HomeMy WebLinkAboutBIGHORN 5TH ADDITION BLOCK 5 LOT 8 UNT B LEGALTO\^/N OF VAIL DEPARTMENT OF COMMTIMTY DEVELOPMENT
75 S. FRONTAGEROAD
VAIL, CO 81657
970-479-2138
NOTE: THIS PERMIT MUST BE POSTED ON IOBSITE AT ALL TIIVIES
ADD/ALT SFR BUILD PERMIT Permit #:8;024066
job Address: 4966ILINIPER LN VAIL Status . . . : ISSLJED
Location.....: 4966 jumiper lane Applied. . : 04/15/2002
ParcelNo...: 210173702031. Issued...: 04/77/2002
Project No : Expires . ..: 70/14/2002
olrINER I-,OBTaz, w. CHARIJES, III O4/L5/2O02 Phone:
315 HT'MBOI,DT ST
DESI\TER CO
80218
L,i.cense :
CONTRACTOR MASTER SEAI-,ERS
P. O. BOX 4473
VAIL, CO
8165I
L,icense z 577-B
APPI-,ICAI\N I4ASTER SE,AI,ERS
P. O. BOX 4473
VAIIT, CO
8155I
IJicense : 577 -B
Description:re-rolof same for same
Occupanry:
Type Construction:
Building-> g42O .00 Restuarant Plan Review->
Plan Check-> $2?3 . oo DRB Fee---->So . oo Additional Fees->
04/t5/2OO2 Phone: 97O-476-3975
Valuation: $40,000.00 Add Sq Ff 0
Fireplace Information: Restricted: Y # ofGas Appliances: 0 # of Gas Logs: 0 # of
Wood Pelleh .**' FEE SUMMARY
go. oo Total Calculated Fees-> 9696 - 00
04/L5/2OO2 Phone t 970-476-3975
s20.00
$0.00 Total Permit Fee-> $715-00
90.00 Payrnents-> $715.00
90-00
Investigation->
will call->
$0 - 00 Recreation Fee--->
$3.00 Clean-upDeposit->
TOTAL FEE$______> S6e6 . oo BALANCE DLiE-->
Approvals:I€e'm: 05100 BUILDING DEPARTMENT
o4/t5/2oo2 DF Action: AP
It.em: 05400 PLANNING DEPARTMENT
Item: 05600 FIRE DEPARTMENT
IEem: 05500 PITBIJIC WORKS
See page 2 of this Document for any conditions that may apply to this permit.
PAGE 2
Permit #:. 8O2-00,65
CONDITIONS OF APPROVAL
asof.M-77-20O2 Status: ISSUED
Permit Type: ADD/ALT SFR BLIILD PERMIT Applied: M/15/2002
Applicant: MASTERSEALERS Issued: M/17/2002
970476-3975 ToExpire: 70/74/2002
|ob Address: 4966 JUNIPER LN VAIL
Location: 4966 jumiper lane
ParcelNo: 21011310203'1.
Description:
re-roof same for same
*{ik****.*fi*ffi********************#r****ffi** COnditiOnS *#********lil***************************
Cond: 12
(BLDG.): FIELD INSPECTIONS ARE REQUIRED TO CHECK FOR CODE
COMPLIANCE.
Cond:16
(BLDG.): SMOKE DETECTORS ARE REQUIRED IN ALL BEDROOMS AND
EVERY STORY AS PER SEC.310.5.1 OF THE7997 UBC.
DECLARATIONS
I hereby acknowledge that l have read this application, filled out in futl the information required, courplebd an
accura@ plot plan, and state that all the inforrration as required is cortect I agree to comply with the information and
plot plari to comply with all Town ordinances and state laws, and to build this structure according to the towns zoning
and zubdivisioncodes, designreview a11prove4 Unifonn BuildingCode and other ordinances of the Town applicable
thereto.
REQI,JESIS FORINSPECTIONSHALLBE MADETWENTY.FOURHOTJRSIN ADVANCE BYTELEPHONE AT
PM.
Send Clean-up Depoeit To: N,/A
OR AT OTJROFFICEFROM&M AM.5
OR CONTRACTOR FOR HIMSELF AND OWNEF
tl
?rtJr?-d)
)-PLETE OR
Project #:
Building Permit #:
97G479"'2149{!ni
MWNOFVIN
75 S. Frontage Rd.
Vail, Colorado 81657
Contact and Phone #'s:
77a" 6?tTown of Vail Reg. No.:r=z -3General Contractor:
':rE'.{ f/--4,//z '/
cOM PLETE VALUATIONS FOR BU ITDIN G PE RMII Ga-bqt&-Ueteria ls
BUILDING: $ELECTRICAL: $orHER: 5 ,Z{-'le/ /a,aaa. a
PLUMBING: $MECHANICAL: $TOTAL: $
For Parcel # Contact Assessorc Office at 97O-328-8640 or visit
€e-ail-
)ob Name: u//?/ /4i /''/b//t't //JobAddressTu"" r--zr'a--t--a
Legal Description ll Lot: ll Block: ll Filing:Subdivision:
lpho|g;_ rt,t
Architect/Designer:Address:Phone:
Engineer:Address:Phone:
Detailed description of work: frU<Aap- o-FT
- -,t41'- ,zzaz/ 3*n6rz z.fa/.f - )a zrrtel,'-fipc 7' Z '
Work Class: New ( ) Addition ( )Remodef ( ) Repair( ) Demo( ) Other(4/.tCE'azef
WorkType: Interior ( ) Exterior (rf Both ( )Does an EHU exist at this location: Yes ( ) No ( )
Typeof Bldg.: Single-family( ) f*o-f.tity.lTfUurcirfamily( ) Commercial ( ) Reslaurant( ) Other( )
No, of Existing Dwelling Units in this building: 7 No. of Accommodation Units in this building:
No/Tvoeof FireplacesExistinq: GasAppliances( ) GasLoqs( ) Wood/Pellet( ) WoodBurninq( )
No/Tvpe of Fireplaces Proposed: Gas A!6liances ( ) Gas Loqs ( ) Wood/Pellet ( ) Wood Burninq (NOT ALLOWED)
Ooes a rire Atarm Exist: Yes (rY No ( )@Exist: Yes( ) No( )
O'lher
DRB
F : /everyone/f orms/bld gperm
of Construction:
**************************************FoRoFFIcEUSEoNLY**********************?r***************
ffiHl
Questions? Call the Building Team at 479-2325
TOl{]V
Department of Community Development
Project Name:
Project Address:
r' This Chrcklist must .omoleEd beforc a Building Permit apoliation is
acrepted.
q/ 6tl pages of application is complete
tl
4 /Fas DRB approval obtained (if required) Provide a copy of approval form
ci1/C/naoninium Association letter of approval attached if project is a Multi-Family complo<
a
,ETnOlete
site plan submitted
ilrPublic Way Permit application included if applicable (refer to Public Works checklist)
d gAging plan included (refer to Public Works checklist) No dumoster,oarklnq or materiat storaoe
sbestos test and results submitted if demolition is occurrino
Architect stamp and signature (All Commercial and Multi family)
Full floor plans including building sections and elevations(4 sets of plans for Multi-Family and
mmercial)
indow and door schedule
ull structural plans, including design criteria (ie.loads)
Applicanfs Signature:
Date of submittal:
F:/everyondforms/bldperm2
Received By:
ffi."At$/"/
NmEunV
HOW DID WE RATE WTTH YOU?
Town of Vail Survey
Community Dwelopment Deparfirent Russell Fonest, Director,
(970)479-2139
Check allthat applies.
,/1. Which Dep4f,funt(s)did you conbct?
Buifding ll Enutonrnenbl_ Housing_ AdminPlanning DRB _ PEC
Was your inilial conEct witr our staff imrylgdiatea_ dow
no one available ? ,/-.-2 t/
3. lf you were required to wait, horr long was it bebre you were
helped?_
4. Was your proj,rt revieured on a timely basisl Yes)/ No
lf no, why no? \'/
5, Was ffris yourfirstiimeb file a DRB app- PEC +p_
0r
Bldg Permit ,.,,-a 1iY4
6. l\ase rab fte performance of he staff.person who assisied you:(5)l 3 2 1 Name: aa.../-f
fnowledge, responsiveness, availabilityj--
7. Overall efiectiveness oftre FrontSerutceCou*xgp I I 2
8. What is fie best time of da1fur you to use fre Front Service
Counter? .a/-p 4-.**/
9. Any commenb you have which would allow us to better serrre you
nexttime?
Thank you for taking the time to complete this survey. We are
commified b improving our service.
WHEN A "PUBLIC WAY PERMIT" IS REQUTRED
PLEASE READ AND CHECK OFF EACH OF THE FOLLOWING QUESTIONS REGARDING THE NEED FOR A
o
o Is the Right-of- Wuy, "^y4ts or public property to be used for staging, parking or fencing?YES NO T
Is a "Revocable Right-of-Way Permit" required?YES
If answer is NO, is
^
py(ng, staging or fencing plan required by Public Works?YES_ No/z_
NO
If you answered YES to any of these questions, a "Public Way Permit" must be obtained,
"Public Way Permit" applications may be obtained at the Public Work's office or at Community
Development (a sample is attached). If you have any questions please call Leonard Sandoval in Public
WorK at 479-2L98.
ALL THE ABOVE QUESIONS.
,-**zftra t.f24./4 / 5X
Job or Project 11vri|2i /--o/y'2*u ..z.tt-f lar>C//
Date Signed:
I HAVE READ AND ANSW
F:/everyone/forms/bldperm4
Company Name
PUBLIC WORKS AND THE PUBLIC WAY PERMIT PROCESS
How it relates to Building Permits:
Fill out the attached check list with the Buildino Permit Apolication.
If yes was answered to any of the questions then a "Public Way" permit is required. you
can pick up an application at either Community Development, located at 75 South Frontage
Road or Public Works, located at 1309 Elkhorn Drive.
Notice sign-offs for utility companies. ALL utilities must field verify (locate) respective
utilities prior to signing application. Some utility companies require up to 48 hours notice to
schedule a locate.
A construction traffic control/staging plan must be prepared on a separate sheet of paper.
An approved site plan may also be used. This plan will show locations of all traffic control
devices (signs, cones, etc.) and the work zone, (area of construction, staging, etc.), This
plan will expire on November 1st and will need to be resubmitted for consideration for
approval through the winter. Be aware that your resubmission for winter may be denied
depending on the location of construction.
Sketch of work being performed must be submitted indicating dimensions (length, width
and depth of work). This may be drawn on the traffic control plan or a site plan for the job.
Submit completed application to the Public Work's office for review. If required, locates will
be scheduled for the Town of Vail electricians and irrigation crew. The locates take place in
the morning, but may require up to 48 hours to peform.
The Public Work's Construction Inspector will review the application and approve or deny
the permit. You will be contacted as to the status and any requirements that may be
needed. Most permits are released within 48 hours of being received, but please allow up
to one (1) week to process.
As soon as the permit is approved, the Building Department will be notified, allowing the
"Building Permit" to be released. Please do not confuse the "Public Way Permit" with a
"Building Permit".
i NOTE: The above process is for work in a public way ONLY. Public Way
Permits are valid only until November fsth. A new Public Way Permit is required
each year if work is not complete. Re-application each November 15th does not
mean an automatic renewal.
,/ ,/
/ - - --
Date Signed
I have read and u
F:/everyone/forms/bldperm5
BUILDING PERMIT ISSUANCE TIME FRAME
If this permit requires a Town of Vail Fire Department Approval, Engineer's (Public Works)
review and approval, a Planning Department review or Health Depaftment review, and a review
by the Building Department, the estimated time for a total review will take as long as three (3)
weeks.
All commercial (large or small) and all multi-family permits will have to follow the above
mentioned maximum requirements. Residential and small projects should take a lesser amount
of time. However, if residential or smaller projects impact the various above mentioned
departments with regard to necessary review, these projects may also take three (3) weeks to
review and approve.
Every attempt will be made by this department to expedite this permit as soon as possible.
I, the undersigned, understand the plan check procedure and time frame. I also understand
that if the permit is not picked up by the expiration date, that I must still pay the plan check fee
and that if I fail to do so it may affect future permits that I apply for,
Agreed to by:
Project Name:ZZa'2.,r2-
Date: ,44>
'e//
F:everyondforms/bldperm3
zz/2/*zy'
APPLICATION
FOR TOWN OF VAIL
PUBLIC WAY PERMIT
pw*:If !!I!
PATCEI*:N T T T' T T T' T T T N T
le- Brds.Permitn,E [ f,,I I I I
1.Job Nam€Stregt Address n n n- Tl (llunknowncall
L_J LJ LJ | | 479_2139 ext.o)2.Excavaling Contraclor Name Maillng Addr€ss TOV Conlraclor's License Number REOUIRED
()
zipCity Phone #
4.
Start Dat6
Work is for lcircte onel
Other
Complalion Dals
Water Sewer Gas Electric
(Psrmit Expiration Dat€)
Telephone CATV Landscaping Temp. Site Access
Trench-width
(min.4')
Bond Amount $
ALL MATERIAL, EQUIPMENT, AND TRAFFIC
JOB IS STARTED.
Rubber out-riggers are required on
Asohalt surfaces underneath the
A signature below indicates a
signatures are obtrained, permittee
necessary Town of Vail signatures,
BE ON THE JOBSITE BEFORE THE
working on asphalt.
at all tim€s.
utility locatlons and approvals. Once all utility company
application through the Public Works olfice to obtain the
up to one week to process.
Depth
Toral sF $
Total LF $
Permil Fee TotalPermit Fee $
6.
7.
Public Service Natural Gas Group (1.800-9?2-19871
Public Service Company (1
U.S. West (1-800-922-1987)
9.
10,
11.
12.
TCI Cablevision of the Rockies (1-800-922-1987)
Eagle River Water & Sanitation District (970-476-7480, ext. 114)
Holy Cross Electric Company (1-800-922'1987)
Town of Vail Electricians (970-479-2158)
Town of Vail lrrigation (970-479-2158)
Town of Vail Public Works Construction Inspestor (970'479'2198)
THERE W|LL BE NO TOTAL STREET CLOSURESI A construction traftic control plan must be approved by the
Public Works Department prior to issuance of the permit.
All excavation must be done by hand within 18- of utilities - (Senate Bill 172).
Pennittee must contact Public Works Dopartmenl at 479-2198 24 hours prior to commencino of work. Failure to notify
the Town will result in fodeiture of bond money. Scheduled inspections which are not ready may result in the Town
charging the contractor a reinspection fee.
I certity that I have read all chapters of Title 8 - Public Ways and Property, ol the Vail Municipal Code and all utility
company agreements, signed by me, and will abide by the same, and that all utilities have been notified as required.
Contractor's Signature of Agreemenl
ATTACH PLAN OF WORK,INCLUDING CONSTRUCTION TRAFFIC CONTROL PLAN
show streets with names, buildings, and location of cuts. usE DASH LINES FOR CUT.
Print name clearly Dats ol Signature
Whils - Public Works
Y€llow - Contractor
DRAINAGE AND CULVERT INSPECTIONS ARE REOUIRED BY PUBLIC WORKS!
Please read and check off each of the items below:
o The Town of Vail Building Department has developed the following procedures to
ensure that new construction sites have adequately established proper drainage
from building sites along and adjacent to Town of Vail roads or streets.
The Town of Vail Public Works Depaftment will be required to inspect and approve
drainage adjacent to Town of Vail roads or streets and the installation of temporary
or permanent culvefts at access points from the road or street onto the construction
site. Such approval must be obtained prior to any requests for inspection by the
Town of Vail Building Depaftment for footings, temporary electrical or any other
inspection. Please call Leonard Sandoval at 479-2198 to request an inspection from
the Public Works Department. Allow a minimum of 24 hour notice.
Also, the Town of Vail Public Works Depaftment will be approving all final drainage
and culvert installation with resulting road patching as necessary. Such approval
must be obtained prior to any Final Ceftificate of Occupancv issuance.
Agreed to by:
za-fu.- 4//2.a7:-c,/Project Name:
Date Signed:?/, -
F:/everyone/forms/bldpermS
Please read and check off each of the items below.
(Copies of complete te)d are available upon request)
CODE 5.2-10: DEPOSITS ON PUBLIC WAYS PROHIBITED
o Unlawful deposits: Subject to subsection C thereof, it is unlawful for any person to litter, track or
deposit, or cause to be littered, tracked or deposited, sand, gravel, rocks, mud, dirt, snow, ice, or any
other debris or material upon any street, sidewalk, alley or public place, or any portion thereof.
! Notice; Abatement: The Director of Public Works may notifo and require any person who violates or
causes another to violate the provision of subsection A hereof, or who has in the Director's employment
a person who violates or causes another to violate the same, top remove such sand, gravel, rocks, mud,
dirt, snow, ice or any other debris or material within tvventy four (24) hours after receipt of said notice
by the Director of Public Works. In the event the person so notified does not comply with the notice
within the period of time herein specified, the Director of Public Work, or other authorized agent, may
ciruse any such sand, gravel, rocks, mud, dirt, snow, ice, debris or any other material to be removed
from any street or alley at the expense of the notified.
o Summons and Penalty: As an alternative to the notice for removal provided in subsection B above,
any person who violates or causes another to violate the same, may be issued a summons to appear
before the Municipal Court of the Town for said violations, and upon being found guilty of a violation
hereunder be punished as.provided in Section L4-t of this code.
o Notice and Penalty: It is unlawful for any person to fail or refuse to comply with the notice of the
Director of Public Works as provided in subsection B hereof, and any such person shall, in addition to
payment of the expense of removal incurred by the Director of Public Work, as provided in subsection B
hereof, upon being found guilty of a violation hereunder, be punishable as provided in Section 1-4-1 of
this Code. (1997 Code: Ordinance 6 (1979).
CODES 7-3A-I AND 7.3A-3I PARKING OBSTRUCTING TRAFFIC & IMPOUNDMENT AUTHORIZED
o No person shall park any vehicle upon a street or at any other place within this Municipality in such a
manner or under such conditions as to interfere with the free movement of vehicular traffic or proper
street or highway maintenance. (Ord. 2(1968) 5 1)
o Whenever any police officer finds a vehicle attended or unattended, standing upon any portion of a
street or upon any place within this Municipality in such a manner as to constitute a violation of any
section of this Article, or left unattended for a period of twenty four (24) hours or more and presumed to
be abandoned under the conditions prescribed by Colorado Revised Statutes section 42-4-1102, as
amended, the officer shall require the vehicle to be removed or cause it to be removed and placed in
storage in the nearest garage or other place of safety designated or maintained by this Municipality, and
the charges for towing and storage of such vehicle shall be charged to the owner of the vehicle in
addition to a ten dollar ($10) impoundment charge, (Ord, 2(1968) $ 3: Ord. 28(1981) 5 1)
I have read and will comply with the above code provisions:
Position or Relationship to Project:
Date Signed:/.
F:/everyone/forms/bldpennT
tf .o-'Zoo,*
TOI4'Nffi
Yail2002
Vail Village/Lionshead Gonstruction Hours Handout
Problem Statement
The Vail Village and Lionshead are invaluable assets to the community. Thousands of
people come to Vail each year to sightsee, recreate, shop and to enjoy the Vail Valley.
The community and merchants rely upon the summer/winter tourism to generate
revenue. Our summer/winter guests expect a pleasant experience while in Vail.
To insure that all of the proposed construction has as little negative impact on the
community and on our guest as possible, the Town of Vail finds it imperative to create
and implement the Vail Village/Lionshead Construction Master Plan. Maps of the Village
and Lionshead are included to show areas of construction being affected by this plan.
It would be irresponsible for the Town of Vail, the Constr.uction Contractors and the
Merchants, to not actively participate to minimize the impact of construction on the Village
and Lionshead areas.
Givens
The following givens are intended to provide the basic foundation by which construction
will be completed in the Village:
. The public's health, safety and welfare shall be honored at all times.
. Adequate pedestrian, loading/delivery, vehicle, and emergency vehicle access and
circulation shall be maintained.
. Roadways and pedestrian walkways shall be kept clean and free of dirt and debris.
r All construction deliveries, equipment, tools, materials, etc. to the Village must go
through Check Point Charlie. All Lionshead construction activity must go to the Vail
Police Department for a parking permit. Do not use delivery zones for construction
parking, refer to approved staging plan or make other arrangements for parking'
r The hours of Outside Construction Activity shall be as follows:
- April 15 - June 21 & September 9 - November 15, 7 a.m. untilT p.m', seven days
a week. Between June 22 -September 6 work must end bv 4:00 p.m. on Fridavs.
November 1 5 - April 15, 2003 work allowed within daylight hours only.
- Deliveries shall be restricted to the hours of 7 a.m. to 11:30 a.m. on Gore Creek
Drive and 7 a.m. to 8:30 a.m. on Bridge Street.
- Special delivery permits must be requested in advance, from Public Works in
conjunction with Code Enforcement at Checkpoint Gharlie.
- No. construction activity shall occur on Saturday or Sunday between June
22 & September 6
No outside construction activity shall occur on the following dates:
Friday, February 15, Saturday, Februaryl6, Sunday, February 17, and Monday,
February 18. (Presidents Weekendl
Saturday, May 25, Sunday, May 26 and Monday, May 27 (@dg!_Dayl
Friday, June 28, Saturday, June 29 and Sunday, June 30. (Vail Arts Festival)
Wednesday, July 3, Thursday, July 4. Friday, July 5, Saturday, July 6 and
Sunday, July 7. (lndependence Dav)
Saturday, August 31, Sunday, September 1, and Monday, September 2
(Labor Davl.
Friday, September 13, Saturday, September 14, Sunday, September 15 in
(Lionshead) and then on Saturday, September 21 and Sunday, September 22.
(Vail Village) - (October Festl
Thursday, November 28, (Thanksqivinq Davl Friday, November 29, Saturday,
November 30 and Sunday, December l.
Wednesday, December 25, Thursday, December 26, Friday, December 27
Saturday, December 28, Sunday, December 29. (Christmas Dav Holidavl
Monday, December 30, Tuesday, December 31, Wednesday January 1 ,
(New Year 2003) No Work allowed the entire week of the Christmas/New Year
Holiday.
The Town of Vail Noise Ordinance has been waived by the Town Manager from 7a.m.
- 7p.m. For construction activities from April 15 through June 21, and from September
9 through November 15. The Noise Ordinance shall be in effect and strictly regulated
from June 22 through September 8 and November 15 to April 15, 2001
All construction sites will be required to obtain an Approved Construction-Staqinq
Plan from the Town of Vail Public Works Department in conjunction with Code
Enforcement. (The approved staging/parking plan is required to be on site at all
times).
The Town of Vail reserves the right to amend the Vail Village/Lionshead Construction
Plan regulations at anytime should abuses or problems arise.
The Three-Strike Rule will be enforced. Step l. (Written warning), Step 2.
(Written warning), Step 3. (Construction site will be Red Tag until all issues are
resolved).
The following expectations are established to insure the success of the Vail
Village/Lionshead Construction Master Plan:
. Full and complete cooperation and understanding from all parties involved in the
construction activity in regards to this plan.
adherence and compliance with the requirements outlined in the construction
r Respect and consideration for the affected interests and parties.
lf you have any question, Please contact the Town of Vail Public Works Department
(Construction Inspector) or Vail Police Department (Gode Enforcement Officer)
o Strict
plan.
970479-2198 970-,476-7603
TOItrN OF VAIL
Vail2002 Staging / Parking Plan Information
The Staeine / Parkine Plan Philosonhv- Is a very important step in the building
prooess. Striking a balance between safe public access and giving construction projects
room to build is becoming increasingly challenging, for us to meet all the needs of those
who will be impacted by construction projects. The fact is, there is less room to build in
the Town of Vail.
Developing a creative Staging Plan is a must. Staging in the Town of Vail Public Right of
Way is a Privilege, not a given right. We take into account when we review and approve
staging / parking plans, impacts on neighborhoods, tourism, business and the traveling
public along with your right to build.
The General Contractor is responsible for all subcontractors and all construction
activitv relatine lo the buildins nroiect. The staging plan will be enforced according to
the Approved Set of Building and Staging Plans. You are required to keep a copy of the
Approved Staging Plan on site.
Two staging /parking plans are required, a suntmer and winter. Summer staging plans
expire on November l, and winter staging plans expire on April 15. (NSlgJlere is-99-9!
street parkins in the winter season and all materials. eguipment. etc must be 10'off the
edee ofasphalt).
Enforcement of all staging / parking plan is as follows.
A) Staging / Parking Plans to scale required.
B) Once the plan is approved, they will be held to complete compliance.
C) We will use a 3 step and you're out, process.
Step One- Verbal and written wamings as to the staging plan violation, then have
contractor sign and date field memo warning.
Step Two- Police Department issue tickets and tows or public works writes second
written warning to all violators who have been notified under step one and who are still
in violation of the approved Staging / Parking Plan. The Town of Vail Chief Building
Official will call the contractor and notify them, the next time any violation happens, the
building department will red tag the construction site for 48 hours.
Step Three- If still in violation after step two, a 48 hour Red Tae will be issued to the
project site.
If you have any Questions, Please contact the Town of Vail Construction Inspector at
970-479-2198
F:\cdev\FORMS\PERMITS\Staging-Parking.doc
Requirements for an Acceptable Staging Plan
It is prefened that and Approved Site Plan is used to draw a staging plan, but a hand
drawn plan may be used as long as it is dawn to scale and is neat and legible.
l.) The Staging Plan must show the following:
(a) Show all parking that is required for the job site. (Including construction
equipment).
(b) Show the location of all material that will be staged on site.
(c) Show the location ofall dumpsters and port-o-john that are to be on site.
(d) If a fence is required, then show the location of the fence and describe the
material used for the fence.
(e) Iftrees and / or vegetation is required to be protected, then show how this will be
done.
(f1 If this staging plan is for a Demo Permit, then show staging for dump trucks and
all related equipment. If the Town of Vail Right of Way area is needed for
staging, then a Traffic Control Plan is required in conjunction with the staging
plan.
(g) Please provide and show an Erosion Control Plan.
(h) No equipment, vehicles, materials are allowed on Town of Vail Right of Way in
the Winter Staging Plan.
2.) If work needs to occur in the right of way, then add a Traffic Control Plan to the
staging plan showing the following:
(a) The work zone (area that is to be performed)
(b) Traffic Control Devices (waming, signs, cones, flaggers, etc.)
(c) Distances that all devices will be set up from the work zone. Also show all
dimensions of work being performed in the right of way. All traffic control plans
must conform to the MUTCD manual.(Manual of Uniform Traffrc Control
Devices)
2.) This plan will be reviewed by Public Works and if Necessary the Police, Fire, and
Community Development Department. Once the staging plan is approved, it will be
registered with the departments listed above and enforced.
3.) The Village and Lionshead area have outside construction restrictions, Please become
familiar with the Yail2002, Vail Village and Lionshead Construction Hours handout.
F :\cdev\FORMS\PERMITS\Slaging-Parking.doc