TOWN OF VAIL REG.NO. CONTRACTOR OEMO TELE. fIRM I hereby acknowledge that I have read this application,filled out in furl the information required, MECHANICAL completed an accurate plot plan,and state that all the information provided as required is correct.I CONTRACTOR TOWN OF VAIL REG.NO,agree tG comply w;'h the ;ntormat;on and plot plan.to ~r W;t1~Town ord;nences and state TELE.laws,and to buUd th;s structure accord;ng to the r %'~~an subd;,;s;on codes.des;gn review approved,Uniform Building Code and other or ces a he Town applicable therelo. OTHER FIRM CLEAN U DEPOSIT TO:(.f. 'I/fr'>/ TOWN OF VAIL REG.NO.SIGNATURE O~~NER OR CONTRACTOR FOR HIMSELF CONTRACTOR TELE.AND THE OWNER. ,~...,1V.,1 •• Design Review Board ACTION FORM Department of Community Development 75 South Frontage Road,Vail,Colorado 81657 tel:970.479.2139 fax:970.479.2452 web:www.ci.vaiLco.us Project Name:Potato Patch Club Project Description: Revise color scheme Participants: ORB Number:ORB020116 OWNER POTATO PATCH CLUB CONDO ASS004/24/2002 Phone: %VAlL HOME RENTALS 143 E MEADOW DR STE 397 VAlL CO 81657 license: APPUCANT Frttzlen Pierce ArcMects 04/24/2002 Phone:476-6342><12 David 1650 E Vall Valley Drive Vall,CO 81657 License: Project Address:870 POTATO PATCH DR VAlL location: legal Description:lot:7TH.Block:Subdivision:POTATO PATCH CLUB CONDOM Parcel Number:210106306047 Comments: BOARD/STAFF ACTION Motion By:Brittain second By:RodgersGarvey Vote:3-oWoldrich,Pierce recus Conditions; Action:APPROVED Date of Approval:05/03/2002 Cond:8 (PLAN):No changes to these plans may be made without the written consent of Town of Vail staff and/or the appropriate review committee(s). Cond:0 (PlAN):ORB approval does not constitute a permit for building.Please consult with Town of Vail Building personnel prior to construction activities. Planner:Allison OChs ORB Fee Paid:$20.00 •Questions?Mtlle Planning Staff at 479-2138 APPLICATION FOR DESIGN REVIEW APPROVAL GENERAL INFORMATION l'11is application is for any project requiring Design Review approval.Any project requiring design review must receive Desgn Review approval pror to submitting for a building permit.For specific information,see the submittal requirements for the particular approval that is reQuested.The application cannot be accepted until all ttle required information .is submitted.The project may also need to be reviewed by the Town Coonal and/or the P\anning and Environmen~l Commission.Design Review Board approval expires one year after final approval unless a bUilding pennit is Issued and construction is started. A. B. C D. E. F. G. H. LOCATION OF PROPOSAl:LOr:BLOCK:FlUNG:~,"'"I.B06lo fl!,-a\, PHYSICAl.AOORE5S:"60 III!P _"""\:lE f'a/':lP PARCEL II:2=101",.,l5.C!fpCOl -04J(COnlact Eagle Co.Assessors Office at 97G-328-8640 for parcel #) ZONING:_ NAME OF OWNER(S);lbbl!?rJi1c.l\Cl"I3 CD>\""'i-tlco'\I I<e>Il"IlUIllfe ,I'f!;ls,. MAlllNG ADDRESS;2.W2.M!>lf'!NlE 1:&.1:&"1.e""B:i,'"eP\<l1 ~~'!'HONE;!6.~.1""" OWNER(S)SIGNAlURE(S):~~dY.r.v ,.,O!iIJ/I~eer.r Il?t'~f 9 NAME OF APPIlCANT;P!I02I....""""E HIQU,,,..,,..,~ MAnlNGADDRESS:lU5p e ....\W1PY'ggve I J'H..Uc,\t::JEJe ,c:.l ;;JffvJO lIJl11!.I CD!~1'.01'6>'PHONE;'10 ."t1I..II.!A':2.XI k 1YPE OF REVIEW AND FEE;o New Construction -$200 Construction of a new building. o Addition -$50 [neludes any addition where square footage is added to any resldentlal or ammerclal building. •Minar AlteratIon ...$20 Jndudes minor changes to buildings and site Improvements,such toJ Y L,.~as,reroofing,painting,wlndl7N additions,landscaping,fences and&lLl~1V •_inlng wal~,ott.. ORB fees are to be paid the lime of submitrnl.l.llrer,when applying Ib'a building ~please Identify the accurate valuation eX the project The Town of Vail wrn adjust the fee according lD the project valuaOOn. PLEASE SUBMIT TIllS APPUCATlON,ALI.SUBMmAL REQUIREMENTS AND TIlE FEE TO TIlE DEPARlMENT OF ODMMUNnY DEVELOPMENT, 75 50UTIl FRONTAGE ROAD,VAIL,COLORADO B1657. For 0IIIce Uae Only; fee Paid,.ttl 0<#;Ilm«:By:e"":"""'"-::--=---,;;---------I Application Date:.-=etiii9oate:=:=====:DRB=~M:eetrn::~~Applicaoon Meeting Date: RE APR H 2IlO2 • UST OF PROPOSED MA nRfALS • QUIJ.DrNG MATERIALS: Roof Siding Other Wall Materials Fascia Soffit.s Windows Window Trim .Doors Door Trim Hand or Deck Rails FlllC~ Fl,lshings ChillUlCyS Trash Enclosures Greenhouses Rcmining Walls Exterior Lighting"· Other ,. TYPE OF MATERIAL: ..' COLOR:' ..sw 10Uo ~)"D(·i7_A.7 =:;I .)?oc=d.F "'\E 'iT LA)~rre- SQ 2o~\'&u.L~~ ~"Tl.E'E:.~ S\O.?ZO'i \.sEA.!"'F;=AC" G!.-u:..E."",- ~Plea'ic specify the nmnufacturer's COIOf.number and attach a small color chip ...*All exterior lighting must meet the Town's Ligh.ting Ordinance 18.5~.059(J)_If.cxterior lighting is proposed, plC:lSC indicale the numbcr'offixtllfCS and locations on a separate lighting plan.Identify each fix"tllre type and provide the height above grade,lumens output.luminous area.and attach a cut sheet of the lighting fixtures. ". 2 ~.Uudaled 6/97 • PROPOSED LANDSCAPING • ,PROPOSED TREES AND SHR'UaS: EXISTING TREES TO IlE REMOVED: BOlllOicn]Name COOlmon Name lliiaotily GROUND COVER SOD SEED IRRIGATION "Minimum 'requirements for landscaping:deciduous trees·2 inch caliper coniferous trcc~•6 feet in height shrubs -5 gallons SQuare FOQI8CC TYPE OR METHOD OF EROSION CONTROL OTHER LANDSCAPE FEATURES (retaining waiis.fencc.s,swimming pools,efc.)PIe:lSC specify.Indicate top and bottom c1c'/atiollS ofrct.:"lining walls.Maximum height of walls within the ITont setback jc 1,ft:t:l.Maximltm height of w~\lls elsewhere on the property is b teet. ',' 3 't ,, <:Up;latod 6/97 •• UTILITY LOCATION VERlflCUIOCi This foml is 10 verify service avuilability ami location far new con.c;lruction and should be used in conjunction with preparing your ulilirJ plan and scheduling install:l.Iions.The loc.,tion and availabiliry of utilities.whelher they be mnin tr"..lnk line<>or proposed lines.mlt.'it b::approved and vc:iiicd by'the following utilities for Ihe <Iccolllp:~nying site plan. AuthQrized Si!!D8turc U.S.West Comrnunications 1-800-922-1987 468-6860 or 949·4530 ,' Public Service Co~pflny 949-5781 Gary Hall Holy Cross Electric Assoc. 949-5892 Ted HuskylJohn Boyd T,C.1. 949-5530 Floyd Saln7.:lf Eagle River Wafer &Sanimlion District· 476w 7480 Fred Hal,;lec •P]C;ISC bring a site plan.Ooor plan.and elevations when obtaining Upper Eagle Valley Water &Sanitarion sig!1'lturl::s.Fire now needs must he addressed. NOTES: 1.If the utility verification form hao;signatures from each of the utility companies.and no COlillllents arc made directly on the fonll.the Town will presume Ihat there arc no problems and Ihe development can proceed. 2.If a lltilirJ cOlnpany has concerns with Ihe proposed construction.Ihc ulility representative shall note directly on the utility verificarion fonn lhallhen:is a problem which nc:us to be rcsolvt=d... The issue shoulu then be dc.::ailerl in ~n attached letter to !hc Town of Vail.Howe ....::"~~:.:;se kecp in mind rhat it is the r:::sponsibility of the ulility company a",1d the applicant 10 resolve :'::;";:ii.il,;~".""~:.:::;;:_" 3.These verifications do not relieve the contractor of Ihe responsibility to obtain a Public Way PC0l1it from the Dl.:"partmcnl of Public Works at the Town of Vail.Utility locations must be obtained before digt,';ng in any public right·of·way or casement within t~c Town ofYail.A buildinl!pennir is [lot a Public Wav permit and must be obtail1e&scvaaucly.,- ".' 4 II •I' ~:..".'Updated 6197 ••Questions'Call tile Planning Staff at 479-2138 AoomONS -RESIDENTIAL OR COMMERCIAL SUBMITTAL REQUIREMENTS GENERALINFORMAlJON Applicants requesting the review of additions which require the utilization of an Additional Gross Residential Floor Area (GRFA)(250 )request must also submit a Planning and Environmental Commission (PEe)application.If the addition requires an Additional GRFA request,the applicant must receive PEe approval prior to Design Review Board approval. 1.SUBMmAl REQUIREMENTS o Q.ill:complete set of existing floor plans or "as-built"drawings with all specifications shown. oA preliminary title report,induding schedules A and Bt to verify ownership and easements. o Condominium Association approval,(if applicable). o Photos of the existing structure. o Specifications of all materials and colors of the addition. o TooooraDhjc survey,stamped by a licensed surveyor,at a scale of 1"""20'or larger,on which the following infonnation is provided: o TH3 to existing benchmark,either USGS landmark or sewer invert.This information must be clearly stated on the survey so that all measurements are based on the same commencement point. o lot area and if applicable,buildable area. o Legal description and physical address. o SCale with a graphic bar scale and north arrow. o Property boundaries to the nearest hundredth Cal)of a foot accuracy.Distances and bearings and a basis of bearing must be shown.Show existing pins or monuments found and their relationship to the established corner. o Topographic conditions at two foot contour intervals unless the parcel CDnsists of 6 acres or more,in which case,5'contour intervals may be accepted. o Existing trees or groups of trees having trunks with diameters of 4"or more,as measured from a point one foot above grade. o Rock outeroppings and other signifICant natural features (large boulders,intennittent streams,etc.). o All existing improvements (including foundation walls,roof overhangs,building overhangs, etc.). o Hazard areas (avalanche,rockfall,etc.),centerline and edge of stream or creek.,required creek.or stream setback.lOa-year floodplain and slopes of 40%or more,if applicable. • o Size and type of drainage culverts,swales,etc. • o Exact location of existing utility sources and service lines from their source to the structure.Utilities to include: Qlble1V Telephone sewer Water Gas EJectric o Show all utility meter locations,including any pedestals on site or in the right-of-way adjacent to the site. o Indicate all easements identified on the subdivision plat and recorded against the property as indicated in the title report.List any easement restrictions. o Spot elevations at the edge of asphalt,along the street frontage of the property at twenty-five foot Intervals (2S'),and a minimum of one spot elevations on either side of the fat. Three (3)copies of the following: o Site plan.at a scale of 1"=20'or larger,showing the following information: o Existing and proposed layout of buildings and other structures. o location of landscaped areas. o All fle',V retaining walls with spot elevations for top and bottom of wall. o Location of all required parking. o Indicate roof ridge elevations with existing and proposed grades shown underneath. o Floor plans,at a scale of l/B"""l'or larger (1/4"""l'is preferred),dearly indicating the proposed addition. o Building Elevations,at a scale of 1/8"=1'or larger (1/4"=1'is preferred). o If existing structure is proposed to be modified,show elevations of existing structure. D Building elevations must be shown,clearly indicating the new addition.If building faces, existing or proposed,are at angles not represented well on the normal building elevations, show these faces as well.Show all rooftop mechanical systems,if applicable. D If the intent of the propOSal is not dearly indicted,the Administrator may determine that additional materials are necessary for the review of the application. 2 • I.PilE-APPLICATION CONFERENCE • A prc·applic:uion conference wilh Town of V<lil SI2rr is required.No application ettn be accepted unless lhe lll:J.ndalOry prc-appJic;,uion mcc!lng hJS been completed.It is Ihe applicant's rc::;ponsibilil)'to schedule this mccrmg by calling 970...479-2128. II.TIME REOUIREMENTS The Design Review l3o:lfd meets on thc lsI and 3rd Wednesdays of och month.A complete application form and all accompanying mntcriall11ust be accepted by the Community Development Depanrne.'1t a minimllm of three and a half (3 112)weeks prior to Ihc date of the ORB public hcaring. III.REVIEW CRITERIA Your proposal will be reviewed-ror compliance with Ihe Design Guidelines as set forth in Section 18.54 of the Municipal Code.. IV.NOTE TO ALL APPLICANTS: A.rr n property is located in a mapped h:::rz:.ard area (Le.snow avalanche,rockfall.floodplain.debris· flow.wetland.etc).a ha7...ud study must be submitted and the oWller must sign an affidavit recognizing the hazard report prior to the issuance of a building pcrmit.Applicants arc encouraged to check wilh the pl<wning staff prior to subminal of a ORB application to determine thC.rCltllionship offhc property to nlllll;lppcd hazards.. O.Basic Plan Sheer Fornmt.For all surveys.sile plans.landscape plans and other sire improvements pl:.ms.<Ill of the following must be shown. I.Plan sheet size must be 24~x 36".For large projcxts.larger plan size may beallowcd. 2.Sc:Jlc.The minimum scale is I "=20'.All plans must be at the same scale. 3.Graphic bar scale. 4_Nonh arrow. 5.Title block.project name.project address .lnd legal description. 6.IIlUiclIholl of plan preparer.address llJld phone Ilumber. 7.D~~lc:i of original plan prcparatibn and all revision dates. R,Vicinity lllap or loc:uion map 'II n scale of J "=l.OOO'or larger. 9.Sheet labels and number.;. 10 .A border wilh a minimum left side margin of 1.5". I I.Names of all adjacent roadways. 12.Plan legend. C.For new constmctioll and additions,the applicant mUSt st.ake and tape the:project site to indicate property lines.proposed buildings and building comers.All trees to be removed must be taped.The ;:pplicant must ensure thai Slaking done during the wimer is not buried by snow All site tapings and st~king must be completed prior tn the day of the DRB meeting. .D.Applicants who fail to appear before the Design Review Board on their scheduled meeting date and who have not asked in advance t~t discussion on their i(em be postponed,will have their items removed from the;:;ORB agenda Wllil such lime tiS the itcm has been republished. E.If the DRB approves the application with conditions or moditicatio~s,all conditions of approval 11lUst be:resolved griQr to the issuance ofa building permit. '., 5 ~Updaled 6197 V.STAff APPROVAl.••... The Administr:1tor may review and approve Design Review applications.approve with cenain modifications. deny the application.or may refer the application 10 the Design Review Board for decision.All staff approvals arc subject 10 final appro\>-al by the ORB.The following types of Design Review applications may be !l,afT approved: A.Any applicahOn for an addition {O an existing building that is consistent ~ith the architectural design. malerials and colors of the building.and approval ha,<;been received by an authorized member of a condominium associaliun.if applicable: B.Any <Ipplicarion to modify an existing building thaI docs nof significanlly change the e.:tLsling planes of {he building and is gencmlly consistent with the architectural design.matcnals and colors of the building.including.btl!not limited to exterior building finish materials (e.g.stonework.,siding.roof ma!erinls.painl or ~1ain.).exterior lighting.canopies or awnings.fences.antennas.satellite dishes. windows.skylights.sIding.minor commercial facade imprOVCllll:nts.and other similar modi~icariolls: C.Any application l\'lr sire imprbvcrncn!s 'or modifications including.bur nOllimitcd 10.driveway modifications.site grading.site walls.removal ur modifications to existing landsr.:aping.installation of accessory structures or recreational facilities. VI.ADDITIONAL REYJEW ANn fEES A.Iffhis application requires a separate revicw by any local.state or Federal agency other than the Town ofVai!.the application fce shall be increased by $200.00.Examples of such review.may includc.but are not limited to;Colorado Department of Highway Access Pennits.Army Corps of Engineers 404.etc. B.The applicant shall be rC~'Ponsible for paying any publishing fees which arc in excess of 50%oftbe application fcc.If.nt the applicant'S request.any matter is postponed for hc.1ring.causing the lTk"ltter to be rc~publishcd.Ihen the entire fee for such re~publication shall be paid by the applicant. C,Applications deemed by the Community Development Depanmcnt to have design.land usc or other .issues \vhich may h<lve a significanl impact on the.community may require review by consultants in addition to Town Slaff.Should a determination be made by the Town slafTthat an outside consultant is'needed.the Community Development Department may hire the consultant.lbe Department shall c'-;tirnate the amount of monl.)'necessary to p'ay the consultant and this amount shall be forwarded to the Town by the applicant at Ihe lillle of filing an application.Expenses incurred by the Town in excess of the amount fon"arded by the application shall be paid to the Town by the applicant within 30 days of notification by the Town.Any excess funds will be remmed 10 the applicant upon review COll1pj~fioll. 6 ",. ~Updated 6/97 •"or.;<b/~.t"¢!:"/"2..1-•'"• ~ I I'L.",,'t.1 .... l. I I,. L."'-<v IT'('TI')~), ""I' L [,./ F~'"', [."~..-. ,• .--_._-.-• ------~._tI._'--_-__-:_--•.~..t.-t·=..:=j.-LI~....!~!(.1==:~bf-~~-='1"~.~~~~-t:j I~OBL ..--,.. I', ., I_.1.-_ ! .- I I., I.; ..,- If . t ....:"=.=='=i::'~""=§"-~--="=31 I w",'"~""~..,~I ~(T(f6 .. I .. IIr ." , .j- 'r-...,._. , --i r~--~~-.,.,;r/-''- .,1 I/,J/I-....1 .'I . I NK1'--l I".,I '\ '1 I "-.,"_.-.(! _...:._-..:J II \• ,/ --~~"._- .-...- -....-. , t I i I!I~Ll1lJ.1, -.. -..---, I I tiI:I ~ II-, 'l?fyvlT'(TT'rc)'Jf I..__1..•_ E..LE.vATIO~.-.... 1.. ,, I r___J ----- -, ----- ---_.- --.-- I I .,.'j • -'- -- --- • ---.-".. r ----.r-----j~~~;(.,')=-~.....(L i 1"14"I 0 /'I '1""'7"'.-'=-=-~.-,--..,."c,._=-~~------- "~--.I'-'~/",'.=-<'~-:':""'--~-[1\'-'I II I '\II -'-,II -'"1I\1 'I I :",tl/_._.._-_:J~_/-.._-'-'-J ):\~/1 It"I J\1/IL....J __•__.....ll j/_.__•...1 r~I Pf'iV Ii"C-f'(r:)../ ~r,I '", ~""'(-;1.'--__............. i"Jr:::y , ----;:--~-----~--';-.--="---"-----"-........--...--~-~--------""""'''v"NT'~,t::--.'...-_,-----------.______..'-..--.----•-tr ~_- -----:~--~.-:....:.::-..::;----_.- _.~~------~--...---.-.----.--::---,---.------------_.--..-----~:.::::::.:~"""".....- "---------------"'.---.-r'---...:::::::---J;;~'::~-___I--.---~..J -_~_.."_,__.r"__.-.,:,~_~~ ---r~--_----__-.--::-~~u.::.;u I -...".-----:::...--.:..-:::-- I --.-----'::::'=::::::::"",_I -__-----11 .-=:-------.::: I ---.~----__- I -------.r,-, L • 1/\,~,- .'. - -'...- .' \----------4--------w{-------- -n"EJULt::J1 Gv+-1"0 "1 I --, j I , I I I r I___1--_ r ----., I ------1 I I J I •I, -,:1:+---'-=::..,,- __~...l-.........__•. I i 1 6»6))1 I .::::1 QD ,1-----------------------."..--'--------_._--------- E~E:VAT'ON I 1 ~--,1. I .1._ --- /""- --- -----: __C':;_.,-.-_ .~..".--:...:t.... ------- I I_,_Lj , :0/+1 '---- ------.--..---.-:----..--.........---- -- .-------I I -----,-,- I f;1 f' I I Iii G I!1\( '~"",vAI.!~;J'!'Jl~~----.-..---- --- r---:rr=-/J-- i ~:~4A I "--~--=--~---II:i,,:~/7,ji··~7",i ~\I I I I',It /"11 /""'J 11 \!III"I~_·L __..__II 1/I I I ,I I\1/IL.-l .J ••fl.JI_.••-1 -- • ,..+~..y .-~---..------., q'') Q "-----=--:-~.--~~-'--'-.-: ------:=::-------- &,-.J....l-:.=?--...-----------....r-~:o-VI;.}JT"..........~_~_..-_"---____-.h.;"-.....--------_..- _~.~_..,11 -_."..•__.---~ ..--=~~~-:=:------"-':'--'---~-----~-.--------~----~.,.----..-----"----_.----..---------.-------...-.----------"--"----"-..-----------.--.:"._-:==::.'~---._.------~:-.-~..:-::::::--.. -----.-...L ......------..:-:':::':':-§'~';;;-;~88._.~r '_-___--._ ---I -~-----.",-r-__•---__-.----::::.-....:.,.~,~ I ....--..~._-.-.::-----_-__ 1 -"-----------.o:-~1 ------:::-----;---:::.,------."'I --__--___J -_____--__1 --r :__I,, • -,- i @®, l\TI ]-~ -.. ~~~---------- --..--- -" • I I i _i._ '1 I ._._....1........_ J,,.-------.-,------ i 11~~BI ~-=-~-=--=--=--=--=-_~~:=_..=-....:.-=.-:-_=.::-=-:_-_.-1 r"----,I1--.---.---1 Ii: iiiJ-----'-_-:::--,-'--------------...l_ ,-.___--l.--__._.. , I',., -_._-------..- F=-' t .:-~. t .',, ~-- cF=-==--- j ---- .----, i, I\-r'I'L'"t'+.1 ,-, '!..--._---_.._-- ., ,-1.--__ ,, '-:'''6;----"'-1 ---- -r-:--- ""-_....---,..-_.-_.-II I • ... ._----~ • i ; I I i ~I~Li11,.1 .l.., ---:-::;:"-::".--.p,-.•_----..--r-=:..=...._-.--~.,..,....:..,>-.-'_../. -t:---... --·r·---.--.--- "I .--~!,.._-----r-~1 ...l'.,." , r-..------!I"I, .r .-1 ,(Tir:/ii?f't Y1T --W"'~oS"",U. I _____(lrln. ,,, Ir-..'-----, ..1'rr---'l~-T ----j~- ---- t '0 i',-.jlJ . -I ';-.~!J/i -~,- 1/I,--'~...-=-!. I "<Z4-1 . I -- ,~-""--c=.... I ',,--"'1 ~I '\.-.--- .,~"-!---_. .:"---"\l ,-. .......".-Li!~.--. ...-,.-----'--.. - _.~.. i, __.1. , eLEVATION ..., !- __-l __ •• •••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••• TOWN OF VAIL,CQLQRAOO Statement •••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••• Statement Number: Payment Method: R000002220 Check Amount:$20.00 04/24/200204:27 PM loft:JAR Notation:Il002-Fritzien Pierce Permit No: Parcel No: Site Address: Location: DRB020116 Type:DRB-Chg to Appr Plans 210106306047 870 POTATO PATCH DR VAIL This Payment:$20.00 Total Fees: Total ALL PInts: Balance: $20.00 $20.00 $0.00 •••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••• ACCOUNT ITEM LIST, Account Code OR 00100003112200 Descriptlon DESIGN REVIEW FFES Current ~ts 20.00 -'----, _~.'-<...i:..0-_',----".-- -----.- I, c" -'-....j • -, ------ ._-"-E-~/+I r--:-..:.:.._~-=:-- t"--.-.-:----.--... • ,.---- I___,,-__----l, __J2,Jt ®J~~l t- -I·--·'-~--I,-·:"~'=·-rf-"';.;:r.~'I /1 I"II -"'II -",II\I 'I I"I L:,II --',I II 'I .'I I I '\I -----"",_._.,.-._-II 1/I I !'\J t\t/JL...J __.__."--....U.__J'_._...1 ~,,' ..[-Pf'iVIT (Tit:V • C§J '@l .g"Pl,J",t.T)J II ,..., \',,___~J ,- -_. -' -'-.----_--""2---------"---.' \:.-OlMoo,.JAl--,.'~" ---.............=~~~-~--+-.--,,---I ,-' .--..--- I i .L_ l I __,l ......,,... _l-._ .._----,i ..-j rt:-------==:-r'-____....L.-_ I II~ODIIi:::1Q 1), ,-L-----------,-----".--._-'---------------------_._- ..••"..•., \_.f'.!.-.1+.1 I',. •,.,.' , :II~o Iiii:::::JQ .J _ --_._-- ,--~ • +-----.r-=:-.._-_.---tl i - " rcrr-..:::. , "~---i_.._._ Ti.I I.. , "-. ~---..-----....-, "l~_. ~--_..- ._-----.~-::....-- .-'.'--~---- ----,--;-, w,.,P'"$,,,,,.,,,,~ ...---(T(~) .....-- -'."':::=--.=-=-- /' f1 ./"j -!=-1~--. _.-_.- ......,.......-- •I,~_-==r=====:::,;=lt··-----.--._ ~rfI/--.t!/. J 1/i )' ,~~I'-I ,>- I,".•I '\. i...-.,z.I '._~I''.---_.---.:.::-- r ,j,. II I!I~Ll1lJ,~ Il:I ~-., I. r-{::===~::::~·s~?·::".::"-=•.::=_":':-:_~-'---~--~~~~...~:'==.=:'~'=====j ,;'~.°_°.•,:"~•._.- --_.-.._---._-----_.--."-- I I__..J,-"--" E..LEVATIO,'..... ,..-. • Project Name:Potato Patch Club Project Description: Removal of 13 trees Participants: • Design Review Board ACTION FORM Department of CommunityDevelopment 7S South Frontage Road,Vail,Colorado 81657 tel:970.479.2139 fax:970.479.2452 web:www.ci.vail.co.us ORB Number:DRB020109 DWNER POTATO PATCH CLUB CONDO ASSOO4/24/2002 Phone: %VAIL HOME RENTALS 143 E MEADOW DR STE 397 VAIL CO 81657 license: APPUCANT larry Barnes 04/24/2002 Phone:476-2221 %VAIL HOME RENTALS 143 E MEADOW DR STE 397 VAll CO Vail-home-rentals@toski.com 81657 License: Project Address:870 POTATO PATCH DR VAIL Location: Legal Description:Lot:7TH.Block:Subdivision:POTATO PATOi CLUB CONDOM Parcel Number:210106306047 Comments: BOARD/STAFF ACTION Motion By:Brittain second By:Garvey Rodgers Vote:3-0 (woldrich,Pierce re) Conditions: Action:APPROVED Date of Approval:05/03/2002 COnd:8 (PLAN):No changes to these plans may be made without the written consent of Town of Vail staff and/or the appropriate review committee(s). COnd:0 (PLAN):ORB approval does not constitute a permit for building.Please consult with Town of Vail Building personnel prior to construction activIties. Cond:CONOO05273 1.That the applicant shall submit a plan to staff Indicating that for every foot of tree removed,an equal number of feet shall be planted. Planner:Allison Ochs ORB Fee Paid:$250.00 •• Application for Design Review Department c:A Community Development 75 South Frontage Road,Vall,Cok:lrado 81657 tel:970.479.2139 fax:970.479.2452 web:www.d ....aH.co.us General Information: An projects reqUlnng design revtew must receive apprcMll poor to submitting a buIlding pennit application.Please refer to the submittal reqUirements for the particular approval that is requested.An application for Design Review cannot be accepted until all required informatlofl is received by the Community Development Department.The project may also need to be reviewed by the Town Council and/or the Planning and Environmental Commission. Design review approVilI litpses unless a bUilding permit is issued and construction commences within one year of the approval.r;~ Description of the Request:ReM oval ()f'F :{+(eo c;.S <2=-i-\J.'3 ~ Lll'l,k-S"LR,.:3!:l,3K,3"1,'10 ,~ny"J.,,£,&,::",,'''-0, 1)..*lAn\~~~1.}-\{I i:l3 ~as (,,;;C;;wn On s;+;?k:;~) Location of the Proposal:Lot:Block:__Subdivision:V 0.,\E",-Ic~+-'"\'"",--tel.,. Physical Address:'1 5D ~o.n J..sto " o~- Parcel No.:Ol.\0\Q !o 30 (,00'Eagle CO.Assessor at 970-328-8640 for parcel no.) Zoning:---;-_ Name(s)of Owner(s):fh-l<...+o P ..kh (Iula c..eaAOM''''UM Asso"...+;o"1 Mailing Address:C/o V()...\\-\()MG Q..l!.I\k.\.s \4'3;E.rn~l)-(lp....,;Jo 1.>,~v''''e '!II, Vo..l'Lt>~\b 5'Phone:---''',,--,7'..<lL).:.·--''IL7Ll''....-=--.....'''a.''''...''''L _ Owner(s)Signature(s):?':,2la.~j)~ Name of Applicant:LOI.rry ~~rncs. Mailing Address:143 &<i~~Meo.dQW Dr Sv,f.. \.1<..\Co )(16""Phone:97Q-'17"- £·mail Address:""cul-,",0"..-ru..L.J,@ ~oS\4.(.Ofix:q 70 o/7b Type of Review and Fee: 0 Signs $50 0 Conceptual Review No Fee 0 New Construction $650 0 Add_$300 II Minor Alteration S2S0 (multi-family/commeroal) 0 Minor Alteration $20 ("""le-fam;ly/duplex) 0 Changes to Approved Plans $20 0 separation Request No Fee &Is $1.00 per square foot of total sign area. For construction of a new bUilding or demo/rebuild. For an addit:iotl where square footage is added to any residential or commerdal buikhng (includes 250 additions &mterior conversions). For minor changes to buildings and site Improvements,such as, reroofing,painting,window additions,Iandscaptng,fences and retainIng walls,etc. For minor changes to buildings and SIte Impl'O\'ements,such as, reroofing,painting,window additions,landscaping,fences and retalnrng walls.etc. For revisions to plans already approved by Planning Staff Of the Design RevIew Board. For Office Use~O[1IY:.-~~". Fee Pa;d:J:&~2~/rL::::..:::Ch:ec~k N:O,~::::,"=:f'.:cY=By:."Nc;===~~::;::;;x;;:;:;~\;;::::==1-/Application Date:DR~No,;I ~~//'0CPla:nne~r:=======::P,:OJect~N:':::O.::.=~f4~l'2.~i&~~;::.:;f-tJ~7~lA5,:,=-==.J ':J.1'3 {/£..Ql?L~n /{tV ,• JOINT PROPERTY OWNER WRITTEN APPROVAL LETTER • T,(print name)L l>-n-i 8"r ne So description)q S a Q.u\..s.t:lll\~~(..n:l . ,a joint owner of property located at (address/legal ASSdC,, provide this letter as written approval of the plans dated A~.Ii aa ,0>0<'a..which have been submitted to the Town of Vail Community Development Department for the proposed improvements to be completed at the address noted above.I understand that the proposed improvements include: "f.e \-'Q.C<-l\'\ov~\@ v,,',h.\>1)sU,3Z,3"l)4Q I further understand that minor modifications may be made to the plans over the course of the review process to ensure compliance with the Town's applicable codes and regulations. Page 2 of 12/02/07/02 •••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••• TOWN OF VAIL.COLORADO Statement •••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••• Statement Number: Payment Method: Permit No: Parcel No: Site Address: Location: R000002214 Amount:$250.0004/24/200209:54 AM Check Init:JAR Notation:5404 Potato PatcbClub Condo Assn.,Inc. DRB020109 Type:DRB-Minor Alt,Comm/Multi 210106306047 870 P<YI'ATO PATCH DR VAIL Total Fees:$250.00 This Payment:$250.00 Total ALL Pmts:$250.00 Balance:$0.00 •••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••• ACCOUNT ITEM LIST: Accounl Code OR 00100003112200 Description OESIGN REVIEW FEES • Current Pnlts 250.00 • •• • Project Name:Potatio Patch dub Project Description: Design Review Board ACTION FORM Department of Community Development 75 South frontage Road,Vail,Colorado 81657 tel:970.479.2139 fax:970.479.2452 web:\WIw.d.vail.co.us ORB Number:DRB020038 New roof,paint,chimney caps,&privacy walls Partidpants: OWNER POTATO PATCH CLUB CONDO A55002/25/2002 Phone: %VAIL HOME RENTALS 143 E MEADOW OR STE 397 VAIL CO B1657 License: APPUCANT Fritzlen Pierce Architects 02/25/2002 Phone:476-6342 1650 E.Vall Valley Drive C-1 Vail,CO 81657 License: Project Address:870 POTATO PATCH DR VAIL Location: Legal Description:Lot:7TH.Block:Subdivision:POTATO PATCH CLUB CONDOM Parcel Number:210106306047 Comments: BOARO/STAFFACTION Motion By:Clark Brittain second By:Andy Blumetti Vote:3-0 (Pirece recused) Conditions: Action:APPUED Date of Approval: C<>nd:8 (PLAN):No changes to these plans may be made without the written consent of Town of Vail staff and/or the appropriate review committee(s). Entry:04/09/2002 By:aa Action:AP 1.Recommendation that a stone cap be used. 2.That a site plan of all walls be submitted. c<>nd:0 (PLAN):ORB approval does not constitute a permit for building.Please consult with Town of Vail Building personnel prior to construction activities. Planner:Allison Ochs ORB Fee Paid:$250.00 Questions?Cal !!PlannlngS!aff at 479-2138 GENERAlINEQRMAIION This application IS fur any ProJect=u.g I;Ieslgn Revi ....approval.Any project requiring deslQr.l review must receive Design ~aPproval prior to fur a buildIng permt.For specific informatiif",.-tI1e submittal requirements fur the Particular aPl'Is requesred.The application cannot be acc:epted u!1tiLail the required ,ntonnalion is sutrnrtlEd.lJll!;pniJel;fuiIY also need to be _by tile Town Council and/o~lhe)'fannrng and J;nvIronmellfal Commission ~Board apPfOVIII ne yeqr afteJ:lina ;j'...prava~""less a building pennlt Is lsau"""vcan_n Is started Po,DESCRIPTl~OF life REQlJE5l':.RD.IIi~ For Office Use On _Paid PLEASE SUBMIT THIS APPUCAllON,ALL:~BMITTAL REQUIREMENTS ANO THE-FEE TO THE OEPARTMENT OI"Q)MMUNIlY DEVELOPMENT, 75 SOUTH FRONTAGE ROAD,VjU!;"Q)LORADO 81657. I\ilI>IbltiOn Date., Pre-Applicati:Jn ~'!\!1J;lte: APPUCATION FOR DESIGN REVIEW APPROVAL B. Co D. H. ADDmONS -RESIDENTIAL OR COMMERCIAL SUBMITTAL REQUIREMENTS ~"••Questions?call the Planning Staff at 479-2138 GENERAL INfORMATION Applicants requesting the review of additions which require the utilization of an Additional Gross Residential Floor Area (GRFA)(250 )request must also submit a Planning and Environmental Commission (PEe)application.If the addition requires an Additional GRfA request,the applicant must receive PEC approval prior to Design Review Board approval. !.SU8MffiAL REQUIREMENTS o om:complete set of existing floor plans or "as-built'"drawings with all specffications shown. oA preliminary title report..including schedules A and B,to verify ow~hip and easements. o Condominium Association approval,(if applicable). o Photos of the existing structure. o Specifications of all materials and colors of the addition. o Topoo@Qhjcsurvey.stamped by a licensed surveyor,at a scale of 1"=20'or larger,on which the following information is provided: o TIeS to existing benchmark,either USGS landmark or sewer invert.This information must be dearly stated on the survey so that all measurements are based on the same CCIO'VTleflCeITt point. o Lot area and if applicable,buildable area. o legal description and physical address. o scale with a graphic bar scale and north arrow. o Property boundaries to the nearest hundredth (,01)of a foot accuraey.Distances and bearings and a basis of bearing must be shown.Show existing pins or monuments found and their relationship to the established comer. o Topographic conditions at two foot contour intervals unless the parcel consists of 6 acres or more,in which case,5'contour mtervals may be accepted. o Existing trees or groups of trees having trunks with diameters of 4"or more,as measured from a point one foot above grade. o Rock outcroppings and other significant natural features (large boulders,intermittent streams,etc.). o All existing improvements (including foundation walls,roof overhangs,building overhangs, etc.). o Hazard areas (avalanche,rockfall,etc.),centerline and edge of stream or creek,required creek or stream setback,100-year floodplain and slopes of 4()01o or more,if applicable. • o Size and type of drainage culverts,swales,etc. • o Exact location of existing utility sources and service lines from their source to the structure.Utilities to include: cable TV Telephone Sewer Water Gas Electric o Show all utility meter locations,including any pedestals on site or in the right-ot-way adjacent to the site. o Indicate all easements identified on the subdivision plat and recorded against the property as indicated in the title report.Ust any easement restrictions. o Spot elevations at the edge of asphalt,along the street frontage of the property at twenty-fIVe foot intervals (25'),and a minimum of one spot elevations on either side of the lot. Three (3)copies of the following: o Site Dian.at a scale of 1"=20'or larger,showing the following information: o Existing and proposed layout of buildings and other structures. o location of landscaped areas. o All new retaining walls with spot elevations for top and bottom of wall. o location of all required parking. o Indicate roof ridge elevations with existing and proposed grades shown underneath. o Floor plans.at a scale of 1/8"=l'or larger (1/4"=l'is preferred),clearly indicating the proposed addition. o Building Elevations,at a scale of 1/8"=1'or larger (1/4"=1'is preferred). o If existing structure is proposed to be modified,show elevations of existing structure. D Building elevations must be shown,clearly indicating the new addition.If building faces, existing or proposed,are at angles not represented well on the normal building elevations, showthese faces as well.Show all rooftop mechanical systems,if applicable. o If the intent of the proposal is not dearly indicted,the Administrator may determine that additional materials are necessary for the review of the application. 2 ,• I.PRE·APPLICATION CONEERENCE • A prc-applicrHion conference with Town of Vail staff is required.No applical10n can be accepted unless the 1ll311darory prc·applicarion mcctin,g has been completed.II is rhe applicanr's responsibility to schedule this meering by calling 970-479·2128. II.TIME REOUIREMENIS The Dc.':;ign Review Board meets on Ihe 151 and 3rd Wednesdays of each month.A complete application form and all accompanying material must be accepted by the Community Development Department a minimum ofthrcc and a half(3 112)weeks prior 10 the date Oflhc ORB public hearing. HI.REVIEW CRITERIA YOllr proposal will be reviewed {or compliance with the Design Guidelines as set forth in Section 18.54 of the Municipal Code.. IV.NOTE TO ALL APPLICANTS: A.rf fl property is located in a mapped hazard area (i.e.snow avalanche,rockfall,floodplain.debris: flow.wetland,erc),II hazard study must be submitted and the owner must sign an 'affidavit recognizing Ihe h..zmd 'rc:pon prior to the issuance ofa building pemtiC Applicants are encouraged to check with the planning staff prior to ::'1Jbmittal of a DRB application to dcraminc thc.relationship of the property to :Ill I1I,1.ppcd hazards...' O.B;:lsie PI"n Sheet Format.For all surveys,~;te plans,landscape plans and other site improvements pli.lIls.all of the following must be shown. I.Plan shcct size Illust be 24"x 36",For larse projects.larger plan size may be allowed. 2.Scale.The minimum scale is 1"=20'.AU plans must be at the same.scale, 3.Graphic bar scale. 4.North arrow. 5.Title block.project name,project adtircss and legal description. 6.Indication of plan preparcr.addTtss illld phone number. 7.Dates of original p!an preparation and all revision dates, K.Vicinity map or location map at a sc.1le of 1"=1.000'or larger. 9.Sheet labels and numbers. 10,A border with a minimum len side margin of 1.5". 1 I.Names of all adjaccnl roadways. 12.Plan legend. C.For new constmetion and additions.the applicant must stake and tapc the project site to indicate property lines,proposed buildings and building comers.All trees 10 be removed must be taped.The applicant must ensure that slaldng done during the winter is not buried by snow All site t:Jpings and Slaking must be completed prior to (he day of the ORB meeting. ,D.Applicants who fail 10 appear before the Design Review Board on Iheir scheduled mecting date and who have lIot asked in advance that discussion on their item be postponed,will have their items removed from the DRB agenda until such time <IS the item has been republished. E.If the DRB approves the application with conditions or modifications,all conditions of approval must be rc.<iolvcd prior to the is!,.l..l3nce of a building permit. .-,5 .." ~Updated 6197 v.STAff Al'l'ROVAL •• The Administrator may f"Cview and approve Design Review applic.1.t1ons.approve with cenain modifications. deny the application.or may refer the application to the Design Review Board for decision.All st.1ff approvals are subject to final approval by·the ORB.Tne following types ofDcsign Review applications may be staff approved: A.Any application for an addition to an e;o;isting building that is consistent wifh the an:hitccturaJ design, matcriais and colors of the building.and approval has been received by an authorized member of a condominium association.if applicable: B..Any applk.uion to modify an existing building thai docs not significantly change the existing planes oflhe building and is generally consistent with the architcctural design.materials and colors of the . building.including.bur nOllimircd (0 exterior building finish malerials (e.g.srooework.siding.roof materials.painr or srain.).exterior lighting.canopies or awnings.fences.antennas.satellite dishes. windows.skylights.siding.minor commercial facade improvements.and olher simila.modifications: C.Any application tor site improvements or modifications including.but not limited to.driveway modifications.sile grading.::,;Ie walls.n:movaJ or modifications to existing landscaping.installation of accessory 5ttUctures o.recreational facilities. VI.ADDITIONAL REVIEW AND fEES A.Iflhis application requires a separate revir::w by any local.state or Federal agency other than the Town of Vail,the application fcc shall be increased by $200.00.Examples of such review.may include.bUl arc nOt limited to:Colorado Dcpanmcnt of Highway Access Permits.Army Corps of Engineers 404.etc. B.The applicam shall he responsible for paying any publishing fecs which arc in excess of 50%oftbe application fcc,If.at the applicant'S request.any matter is postponed for hearing.causing the matter to be rc·published.Ihen the entire fee for :>"Uch rc·publication shall be paid by tbe applicant. C,Applications deemed by the Community Development Department to have design.land usc or other ,issues which may have a significant impact on the community may require review by consultants in n~dition to Town staff.Sh~uld a detcnnination be made by the Town staff that an outside consultmlt is needed.the Community Devc:lopmenl Department may hire the consultant.The Department shall estimate the amount of monC'j necessary to pay the consultant and this amount shall be forwarded to the Town by the applicam at the time of filing an applicarion,Expenses incurred by the Town in excess of the amount f'orv.'arded by the application shall be paid to the Town by the applicant within 30 days ofnotifie:ltion by the Town.Any C'l:CC$S funds will be remmcd to the applicant upon n:vicw L'Ompkliull. "6 Updated 6197 •, •PROPOSED LANPSCAPING • BOIunjcill Name ('oolmon Name Quantity .PROPOSED TREES AND SHRUBS; EXISTING TREES TO .l~'>I\t.~_ BE REMOVED; "'M ininlllnl "requirements for landscaping:deciduous trees -2 inch caliper coniferous trees -6 feet in height shnlbs -5 gallons GROUND COVER SOD SEED IRRIGATION TYPE OR METHOD OF EROSION CONTROL 1= e"lS ""\0 lZE~· Square footage OTHER LANDSCAPE FEATURES (retaining waiis.fencc"swimming pools,-etc.)Plca.''ic specify.lndicate top and bottom elevations of retaining walls.Maximum height of walls ,vithin the fTont setback j"1,fp:et.Maximtlm heighl of walls elsewhere on ihc property is Cl teet. .,: 3 \'.I C UP<iatcd 6197 BUiLDING MATERIALS; Roof Siding Other Wall Materials Fascia Soffit~ Windows Window Trim ..Doors Do·orTrim Hand or Deck R:'lils Fluc.>; FI:L"hings Chimncy's Trnsh Enclosures Greenhouses Retaining Walls Exterior Lighting.... Other •• LIST OF PROPOSED MATERIALS TYPE Of MATERIAL: ,~ I'·. '. " " " " • " • -.lU""",~_ COLOR:' grb1. " " " \\In,,_ _"'\\1"'''_ "I" _.l:'\\/A"'-_ t'o Ie. • , •Plca<;c specify the monufacturcr's color,otlmber and attach a small color chip *.All exterior lighting must meet Ihe Town's Lighting Ordinance 18.54.050(1).If exterior lighting is proposed. plcnsc indicate the number offixtUrcs and locations on a separate lighti~g plan.Id~tify each fiX-cure type and provide the height above grade,lumens output.lum.inous area.and attach a cut sheet of the iighting fixtures. ", " 2 i-..~• .Updated 6/97 ,• uTlury LOCATION VERIFICATION • Thi$foml is to verify service availability and location for new construction and should be used in conjunction wirh preparing your urili[)'plan and scheduling installations.The IOc.1rion and availability ofutiliries.whether rhl.-y be main trunk lines or proposed lines.must be approved and verified by"the following utilities for the ilccolllfU!nying site plan. Aythorized SiIDJat"Jrc u.s.West Communications 1-800-922-1 987 468-6860 or 949-4530 Public ScrJice Co~pany 949-5781 Gary Hall Holy CroSS Electric A'isoc. 949-5892 Ted HIL'il..-ylJohn Boyd T.e.1. 949-5530 Floyd Sala7..1r Eagle River Water &Sanitation Dist"riet • 476-74RO Fred Haslce .. •Plc::isc bring a site plan,floor plan.and elevations when obtaining Upper Eagle Valley Water &Sanitation sig~at\ln:s.Fire flow needs must be addrcs.scd NOTES; 1.If the utility verification farm has signaturc.c;from each of U1C utility companies.and no COllllllcnts arc made diret:tly on the fonn.fhe Town will presume that there arc no problems and the dcvclopmcm l.oan proceed.. 2.If a uiility company has concerns with the proposed construction.the utiliry representative shall note directly on the utility vc:'ification fonn that there is a problem whieh ne~ds to be resolved. The issue should Ihen be ae:c.ilerl in an attached letter to the To'Nn of Vail.How~\":~.;;==.:.so: keep ir.mind thai it is the responsibility of tile utility company and the applicant to resolve ;",__•..•.•I ."•.__.••IUI,;U l"......~..:_. 3.These verifications do nOt relieve the contractor of the responsibility to obtain a Public Way Pcnnit from (he Department of Public Works at the Town of Vail.Utility locations must be obtained before digglng in any public right-or-way or C3sement within the Tqwn ofYaiI.A building permit is not a PJ.!bljc Wav ocrmit and OlliS}"be obtajne&separately..~ '.'. 4 \, "~~Updated 6/97 bTln FriLdNl,.\1'\.,4,r h.lr.... \V,lh ..m r PiNe,·.Nl h<tl-11 1'l>'nld~R[)ua"".\nit,...., "tcphdrl".',HJ+.Jhn><.'II.Ard"lt;I Dol"d fld"",'.,vd,,·,I 1 Iulh\"H...,.III>!'~"lr~,\lm~, LETTER OF TRANSMITTAL FRITZLEN PIERCE ARCHITECTS VAIL COlORADO Date: To: From: Re: Monday,February 25.2002 Town of Vail Design Review Board David Ailum,FPA Potato Patch Club Condominiums Minor Alteration File Attached Please Find: ___:Progrcss Prints ___Specifications ___Plans _---c_Shop Drawings _-,X,---O'he, .Iem No. 1 2 No of 3 o..cn Submillill lor minoraftenliom lo the PoLlto PolICh Club Cleek No.10874 for S2O.00. The Items listed Above Are: ____For Review and Comments _____For Your Use As Requested----~Returncd After Review __---'Other Remarks: Please feel free to call with any questions or comments.Thanks. FA;ITZL(N 'Ii'i(l EdSI Vil'l V.lI!r\Ilr lot'F.I Ir"':!:':C ;. PIERCE V;uI.U,I',lild"lllb5? p 'j"\H7"{."'4! F 'n1.1-".1<1l11 E,il·I(r.q)\"id"ft_hill:~l~.()'tTl •••M"'~".........w.I..I11.'·,hilN I'f,lm •• •••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••• TOWN OF YAJ L.COLORAIXJ Slatement •••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••• Statement Number: Payment Met.hod: R000001994 Amount: Check Notation: $250.0002/25/200204:10 PM Init:JAR 10876 .FritzIen Pierce Architects Permit No: Parcel No: Site Address: Location: DRB020038 Type:DRB-Hinor Alt,Corrm/Multi 210106306047 870 POTATO PATCH DR VAIL This Payment.:$250.00 Total Fees: Total ALL Pmts: Balance: $250.00 $250.00 $0.00 •••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••• ACCOUNT ITEM UST: Account Code OR 00100003112200 Descriptlon DESIGN REVIEW fEES • Current PInts 250.00 • .. .Lynn Frit~len,AlA,An::hitl'l:t Wilfillm F.Pierce,Archite<:t Thomas R.Du Bois,"rehiteet 5lephill1it!Lord·Joon<.on,/vChiled D.tvJd S<lUffl.Nchlll!Ct Kathy H~5IiIl8i1.Rusina~M,Jnager •FR/TZLEN PIERC'ARCHITECTS VAIL.COLORADO ..-"-VI.E. / '- "'/-•1..,,- / /' ~.1...... Fk."/I~.Jc...~.......•/ "'~V I... '..IT'..~· ~II .-·I?'n'••·V I...~~.'...:·"tifr .o ~""•~:u •,~a-.··.••·•J···.I ..'-~'-t:J.~,··/.....·".~ ·.:,.-".·.'.·.·rrrJ.u~~[i ...-III <I?C ~~InJ '"..~{1......... ,~..., ,..,I,I.>..........,... ,.,l,~• I o.~:II •'I ~n" I TITlE: DETAil NO.: PRqECT~ RE: Typical Section at Wall Base Al Potato Patch aub Exterior Renovation and Remodel Delair 51 ~RITZLEN 1&50 (.a>t ""liI VaJIl!y Om.,,_Fal'ridg.'C-"1. •I ERe E V,jil c..,loril&.)81657 P;9104:'1.1 6342 F,9Jt14:"J'j.4qm E:iT.lo@v;tiIOl!Y'.hill."'C1S.COIll..«_......wv.w\.,tbrchhYh,cum •lynn Fritzlen.AI'"An:hil~; WiHiJm f.Piela',Archirect rtWlnta!>It Ov Bois,Architecl. Stephanie lorc!.JohnSOfl,l\t'Chiteet D<Md SilUro,Nchltea ~thy t-1t'SlltlSl'\.8u:sJness Ma""'ger •FR/TZLEN PIER~ARCHITECTS VAIL,COlQAADO ."..'"'.':'.~'I;':'-":"'l';-J-' ."- •• .:,. .. .I Ii'.... ~+-+-+--f-+++-+J·r+-+-+-+-t-!-!~.I~",.,I-~~-+.-+I,-t..d-!~-.,.++-i 1 ~"'.'_n I Typical Wall Elevation DfTAILNO., PROJECT: RE: A2 Potato Paten Oub uterior Renovation and Remodel FRITZlEN 1650 E~t vail VaJIe-y 0rivP,Fatlrrd~C-l, II [R CE Vail.c....lor.p}8165; P:9704:'66342 I:970 ,I :'601901 E:;nr~>(Wvllilaf\:tlitc(,t;.oo..., ••~.o ••~....www.vailarchilect.\."flm .lynn FrillJtm,AlA,Archlllx:r William F.~~€I'Cf',Nchilcet Thoma~R.Ou Bois,An:-hirect Stephanie lom-JohnYlfl.An:hil8C1 David Bai.Jm.Ardlirect Kalhy ~illgll.Business Mlna!.'eI" •FRITZLEN PIERC'ARCHITECTS VAIL,COLORADO ./ • 17 / / '/ / .'""OJ ... '~ 1/ / 1/ I- I ••~_ , lcr.J.'a.IIIJ.-.... TITLE: DETAIL NO.: PROjECT: RE; Typical Section at Wall Cap A3 Potato Patch dub Exterior Renovation .nd Remodel ORITZ LEN 1{,50 Ea.;t Vall vaJk>y Ori\'('.Fa;l(id~C_-I, IE It CEV..il,CoIOMdo A1657 P.970.'l76.63-12 F:')m~-l76490T- f .lnlt!@vai!ardl;teCl5.wrn ~.~........\l!ONW ~·<Jil'f(chilC(:ti<:()m •lynll Fritzlel'l,AlA,.An:hilccr William f.Pieta',..vehitcct rhomas R Du BoIs,Arthilt'd Stepholnie lord John.<on,Architect D.wid Uaum,Atdlilect Kathy Heslinga..Busif)CSS Mlnascr •FRITZLEN PIERC'ARCH/TECTS VAIL,COlORADO I ....l..Iu••~:.;.L~ 7 '-.b....l I~ "I ~, ",0-••~ 7 ••/ 1'0 1/l-I-T!.. I I j '\ -/If !•1'\ f7 \ff "II II 1'\ I....... I '\IV 7 TITLE: "-,I., Typical Plan at Wall ....~...,..."- DETAIL NO,: PROJECT: RE; A4 PatillO Patch Oub Exterior Renovation and Remodel "'RITZLEN 1650 East V,l;1 V.l!IClY Drive.F;lIlri:ll;C'C It IE RCE VJ,il,Color.ldo 8165, P:970...76.6342 F;970.'176."911 E:f('~,brr:hil£""..b ..'v, ~••~.-....ww"".v.:li~fCh,tc<;ts..om '. Lynn fritzler'l,AlA,An:hltel;l William f.Pierce,Arch!tect Thomas:R.Du Ibs,AI\."hileo 5lephanie lon.!·}ohtlson,NchilCCt Dmd B3\lm.Mhita.1 K.lthy H~I!Ilgl\.Business MJn;'t~ ••FRITZLEN PIERCE ARCHITECTS VAll,COlORADO -_.. !'ll:..1 '., oJ.0 ~/~~L '-,-;£17/.'I ~"'0 ~ i'..-,b.., ~--....y-o 17./'"-.'OfI /'-'-b.~, V/V/;(/;I'lVl u".·........"L·."-...·."-~'-..·.·.... ~..I~.."~·c..;. t....L..-- KI Typical Chimney Cap DETAil NO., PROIECT: RE: AS Po!ilfO Patch dub Exterior Renovation and Remodel OeliIil52 .'RIT2LEN 16.;0 (aj!vdil Val~y 01iVt'.fal:rid~C I, PtE RCE VillI.C.oJofado 616Si P 970"7b.6].12 f·970A76.4:J{l1 F;inlo@lt.:ltlJrchilfrb.cn m ·'~N··""ww,",vililarchi!ce:tS"inJ ". , ./ ••FRITZLEN PIERCE ARCHITECTS V\.U IRAI ) CURVED WAll EXAMPLE E/'-.;D CAP DETAIL IHl'LllN 1'1 till ~ TI rLE: on/\Il MJ ; PROJECT CONCRETE CAP SAMPLES Ah Pohltn P.ll,h (luh htl'lit/!Rl'rlm,lliull .Hld l{('mor!('1 ,, I 'j Ii "••FRITZLEN PIERCE ARCHITECTS VAIL,COlORADO TYP.NEW EXTERIOR LICHT TITLE: DETAIL NO.: PROJECT, EXTERIOR LIGHTS A7 POlrlto Patch Club Exterior Renov;llion and Remodel FRITZlEN 1',11.111\.11,\0,1.,11 PIERCE VII (,I,r.l.t,1r" I''1-"" ."C~·1'"'I t ~T1!l I ,jIlt \,.,No kI \\;lli,fI\r riu,,'VI ...~,R Ill1 Ho.Ii """ f'lllN:l ••;"., :),h'ld B ~...h Ih.Ht>M.VIag ••FRITZLEN PIERCE ARCHITECTS VAil,COLORADO .,,_~W1~..""" •~o::...""",,"d--'-.I ..... ",,-"'.mc- .~~-...­ ~.~,_.:.. ¥.wiodo..-.l_Jood>. .r........,~_ Wt.C"""".lIl ....... .........1iUa.I FIUTZLEN l&~It.1\\'I 'I'_il,," PI [II.CE \",,1 wl.r"d,!;11'~• 'leO I."I-\\.: (I.~~1,01 "tl '{"'11.t h'1;.,1 ,r,> .......';'07........"ro ,d• •FRITZL~N PILRCF ARCIII fLeTS ..•• COLOR PALLETE SELECTION ,._I ·L \\11 (lll !Ii \Il( ROOF:Custom Color FASCIA:Cranbrook SW2154 SIDING:Grid Grey SW1026 STUCCO:City Loft $Wl032 ._~._.... ~..,.<.-.. Potato Patch Club ['II r"l 1/0,11 ml iii r In,R I \h I [)rJ If to:th H \1 \Ii .lor h IJ N til :l J oil \rot h '\,n "'-I ••FRITZLEN PIERCE ARCHITECTS VAIL,COLORADO TYP.NEW EXTERIOR LIGHT • TITLE: DETAil NO., PROJECT, EXTERIOR LIGHTS A7 Pol;llo Patch Club Exterior Renovation and Remodel FRITZlEN 11 Ilf \o"o1\'.\Dr f Inl1"L PIE ReF.V.111 (.,I,rad"lIlh';7 I'I"1.1,1"" f +'1\1-1,'I 1 I n HI.If,h.lc ~'.M •••••~'I I,III •I \T1n flitrll:!\t.\.tV h,t \\.,:nll f l'it1U'\r1 hk I tx>mJ~"<1 &'>"'"h, <;"'f~lJnll 'ell ~N IN I e.t\..d ~um.At 'It 1 ~(hy H BOJ!ol_M.InIt. •FRITZLEN PIERCE ARCHITECTS VAIL,COlOlWJO ••_.......eo_.. •..-,...,.cd-.-l_..---......~­ P""'Iotot~_.............-... .....-....... ,.....-._"CIIft_-- I .,......------ FRlTZlEN Ifni EJ Vd 1 V,,1I ~~fi'llrlOJll' PIE RCE \,1,1 ()Inr.w [tll~" F 'Yll.j]l>f,11l f:'170.476<1JOI r ,nl(.{"'~II.1 I,h III ;.-;-;.,·.........·\,;I(.)rrht •••FRITZLEN PIERCE ARCIIITECTS COLOR PALLETE SELECTION \,...11 (01 OR-\D:1 ROOF:Custom Color FASCIA:Cranbrook SW2154 SIDING:Grid Grey SW1026 STUCCO:City loft SW1032 • Polalo Palch Club -._-- /' / L.. '- - -.-.....-..---:.-~ .-"--~.L-c:~;-.-.~-'--,""':-------.".----=---.-.--- ./ Ie _• -, I I r IL _ -.,, I I I .----- • .--' ...--_.-.--,.-.-,- ~--..... • ," ., r "II --_._--1 __J,_ -.~._-;--._.~- -"-l I I ------. ELEVATiON0»E'UI DiN Gi c'::::I V+'!~I'.01 I 11~~BI ,.L-----------.-...-1 I1..-_--------I I : i I __:L+'__-_-:::.-~G'""_RID GRAYJ:.:..._C_~!~~~~_~__:l __~'r:lO_-_FT--__...•__] r ••••1 JL~,""+1 -,, " r-_.._--.. --- ---.--_. - __•.•.._I ____.__.1. II::.:~--:~~~-~..::..'JL-I -~====±;:::= ~..!.':-¥~-~.~-,§.f1-h~II'F-'.~[!~·r,: It=-::-:'"r"..-..I1-.-·r--_. t----_.I '-1"~.,L"'I~"'".._.f---t-~..--_._---I'r---........._-._----......,'1-Ii -..--.._. ~_...'-.._,-I '/I l -..-....::,.~r:-:-::..'..""--_=:--11/~~._-_..-".~. 1-'''_--------.....i 1/~I , I I _1.-----1-----f-------l --._.-1-'-_.-.---,'; ,, ,1 .....__.-..~- ., ...1 .I .-..J ~------------.------ ,;:==.====,=::::;.=::.::'=_=_::':::':'_::"=_--'.-"'~='~'-~'_~"·~c=.~~~_;.-----~.'-..~.--.-.-. _..- 1-.._.•-... , ~i t i j II .:f I~L(11J.l,c:::J il .. , ,----_._-- I 1;--',I~. I'"J'"(i)/)I 'It./"L...._;:.-. _.. I I II I Il'l I I II : I I.I L~~-;._ ---------------~--_.-..-_.---- CITY LOFT GRI D GRAY CRANBRooK ROOf E.LEVAllON . ""0./_"~i"'__r--~~.1.j ." . r-- ....= t. 7 NOTE -COPY OF PERMIT TO BE KEPT ON JOBSITE \\s.\l Aor"28 1987DATEI. PERMIT NO.002875 1.TYPE OF CONSTRUCTION IlJlIIlVV 2.OCCUPANCY GROUP ABEHIRM BUILDING 20,000 DIVISION 122a34 z ELECTRICAl 1,UUU Q GENERAL DESCRJPTlONOFWQRK:~PlUMBING CONVERT EXISTING DECK INTO EXPANDED :- ~ LIVING ROOM DINNING ROOM AREA.~MECHANICAL ADD KITCHEN CABINETS TO EXISTING.Tn,,'•"Mn M TYPE GROUP G.R.F.A.VALUATION PERMIT FEES \I D_,?,nM BUILDING PERMIT ?1"nn PLAN CHECK 10B.00 ELECTRICAL 45.nn ~~NEW(I ALTERATION )ADDITIONAL ()REPAIR (I PLUMBING DWELLING UNITS __ACCOMMOOATlONUNITS __MECHANICAl. HEIGHT IN FT.__NO.FIREPLACES --RECREATION FEE 18.00(158 x .7 ~:INSULATION:TYPE THICKNESS R·VALLUE DESIGN REVIEW BOARD l5.00 FLOOR 1 CLEAN-UP DEPOSIT,100.00 EXT.WALLS I ///250.00 ~\~USE TAX ROOF I /1'1 TYPE fLEe.I GAS TOTAL PERMIT FEES ~762.00 1'- OF HEAT SOLAR WOOD .§ARLMURRA1N~"L ___.1'~JLI98l__ ADDITIONAL PERMITS NEEDED:UB~~F_lack A 1-'"INITIAL :;::BETSLROSOLAC",-___Wi!.LAPRI~29-!.-.h ST.CUT t ,/ONING ADMINISTRATOR DATE BLASTING \V/"\QNING &BUILDING NOTES: PAI'lKING DEMO I hereby acknowledge that I have read this application.filled out In full the information required. completed an accurate plot plan.and state that all the information provided as required is correct.I a9'"to comply with tha Info.matlon and plot PI~J:wl'h a"Town ord;nancas and stat. laws,and to build this structure according to the T 's onin and subdivision codes,design review approved.Unitor'2.BUil~Code and other in csa ~e T~PPlicable thereto. CLEAN UP TO:;::;+.J.4 -;;q -------7.0.&/773l.J./G g/{,£8 SIGNATURE OF OWNER OR CONTRACTOR FOR HIMSELF ttl!J ANDTHE OWNER. /~CONSTRUCTION PERMIT Iln~ department of community development TO BE FILLED OUT COMPLETELY PRIOR TO ISSUANCE OF PERMIT TYPE OF PERMIT !Xl BUILDING IX)(PLUMBINGegELECTRICALDFOUNDATION D MECHANICAL D LEGAL LOT BLK DESC.FILING Potato Patch ClI!b Ilnit 3 .BNAME:SCOTT REMJDEL IInit 11 OWNER NAME Fitzhugh Scott MAILAOpRESS Bri ne r-Scott CITY PH. ARCHITECT Br1ner-Scott FIRM MAil ADDRESS 143 E Meidol!!Or CITY Vail PH6-3038 GENERAL FIRM BROWN-WOI IN«CONST,INC CONTRACTOR TOWN OF VAIL REG.NO.101-B TELE.O,"_A ,.< FIRM BURNETT PLUMBING ELECTRICAL IOU-P NTRACTOR TOWN OF VAIL REG.NO. TELE.827-5562 FIRM PLUMBING TOWN OF VAIL REG.NO.CONTRACTOR TELE. FIRM MECHANICAL CONTRACTOR TOWN OF VAIL REG.NO. TELl:. OTHER FIRM TOWN OF VAil REG.NO. CONTRACTOR TELE. _M I~.OO--- USE TAX CLEAN·UP DEPOSIT DESIGN REVIEW BOARD :..,~~'7(1RECREATIONFEE MECHANICAL OHING a.BUILDING NOTES:_ BUILDING z ELECTRICAL 0 ~PlUMBING~ ~ ~MECHANICAL> """~""", GAS WOOD ~INITIAL V...- /'-I.1/ / / IflEe. SOLAR 1/// I ADDITIONAL PERMITS NEEDED; !. PARKING S1 CUT BLASTING DEMO EXT,WALLS TYPE DF HEAT FLooFl ROOF DWELLING UNITS __ACCOMMOOATIe»t'UNITS __ HEIGHT IN fT.__NO~CES __ INSULATION;./7TYPE/THiCkNESS R-VALtUE /tJ!-\3> PH MAIL ADDRESS ~/4"'1.A;~yr- C'TV U."c.;'PH.47''!o3R C'TV I"BM /I.'/A 01L FlBM ~;o:l y- LECTRICAL iN-f.A F NTRACTOR TOWN OF VAll REG.NO.';= TElE.<i ..,-S,(,;;<.. ARCHITECT PLUMBING I TOw"0<VA>!.d"~ CONTRACTOR L.BE TELE. X GENER'it:- CONTRACTOR TOWN Of VAIL REG.NO. TElE.~-4/8' x x ,, ~NOTE -COPY OF PERMIT TO BE KEPT ON JOBSITE~',.,CONSTRUCTION PE_R..:.M...:.:.IT.:...._X~D~AT::.E.:4=/~~v'i=g=2:..",,_---.THE FOLLOWING IS NEEDED FOR FILING PERMIT: "..•1.Letter from condo assn,(1 F APPLI CABLE) 1101 tal 1.TYPE OF CONSTRUCTION 1ll1lllW 2.2 Sets pf cOJT1>lete drawings/explanation department of community development 2.OCCUPANCY GROUP ABE H t:BJ/~~)( *****PLEASE FILL OUR WHERE THE (X)MARKS ARE!/Ot9!')( TOBEFJLLEDOUTCOMPt..ETElYPRIOAT01SSUANCEOFPERMIT DIVISION Nn~IG2adi'~~1 X TYPE OF PERMIT ~GEN~OE~RtPTlONOF~rRi;;;.""'21 0 o BUILDING 0 PLUMBING (,',~""-11.......Q :=-..:O'---__--!'l--Io~L.;;CTRICAL 0 FOUNDATION "'d (,I:."/;.(..(,...:/.....",,.\,,,.G,!,"J-. o Tx~';;t~Jf4~..Ei,I PM aJ,.TVPE GROUP G.AF.A.~~T10N PERMITFEES :;''.(10 dXLEGALLOTBLK.-tl':-1f-'3 -~'UILD'NGPER.IT Z/I:,.o~ DESC.FILING U,'Or)PlAN CHECK /011,~X'~BNAME:5",-{f /997 K!~ELECTR'CAL <lC:;,'!!:.- OWNER IN.f.UJ:r:.~NEW(I ALTERATION (I ADDITIONAl!)REPAIR ()PLUMBING _..... X'••".,/(K'r,...-s..<l' CONTRACTOR TELE. I.'BM N/AVMECHANICAL '\CONTRACTOR TOWN OF VAil EG.NO. T'" OTHER FIR.AliA- TOWN OF VAIl'REG.NO. I hereby acknowledge that I have read this application,filled oul in full the information required. completed an accurate plot plan,and slate thai all the information provided as required is correct.I agree to comply with the information and plot plan,10 comply wilh all Town ordinances and state laws,and to build this structure according to the r ~;~sf;l zoning and subdivision codes.design review approved,Uniform Building Code aX othe!~X:E~Plicabletherelo. SIGNATURE OF OWNER OR CONTRACTOR FOR HIMSELF AND THE OWNER. "p-.y .al NOTE -COPY OF PERMIT TO BE KEPT ON JOBSITE 2/19/87CONSTRUCTIONPERMIT •• ,DATE "002808"PERMIT NO. 1.1.a III 1.TYPE OF CONSTRUCTION I If III IV II department of community development 2.OCCUPANCY GROUP ABEHIRM BUILDING DIVISION 1220134 z ELECTRICAL 175.00TOBEFILLEDOUTCOMPLETELYPRIORTOISSUANCEOFPERMIT"~ GENERAL DESCRIPTION OF WORK;c PlUMBINGTYPEOFPERMIT~ ~ REPAIR UNDERGROUND FEEDER WHERE c MECHANICALoBUilDING0PLUMBING> I!}:ELECTRICAL 0 FOUNDATION FAULT DAMAGED WIRES.o MECHANICAL 0 TYPE GROUP G.R,F.A VALUATION PERMIT FEES LEGAL LOT BlK BUILDING PERMIT DESC.FILING ,~ PlANCHfCK ".,-BNAME:PDTATD PATJ:tl.oUnit II ElECTRICAL 45.0D '>::l OWNER NAME NEW(I ALTERATION (1 ACOITIONAL (I REPAIR l(Xj PLUMBING ~ MAil ADDRESS DWELLING UNITS __ACCOMMODATION UNITS __MECHANICAL C'TY PH.HEIGHT IN FT.__NO.FIREPLACES --RECREATION FEf • ARCHITECT FIRM INSULATION:TV'"THICKNESS R-VALLUE DESIGN REVIEW BOARD .,.... FLOOR ."'"MAIL ADDRESS CLEAN·UP DEPOSIT r:;..EXT.WAllS h>CITY PH.USE TAX ROOF 1:'1 ~GENERAL FIRM I TYPE ElEC GAS CONTRACTOR TOWN OF VAIL REG.NO.OF TOTAL PERMIT FEES I'A.nn SOeAR WOOD _~~~~____2/19/87 ___TELE.HEAT FIRM """tLtLI"!L ADDITIONAL PERMITS NEEDED;UIl:DING OFFICIAL DAft: lECTRICAl 145-E :!-"INlTlAL 1---------TOWN OF VAil REG.NO.------ NTRACTOR ST.CUT ONING ADMINISTRATOR DATE TELE.949-1403 BLASTING ONING &BUilDING NOTES; FIRM PARKING PLUMBING TOWN OF VAll REG.NO.CONTRACTOR DEMO TELE. FIRM J hereby acknowledge that I have read this application,filled aut in full the information required, MECHANICAL completed an accurate plot plan,and state that all the information provided as required is correct.I CONTRACTOR TOWN OF VAIL REG.NO.agree to comply with the information and plot plan,to comply with all Town ordinances and state TElE. laws,and to build this structure according to the Town's zoning and subdivision codes,design OTHER FIRM GDPHIE EXCAVATlI~GII2-X review approved,Uniform Building Code and other ordina~ces of the T~thereto. . TQWN QF VAIL REG.NO. 13.v..-,~ SIGNATURE OF OWNER OR CONTRACTOR FOR HIMSELF CONTRACTOR TElE.AND THE OWNER. ....rill"holl 002373 NOTE -COpy OF PERMIT TO BE KEPT ON JOB$ITE~CONSTRUCTION PERMIT,,.DATE 1 /17/8 6.r,.. PERMIT NO. 11111 III "I lI(ij'j)l Vv I #.e.1.TYPE OF CONSTRUCTION department of community development 2.OCCUPANCY GROUP Q)EHIRM BUILDING '1<0.00 DIVISION 1220 z ELECTRICAL 465.00TOBEFILLEDOUTCOMPLETELYPRIORTOISSUANCEOFPERMIT0 GENERAL DESCRIPTION OF WORK ;~PLUMBING 3RR.00TYPEOFPERMITRemova1of"all to add seating ~ ~ [jJ BUILDING [j PLUMBING >MECHANICAL ~ELECTRICAL o FOUNDATION 3013.00 MECHANICAL 0 PERMITFEES \TYPE GROUP G.R.FA VALUATION Bl",IT :Me A_',m,00 ~1.00~GAL LOT BUILDING PERMIT ~ESC.FILING Potato Patch Clubhouse PLAN CHECK An no JOB NAME:McKinlev's Grill elECTRICAL 45.00 ~OWNER NAMEEd Campbell/J.Hejlma n NEW(I ALTERATION ()AOOITlONAL ()REPAIR ()PLUMBING 10.00 non DoA MECHANICAL -,~.~DWELLING UNITS __ACCOMMODATlQNUN1TS __ CITY ".;,rn PH.47<;_'61'HEIGHTINFT.__NO.FIREPLACES RECREATION FEE ~~--- ARCHITECT fiRM INSULATION:TYPE THICKNESS R-VAlLUE DESIGN REVIEW eOARD I- "00'I Aj//1 I -~,!:::MAil ADDRESS CLEAN·UP DEPOSIT 100.00 CITY PH.USE TAX ~~EXT.WACL: pAT •Inc. ROOF GENERAL fiRM I ~TYPE ELEC.nAS 25B.95CONTRACTORTOWNOFVAILREG.NO.202-B OF TOTAL PERMIT FEES so,"",WOOD TELE.HEAT Gary Jj=.Ain.______l/JUB..2 ____ fIRM White Rjyer Electric ADDITIONAL PERMITS NEEDED:BUILDING OFFICIAL ATE LECTRICAL 1-ii IN1TIA.L ~rlitan.lXi tz __JD~B..2-_--TQWN OF VAil BEG.NO.--CONTRACTOR ST CUT QNING ADMINISTRATOR DATE TELE.BLASTING /'./1 ONING &BUILDING NOTES: FIRM PARKING /V 1/7 PLUMBING CONTRACTOR TOWN Of VAll REG.NO.DEMO TElE. FIRM I hereby acknowledge that I have read this application,filled out in full the Information required, MECHANICAL completed an accurate plot plan,and state that all the information provided as required is correct.I CONTRACTOR TOWN Of VAil REG.NO.agree to comply with the information and plot plan.to comply with all Town ordinances and state TElE.laws,and to build this structura accord;ng to tha ~~;r;ning and subdivision codas,daslgn review approved,Uniform Building Code and other ord·as of tjjle Town applicable thereto. OTHER FIRM fhc.k11e:i~6..-,/1 n 1,/\ TOWN OF VAil REG.NO.1ff'q I e SaJlc1.S1lsrJe!Cd JfIf.&tGNATUAE llF"~V\!:!ADA OONTAACTOA FOA HIMSELF CONTRACTOR TElE.t:...'AND THE OWNER. , 002368 NOTE -COPY OF PERMIT TO BE KEPT ON JOBSITE 1/13/86CONSTRUCTIONPERMIT .... ,DATE..PERMIT NO .••1m I III I.TYPE OF CONSTRUCTION 1IIllIIVV department of community de\lelopment 2.OCCUPANCY GROUP ASEHIR'"BUILDING DIVISION 122.134 z ELECTRICAl TO BE FILLED OUT COMPlETELY PRIOR TO ISSUANCE OF PERMIT 0 G~~L~;C;IPTlONOFWORK :~PlUMBINGTYPEOFPERMITJ ~•MECHANICAl0BUILDING0PLUMBING> 0 ELECTRICAL 0 FOUNDATION 0e1lD 10.00 0 MECHANICAL []OEKJ TYPE GROUP G R.F.A.VAlUATION PERMITFEES ~GAl lOT Bl"BUILDING PERMIT ESC.FILING Potato Patch Club .....PlAI\l CHECK JOB NAME:McKinley's Gri 11 ELECTRICAL l' OWNER NAME NEW(J ALTERATION ()ADDITIONAl (J REPAIR ()PlUMBING p->'l' MAIL ADDRESS DWELLING UNITS __AOCOfroIWOOo\TlON UNITS __MECHANiCAl ~~CITY PH.H£JOHT IN FT __NO.fiREPLACES --RECREATION FEE rNSULAT1ON~TYPE THICKNESS A-VALlue f'<>oARCHITECTDESIGNREVIEWBOARDFIRM "000 I II '\nMAILAOpRESSCLEAN·UP DEPOSIT CITY PH.USE TAX ~ Pat.Inc. EXT WAlLS ~~fiRM ROOF DellD 10.00GENERALTYPEELEe. I GASCONTRACTORTOWNOFVAilREG.NO.Z02_A OF TOTAL PERMIT FEES TI='1=. SOlAR WOOOHEAT Gary t-kJrrain 1/13/86 FIRM ADDITIONAL PERMITS NEEDED:Ulll)ING OffiCIAL ------l5"An:----- lECTRICAl :L ~INITIAL ~Tom Braun ___1/13/86 TOWN OF VAIL REG,NO.--------ONTRACTOR ST CUT ONING ADMINISTRATOR DATE TELE.BLASTING FIRM PARKING ONING &BU~g~~G N~~~~ PLUMBING TOWN Of VAIL REG,NO.CONTRACTOR DEMO I"". FIRM I hereby acknowledge that I have read this application,filled out in full the Information required, MECHANICAL TOWN Of VAil REG,NO, completed an accurate plot plan.and state that all the Information provided as required is correct.I CONTRACTOR agree to comply with the information and plot plan,to comply with all Town ordinances and state TElE.laws,and to build this structure according to the Town's zoning and SUbdivision codes,design review approved.Un;'o,m Building Code and O(he,(;nanc;j!!j:,own ,ppUcable tharefo. OTHER FIRM //i,'",)"V, SIGNATURE OF OWNER OR ~TRACTOR FOR HIMSELFTOWNOFVAIl-REG.NO. CONTRACTOR TELE.AND THE OWNER. h .~ NOTE -COpy OF PERMIT TO BE KEPT ON JOBSITE~CONSTRUCTION PERMIT,DATE 001988".••.PERMIT NO .lin I III l.TYPE OF CONSTRUCTION I II III 1'CJ . department of community development 2.OCCUPANCY GROUP ABEHIRM BUILDING DIVISION 122a34 z ELECTRICAL $200.00 TO BE FILLED OUT COMPLETELY PRIOR TO ISSUANCE OF PERMIT Q . TYPE OF PERMIT GE~'lft-t'Eex~I~Ug~°U'II"an roof'of ~PLUMBING~ ~f'eslaurant <MECHANICAl~BUILDING 0 PLUMBING > ELECTRICAL 0 FOUNDATION 0 MECHANICAL 0 TYPE GROUP G.R.F.A.VALUATION PERMIT FEES LEGAL lOT BlK V Potato Patch Club BUILDING PERMIT DESC.FILING PLAN CHECK Q: JOB NAME:$25.00PotatoPatchClubRestauranELECTRICAL ~~OWNER NAME pep1 liramsnanrner NEW(I ALTERATION ()ADDITIONAl (I REPAIR (I PLUMBING MAIL ADDRESS 231 L Gore Ck.DWELLING UNITS __ACCOMMODATlONUNlTS __MECHANICAl {(l ... Vail ,476-5626 'll VJCITYCO.PH.HEIGHT IN FT.__NO.FIREPLACES RECREATION FEE INSULATION.TYPE THICK E R-VALLue O~ARCHITECT FIRM DESIGN REVIEW BOARD FLOOR AI /'(")D<, MAil ADpRESS CLEAN·UP DEPOSIT rt"~EXT.WALLS /1/7CITYPH.,USE TAX ROOF ~" GENERAL fiRM TYPE ELEC.GA;TOTAL PERMITFEES $25.00 "-CONTRACTOR TOWN OF VAIL REG.NO.OF SOL<R WOOD -~:;.u:=//-~TELE HEAT -'.:2 3'/..8'..5 FIRM I ne II ectel C cO.AssoC ADDITIONAL PERMITS NEEDED:BUILDING OFFICIAL DATE ELECTRICAL 103E :!.."-INITIAL Rick Pylman 1/18/85 TOWN OF VAIL REG.NO.,-----------OATE----ONTRACTOR ST.CUT DNING ADMINISTRATOR TELE.949-1662 .I ZONI~tffi\/!iN~fflTE5'palnt to matchBLASTING FIRM PARKING j/, PLUMBING TOWN OF VAIL REG.NO. CONTRACTOR OEMO TELE FIRM I hereby acknowlBdge that I have read this application,filled out in full the information required, MECHANICAL completed an accurate plot plan.and state that all the information provided as required is correct.I CONTRACTOR TOWN Of VAIL REG.NO_agree to comply with the information and plot plan.to comply with all Town ordinances and state "LE. laws,and to build this structure according to the Town's zoning and subdivision codes.design review approved,Uniform Building Code and ot~~~nancesof the Town applicable thereto. OTHER FIRM ,/AL '"• TOWN OF VAIL REG.NO.~IG_R~TURE Of OWNER OR CONTRACTOR FOR HIMSELF CONTRACTOR TELE.AND THE OWNER. ~...,..,I NOTE -COpy OF PERMIT TO BE KEPT ON JOBSITE 11 /27/84~CONSTRUCTION PERMIT,DATE 001962. "PERMIT NO.•IltllllV@tILLI'II 1 TYPE OF CONSTRUCTION department of community development 2.OCCUPANCY GROUP ABEHI@M BUILDING 1 nnn DIVISION 12 Za{)J4 z ELECTRICAl 2nn TO BE FILLED OUT COMPLETELY ?RIOAlD ISSUANCE OF PERMIT Q GENERAl DESCRIPTION OF WORK:~PLUMBINGTYPEOFPERMITremoveshower,remoVe sauna room.~ ~ 00 BUILDING 0 PLUMBING redo shetrock,paint &recarpet ~MECHANICAl 00 ELECTRICAL 0 FOUNDATION 0 MECHANICAL 0 TYPE GROUP GRF.A.VALUATION PERMITFEES ..LEGAL LOT Unit 42 BL"V R-3 1200.00 BUILDING PfRMIT ?n .n \ DESC.FILING Potato Patch Club PlAN CHECK "..~JOB NAME:FERMAN IS REMODEL elECTRICAL C)~ OWNER NAME JuHN FERMANIS NEW')AlTERATION ()I ADDITIONAl I )REPAJR ()PlUMBING 0"-1685 Clover Or. MAlt AQQREss PWELLINGUNlTS __ACCQMMOOAnONUNITS __MECHANICAl ;~C'TY Palatine,11 PH.HEIGHT IN FT._NO.FIREPLACES RECREATION FEE-- ARCHITECT none INSULATION'TYPE THICKNESS R·VAllUfiRM DESIGN REVIEW BOARD ROOA •/••{l""./}f' MAll ADDRESS CLEAN·UP DEPOSIT ~~EXT WALLS 1/1-~I+I ".P'use TAXc.TY PN I'·,0/\1 ~~:::Earth and AOO' GENERAL FIRM Sun I~r Ot.t~1·~"'CONTRACTOR 1578 TYPE ElEC-TOTAL PERMITFEES ,n 7<TOWN OF VAIL REG.NO.OF TElE.926-3854 S<X.AR fHEAT -U"-OI~~~;F~~~N-f;~---1&fT~7 /8i---- FIRM Oon Kiese ADDITIONAL PERMITS NEEOED \'".'/.'~ ELECTRICAL 112E !..M/INI1Al I---.Jo.'l'..BrauB.-__llL2~8L _____ CONTRACTOR TOWN OF VAIL REG.NO,5T CUT ONING ADMINISTRATOR DATE TElE.926-3354 BLASTING b-ONIN~,~.,:UIL.DING NOTES: ,,<0 •••,<.on ...FIRM PARKING PLUMBING TOWN Of VAIL REG,NO,11CONTRACTORDEMO TI:l 1:. FIRM I hereby acknowledge that I have read this application,filted out in 1ull the In1ormatlon required, MECHANICAL completed an accurate plot plan,and state that all the information provided as required is correct.I CONTRACTOR TOWN OF VAIL REG.NO.agree to comply with the information and plot plan,to comply with all Town ordinances and state TElE, laws,and to build this structure according to the Town's zoning and subdivision codes,design OTHER FIRM review epproved,Uniform Building Code and o,~es 071 ~Plicable 'here'o. TOWN OF VAIL AEG,NO.SIGNATURE OF OWNtR OR NTRACTOR FOR HIMSELF CONTRACTOR TElE.ANDTHE OWNER. NOTE -COPY OF PERMIT TO BE KEPT ON JOBSITE 12/19/84CONSTRUCTIONPERMIT •• ~.DATE 001975 lalll III ::1IIIIIt~-PERMIT NO. I.TYPE OF CONSTRUCTION . department of community development 2.0CCUPANCY GROUP ABE H It!'BUILDING DIVISION 12 2a{j)4 z ELECTRICAL 500 TO BE FILLED OUT COMPLETELY PRIOATO ISSUANCE OF PERMIT 0 TYPE OF PERMIT GEfER1L ~RIPTION OF WORK;~PLUMBING ns a 8 outlets around booths ~ ~• 0 BUILDING 0 PLUMBING >MECHANICAL Q ELECTRICAL 0 FOUNDATION 0 MECHANICAL 0 TV'"GROUP G.A.F.""VALUATION PERMIT FEES LEGAL lOT Bl"V R-3 $500 BUILDING PERMIT "DESC.FILING PLAN CHECK ~JOB NAME'POTATO PATCH RESTAURANT ELECTRICAL 35.00 <OWNER NAMEPepi Gramshammer NEW(l AL lEB....nON ()ADDITIONAL ()REPAIR {l PLUMBING 950 Red Sandstone Rd ;;-~MAil ADDRESS OWE.LLlNGUNITS __ACCOMMOOATlONUNITS __MECHANICAl CITV Vail CO 476"H.1614 HEIGHT IN FT.__NO.FIREPLACES RECREATION FEE-- ARCHITECT FIRM INSULATION:"'"THICKNESS A-VALLue DESIGN REVIEW BOARD ~~"00'I bAr /4MAilADDREss CLEAN·UP DEPOSIT CITV PH.USE TAX ~~m.wms '00' GENERAL FIRM TYPE ELEC.GAS CONTRACTOR TOWN OF VAIL REG.NO.TOTAL PERMIT FEES 35.00 0'SOLAR wooo TELE.HEAT jtev~J'.att~r~n _12a6J,~__ ADDITIONAL PERMITS NEEDED:BUIL~ING OFFICIAL /Jt::-ATE --- FIRM The El ectrj C Co ELECTRICAL 103E :i-t!.~T omos A.Braun 12/19/84 -- •ONTRACTOR TOWN OF VAIL REG,NO.ST CUT =ONING ADMINISTRATOR ----DATe-- TELE.476-8149 BLASTING \n-..I;!zONING &BUILDING NOTES: fiRM PARKING r PLUMBING TOWN OF VAIL REG,NO, CONTRACTOR DEMO TElE. FIRM I hereby acknowledge that I have read this application,filled out in 1ull the information required. MECHANICAL completed an accurate plot plan,and state that all the information provided as required is correct.I CONTRACTOR TOWN OF VAIL.REG.NO,agree to comply with the Information and plot plan,to comply with all Town ordinances and state TElE. laws,and to build this structure according to the Town's zoning and subdivision codes,design review approved,Uniform Building Code and other ordinances of the Town applicable thereto. OTHER FIRM ~....-</---z TOWN OF VAIL REG.NO.'SIGNATURE OF OWNER OR CONTRACTOR FOR HIMSELF CONTRACTOR TElE. AND THE OWNER. ...lin......ail NOTE -COPY OF PERMIT TO BE KEPT ON .jOBSI'E 28 83~CONSTRUCTiON PERMIT DATE --aaUl..;•PERMIT NO .•tin I III 1 TYPE OF CONSTRUCTION 1111111'1'1 department of c:ommunity d.....lopment 2.OCCUPANCY GROUP ABEHIRM BUILDING ,n 00 DIVISION 122134 z ELECTRICAl.<onn TO BE FILLED OUT COMPlETELY PRIOAlO ISSUANCEOF PERMIT "GENERAl DESCRIPTION OF WORK:~PlUMBINGTYPEOFPERMITFireDamageRepair~ ~ ~ ~BUILDING 0 PLUMBING >MECHANICAL ElECTRICAL 0 FOUNDATION MECHANICAL 0 TYPE GROUP G.R.FA VALUATION PERMIT FEES LEGAL LOT BL"V R-3 30,000 BUILDING PERMIT 193.00 DESC.FILING PLAHCHECK 96.50 ~BNAME'Potato Patch Club Rep.-Unit ELECTRICAl 72.00 ~OWNER NAME NEWI I AtTERATIOH ()AOOrT1ONAl()REPAIR (x I PlUMBING MAIL ADDRESS OWEUFNGUNITS __ACC()t.V.IOOATIONUNITS __MECHANICAL ~~ CITY PH.HEIGHT tN FT __NO.FIREPLACES --ReCREATION FEE -:;-' INSULATION:TYPE THICI<NE$S Fl·VALLUE 16C1lARCHITECTFIRMDESIGNREVIEWBOARD 'COO"CLEAN·UP DEPOSIT 250.00 0 MAIL ADDRESS ~~EXT,WALLS Eo".USE TAX 250.00CITYPH. ROOF GENERAL FIRM Palace Canst. TYPE mc X GAS TOTAL PERMIJ.J;EESCONTRACTORTOWNOFVAILREG.NO.0'$861.50 TEl ~.HEAT SOl'"wooo b\~r,:hun ,;J.-K-~,,--l5"Al'E --- FIRM ADDITIONAl PERMITS NEEDED:Ull ING 0 'F"I6Xi "~ECTRICAL :L "-INITIAL--1---------TOWN OF VAIL REG,NO.------NTRACTOR STOUT X OHING AOMINISTRATOR DATE TElE.BlASTING X ONING &BUILDING NOTES: FIRM PARKING vPLUMBING CONTRACTOR TOWN OF VAIL REG.NO.DEMO X TEL~ FIRM I hereby acknowledge that I have read this application,filled out In full the information required, MECHANICAL completed an accurate plot plan,and state that all the Information provided as required is correct.I CONTRACTOR TOWN OF VAIL REG.NO.ag'.o to comply with 'ho 'nfo.matlon and plo'pion,'0 comply with Ol~:o.dlnancos and stoto TEL~.laws,and to build this structure according to the TO~r 20/}ng and bdivision codes,design re~pproYed,Uniform~ilding Code and other or j nc s of t~wn applicable thereto. OTHER FIRM ht efu4,..-~:-.....,... TOWN OF VAIL REG.NQ ~~~SiG'NAi RE 0 OW~E'Y0R CONTRACTOR FOR HIMSELF CONTRACTOR TELE.~tf."..AND THE OWNER. ~,- 261 NOTE -COPY OF PERMIT TO BE KEPT ON ~OBSITE 2-4-83~CONSTRUCTION PERMIT~,DATE 001-..••PERMIT HO . III"III 1.TYPE OF CONSTRUCTION I II III IV V department of community development 2.OCCUPANCY GROUP "'BEHIRM BUILDING DIVISION 122.34 z ELECTRICAl TO BE FILLED OUT COMPLETELY PArCR TO ISSUANCE OF PERMIT 0 GENERAL DeSCRIPTION OF WORK;~PlUMBINGTYPEOFPERMIT~ Demolition ~MECHANICAL0BUILDING0PLUMBING> 0 ElECTRICAL 0 FOUNDATION 0 MECHANICAL 0 <n.FT.TV""GROUP VAlUATION PERMIT FEES EGAl lOT Bl"BUILDING PERMIT 10.00 oESC.FILING Pl4NCHECK JOB NAME:Potato Patch Club-Unit 41 ELECTRrC"l OWNER NAME NEW')AlTERATION (I AOO1TlQNAl (I REPAIR I )PlUMBING ~ MAIL AQQRESS DWELLING UNITS __ACCOMMOOATION UNITS MECHANICAl ":J C'TV PH.G_B_FA __BEDROOMS RECREATION FEE ~, ARCHITECT fiRM COMMERCiAl SYST __COVERED PARKING DESIGN REVIEW BOARD ';:(r6 MAlL AODRESS HEIGHT IN FT __UNCOVERED PARKING CLEAN·UP DEPOSIT CITV PN.NO FIREPlACES USE TAX n-!: GENERAL EIRM Palace Canst.INSULATION I~...s CONTRACTOR TOWN OF VAIL REG.NO.TOTAL PER¥fl FEES $10.00 p- TV""THICKNESS R·VAlUE ~'~::O'F1~l~-.?~.~-:i3 ___TELE.FLOOR FIRM Duro Electric LECTRICAL EXT.WALLS TOWN Of VAIL REG.NO.---------------NTRACTOR ROO'OHING ADMINiSTRATOR DATE TElE. HEAT ZONING"BUILDING NOTES; fiRM PLUMBING ELEe:CAS: CONTRACTOR lOWN OF VAil REG.NO. TEl E. SOLAR:WOOD: FIRM I hereby acknowledge that I have read this application,filled out In full the Information required, MECHANICAL completed an accurate plot plan,and state that all the information provided as required is correct.I CONTRACTOR TOWN OF VAIL REG.NO.agree to comply with the information and plot plan,to comply with all Town ordinances and state Tell:.laws.and to build Ihls SlrUClure according to Ihe rn's Z~~~bdiYiSIOncodes.design OTHER fiRM review approved,Uniform Building Code and other .jI7)~es of th i own applicable thereto. TOWN Of VAll REG,NO,SIG ATURE Of Ow,NER'OR CONTRACTOR faA HIMSELF CONTRACTOR TELE.AND THE OWNER. -.,,:f''";. Z EllCTRIC'-L , Q "P...~M8INC~ ~•>MEC~tANICAl lVPE OF PERMIT ~ILOING 0 PLUMBINGoELECTRICAL0FOUNDATION ONLY Ii MECHANiCAL n (-=~,'CONSTRUCTION PER_r_.1_IT__D~A~TE:":=====:-'.'-:P~RO::J~ECT NO _ ~<'/r-1 PERMIT NOlawn31t111tYITYP!EorCONSTHUcnCN Iii III IV V ~ /.:1,r-I I,"'_0.-'"'Of?,o..,.-·----'~department of community development 20CCUPIoNCYGRQUP A a E H LrM BJILDI",,,4"().;;;J''.0.-1 DIVISION I2 Z@ GENERAL DESC~IjJ'1 OF WORK:----r----III 1Jcrcf.6=d<'~.vlCde I I TOTAL PERMIT FEES _DA1HTUB/SKOWFR __NO.TOILETS I-lEIGHT IN FT. NO FIREPLACES COVEREOf>AAKING __UNCOVEREO ..RKINO -l 1---tr""TL 9'?S'9'l-W dj ----OA1""Z;-l!.p-,- INSULATION ~_...u-'I',I"--"-.:ti"'=::-==c-==-,_/ 'oNINe ADMINiS1'RATOR O"TE TYPE THICKNESS R,VALUEPO,rlTv ElECTRICAL a:':l!".,71PJ"e,-p-------1 NT RACTOR '.11 ADD S Ll::GAL ILOT BLKr-"".---.,-__1 T'l'I"E GROUP SQ FT VAlUAilON PERMiT FEES ,.. D[SC FlUNG ~fr.k hie/"cly,t ::;;L I.?-~0=BUILOI"GPERM"7 Lf.0 c;:J ADI"VSN~.,ARME:.J6t.../I.II~....1 'l'N CHECK 3 7,?S"'j :~~~-.:To'",.qu,1,.__-l +--l n.~'~'~<C~T:.~Ir.:,A=''-----t---~_=-=---.J 1 AntlRFS-<::,1:::·:~IJ'';;...{if....1 ~t PlUMB·NC,----I IJ I .,..71"~~~~~~b~~~I~~~I~~~=_=::::~t=:;;~~~~'t-:--1,C~I~TV'-"".~·~"""""'~";;..~"r"'",r;..;.p~H~771~J~'~'SW::.:-.17:"f7~EW'I AlTEf!Ai'ON')ADOITlO'V'l f )REPAIR(l MECHANICAl -I ARCHITECT FIR ...P;,t!L {Ja..IJr.y,...'8s$<'{,=:lWElLlNC UNITS __.a.CCOMMODATION UNITS__n_.::."EC::R.::':..'.::T1::.0.::".::"::E:..;:._mULr:-....,q~g-;-,-;o;;;-0::o;-jl MAil AppRESS IltJO ..5.FrO"-I~r.I!tl G.rtF A l'Io-r;__BEOROOMS __II-::.O::."::'::.ON..:::..,::,,,,,::,.::',::,o::,_.,,o_+_Z--;-,I,,,,O:;o;_'_°-;<;,,°;:;:--11 CITY (/0,1 colo.PH lf76 -ttV,),COMMERCIAL SVST __RESTAURANT SEATING CLEAN UP OEPOSIT I (!}CJ ~CJ 0 I GENERAL fiRM 5o!«U/,/.Ii<.!>1 ••c CONTRACTOR MAil aDDRESS Bot 6C. lTV {J",.0.4.s P"Qz'·\'-SO PH 'flllM- PLU.'SING..,,1.00 ~CONTRACTOq ~'-'JIj.L"AOOJO'"_I<l_""-C-'-':.,1 CIH' FLOOR EXT"WAi,.lS ROOF 'ONING NOTES·_ I 1J~"(Il\'\("::-;""'·I.f:lll.l.Til'"I 11·\\I Itt...u Tlll1>AiON.If'ATU,S ASL;~T"'"111 A r 1111 .o.llfJIJ[l~'·O!tl<I':<.T ASO J\l.O'fIt:t ~"(-fl'"'L~ ""ITlI "Ll.T'I"''''I>1l£>"A,r;:t\,,'I)'<1 \,. 1....IlIS ltH;"lolf..'it.Ill'Il.'":-'''{11'\111"("'''' GAS· WOOO, HEAT £lEC; V/lll WATER &SAN OIST.TAPFEf' S?ECIAL NOTES' SOlAR PH PH 11RM If ....I""OTHER CONT~ACTOR CITY fiR"~~_ MECHANIC;,t It Vt e CONTRACTOR ljt"'_AQ[~__:"'::,_ rllY --".,.... •.....I '""'..."~"""',,..'1"I"~ •1 (Jf18772-4-82CONSTRUCTIONPERMIT '---,DATE PROJECT NO. O'••PERMIT NO .lam III I TYPEOFCONSfRUCTlON I II III IV V department of community development 2 OCCUPANCY GROUP ABEHIRM BUILDING 170M DIVISION 122,34 Z ELECTRICAl 1 500 TYPE OF PERMIT 0 ")S:"PLUMBING CENERAL DESCRIPTION DEWaRK <PLUMBING 3 700RemodelHouse~i"BUILDING ~< ELECTRICAL ::::J FOUNDATION ONLY >MECHANICAL o MECHANICAL 0 LEGAL LOT BLK TYPE GROUP so FT.VALUATtON PERMIT FEES DESC FILING Potato Patch Club -U j V R-3 396 32,800 206.50 ~BUILDING PERMIT .OBNAME.l.Yl e Beman Remade 1 "103.25PlANCHECK OWNER NAME ELECTRICAL 35.00 ~ MAil AQDRESS PLUMBING 40.00 l'..: CITY PH NEW'At TERATION I ADOITIONAll )REPAIR I )MECHANICAL lJ\I ARCHITECT fiRM DWELLING UNITS __ACCOMMODATION UNITS RECREATION FEE 118.80 ~MAil ADDRESS 396 BEDROOMS DESIGN REVIEW BOARD 25.00G.REA. CITY PH COMMERCIAL 5YSl __RESTAURANTSEATING CLEAN·UP DEPOSIT 100.00-- GENERAL FIRM Duddy-Viele Canst.HEIGHT IN FT __BATHTUB/SHOWER Use Tax 250.00 ""- CONTRACTOR MAli AODRESS TOTAL PERMjif"fEES I .070 " c.J NO FIREPlACES __NO TOILETS Ir'N ""COVEREO PARKING __UNCOVERED PARKING 1,""'::.f1../~/.~¥~-FIRM --- .~ECTRICAL NTRACTOR MAIL ADDRESS INSULATION >------------- 1~ITY ~OHING AOMINISTRATOR DATE TYPE THICKNESS R·VAlUE fiRM FLOOR RAtt '"1Q ONING NOTES' PLUMBING MAll APDRESSCONTRACTOR EXT WALLS 8att 6"19 IrlTY PH ROOF Batt 1011 38 FIRM HEATMECHANICAL CONTRACTOR MAll ADDRESS ELEC.GAS- Ir'N PH IIILICF.lIY IO:'I.II ....Ill:r TII ...TI 11-\\£ SOLAR WOOD:liIf ...O nll~,,""I.ICATIU'"'SO ST "TL nl"T Tilt OTHER Fl~M A"O\'£IS (;O""fC1 ASl)AtiREr 1')COllrl.V MAIL ADDRESS VAILWATER&SAN DISTTAPFEE :-~'TtlIII"O"Ol",,~('"r,.;;""~T"lI ,m '~:""aU'~"?f)~::"~rd/CONTRACTOR CITY PH SPECIAL NOTES.._~(.,,.,""" \ J CONSTRUCTION PERMIT-;DATE PROJECT NO (0 r ~7 Z----.,'"PERMIT NO.I'''aa ..$I I TV"'<:OF CONSTlWCT1Q"I1 I It III IV <;J ~,..I.' deportrnt.nt of community development 2 OCCUPA;IlCY GROUP ABE H r@M Bl,:llO,',G 32 800 12 204 z CLECTRICAl 1 500 TYPE OF PERMIT DIVISION Q GENERALDESCRIPTION OFWQRK ;:;PlUMBrflG 3,700C~ i3:ml'dd ~BUILDING PLUMBING 14175 t' ~-<r ELECTRICAL 0 FOUNDATION QNl Y >MECHANICAl NfA-~r.~ECHANICAl ~,, LEGAL ILOT BlK .;,- PERMITFEE"It,,'-flL,,-Z TYPE (iROUP SO FT.VALUATION 2 / DESC FILING 'tf ,--rz:v-,?qi.3.2 yO<?BUILOI"'G PERMIT ..::2ot SO~NAME / PLAN CHECK /0-<:_X" r;"'~E Nr.Lyle Berman 3S-ooOWNERelECTRICAL f4JJL r~o'h'k~~l'ay Road PLUMBING L/e·eo <h'l\Yzata,Minn.PH MECHANICAL --NFWI )ALTcRATIO )ADDlTIONAt ,REPAIR (, ARCHITECT ~e,Baldwin 60 AS$oc.RECREATION fEE •)0 //q 8'.:/DWELLING UNITS __ACCOMMODATION UNITS__ \~9?AJ~E{iontage Road West G RFA..5f'''DESIGN REVIEWBOARO •.2,~C)O~_~~aEOROOMS --CO 'I>~6-4433 /t:/cJ·00COMIJCRCI"l SYST __RESTAURANTSEATINC CLEAN UP DEPOSIT uddy-Viele Construction 1i9 f/1L &So 00FIRMHEIGHTINFT__BATHTUB/SHOWER -GENERAL CONTRACTOR 1000 S.Frontage Road West TOTAL PERMIT fE'ES .9'7V.<:<;"Mo\!!1u10RfSS NO FIREPlACES __NO TOilETS~CO !j16-3082 COvERED PARIIING __UNCOVERED PARIIINC ~/~ass Electric I'''-rio'~.~--~A~1ifi~~ElECTRICAL .0.Box 329 N ....RACTOR MAIL 'OORESS INSUlAT;ON '01G AO"ISTRATCRrisco.CO 666-5522 0<'CiTY PH TYPE THICKNESS R·VAlUEcH~era"[i(fJS""maLIWooo i?~I"1'7 ONING NOTES:W"fLOOR0 PLUMBING .0.Box 1487 IR,,_~-ta ),~~CONTRACTOR '''All ADORESS EXT WALLS ail.CO ~~6-1641 IlZ6"-~/t'~<',¥'('lTV ROOF eBM NfA ~.:ECHANICAI HEAT CONTRACTOR ",All ADDRESS nEe'GAS 1"1 T'PH I IU..Kt:IIY ,\(.I(S""I.~.Il';1"lllAT I 1/.\\'. SOLAR WOOD R ....(J THI"AI'I'I.ll....,."JS .....~u \1.\1.TIl ....l TIH OTHER FIr-'.:NfA ....11U\lt:1\(..HI<IU.CT ....""...t,MII 1"(;U\II'I.V VAlLWATER&$AN DIST TAf'FEE IIo'ITII ....1.1.TUlloS "I<r>I ....SC"t:~......1'..rut '.':"AODRf-SS I ......·S M.'.AIUlIt-(,i 11II·ILaIN..t."..'1 M'<;110\ C01\lTRAr rem POI SPECIAL NOTES'cnv ,,><__••1 ,,I'M~".."..~M 'I"'''''I''".,".. • rrA.o··.•~,.,/__ ".".---.~"'.>f'.'"-._--.lP'<-"\.l1"r.,'.......--..-..'-••__~·t'l'Cf' •'••"4•••__;",.1....-.If XV,•,s~~"~.- V.".", -~-~·('Oft:~'.,'..::-----.,.-..-"rr..~,··-··Y:' CHECK REQUEST \jv' PREPARED BY:g ~',..((J-J DATE:G A"IfJVENDORNAME:Ik:/IJvn.,/~yJ-,( VENDOR NUMBER:-t-rl :2 '/71/ DESCIUI'TJON OF EXPENSE:CLEAN UP DEPOSIT REFUND FOR BP #8 fo+-'~I.,:J 76 -OJ VaNAMEOFJOB:0 T.Pc-fc(cP r..t PO"! ACCOUNT NUMBER:OJ 0000 22002 AMOUNT OF REFUND:L.-S--O .6 0 DATE APJ'ROVED:(,-2-'-'-'71 APPROVAL SIGNATURE: Valuatl.on;:J£,V..I.J Firepl~,e Jnfor.8tion:Restritted:IIOf GO$App l lances:If Of GIIS logs:1IOf Wood/Pallet: *A'****************************~*************************FEE SU~RY ~~k*t**************'****************'*******'**I******* aullding----->371.00 Rcstuarant Plan Review-->.00 Total Clll,ulilted Fecs---)865.15 Plon Chcck--->241.15 DRS fee__------).00 Additional Fets----->.00 Investigation>.00 Re~reatlon Fee----------).00 Total Permit Fee-------)865.15 lIill Call----)3.00 Clean-Up Deposit-------->250.00 Pay'"ents------------)865.15 TOTAL fffS---------)865.15 BALANCE DUE--------).00 kt*t**.~*",.,*.*••••llllll.*******~ll*.*••••************kkt*i~********.l*••••*~*l ••••***l •••***,.".**,.**.**.*.*~***.****'* Item;05100 BUILDING DEPARTMENT 08/15/1996 CHARLIE Action;APPR Item:05400 PLANNING DEPARTMENT 08/15/1996 CHARLIE Action:APPR N/A Item;05600 FIRE DEPARTMENT 08/15/1996 CHARLIE Action:APPR N/A Item:05500 PUBLIC WORKS 08/15/1996 CHARLIE Action:APPR N/A Dept:BUILDING Division: Dept:PLANNING Division: Dept:FIRE Division: Dept:PUB WORK Division: See page 2 of this Document for any conditions that may apply to this permit. DECLARATIONS S GHAT RE OF OWNER OR CONTRACTOR FOR HIHSELF AND OWNER I hereby acknowledge that 1 have read this applicatton,filled out in full the information required,completed an accurate plot plan,and state that all the inforeation provided as required is correct.1 agree to co-ply with the infor~tion and plot plan, to co~ly with all T~ordinances and state laws,and to build this structure according to the T~'s zoning and subdivision codes,design review approved,Unitore Building Code and other ordinances of the Town applicable thereto. REQUESTS FOR INSPECTIONS SHALL BE HAOE TWENTY-FOUR HOURS Iii AOVANCE BY TELEPHONE.).T 1,7 -2138 OR Send Clean-up Deposit To: ••,. TOWN OF VAIL 75 S.FRONTAGE ROAD VAIL,CO 81657 970-479-2138 DEPARTMENT OF CO~~NITY DEVELOPMENT NOTE:THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES \ PLU11BING PERMIT Job Address:870 POTATO PATCH DR Location ...:POTATO PATCH TOWNHOMES Parcel No ..:2101-063-06-047 Project No.:PRJ96-0163 Permit t:P96-0148 Status ...:ISSUED Applied ..:09/18/1996 Issued ...:09/18/1996 Expires ..:03/17/1997 APPLICANT VAIL VALLEY PLU11BING •HEATING Phone:3039497771 POBOX 2048,AVON CO 81620 CONTRACTOR VAIL VALLEY PLUMBING'HEATING Phone:3039497771 POBOX 2048,AVON CO 81620 OWNER POTATO PATCH CLUB CONDO ASSOC IN %VAIL HOME RENTALS,143 E MEADOW DR STE 397,VAIL CO 81657 Description:REPLACE PERMENENT HOT TUB (SPA)Valuation:1,100.00 *****~*************************~*~A*********l***FEE SUMMARY **************i1ntt*********************~*******~ Plullbing---)30.00 Rutuarent Pllln Rev1e ......-).00 Toul Calculated Fee~-->40.50 Plan Check-->7.50 TOTAL FfES-----·)40.50 Additional Fees------).00 Investiglltion>.00 Total Pl!!rlllit Fee----->40.50 '1ill ClIll-->3.00 Payllents--------)40.50 BAlAHCE DUE----).00.ttl"l_'tltta""",.""".""",••••,••••_••!••*.*****************~****.*****l****************.*.**••,*.t."••_.*t'***"* Item:05100 BUILDING DEPARTMENT Dept:BUILDING Division: 09/18/1996 CHARLIE Action:APPR CHARLIE DAVIS CONDITION OF APPROVAL 1.FIELD INSPECTIONS ARE REO'D TO CHECK FOR CODE COMPLIANCE 2.ALL WORK MUST COMPLY WITH 1994 UPC DECLARATIONS I hereby ~cknowledge thet I heve r~&d this ~ppl1eation,filled out in fyll the infor..tion reqyired,co.pleted ~n ~ccurate plot plan,and _tlte thlt all tM inforution provided ill required is correct.I agree to c:oeply \lith the inforwtion and plot plan, to comply with ell Town ordinances and state laws,and to build this structyre according to the Town's zoning and subdivision codes,design review ~pproved,unifor.Bu1lding Code and other ordinances of the Town applicable th'reto. SIGNATlJ f OUNER OR COHTRACTOR FOR HII1SELF AND Ol/HER ••• **************************************************************** TOWN OF VAIL,COLORADO Statemnt ****************************************************************• Statemnt Number:REC-0202 Amount: payment Method:CK Notation:116101 40.50 09/18/96 12:50 Init:CD PLUl1BING PERMIT 40.50 Permit No: Parcel No: Site Address: Location: This Payment P96-0148 Type:B-PLMB 2101-063-06-047 870 POTATO PATCH DR POTATO PATCH TOWN HOMES Total Fees: Total ALL Pmts: Balance: 40.50 40.50 .00 **************************************************************** Account Code 01 0000 41311 01 0000 41332 01 0000 41336 Description PLUl1BING PERMIT FEES PLAN CHECK FEES WILL CALL INSPECTION FEE Amount 30.00 7.50 3.00 ..•• ADD/ALT COMM BUILD PERMT TOWN OF VAIL 75 S.FRONTAGE ROAD VAIL,CO 81657 970-479-2138 DEPARTMENT OF COMMUNITY DEVELOPMENT NOTE:THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES Permit #:B96-0240 • Job Address:870 POTATO PATCH DR Location ...: Parcel No ..:2101-063-06-047 Project No.:PRJ96-0163 Status .... Applied... Issued ... Expires... ISSUED 08/15/1996 08/20/1996 02/16/1997 APPLICANT CONTRACTOR OWNER CONTRACTOR GALLEGOS MASONRY,INC POBOX 99 1 WOLCOTT,CO 81655 GALLEGOS MASONRY,INC POBOX 99 1 WOLCOTT,CO 81655 POTATO PATCH CLUB CONDO ASSOC IN %VAIL HOME RENTALS,143 E MEADOW HIGH COUNTRY POOLS,INC 6541 S.COLLEGE AVE,FORT COLLINS Phone:9709263737 Phone:9709263737 DR STE 397,VAIL CO B1657 Phone:970-226-2657 CO 80525 Description: REPLACE COPING STONE SIDEWLK REPLACE SPA Occupancy:82 Type Construction:VN Type Occupancy: B2 Type V Non-Rated valuation: Fi replate Informat ion:Rest r;cted: 40,565 #01 Gu Appl ianet's: Add Sq Ft: 11101 Gas logs:N01 ~ood/Plllet: ***********************************************************fEE SUMMARY ***************************i***i******i*******~***** Bl,lilding----->427.00 Rutuarllnt Plan Rev;e\/-).00 Total Calculate<!'Fets---)957.55 Plon Cho!:ck-->zn.ss DRB fee----------->.00 Additional fees------->.00 Investigation>.00 Recrution Fee------>.00 Total Perlllit Fee-------->957.55 \lill Call---->3.00 Clelln-Up Depoait--->250.00 PayJllents------------>957.55 TOTAL FEES------->957.55 BALANCE DUE--------->.00 ***************A*A*.*A*************************kt**~******ttt*tt****ttttt*ttt*titttttt*t*tttttt*tttt**t********************** Item:05100 BUILDING DEPARTMENT Dept:BUILDING Division: 08/15/1996 CHARLIE Action:APPR Dept:PLANNING Division:Item:05400 PLANNING DEPARTMENT 08/15/1996 CHARLIE Action:APPR N/A Item:05600 FIRE DEPARTMENT Dept:FIRE Division: 08/15/1996 CHARLIE Action:APPR N/A Item:05500 PUBLIC WORKS Dept:PUB WORK Division: 08/15/1996 CHARLIE Action:APPR N/A See page 2 of this Document for any conditions that may apply to this permit. DECLARATIONS J her~y aeknoliledge that I have rud this application,filled out in full the inforution required,completed an accurate plot pllln,and state that all the information provided as required is correct.I agree to cOilply with the inforlDlltion and plot plan, to comply lIith all Town ordinances and state laws,and to build this structure according to the Town's zoning and subdivision codes,design review approved,Unifor.Building Code and other ordinances of the TOlin applicable thereto. REQUESTS FOR INSPECTIONS SHALL BE HADE T\lENTY-FOUR HOlJRS IN ADVANCE BY TELEPHONE AT 479-2138 OR AT OUR OffICE FROK S:OO AK 5:00 PH ..••,\ ******************************************************************************** CONDITIONS Permit',B96-0240 as of 09/18/96 Status:ISSUED ******************************************************************************** Permit Type:ADD/ALT COMl1 BUILD PERMT Applicant:GALLEGOS MASONRY,INC 9709263737 Job Address: Location: Parcel No:2101-063-06-047 Description: REPLACE COPING STONE SIDEWLK REPLACE SPA Applied:08/15/1996 Issued:08/20/1996 To Expire:02/16/1997 Conditions: 1.FIELD INSPECTIONS ARE REQUIRED TO CHECK FOR CODE COMPLIANCE. •..••**************************************************************** TONN OF VAIL,COLORADO Statemnt **************************************************************** Statemnt Number:REC-0202 Amount: Payment Method:CK Notation:#16101 92.40 09/18/96 12:50 lnit:CD ADD/ALT CO~1 BUILD PA-COMM 92.40 B96-0240 Type: 2101-063-06-047 870 POTATO PATCH Permit No: Parcel No: Site Address: This Payment DR Total Fees:957.55 Total ALL Pmts:957.55 Balance:.00 **************************************************************** Account Code 01 0000 41310 01 0000 41332 Description BUILDING PERMIT FEES PLAN CHECK FEES Amount 56.00 36.40 ••• TOWN OF VAIL 75 S.FRONTAGE ROAD VAIL,CO 81657 970-479-2138 DEPARTMENT OF COMMUNITY DEVELOPMENT NOTE:THIS PERMIT MUST 8E POSTED ON JOBSITE AT ALL TIMES ELECTRICAL PERMIT Job Address:870 POTATO PATCH DR Location ...:POTATO PATCH TOWNHOMES Parcel No ..:2101-063-06-047 Project No.:PRJ96-0163 Permit t:E96-0226 Status ....APPROVED Applied ..:09/18/1996 Issued ...:09/18/1996 Expires ..:03/17/1997 DR STE 397,VAIL CO 81657 APPLICANT CONTRACTOR OWNER BEST ELECTRIC,THE POBOX 273,EAGLE CO 81631 BEST ELECTRIC,THE POBOX 273,EAGLE CO 81631 POTATO PATCH CLUB CONDO ASSOC IN %VAIL HOME RENTALS,143 E MEADOW Phone: Phone: 3033281610 3033281610 Description:ELEe FOR REPLACEMENT SPA Valuation:650.00 Eleetrie.l-> ORB Fee -> Investigation> Will Cllll-> TOTAL fEES-> 50.00 .00 .00 '.00 53.00 Total Caltulated fees--> Additional fees ) Total Per.a Fee > Pa)'IIMts ) BALAHCE OUE-----> 53.00 .00 53.00 .00 53.00 Item:06000 ELECTRICAL DEPARTMENT Dept:BUILDING Division: 09/18/1996 CHARLIE Action:APPR FOR ERNST CONDITION OF APPROVAL 1.FIELD INSPECTIONS ARE REQ'D TO CHECK FOR CODE COMPLIANCE DECLARATIONS 1 hereby llcknowledge that I have read this application,filled out in full the infor.ation required,ea.pleted an accurate plot plan,and state that all the infor.etion provided as required 15 correct.I agree to ca.ply with the infor.ation and plot plan, to ca.ply with all Town ordinances and state laws,and to build this structure according to the Town'.zoning and subd;v;,ion codes,design review approved,lJnifor.Bui lding Code and other ordinancu of the Town appl ialble thereto. REQUESTS FOR INSPECTIONS SH~LL BE M~DE TWENTY-FOUR HOURS IN ADV~NCE BY TELEPHONE AT 479-2138 OR AT OUR OFFICE FROM 8:00 AM 5:00 PM SIGNATURE OF OWNER OR CONTR~CTOR FOR HIMSELF AND OWNER •• TOWN OF VAIL DEPARTMENT OF COMMUNITY DEVELOPMENT 75 S.FRONTAGE ROAD VAIL,CO B1657 970-479-2138 NOTE:THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES PLUMBING PERMIT Permit .:P96-0148 Job Address:870 POTATO PATCH DR Location ...:POTATO PATCH TOWNHOMES Parcel No ..:2101-063-06-047 Project No.:PRJ96-0163 Status ....APPROVED Applied ..09/18/1996 Issued ....09/18/1996 Expires ..:03/17/1997 APPLICANT VAIL VALLEY PLUMBING &HEATING Phone:3039497771 POBOX 2048,AVON CO 81620 CONTRACTOR VAIL VALLEY PLUMBING &HEATING Phone:3039497771 POBOX 2048,AVON CO 81620 OWNER POTATO PATCH CLUB CONDO ASSOC IN %VAIL HOME RENTALS,143 E MEADOW DR STE 397,VAIL CO 81657 Description:REPLACE PERMENENT HOT TUB (SPA)Valuation:1,100.00 .**.*••*********************~******.*******************FEE SUKKARY *****************************************************•••** Plufllbing--->30.00 Re!Otuarant Plan Review->.00 Total Calculated Fees->40.50 Plan Cheelt--)7.50 TOTAL FEES------>40.50 Additional F~s---->.00 Investigation>.00 Total Per.it f~->40.50 !lill Call--->3.00 PIly.ents--->.00 BALANCE DUE------)40.50 **************,****,••••*.******************,*,,*,******************************************************************************** Item:05100 BUILDING DEPARTMENT Dept:BUILDING Division: 09/18/1996 CHARLIE Action:APPR CHARLIE DAVIS CONDITION OF APPROVAL 1.FIELD INSPECTIONS ARE REO'D TO CHECK FOR CODE COMPLIANCE2.ALL WORK MUST COMPLY WITH 1994 UPC DECLARATIONS I hereby acknowledge that I have read this application,filled out in full th~infor.ation required,cOMpl~ted 3n 3ccur3te plot pl3n,3nd state th3t 3ll th~inforaation provided IS reqYired is correct.I agree to co-ply with the infor.ation and plot plan, to ca.ply with all Town ordinances and state laws,and to build this structure according to the Town's zoning and subdivision codes,desi9"review approved,Unifora Building Code and other ordinances of the Town applicable thereto. REQUESTS FOR INSPECTIONS SHALL BE MADE TWENTY-FOUR HOURS IN ADVANCE BY TELEPHONE AT 479-2138 OR AT OUR OFFICE FR~8;00 Aft 5;00 PM SIGAATURE OF OWNER OR CONTRACTOR FOR HI"SELF AND OWNER I •• TOWN OF VAIL 75 S.FRONTAGE ROAD VAIL,CO 81657 970-479-2138 DEPARTMENT OF COMMUNITY DEVELOPMENT NOTE:THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES ADD/ALT COMM BUILD PERMT Job Address:870 POTATO PATCH DR Location ...: Parcel No ..:2101-063-06-047 project No.:PRJ96-0163 Permit f:896-0240 Status ...:ISSUED Applied ..:08/15/1996 Issued ...:08/20/1996 Expires ..:02/16/1997 APPLICANT CONTRACTOR OWNER CONTRACTOR GALLEGOS MASONRY,INC POBOX 99,WOLCOTT,CO 81655 GALLEGOS MASONRY,INC POBOX 99,WOLCOTT,CO 81655 POTATO PATCH CLUB CONDO ASSOC IN %VAIL HOME RENTALS,143 E MEADOW HIGH COUNTRY POOLS,INC 6541 S.COLLEGE AVE,FORT COLLINS Phone:9709263737 Phone:9709263737 DR STE 397,VAIL CO 81657 Phone:970-226-2657 CO 80525 Description: REPLACE COPING STONE SIDEWLK REPLACE SPA Occupancy:B2 Type Construction:VN Type Occupancy: B2 Type V Non-Rated Valuation: firepl~ce Information:Restricted: 40,565 Add Sq Ft: 1I0f Ges Logs:1I0t IIood/P8llet: ***********************************************************FEE SUMMARY *********1111'***11*******************************************BuiLding----->427.00 Restuarant Plan Rev1~>.00 TotaL Calculated Fees~-->957.55 Plan Check--->277.55 ORB Fee-------->.00 AdditioMl Fees------).00 Investigation>.00 Recreation Fee----------).00 Total Per.it Fee----)957.55 \lill Call---)3.00 Clean-Up oeposit-----)250.00 Payrnents---------)865.15 TOTAL FEES------)957.55 BALANCE OUE-------)92.40 ~_lllllllll~**A**llllllll****A**llllllllllllllllllllllllAAA*********llAAlAlA*lA***lAlA*llll'***********••••,****"******A***** Item:05100 BUILDING DEPARTMENT 08/15/1996 CHARLIE Action:APPRItem:05400 PLANNING DEPARTMENT 08/15/1996 CHARLIE Action:APPR Ite~:05600 FIRE DEPARTMENT 08/15/1996 CHARLIE Action:APPR Item:05500 PUBLIC WORKS 08/15/1996 CHARLIE Action:APPR N/A N/A N/A Dept: Dept: Dept: Dept: BUILDING PLANNING FIRE PUB WORK Division: Division: Division: Division: See Page 2 of this Document for any conditions that may apply to this permit. DECLARATIONS 1 hereby acknowledge that 1 have read th\$application,filled out in full the infor~tion required,co~leted an accurate plot plan,and state that all the inforMation provided as required ,s correct.1 agree to co~ly with the information and plot plan, to comply with all Town ordinances and state laws,and to build this structure according to the Town's zoning and subdivision codes,design review approved,Unifor.Building Code and other ordinances of the Town applicable thereto. REQUESTS FOR INSPECTIONS SHALL BE HADE TWENTY-FOUR HOURS IN ADVANCE BY TELEPHONE AT 479-2138 OR AT OUR OffICE fRQM 8:00 AN 5:00 PM Seod Clean-Up'Depo~it"To:••SIGNATURE OF OWNER OR CONTRACTOR FOR HIMSELF AND OWNER ******************************************************************************** CONDITIONS Permit #:B96-0240 as of 09/18/96 Status:ISSUED ******************************************************************************** Permit Type:ADD/ALT COMM BUILD PERMT Applicant:GALLEGOS MASONRY,INC 9709263737 Job Address: Location: Parcel No:2101-063-06-047 Description: REPLACE COPING STONE SIDEWLK REPLACE SPA Applied:08/15/1996 Issued:08/20/1996 To Expire:02/16/1997 Conditions: 1.FIELD INSPECTIONS ARE REQUIRED TO CHECK FOR CODE COMPLIANCE. •• TOWN OF VAIL 75 S.FRONTAGE ROAD VAIL,CO 81657 970-479-2138 DEPARTMENT OF COMMUNITY DEVELOPMENT NOTE:THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES ADD/ALT COMM BUILD PERMT Job Address:870 POTATO PATCH DR Location ...: Parcel No ..:2101-063-06-047 Project No.: Permit t:B96-0240 Status •..:APPROVED Applied ..:08/15/1996 Issued ...:08/15/1996 Expires ..:02/11/1997 APPLICANT GALLEGOS MASONRY,INC Phone:9709263737 POBOX 99,WOLCOTT,CO 81655 CONTRACTOR GALLEGOS MASONRY,INC Phone:9709263737 POBOX 99,WOLCOTT,CO 81655 OWNER POTATO PATCH CLUB CONDO ASSOC IN %VAIL HOME RENTALS,143 E MEADOW DR STE 397,VAIL CO 81657 Description: REPLACE COPING STONE AND SIDEWALD AROUND POOL Occupancy:B2 Type Construction:VN Type Occupancy: B2 Type V Non-Rated Valuation: Flreplace Info~t1on:Rt&trictld: 32,015 'Of 60..Appl iances: Add Sq Ft: Mof lOllS logs:Mof Wood/Pallet: ••t,.,t.""••,•••••••••"•••••••,•••••••,.,••••••••••t""FEE SUNKARY ,."titt.,••tta••••,••"""",.".,."•••,_",*"",*•••t BuHding-->371.00 Re$t~rant Plan !leviev->.00 Total Calculated Fus-)865.15 Plan Check-->241.15 ORB Fee------->.00 AdditiOMl FHS--->.00 Investi~tion>.00 Recreation fee------).00 Total Per.it fee----)865.15 Will Call--)3.00 ClearrUp Oeposit---)250.00 Paytlenta--------).00 TOTAL fEES )865.15 BALANCE DUE )865.15 """*""",*,*,*****,*,*,,,*_*,**'*'**'*""""'AAAAAA'*'***"'*'*'******""A'*""""""****""*********""****"'*'*'A* BUILDING Division:Item:05100 BUILDING DEPARTMENT 08/15/1996 CHARLIE Action:APPRItem:05400 PLANNING DEPARTMENT 08/15/1996 CHARLIE Action:APPR N/AItem:05600 FIRE DEPARTMENT 08/15/1996 CHARLIE Action:APPR N/AItem:05500 PUBLIC WORKS 08/15/1996 CHARLIE Action:APPR N/A Dept: Dept: Dept: Dept: PLANNING FIRE PUB WORK Division: Division: Division: See Page 2 of this Document for any conditions that may apply to this permit. DECLARATIONS 1 hereby acknowledge that 1 have read this application,filled out in full the infoNietion required,~leted an accurate plot plan,and state that all the infor..tion provided as required is correct.1 agree to cc.ply ~;th the infor.ation and plot plan, to C08lply with all Town ordinancl'S and state lalls,and to build this stNcture according to the Town's zoning and slbdivbion codes,desiWl review approved,Unifor.Building Code and other ordinances of the Town applicable thereto. REQUESTS fOR INSPECTIONS SHALL Sf MOE TWENTY-fOOIl HOUIlS IN AOVAHtE BY TELEPtfOHE AT 479-2138 OR AT OOR OffICE fROM 8:00 AM 5:00 PM Send etlan-Up Deposit To:SIGNATURE OF OWNER OR CONTRACTOR FOR Hl"SELF AND OWNER •• ******************************************************************************** CONDITIONS Permit t:B96-0240 as of 08/15/96 Status:APPROVED ******************************************************************************** Permit Type:ADD/ALT COMM BUILD PERMT Applicant:GALLEGOS MASONRY,INC 9709263737 Job Address: Location: Parcel No:2101-063-06-047 Description: REPLACE COPING STONE AND SIDEWALD AROUND POOL Applied:08/15/1996 Issued:08/15/1996 To Expire:02/11/1997 Conditions: 1.FIELD INSPECTIONS ARE REQUIRED TO CHECK FOR CODE COMPLIANCE. PERMIT I._ **ContaCX Eagle County Assess~Office ~~.;..t 970-Ji8-86''j()for'Parcel #.TOWN'OF VAIL CONSTRUCTldI" •PARCEL i:'2/0 (DC"3060 '(7 PERMIT APPLICAT ON FORM ,J DATE:6'X>,£,r.",'fi!$S7BtIAPPLICATIONMUST BE FILLED OUT COMPLETELY OR IT MAY NOT BE ACCEPTED ~**.***********.****••*•••*•••PERMIT INFORMATION •••••••••*****••••**.***••*** [J -Building [)-Plumbing [)-Electrical [)-Mechanrcal [;xl-other (0"'0.1" Job Name:Mr.fi>If<frl ci,6 Job Address:q,o ({elf 5:,,;01.510»(t~ UN;f 4~a",cf fc..rceL B -';1.1-0 fcJet.<-/.6 <"",-•.t. Legal Description:Lot Block Filing SUBIUVISION: o I J 0 I I I.J (C£)")t!,,s va;1/-1""",//',.,,10", Owners Name:rlD:Q1<~Bl.1tn1L!Jrc;jtt«f,~-,C.lu.uJ~1.i.fl,l!::1!~;,!~§:Address:H J E'1>1 (gcl.w :>-Ycl,'/ Architect:Address:Ph 0 _ General Description:'Kpnl"e Gx(~J:..vo.(otJc/tl.t Lo/r'VC;5/0";'Q.rO~<JC1 10,,/a1,,-, "'1J[e"",7'"0;=WtJo~-.' Work Class:[)-New [)-Alteration []-Additional [~-Repair p.d-Other~~ Number of Dwelling Units:Number of Accommodation Units: * Mber and Type of Fireplaces:Gas Appliances Gas Logs Wood/Pellet •••••••••*******•••••••••••••••••VALUATIONS •••••••••••••*•••••••••••••*.*••• I:x> _BUILDING:$'3''::;015 ELECTRICAL:$OTHER:$~~_ PWMBING:$MECHANICAL:$TOTAL:$._~_X...***••~••*••**•••••••~•••CONTRACTOR INFORMATION •••••*•••••••••••**.*•••••• eneral Contractor:§4If~7.Q5MDrcAJr L Town of Vail Reg.NO.3i8-S Address:11o.Ii,,,,9,,[~)gU (L~Phone Number:9.;1(,--p;n Electrical contractor:£~'-9'7t;.-222./Town of Vail Reg_NO _ Address:Phone Number: Plumbing contractor: Address: Town of Vail Reg,_N~O~.=====-~Phone Number: Mechanical Contractor: Address: Town of vail Reg.NO.__ Phone NUmber: •••••••••••••••••••••••••••••••• BUILDING PERMIT FEE: PLUMBING PERMIT FEE: MECHANICAL PERMIT FEE: ELECTRICAL FEE: ~OTHER TYPE OF FEE: DRB FEE: FOR OFFICE USE ••••••••••••••••••••••******.*. BUILDING PLAN CHECK FEE: PWMBING PLAN CHECK FEE: MECHANICAL PLAN CHECK FEE: RECREATION FEE: CLEAN-UP DEPOSIT: TOTAL PERMIT FEES: BUILDING: SIGNATURE: ZONING: SIGNATURE: TYPE GROUP SQ.FT.VALUATION .COlUIDents '_ XCLEAlI UP DEPOSIT REl'UIlIl TO: town of vai •• 75 south tront.gr ro_d v.il,colorado 81657 (303)479-21)8 or 479-2139 oUlce of community development TO: FROM: DATE: SUBJECT: ALL CONTRACTORS CURRENTLYL REGISTERED WITH THE TOWN'OF VAIL TOWN OF VAIL PUBLIC WORKS/COMMUNITY DEVELOPMENT MARCH 16,1988 CONSTRUCTION PARKING &MATERIAL STORAGE In summary,Ordinance No.6 states that it is unlawful for any person to litter,track or deposit any soil,rock,sand,debris or material,including trash dumpsters,portable toilets and workmen vehicles upon any street,sidewalk,alley or public place or any portion thereof.The right-of-way on all Town of Vail streets and roads is approximately 5 ft.oft pavement. This ordinance will be strictly enforced by the Town of Vail Public Works Department.Persons found violating this ordinance will be qiven a 24 hour written notice to remove said material. In the event the person so notified does not comply with the notice within the 24 hour time specified,the Public Works Department will remove said material at the expense of p~rson notified.The provisions of this ordinance shall not be applicable to construction,maintenance or repair projects of any street or alley or any utilities in ~he right-a-way. To review ordinance No.6 in full,please stop by the Town of Vail Building Department to obtain a copy.Thank you for your cooperation on this matter. Read and acknowledged >l<le-7J]uL "Ma.va.5·',vt ~01 f~ositiorl/R lat nShip W"f5(N/9~""'Date by: lor &lalu Iw Ie!c.l.!!I->soc to Project (i.e.contractor,owner) •......--- 75 south trontllge road nil,colorado 81657 (303)479-2138 or 479-2139 •• oHlc.01 community development BUILDING PERI·lIT ISSUANCE TIME FRAIIE If this perm\t requires a Town of Vail fire Department Approval, Engineer"s (Public Works)review and approval.a Planning Department review or Health Department revi"ew,and a review by the Building Department,the estimated time for a total review may take as long as three weelC.s. All corrmercial (large or small)and all multi-family pennits will have to follow the above mentioned maximum requirements.Residential and small projects should take a lesser amount of time.However,if residenti"al or smaller projects impact the various above mentioned departments with regard to necessary review,these projects may also take tne tnree week period. Every attempt will be made by this department to expedite this . permi"t as_soon as possible. It the undersigned~understand the plan check procedure and time frame 0, v1rrr1]a<Ua ,'I..Jk,,,11l R~jal5 ,..AgreeatObY7' ]tp~j~;f~.31c1.Q..<.S".<.»o=c._ ~Da te wor¥~~(t?f.turned into the Community Oevel~om~~t Department. •MEMORANDUM • TO: FROM: DATE: RE: ALL CONTRACTORS TOWN OF VAIL PUBLIC WORKS DEPARTMENT MAY 9,1994 WHEN A "PUBLIC WAY PERMlr'IS REQUIRED ~~~e~ame:-Jdq?.IUd?cfy t A550C Please answer th'e following questionnaire regarding the need for a "Public Way Permit": 1)Is this a new residence? 2)Is demolition work being performed that requires the use of the right of way,easements or public property? 3)Is any ·utility work needed? 4)Is the driveway being repaved? 5)Is different access needed to site other than existing driveway? 6)Is any drainage work being done affecting the right of way,easements, or public property? 7) S} Is a "Revocable Right Of Way Permit" required? A.Is the right of way,easements or public property to be used for staging, parking or fencing? B.If no to SA,is a parking,staging or fencing plan required by Community Development? If you answered yes to any of these questions,a "Public Way Permit"must be obtained. "Public Way Permit"applications may be obtained at the Public Work's office or at Community Development.If you have any questions please call Chariie Davis,the Town of Vail Construction Inspector,at 479-2158. I have read and answered all the above questions. ~fo.f()g.)J dtA550C 1L!z=~=--_tJ;~rY,-L1'~=(1,--",1.=,v~=&",---'f ----!q~I/>I'l,t Job Name Contractor's Sigl\aiure Date •• PUBLIC WORKS PERMIT PROCESS How it relates to Building Permits: 1)Fill out our check list provided with a bUilding permit application. If yes was answered to any of the above que~tion~then a "Public Way"is required.You can pick up an application at either Community Development, located at 75 S.Frontage Road or Public Works,located at 1309 Vail Valley Drive. --2)Notice sign offs for utility companies.All utilities must field verify (locate) respective utilities prior to signing application.Some utility companies require up to a 48 hour notice to schedule a locate. 3)A construction traffic controVstaging plan must be prepared on a separate sheet of paper.An approved site plan may also be used.This plan will show locations of all traffic control devices(signs,cones,etc,.)and the work zone,(area of Construction,Staging,etc ..).This plan will expire on Oct.15th.and will need to be resubmitted for approval through the winter. 4)Sketch of work being performed must be submitted indicating dimensions (length, width &depth of work).This may be drawn on the traffic control plan or a site plan for the job. 5)Submit completed application to the Public Works's office for review.If required, locates will be scheduled for the Town of Vail Electricians and Irrigation crew.The locates take place in the moming but,may require up to 48 hours to perform, 6)The Public Work's Construction Inspector will review the application and approve or disapprove the permit.You will be contacted as to the status and any that may needed.Most permits are released within 48 hours of being received,but please allow up to one week to process. 7)As soon as the permit is processed,a copy will be faxed to Community Development allowing the "Building Permir to be released.Please do not confuse the "Public Way Permit"with a "Building Permit"to do work on a project itself. NOTE: •The above process is for work In a public way only. •Public Way Permits are valid only until November 15th. •A new Public Way Permit Is required each year if work is not complete. 75 Soulh Fromage Road Vail,Colorado 8/657 303-479-2138/479-2/39 FAX 303-479-2452 •• Deparrmenr a/Communiry Development INFORMATION NEEDED WHEN APPLYING FOR A MECHANICAL PERMIT 1.HEAT LOSS CALCULATIONS. 2.TO SCALE FLOOR PLAN OF MECHANICAL ROOM WITH EQUIPMENT DRAWN IN TO SCALE,WITH PHYSICAL DIMENSIONS AND BTU RATINGS OF ALL EQUIPMENT IN MECHANICAL ROOM. 3.SHOW SIZE AND LOCATION OF COMBUSTION AIR DUCTS,FLUES, VENT CONNECTORS AND GAS LINES. 4.NOTE WHETHER ELEVATOR EQUIPMENT WILL ALSO BE INSTALLED IN MECHANICAL ROOM. FAILURE TO PROVIDE THIS INFORMATION WILL DELAY YOUR PERMIT. •• 75 IOUIh frontage road dil.colonda 81657 (303)479-2138 {303)47i-2139 • office of community de¥~opment NOTICE TO CONTRACTORS/OWNER BUILDERS Effective June 20,1991,the Town of Vail Building Department has developed the following procedures to ensure that new construction sites have adequately established proper drainage from building sites along and adjacent to Town of Vail roads or streets. The Town of Vail.Public Works Department will be required to inspect and approve drainage adjacent to Town of Vail roads or streets and the installation of temporary or permanent culverts at access points from the road or street on to the construction site. Such approval must be obtained prior to any request for inspection by the Town of Vail Building Department for footings or temporary electrical or any other inspection.Please call 479-2160 to request an inspection from the Public Works Department.Allow a minimum of 24 hour notice. Also,the Town of Vail Public Works Department will be approving all final drainage and culvert installation with resulting road paLching as necessary.Such approval must be obtained prior to Final Certificate of Occupancy issuance. •• ELECTRICAL PERMIT TOWN OF VAIL 75 S.FRONTAGE ROAD VAIL,CO 81657 970-479-2138 DEPARTMENT OF COM}nrNITY DEVELOPMENT NOTE:THIS PERMIT MUST 8E POSTED ON JOBSITE AT ALL TIMES Permit t:E96-0226 Job Address:870 POTATO PATCH DR Location ...:POTATO PATCH TDWNHOMES Parcel No ..:2101-063-06-047 Project No.:PRJ96-0163 Status ...:ISSUED Applied ..:09/18/1996 Issued ...:09/18/1996 Expires ..:03/17/1997 DR STE 397,VAIL CO 81657 APPLICANT CONTRACTOR OWNER BEST ELECTRIC,THE POBOX 273,EAGLE CO 81631 BEST ELECTRIC,THE POBOX 273,EAGLE CO 81631 POTATO PATCH CLUB CONDO ASSOC IN %VAIL HOME RENTALS,143 E MEADOW Phone: Phone: 3033281610 3033281610 Description:ELEC FOR REPLACEMENT SPA Valuation:650.00 Ele~tric.l-> DRS FIN!-> Invl'$tlgat;on> vill Call-> TOTAL fE£S-> 50.00 .00 .00 3.00 53.00 Total Cllculltl'd Fees---> Additiol"lll Fees----> Total Per.;t Fee--------> payHnU-------> SALAHCE DllE------------> 53.00 .00 53.00 53.00 .00 Item:06000 ELECTRICAL DEPARTMENT Dept:BUILDING Division: 09/18/1996 CHARLIE Action:APPR FOR ERNST CONDITION OF APPROVAL 1.FIELD INSPECTIONS ARE REQ'D TO CHECK FOR CODE COMPLIANCE DECLARATIONS I hereby aekl'lOWledge that I ....ve read this application,filled O\I~in full the ;nforaation required.«MIIpleted an accurate plot plan,and state thet all 'the 1nfor..tion provided es required is correct.I egree to cOliply with the inforlllltion and plot plan, to ca.ply with III Town ordinlnce$and stlt.llws,and to build this structure according to the Town's zoning and $uOdtvision codes,de$ign review approved,Unifor.Building Code and other ordinances 01 th~Town applicabl~thereto. REQUESTS FOR INSPECTIONS SHALL BE HADE TWENTY-FOUR HOURS IN ADVANCE BY TELEPHONE AT 419-2138 OR AT OUR OFFICE FROK 8:00 AM 5:00 P~ ~Z?R WI'?II..,...R~..Ms . SIGNAiir'OF OIlNER OR CONTRACTOR FOR HIMSELF AND O\INER ••**************************************************************** TOWN OF VAIL,COLORADO Statemnt **************************************************************** Statemnt Number:REC-0202 Amount: Payment Method:CK Notation:'16101 53.00 09/18/96 12:51 Init:CD Permit No:E96-0226 Type:B-ELEC ELECTRICAL PER!1IT Parcel No:2101-063-06-047 Site Address:870 POTATO PATCH DR Location:POTATO PATCH TOWNHOMES Total Fees:53.00 This Payment 53.00 Total ALL Pmts:53.00 Balance:.00 **************************************************************** Account Code 01 0000 41313 01 0000 41336 Description ELECTRICAL PERMIT FEES WILL CALL INSPECTION FEE Amount 50.00 3.00 I.•• TOWN OF VAIL 75 S.FRONTAGE ROAD VAIL,CO 81657 970-479-2138 DEPARTMENT OF CO~~NITY DEVELOPMENT PLUMBING PERllIT NOTE:THIS PERMIT t~ST BE POSTED ON JOBSITE AT ALL TIMES Permit #:P96-0148 Job Address:870 POTATO PATCH DR Location ...:POTATO PATCH TOWNHOMES Parcel No ..:2101-063-06-047 Project No.:PRJ96-0163 Status ...:ISSUED Applied ..:09/18/1996 Issued ...:09/1B/1996 Expires ..:03/17/1997 APPLICANT VAIL VALLEY PLUMBING &HEATING Phone:3039497771 POBOX 2048,AVON CO 81620 CONTRACTOR VAIL VALLEY PLUMBING &HEATING Phone:3039497771 POBOX 2048,AVON CO 81620 OWNER POTATO PATCH CLUB CONDO ASSOC IN %VAIL HOME RENTALS,143 E MEADOW DR STE 397,VAIL CO B1657 Description:REPLACE PERMENENT HOT TUB (SPA)Valuation:1,100.00 ********************************************************,t,FEE SUKKARY •••••••******••**********,.,******************••••,*•••*** Plullblng--->30.00 RestUlral'lt P[lIn Re\l;r,:--).00 Toul Calcutat~Fel!s-->40.50 Plan Che,k->7.50 TOTAL fEES >40,50 AdditionaL fees---->.00 Itlvutiglltion>.00 Total Per.it fit >40.50 yHl call---->l.OO Payaents------->40.50 BAlJJfCE DUE >.00***••,************••••••••*.*,.*.*.*,*.*******•••****,*tt.""•••".*••,••,_",*,.,.,.,••••••••,••,._,••,••,.t.,••••••••_•.,.*,••_ Item:05100 BUILDING DEPARn1ENT Dept:BUILDING Division: 09/18/1996 CHARLIE Action:APPR CHARLIE DAVIS CONDITION OF APPROVAL 1.FIELD INSPECTIONS ARE REQ'D TO CHECK FOR CODE COMPLIANCE 2.ALL WORK 11UST COMPLY WITH 1994 UPC ****••••••••111111.111111111111111111111.111.111*".1'"*'*'*"'1'***1*****1***"1****'.**"1*******'**********************11*1*1* DECLARATIONS I hereby actl'lO'llltdge that I have read this application,filltd OUt in full the inforlllltion r~1red,co-pleted an accurate plot plan,.nd SUite that all the inforfllltion provided as required h correct.1 agree to cOIlply with the infor_tion end plot ptan, to cc.ply with .ll Town ordinanclI&.nd st.te laws,and to build this structure eccording to the:TO'Jn's zoning and subdivision codet;,design review approved,unitor.Building Code end other ordinances of the Town applicable thereto. REQUESTS fOR INSPECTIOHS SHALL 6E MADE TVENTY-FOOR HOURS IN ADVANCE 6Y TELEPHONE AT 479-2138 OR AT OUR OFFICE FROft 8:00 All 5:00 PI' SIG:2it ~4R OR C~~:C~R~~H~S[;~~NER I -••*.**.****~****~************************************************* TOWN OF VAIL,COLORADO Statemnt **************************************************************** Statemnt Number:REC-0202 Amount: Payment Method:CK Notation:i16101 40.50 09/18/96 12:50 Init:CD PLUMBING PERMIT 40.50 Permit No: Parcel No: Site Address: Location: This Payment P96-0148 Type:B-PLMB 2101-063-06-047 870 POTATO PATCH DR POTATO PATCH TOWNHOI1ES Total Fees: Total ALL Fmts: Balance: 40.50 40.50 .00 **************************************************************** Account Code 01 0000 41311 01 0000 41332 01 0000 41336 Description PLU}IBING PERMIT FEES PLAN CHECK FEES WILL CALL INSPECTION FEE Amount 30.00 7.50 3.00 ••• )WN OF VAIL ;S.FRONTAGE ROAD \IL,CO 81657 70-479-2138 DEPARTMENT OF COMMUNITY DEVELOPMENT NOTE:THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES ADD/ALT COMM BUILD PERMT Permit #:896-0240 Job Address:870 POTATO PATCH DR Location ...: Parcel No ..:2101-063-06-047 Project No.: Status ...: Applied ..: Issued ... Expires ..: ISSUED 08/15/1996 08/20/1996 02/16/1997 APPLICANT GALLEGOS MASONRY,INC Phone:9709263737 POBOX 99,WOLCOTT,CO 81655 CONTRACTOR GALLEGOS MASONRY,INC Phone:9709263737 POBOX 99,WOLCOTT,CO 81655 OWNER POTATO PATCH CLUB CONDO ASSOC IN ,VAIL HOME RENTALS,143 E MEADOW DR STE 397,VAIL CO 81657 Description: REPLACE COPING STONE AND SIDEWALD AROUND POOL Occupancy:82 Type Construction:VN Type Occupancy: B2 Type V Non-Rated Valuation: Fireplace lnfor.ation:Restricted: 32,015 lIot Gas Appl1lnce,: Add Sq Ft: 1Iof Gas Logs:1I0f Wood/Pallet: ,""tl't".il"aa""."""_"""""."""""'"*,••FEE SU~RY "'l'll""""""""""""""""""""""'""" Building---->37'.00 RestUilrant Plan Reviev->.00 Total Calculated Fees->865.15 Plan Cheek-->241.15 ORB Fee >.00 Additional Fees----->.00 Investigation>.00 Recre~tion fee--------).00 Total Per.it fee )865.15 Yill C~ll---)3.00 Clean-Up Deposit----)250.00 Pay.ents--------)865.15 TOTAL F££5-----)865.15 8ALANCE DUE----).00 ~**'I •••'I•••""••IIII ••"".'.III'••"•••••••••,"""""".".",.,.,•••••",••,••""".""."""""*""""*"*'*"* Item:05100 BUILDING DEPARTMENT Dept:BUILDING Division: 08/15/1996 CHARLIE Action:APPR Itim:05400 PLANNING DEPARTMENT Dept:PLANNING Division: 08 15/1996 CHARLIE Action:APPR N/A Itim:05600 FIRE DEPARTMENT Dept:FIRE Division: 08 15/1996 CHARLIE Action:APPR N/A Item:05500 PUBLIC WORKS Dept:PUB WORK Division: 08/15/1996 CHARLIE Action:APPR N/A See Page 2 of this Document for any conditions that may apply to this permit. DECLARATIONS 1 hereby acknowledge that I have read this application,filled out in full the infor.etion required,coapleted an accurate plot plan,and state that all the inforlation provided a.required is ocrrect.I agr~to cc.ply with the inforaation and plot plan, to comply with all Town ordinance.and state laws,and to build this structure according to the Town'.zoning and subdivision codes,design review approved,Unifor.Building Code and other ordinances 01 the Town applicable thereto. REOUESTS FOR INSPECTIONS SHAUL BE ftADE ~ENTY-FOUR HOURS IN ADVANCE BY TELEPHONE AT 4 Send Clean-Up Deposit To: •• ~***********************************••******************-,•••,.""---*.,.,,._- CONDITIONS Permit ,:B96-0240 as of 08/20/96 Status:ISSUED ~******************************************************._.*-***-------*-***-*-* Permit Type:ADD/ALT COMM BUILD PERMT Applicant:GALLEGOS MASONRY,INC 9709263737 Job Address: Location: Parcel No:2101-063-06-047 Description: REPLACE COPING STONE AND SIDEWALD AROUND POOL Applied:08/15/1996 Issued:08/20/1996 To Expire:02/16/1997 Conditions: 1.FIELD INSPECTIONS ARE REQUIRED TO CHECK FOR CODE COMPLIANCE. "..,************************************************************** JWN OF VAIL,COLORADO Statemnt ~************************************************************** itatemnt Number:REC-0186 Amount: Payment Method:CHECK Notation:15975 865.15 08/20/96 09:55 Init:ALM 865.15 865.15 .00 ADD/ALT COMM BUILD PA-COl-1M DR Total Fees: Total ALL Pmts: Balance: 865.15 B96-0240 Type: 2101-063-06-047 870 POTATO PATCH Permit No: Parcel No: Site Address: This Payment ~*****************************************************.******** Account Code 01 0000 41310 01 0000 41332 01 0000 22002 01 0000 41336 Description BUILDING PERMIT FEES PLAN CHECK FEES CLEANUP DEPOSITS WILL CALL INSPECTION FEE Amount 371.00 241.15 250.00 3.00 · **Concact Eagle County Assess~Office , %at 970-318-8640 for'Parcel Ii.TOWN OF VAIL CONSTRUCTIO PARCEL p,;l.fQ/-063 -0(,-0'/7 PERMIT APPLICATION FORM DATE:_ PERNIT .:-- APPLICATION MUST BE FILLED OUT COMPLETELY OR IT MAY NOT BE ACCEPTED~•••••••••••••••••••••••••••••PERMIT INFORMATION •••••~••••••••••••••••:::•••• [l-Building C)<l-PIWllbing t;><J-Electrical [l-Mechan~cal [)<iI-Other MI./, Job Name:~/Itrz:«&1-Job Address:~fiEJJ '5/Vurr>@"JJ£.KvtO Legal Description:Lot Block Filing SUBDIVISION'Form /'Ar!/lC4J/2 Owners Name:<;p""""ff>rL}j ~ddress:ttk~~Ph.t/76-~;}?I Architect:ike-It ~~O'b ~dress'vN3~(YJ~'()~~7 Ph.,_ General Description:~PEZ:.&,<!QFt~~/Mr ~ Work Class:[~New [v1-Alteration [l-Additional ~-Repair [l-other'_ Number of Dwelling Units:Number of Accommodation Units: * mber and Type of Fireplaces:Gas Appliances Gas Logs Wood/Pellet pesq,-OilS *****************.*.****•••******VALUATIONS ****••••****.****•••••*.**••••*.* £)'4>-.,;l.~Ce #. BUILDING:$ELECTRICAL:$6$'"OTHER:$!££Twt:-0Zti!~ PLUMBING:$/rt6D MECHANICAL:$TOTAL:$W'''c:)n X 1>9(;,-01'(*••••••**~******••***••••*CONTRACTOR INFORMATION .*.******.*.*****•••***•••* eneral Contractor~kN;flu~~.Town of Vail Reg.NO.Itj9~ Address:i054t S,Cn~_,;V;;;;IJ.€'&JJ¥.wQ 1'125"?Phone Number:9702G!4 ·X,,? Electrical Contractor:~~.~Town of vail Reg.NO.{Ol E Address:Pc>·80";>13 ?9l"~S/6JI Phone Number:'-{"JI-0610 ,[l8-P Plumbing co?tractor:\/0/}}1,'/4;;.elur 4"'Jj Town of Vail Reg.NO.,>,.,~Q)t Address:@.60'1£'2<)48 _VL «(Lgo Phone Number:t7l.ftf-JJJI Mechanical Contractor: Address: ******************************** BUILDING PERMIT FEE: PLUMBING PERMIT FEE: MECHANICAL PERMIT FEE: ELECTRICAL FEE: OTHER TYPE OF FEE: ORB FEE: Town of Vail Reg.NO._ Phone Number: FOR OFFICE USE ******************************* BUILDING PLAN CHECK FEE: PLUMBING PLAN CHECK FEE: MECHANICAL PLAN CHECK FEE: RECREATION FEE: CLEAN-UP DEPOSIT: TOTAL PERMIT FEES: TYPE GROUP SQ.FT.VALUATION BUILDING: SIGNATURE: ZONING: SIGNATURE: Comments :_ • town of vai 75 south lronlage road vail,colorado 81657 (303)479-21.38 or 479-2139 • office of community development TO: FROM: DATE: SUBJECT: ALL CONTRACTORS CURRENTLYL REGISTERED WITH THE TOWN OF VAIL TOWN OF VAIL PUBLIC WORKS/COMMUNITY DEVELOPMENT MARCH 16,1988 CONSTRUCTION PARKING &MATERIAL STORAGE In summary,Ordinance No.6 states that it is unlawful for any person to litter,track or deposit any soil,rock,sand,debris or material,including trash dumpsters,portable toilets and workmen vehicles upon any street,sidewalk,alley or public place or any portion thereof.The right-at-way on all Town of Vail streets and roads is approximately 5 ft.off pavement. This ordinance will be strictly enforced by the Town of Vail Public Works Department.Persons found violating this ordinance will be given a 24 hour written notice to remove said material. In the event the person so notified does not comply with the notice within the 24 hour time specified,the Public Works Department will remove said material at the expense of person notified.The provisions of this ordinance shall not be applicable to construction,maintenance or repair projects of any street or alley or any utilities in the right-a-way. To review Ordinance No.6 in full,please stop by the Town of Vail Building Department to obtain a copy.Thank you for your cooperation on this matter. Read and acknowledged by: )l _ ~osition/RelationshiP ~Date to Project (i.e.contractor,owner) • 75 south Iron~ge road vail,colorado 81657 (303)479-2138 or 479-2139 • office 0'community development BUILDING PERI·aT ISSUANCE TIME FRAIIE If this permit requires a Town of Vail Fire Department Approval, Engineer··s (Public Works)review and approval,a Planning Department review or Health Department review,and a review by the Building Department.the estimated time for a total review may take as long as three weeks. All commercial [large or small)and all multi-famfly permits will have to follow the above mentioned maximum requirements.Residential and small projects should take a lesser amount of time.However,if residenttal or smaller projects impact the various above mentioned departments with regard to necessary review,these projects may also take the three week period. Every attempt will be made by this department to expedite this . pCl-mH as soon as possible. I.the undersigned.understand the plan check procedure and time frame. j!Agreed to by. )!prOject Name )C.oa te Work. COrmluni ty Sheet was turned into the Devel(l~~~t Department. .'•MEMORANDUM • TO: FROM: DATE: RE: ALL CONTRACTORS TOWN OF VAIL PUBLIC WORKS DEPARTMENT MAY 9,1994 WHEN A "PUBLIC WAY PERMIT'IS REQUIRED Job Name:~&tdJ <1ue.bot- Date:~17 Please asWet1he following questionnaire regarding the need for a "Public Way Permit": 1)Is this a new residence? 2)Is demolition work being performed that requires the use of the right of way,easements or public property? 3) 4) 5) Is any utility work needed? Is the driveway being repaved? Is different access needed to sije other than existing driveway?x 6)Is any drainage work being done affecting the right of way,easements, or public property? 7)Is a "Revocable Right Of Way Permit" required? 8)A.Is the right of way,easements or public property to be used for staging, parking or fencing? B.If no to 8A.is a parking,staging or fencing plan required by Community Development? If you answered yes to any of these questions,a "Public Way Permit"must be obtained. "Public Way Permit"applications may be obtained at the Public Work's office or at Community Development.If you have any questions please call Charlie Davis,the Town of Vail Construction Inspector,at 479-2158. I have read and answered all the above questions. Job Name Contractors Signature Date •• PUBLIC WORKS PERMIT PROCESS How it relates to Building Permits: 1)Fill out our check list provided with a building permit application. If yes was answered to any of the above questions then a "Public Way"is required.You can pick up an application at either Community Oevelopment, located at 75 S.Frontage Road or Public Works,iocated at 1309 Vail Valley Drive. 2)Notice sign offs for utility companies.All utilities must field verify (locate) respective utilities prior to signing application.Some utility companies require up to a 48 hour notice to schedule a locate. 3)A construction traffic controVstaging plan must be prepared on a separate sheet of paper.An approved site plan may aiso be used.This plan will show locations of all traffic control devices(signs,cones,etc ..)and the work zone,(area of Construction,Staging,etc ..).This plan will expire on Oct.15th.and will need to be resubmitted for approval through the winter. 4)Sketch of work being performed must be submitted indicating dimensions (length, width &depth of work).This may be drawn on the traffic control plan or a site pian for the job. 5)Submit completed application to the Public Works's office for review.If required, locates will be scheduled for the Town of Vail Electricians and Irrigation crew.The locates take place in the morning but,may require up to 48 hours to perform. 6)The Public Work's Construction Inspector will review the application and approve or disapprove the permit.You will be contacted as to the status and any that may needed.Most permits are released within 48 hours of being received,but please allow up to one week to process. 7)As soon as the permit is processed,a copy will be faxed to Community Development allowing the "Building Permit"to be released.Please do not confuse the "Public Way Permit"with a "Building Permit"to do work on a project itself. NOTE: •The above.process is for work in a public way only. •Public Way Permits are valid only until November 15th. •A new Public Way Permit is required each year if work is not complete. c6pway ~....'::="TOWN OF VAll 75 SouTh Frolllagt!Road Vail.Colorado 81657 303-479-2138/479-2139 FAX 303-479-2452 •• Deparrmenr n/Cnmmun;ry De\Ie/o"mem INFORMATION NEEDED WHEN APPLYING FOR A MECHANICAL PERMIT 1.HEAT LOSS CALCULATIONS. 2.TO SCALE FLOOR PLAN OF MECHANICAL ROOM WITH EQUIPMENT DRAWN IN TO SCALE,WITH PHYSICAL DIMENSIONS AND BTU RATINGS OF ALL EQUIPMENT IN MECHANICAL ROOM. 3.SHOW SIZE AND LOCATION OF COMBUSTION AIR DUCTS,FLUES, VENT CONNECTORS AND GAS LINES. 4.NOTE WHETHER ELEVATOR EQUIPMENT WILL ALSO BE INSTALLED IN MECHANICAL ROOM. FAILURE TO PROVIDE THIS INFORMATION WILL DELAY YOUR PERMIT. • town of vai 7S south frontage roMt v",c~81657 (303)47&-2138 (303)47&-2139 • office of community development NOTICE TO CONTRACTORS/OWNER BUILDERS Effective June 20,1991,the Town of Vail Building Department has developed the following procedures to ensure that new construction sites have adequately established proper drainage from building sites along and adjacent to Town of Vail roads or streets. The Town of Vail Public Works Department will be required to inspect and approve drainage adjacent to Town of Vail roads or streets and the installation of temporary or permanent culverts at access points from the road or street on to the construction site. Such approval must be obtained prior to any request for inspection by the Town of Vail Building Department for footings or temporary electrical or any other inspect.ion.Please call 479-2160 to request.an inspect.ion from the Public Wo=ks Department.Allow a minimum 0:24 hour notice. Also,the Town of Vail Public Works Depa~tment will be approving all final drainage and culvert installation with resulting road pat.ching as necessary.Such approval must be obtained prior to Fjnal Certificate of Occupancy issuance. TOWN OF VAIL,rGL9RADO 08:03 REQUFSTS FOR INSPECT I IN WORK SHEETS FOR.6/13/97 -, I •IlEPT1306/13/97 ••PAr,E AREAl <4 ( ..Rctlvlty:E9&-022&&/13/97 Type.B-rLEC St.tU~1 ISSUED Constrl AClM Addre ••:870 POTATO PATCH DR Parcel:2101-0&3-06-047 Dec:Use • ..ID~5crlptlon:ELEC FOR REPLACEMENT SPAI~ppl1C nt:BEST ELECTRIC,THE Phonel ~033281G10 Dwrer;POTATO PATCH CLUB CONDO A sor IN Phone: •ontra tOt:BEST ELECTRIC,THE Phonel 3032281&10 Ar'PROVED APPROVED Phone.471-0&10 Action:APPR A t i on I APPR --------------- n"OY"lllat 'Ion ••••• Co~nents:jacuzzI nd pool be Inspected...A~;;J Coalllents .:;?~THae Exp c."""<,",.'G",G,"/'~.=-;;;,.L'--_ ]tell : Ite.: He.: apet t lOTI Reque~t;I•I Requ ••to",;LouisIRe~Ti~e:08:~0 l Ite.!!'equested to •00190 ELEC-Fina1 I ·1 --I- ~1~~'P~~:~~~:~:~::~~E~~~:::~-:::::----------~-;:;=9-;;---~~----------- .,Itell.00120 ELEC-Rough 0q/20/96 Inspector':EG Itelll:00130 ELEC-Condl it Ite.:00140 ELEC-M15C. OS/27/97 In,pector:EG 00190 ELEC-Fln&l 002c4 FIRE-ALAPM ROUGH 00538 FIRE-FINAL C/O • • • • ••• ~,~J E/~ohf~~A ;p~, - • • •~ •TOwN rlF VA I L.cr :~7 REGUr~TS FOR IN~~~(TluN WORK )RA(l SHEET •• PAC AREA. C III III _=a 896 0240 6/1&/97 TYP~I A (~MM 870 POTATO PATC~R ltatu I t..,SLoEO Constr I A 1M PPctl P\:QJ t Info ....tian ••••. R9~YP t ,r:r M P~on~:47G-22)1 neq TI.e;08:00 Co ••ent~:c ubhous. I It ••......eq1.le5t~d tu be Inspf'ctl!'d...Act lon (.o_'IIe"t.TIe EKp --------_._--------~~~:::::::-==-- tn_pectlon History ••••• ItpM:00010 BLDG-Footings/Steel Itl!'~:00020 BLDG-Foundation/Steel OS/21/97 Jn5pecto~:EG A~tibn:APPR slab around pool It ••:00030 BLDG-Fra"lng It ••,00070 BLDG-Misc. Ite~1 00090 BLDG-Final Ite ••00540 BLDG-Fin.1 C/O /12/97 Inspector.OS A tl0n:ON ELECTRIC FINAL NOT DON •• _===~===_=_=.=c_•• R PTl I 0t 16 970 .<7 REQu"ST [ PRe AREA. Co .t ;ACar., use: 1 DeL' PhQn~:1039497771 hone PhonR 0 94q7771 (loiN OF VAIL,I Ol QRADO FuR r )ECTIOr-;wORK SHEETC F'lR:&/te. y:J:96-0148 6/1b/q7 Type:B-PLMB ••870 POTATO PATCH DR •POTATO FA (H TOWNHOMES •'01-063 0b-041 I RE~LACE PE~MENENT HOT TUB P.pA' VAIL VALLEY PLUMBING &HEATING r POTATO PATCH CLUB CONDO ASSOC IN f ~fIL VALLEY PLUMBING &HEl·ING I=Ict 1 Y1 Add 0<a @ r ~1 Appll C'wnE" antI'" • r"§pe~tlon Request Infor.tl0n .••.. Requestor":TO~1 Phone:4 7 62Zl..1 eq Tt.eJ 08:00 Con~8nt5:clubhouse Ite~s requested to be In$pectpd ...Action Comments 00290 PLMB .r-ina 1 I Illf>Fxp - In~pecti n History .•... It ••r 00250 PLMB-Pool/Hot Tub 09/20/96 Inspector:CF Ite.0029~PLMB-Flnal 00/11/97 Inspector:DS Acotlonl APPR 10p~~.1t~t.~t Actlont APPR APPPQVED PLANS ATTACHEDNOTE-copy OF PERMIT TO BE KEPT ON JOBSITE TE IN ON JUNE 30 1992,DA ,005561~,PERMIT NO. o "IIWlI III 1.TVPE OF CONSTRUCTION I II III IV V department of community development 2 OCCUPANCY GROUP ABEHIRM BUILDING 4,000 DIVISION 1220134 Z ELECTRICAL 2,000 TO BE FILLED OUT COMPLETELY PAIOR TO ISSUANCE OF PERMIT 0 "GENER"l OESCRIPTIONOFWORK:•PlUMBING 5,000TYPEOFPERMITKITCHENALTERATIONANDPOWDERROOM~ ~ ADDITION.•MECHANICAL~BUILDING ~PLUMBING > ~ELECTRICAL o FOUNDATION TOTAL 11 ,000oMECHANICALo950REDSANOSTONEDTYPEGROUPGRFAVALUATIONPERMITFEES .__~EGAL LOTUNIT #41 BL"V R-I 0 11,000 BUILDING PERMIT .» -DESC FlUNG POTATO PATCH CLUB PlAN CHECK 101 JOB NAME:EVERSHADE REHDOEL ELECTRICAL 50 OWNER NAME PAUL EVERSBADE NEW(I ALTERATION lUi A00lT10NAl (I REPAIR ()PlUMBING $75 I $19 '4133--<J'-2334 UNDERWOOD~\ON,IX DWELLING UNITS __ACCOMw)OATIONUNITS __MECHANICAl t4CITYPHHEIO"lT1"1 rr __,,"0 ""REPLACES --RECREATION FEE DAVID PEEL --l) ARCHITECT FIRM INSULATION TYPE TH'CKN~R-VALlUE DEStGN REVIEW BOARD () E=bBOX1202FLOOR -1 NONE - CLEAN UP DEPOSIT 100 "MAIL ADDRESS CITY VAIL ""476-4506 ~W"'LLS USE TAX ~~TIHBERWOLF ENTERPRISES '00'IFIRM~~GENERAL 193-B TYPE ELEC GA,TOTAL PERMIT FEES $500CONTRACTORTOWNQFVAILREG.NO.OF 926-2070 HEAT SOLAR WOOO CHUCK FELDMANN JULY 6.1992TELE. ADDlTtONAL PERMITS NEEDED'UIU)ING OFFICIAC ------D"Aff -----FIRM SHEARON ELECTRIC ElECTRICAL 121-E !~lNtTlAl MIKE MOLLICA JULY 2.1992 TOWN OF VAll REG.NO.X ~--------------CONTRACTOR '"949-6456 ST CUT ONING ADMINISTRATOR DATE T LEo 8LASliNG A ONING &BUilDING NOTES.BLACK DIAMOND MECH.- fIRM PARKING X PLUMBING 1l6-P -TOWN Of VAil REG,NO,XCONTRACTORDEMO THE 845-9717 FIRM I hereby acknowledge that I have read this application.filled out In fuJI the information required. MECHANICAL completed an accurate plot plan,and state that all the information provided as required is correct.I CONTRACTOR TOWN Of VAll REG.NO.agree to comply with the information and pial plan,to comply with all Town ordinances and state T~I ~.laws,and to build this structure according to the Town's zoning and subdivision codes,design review approved,Umform Building Code and other ;ii,nr:!!;the Town applicable thereto. OTHER FIRM CLEAN UP TO:TIMBERWOLF ENTERP.'/1 ), TOWN OF VA.ll REG NO PO BOX 3625 ~~ONATUAE Of OWNER OR CONTRACTOR FOR HIMSELF CONTRACTOR TElE.VAIL.CO BI65B A 0 THE OWNER ~~CONSTRUCTION PERMIT ,01 - PERMITFEES MECHANICAL BUILDING PERMIT MECHANICAl PlAN CHECK. PlUMBING ELECTRICAl. RECREATION FEE tzONING &BUll~rNG NOTES:_ TOTAL PERMITFEES :::-f)0 - "'J U"J'_'1...,2-~U'"iiDJNGOFEtCIAC ------'lfATt -r---- 1--!Ut!J~__7:...-2:.H,..._ DNINGAOMINISTRATOR DATE VALUATION GAS WOOD G,R.E.A. __NO.flnEPLACES ELEC.I -"'...'...AA---- GROUPTYPE II If""I DWELlINGUNlTS __...ccoMN()(),ATtONUNITS __ DeMO Sf CUT ADDITIONAL PERMITS NEEDED: 1. TYPE OF HEAT BlASTING PAnKING HEIOtn IN rT. INSULATlONi"_--'-""....:.-THICKNESS A·VAlLUE IN,..,'"bJP1l.~./i},..v{:::;Al~I1 1 1 1-..::..:~E:::..:~-Au:::..:D::E::PD.:.::S1..:T---+_..:O""'O"'-~--""---l''''' NEW (I AI..TERATION ()<l ADDITIONAll )REPAIR ()OWNER JOB NAME,-R"IIfJJd~1 ".u<#1>.1 ~NOTE -"0 •R,FiP\fM 'BE KEPT ON JOBSITE ..',':".,CONSTRUCTION PE~'R~M=IT_~DA~TE:,:===~_-,,::::;54)I I PERMIT NO.---"'=-:::"'-'---.:-Ift I til 1.1YPEOFCONSTRUCTlON I II III IV~l..oIr..,.,...,......,-,......,.-------:-....,----~ ,department of community development 2.OCCUPANCY CROUP ABE tll RM BUILDING ~200 "-I 'J ""-J DIVISION '12 2a 3.Z ELECTRICAl /iO<l ~C}) CEHE~oeSCR!fl.ION OF WORK:,Ktk ~~~>'h;-P::lU::":::.::IN::G=--l-..3..,...~OO~O ....c<,,-:..:,):::..:"_".., ,_....I.H7.LII;ff!.~~~'!'!"'.".."__.<_""'jL_I_P:.",,"•.Lt~,,-~JZ,,--..-,..--"---II~'j~~L!"''''',*,,''';£''L",''''-'.-'''11 , ARCHITECT FIB"tM.:d e«/ MAIL ADDRESS ;JO(J1..0 L. MAIl NlpRESS 233'1 tk-,J,.A ANd Cl#"p,~·r~a..P1r"!-._)lt< TYPE OF PERMIT o BUILDING 0 PLUMBINGoELECTRICAL0FOUNDATION ADD.Q;S~EC¢'.~~IC~<__.1 1'.1 LEGAL LOT BLK (;",,1#'11 ESC.FlUNG 1'0149 fl,kJ.(!vb GENERAL FIB"zu"6,,,,,"',{E"""v"';<; CONTRACTOR tOWN OF VAll REG.NO./53 & THE.';2-'-2070 TO BE FILLED OUTCOMPlElELY PRIOR TO ISSUANCE OF PERMIT ( ~I,",u tftoe.J 4-'J~,,' PLUMBING ITOWN n<u ...•,n un \\\\) CONTRACTOR ._ TELE f''I'f"-171/ ,MECHANICAL FIRM \CONTRACTOR ~TQIlW""Nj,O"'F..lV"'A'"",j""'''GL..oN''O'_.-----·1 THE. OTHER ~Fl"R""--·I' lIOIl_!!!!.lOI!F..lV!l.A"'",j."""G....oN!I<O....II CONTRACTOR TELE. I hereby acknowledge thai t have read this application,filled oul In lull the Information required, completed an accurate plot plan,and slate thai ailihe Information provIded as required is correct I agree to comply with the inlormation and plot plan,to comply with all Town ordinances and state Jaws,and to build this structure according to t;h~eTown's zoning and sub<fivlslon codes.design review approved,Uniform Building Code a~.n~dother or i~~ce;of the Town applicable therelo. CLEAN UP DEPOSIT TO,r £.-r L _ p;';J&t..vtlf ~,4/S~J ·~"G"N:..A~TU::B..:'~O..:F"O~W=.N~'~B-O~"~C~O-N~TRA~C~T~O~B-F~OR~~H~''''~S~'-lJ' ANO THE OWNER. 6.000 WORKSHEET ATTACHED PERMIT FEES BUILDING z ELECTRICAl0 ~PLUMBING"~<MECHANICAl> TOTAL VALUATION 122834 G R.FA. DIVISION GROUPTY'" GENERAL DESCRIPTION OF WORK:==0-::::-==0--UREMOVALOFEXISTINGBUILDUPROOF REAPPLY 4 PLY TYPE BUILD UP ROOF. ~NOTE -COPY OF PERMIT TO BE KEPT ON JOBSITE .'....CONSTRUCTION PEI""R_M_IT_---.:O~A~TE~IN=JUN=E=.:4'.:,1:.::,99:.:2....... PERMIT NO.__0=-0=-5=.5.::....:..0-,-1_ tin I til 1.TYPE OF CONSTRUCTION I II III I V v I...,.,==="'T------..,...".,,.,,..-----, department of community development 2.OCCUPANCY GROUP ABE H IR M 6 J 000 .. TO BE FILLED OUT COMPLETELY PRIOR TO ISSUANCE OF PERMIT TYPE OF PERMIT I)g<BUILDING 0 PLUMBINGoELECTRICAL0FOUNDATIONoMECHANICAL~50 REO SANDSTONE LEGAL LOT unu",BL":-K-=-=-__-1 DESC.FILING POTATO PATCH CLUB 6,000 BUILOING PERMIT PLAN CHECK 105 68 ELECTRICAL FIRM FIRM ARCHITECT I ,,""8,,"<-1 C~~~~:~~~R TOWN OF VAIL REG.NO. ITEl•. PlUMBING MECHANICAl ONING &BUILDINQ NOTES:=,,=c----.="'==,--_H SEE ATTACHED MEMO FOR ADDITIONAL NOTES. x x x x ACCOf,lM()()ATION UNITS __ PARKING DEMO ST.CUT ADDITIONAL PERMITS NEEDED: :!.....!! OWELLING UNITS BLASTING ~ ~ ""EIGHT IN FT __NO FIREPLACES RECREATION FEE ::"-"'==:.------;=_---;;;==-----,==~.-===='-------+--------1.....0iNSULATIONTYPETHICKNESSR-VALLUE •DESIGN REVIEW BOARD ~'S::-==:.::;:----=-'---T----'-'==,-c==---1----=--=-'--"-----"-----'---'---'----+-------,----1....'-ll _"_O_""__t--+t-I----'C"LE:...:..H--'-":..P--'O:.:.:..PO,,~'_'_T__+----l-O-O------i~, EXT WALLS _NONE _---a-_":..:S.:.ET__AX -t +" ROOF q."'TY"'P~.-..b-EL-EC--..b~F-GASdb~~~TOTAL PERMITFEES $273 ~(~ OF HEAT SOl.AFl WOOD DAN STANEK JUNE 4.1992 UQOING OFFICIAL ------trAff ----- _l!.0 LLANNER _ =ONING ADMINISTRATOR -OATE---- NEW (,AI.TERATION II ADDITIONAl ()REPAlF«J{) PH.C'TY MAIL ADD8ESS ELECTRICAL ONTRACTOR TOWN OF VAIL REG NO. TELE. ElBl'l!....:A::C:;E:....:R::oo=F::IN::'G:....:C::O".-T•.,;rIN"'C..·'---1GENERAL12J-S CONTRACTOR TOWN OF VAil REO.NO. TEl•.945-5366 fiRM C~~CT~~~~;~TOWN OF VAil REa,NO. TELE. OTHER ",,"'."=-_ TOWN OF VAIL REG.NO. CONTRACTOR TElE. I hereby acknowledge that I have read this application,filled out In full the information required, completed an accurate plot plan,and state that all the information proVided as required is correct.I agree to comply with the information and plot ptan.to comply with all Town ordinances and state laws,and to build this structure according to the Town's zoning and subdivision codes,design review approved.Uniform Building Code and other ordinances of the T~n applicable th~reto. CLEAN UP TO:ACE ROOFING CO 7:::..~c:?..d>-~ PO BOX 276 SIGNATU OF OWNER OR CONTRACTOR FOR HIMSelF GLENWOOD SPRS.CO B160tNOTHE WNER. PLANS ATTACHED PERMIT NO._---'O'-'O'-'5'--1_9---'2=___ 50 95 62 PERMIT FEES eUILOING PERMIT ELECTRICAl PlAN CHECK BUILDING z ElECTRICAL0 ~PLUMBING~ ~<MECHANICAl> VALUATION 4,700 x x o GRF A. R GROUPTYPE ST CUT Bl.ASTING ~9NING &BUILOING NOTES:===,,===__ X -----FIELD INSPECTION REQUIRED FOR CODE PARKING---------t--x-I-~-ILC:::O::MP=LI::AN=CE=."'-_ DEMO .. HEAT =SOl.AR ~w~oo~o~~~~_DAN STANEK 11/1/91 ADOlTlONAL PERMITS NEEDED eUIiOING OFFICIAL ------'DAfE ----- !.~INtTlAL MARY DEWING 11/1/91 ~NINGADMINi'STRATOR-----o;TE---- -------- DIVISION I2 2a 34 GENERAL DESCRIPTION OF WORK REMOVE EXISTING SPA AND EXTEND DECK FOR NEW PORTABLE SPA. v POOL I 267-B o PLUMBING C FOUNOATIONo VAIL CITY FIRM MAXIMUM COMFORT FIRM FIRM DOUBLE DIAMOND SERVICE 134-B MAIL ADDRESS ~BUILOING ~ELECTRICALoMECHANICAL TYPE OF PERMIT ARCHITECT ElECTRICAL ONTRACTOR TOWN Of VAll REG.NO. TELE.476-6272 PLUMBING CONTRACTOR TOWN OF VAll REG,NO, TElE. GENERAL CONTRACTOR TOWN OF VAIL REG NO TELE.949-6339 TO BE FILLED OUT COMPLETELY PRIOR TO ISSUANCEOFPEAMIT LEGAL LOT UNIT 118 BLK I OESC.FILING POTATO PATCH CLUB coNIi.JOB NAME:GLENN DECK &SPA OWNER NAME JOHN &ANNIE GLEaN __Lt"~E~W~,,-,,,-,A,,LT;.:E,,R;;AT;.;';;,O";;.>.'X1Q"'<>..;A::O:;O;,;IT;.:'O;;;":;;A;;.':.'..''-'R;.:E;;,P;;AI;;R,;,I..,:.'II-.:.Pl:U:":::8:'":::G=---+-i L MAllAOpRESS 7802 EAGLE RIDGE ~~~ELlINGUNlTS .o.ccOMMOOATIO"OUNITS __MECHANICAL rfJ ~ CITY BETHESDAIlf.MD PH ~~HTINFT -=-NO F'PEPl.ACES RECREA,TlONFEE In ~ fiRM DAVID KARK PEEL ~~LA'!.'~~_.'!y'!'~THICKNESS R·VAl.l.UE DESlGNREV1EWBQARD 20 _ PO BOX 1202 "OOA " 6-4506 EXT WA.t.t.S ----:NO-NE-::-It-_C_LE_A_"_U_P_o_E_PO_~_T__~r-__..l"O"O _j~ ---+----1 ----USE TAX (1\ ROO'II----------+-------_j<-- II-T-O-T-A-L-PE..R-M-,..T-F-EE-S-+--:$.....,3::':2~7.....,---l~ FIRM MECHANICAL CONTRACTOR TOWN OF VAIL REG.NO. TELlO. OTHER "",,n""-_ TOWN QF 'VAIL REG NO CONTRACTOR TELE. I hereby acknowledge that I have read this application,IlIled out In full the 'nlormation required, completed an accurate plOI plan,and state that all the information provided as required is correct.I agree 10 comply With Ihe information and plot plan,to comply with all Town ordinances and state laws,and to build this structure according 10 the Town's zoning and subdivision codes,design review approved,Umform Building Code an~O'herordl~anTown applicable thereto. CLEAN UP TO:fvll\XlM.UM U>MH<-r ---- IOOL'SDA ~ I I I I I II II IIII .II.....-z..<..(Pb SIGNATURE OF OWNER OR CONTRACTOR FOR HIMSELF~21'~,....:Iff",A.ND THE OWNER~------_--I -- - / / / ,,,,,D II II 'vVE5T E.LlV/\TION UNIT 2S • ::',II //"II //"I 1/I l : I I"II /"II /"I I //I I III',11L ~k )1 1/I I I L L====~~=.===::I_l_J I Ir-------, I I I I I I I I I I I I I I I I I I I •• , ~ J I I J I=' i ;:I kJ I III ~I II •.J*':I L.------~~k.'9 L-___________L __.-=-c~-----_____L ~-'"~,,-'- ~.111 3i~, ~I . ::!ll!: 50UTH ELEVATION UNIT 25 Ff\OFOSED . .::::. ----;) ------------ r ( DEC~-'I\S~'ft<~U~IT25 ,-,).Y;p:~'"~y JE;"TH.,-----------..:....------..:...---------:·~7 ", J- f!I. UNIT 25 / u • I I II~~:::,;IJ I IR I I~ I [ I I UNIT 26 • Validity or Permil Sec.303 (c)1002 UB C. The ~suance or granting of a permit or approval of plans and spec Ications shall nol tie construed to he iJ permit for,or an appr val of.any violatilln of any 01 Ihc p"oYlsions of this code o~"I ';il'l olr,:lr or(li'lanco 01 tt,s jUf!Sclcation.The issuance 01 z r.~-.,it uased ul1~n p!;ms sj;cclli~tir:n!l a'lD other data ,,:tK.1l r.'.'e<vent the bclilo;ng o'fiCial frtlx !:-:eieaiter requl(ll'lg the C.'tl:)n of errors in sa,d plans.speclhcatioilS and other :~'q J)/~,,/\('~~ lown of Vall Community Development - Plan ;::Health Fire Appr ,ad t{0 0 Deni d 0 0 0 0 " Ff\OFOSED .- --' ,1 ,- \......".p ;'0 ~ \"""LJ\..--, \'-YJ \ I,~',,, I I::l(.",...~~L':=_==:;;::r-=====.:,.....==-CIt~. .-.'-~.q.;o •1 1 '~,,.,,\•I ,4- -,.;>,I j\,',~..'......... UNIT 25 .I • UNIT 26 Town of Vall Community .Development -PI an ~Heanh Fire pproved '-¢-0 0 enled 0 0 0 0 Validity of Permit Sec.303 (e)1982 U.S.C. hI?Issuance or granting of a permIt or approval of pransJ-r:~llications shall not be construed to be a permit for,or 'DrQva!Of.any violation of any of the provisions of this of any olher ordinance 01 the Jurisdlcation The issuanc~ ;,oermll based upon plans.spe~rficatJon:";,nd other data s ~I n •~~.e"enl the bUilding olfitlal from thereafter reqwrlng I c 'n.el'on of errors in said plans,Specifications and othl d !...!==;-;J rlLtt6L \I~~~I IR I I~ I I I I • o TE. , .. , • - JI~ I ~ ;:=~ ::!.1-t-...Jt.J f- IIii III ~i :L..------~#-9J L ____________L ____~-----_____L ,.-. ,_....,,-" cP~ ~~~.Y . . 50UTH ElEVATION UNIT 25 • • - • -- ,,,,, ::'\.i I /""II //"II/I :r I I"I.//"II /"I I/I1 III'\1k::.~lL ":::.I I //I I I L L===='>J iL=-==::='-J J I Ir-------, I I I I I I I I I I I I I I I 1 I I I • D II II • 'vVE5T E.LE..V/\TION UNIT 25 - , TOP OF WtlJ 2<1>DEC"'N," '"ToP OF e~T"'.D.C~I~ :loo~0 'e "I t:r!NEltAl.NOT'S!lo: I.Ace oUl<FUHI"G,t-l.K~ek'Are WOu-«1J1ZI1O ~OUioLA$FIt.• t.c~c Itl if.S4AU.tiA~28 ~~y OM,t.e'S"StlVE ·5ru.""..,....0 ,.Fo""~ATlo"DHI;;IJ BA~e.ON A,5:MRo ~=r"f Bf,UlIJ<,( -4-.tEIN.F~t"N'"'tEiL.I!:I c;,JtAD~4'. S.0:;:(.1o.!L.o,,::::'5:LL:IDOp.';O~:IC ~~f CJ.5::aJ"f "LL TO~~tl-AND "1I!'~AN;c.~A-e:!:IA!'"FJUU-....&E'N~~l.AB TG A~~~v"'T~b~Io.~It.:~MA~~EI,.,t..AS "'U FlED 6y ~\".s l!Eg. .. KRM CONSULTANTS.INC. structural engineering and des~gn P.O.Box 4572.Veil.CO 81658 •(303)949-9391 •FAX 949~1577•• . 'I.'f T>i~V'f>OcT~~, @ 3!..0 To ~}(,ST".~I 2,.\:0 e~61!JOI$T UZII UZlt·Z U2.IO VZIO .2, "-, ,\ r---_rJ------ , -'I._ ,~-----.J 11 11 1 I 1I 1 I II II 11 Ii 1II t"""lr--.+J __lJ_-l..J (1)-2.<" (2.).2.1<11 (,)-Z"1'2. (2.)-:<"'Z o o FI'" • ()-.i' • I, /Z}------,.",,,-..-.,---,...,.-"-=,0".,....'-'--··0. c.. • I I it---E'i<STG,.STUD /$iIXCIJ 1--=,2."'II"",,,---.!)<,!'-t ""V"",.,.loIAU- eLlA.1t t I I III--------Tl 'I II "ol.li~ColoJCjlt£':'E'A~"'ll<J~T_~.r;!:'t::.r.:,I (:~;~~l..~'T'of EJ(~T". !lEYON C>1-NEW S,PA -,I :..L":J'-~~__t::'I i L II T,-::,'- ~.~>)Killl~'o~ ~r--.''..,,'":.II.•~....==-<!",I ,,:--,'.~....•'0';.,II"r"··Ill; <:.•~•I.'...'...'....'_'••lo."n.ol~'C!if C rtJOi'-i--o'Q,:;)0 •0 i',.'~J;7-.J2 t ••:!'l'.·.,I'!!l n............~,.•"••o:•••••••••:•••:>•••,•••'.,.........~.'".,,..,••--=;-~T ....::...AB I •.••-'.r ..;1111 70 F.O~R ::-'~';"ran llui 1'J8.]lth CONt-J!~'T-~TO :-...~:';G.l-IW't'!i~TEtoO NOTE -COPY OF PERMIT TO BE KEPT ON JOB$ITE PLANS ATTACHED 1"ON NOV 13.1919CONSTRUCTIONPERMIT ·.. IIII~DATE 005228PERMITNO. I.TYPE OF CONSTRUCTION I II III IV V department of community development 2 OCCUPANCY GROUP ABEHIRM BUILDING !2.0uu DIVISION 122aJ4 z ELECTRICAL 3.000 TO BE FILLED OUT COMPLETELY PRIOR TO ISSUANCE OF PERMIT a ~GENERAl DESCRIPTION OF WORK :<PlUMBING 4.500TYPEOFPERMITBATHROOMADEITIONTOEXISTINGRESIn.~•<MECHANICAL~BUILOING IJ!lCPLUMBING > ~ELECTRICAL o FOUNDATION TOTAL 19.500oMECHANICALl;!so RED SANDSTONE RD TYPE GROUP GRF A VALUATION PERMIT FEES LEGAL LOT BI.V R-3 0 19.500 BUILDING PERMtT 245 ;;;::: OESC.FILING ~"'~~'\.'\-PLANCHECK 159 ~~~BNAME:::>JOHANSEN BATH ADDITION ElECTRICAL 54 OWNER NAME JOHANSEN --NEW')ALTERATION (M ADDITIONAl ()REPAIR ()PLUMBING $8/$17 #41334 MAil AppRESS :~TATO PATCH PHASE I MECHANICALOWELL1NGUNlTS__ACCOMUOOATIONUMTS __ CITY VAIL PN.HEIGI"lTINFT "to fiRePlACES --RECREATION FEE - ARCHITECT FIRM MORTER ARCH.INSULATION "....THICKNESS R-VAlLlIE DESIGN REVIEW BOARD 143 W.MEADOW DR FLOOR 1NONEJ CLEAN·UP DEPOSIT ,nn ~MAli APORESS VAIL PH.6-5105 EXT WALLS USE TAX ~C'TY - DUDDY-VIELE CONST.ROO':=t=- FIRM "GENERAL 188-A TYPE ELEC J GAS SCONTRACTORTOWNOFVAILREG.NO.a'--TOTAL PERMIT FEES $643 TEL'476-3082 so,,"WOODHEAT DAN STANEK NOV 15,1991 HUNT ELECTRIC ADDITIONAL PERMITS NEEDEO'BUILDING OFFICIAL ------DATE ----- FIRM LECTRICAL 125-E ~1<INITI"L NO PLANNER--cc---------TOWN OF VAil REa.NO.x ------NTRACTOR 949-3291 ST CUT OMING ADMINISTRATOR DATE TELE.BLASTING X ZONING l BUilDING NOTES: fiRM LUNSFORD MECH.PARKING XPLUMBING133-PTOWNOFVAilREG.NO. CONTRACTOR DEMO X TELE.242-5790 FIRM LUNSFORD MEeH.I hereby acknowledge that I have read this application,titled out in full the information required, MECHANICAL 121-~completed an accurate plot plan,and state that all the information provided as required is correct.I CONTRACTOR IOWN OF VAil AEG.NO.agree to comply with the information and plot plan.to comply with all Town ordinances and state242-5790 laws.and '0 bu;ld Ih;."'uc)u,e accord;ng to the To;n·7~1.y;ubd;Vt!J codes.des;gnTELE.review approved,Uniform Building Code and o~~i~an s the ~?.A ~ble thereto. OTHER FIRM CLEAN UP TO:D.VC-."".~ TOWN OF VAIL AEG.NO.I IIII II IIII I SIGNATUR_~.OF_~NEA OR Cd!1TAACTOA FOA HIMSELF CONTRACTOR TElE.AND THE OWNER NOTE -COPY OF PERMIT TO BE KEPT ON JOBSITE 8-10-89~CONSTRUCTION PERMIT,DATE PERMIT NO.0040 12-, 1111 nl 1.TYPE OF CONSTRUCTION t UIIIIV '0 department of community development 2.OCCUPANCY GROUP ABEH''''''BUILDING DIVISION 1122,34 z ELECTRICAL TO BE FILLED OUT COMPlETELV PAIOATO ISSUANCE OF PERMIT ~GENERAL OESCRIPTIONOFWDRK:Re-roof of PLUMBINGTYPEOFPERMIT900sq.ft.re use gravel ~ ~ 0 BUILDING 0 PLUMBING re use metal ~MECHANICAl 0 ELECTRICAL 0 FOUNDATION Re Roof 2000.00 0 MECHANICAL ~Re-Roof TYP,GROUP G.R.FA VALUATION PERMITFEES lEGAL lOT Bl"V R-I BUILDING PERMIT 45.00 C~ OESC.FILING PLAN CHECK 23.00 ~JOB NAME:Potato'Patch 021 ELECTRICAL OWNER NAME Scott NEW()ALTERATION ()ADDITIONAL ()REPAIR(X)PlUMBING 337 MAil AOpRESS Potatoe Patch DWELLING UNITS __ACCOMMOOATIONUNITS __MECHANICAl 81to~CITY VAil PH.HEIOHTtNFT __NO.FIREPLACES --RECREATION FEE ARCHITECT fiRM INSULATION:mE THICKNESS A-X.\LLUE DESIGN REVIEW BOARD JfFLOOR.\11/'MAIL ADDRESS CLEAN·UP DEPOSIT 100,00 EXT.WALLS "•.A USE TAXC'TY PH. ROOF B/UD ,.I)'" GENERAL FIRM Mountain Top Roofing TYPE ELfC."y ,tr GAS CONTRACTOR TOWN OF VAIL REG,NO.OF TOTAL PERMITFEES 16B.00 T"LE.32B-5442 SOeAR I'WOODHEAT Joe Norris B/IO/89 FIRM ADDITIONAL PERMITS NEEDED;UIlOING OFFICIAl-------DATe ----- ELECTRICAL "-"-INITIAL 1----------TOWN Of VAIL REG.NO.-----CONTRACTOR ST.CUT DHING ADMINISTRATOR DATE TELE.BLASTING OHlNG &BUILDING NOTES: FIRM PAAKING PLUMBING TOWN OF VAIL REG,NO.MATCH EXISTING CONTRACTOR DEMO ITOI< FIRM I hereby acknowledge that I have read this application,filled out in full the information required, MECHANICAL completed an accurate plot plan,and state that all the information provided as required is correct.I TOWN OF VAIL REG.NO,agree to comply with the information and plot plan,to comply with all Town ordinances and stateCONTRACTORlaws,and to build this structure according to the Town's zoning and subdivision codes,design.TELE. OTHER FIRM review approved,Uniform Building Code and oth~ce.of the Town epplicable thereto. .&~ TQWN QF VAIL REG.NO. 0.SIGNATURE OF OWNER OR CONTRACTOR FOR HIMSELF CONTRACTOR TELE.AND THE OWNER. NOTE -COPY OF PERMIT TO BE KEPT ON JOBSITE JAN.11,1990CONSTRUCTIONPERMIT .~~DATE 004267PERMITNO. nit"1.TYPE OF CONSTRUCTION IIIIIIIVV rtment of community development 2.OCCUPANCY CROUP ABEHIRM BUILDING 10 000 z ELECTRICAL 2,000 TO BE FILLED OUT COMPLETELY PRIOR TO ISSUANCE OF PERMIT DIVISION 12 2a 3 4 ~GENERAL DESCRIPTION OF WORK;CHANGE OUT PLUMBING TYPE OF PERMIT GARAGE DOOR &MAIN DOOR ON BOTH "~ 0 BUILDING 0 PLUMBING GARAGE LEVELS.~MECHANICAL 0 ELECTRICAL 0 FOUNDATION 12.000 0 MECHANICAL 0 VALUATION PERMIT FEESTYPEGROUPG.R.F.A. ~lEGAl lOT Bl"II IHR B-1 12,000 BUILDING PERMIT 135 t;r.f: DESC.FILING 180 S.FRONTAGE ROAD PLAN CHECK 88 r;&r11 JOB NAME:ELECTRICAL -44 M~VAIL NATIONAL BANK BASEMENT OWNER NAME VAIL NATIONAL BANK NEW ()AllERATlON ornx ADDITIONAL ()REPAIR ()PlUMBING 1~& MAIL ADDRESS OWElUNGUNITS __ACCOMMOOATIONUNITS __MECHANICAL 61ML VAIL PH.HEIOHT IN FT.__NO.FIREPLACeS --RECREATION FEE ~INSULATION:mE ,KNESS R-VAlLUEARCHITECTFIRM DESIGN REVIEW BOARD FlOOA \MAll ADDRESS CLEAN-UP DEPOSIT 100 YoEXT.WALLS -No E -\USE TAXenvPH..A ROOF [~r-..1.$1GENERALfiRMSHAEFFERElIfSHXHEXHU1H \,/;.g\129-B TIPE ELEC. SCONTRACTORTOWNOFYAILREO.NO.OF I~OOO TOTAL PERMIT FEES 367.00 TELE 845-5656 HEAT SOL~(\j'JOE NORRIS JAN.ll,1990 FIRM NEW ELECTRIC AOOITIONAL PERWEEDEl v liuliDINGOFFICIAL ------DATE ----- lECTRICAL 1l0-E !i INITIAL I--_BETSY_R:-__AIIN.15,1999 __ TOWN QF YAIL REG.NO.ST.CUT \\-X - CONTRACTOR I""949 4651 ONING ADMINISTRATOR --DATE--- BLASTING \l X tz;ONING &.BUILDING NOTES: FIRM PARKING XPLUMBINGTOWNOFYAILREG.NO.XCONTRACTORDEMO TELE. FIRM I hereby acknowledge that I have read this application,tilled out In futl the Information required, MECHANICAL completed an accurate plot plan,and state that all the information provided as required is correct.r CONTRACTOR TOWN Of VAIL REG,NO,agree to comply with the information and plot plan,to comply with all Town ordinances and state TELE. taws,and to build this structure according to the Town's zoning and sub<:tlvision codes,design review approved,Uniform Building Code and ot~nanc of ~Iethereto. OTHER FIRM CLEAN UP TO:t1 C..-,,_~S'#~.aR.'"'"~ TOWN Of VAIL R!G.NO.IIIIIIIIIIII/'O f30.37;'SIGNATURE Of OWNER OR CONTRACTOR FOR HIMSELF CONTRACTOR TE;LE.l/1PFc.GO ;:;-/~r57 AND THE OWNER. /S1.~ PEnt.I~;FEES OUllOIIIG I'E 11M.r NfIIlCllECI( r-!.!!:.E CIIOUP G J1.F A.VMUIIIIOll .245.00 I.~··'':','i :;.<f\.",,"--:~(' i'"-,~.>.,~ Imomil . clClI:lltlllr.llt 01 r.nllllllllllitv ,1r.Vl!lnl'lI1ll,'1 .....,'L[~Sr.riLL UUI\IIII[HE lHE (~)WInKS AIlE! 10 lIE fIllED OU'CO,APlE'El 't pmon TO ISSU,I\UCEOF PEnMl T 111'E or:I'EIIIAlf ~UllUIln;fJ rLU"'U111a I.J rU:CIIIlCAl I~FO.VNOATION_-;:;:iU~'::,:'E1C~"iA~"I=C::AL='~q~=~::~c!':!~'~'':='~.=.~t",J~X LEGAL LO r OtK .c::: OESC.II1IHG 1----------------...._---------_... '. " lICCII(AIIOII fEE EL[CIIUClIl rlUl.llllllG ""ECIII\IIIClIl ZOt~lNO"BUILDING NOlES:_ 'QHUlG tlOlAitllSlllAIOn "~I'/Ulll I " I hClt'by "c~"oVllcdg~IImt I have lO:lfl this :Jppllcallon.lillcd aul In lull Ihe illlorr1\:\lion Icquirr.d, cOlnplcltlcJ an nccUf;)lr.11101 pl<\lI.\lmJ 51hlo \h",tllllhc IlIlolll1aliollllJOvidcd as ,elluircd is cOllcc1.l· OIIICC 10 complv wilh Ihe InlUllllillioll ;\IId plol plall,10 cOlllply willi nil TaWil Qlllj";lnCC5 end slale laws,lind to huild this slrllel",.,accoHJing 10 Ihe TO .....I1·s ZOn,"lgy..n<.l:$Ub~~(JiVi~011 codes.design '..,eview approved.Unll,otln Building Coda and othe~~d~n~'t 01 he 70~0 2'="'~le Iherelo. .XX _'il:.r~//'~.:/A~Jt~~.~c,.~~=-=== SfGf'AlUI~.rO;:o,"mEn on CONtnACTOI\,on IUMSEU' AllO TIlE OWN(n. Dll\SIltIO-'------1--1---11----------- ST.CUT--'-'----1--1-- III 'GIn nIt r "c.:::=Si~~,,=o,=,~,nfu"~'~.C~'~'~E~~=iiiSULA i io~!.:I H'E 11 iiCKNr.SS n·YAllUE llf;SICIIII(VI(W UO/utO "o~1=."I-C:::."::::"::..:'"::..':::0'::..:'0:.::":..'__I_~/l.!I!J~c~..:::4b=--_1;a:----.-----II·~"::S::E:.:T::':X:'-I I ~i;:c :~~~:._..1 :::0 T~i~LPE~-;;=-rE-E-s---I--l.J>~",~~~~,":()O:-:~-1 , ,'L,~./L/r--~~- ADOlf/ONAl PEnMITS NEEDED:'IUll'tUlGOffiCIAl OA E 1. rl\nKlIlO--'-----1--1--11 _ D£MQ1.;-..~;;;;iU;~;:.;;;;;;;;;.:;;,;;.;;it;;_=;;-1,-;;;;.'~.;;;;;;;;_;;;;.-;;;;;;;;;JIl.,____I~_..~..--...U.....".............DZ.u:...........,,,....._ b QWElUtlOUflllS _ACCOlo\t.l00AIIONUlllIS_ rll. /,I1\J1J!OI)!l[SS ellY ....'-''1'"'' \ row"Of VAIL nEO.tm, r,OllII1I\C1QIl ICU'. 004831 2,000 4,000 PERMIT FEES PERMIT NO._ TOTAL BUILOING MECHANICAL VALUATION ItlllllVV ABEHJRM IN ON APR 23,1991 GRFA NOTE -COPY OF PERMIT TO BE KEPT ON JOBSITE DATE GROUPTYPE 1.TYPE OF CONSTRUCTION 2 OCCUPANCY GROUP DIVISION 1 2 23 34 z ELECTRICAL 1,000 •g J-----I-------~1"0~0~0"-------f GENERAL DESCRIPTION OF WORK :-""",,,,,,,..,,,,,,,,,dl PLUMBING •ADD BATHROOM OFF OF EXISTING BBDROOM 3 1----+-------------1 UPSTAIRS AREA CURRENTLY USED FOR ~ SITTING ROOM. CONSTRUCTION PERMITr---~~~~~".7~;(,-, lOll Of 1I11lY department of community development TO BE FILLED OUTCOMPLETElY PAIOATO ISSUANCE OF PERMIT TYPE OF PERMIT xOCJ BUILDING OOtPLUMBING xi]ELECTRICAL 0 FOUNDATION D MECHANICAL n~9'50 RED SANDSTONE RD 28 57 44 10 BUILDING PERMIT PLUMBING MECHANICAL ELECTRJCAL PLAN CHECK 4,000 ACCOMMODAllON UNITS __ R-3V-N DWELLING UNITS NEW ()ALTERATION DOl ADDITIONAL (l REPAIR (I ~OB NAME:LARRAGAIN RESIn.REMOOEL -__f OWNER NAME LARRAGAIN___ POTATO PATCH CLUB MAIL ADDRESS W EGAl LOT BlK DESC.FILING POTATO PATCH CLUB CIIY VAIL PH.6-9466 HEIGHIINFT NO.FiREPLACES RECREATION FEE RON AST PLUBMING FIRM ----DATE 4/30/91 -DATE ONING &BUILDING NOTES:_ TOTAL PERMIT FEES MICHAEL WHITAKER BUILDING OFFICIAL --- INITIALN x X X X GAS WOODSOLAR ELEC DEMO Sf CUT PARKING ROOf ADDITIONAL PERMITS NEEDED., ~IN=S=U=l=A~T1=OcrN'------'='~'~'-,----"~H='C~KNESS R·VALLUE DESIGN REVIEW BOARD b CLEAN·UPDEPOSIT 100 NONE_-_I~~USE TAX BLASTING TYPE OF HEAT FLOOR EXT WAllS 121-E PH. SHEARON ELECTRIC FIRM fIRM CITY MAIL ADDRESS ARCHITECT LECTRICAl ON TRACTOR TOWN OF ....All REG.NO. 949-6456 TElE. C;~~~AB~~~R TOWN OF VAIL REG.NO. THE. fiRM KLAHR CONST..INC. GENERAL 135-B CONTRACTOR "T~0~W~N~0"",F~V~A~IL;,R~E7G~."N~0~._ 328-1614 TELE. SIGNATURE OF OWNER OR CONTRACTOR FOR HIMSELF AND THE OWNER. fiRM MECHANICAL CONTRACTOR TOWN QF VAIL REG.NO TElE. OTHER 1""'"0:"'------------1 TOWN OF VAIL REG.NO. CONTRACTOR TElE I hereby acknowledge that I have read this application,filled out in full the information required, completed an accurate plot plan,and state that all the information provided as required is correct.I agree to comply with the information and plot plan,to comply with all Town ordinances and state laws,and to build this structure according to the Town's zoning and subdivj.sion codes,design review approved,Uniform Building Code and othe~or'nces of Tp-L7 cable Ihereto~ CLEAN UP TO:__ 1II1I1I11I1 -- ·- OATE 73 PERMIT NO. BUILDING MECHANICAL TOTAL PER ~TFj'ES ONINO a BUILDING NOTES:_ ~elECTRICAL ~'5c::x:> ~I-PL"U_"_8_'N_O_I-\l"I..\,,/91.::IO::.:::VC--, ~ ~".Y ~li"uiiofN~dFFICIAt ::CNINGADMINISTRATOR -- wooe GAS I II III fI)j) A.B EH Il!!lM NOTE -COpy OF PERMIT TO BE KEPT ON JOBSITE DATE RfLD APR 231991 ELEC. SOLAR 1.TVPE OF CONSTRUCTION 2.OCCUPANCY GROUP PARKING OEMO ST.CUT BLASTING ADDITIONAL PERMITS NEEDED: 1- TYPE OF HEAT CONSTRUCTION PERMIT~..:...-~~~~11~'o..\\" deplh",crnt of community development "PU ,,-\,\:'\.~l'- ~;~~R~~~~TOWN OF VAIL REG.NO.\a.\-e- TElE,"N'1-(.A 5(" "••v.".,0...1,-'Vl \. PlUMBING CONTRACTOR TOWN OF VAIL REG.NO. nL· TOBEFILLEOOUTCOMPLETELYPAIORTOISSUANCEOFPERMIT DIVISION 12 bt;p4 ~ TY""10F PERMIT ~G'N"ALD'SC"pjIONOFWORil':~P ~:ul7:.!=~=-'.:.~of,.\,.p>-"",\-:!b~;'>"~ BUILDING [::T PLUMBING 0...-\ L!ELECTRICAL 0 ~O~NOATION \","~\~ib,=.!o(~_'_....a~__..l!>~~~'~~""':~·__=lI...Lh',:,::Ol.,.~\_.L.:QW?~""I.2l:,bO::....---. ~0 MECHANICAL ~\)~"\c-,~\\'"'h ,..TYPE GROUP OR.FA VALUATION PERMIT FEES LEGAL LOT ''''~\WI ~\:JI.::1·-1~!-j~R.~-~"'+---=-t2~~+--~~~~~~IO~-11_"!8U~Il:"D~IN~G~P'~.~.,~T__+-~<;'~'-7~ OESC,FILINlYv/i)~ro \f~~'1 PLAHCH'CK Z OB NAME:l ,-,,''\).1---+----+---+-----U-"EL"""CT"."'<C"'AL"----+------7.',+~-j ~......,b.;u....e:-~~w~~~~~8:1]~~~LW~~:L~~~~~~====C=====:1~~~OWNER NAME l~~......j YQ,\:)~few()ALTERATION (AODlTIONAlI l REPAIR ()PLUMBING 10 MAil AOpRESS OWELUNGUNITS __ACCOMMQOATIONUNITS__MECHANICAL ClTY\I9rl,\to PH.t.\l"-C\I.\l..CP HEIGI~TINFT.__NO.FIREPLACES RECREATION FEE 'I ARCHITECT ~tDt.l \---\/~~:~ATIONI:TYPE I THICKNESS I ~-VAlLUE 1f--:=:~:E~S:::::::NU~·p:.:'::::~::':~:.:./_RO_+-----~f-,I'Q~,"~ /\CITY PH.:::;AllS f----USE TAX )Q ,GENERAL "pu ¥J.i\1W..{'"~----I..C CONTRACTOR TOWN OF VAIL REO.NO. TElE.:>;}.~-\\,.\<.\ I hereby acknowledge that I have read this application,filled out In full the Information required, completed an accurate plot plan,and slate that all the Information provided as required Is correct., agree to comply with the information and plot plan,10 comply with all Town ordinances and state laws,and to build this structure according to the Town's zoning and subdivision codes,design review approved,Uniform Building Code and other~2w@.ble thereto. 'I IGNATURE OF OWNER OR CONTRACTOR FOR HIMSELF~ND THE OWNER. .'"U '\.I' OTHER t/MECHANICAL TnWN n<vJ;;-...n vn "CONTRACTOR NF v Il eN. TELl:.I 04522 NOTE -COPY OF PERMIT TO BE KEPT ON JOBSITE XHK r.16 1990CONSTRUCTIONPERMIT,,,DATE ,All ,• "PERMIT NO .., 1.1.I ,al I,TYPE OF CONSTRUCTION I II III IV V department of community development 2.OCCUPANCY GROUP A6EHIRM BUILDING DIVISION z ELECTRICAL 900TOBEFILLEDOUTCOMPLETELYPAIOATOISSUANCEOFPERMIT122<134 0 GENERAL DESCRIPTION OF WORK:~PLUMBINGTYPEOFPERMITTEMPORARYSERVICEANDJOBTRAILER~ "o BUILDING 0 PLUMBING HOOKUP.BY ORIVE xx.AT 770 POTATO ~MECHANICAL lCl ELECTRICAL 0 FOUNDATION PATCH.o MECHANICAL 0 TVPf GROUP GRF A.VALUATION PERMIT FEES _EGAL LOT b BLK BUILDING PERMIT ~~;DESC.FILING POTATO PATCH PLAN CHECK JOB NAME:POTATO PATCH CLUB ELECTRICAL 44 ~OWNER NAME SHAPIRO REALTY NEWt )....LTERATION (X»{ADOITIONAL ()REPAIR ()PLUMBING PO DRAWER 5490 MAIL ADDRESS DWELLING UNITS __ACCOMMODATIONUNITS __MECHANICAL CITY AVON 9-7979 ItPH,HElGHTIN FT __NO.FIREPLACES --RECREATION FEE ARCHITECT fiRM INSULATION,TYPE THICKNESS A·VALLUE DESIGN REVIEW BOARD FLOOR ClEAN·UPDEPOSITMAILADDRESS EXT WALLS USE TAXCITVPH,'NO ,.JaROOF ...- GENERAL FIRM "WITYPEELECc"TOTAL PERMIT FEES $44,00CONTRACTORTOWNOFyAllREG.NO.OF THE, SOLAR WOODHEAT ERNST GLATZLE __~UQ"_1I...J9~0__ fIRM BRYANT ELECTRIC ADDITIONAL PERMITS NEEDED:~UILDING OfFICIAL ---DATE ELECTRICAL ,"-~150-E - toNING ADMINISTRATOR -TOWN OF yAll REG,NO,--------CONTRACTOR ST.CUT X DATE TELE.949-4155 BLASTING X ONING &BUILDING NOTES: FIRM PARKING XPLUMBINGTOWNOFVAILREGNO. CONTRACTOR OEMO v TELE. FIRM I hereby acknowledge that I have read this application,filled out in full the information reqUired, MECHANICAL completed an accurate plot plan.and state that all the information provided as required is correct.I TOWN OF VAil REG,NO.agree to comply with the information and plot plan.to comply with all Town ordinances and stateCONTRACTORlaws,and to build this structure according to the Town's zoning and subdivision codes,designTELE.review approved,Uniform Building Code and other ordina:/~of the Town apPlica.h'ereto. OTHER FIRM ~H""~,", TOWN OF VAil REG.NO_SIGNA"'TURE OF OWNER OR CONTRACTOR FOR HIMSELF CONTRACTOR TElE.AND THE OWNER. PRO EeT 0~CONSTRUCTION PERMIT ~ ,DATE J N On520--PERMIT NO .••11l1ll1V~Ima Ial I TYPE OF CONSTRUCTION department of community development Z OCCUPANCvGROUP A 6E H If)M BUILDING ~Cl 3 000 PIVISION (j}2 2.3 " z ELECTRICAl "/0 0000TyPEOFPERMIT GENERAL DESCRIPTION OF WORK:~""IS-OC>O -IDUILDING ~UMBING <PLUMatNG~ f ~~CTRICAl D FOUNDATION ONLY S l.Jn;UI,rl~MECHANICAL -<;;- .'MECHANICAL 0 LEGAL LOT BLK TYPE GROUP SQ FT VALUATION PERMITFEES?I -/ DESC.FILING II I~-I 10<;'0 ~S'/S ()()()BUILDING PERMIT /.'i'O.~-0 DB NAME:~7~-'r;J.;:;j .3 7T It-/I LI'IIJ .5 &-!J,,;;;PlAN CHECK 'W -<S,.2S OWNER I tJLUtO J)UA/~-'J"'£elECTRICAL J~.~S' MAll ADpRESS A PLUMBING .r.;~O.OC/ CITv PH NEwfXI ALTERATION {)ADDITIONAL (I REPAIR I I MECHANICAl --ARCHITECT FIRu c-dd.,feN ~~;".:0:::...DWElL:'NG UNITS __ACCOMMODATION UNITS RECREATION feE /b 3 2.,,:?S' MAl!AOgREss C.R.FA./(?~"~'EOROO"S DESIGN REVIEW BOARD .:20C:>"'0 CITV PH,COMMERCIAL S'/'ST __RESTAURANT SEATING CLEAN·UP DEPOSIT £/0"00 1 )nl/~.f.I h'de - 1"0"HEIGHT IN FT __IMTHTUB/SHOWERGENERAL, CONTRACTOR MAil ADDRESS NO FIREPLACES __NO TOILETS TOTAL PERMIT FEES IK ~f'lX.S-~ orv ••caVfREO PARKING __UNCOVERED PARKING ~4./;(. FIRM BUILDING OFFICIAL ------frAn.----- .~ECTRICAL NTRACTOR MAIL ADDRESS INSULATION :----------- orv ONING ADMINISTRATOR DATE P"TVPE THICKNESS R·VALUE FIRM FLOOR Kt.-kJ/ONING NOTES' PLUMBING MAIL AQDRESS 81'f-/CONTRACTOR EXT WALLS orv ."ROOF 1,--/2-30 FIRM HEATMECHANICAL CONTRACTOR MAil AQDRESS ELEe 'X\GAS' my PH /'ltl.MI.II\,1,."NII"I.LUtOl:1u ...r 111.,\'1 SOLAR WOOD Mt....U flll:>...rrl.ICA T'''S ...NU H ,\1L 111 ...r Till OTHER FIRM /t?,..s!i'/J<.-AM""I;.S (UMM ...·1 ...sn A(iMLr 1"I·u"r••'· VAIL WATER &SAN OIST TAP FEE ......TII ...1.1.THWN OIlIlI"...NI"''''''III ~l\l' MAil ADDRESS I........S kl .....III'I.,..C 111'11.1111"'"U'N~lMt'III'" SPECIAL NOTES CONTRACTOR CITY PH ""..-'Y ....",,""...~t ","~r "",.. NO PLANSNOTE-COPY OF PERMIT TO BE KEPT ON JOBSITE IN ON SEP 9 1992CONSTRUCTIONPERMIT,'!\DATE , 005693"PERMIT NO.1.1111 illflY'1.TYPE OF CONSTRUCTION I II III IV' department of community development 2.OCCUPANCY GROUP ABEHIRM BUILDING DIVISION z elECTRICAL TO BE fiLLED OUT COMPLETELY PAIOR TO ISSUANCE OF PERMIT 122a34 0 GENERAl DESCRIPTION OF WORK :~PLUMBING 1,000TYPEOFPERMITINSTALLGASLOGINTOWOODBURmING:> ~ FIREPLACE.~ 0 BUILDING ~PLUMBING >MECHANICAL 0 ELECTRICAL o FOUNDATION 0 MECHANICAL ~O POTATO PATCH DR TYPE GROUP G.R.F.A.VALUATION PERMIT FEES LEGAL LOT UNIT E Bl"V R1 D 1.000 BUILDING PERMIT ~ESC.FILING 7),+,;"P..+-CLCA"'"PLAN CHECK, 08 NAME:WILLIAMS FIREPLACE CONVERlia;elECTRICAL OWNER NAME ED WILLIAMS NEW()ALTERATION (ADDITIONAL ()REPAIR ()PLUMBING FEES WAIVED MAIL ADDRESS OWELLINGUNIT$__ACCOMMODATION UNITS __MECHANICAL CITY VAIL 476-4311 RECREATION FEEPH.HEIGHT INFl __NO FIREPLACES -- ARCHITECT fiRM INSULATION:TYPE THICKNESS Fl-VALlUe DESIGN REVIEW BOARD fLOOR CLEAN-UP DEPOSITMAILADDRESS EXT WALLS -N NE - CITY PH.use TAX FRISCO FIREPLACE ROOF GENERAL FIRM TYPE ELEe.G"CONTRACTOR TOWN OF VAll REG.NO.IDI-M TOTAL PERMIT FEES FEES WAIVEDOF 668-3760 HEAT SOLAR WOOD CHUCK FELDKANN SEP 19,1992TELE. BUlLOINGOFFICIAl --~---'C)A'fE----- FIRM ADDITIONAL PERMITS NEEDED: LECTRICAL ,N INITIAL 10 PLANNER-It 1----------TOWN OF VAIL REG.NO.------NTRACTOR ST.CUT ONING ADMINISTRATOR DATe TELE.BLASTING X OHING &BUILDING NOTES: FIRM FIELD INSPECTION RE VIRED FOR CODEPARKINGXPLUMBINGCOMPLIANCE. CONTRACTOR TOWN OF VAIL REG.NO.OEMO v THE FIRM I hereby acknowledge that J have read this application,filled out in fuillhe Information required, MECHANICAL completed an accurate plot plan,and state that all the information provided as required is correct.I CONTRACTOR TOWN OF VAIL REG.NO.agree to comply with the information and plot plan.to comply wilh all Town ordinances and state T~L~.laws,and to build this structure according to the Town's ~'1I~:~d subdivision codes,design review approved,Uniform Building Code and otherrr.di,nj.J es of th Town appllcable thereto. OTHER FIRM .(1'>01 "0 TOWN OF VAIL REG.NO.SIGNATURE OF OW'Fl("R OR CONTRACTOR FOR HIMSELF CONTRACTOR TELE.AND THE OWNER. NO PLANSNOTE-copy OF PERMIT TO BE KEPT ON JOB$ITE IN ON NOV 20,1992•~CONSTRUCTION PERMIT,DATE 005854" IIIII III ,-PERMIT NO. 1.TYPE OF CONSTRUCTION 111111 IV V department of community development 2.OCCUPANCY GROUP ABEHIRM BUILDING DIVISION I2 2.1 34 z ELECTRICAl TO BE FILLED OUT COMPLETELY PAIOATO ISSUANCE OF PERMIT 0 GENERAL DESCRIPTION OF WORK:~PlUMBINGTYPEOFPERMITINSTALLVERMONTCASTINGSRADIANCE~ ~ GAS STOVE.•MECHANICAl.2.000oBUILOINGoPLUMBING> o ELECTRICAL o FOUNOATION E9'MECHANICAL f;C34 BIGHORN ROAD TY'"GROUP G A.FA VALUATION PERMIT FEES ~GAL LOT 1 BL"V R-3 0 2 000 BUILDING PERMIT ESC.FILING BIGHORN SUBDIVISION PUN CHECK JOB NAME:STOUT GAS STOVE ELECTRICAL OWNER NAMEGEORGIA STOUT NEW()At TERATIONXXI ADDITIONAl ()REPAIR ()PLUMBING MAIL ADDRESS 4034 BIGHORN ROAD "'ECHANIC~OWELlINQUNITS __ACCOMMOOATfONUNITS __FEES WAIVED CITY VAIL ....479-9155 HElGHTIN FT __NO FIREPLACES --RECREATION FEE INSULATION.ARCHITECT FIRM "...THICKNESS R-VALlUE DESIGN REVIEW BOARD FLOOR CLEAN·UP DEPOSITMAILAppRESS EXT WALLS NONE - CITY .....USE TAX 'OOF GENERAL fIRM TYP,ElEC GAS TOTAL PERMIT FEES FEES WAIVEDCONTRACTORTOWNOFVAILREG.NO.OF TFIF.SO<AP WOOD CHUCK FLEDMANN NOV 23.1992HEAT ADDITIONAL PERMITS NEEDED.U1LD1NG OFFICIAL ------irAff:----- fiRM NO PLANNERlECTRICAL,N INITIAL TOWN OF VAIL BEG.NO.X 1----------------ONTRACTOR ST.CUT ONING ADMINISTRATOR OATE TELE.BLASTING X ONING &BUILDING NOTES: fIRM PARKING X PLUMBING TOWN OF VAil REG.NO, CONTRACTOR DEMO X ITEL,. fiRM FRISCO FIREPLACE &STOV I hereby acknowledge that I have read this application,filled out in full the Information required, MECHANICAL TOWN Of VAI~fIl4Q.101-M completed an accurate plot plan,and state that all the information provided as required is correct.I CONTRACTOR agree to comply with the information and plot plan.to comply with all Town ordinances and state ITEL,666-3760 laws,and to bu'ld thl,structura accord'ng 10 t~~'ZO~J2t!"d subdi,is'on codes,das.gn OTHER FIRM review approved,Uniform Building Code and other 0 "'l~es 'A~::own a:;;:a:;.;::o.y:',,~ TOWN QF vAll BEG.NO.~~A~~OWNER OR CONTflACTOA FOR HIMSELF CONTRACTOR TElE.DTH w ER. NOTE -COPY OF PERMIT TO BE KEPT ON JOBSITE AUGUST 27 1993-,DATE •6286..PERMIT NO .••1m I iii I TYPE OF CONSTRUCTION I II III IV V department of community development 2 OCCUPANCY GROUP ABEHIRM BUILDING 4000.00 DIVISION 122a34 z ELECTRICAL 1000.00TOBEFILLEDOUTCOMPlETELIfPAIQRTOtSSUANCEOFPERMIT0 "GENERAL DESCRIPTION OF WORK:<PLUMBINGTYPEOFPERMITADDITIONOFDUMBWAITERINKITCHEN.~ ~< [,BUILDING 0 PLUMBING >MECHANICAL C ELECTRICAL o FOUNOATION 5000.00 C MECHANICAL Ga DUHllWAITER TYPE GROUP GRfA VALUATION PERMIT FEES LEGAL lOT &BlK V 1RR R1 BUILDING PERMIT ""(,",.,OESC.FILING PLAN CHECK &2.00 JOB NAME'VAIL POTATO PATCH UiU ELECTRICAL 50.00 OWNER NAMESll~IRO REAlIY NEW!,ALTERATION ('lOO AODITIONAL I ,REPAIR (,PLUMBING-- MAlL ADDRESS p.P.T.H.PM.TNERSH P OWHtlNGUNrTS __ACCOMMODATION UNITS __MECHANIC....L CITY PH 949-7980 HEIGHT INn --NO.FIREPLACES --RECREATION FEE j ARCHITECT fiRM BACHRACH INSULATIO~_TYPE:THICKNESS R·VALLUE DESIGN RE ....IEW BOARO '"- BOX 2236 fLOOR ClEAN·UPOEPOSIT 100.00 ~~MAil ADpRESS CITY AVON 81620 949-9408 EXT WALLS USE TAX <f' PH.o;p ReoF -SGENERALFIRMSHAPIROREALTY I ,'n o,n n,on on 312-A TYPE ELEC GAS TOTAL PERMIT FEES "''' ~CONTRACTOR TOWN OF VAIL REG NO.0' OkO. SOLAR WOOD TElE.HEAT iDAlLSI!IIIl'K._~6=U ___ fiRM BRyANT EI EeTRIC ADDITIONAL PERMITS NEEDED·BUILDING OFFICIAL DATE ----- ELECTRICAL !~~~------TQWN QF ....All REG.NQ.l>O-E --------CONTRACTOR ST CUT ONING ADMINISTRATOR DATE TElE."'.0 ,.,,_8LASTING ZONING &BUILDING NOTES: fiRM PARKING PLUMBING TOWN OF VAIL REG.NO. CONTRACTOR DEMO TELE. FIRM I hereby acknowledge that I have read this application,filled out in full the information required. MECHANICAL completed an accurate plot plan,and state that all the information provided as required is correct.I CONTRACTOR TOWN OF VAIL REG.NO.agree '0 comply w;'h 'he ;nformal;on and plof :~:comp'y with all Tow,~;ord;nances and slale TELl:.laws,and to build this structure according to the wn's ~~~g and sub iViSjO~OdeS desIgn review approved,Umform Building Code and othe ordinanc lh ~r appHc leJ.eto. OTHER FIRM CLEAN UP DEPOSIT TO,:r--//1):1 lA ~( TQWN OF VAIL REG.NO.(b}MbJ~~~(J~vih-s Iv-f SIGNATURE OF OIfllilER OR CONTRA OR FOR HIMSELF CONTRACTOR TElE..,-0 ":>1-..t:'J..JcJ fMJO'n.fA,<lU...}-o AND THE OWNER. ,~CONSTRUCTION PERMIT IL CONSTRUCTION APLICATION FORM /3"1;::PERMIT , 13:49 NOT BE ACCEPTED 93- IT MAY r COMPLETELY OR I~3-479-2452TOWNOc·VAIL COM-DEV Post.it ','brand is)(transmiltal momo 7071 r;'"......~ To :i fl.wl tJ h .....'TnJ e•.lco. •pl.Phon,• ...(flIq -r-.!n 7 Ui Ffllt' ~...- ~*.*•••••*••••••••**••***.**••PERMIT INFORMATION ••••••••••••••••••••••••••••• "J)\Jj1\?JW ~\Te~ []-Buildinq []-Plumbinq []-Ele erical []-Mechanical [~Other _ Job Name:V/.,il-f'"T ...-ro PATc..IJ ,1 '0 ~~ess:770 1.1.P~7"A-"'o fJlf-TqI {)e,;;~ Legal Description:Lot Ie Block y Fllinq SUBDIYISIQ~:P.TATO {1.rdf- I'J'.T.H ..P"'c<'l""''''''<;H o',~,~Owners Name:"HAP,!?o R"''''.T't Address:AJ.,.J C.<">!T.;Q M·,J Ph.<;<lq·79ll'o Architect:(3 ...C-l+e~uti'L,--l>Address:1'.""13,,,·V\.>,C-AoJ<>/J r<>Ph.lV~-N~ General D<l.cription:~{)o"n·..tJ <!>F 8 /)O/H!3tullirw '--N j:'.,'ic..Ifc?"Ai.'Work Class:[]-Naw [l-Alteraeion [~Addieional [J-Repair []-Other __ Number of Dwellinq Units:I Number of Accommodation units:~ * mber and ~pe o~Fireplacec:Gas Appliances ~Gas LoqS~oOd/pellet~ •••••_,••••••••••••••••••••••••••VALUATIONS ••••••••_*-_-**---*----- /,;L~ BUILDING:$//<'"Y'C-ELECTRICAL:$r...'......OTHER:$of ---'-~LOMBING:$MECHA!HCAL:$TOTAL"4i .~''-'?i9€: **_...*.********.****••••••co_~&R !NFO =~N ._*..***•••••••••••••••••~. eneral Con·r cto ::;;MiRo Town of Vail ~q.NO.J3~-ti Address:I!>0 eo {:>-o Phone NUmbar:':i....q -"I'D ~ Electrical cQJ'l.tractor:f3~~~/=.A,c..Town of Vail Reg.NO.(Y/)·C Address:~p Yl-'-.{-~~!:::&~~Phone Number:'lyq-\~tS5' Pl~mbinq Contractor:Town of Vail Reg.NO._ Address:Phon.Number: Mechanioal contractor: Address: Town of Vail Reg.NO._ Phone Number: t.r~{OQ- 31.3 - .*••••••**•••••••****••********* B!JILDING PERMIT FEE:9 £"- PL!J~B:NG PERMIT FEE' MECPJlliICAL PE~~l~rEE: ELECTRICAL PEE: OTHER TYPE OF FEE:p,<~, DRB FES: FOR OFFICE USE •••••••••••••••••*.**••••••••** BUILDING PLA.lq CHECK PEE:~0~P~-===PLUMB:NG PLAN CHECK FEE: MECHANICAL PLAN CHECK FEE: RECREATION FEE: CLEAN-UP DEPOSIT: TOTAL PERMIT FEES: TYPE GROUP SQ.FT.VALUATION vIlli·I.!·/ Comments: BUILDING: SIGNATURE: ZONING: SIGNATURE I 'tCLUN l1P DEPOSIT llE1'llND TO: TOWN OF VAIL 75 S.FRONTAGE ROAD VAIL,CO 81657 970-479-2138 •rJr,TlFl£C ~-/8-'i,- DEPARTMENT OF COMMUNITY DE~~MENT NOTE:THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES MECHANICAL PERMIT Permit #:M96-0100 Job Address : Location : Parcel No : Project Number: $-'s'"/2</.' 950 1lQ=IlA:I1"K-DR 50 no 2101-063-06-010 Status . Applied . Issued : Expires ..: APPROVED 07/18/1996 07/18/1996 01/14/1997 APPLICANT RICH COOLEY GAS LINES Phone:719-486-3491 814 TURQUOISE STREET,LEADVILLE,CO 80461 CONTRACTOR RICH COOLEY GAS LINES Phone:719-486-3491 814 TURQUOISE STREET,LEADVILLE,CO 80461 OWNER STERN LESLIE W &MADELINE K 75 E END AVE 6A,NEW YORK NY 10028 Description: GAS PIPING FROM METER UNDERGROUND TO valuation: B8Q+RANGE 1,500.00 fireplace Info"",tion:Restricted:lOt GIIS AppU~ces:'Of Gas Logs:lOt VOOd/pa llet: "ttttt._""."",."""""""""_.""".,,.,,__"'"FEE ~RY *.***************************************************"'" "eeMn1~l-->40.00 ReltUllrant PLan Review->.00 Total calculated Fees->53.00 Pl.,Checlt-)10.00 ORB Fe.).00 Additional fees->.00 InveuigatiOlV .00 TOTAL FEES------)53.00 Total Per.it Fee---->53.00 \oIill Call--->3.00 Pay.enu--------->.00 BALANCE DUE---------)53.00******••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••~••~.~•••~.~••••~.~.*.,**••••••••••••••••••••.••••••••••.••••••••~. Division: Division: BUILDING FIRE Dept: DAVIS Dept: Item:05100 BUILDING DEfARTMENT 07/18/1996 CHARLIE Actlon:APPR CHARLIE Item:05600 FIRE DEPARTMENT 07/18/1996 CHARLIE Action:APPR N/A CONDITION OF APPROVAL 1.FIELD INSPECTIONS ARE REOUlRED TO CHECK FOR CODE COMPLIANCE. 2.ALL WORK MUST CONFORM WITH THE 1994 UPC CHAPTER 12 ******************************************************************************** DECLARATIONS 1 hereby acknowledge that I have read this application,filled out in full the infor-..tion required,t:OIIfJleted an accurate plot plan,and state that all the infor.at;on provided as required is correct.I agree to cc.ply with the infoNiation ~plot pl~, to cc.ply with all Town ordinant:es -.d SUIU laws,and to build this $tructure according to the Town's zoning and subdivision codes,deslgn review approved,Unifor.8I.nlding Code ~nd other ordinlinces of the Town applicable tnereto. REOUESTS fOR INSPECTIONS SHALL BE I'WlE TWENTY-FOUR HOURS IN ADVANCE 8Y TELEPl«>NE AT 479--2138 OR AT OUR OFFICE FROM 8:00 Aft 5:00 P" SIGN'TURE Of 011'"OR CONTRACTOR fOR NlNSELF AND OIINER #+ .,UUO.OOBUILDING I II III IV v A6EHIRM NOTE -COPY OF PERMIT TO BE KEPT ON JOBSITE ~\~'N.~\C\.~..:l) OATE 10/17/91 P vJA{005167 PE RM IT NO._--=-,,-=--,--=-,--_ 1.TYPE Of CONSTRUCTION 2 OCCUPANCY GROUP CONSTRUCTION PERMIT I.WD DIIIW department of community development --- RECREATION FEE MECHANICAlot.CCO"~tlONUNITS __ DIVISION 12 2.:1 34 z ELECTRICAL 500.00g1------1I---'-'-'-'----------~ GENERAL DESCRIPTION Of WORK:111_PLUMBING -'D,.E;cC"'K-A.nDnD~IT:uIO"NOL II~f-:..:.....:.....:...+--------------~ -_MECHANICAl DWElLlNGUNITS PLUMBING FOUNDATION IJ!I BUILDING TO BE FILLED OUT COMPlETElV PRIOR TO ISSUANCE OF PERMIT TYPE OF PERMIT c C ELECTRICAL C ....__U__M_E_C..H_A_N_'Cf&;;.;;;::..;R:;;hl:;:;.'..:S:;AND;;;:;;S:.:T;;:0:;;N:E:::.~UN.::.:;I,:;T..:.',26 t-.'.TY!''''''-,-''CR()'''''U''P'--,'''G'''.'''F'-A''-T_!.yA'''l'''U'''.'"n"O!!N_...lI ~P.':E~R~M~'T!...:F.':E.':ES:"',-_--1 LEGAL LOT BLK·.I V R BUllDINGPERMlT 135.00 :- DESC FILING POTATO PATCH CLUB cr DI~S~;f;~~~;;~~;;~~;ljPl1A~N~C1H!EC~·~~~~f~'8~8f·lo!0~~~j~::~3t':!-,;r JOB NAME:NOBLE DECK ADDITION elECTRICAl 50.00..::::-~ OWNER NAME l'luBLE __NEW(I AlTERATlO I ADOITIONAll I REPAIR {I PlUMBING MAli AQQRESS 490 WINDY POINT Oil ClrPLENDALE HS,FL",,08-358-19 1 ARCHITECT f"',,RM"-1 MAIL ADDRESS PH EXT W"llS USE TAX lECTRICAL 108-E QNTRACTQR TOWN OF YAIL REG,NO. TElE 949-6780 ZONING &BUILDING NOTES'_BLASTING SI CUT DEMO PARKING ---- ADD1TIONAl PERMITS NEEDED' 1.!! ROOF =TY~P~E~~·-"-EC--[-CA-,*~~~~1I---------4~~~~~--==1Clc: OF TOTAL PERMIT FEES 17'\.nn <:::J HEAT SOlAf1 WOOD 10/24/91 ,u'l','iM.ifJ-MW.\.----...--0'"----- _BETS,--ROSOLAC~.!9/1.I~1 __ OHING ADMINISTRATOR DATE VAlL VALLEY BUILDERS STONE CREEK ELECTRIC fiRM FIRM GENERAL CO NT RACT OR I-"TQ"W""N~O""F~Y"'A"'''~."E"'G'-''N"O-~1"9,,5,,-,,B'--­827-4194TELE FIRM MECHANICAL CONTRACTOR TOWN OF VAIL.REG.NO. fFLE. OTHER :,;";,:R:;;"_ TQWN QF VAil REG.NO. CONTRACTOR TELE I hereby acknowledge that I have read this application,filled out in full the information required. completed an accurate plot plan,and state that all the information provided as required is correct.I agree to comply with the information and plot plan,to comply with all Town ordinances and state laws,and to build this structure according to the Town's loning and subdivision codes,design c.i:.::.u;ro;'"un;torm BuUd;ng Code and old~nce'.;~,'h~TOd~!hseto. A 'AAA ~t3 J_SIGN~~RE OF OWNER OR CONTRACTOR FOR HIMSELF~')V /I()~AND THE OWNER. NOTE -COPY OF PERMIT TO BE KEPT ON JOBSITE ,,DATE June 4,1993 6086-..PERMIT NO ... 1m DIll I TYPE OF CONSTRUCTION I II III I \I V department of community development 2-OCCUPANCY GROUP ABEHIRM BUILDING 3000 no DIVISION 1 2 2it J 4 z ELECTRICAL TO BE FILLED OUT COMPLETELY PRIOATO ISSUANCE OF PERMIT 0 ~~ENER"'L O~CRIPTIOJ OFWQRK ;•PLUMBINGTYPEOFPERMITepa~r amage wall on deck.~ ~ ~•MECHANICALBUILDING0PLUMBING> 0 ELECTRICAL 0 FOUNDATION ::::J MECHAN ICAl 0 VALUATION950SandstonDiveTYPEGROUPGRFA PERMIT FEES LEGAL LOT BlK V-N R-1 BUILDING PERMIT 75.00 DESC.FIliNG )PLAN CHECK 49.00 ~ 06 NAME:Potato Patch 03 /ELECTRICAL OWNER I"'"'Pot..ato Patch Condo Ass c REP~.~NEWf ,Al lEBATION ()ADDITIONAL (,PLUMBING MAlt ADDRESS DWElliNG UNITS ....CCOMMOOATION UNITS __MECHANICAL ~~Clry PH 6-8067 I' HE'GHTIN~l -NO.FIREPLACES --RECREATION FEE---- ARCHITECT FIRM INSULATION TYPE rHICKNESS R-VAlLue DESICN REVIEW BOARD FLoon =c +-CLEAN·UP DEPOSIT 100,00 ~MAlI ADDREss EXT.WALLS ~CITY PH.USE TAX Rippy Contractors Roor GENERAL FIRM I124-8 TYPE ElEC GAS CONTRACTOR TOWN OF YAIL REG.NO.0'--TOTAL PERMIT FEES 224.00 02<-'6"SOLAR WOOD Dan Stanek 6-1-93TELE.HEAT BUI1I51NG OFFICIAL ------DATE ----- FIRM ADOITIONAL PERMITS NEEDED: ELECTRICAL 1."INITIAL 1---------TOWN OF VAll BEG.NO,------ NTRACTOR 51 CUT ONING ADMINIS1RAlQR DATE TElE.BLASTING IzONING &BUilDING NOTES: FIRM I ~~.~"..PARKING PLUMBING . CONTRACTOR TOWN QF VAll REG,NO.DEMO TElE. fiRM I hereby acknowledge that I have read this application,filled out in full the information required, MECHANICAL completed an accurate plot plan,and state that all the information provided as required is correci.I CONTRACTOR TOWN OF VAll REG.NO.agree to comply with the information and plot plan.10 comply WIth all Town ordinances and state laws,and 10 bu;ld 'h"struclure accord;ng 10 the TOW~.9~~bd,v",on codes.deSIgnTElE.r~r~X1 a£fl,r~edbunlform BUIlding Code and other--.2.rdinan of t e wn applicable thereto. OTHER FIRM N EP ~TO:l TQWN OF VAil REG.NO.'R.flN ,()~SIGNATURE OF OWNEMlR.>A FOR HIMSELF CONTRACTOR TElE.t AND THE OWNER ~~CONSTRUCTION PERMIT 35 ATTCHHHNT 23 PERMIT FEES BUILDING PERMIT PLAN CHECK 1,000 VALUATION 122a34 o G R.F.A. DIVISION CROUPTYPE v DR ~NOTE -COPY OF PERMIT TO BE KEPT ON JOBSITE S\'I ""CONSTRUCTION P E,..R_M_IT_.....,;D~A~TE;,.:I=N=O=N:::SE:::P;.::8.:..,.:,19:.:9:.2.,005688 I PERMIT NO.-_=...::....::.-=-=--=-In I III 1.TVPE OF CONSTRUCTION I II III IV V department of community development 2.OCCUPANCY GROUP ABE HIRM 1r-"T~.~U~Il~O~IN~G:-"'------I"".o~o~o""------" Z ELECTRICAL•~1-------1----------------. GENERAL DESCRIPTION OFWORK :""",,,,,;;;;....,,,,__11 PLUMBING ADD NON-BEARING WALL AND DOOR IN ::I t----t-----------------I BEDROOM AREA,AND DRYWALL REPAIR.~f-M_'_C_H_AN_'C_A-ILI----1 LEGAL LDTUNIT HIO BL~.==-_-I DESC.FlUNG POTATO PATCH CLUB TO BE FILLED OUT COMPLETELY PRIOR TO ISSUANCE OF PEAMIT TYPE OF PERMIT [jQ<BUILDING 0 PLUMBINGoELECTRICAL0FOUNDATIONoMECHANICALC9150REDSNADSTONE ---DATE CHUCK FELDMANN SEP 8,1992 --DATE -- RECREATION FEE MECHANICAL DESIGN REVIEW BOARD iZONING &BUILDING NOTES:_ I-_C_L_'_A_N._U_P_O_'_I'O_S1_T__--1 ---11X use TAX Ni 1I-----------1---------I~ II=T-O-T-A-L-P-E~RM~IT~F~E~ES~+-~$"5"8F~---!i~ x xDEMO BLASTING X HEIGHT INFT __NO.FIFlEPLACES -- INSULATION TYP'E THICKNESS R-VALLUE FLOOR EXT,WALLS CiNONE - ADDF TYPE ELEe.GAS OF SOL""WOODHEAT PARKING ADDITIONAL PERMITS NEEDED: !..!:! ST,CUT X DWELLING UNITS __ACCOMMODATlONUNITS __ PH~76-0157 PH. VAILCITY FIRM FIRM t~[:~~~~~!!:~~~[I:L~~IT~t'~LE~C~T~R1~CAl.~====t======j~a ~NAMELESLE STERN NEW ()ALTERATION!ADDITIONAL ()REPAIR ()PLUMBING 3-B TREE TOPS CON 0MAILApORESS MAIL ADDRESS CITY 08 NAME:STERN REMODEL OWNER ARCHITECT ~F1..RM,,--_ C~~~~:~~~R TOWN QF VAIL REG.NO. rELE. ELECTRICAL .ONTRACTOR TOWN OF VAIL REG,NQ. Tl='lE. I hereby acknowledge thai I have read this application,filled out in full the information required, completed an accurate plot plan,and state that all the information provided as required is correct.I agree to comply with the information and plot plan.to comply with all Town ordinances and state laws,and to build this structure according to the Town's zonin9t:2d subdivision codes,design review approved.Uniform Building Code and other ordinances Of.7/TAown applicable thereto. '-",_/I'l. FIRM MECHANICAL CONTRACTOR TOWN Of VAIL REG.NQ THE. OTHER FIRM JEFF LUTZ lUaiLRiNiiix TOWN OF VAIL REG.NO.302f,=-S_B CONTRACTOR TELE.328-1622/949-8840 E R'0 A ~~TRACTOR FDA HIMSELF .',:;;;;;"",.. 7.000 PERMIT FEES BUILDING ,non z ELECTRICAl 1.000 0 ~PlUMBING~ ~ ~MECHANICAl> VALUATIONGRFAGROUP BEDROOM NOTE -COPY OF PERMIT TO BE KEPT ON JOBSITE~.),)CONSTRUCTION PE...R_M_IT_~DA~TE=-==8::/2::5/~92=------. ....,amY I TYPE OF CONSTRUCTION I II III I v@ depanment of community development 2.OCCUPANCYGRQUP ABE H ~ DIVISION G:)2a 34 GENERAL DESCRIPTION OF WORK:--------11 TNSTAJ.I,WINDOW,REMODEl.MASTER TO Be FILLEO OUT COMPLETEr..Y PRIOATO ISSUANCE OF PERMIT TYPE OF PERMIT Qij BUILDING 0 PLUMBING Qij ELECTRICAL 0 FOUNDATION ~.~IJf.W-~lS,"tstoQ Rd fiRM Hunt FIRM Lunsford Mech ARCH ITECT I ''''"RY''------'M"our:<'''.''r:-I 115BUILDINGPERMIT F'lANCHECK 75 ONING &BUILDING NOTES:_ Rlv PAflKING $1.CU1 AOOITIONAL PERMITS NEEDED: 1. DEMO BLASTINQ ~~W~~~~~~~~~~!:D~~~~~'~l'~C~T~R~'CAl~====j===:5:0===jrew()AlTERATION!)ADOITIONALI )REPAIR I)PlUMBING M ~ DWELLING UNITS __ACCOMMODATION UNITS __IJ-.:M::'::C::H.:::N::'C::Al=-l-.!,2J10'-!+25 -1~. HEIGHT IN FT NO FIREPLACES RECREATION FEE N ~~,N~S~u~LAiTf,lio~N-___=TY~Pe:E~jT~HI~C~.N~E~SS~::-:R.:v:V.A;l:i:l~"''=DESIGN REVIEW BOARD f 6 "008 III I:W'N.E~3F~W 100 "-::~LLS f-------f------I-.:U:OS:::'::T::"":::.:::::..:::.:---l-----.::::.-------j r f: TYPE ELEC I GAS :~0'-----TOTALPERMITFEES 365.00 SOLAR WOOD HEAT CR Feldman 8/21/92 UILDINGOFFICIAC-------!)AfE ----- l-xxxxxxx Tim Devlin 8/21/92 ONINGADMiNiSTR.~TOR-----OATE---- 293B PH £.,n< &CoBergafIRMJ,T. MAIL ADDRESS CITY LECTRICAL ONTRACTOR TOWN OF VAll REG.NO. TELE. :JOB NAME:JOHANSEN RESIDENCE OWNER NAME Even Johansen MAIL ADDRESS 66 Gatehouse Rd CITY Stamford Ct pJ03-661- C;~~::~~gR TOWN Of VAll REG.NO.133P TFiE.242-5790 GENERAL CONTRACTOR TOWN QF VAIL REG.NO. Tl=ll=.328-6432 _ EGAL LOT PhliAP I BLK TI ...;'r;. OESC FILING Potato Patch Club CONTRACTOR TELE. TOWN OF VAll REG.NO. OTHER ~F1"R=M _ FIRM Lunsford Mech C~~;~~~~;~TOWN OF VAil REG.NO. ITFIF 127M I hereby acknowledge that I have read this application,filted oul in full the Information required, completed an accurate plot plan,and state that all the information provided as required is correct.I agree to comply with the information and plot plan,to comply with all Town ordinances and state laws,and to build this structure according tOI1t~~(wn's zoning and subdivision codes,design review approved,Uniform Building Code and at dln",ces of the Town applicable thereto. Clean-up to'J.T.Berga (,Ji.1«",.Ii..41 II P.o.Box 1659 v".--:r.B C!o.le· Eagle Co 81631 SIG!!t:rURE OF o~EFfoR CONTRACTOR FbR HIMSELF HE OWNER. ~CONSTRUCTION PERMiT~DATE PROJECT NO.N~20S"o. I II III IV{i;J PERMIT NO. town 0 val I.TYPE OF CONSTRUCTION department of community development 2.OCCUPANCY GROUP ABEH@.1 BUILDING ?J11 ....-j!) DIVISION (J)z2a34 z ELECTRICAL I z...'">~.d TYPE OF PERMIT 0 ~;PJOODdBUILDING GENERAL DE~T10N OF WORK:~PLUMBING13'PLUMBING ~ ~--n";!'-/EX ~-4""60'ELECTRICAL o FOUNOATION ON LV >MECHANICAL 0'MECHANICAL 0 LEGAL LOT BLK TYPE GROUP SOFT.VALUATION PERMITFEES DESC.FILINM6rIl",'tb:14 <::Z.m 5 12-\I t,'1'ry '7'Zf78J%()BUILDING PERMIT B NAME:'P?<::'t.All~~2/,2:Z..=>"''1 ')01-{/C)3n)PLAN CHECK NER ","<I~,A>"(p-</D _~2DQ /''Ii".&>1.5 /'A.ELECTRICAL MAil ADDRESS PLUMBING •rZC,OC!') CITY PH.NEW()ALTERATION ()ADDITIONAL (I REPAIR (I MECHANICAL ('~/J.IY')) ARCHITECT FIRM C7:ea>yr ~ff DWELLING UNITS ~OMMODATION UNITS -RECREATION FEE MAIL ADDRESS G.B.F.A.7:!;5'3 I TooMS q DESIGN REVIEW BOARD CITY PH.COMMERCIAL $Y$T ---=":"RESTAURANT SEATING -CLEAN·UP DEPOSIT IFlR.\/"""[0.~..'/--=--BATHTUB/SHOWER q GENERAL HEIGHT IN FT. CONTRACTOR MAll AQLJRESS NO FIREPLACES ~NO.TOllETS n TOTAL PERMIT FEES Irl~PH COVERED PARKING ~UNCOVERED PARKING -::i FIRM BUllOINGOFFICIAl ------DATE ----- &ECTRICAL TRACTOR MAil ADDRESS INSULATION f------------- I r.ITY PH. ONING ADMINISTRATOR DATE TYPE THICKNESS R·VAlUE FIRM FLOOR .s.o.c ONING NOT!:S: PLUMEJ;NG MAil ApDRESS ,.S;/8CONTRAC'r.OR EXT.WAllS R;,-FO '3,~- Imv P"ROOF "Fe.../0 "3D flRM HEATMECHANICAL CONTRACTOR MAil ADDRESS 'ib:RElEe:GAS: I mv PH.I HER£YV "CKNOWLEDG£THAT I HAV£ •SOLAR:WOOD:R £A D TillS AI'PI.ICA TIQN A"'·D STA ToE TIIA T THE QTHER FIRM AOOV£IS COORECT AND AGOE£TO COMI'LY....VAil WATER &SAN.OIST.TAP FEE:WITII ALL TOWN ORDINANCES AND STATE \MAil ADDRESS LAWS REGAIIOING BUILDING CONST"UCTlllS. SPECIAL NOTES:CONTRACTO~CITY PH., <:r:,...·n"·:-;-",·n"C 011 .. CONSTRUCTION PERMIT PROJECT NODATE PERMIT NO.N£~ I.TYPE OF CONSTRUCTION I II III Ivf!) 2.OCCUPANCY GROUP ABEHI@.4 BUILDING 70'>.'11 CJ 1220 z ELECTRICAL ...~('.DIVISION Q , ~17 ~G~Al DESCRIPTION OF WORK;<PLUMBING~ ~lO'.E t <>MECHANICAL -3 a::JO TYPE GROUP SQ.FT.VALUATION PERMITFEES .5 72-3 ~.,~/fj z.?hD BUILDING PERMIT S I'"np,19.~PLAN CHECK .- S /V1 SSt.>·7 f).CO ElECTRICAl ("D.qoi PLUMBING ')'-q '1..o;v NEW{Al TERATrQN ()ADDITIONAL ()REPAIR(I MECHANICAL -/.7..<,.'0 DWELLING UNITS ~MMOOATIONUNITS__RECREATION FEE GR'.A.'I1-/~B 0 toMS ~DESIGN REVIEW BOARD COMMERCIAL SYST -=-RESTAURANT SEATING -CLEAN-UP OEPOSIT 1-l:"IGHT IN FT.-=-BATHTUB/SHOWER ,J NO FIREPLACES ~NO.TOILETS .1L TOTAL PERMIT FEES COVERED PARKING 'Z-UNCOVERED PARKING BUIi.D1NG OFFICIAL ------DATE ----- INSULAT.ION f---------------ONING ADMINISTRATOR DATE TYPE THICKNESS R·VALUE FLOOR s_oc.,ONING NOTES: ~{,,'-;::c 25 -1f3EXT.WALLS \.~ ROOF 1=-r'10 3D HEAT ELEC:1313 GAS; 1 IlEREBV ACKNU .....LEUGE Til AT I HAVE SOLAR:WOOD:REAUTIWI Arpl.lCATION AND STATE Til AT TilE ABOVE IS CORRECT A~D AGMEI';TU CO.\IPLV VAIL WATER &SAN.oIST.TAP FEE;WITH ALL TO .....N ORDINANCES AI'D sTAn: LAWS KEGAHOING BUll.omG CON$TRUCTmN. SPECIAL NOTES: ,,,'rl\\·S~·M 011 {·"...-TIt·CTIlII . TYPE'GF PERMIT 13'"BUILDING 0 PLUMBINGrrELECTRICAL0FOUNDATION ONLY 0"MECHANICAL 0 lown ~ial department of community development LEGAL lOT BlK DESC.FILING ";:(;~~~r+-C'lJ..!8 JOB NAME:<p P ('I )J>1'T"t 73 v-J NER NA"'\IA II :r 'LA,;:> MAIL ADDRESS CITY PH. ARCHITECT fiRM ~CHe.ec£ MAll ApoRESS CITY PH. GENERAL FIRM V~lk ~)2.'r CONTRACTOR MAil ADDRESS I ('lTV 'N FIRM .CTRICAL RACTOR MAIL ADDRESS I ('ITY 'H. FIRM PLUMBING MAll APDRESSCONTRACTOR CITY PH. fiRM MECHANICAL CONTRACTOR MAll ADDRESS I ('ITY PH. OTHER FIRM •. MAIL ADDRESS 'CONTRACTOR CITY PH. L TYPE OF CONSTRUCTION 2.OCCUPANCY GROUP BUILDING CONSTRUCTION PERMIT lown Of Y311 LY department of community development DATE PROJECT NO._ 1111111'(0 ABEHI(!) PE RM IT NO._:.:N.:.£_-'...."'d"'''-__ 071 ./'Ir.<' DIVISION TYPE OF PERMIT o BUILDING 0 PLUMBINGoELECTRICAL0FOUNDATION ONLYoMECHANICAL0 Pf\o /;\.Z ELECTRICAL L/,'<V"Q f-===.::..+------------G~L DESCRI~OF WORK:_---,.=;:--_=_--,11 ~PLUMBINGr~IO".o:~E"",/7k:i -R£X ~~===+_------------­ ___________________11 >~M:.:E:.:C:.:H:.:.:;NI:.:C:.:A=iLf--------------- LEGAL LOT Jl,L ""....---,,._---1 DESC.FILING it31'ilJikcl:\-G..r3 TYPE GROUP 'MO SO,FT.VALUATION BUILDING PERMIT PLAN CHECK PERMIT FEES /,.",.-o.7 /). ZS'l.q() MAIL ADDRESS PLUMBING 9'1,.50MECHANICAL __BEDROOMSG.R.F.A. DWEL LING UNITS __ACCOMMODATION UNITS;If--.::RJ::EC:::R::E;:A::.Tl:::O:::N:;'::.E::E +-I DESIGN REVIEW BOARD NEW tv)AL TERATIQN ()ADDlTlDNAL ()REPAIR () MAll ApDRESS ARCHITECT FIRM GCJtZO.:A<(r1eRc r:; CITY PH. CITY PH.COMMERCIAL SYST __.RESTAURANT SEATING CLEAN·UP DEPOSIT p> GENERAL CONT~TOR MM.8jAIIL.L.8jAO"'O/ljR"ES"S'--_ _.I~ITY HEIGHT IN FT,__BATHTUB/SHOWER NO FIREPLACES __NO.TOILETS COVERED PARKING __UNCOVERED PARKING TOTAL PERMITFEES 3/1 A '10-I~;";;;;;~~;;;;;:;"~~~~~~= FLOOR EXT.WALLS ROOF 1---lIBUTLDINGOFFICIAl ------DATE ----- t l~~I=N]SU=L=A~T~'O~N~=[~~~jll-=~~~~~~~:....:=-=-~=-~=-'~c--=--=-ONING ADMINiSTRATOR DATE TYPE THICKNESS R·VALUE ONING NOTES:_ PH. PH. FIRM AECTRICAL EillM'-_ "'1!I5"NTRACTOR MAllAOOBESS CITY I PLUMBING CO NTRACTOR I'M..A"'IL"."O"'O"'""ES"S'-_ CITY fiRM THER.I"""R"M'----I I HEREBY ACKNOWLEI)(;E TlUT I IIA\'E REA D THIS APPLICATION AND STA TE TIIA T Tit E ABUVE IS CORKECT AND AGREE;Til CO\\PLY WITH ALL TOWN ORDI:-IANCES ASD STATE LAWS II£GAltDING BUILDING CONSTRUCTION GAS: WOOD: HEAT ELEC: VAil WATER &SAN OISl.TAP FEE: SPECIAL NOTES:~-/I SOLAR: PH. PH. MAll ADDRESS TRACTOR CITY MECHANICAL CO NTRACTORI jM"'!>!'I.LA!>!o"o"'RltEs>;s'-1 CITY 1•l'JWS'I en>;.e I PRO~CONSTRUCTION PERMIT DATE JECT NO.N£205."PERMIT NO .••11l1t11@lown0valLTYPEOFCONSTRUCTION department of c0f'!'lmunity development 2.0CCUPANCY GROUP ABEH@ BUILDING 2 I\'3< DIVISION 1220 z ElECTRICAL Ii <:;'1 "Z....QTYPEOFPERMITIi If)'1(1/\~UILDING 0"PLUMBING G~SCRIPTIONOFWORK:~PLUMBINGEX~ -:i/V'l6< ~ECTRICAL D FOUNDATION ONLY >MECHANICAL ECHANICAL D LEGAL LOT BLK TYPE GROUP sn.FT.VALUATION PERMIT FEES OESC.FILING '1trr~.,,)r i"?,."..>\(,',JP...'it;'i2-3 1<1'3 )D \'I Z.'110 BUILDING PERMIT JOB NAME:.~".;"./t,III IR-\q ~N\IY \7 :3S:~O PLAN CHECK OWNER INW'\lA'.1-0",0-}-f\bSS".3 '12~ELECTRICAL (6-qI-O MAll ADDRESS PLUMBING ()COCO CITY PH.NEW{)AllEBATlON ()ADDITIONAL (I REPAIR (I MECHANICAL 17.,_.tl) ARCHITECT I FIRM h;''''O~(I{-~2-ACCOMMODATION UNITS ,-RECREATION FEEDWElLINGUNITS MAIL ADDRESS~/J2-..3 G.R.FA __BEDROOMS --"'-DESIGN REVIEW BOARD CITY \h Xlii I ~c:-'1I!-COMMERCIAL SYST -=-RESTAURANT SEATING -CLEAN·UP DEPOSIT- GENERAL I"."\~II ~HEIGHT IN FT.__BATHTUB/SHOWER (~ CONTRACTOR MAil ADDRESS NO FIREPLACES ~NO.TOILETS "TOTAL PERMIT FEES.P"COVERED PARKING ~UNCOVERED PARKINGCITY -z.- .fIRM BUILDINGOFFICIAL ------DATE ----- ELECTRICAL CONTRACTOR MAIL ADDRESS INSULATION f-------------- C'TY PH. ONING ADMINISTRATOR OATE TYPE THICKNESS R·VAlUE FIRM FLOOR :;06·ONING NOTES: PLUMBING MAIL ADDRESS It?CONTRACTOR EXT.WALLS F6-Fo '3S-\.:> If':ITY PH.ROOF 1='b /0 30 FIRM HEATMECHANICAL CONTRACTOR MAll ADDRESS "8$ELEC:GAS: IrilY PH.I HERE8Y ACKNOWLuua:THAT I flAVr. :,aLAR:WOOD:READ THIS APPLICATION "I'"D STATE TIiAT THE OTHER FIRM A80VE /S COflllECT /l.ND AGRU:TO COMPLY-VAll WAT~R &SAN.015T.TAP FEE:WITlJ ALL TOWN ORDIN"'NCES AND STATE MAll ADDRESS L.,.,ws REGAltDING 8UIl.DlNG CON5TRUC;TlllN.,SPECIAL NOTES: NTRACTOR CITY PH. .rTII".."l nws',l"1I"" NO. PERMIT NO.N~JiR" BUILDING 171')<:r)If) z elECTRICAL !)C)q Ie:>0;=17...9,00<PLUMBING~ ~<MECHANICAL <.000> /).{''2 $-2"1 PROJECT ~M.E DATE 1.TYPE OF CONSTRUCTION ,II III I Vcf) 2.OCCUPANCY GROUP ABE H 18)A ,DIVISION 12 2@ GENERAL DESCRIPTION OFWQRK ;--------11 U"fLT-l?< CONSTRUCTION PERMITr---~::::::::::::"';~ TYPE OF PERMIT tf BUILDING ~PLUMBINGoELECTRICAL0FOUNDATION ONLY B'MECHANICAL 0 PERMIT FEES CLEAN-UP DEPOSIT BUILDING PERMIT PLUMBING PLAN CHECK MECHANICAL ELECTRICAL TOTAL PERMIT FEES Ip VALUATIONSO.FT.GROUP \2.-55 TYPE COMMERCIAL SY$T __RESTAURANT SEATING HEIGHT IN FT.__BATHTUB/SHOWER NO FIREPLACES -=-NO,TOILETS COVERED PARKING ~UNCOVEREO PARKING NEW()ALTERATION ()ADDITIONAL (1 REPAIR () DW:::LllNG UNITS "'2..ACCOMMODATION UNITS,_7'"'_n-.:.:R:::EC~R::E::A~TI::O:::N~'.=E:E +--------_I G ,~U J/()1 r '1'717\L-/1Ii--=0:.:E:.:S:.:'G:;.N:;.R:.:E:,:V::IE:;.W:;.B:.:o:;.A:;.R:.:o_-+-j.R ..A.¥T'•~BEOROOMS ~ 1---1IBUILOINGOFFICIAL ------DATE -- t l~~'~N~SU~L~A~T~IO~N~~+~~~jl!I--~~~~~~~:...::~=-=:...::~~=-=:...::=-ONING ADMINISTRATOR DATE TYPE THICKNESS R·VALUE FLOOR .ONING NOTES:--------------- "T.WAllS ~1'R;1L·!:.F.':::{):j.23~,,5:c..=.JI.,-,CLJ--"~';'''"-,_-11--------------- ROO''FG 10 :>0 PH. PH. PH. PH. DU RI. FIRM fiRM fIRM CITY CITY MAil AOQRESS NG OR MAIL ADDRESS CITY LECTRICAL TRACTOR MAIL ADpRESS CITY MAIL ADQRESS ARCHITECT LEGAL LOT OESC.FILING If V OWNER I'Ntl!AlliMLEE 1 GENERAL FIRM CONTRACTOR,I·M"'A"IL.lAWOWO"R"ESS"'-_ CI'V fiRM HEAT V~IL WATER &SAN,OIST.TAP FEE: SPECIAL NOTES;11 MAIL ApDRESS ODRESS PH. PH. hEC,'13 R ':;OLAR; GAS: WOOD: I IlEREKY oH':K:"IOWLEO(;£TH ....TI 1/1\\'£ Rr.....OTHIS ....PPI.IC....TIOf'l ....f'l0 ST ....TE TH ....T THE ....nOvE IS t;ORRJ;CT ....ND GREE TO COM!:'LY WITH ....LI.TOWN ORDIN ,.·CES ":"ID ST ....TE LAWS R£O ....HOING BUll.DING CO~STRUt;TlUS. 1 I'1\\......1 Cll....rT lH AT OF VA IlTOWN ~~"U~I~'~O~'N~G~=t====t1/~9~"j~/~~~)~7tt~~~;;;;~:;;;;+;;:;;~=~~PLUMBING 1/TYPE Of OCCUPANCY AMOUNT EXITS REO. rT"flB"U,...-I,L........D1N..-G__P_E_R_M_I_T_-.I i ~M~'C~H~AA.N~'C~A""_f-__+---"i'3¥b,,~10~---It---!S'R-032-__~-91~'30~+J;LI'7,~A~'''VLj v",.,~~~'..-;-")~~'~","C~TR~IC~AC,-+__-+_.:.L'7",l5~'"T?:S~-jfIL!JML::'-:..lt:~.•o!O..-_+'7.!.7=3'-14_Ll:.I>/L2,;.~<;t'):LI.Lj ~':!"O.~N~A~M~'J1n:eu:Q.-X~LC:""!!:.~OTH"/J\-Ocr<--'-052.-z.2A?. DATE OF APPLICATION !~I In 19'7~TOTAL 70lJH_/9&bB 2-, TOTAC ~""--7{'''''-;~..,)c------NAME CLASS OF WORK<w NEW)6 ALTERATION I I ADDITION I~MAIL ADDRESS )REPAIR [)0 USE OF BUILDING~'...(~....CITY 'H.<NAME sa.FT.OF BLOG.'ctJfi'l HEIGHT IN FT.0•7.0 MAIL ADORESS NO.OF STORIES SETBACKS••0<Z.T o.CITY 'H.NO.OF LIVING UNITS FRONT •NAM"--....-'=0,='1 .=D.CONOO.l~lLODGE 16-SIDE I (RI lei 0....w•MAIL ADOR'ESS~Y "22..q9 I.e-;;so.FT.COMMERCiAL REAR (")0 CITV Va"PH /111/TYPE OF HEAT C){I<•WATER (I FORCED AIR I I ELEC UNIT () OFF ST,PARKING OFF ST.LOADING EASEMENTS VARIANCE COVEREO UNCOVEREO DATE J.USE ZONE 2.OCCUPANCY GROUP ;i 0 LOT BLK FILING COVERING0_ ~~~~~~~T~R~A~C~T~=========::;:::=~t='~X~T~'~W~A~'~'~S,'''~':L~~~<i::D~j~R~o~o~'~r3~~O~-:=~tl~~::::;;;~:::;l2iq:;~~,..~c....,.....l.APPLICATION INT.WALLS L~C'\")"FEES 71'1 _'7'":l ACCEPTED 1.TYPE OF CONSTRUCTION I II III IV 0 I HR BUILDING PERMIT 'It:J.~ AB~_EF GHIJ II-_S::..:P--=EcC:..:.I"F...:..1oEcD::..:+-CVC."S'___I-~NOO'::::,--1t-"OCA""N"C"H"."C"KC'C."."S'_I-_/""7'i::>CJq11~'9"1 PLAN CHECK~==========~O~I~V~lS~'~0~N~~'~2=(,).'===j=='~'~R~'~S~'~R~'N~K~"~R~S~=====t==±~"'---~~-=j~'~,"~M~"~'N~G~;::=j=tj~~~r~?......-.""--r WET STANDPIPE ~MECHANICAL ---lL I _/1.AP~AL /•.• DRY STANDPIPE ELECTRICAL CUIJc-.L _j.J :::'ESpTR::~:CLOSURE :~:::UP DEPOSIT ~a?1~{I (~2Mlr-& f~"~'~N~'fR~A~'iD~'~S~C:R~":T:'~O~N~O~';:W~O~R~K;---------l==A~R;'A~S~'~"~R~A~T~'O~N~~;==~===~~t=~~~:==T;O~T;A~,j]~~~,~I~~~~ I <;-I )~JOt r=::.V OCCUPANCY SEPARATION I HEItEln'ACKNOMoUE THAT I HAVE • 'SOIL TEST READ TillS APPLICATION AND STATE TIIAT TilE "!lOVE IS COItRECT AND AGItEE TO COMPLY f__---------------------i!-cseu~Rov'.CV'-----------_+---f__+--_11 WITH ALL TOWN ORDINANCES AND STATE '"LAWS/.KJo:GAKD1~G/II.U~DIN_G CO:-lSTRUCTIOK. SPECIAL INSPECTOR //./f /_//,._,/ PLAN NUMBER V ERMIT DATE 9/2<I.PROJECT NO If.,-"128 PERMIT NO.NQ 105 1.TYPE OF CONSTRUCTION 111111 I~II+R- 2.0CCUPANCYORDUP ;(}E HI ~BUILDING -:>'rJ3 700 DIVISION 2a 3 4 z ELECTRICAL I L..\0000 <j~;~~L 011.S:~~'7~RK ;~PLUMBING J),~rJnJ~ ~Ir,7-en~ lU9A"-,,>MECHANICAL- TYPE GROUP SO.FT.VALUATION /PERMIT FEES 5-1 f.\g.,v-1.3s-BUILDING PERMIT '7//,20 V-'HQ 12-1 ~4(."PLAN CHECK i5'-(~0 a;:I !-II P'-1S<:P2.ELECTRICAL 9~.CO .7,,..,~/.00 PLUMBING /z'7 ISO,r,-:7'''1 '- NEW ALTERATION ()ADDITIONAL ()/REPAIR ()MECHANICAL /-:>'$,0 c.J .L-ACCOMMODATIDN UNITS -e:r-RECREATION FEE (,'1 '/3,~S-I'< DWelLING UNITS G.R.F.A.__BEDROOMS I DESIGNREVIEW BOARD ~\'lOJ -'(9J COMMERCIAL ~Z3?GESTAURANTSEATING I/~";-CLEAN·UP DEPOSIT :tT Jqe,-rJA,i/~HEIGHT IN FT 30 BATHTUB/SHOWER NO FIREPlACES J'XNO.TOilETS /S"TOTAL PERMIT FEES I I"l, COVERED PARKING -b-UNCOVERED PARKING -G-A'~4 0=,_'2'~_2e-_~~:5P _Dl;.;0 YINSL!k!TION TYPE .THICKNESS R-VALUE ON~O~:,,-;r I ~ FLOOR <;D -In EXT.WALLS ,I.,A0onJl rJ:u.rL-.-a..ROOF . '/J A HEAT fP,'h tI ~:E~'~":~~:'~~'ELEe:GAS: WOOD:SOLAR:REAO TillS APPLICATION AND STAT~Tit AT THE AIIOVE IS COMltt:(:T ANI)AGREE TO COMPLY VAIL WATER g.SAN.0151 TAP FEE:WITH Al.l.TOWN ORDINANCES AND STi\Tt: SPECIAL NOTES:)h~RF:A7/)~L::;/~MU~Tli~ "''''.•C'O~' lYPEOFPERMIT BfiUILOING 0"PLUMBING .0'.-ELECTRICAL 0 FOUNOATION ONLY 0'MECHANICAL 0 C""'\C42,..I;)o~~~-r-LU~l,LUlVII(CA..~4-1~-3C82-~CONSTRUCTION P taw~ department of community development LEGAL LOT BL" I DESC.FILING ~'''lT''''/"l-ro-'C....f3 ~NAME:rp;,q-r-::;',L H 0 ,.cC- NER NAMF (_....CuAJ MAil ADDRESS:&?><Z3b CITY IJ",;LI')GPH.·,~"J ARCHITECT ::E~R~ai~~~lf~ I CITY \{'"Jl-P~~3C>. F'O'\. I",,,r7.r ,'""\. GENERAL CONTRA(;TOR MAIL AQDRESS C'TY PH. EIRM LECTRICAL NTRACTOR MAILAOpRESS I ('lTV 0_ FIRM PLUMBING CONTRACTOR MAIL ADDRESS 'CITY PH. fiRM MECHANICAL CONTRACTOR MAIL ADDRESS "'ITY PH. OTHER F)RM MAIL ADDRESS CONTRACTOR CITY PH 275/24/79~CONSTRUCTION PERMIT,DATE PROJECT NO. N __ 6,, "NO.NQ 278 "PERMIT1mDIal1.TYPE OF CONSTRUCTION 1IllllIVV department of community development 2,OCCUPANCY GROUP ABEHIRM BUILDING 203 710 DIVISION 122a34 z elECTRICAL 7,996 TYPE OF PERMIT 0 ~GENERAL DESCRIPTION OF WORK;<PLUMBING 12 800[l BUILDING IX]Duplex ~ PLUMBING ~<3 nnn[]ELECTRICAL 0 FOUNDATION ONLY >MECHANICAL []MECHANICAL 0 LEGAL LOT BLK TYPE GROUP SO FT.VALUATION PERMITFEES DESC.FILING Potato Patch II 5 R-3 45~9~B NAME:Potato BUILDING PERMIT Patch Club 25 &26 5 M 728 PLAN CHECK OWNER NAME 5 M 550 ELECTRICAL (60.90\ MAIL ADDRESS PLUMBING (97.50\ CITY PH.MECHANICAL (22,50'NEWt )ALTERATION ()ADDITIONAL ()REPAIR () ARCHITECT FIRM DWELLING UNITS _2_ACCOMMODATlON UNITS RECREATION FEE MAil ADDRESS G.R.FA 4410.75 tOil!tll<OOM5 6 DESIGN REVIEW BOARD CITY PH.COMMERCIAL SYST __RESTAURANT SEATING CLEAN-UP DEPOSIT GENERAL FIRM Vail Resort Dey.Inc HEIGHT IN FT __BATHTUB/SHOWER 6 CONTRACTOR MAIL ADDRESS Box 236 NO FIREPLACES _2_NO .TOILETS 8 TOTAL PERMIT FEES 156-A CITYVai1 "0 PH COVERED PARKING _2_UNCOVERED PARKING FIRM /'BUIL6iNG OFFICIAL 5J23L7fL -- LECTRICAL DAT ONTRACTOR MAIL ADDRESS INSULATION 1-------------- lTV PH.ONING ADMINISTRATOR DATE TYPE THICKNESS R VALUE, ONING NOTES'-fiRM fLOOR-P~BING CON R~OR MAIL ADDRESS EXT.WALLS FG-FO 3.5 1.5 ~I'"- I~ITY PH.ROOF I 1'G 1n ,n fIRM HEATMECHANICAL CONTRACTOR MAIL ADDRESS ElEC:BB GAS: P>TV PH.I HEREBY ACKNO ....'LEO<H:TH"T I lIA\'t: SOLAR:WOOD:Kt:AUTHISAPPI,ICATION "NO STATE Til AT Tltt: "'XE R fIRM ADOVE IS CORRECT AND AGIlEF TO COMPLY-. MAIL ADDRESS VAil WATER &SAN OISl.TAP fEE·...../TIl ALL TOWN OIlOINANC£S AND STATI:: LAWS MI::(;AIIU1NG IIUII.DING CO~STRl:CTIO~ SPECIAL NOTES:CONTRACTOR CITY PH ,.",.....''f)",••K TOTAL I-'.",U:,::"~DI",NG"-_-f-__L-/+I-a~~...L9'7L;!-1+--11--,---__,-----, 2 L~P~LU~M=.~I~N~G'____+----pl;"""\t;~~~~@~=t~T~Y~PE~O~F~OC:C~UP~A~N~C~YtA:M:O~UN:Tj=.~X~'~T~S~R~.~O=.=jgr,_~ ,....MECHANICAL ./~ OF VAilTOWN BUILDING PERMIT ,-------------,j 3 Ar,J'"1 ~I",,.,I~~1-~.~L~.C~T~R~I~CA~L~..=l~~!.'teltW~l::>::1JU:2._I'·:!'/""'~''.LII-I--~I_-------I_--___j------~~/~O~.~N~AM~.~c~d2Z7-Z·:&'bT7'>Z:;:;;l~I r;:;~22-!2':L-.iC"..c::d.!.~A.~_=_~OTHER DATE OF APPLICATION h -Z 19'7 t=\ TOTAL FLOOR AREA ,:::;ql SIt/It::?tL. TOTAL LOT AREACLASSOFWORKNAME........«w 2 _1-"M=A~"::.::A=D=D~RE~SS=-----------_t--~N~.~W~I~I~A~L~T~.~R=A=TI=O~N~I,-,-I~A~D~D~IT~'O=N"_'_'~I~R=.~P~A~IR'_'_'~I--H-'F~LO~O~R~A~R~.~A~R~A~T~'O'__,,---___,,-----~I\CITV PH.USE OF BUllDING-r")_'t='1 I I A..COVER EO I UNCOVERED TYPE OF HEAT WATER (J FORCE[)AIR (I ELEC (I UNIT I I SET8ACKS • DATE _ A.-~ VARIANCE OFF ST.lOADING EASEMENTS '"IRI FRONT REAR SIDEI I NO.OF STORIES SO.FT.COMMERCIAL NO.OF LIVING UNITS CONDO.I ILODGE C'TY 1/.411 PH."IJjJ,3039 MAILADORESS ~y 2704 ~r"/.,.Iff,A c cj LOT BLK FILING COVERING ~,••~-I ~~~4') 0_ ~~TRACT EXT.WALLS ROOF /tee tee.//~L.lt,,:t;().,"L::::::~~:~:::::::::::::::::::::::::::::::::~~::::::j:::~~~~~::::::::::::::::::::::::f~~:::::::::::::::jb~~~~~~~......~.,'2=..~~~;;"l-r:.APPLICATIONrINT.WALLS -'::EES~1-.~EP.!r%zol."f6 1.TYPE OF CONSTRUCTION I II III IV @ I HR BUI~IT I '/~ 2.OCCUPANCY GROUP Ari':-DEFGHI J SP Eel FIE D YES NO PL N)C~~I <;t!JL.~_PLAN CHECK DIVISION 1 2/.i').t FIRE SPRINKLERS PLUMBING b:;:.sb-~~~~~~- ,--------7.A"",,---------tI--W=.T=ST~A~N~D~P~IP~.~-----+_--+_-+_-t~M~.=C~H~A~N~'C=A~L'--_+-t,,=~~..,r>~::>'-f:::<:==~//.f P~OVA"/_- 3.USE ZONE f(r'DRY STANDPIPE ELECTRICAL r""_~"7 'V/I) COMS.STANOPIPE SMOKEPROOF ENCLOSU RE AREA SEPARATION #7-~;;;z.;i2 OCCUPANCY SEPARATION SOIL TeST Uti"(Y,)~\l..\.,r I~~.<2 ""J.-,---/rITA L. """'~..<'f;G 1?:U:'.IuI;;" SURVEY Sf'ECIAL INSPECTOR ~~/X'...,......,...... TOWN OF VAIL BUILOING I/a~, "'"rh ~)'.so I'"z PLUMBING 300 TYPE OF OCCUPANCY AMOUNT EXITS REO. BUILDING PERMIT 0 '+~~L 'R 17Qt{,9 O;0 Z.000 "3<, "1"01 1 M---.'---~/'"1-.'0U""T /,....."ELECTRICAL< JOB NAME ~~_..'::::!r,~> I ""-'0;0",,_...,-Ill /~nOTHER DATE OF APPLICATION ,s7/o ,,7-;;:TOTAL 14..-"-1:3'" TOTAL FLOO';(~ NAME CLASS OF WORK .TOTAL LOT A A< 0 NEW M ALTERATION l I ADDITION I -;:>Z MAIL ADDRESS I REPAIR I,•0 USE OF BUILDING ~·~E:)(CITY PH.COVEREO UNCOVERED •NAME sa.FT.OF BLDG.HEIGHT IN FT.OFFST,PARKING0•7'.0 MAl L ADDRESS NO.Of STORIES SETBACKS Off ST.LOADINGz< 0< 7'o.CITY PH.NO.OF LIVING UNITS FRONT EASEMENTS •NAM{ .,",e~CONoa.~ILODGe is-sIDe I IRI III 0 E-o MAIL AQDRESS~Z::>~QN•I...,.i SQ.FT.COMMERCIAL REAR VARIANCE DATE 0 CITY \/....7_,PH<M'Z30~TYPE OF HEAT ~<<WATER II fOACED AIR II fLEe UNIT I I ~ ~"-"<u LOT BLK FILING COVERING0_ "Qp"ROOF .....U.00 "0 TRACT EXT.WALLS •G7"p'l?Cb,<4/,A APPLICATION INT.WALLS _FEES ACCEPTED K 1.TYPE OF CONSTRUCTION I "I"IV G)IHR BUILDING PERMIT .Id.... G SPECIFIED NO PLAN CHECK FEES PLAN CHECK /'~2.OCCUPANCY GROUP A B12:D E F H,J YES -3 /--~-,-DIVISION ,2 3•FIRE SPRINKLERS PLUMBING I~WET STANDPIPE MECHANICAL £PPROVA~?. 3.USE ZONE DAV STANDPIPE ELECTRICAL Iar ~~:",_4.('/ I<III COMO.STANDPIPE CLEAN UP DEPOSIT Jri.-ZfJ'--ff-~~SMOKEPROOF ENCLOSURE o;z;;l£,B /A/"l [)g;i P RMIT # ENERAL oeSCRIPTION Of 'NORK AREA SEPARATION TOTAL H/)\)!0 ....._,.,,, OCCUPANCY SEPARATION 00.00 [HEIlERY ACKNOWLEDGE THAT [IIAVE: SOIL TEST READ TillS APPLICATtOJ\'ANI}STATE THAT THE ABOVE IS CORRECT AND AGREE TO COMPLY SURVEY WITH AlA.TOWN ORDINANCES AND STAT€ SPECIAL INSPECTOR ',L;W;:::r ;Z;'/;C7=~tbryIe....:.~'.'XPLANNUMBER TOWN OF VAil BUILDING 1/<9S 430 00 z "'~~M~/3 "3<X>TYPE OF OCCUPANCY AMOUNT EXITS REO. BUILDING PERMIT 0 ""~ANICAl 1/-3 -":";"..;1?9~9l>"z 000••, '7 1'701 M G",,-/.,I.!>--oi-W/~,~~-ELECTRICAL•, JOB NAME 'T~-rn ~.,.,.....J4.r;.~~> 1\1\-V~J<'$'1'0 IB'lO"OTHER DATE OF APPLICATION silO ".28..TOTAL ''1~-r30. TOTAL NAME MAll ADDRESS CLASS OF WORK NEW)!ALTERATION I I AOOlTlON (I REPAIR (I TOT~l ~T ARE~~Z-_ CITY PH.USE OF BUILOING--VvP:~Y COVERED UNCOVERED TYPE OF HEAT WATERll FORCED AIR I IELECIIUNITI I DATEVARIANCE OFF ST.lOADING EASEMENTS OFF ST.PARKING III SETBACKS REAR FRONT SIDE I IRI ~HEIGHT IN FT. I,,;,.... NO.OF STOAl ES NO.OF LIVING UNITS CONDO.l~LOOGE sa.FT.OF BLDG. sa.FT.COMMERCIAL NAME MAIL ADDRESS CITY PH. NAMf J...~ MAll ADDRESSr"f3.......c 'Z Z~q LOT BLk FILING COVERING APPLlCA nON ACCEPTEDl4III; ,/SI.1LATULEOFO\\N RCONTKAC1'OK FEES - x INT.WALLS Gyp 'lkAtUJ EXT.WALLS 1/1.I t;;.~.'t£. SURVEY SOIL TEST SPECIAL INSPECTOR <:::,.., PLAN NUM8ER TRACT 1.TYPE OF CONSTRUCTION I II III ..._....,..." IV 0 I HR 8UILOlNG PERMIT ">;I~14c I{2.OCCUPANCY GROUP A B ~EFGHI J S PEe I FIE D YES NO PLAN CHECK FEES ~llJlJ PLAN CHECK~DIVISION 12 (3")4 FIRE SPRINKLERS PLUM81NG ..4..~ RJ ,-jf---'W"'"T-'S"-TAOCN"°,,p'"",,''---+__+-4 __+-'M,,'''C''HAOCN,,'''CAOCL'---_+-+_LJ.n.4~'''1.I"~~PROVA\h /'• "'\3.USE ZONE -1I-....!O~R~y~ST!;A~N~OP~'~P~'+---j_+__-f_'~L~'~C"T~R~'''CA~L__+-I-''''~''''-l'I:2!H'~II,t:.J.'j~L......;.::,d"'~lO'...q"~"COMB.STANDPIPE CLEAN UP DEPOSIT bo Q 19'-7fI'~t:!.......f~~~~~~~~~~=======l~~S~M~O~k~'~PR~OO~F~E~N~c~LOS~u~R~E==f=lff=lro~~~'....~~j2~j~O~,O~t>~6 PERMIT tfGENERALDESCRIPTIONOfWORK1f-~A""R,""-'S,'~PA""R"A"T"'O~N'--t f--+__-1!T~OeT~AoL"-iLLJt A'J I ),,0 ....,..(9OCCUPANCYSEPARATIONIHt:Rt:BY ACKNOW1,£0(i£'l'Hi\'l'I IIAVE RE ...OTHIS APPLIC ...TION AND STATt:TIIAT TH~; ...DOVE IS CORRECT ...NI)AGREE TO COMPLY WITH ...1.1.TOWN ORDINANCES AND STATl:: I.~~GA~ZUILOINGCONSTRUCTION BOILCING TOWN DATE OF APf'LlCATlON OF VAil PERMIT TYPE OF OCCUPANCY AMOUNT EXITS Reo. I--'NOAM:::::"'jf-...,..__e"L~ASS=00:::._F"W"O"R"K'___-II_~"T;O"'T...L LOT AREA ,,--_,(~~,,_-.--)_ MAil ADDRESS NEW)(ALTERATION I I ADDITION II REPAIR I I ~"Y CITY ....USEDF8UlLDING 'Dol';;:'I ~1'_COVERED UNCOVERED MAILADDRESS"''1?l'ly..,..,n" NAM '1312.,........(" e,TV II",,,....L/?(,,303P VARIANCE DATE OFF ST.PARKING EASEMENTS OFF ST.LOADING ILl FRONT SIDE I IRI SETBACKS Z. 1-6- TYPE OF HEAT _, WATER-i,FOACEDAIR II ELEC~UNITI I SQ.FT.OF BLDG.5"7"'''HEIGHT IN FT.I NO.OF STORIES NO.OF LIVING UNITS CONDO.I-f7-ILOOGE sa.FT.COMMERCIAL I..e.-REAR ....CITY NAME MAll ADORESS <euz<0<u .. LOT BLK fiLING COVERING TRACT 1.TYPE OF CONSTRUCTION I II III tV ~I HR 2.OCCUPANCY GROUP A 8 ~~F GH t J DIVISION 1 2~" EXT.WALLS W~QIP INT.WALLS G,f.ip ~e.o ROOF'R () FE" BUILOING PERMIT APPLICATION ACCEPTEO TOTAL /..::l.JI."O 19 I IlEREIlY ,.K~6wL~~~E THAT I HAVt: READ TlIIS APPLICATION AND STATE TIlAT TilE ABOVE IS CORKEC1'ANO AGREE TO COMPLY WITH ALL TOWN ORDINANCES AND STATE LdEG/\K~d."LI)IN:CONSTRUCTION. !Ii 1!1~~r !GENERAL DESCRIPTION OF WOAI( .<T),,m =~ PLAN NUMBER...-.,.....' COMB.STANDPIPE SMOKEPROOF ENCLOSURE AREA SEPARATION OCCUPANCY SEPARATION SOIL TEST SUAVEY SPECIAL INSPECTOR 7 J { x SIG TUR.01"OWN!:R STRACTOR EXITS REO. ",ZO'f '11..,";I,","'ran -13091'2.. I~CJ? TYPE OF OCCUPANCY AMOUNTIIza:,,,. 3 0="'"~-3 ,;,17 (AI"",NI.-GAl'" M-CX-~ TOTAL BUILDING PERMIT OF VAILTOWN BUILDING pilfM~~~~C.~ECHANICAl r:i.JMM""\"r.~-'3"."11-''''';0-,-~-.---------j~ELECTRICAL ~'~O~B~N~A~M~'~1:.Il:a;!Ii.l:til\];',l!:=-1 OTHER DATEOFAPf'LlCATION ..51 ltJ 19'1A US£OF8UllDING ~.,COVERED UNCOVERED SO.fT.OF 8LDG.'4f7Zt.HEIGHT IN FT.I OFF ST.PARKING NO.OF STORIES SETBACKS OfF ST.lOADING NO.OF LIVING UNITS CONDO.LODGE 7 I.e- fRONT SIDE I IRI ILl EASEMENTS so.FT.COMMERCIAL I REAR VARIANCE DATE TYPE OF HEAT WATER!I FORceD AIR (I ELEC'b4.UNITI , AP'f'L1CAlION ACCEPTEO COS TRACTOR FEES Sla 'UItE F nlliNE BUILDING PERMIT ROO''lS.U. COVERING SPECIAL INSPECTOR .~I ~ SOIL TEST SURVEY EXT.WALLS IJ1.-" INT.WALLS hr.,Or"~- PLAN NUMBER FILINGBLKLOT TRACT ..---.,.... \:!1.TYPEOFCONSTAUCTlON I II III 10,HR """Z.OCCUPANCY GROUP A~=-D IE FGH I J II---'S:..;.PcE:..:Ccl'-'.FclcE:..:D:....t-evo'='-t_Nco=c __I-'.cL"AoN:..:C"Ho'c~Ke'"'"'='+_fZ""'~?'-f'~PLAN CHECk~L O~,~v~"~'~O~N_"_.5.,{,\~3_"'.4___jf_-~"~R~'~SI'~R~'~N~K~L~'~RS"-----_+--_+-/''-::-_I-'.~L~UM''''B~'N~G'____+_+---'~:.u.1Gl. \'1 ,it--'We:':.:T-"c;TA:eN:oO"''''''.''-'t-_-t_-+_+=M:o;'C"H=A::N",'C=-AL"-_t--t-c,~'7-l~~""'1 ~~RCC-V;h ~~3.use lONE ~~--'O"R~''-''ST~AONc=OC''C.o't _____j-Ir--i_"L,'"CcTeRo'=CoAoL __t_t::;,'E:i1"'::,:'"';j :..1 III 1\'L _jf_-C:o;O~M=B"-.~S~TA=-N""OI'~'~"'-----_+--_+_-+__I-'C~L~'=_A=_N~U=_._,O~'='~OS~,,,T+_+¥~~,,,,~·'/JOICJ ~d...tJ~~G'N'RALO'SC"''''ONO'WORK ::~::::::::':~LOSURE OTHER TOTAL /,~:~,..'/,,,,:,U -"(-'- ,L)~C>C"')(OCCUPANCY SEPARATION I IlEa£DY ACkNUwt2z'1::Tit AT !IlAVt: RF....O Tfllii APPI.ICA TION AND S1'ATE Til""TilE ABOVE IS CORRECT ANI)IIGKF.F.TO CO ...1PLY WITH ALL TOWN Okl)INI\~CES ....ND ST ....TE I.AWS Il:GAROINO .Wll.IliNO CONSTRUCTION. /,11 N 2725/23/79CONSTRUCTIONPERMIT~!.DATE PROJECT NO.--NQ 272_.PERMIT NO.lawn II vaillY 1.TYPE OF CONSTRUCTION IIIIII'~ department of community development 2.0ccUPANCYGROUP ABEHc!Y'M BUILDING 211 135 DIVISION 1220 z ELECTRICAL 7,5420TYPEOFPERMIT~GENERAL DESCRIPTION OF WORK :PLUMBING 10400 [)g []New duplex ~ BUILDING PLUMBING ~ ~ [)g ELECTRICAL 0 FOUNDATION ONLY >MECHANICAL 3000 [)g MECHANICAL 0 LEGAL LOT BLK TYPE GROUP SO.FT.VALUATION PERMITFEES DESC.FILING futato Patch Club 5 8-3 4310 172 410 BUILDING PERMIT JOB NAME,futato Patch II (Units 18-19\5 M 1412 35 300 PLAN CHECK OWNER NAME 5 M "'''>dO" ELECTRICAL (59.60) MAl!ADDRESS PLUMBING (82.50) CITY PH.MECHANICAL I?O "'"NEW(JO ALTERATlON()ADDITIONAL ()REPAIR () ARCHITECT fiRM Gordon Pierce DWELLING UNITS ...2....--ACCOMMODATION UNITS ReCREATION FEE MAIL ADDRESS B::lx 1123 G.R.F.A ;;;4//Q.JS:;EOROOMS 6 DESIGN REView BOARD CITY Vail en P .~,~o~ COMMERCIAL SVST __RESTAURANT SEATING CLEAN·UP DEPOSIT GENERAL FIRM Vail Resort fuv.Inc.HEIGHT IN FT.__BATHTUBISHOWER 6 CONTRACTOR MAIL ADDRESS Ibx 236 NO FIREPLACES ...2...--NO.TOILETS ~TOTAL PERMIT FEES C58-A ICITY V.il m P"COVERED PARKING ..2-.UNCOVERED PARKING ~~~~~~L.<::'__'fl/,:J'.l!-79-FIRM ---BUILDING FtCIAL D TE,...'S I RICAL MAil ADDRESSCONTRACTOR INSULATION ~- I CITY p,ONING ADMINISTRATOR DATE TYPE THICKNESS R.vALUE FIRM FLOOR 9:r. ONING NOTES: PLUMBING MAIL ADpRESSCONTRACTOR EXT,WALLS >"_1 "10 CI~P".ROOF FG ""10 FIRM HEATMECHANICAL CONTRACTOR MAIL ADDRESS ELEC:BB GAS: I C.ITY PH.I H~_REI:IY "CKNUIOIl.EDGE TH"T I lIAVE SOLAR:WOOD:flEADTlllS "PP/.ICATIOI'V AND STATE nUT nu: OTHER FIRM ABOVE IS CORRECT AND AGHI::F:TO COMPl.Y VAILWATER&SAN.OIST TAP FEE·""nil ...LI.TOWN ORDINANI:F;S AND ST"TE MAIL ADDRESS l....ws REG~H ".~'Hl'(;~II)N PH SPECIALNOTES:<----cCONTRACTORCITY '<;b t I\.1 .n'11"1''n , TOWN OF VAIL BUILDING /:11 () TYPE OF OCCUPANCY AMOUNT EXITS REO. TOTA~i.€l:uIA •w § NAME MAIL ADDRESS CITY 'H. CLASS OF WORK NEW i>t ALTERATION I I ADDITION I f REPAIR C I use 0:BUILDING <'~C"J/ TOTAL LOT~A~R~E~A~a~~===2-~~====== COVERED I UNCOVERED APPLICATION ACCEPTED PLAN CHECK DATEVARIANce OFF Sf.LOADING EASEMENTS III1"' fRONT SETBACKS SURVEY SOIL TEST NO.OF STORIES CITY PH.NO.OF LIVING UNITS z.. NA;re '.:l..........COlli DO.coaE ~sloe MAll ADDRess MAll ADDRESS /?7 Q.OI sa.FT.COMMERCIAL REAR,'In/-."TV>Ea'HEAT ,/CITY .1..PHLL.o::J~1,38-l1-__..JW~A~T~E~R!illl_'~a~R~c~E~a~A~'R~IJIJE"'~E~C~"'L'U~N~ITclL.!.I--_lI_-------------------- / rN~AOM::oE 1l----,s~ao·"'CTC·,aC,".","aOoo·>·",<v..:",Rtl'>",:2:=,C'--lCH"ECOG"HOT,-,IN""'CTC·.L_-t~a"'"'CS~TC,C'"A"R""C'N,o"--_+-_ 7 "uw "1l•< t=============:;~~~;;;~==t;;SP~E:C~'A~'~'N~S~':E~C~T~a~R5;;;~~=t~,l====~.'-.I '/PLAN NUMBER C X • "t- ~ IV)".=If ~~LOT 8U(FILING COVERINGI!~~TRACT EXT.WALLS J I 1._~3;>_ROOF ~_INT.WA,,,G\.IP~~FEES 1"1/.IJ; ~I=ll~:~~:v::~~::A~FN::::~N::::R:aU~u:~T:':ON~~~.~"~.~~:~'~~iE~'V~F~G);O~H~',~H~~J~~S~P~E~C~I~F~I~E~D~~~~~3~V~E~S3~N~at~1~B~u~~~~ti~'~N~O~:~E~R~M~::~=t~~"~ld~. )C'DIVISl N1 213')4 FIRESPRINKLER$PLUMBING )C~~ ~~1-;:;;,-;;;;:;==============~~=W~ET~ST~A~N~D~'~"~E~=====t==t=~=~jM~E~C~H~A~N~OC~A~'~=t~~/.~/.Ai~bl;~I J71~,!Al%I.T I 3.USE ZONE DRV STANDPiPE ELECTRICAL I.q<--'-1"" ~COMB.STANDPIPE CLEAN UP DEPOSIT ~I'TI I'!1- '.'SMOKEPROOF ENCLOSURE OTHER /rf"'V')PERMIT rt ~ENERAL DESCRIPTION OF WORK AREA SEPARATION TOTAL l.o.c-,(at::.-OCCUPANCY SEPARATION I HEKEHY ACKNOWLEDGE TIII\T I !lAVE READTHlS APPLICATIQN AND STATE TIIAT TilE ABOVE IS CORRECT ANI}AGREE TO COMPLY WITII ALL TOI'.':-/OltO'NANCES AND STATE LAWS ~GAKDI G B~~t.~J~-O)~NSTKIJCTlON \ \~,;,,,~11\::::''171,Ot"'fV\ll~J. SIGNAl-unE ~'OW'\ElI OR c.;}lNTRA!"TO·J N 2745/23/79DATE PROJECT NO.-- I II IIII\V; PERMIT NO.N~27' I.TYPE RECONSTRUCTION 2.OCCUPANCY GROUP ABE H IE}-BUILDING 203,7lD DIVISION 12 2'04 z ELECTRICAL 7,9960 ~GENERAL DESCRIPTION OF WORK:<PLUMBING 12800Newduplex~ ~<>MECHANICAL 3,000 TYPE GROUP SO.FT.VALUATION PERMITFEES 5 R-3 4569 182 760 BUILDING PERMIT 5 M 728 18200 PLAN CHECK 5M 550 2 750 ELECTRICAL (60.901 PLUMBING (97,50) NEW/X)ALTERATION ()ADDITIONAL (I REPAIR ()MECHANICAL 122 SO) DWELLING UNITS _2_ACCOMMODATION UNITS RECREATiON FEE G.R.E .A44ID.75 total BEDROOMS 6 DESIGN REVIEW BOARD COMMERCIAL SYST __RESTAURANT SEATING CLEAN·UP DEPOSIT HEIGHT IN FT __BATHTUB/SHOWER 6 NO FIREPLACES -2....-NO.TOILETS 8 TOTAL PERMIT FEES COVEREO PARKING _2_UNCOVERED PARKING :7 -=--...",5/231]9 ""ILOING OFFICIA,DAfE - INSULATION ----------ONING ADMINISTRATOR DATE TYPE TH!CKNESS R·VALUE ONING NOTES'FLOOR &Xi EXT.WALLS FG-FO 3.5 -1.5 J8'(~ ROOF FG 10 :10 HEAT ELEC:BE GAS: I lIEREHY Al:KNOWI.EOOE THAT I HAVt: SOLAR:WOOD:ItEAD THIS APPLICATION AND STATE TIl ...T TilE ABOVE IS COItItECT A:-IO AGREE TU COMPI.Y VAIL WATER &SAN.DIST.TAP FEE:WITH AI.I.TOWN ORDINANCES ASD STATE SPECIAL NOTES.":;;p:g '~'~' "'''., rn PLUMBINGoFOUNDATION ONLYo CONSTRUCTION PERMIT TYPE OF PERMIT !()BUILOING Kl ELECTRICAL Kl MECHANICAL LEGAL LOT BLK DESC.FILING Potato Patch Club NAME:Potato Patch II IUnits23 &24 NER NAME MAIL ADDRESS CITY PH. ARCHITECT FIRM Gordon Pierce MAil ADDRESS Box 1123 CITY Vail aJ PH 476-2657 GENERAL fiRM Vail Resort Dev.Inc. CONTRACTOR MAil ADDRESS Box 236 1 ""_A CITV Voil (Y)P" FIRM ",CTRICAL RACTOR MAIL ADDRESS CITY PH I FIRM PLUMBING MAIL ADDRESSCONTRACTOR CITY PH. FIRM MECHANICAL CONTRACTOR .MAll ADDRESS CITY PH. OTHE,R FIRM '"MAIL ADDRESS ,CONTRACTOR CITY PH N 2735/23/79DATE PROJECT NO.-- PERMIT NO.Ne 213 I TYPE OF CONSTRUCTION 11J1l11~ 2.0CCUPANCYGROUP ABE H 1~BUILDING 301,510 DIVISION ~2a 3 4 z ELECTRICAL 12204Q GENERAL DESCRIPTION REWORK:~PLUMBING 18,000Newtriplex~ ~<>MECHANICAL 4 OeD TYPE GROUP SO.FT.VALUATION PERMITFEES 5 R-l 6974 278,900 BUILDING PERMIT 5 M 774 19 350 PLAN CHECK 5 If R4fl 32M ELECTRICAL 176.50) PLUMBING (135.00) MECHANICAL (30 .00)NEW{)ALTERATION ()ADDITIONAL ()REPAIR () DWelLING UNITS .3.....--ACCOMMODATION UNITS RECREATION FEE G.R.FA 7353 Total BEDROOMS ....fl.-DESIGNREVIEW BOARD COMMERCIAL SYST __RESTAURANT SEATING CLEAN·UP DEPOSIT HEIGHT IN FT.__BATHTUB/SHOWER 9 NO FIREPLACES ..3...-.NO.TOILETS 1?TOTAL PERMITFEES COVERED PARKING _3__UNCOVERED PARKING 3 &=R~"'Z'¥/.23/19 - '"....-BUILDl GOFFICIAL DA INSULATION CONING ADMINISTRATOR -------DATE TYPE THICKNESS R.vAlUE ONING NOTES:FLOOR sex; EXT WALLS FG-FO 3.5 1.5 Ml tel ROOF FG 10 30 HEAT ELEC:BB GAS: I Ilf;RE8Y ACKNOWI.EDGE TI-I"T I HAVE SOLAR:WOOD:READ THIS "PPLICA TION AND ST ATl::Til"T "H~; AflOVE IS CIIIIIO::CT'AND "GRU:TO COMPLY VAIL WATER 80 SAN OISl.TAP FEE"WITfI "LL TOWN OROIN.u>cF.~At'lO ST.\T~· LAWS REG ~"t""G U<.:TIUN SPECIAL NOTES: "'L)<"\\J •1 "Il\\""(·0 ',c 2 IXJ PLUMBINGoFOUNDATION ONLYo TYPE OF PERMIT []=BUILOING []ELECTRICAL []MECHANICAL ~CONSTRUCTION PERMIT tDW~ department of commun ity development LEGAL LOT BlK DJ:SC.FILING Potato Patch Club ~NAME:futato Patch II (Units 20,21 OWNER NAME MAIL ADDRESS CITY PH. ARCHITECT fiRM Gordon Pierce MAIL ADDRESS Box 1123 CITY Vail CD PH.476-?"-~7 GENERAL fiRM Vail Reffirt Deve}oprent CONTRACTOR MAIL ADDRESS Box 236 ,=,'my von m PH FIRM ECTRICAl NTRACTOR MAIL ADDRESS IO'TY PH. PLu!lll'lING FIRM ,MAil ADDRESSCONTRACTOR-Imy PH FIRM MECHANICAL CONTRACTOR MAIL ADDRESS IO'TY PH. OTHER FIRM, MAIL ADDRESS CONTRACT~CITY PH -, TYPE OF OCCUPANCY AMOUNT EXITS REO. TOWN OF VAIL BUILDING 1"':',, z PLUMIlIN6 -'),, BUILDING PERMIT 0 ifA7'>'.J••EC NfeAl•<, U "-1'\3 l'.'-I "ELECTRICAL< 'I-f.>,JOB NAME I OTHER DATE OF APPLICATION ..,//"I]TOTAL 1 PLAN CHECK UNCOVERED APPLICATION ACCEPTEO APPROVAL II ''-~.L.,,~,--"",-,-I DATE COVERED SIGNA1'Ull L 0."OW;.lEIt OU cOt''I'IlAb OR I H.:REII'I ACKNOWI,.:IlGI!:Til AT I H,\V£ READ TillS III'PL.ICII TIOt'AND S'fll'!'¥.:TH,\T TilE A90VF.15 CORRECT liNn AGREE TO COMPLY WIT"IIL.L.TOWN ORDINANCES ...ND STATE L....WS REGIIRDING IIUIL.D1NG OONSTIlUCTIO:-l. VARIANCe EASEMENTS OFF ST.PARKING TOTAL LOT AREA OFF ST.LOADING MECHANICAL 1"'R' YES NO SETBACKS ROOF r" 7 -3l'-j.4EIGHT IN fT. FIRESPRINICLERS COVERING SPECIFIED CLASS OF WORK TYPE OF HEAT WATERl I FORceOAIRllELECl UNITl NEW ~(ALTERATION I I ADOITION (I REPAIR I1 USE OF BUILDING ..-r-">. WET STANOPIPE SPECIAL INSPECTOR EXT.WALLS SOIL TEST CONDO. INT.WALLS NO.OF STORIES sa.FT.OF BLDG. sa.FT.COMMERCIAL REAR 'H. 'H. FILING II III IV r..V I HR ABCDEFGHIJ DIVI~l 2 2,OCCUPANCY GROUP 1,TYPE OF CONSTRUCTION NAME<•Z MAIL ADDRESS•0 CITY <NAME°"U MAIL ADDRESSz<0< U"CITY "NAMEu ,'C•",MAll ADORESS u "<CITY "<U lOT BLK 0-••"0 TRACT , •~L ~'~I"A~N~N~U~M~B~'~R____lL=_~__~_~=--~~=__.L....:~__l _" ~,~.'..---l~_S~U~R~V~E~V'---+__-+-J'--_---< , t=J )c UJ ~0-n.\;r-3.USE ZONE -!f_...!'°~R~Y'_S~T~A~N~O~'~"~''__+---l_-+-__-II-C'''L'''''CCT~R~'~C"A~L=____l__1~;LL-l"y ::-I L --jI---'C,O""M"B'.'S'T'A'NeO"'"'c','+I-_L__Jl--0C"I,,'eA"N'-'Ue'cOe"'cOS~'cT+_¥$.."-'-+¥'~n,l SMOKEPROOF ENCLOSURE OTHER PERMIT:# \~ENERAL DESCRIPTION OF WORK AREA SEPARATION TOTAL / OCCUPANCY SEPARATION 00539PERMITNO. BUILDING ,n,nnn z ELEcnUCAL 40 0000 ~PLUMBING "nnn~ ~•MECHANICAL> PROJECT NO._7,30-80DATE lllllll~ ABEH RM V DIVISION 02 2a 3 4 GfNERAL DESCRIPTION Of WORK .11 5 new unitsPLUMBING ':J FOUNDATION ONLY ':J TYPE OF PERMIT 00 BUILDINGIX:ELECTRICAL C MECHANICAL ~CONSTRUCTION PERMIT llwa I tal I TVPEOFCONSTRUCTlQN department of community development 2 OCCUPANCY GROUP LEGAL DESC ~BNAME OWNER LOT -----7'9,.,/"RI'LII.-- FILING ff;t.~"""f7/ Potato Patch -Phase III NA"lE TYPE v v GROUP R-l M-I SOFT 10885 1440 VAtUATlON 545.000 58 000 BUILDING PERMIT PlAN CHECK elECTRICAl PERMIT FEES ,<an <n 845.25 MAil ApORESS PlUMBING 450.00 CITY PH NEW I ALTERATION (I AODITlONAl,.()REPAIR I)MECHANICAl ARCHITECT 1""',0".'------------1 GENERAL FIRM Duddy-Yiele Canst. CO NTRACTORIIM"""'I.LADOlllOlfOtt.>:SS'---_ 188-A e,~DH TOTALPERMITFEES 1$5_30R.3~VNOFIREPlACES__NO TOILETS COVEREO PARKING __UNCOVERED PARKING COMMERCIAL SYST __RESTAURANT SEA liNG DWELLING UNITS __ACCOMMODATION UNJTS __~I--'O:::.:::cO:::.::.::":::O:::N-":::EE'----+---l.,'JlJ<?[L.?.1"""-__-j GR.FA lQB85.8EDROOIrilS DESIGNRE¥IEWBOARO ?nn nn CLEAN UP DEPOSIT dnn nn--II-=':":::"':="--1-..'IlllJ...lJlL--1v HEIGHT IN FT __BATHTUB/SHOWER PHCITY MAli ADQRESS FIRM FIRM FIRM OTHER :.:":::0."-1 I II HI I'll\"I\l:KN""'I.U'HI"rH."I 111\\1. RL'IOTIlIS Arrr.IC"TIlJJo,A"'''~T,'1'1'lIA I 1'1I~ AII""~r~l"Ollkf.n ANn Mall.f 1,l CO~lrLY W1TIl AI,I.1'U"'S nRlJl"'Asr£~1\"".~1''''. 7·"ill.jS)RroilJil\1I0lNQ1I1'IUU""fjlSSTRl'l:!4I1.... '.ojll Ii.K-eSG '".J.,LO'1"'16JJr; ","II"'''',...,lTD TYPE THICKNESS R·VALUE FLOOR Batt R-19 EXT WAllS 8att R-19 ROOF Batt R-30 HEAT ELEC'X GAS' SOLAR WOOD. VAllWAIER&SAN DIST TAP FEE tlfi 1&:;7 nn SPECIAL NOTES --jll PH PH D MA!L ADDRESS CONTRACTOR CITY MECHANICAL CONTRACTOR MM""Ill.LAADIIJ°O!,,,r,,S>.5---------1 .", PLUMBING CONTRACTO RI!·"'lIJILo1''-'0'''0''RE''S''5~_ ICIT'!' "'"pnnlo",.,.... ELECTRICAL_0 NTRACTOR,I ,."N,"-LA..O"O"O..,,,SS'-I ~ITY PI-l {/ - 58 81CONSTRUCTIONPERMIT,DATE --PROJECT NO. -..PERMIT NO ..,IUIU'v&b~689lilaIIIIITYPEOFCONSTRUCTlQN department of community development 2 OCCUPANCY GROUP A BE H r~BUILDING ?ROO.nnn DIVISION (92 2.3•z ELECTRICAL '00 nnn0TYPEOFPERMIT~11'.nonGENERALDESCRIPTIONOFWORK:PlUMBING :xJ ex PLUMBING 14 new units and landscaping :>BUILDING ~<ex:ElECTRICAL o FOUNOATION ONLY >MECHANICAl "/4 0 MECHANICAL 0 LEGAL LOT BL"lY'"CROUP <OFT VAlUATION PERMIT FEES OESC.FILING V R_'?ROO nnn 7.411.nnBUILDINGPERMIT flo:.~BNAME:Potato Patch Club -Phasel ,7'.on ~V M_'PLAN CHECK ;::: OWNER NAME ELECTRICAL 75O.nn ~MAIL AOpRESS PLUMBING 1 310.00 CITY PH.MECHANICAL 'l!:§;;NEW I AL rERATION ()ADDITIONAL (I REPAIR ()~ARCHITECT FIRM DWELLING UNITS __ACCOMMODATION UNITS RECREATION FEE 7.17Rnn ~36890 BEDROOMS 300.00 ""MAil AOORESS G.R F A DESIGN REVIEW BOARD ,~ C'TY PH COMMERCIALSYST __RESTAURANTSEATlHG CLEAN UP DEPOSIT 500.00 i '::i FIRM Duddy-Yiele Coost.GENERAL HEIGHT IN FT __BATHTUBISHOWER CONTRACTOR MAIL ADDRESS NO FIREPLACES __NO TOILETS TOTAL PERMIHEES It21 392.50 CITY -COVERED PARKING __UNCOVERED PARKING ~{lgi{A -1(/fL __-~. FIRM ~~ECTRICAL NTRACTOR MA'l ADDRESS INSULATION f--------------- "Y PH ONING ADMIN'STRATOR DATE TYPE THICKNESS R·VALUE FIRM FLOOR 10 ...D_'a ONING NOTES PLUMBING MAIL ADPRESS R-19CONTRACTOREXTWALLSBatt "Y PH ROOF Batt R-38 fIRM HEAT '1'w~~:~,::,,::,,:gr~~~J,,I!.~:MECHANICAL CONTRACTOR MAIL ADDRrss XElEe:GAS: Y PH SOLAR:WOOO·Rt:",O TUI~""I'I-lC"'TIU;<;ANO STA 'I't:Til""r Tilt OTHER FIRM ...RlIV ••IS CORKEI:T M~n AliKEf:TO COMPLY VAil W"'TER&SAN DIST.TAP FEE WITII ...t..t.TO....,.:ORlll~...,.cr.s """U STAn.MAll ADDRESS 7i~~;"';:~:;;;:_~G cCJ:"snn Tin ..CONTRACTOR PH SPECIAL NOTES· CITY ",..-.,"'.1 ..,"..." ,,, 5-5-82TE NOTE -COPY OF PERMIT TO BE KEPT ON JOBSITE ,.~CONSTRUCTION PERMIT..'----..'DA 001020"PERMIT NO.., town 0 III 1 TYPE OF CONSTRUCTION 1IIlIIIVII department of community development 2.OCCUPANCY GROUP ABEHI€)"BUILDING 8500 DIVISION 122<1&z ELECTRICAL TO BE FILLED OUT COMPLETELY PRIOR TO ISSUANCEQF PERMIT 0 GENERAL DESCRIPTION OEWORK ;~PLUMBINGTYPEOFPERMITAddgreenhouse~ ~ ~~BUILDING 0 PLUMBING >MECHANICAL ELECTRICAL 0 FOUNDATION 0 MECHANICAL 0 so.FT.TYPE GROUP VALUATION PERMITFEES lEGAL lOT BlK V R-3 8500 BUILDING PERMJT 74.50 ~~ESC.FILING Potato Patch Club PLAN CHECK 37.75 ~B NAME:John Holland Greenhouse ELECTRICAL OWNER NAME NEWe 1 ALTERATION ()ADDITIONAL 1 REPAIR (1 PLUMBING ~~MAIL ADDRESS DWELLING UNITS __ACCOMMODATION UNITS MECHANICAl CITY PH.C.R.FA ~BEDROOMS RECREATION FEE 98.00 ~ ARCHITECT fiRM COMMERCIAL SYST __COVERED PARKING DESIGN REVIEW BOARD 10.00 ..1"'""" MAIL ADDRESS HEIGHT IN FT __UN COVERED PARKING CLEAN·UPDEPOSIT 100.00 CITY PH.NO FIREPLACES USE TAX JT~ GENERAL FIRM Sol ar Utilities,Inc. INSULATION ~CONTRACTOR TOWN OF VAIL REG.NO.TOTAL PERM'¢!lES $320.25TYPETHICKNESSR·VALUE TELE.FLOOR ~k,ctf /A'A~_W~-- FIRM EXT.WALLS ELECTRICAL TOWN OF VAIL REG.NO.---------------ONTRACTOR ROOF ONING ADMINISTRATOR DATE TELE. HEAT ZONING &BUILDING NOTES; FIRM PLUMBING ELEe:GAS' CONTRACTOR TOWN Of VAIL REG,NO. SOLAR'WOOD; TELE. FIRM I hereby acknowledge that I have read this application,filled out in full the information required, MECHANICA completed an accurate plot plan,and state that all the Information provided as required is correct.I CONTRACTOR TOWN OF VAIL REG,NO,agree to comply with the Information and plot plan,to comply with all Town ordinances and state TELE.laws.and '0 build 'his s'.uclure accordin'l'he Town's zoning and subdivision codes.design OTHER FIRM ;:Le~:~unif06:BU~d,E ':/0j?nil ::o:::ceb,e Ihere'o TOWN OF VAIL REG.NO.1,;l;L ./(1"S'GNATURE OF OWNER OR CONTRACTOR FOR H'MSELF CONTRACTOR TELE.Of(~~/AND THE OWNER. ""pm....,"'..1 1 item :P.L. t no. Sheet 1 o ( , w U 2 W 0-enwa::: I-cn 1-::::> •O.....J Uuen II (!)U ::::>1-I~ N CO lJ..1-« 01- 1-0a.. 2 0 -I-J"f)-01--02 <t:::::> r 4 • ----E:1-TE loft VJp.u..G F ""DO TIO"0 e L.a:::1>o'1"fS D 11"1 <fiJi>'e;L.OC 0 lA'S>E'~I (;:J ~L.c.o ~y 1.(;:J ) LAN '--' .. () ) I J <:,p-6 I!!-"";'t>E:r:'V" ~?,..--C )(qr ~& oeI G H".Iool I>oD 'T 11 -lp.1<H D >4 Hb t 4 ~b e~eX 191 t-!&lo". T J I TO ""iBI'-l 6 L-. o • Town of Vail Community Development ;~H:lth Fire pproved 0 Denied 0 o 0 Validity of Permit Sec.303 (C)1982 UB C. :~:Ci~~~~~~~~~;a~~:nge o;o~tt;~~\~r b~p~r~~~~~:~;i1S a~d proval of.any violation of any of the P'o"sions f "or"1~r ~~~~i other ordinance of the /urtsdication The ~ss~~~cceO~~ n ~t.ased upon plans.specifications and olher dala sin c ·rr~~~~~n~:h:r~~tldl ot~cia:from thereafter requiring t t~la."I ans.s eClflcallons anJ 0'_;r r VATION I J • • T / I I I P I • L I ,..D .;,JL,..I:)f /..(lI L < WEST ELEVA IONI • ." \. ., o '0 <1l '-o o <.) " .,' • (l)u U C ~- Q)• .-f/) Q.Q)-'('0a::.-u COof/) 'Otn~<o <.:>oes ". ,. '.~ ':--. r.'-;· -' ..,.. -'.:) ',,,,. \. •• 120 ........110 :....,..----1 IIX' ----.70 ./ • \ \ \ --- -.'---..'10 Proposed B 'k to Pedestria'e P<?thnBridge , -~.... 110 ""- " <" .".'50 -, \ ., ,, • -!to .25 -----.......... .......Ifo· ( l ----....... "---/ ...............:----- ---- \j - - •• - \,. ........--. --...------'-- \ '. -.- \. - \'...--.--,\• .--- '''-- - \ ...... .------=-=--.-- .., ", --"'- " '. .- ", - : --- --. --- " ..0 ------40-_-.80 -------" - ,", \S1te-~P~a '. --,"- - \ Open s~ce ..........-....... --- .- -, -- .......:. -- - '. - ,....-~ ......- ........ '-" ~, --- '" <, -- - ,/ , " It>"- ----.."-"'----"_____I --'-- ---' - -. --..-. "- / / ./ ,, / - ----- 110 -- -- ", --. - .--.-/.'.... ."--.. ".. .-- -.......- ....---/ ...... ------ - '. 1(P0 "-- -- - '-"- -- --- Private PZonedRcroperty .'..'. - -- :I ....--- o.---- - -- -.. o '- Space -- ...0----_.... ,,-.--'--_.--.. --- - ---_•.---- ..- --- -- .--.----_.---- ~----~........ ------...------- / I - '. .. - '.. - Open Space - -..'.. _.'"..-•...~... _.--'--- "" t ~L.4tl I ,/15 ..........Open0_,. -----"...--..... / --.-.'''.---._. -" = .....--. / / .----~ /_---r-t~ --- -=- -'- .._---- -- 1')0 . ............-- -. --- " - '. -- .. .--.---.----_.-.----'" --- ""\ ~....'-' rn· '\. ---- '-'- --- ---- -- '." -.- - '"'- -...._- I -.-- 140 -. -"- -. - -, '--- .........". --- ". - D ••__ - --" ---_.~ ._---.:'-- ---....... - - P.,1M :, ---.......-...... - -- -- ----. '''. .'. •,j.'~ -.. - '. ------ -- ------ --- - / ./ - ) ,.j~ (r !I " \L /j '_"i 1 \!PI'~.',-/,!I(.Ii' :11 ..,,,-··/1 .I1,'.-I :., / / / / ---'-----'----- ...........--------......--------- ..-------------..-_..:-..;---_..--------- --- -- - --••>, -- \ \ \ ," ----- , r'J / ,. .". ----., I ) ! b ) .fJO f / I --._- :.'' ~-"- I // I .fi;)/,.~I ;1 /1/ /\.// /v I/ 1/// /( /\ /\ /\ I\ I J \( - Ridge District i " .,I 1 ~", ,' i,. I .., I, t I I ,.; ·1: :'il ,". i' .1 "---....,'. .j"'); ,. 00 ., ;..' ,I ",....', .f /:. .~, < ,' ..: ~ CD Z o-CD "'0 "'0 Co U) co-a- oa- U) a~41 SeuUl ee»-ro IIn....e Fort Co1llna Colena.1lD!>2~ Phone:(970)i26-21l:;7 OeD ...W>"'(3o$)MO-tlS~ V.eNDUe (:I9S)oWo-8188 IIllAIIl SAL CIHE"Cl(EI) DR D/,l[ 06/10/96 JIC.oU: AS NOTED .lOB IICl. 07-96 IHEET ~[?)U 0 U \ REVISIONS DATE . SAL D.R. o c STRUCTURAL DETAILS -----100W.120V UGHT ---, ~__-1!I·x Ill"1oA.'N DRAIN U-3 SKlloAloIER T.K. BUild n Hpallh I&1CV-0 o 0 Validity of Permit Sec.303 (c)19 U.B.C. Town of Vall ComlT'unity Developn,"-'" / JETS (8)TYP. NEUJAHR AND GORMAN,INC, CONSULTING STRUCTURAL ENGINEERS 44 Cook Street,Suite 200,Denver,Colo.80206 "The uance r gTRnting 01 a permit cr approval 01 plans and shall nol bc ru 1 bn por'll;1 lor.or an 1 any violahon of any 0,.1 P s 01 this code or her ordinance vI I,.JUw I n hossuance 01 a pe d upon plans,speclfica:lOS end olher dala shall no ,11 Ihe building ofiicial Irol'1 the rea Her requiring the correclipn of errors In said plans,spllCillcalionllllld lIIIIIr data'Town of van~,.9--/~-q"OFFICE Copyo</~ STRUCTURAL CONSULTANT DESIGNED DRAWN CHECKED I\PPRO'/ll) Plan ApprO':ed 0 Denied 0 - fffiffijjffi],Iq Irrj~II,r---\,.--Jt----++-h""",""-!_2'FlL TER sucnol-<1j!Ii~P'~iil I 2'SKIMMER sucnm;---I~~III.'I I 2"FI TER RETURN·.( __...J ---; ----,.'--f--+.f--+--3"JET sue ON -----1 I I P.II . ~k --=.8'::£_-------.1" 2 RfTURN INLETS __ / / I r SCAlI,1/2'="-r:!' SCALE'1/2'z "-0' J "ACC9-.E AT STAIRS AND 8ENCii-O=::::::::x>':--- I'CONDUIT TO J-BOX (BY OTHERS) 6' d '8n: Vl< o 8'DIA. J'-OR 25 UN.FT. SO SQ.FT . 1~SQ.n. 1.~20 GALLONS 38 ~PM 30 ~IN 3.P BOOSTER PUMP •<0 6'"S REQ'D • • DRAIN "COVER. DATA t .' 2 1/2' .'. • 8' , ~NO SCAL£ H.C ,OPllON. • ',: o 0 .... •6'-r:!' • SiZE f)EPTH PERIME SURFA l'LAST-.k·1:'" CAPAC:, 1URNOI. ..., ., • " e SCAcL ,~~,-~-1-'--O'--------- • •• ,. ••. , t8l JANnY At'V£ ~l.U.BALL V"Lvt CHECK VALVE •• • • KEY , • i t1 UNION ~aUTTERFlY V/ld...VF. ..Fill(~NQ:;TOR I;Y-SlRAitlER r BALL v~L~ t><l GA1£VAL.vr.: """V£N'TlJRI 3'-6' ED. SPA JET SCHEMA 11C RE.lNfORC£I,(EN1 AROUND ETRA TIONS "THROUGH POOL WAll OR FLOO~. MO SCAlI NO SCALE PIPE PENETRATION DETAIL t 7' V---,4 xC£NlER ~,.6'Z" LlAX .I 'Nl ((1'\ c;J\..)~1-- '<-.1 \ I ,\.....-.......iYP . i'EN • ,. • (9,/,..,'-0· x)'-~- , '..--"-J'\ ,\r J I,t+-., ~ ~-....II N {-,1 "I- /'r., /~ ::f ••<0 (3)'4 x ~, , 4 .-fl' B'"'<.C. •· •• '., ,. 1/ ,... l' t • •, .,? • r>o..-----R STARlffijH.O ..... !.tANU •Y CO!>lROUED BY 1IIlER.e\'Le. •o.'~ .... I , <D 14 NOSING BAR (TYP.)HOOK INTO OPOOl WAll (PROVl::lE ~OOWEL TO "SLAB OPP.SIDE) •• W.L ~92.5' •~© 2'-0' 3 tiP,nov.1 PH WOfCJl 1'-0' .....-<""-,,Y BY E.C. 1L..----.t4 A B'O.C. o 1'-0' l'-..s" • ,-_EXlSllNG HEAlER. ~/OfF BY t:.c. • F1LlER PWP .spA:I hp,22fJII.1 .. ..~ oo SPA fILTRATION ELECTRICAL SC.... SPA JET ELECTRICAL SCHEMATIC~=~~~~~~L~';;;;;:;;';:;";':~=~~===:=':;;:;:;:':-~':"';";'=-"---",, ~O SCAlI HO SCAlf i 5 lot n~ER ()<WAI.L 1ClNtl..N 5'-0'FR()I SPA. OVIOED AND STAli£D BY E.C 1'-0' • • 8 'I'·.1'-~ 8'/'··1'-ll" • .......- •6 '• J • •,, • • •••• 1 / ~;:;:>;:=::~a -rjF';CAL-,• .pJ,....~,:; ~P1%.. / l1' "y I c:~ proiett drawn PH~ .sheet 1 of 1 HtP?~?;:;: ip j--',A~~,9f.' ~..~~~l • ..f ./ 1 .' T .. o 1 J II I\ I .l--__....,.,-I-__-'--__I-_-t'rL ~ j >0 kathy langenwalter,a.i.a. 2588 arosa drive 303,476,4506 post office bax 1202 vail,co 81658 david mark peel,a.i.a. ~r:-r~""':'1 ......p ~IMWA'of ail communIty ~A""""~:7 De elopmlll\t Health ~l-r"'i"'""i"'::;Y·;a.""-, ,A~~ ~/£:9<~ Zl ;;';AC'::;;~- II~.~,...", ~";4:!,e.---I r ~.7."iti ~ 11'"1~0"Jroved-"fJa?,-:: -rl 'lJ l- t e-'U 1 1----'-",..........i=:'1~1"'"E ity o~mit 'i 1 ","I';)1 ('j Ul "t'U.llC..."..r -,~-'of.3 r at 0 llla~s a"~,,~·:,nr 1..,?061ml 1 or pp rml lor,o~an"~"1),••"cIUl'lruod to oe a .l~'dade / '..'I,'<""r.,o\t ",'01 the prov1 ns.IS b i I ..~ani '/:""cr oN~Y,.dcation he'Sll ncp 0 .;:.~'.",'IJ'i,01 1M luns.'th 1lata st\all.'/...,...J.T...tiOnS a"l'-!=s",....,,*",-'--4-'!='..'.d upon pans,SppCI 11';'''It r requlnap,""',l nose di 9 offic,al Irom the ree .nd ott'<· ne,t r·rv~ou~~'"jlllIns.spec\ficatlons a.',~, l..un(.ctire:~.,:ro :\ data',;A~ZXI~.~~~~~r II /4-'.r I J -l 1 )' .\, Jl<' lj :Ie, r c;:I -r.,?,,(,,B I , 1 I,. 9==:....,....., ,- t '11- ...P; )1----4 / ~te'H~~~~~W ..,q.,Je;U~IT -#'11 ~"Z'l:""~C(?~I fuH~ ~~f'1::l:::'~~J:a rp ~L..I CO --. ~.x~~~;A.,;:;I'" ~-060,;;::::'("'JU;-~ !?"?IYrI?11"'-,l-1 --'z:;;> HA-,z::>1 ;;:'<'.7"""~ fi;:J~lSkl~t]Ii - f;:6.7G'-II V • rJ~9~e-<a. ~:--91~ • ~L.~A,~V5 ~h ~1'7"" ~-:....io"'f:-tT1,,..., r-lo/?1f"l ~-+z::>-rjA"'2:"-ES><'P f7<\""1- -fI-- '"v/ 1 .( B-'<I~I--jp.~~ ?~""''''''~I~~,::;r I-.~U ~...,~ rla~~1.jA."c... ~--NAL.L t~I -J- ~J::;:><,~~J-.J ~~!/ ~S7 ~...i"<........~~";-A.,~ ~LA,..-""G y ....~p ""'~-A ::"' '4:;L~...;·,.t:~~r,57:l-Jj"':......-=J t;X1-;::;.....~,!?1aY .:?;-'--:/'.-::. ,A'7 r~.:?,<-i,::'. ( I l Vt":r:/ !s1:?,~-S;:::' ,S"H ~,,­ 7""'J;::';~ BF1J> /\ \I I I ,i 1 ~t..:~~.. cP-,..~L.:": ~• L [ < :II I i-\ I J I 11I - r).-t 0'= ~l./ -t~. T Contractor to visit site and familiarize himself with all new and remodel work.In the event of discrepancies between the drawings and existing conditions,notify the Architect before proceeding with the work. All interior finish materials,paints and stains,fixtures,equip- ment,etc.,to match existing or as selected and approved by Owner. Patched or damaged construction to be finished to match existing. Work to be performed in accordance with all applicable codes and regulations.The Owner shall be responsible for all existing hazards on the property;and for the discovery,presence,handling, removal or disposal of or.exposure of persons to hazardous materials, waste or substance in any form on the property,including but not limited to asbestos,asbestos products,etc. Mechanical and Electrical Systems design,relocation,dropped ceiling locations,etc.,shall be the responsibility of the General Contractor or designated subcontractor.The Architect assumes no responsibility for errors,ommissions and applicable code requirements of consultants. The Architect assumes no responsibility for utility coordination,care of adjacent properties,performance specifications and the components of construction safety;nor for the Contractor's failure to carry out the Work in accordance with the Construction Documents. •GENERAL NlJI'ES: + 9'<'",,(7 l-iV~ ---- 1 11 ,:h:?11 ~- ~rp~'-""'"