HomeMy WebLinkAboutGLEN LYON LOT 48TOWN OF VAIL
75 S. FRONTAGEROAD
vArL, co 81657
97M79-2138
OWNER MCMAHON TRUST
?92 SAI{ I,ORENZO ST
SAI{TTA MOIIICA
cA 90402
APPLICANT DOITBLE Q ELECTRTC
P.O. BOX 242
EDWARDS
co 4]-632
I-,icense: 190-E
CONTRACTOR DOI'BLE Q ELECTRIE
P.O. BOX 242
EDWARDS
co 81632
License:190-E
Electdcal ------- >
DRB Fee----- >
InvestiSation---- >
Will Call----- >
TOTAL FEES-- >
DEPARTMENT OF COMMUNITY DEVELOPMENT
ON JOBSITE AT ALL TIMESNOTE: THIS PERMIT MUST BE POSTED
ELECTRICAL PERMIT
Job Address: 1295 WESTHAVEN CR VAIL
Location.....: 1295 WESTHAVEN CR
Parcel No...: 21031210ffiW
Project No : -F?3, OG,63LtA
Permit #:
Status . ,
Applied,
Issued .
Expires .
oe/27/2005
09/27/2006 Phone: 970-748-9180
09/27/2005 Phone: 970-748-9780
E064199
vG o2Xq
.: ISSUED.: 0912712C[6.: l0l02l2ffi.: O3l3ll2007
Desciption: ADDING 24O V POWER FOR STEAM SHOWERValuation: $0.00 Square feet: 1000
:t:t:Ft:t:t'.tt*i'l++{.:t*+*++*:i*t**lt*t****
$0. 00
$0. oo
$3.00
$s4 . ?5
$54.7s
$0.00
9s4 . ?5
$54.75
s0.00
Total Calculated Fees- >
Additional Fees----- >
Total Permit Fee---- >
Payments-..*------ >
BALANCE DUE----._- >
Approvals:
Item: 06000 EL,ECTRICAIT DEPARTMENf
09/27 /2006 shahn
IICM: 05600 FIRE DEPARTMEIfrT
Action: AP
CONDITIONS OF APPROVAL
Cond: 12
(BLDG.): FIELTD INSPECTIONS ARE REQUIRED TO CIIECK FOR CODE COMPITIANCE'
DECLARATIONS
I hereby acknowledge that I have read this application, filled out in full the information required, completed an accurate plot
plan, and state that all the information as required is correct. I agree to comply with the information and plot plan, to comply
with all Town ordinances and state laws, and to build this structure according to the towns zoning and subdivision codes, design
review approved, International Building and Residential Codes and other ordinances ofthe Town applicable thereto.
REQUESTS FOR INSPECTION SHALL BE MADE TWENTY-FOTJR HOURS IN ADVANCE BY TELEPHONE AT 479-2149 OR AT' Ot]R OFFICE FROM 8:OO AM . 4
PM.
SIGNATURE OF OWNER OR CO FOR HIMSELF AND OWNEI
ttt{'*attltftitit*ttr'ftttt++*+lltittltittfffttlfltffft*lt++ft*ttt*tttt********'}'}l*t*tf,ttttlt*
TOWNOFVAIL, COI.ORADO Statement
tttt*ttttlttttttttlt*tttttttfttttttttttt*ft**t*f*ftt****a*tt+i*****l++t*'|tt'|*afllt{ttal**tatt*
gtateneat Mnber: R060001.585 ArFuDt: 954.75 LO/O2/2006L1:33 Alt
Paymeat t{ethod: Check Init: DDG
NotatLon: Doub1e Q 14260
.ttfttfftfftftftftafff+*ftttt**t***ttt**a*t*ttt***t*t*t'i*rlfttttttttlllalt*{r{r+*1.**ttttttt***t
Permit No:
Parcel No:
Sile Addrese:. L,oCatlon:
Thie Palzaent:
ACCOIJNT ITEM LIST:
Account Code
EP 00100003111100
wc 00100003112800
805-0199
2103 - l.2L-0600-9
1295 WESTHA\rEN
1295 T{BSTIIAVEN
$54.75
Description
Tl4)e: ELECTRICAIJ PERMTT
CR VAIIJ
CR
Tota1 Fees:
Tota1 AL,L Pnte:
Balance:
$s4.75
$54.7s
$0.00
Current Pmts
51.7s
3.OO
EI,ECIT,IEAI.' PERIiIIT FEES
WIr.r. CAIJtrJ INSPECIION EEE
DOUBLE G ELECTRIC PAGE g2a9127/2aAE 13:L8 97A-748-9784
TDDLIATrlOil U|lllilOtBE lcctptED tF tlrooHpt.ETE oRrydt:
_$1lbr-o/?fTWtINltLly .F,^r'rr ,r\F rr.,:. ,r ,'!DFr
75 S. Frortrga Rd.
Vall, Colorado 8165t
coIlTRACrOn rt FoRilATrOil
qg -osVd
Bulldhe FennltEldc.l PennftJ:
9ro'4t 9-2119 (tnrpodor)
COIIPIErE SQ. FEET FOR IlEw EUIIDS and VALUATIOI{S FoR, ALL OTHERII (lebor &, }laterials)
EI,€CIRICAL VALTJA.TIOI{: IAMOUNT OF 5Q Fr n STRIJCTURE:
970-#
Palel t Apq rzJa @
lob Narre nlc a,zra/ 4trgiutrrge-.Hff;u*later ec. r'A!-
Legal Desiption I Lots I Blodc I Fillng:Subdivldon:
Derailed descripbn d rwrk:------ -frOipA z-Utv /ottcr Fr,', *:ir*\ 'fiivPP
WortCtass: Nerv( ) Addluon( ) Re'nodd(2,-. Repalr( ) TanpFower( ), otter( )
wortType rnww 9+- b(brbr ( ) Bdt ( )Does an EHU €rdst at ttis l@tbn: Yes ( ) ttlo ( )
Typeofgdg.: grr9n-farflVj+Duplex( ) lrluld-fand[( ] Comrrtetdal ( ) Resburattt( ] Oncr( )
llo. of Hsting Dwelllng Unhs ln tils bulHlng: /
Is this permit for a hot tub: Yes ( ) No !4
.}..r.rt...tt.rlt+1.1.t..t.*+l.ottft*lrrFiOR OFFICE USE O[LV.ttr.rtata*.tt..tl*'a*'tt't"']'ttlr']r
4e12 tcr Foct:ld:
crfirtcd t\tt-fnngs&D{F
\\vrihdD\ododroRMsrPEL tt$glcPei,l.Doc nnu2ln2
L3:1.8 97A-744-9748 DOUBLE G ELECTRICogt27/2446
ABEts
lr5nl]b|.lult
Quts (Brucc) Qurrcnbeny
9fo-718-1780
PO.Bdz.tz
Edrrzrds, Coloredo 8 | 532
Fax
3lL lU, bteaz hafl** C)tL t
PAGE AL
\x. Y-A- nf<T eagm. L
Cl#otnevlaw B+lsse Commsnt Cl Ptcarc ReplyE urgent
I
TOWN OF VAIL DEPARTMENT OF COMMUNITY DEVELOPMENT
75 S. FRONTAGE ROAD
VAIL. CO 81657
970-479-2t38
NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES
ADD/ALT SFR BUILD PERMIT Permit #: 806-0229
Proiect # PRI06-0348
Job Address: 1295 WESTHAVEN CR VAIL Status . . . : ISSUED
Location.....: 1295 WESTHAVEN CR Applied . . : O8lWl2O06
Parcel No...: 2103121Cf,0W Issued . .. : 0911412006
Expires . ..: 03/13/2007
owNER MCMAr{ON rRUST 08/09/2005. 792 SAN I,ORENZO ST
SANTA MONICA
cA 90402
APPI-,ICANT JEFF LUTZ BUILDERS 08/09/2006 Phone: 970-390-5353
P O Box 1660
Eagle
co 81631
L,icense: 302-B
coNTRAcToR,JEFF r,Ilrz BUrr-,DERs oe/09/2006 Phone: 970-390-6363
P O Box 1650
Eagle
co 8153r-
License:302-B
Description:
MASTER BATHROOM-REPI,ACE TUB, ADD SI{OWER, MOVE TOIIJET
Occupancy: R-3
Type Construction: V-B
Valuation: $29,500.00 Revision Valuation: $0.00 Total Sq Ft Added: 0
Euilding*--* > $/y'.l.'15 Restuarant Plan Review->
Plan Check-- > $287.14 Recreation Fee------->
Investigation-> $0.00 TOTAL FEES-------------->
Will Call---> $3.00
FEE SUMMARY 't:l. t 'iri.:i *+* * '**!i( 't:tr.* **'* * ** {< *.** ** !* *
'a*,Nr
* ** i.* * t {.* + +** *** * 'a** '*r.'ir '1.'a*
S0.00 Toml Calculated Fees-> $731'89
S0.00 Additional Fees------> $0.00
$731.89 Total Permit Fee-::- > $731.89
Payments---------- > $731.89
BALANCE DUE----> $O.OO
Approvals:
Iten: 05100 BUILDING DEPARTMENT
08/30/2006 shahn Action: AP
Item: 05400 PLANNTNG DEPARTMENI
08/09/2006 JS Action: Ap
Item: 05500 FfRE DEPARTMENI
See the Conditions section of this Document for any that may apply.
DECLARATIONS
I hereby acknowledge that I have read this application, filled out in full the information required, completed an accurate plot
plan, and state that all the information as required is correct. I agree to comply with the information and plot plan, to comply
with all Town ordinances and state laws, ard to build this strucfire according to the towns zoning and subdivision codes, design
review approved, Intemational Building and Residential Codes ad other ordirunces of the Town applicable ther€to.
REQI]ESTS T1OR INSPtsCTION SIIAI,L BE MADE TWENTY{OT'R EOT'RS IN ADVANCE BY TELEFIrcNE AT 47'-2149 OR AT OT'R OTfiIC'E TROM &(n
,tc**,F,*'(:|.'.*.,|.*:l'|.*'*****t******************:l.*1.:***:f,t**{.!t*,*:l******'(!8,l*:**,|.*,k{.'(,|c***:**1<*,|.*{(**
CONDITIONS OF APPROVAL
Permit #: BM-0229 as of 09-14-2006 Status: ISSUED
{.*'|.*******,t.*{.*{.*{.!F,{.*{.*******:r**,t!4.*.:l.*{.*.{.*{.,|c**{t***{.{.{i{({.!t(:*,t.*{.*:t.*'l*********
Permit Type: ADD/ALT SFR BUILD PERMIT Applied: 08l0Fl2n6
Applicant: JEFF LUTZ BUILDERS Issued: Wll4l200697G390-6363 To Expire: O3ll3l2007
Job Address: 1295 WESTHAVEN CR VAIL
l.ocation: 1295 WESTHAVEN CR
Parcel No: 2l03l2lffi0E
Description:
MASTER BATHROOM.REPLACE TUB. ADD SHOWER. MOVE TOILET
**'.***,t.*:l.*:l.i.|t.1.****{.'.*,r*{.*{.****:t<*'t,<*1.,l,(*,t(*'!***l1.*1.**Conditions****|k*****,k**!i******,F***x.***:F'!*****'*1.******
Cond: 12
(BLDG.): FIELD INSPECTIONS ARE REQUIRED TO CHECK FOR CODE
COMPLIANCE.
Cond: 16
(BLDG.): (SFR) SMOKE DETECTORS ARE REQUIRED PER SECTION
R313 OF THE 2OO3 IRC.
ft*fal'{'tl!'.!*******a******+*****t*****a***++++++t+f,++*****{'*+*******l'lf*al+t*****t************
TOWNOFVAIL. COLORADO Statement
tf*f*{,tf*********t*********ltt************+*+++*++******t'*****t***i+*f't****ft**************f
Statement Number: R060001457 Amount: S?31.89
Payment Method: Check
Lutz Bullders
09/L4/200602:35 PM
Init: L,C
Notation: #3398/:Ieff
Permit No:
Parcel No:
Site Addrees:
Location:
Thie Payment:
806 - 022 9
2103 -121-0600-9
1295 WESI'rIA'UEN
1295 I{ESTHAVEN
$731.89
rype: ADD/AI,T SRR BUIID PER!,IIT
CR \TAII.,
CR
Total FeeE: $731.89
Total ALL, PmEs: 5731' 89
Balance: $0.00*9*t*l*t++********++++ttttttf'}ftlt**t++ffffl*ft'}lt't***r.***+r!+****'l,f't**+*++**t*{.*******r'***i'lt+
ACCOI.JNTITEM LIST:
Account Code Deecription Current PmtE
BP
PF
vfc
00100003111100
00100003112300
00100003112800
BI'IIJDING PERMIT FEES
PI,AII CIIECK FEES
WILL EELL INSPECTION FSE
44r.75
247.t4
3.00
Hob:UiTf'."""'ffi[$j#t
PLI
Separate are requ l, plumbing, mechanical, etc.l
75 S. Frontage Rd.
Vail, Colorado 81657
CONTRACTOR INFORMATION
Email address:
Jeff Lutz Builderg lnc.
P.O. Box 1660
Eagb, CO 81631-1660 )err Ls-rz-
BUfLDfNG: $ //,Laoa ELECTRICAL: $ ). DC 4:s?OTHER: $
PLUMBfNG:$Klt Slto:P
ATIONS FOR BUILDING PERMIT
For Parcel # Contact Assessors Office at 970-328-8640 or visit
a/o3 tzl 06 Joc,
Job Name:r1r1fu ///hhnn ^ Un ruun-(Job Address: l2q<
b-lrt,a Aur,/u.uta,,-
WorkClass: New() Addition( )-Remodel (.{ Repair( ) Demo( ) Other( )
Work Type: Interior 00 Exterior ( ) Both ( )Does an EHU exist at this location: Yes ( ) No ( )
Type of Bldg.: Single-family }Q Two-family ( ) Multi-family ( ) Commercial ( ) Restaurant ( ) Other( )
No. of Existing Dwelling Units in this building:No. of Accommodation Units in this building: ++-
: Gas Aooliances(A GasLoos( ) Wood/Pellet ( ) Wood Bu
FOR OFFICE USE ONL
?i,', j
VA!L{fltsl/
F:\cdev\FORMS\Permits\Buildin g\buildingjermit. DOC Page 1 of 16 $s ou09l200s
Questions? Callthe Building Team at 479-2325
Departnent of Community Development
Project Name:
Project Address:
/ This Checklist must be omoleted before a Buildina Permit aopliation is
acepEd.
o' All pages of application is complete
o Has DRB approval obtained (if required) Provide a copy of approval form
o Plan Check Fee required at subrnittal for p@ects valued oyer $1OO,0O0.OO (see attached fee
schedule)
o Complete site plan submitted
o Public Way Permit application induded if applicable (refer to Public Works checklist)
o Staging plan included (refer to Public Works checklist) No dumoster.oarkino or material storaoe
allowed on roadwavs and shoulderc uiithout written aooroval
o Asbestos test and results submitted if demolition is occrninga Architect stamp and signature (All Commercial and Multi family)
o Full floor plans including building sections and elevations(3 sets for remodels, 4 sets of plans for SFR
and Duplex, 5 sets of plans for Multi-Family and Commercial Buildings)
a Window and door schedule
o Full structural plans, including design criteria (i.e.loads)
o Structural Engineer stamp and signature on structural plans (All Commercial and Multi Family)
a Soils Report must be submitted prior to footing inspection
o Fire resistive assemblies specified and penetrations indicated
B Smoke detectors shown on plans
o Types and quantity offireplaces shown
Applicant's Signature:
Date of submittal:
Received By:
F: \cdev\FORMS\Permits\Buildin g\building_lermiL DOC Page 2 of 16 02/09pms
P1AN CHECK FEES TABLE
Depatunent of Communily Da/elopment
Building Safety and Inffiion *nie
75 huilt Fronbge Rud
Vail, hbndo 81657
9n4n-2138
FM 9704n-2452
www,vailgrov,@m
Plan check fees are required for projects with a valuaUon over $100,000, at the Ume of Building permit
submittal. Please use the table below to calculate your plan check fee total.
$ 100,000-$150,000 Multiply by
$150,001-$250,000 Multiply by
$250,001-$400,000 Multiply by
$401,000-$750,000 Multiply by
$750,00 1-$1,000,000 Multiply by
.0055 of Valuation Total
.005 of ValuaUon Total
.0045 of Valuation Total
.004 of Valuation Total
.0035 of Valuation Total
ValuaUons over $1,000,000 will be calculated by the Town of Vail Building Department.
If you have any further questions, please contact the Town of Vail Building Department atq,TO-47}-2LZB.
0awl2o0sF : \cde/\FoRJtIS\Permits\Bui lding\bu ildingjermiL DOC Page 3 of 15
ASBESTOS TESTING REQUIREM ENTS
THE TOWN OF VAIL AND STATE OF COLOMDO DEPARTMENT OF PUBUC HEALTH REQUIRE ASBESTOS TESnNG
ANY TIME WHEN MORE THAN 160 S.F. OF MATERIAL VuILL BE DISTURBED OR REMOVED.
AN ASBESTOS TEST AND REPORT IS REQUIRED TO BE SUBMITTED WITH YOUR BUILDING PERMIT APPUCANON
FOR ALL REMODEL, ADDMON OR OTHER PROJECTS INVOLVING ANY DEMOLT'NON OR REMOVAL OF BUILDiNG
MATERLALS THAT MAY CONTAIN ASBESTOS. BUILDINGS CONSTRUCTED AFTER OCTOBER 12, 1988 THAT HAVE
NO ASBESTOS CONTAINING MATERI,AIS ARE E(EMPT.
A coPY oF THE REPoRT MUsr BE suBMrFrEp vvft-H youR BUILbING pERMrr AppucAlfoN
o I have included the asbestos test and report with my building permit application
apdicant signature
OR
date
o I ceftiff my project will not disturb or remove more than 160 s.f. of building material. The construction
plans submitted with my application clearly indicate this information. (fhis wil-l be verified during plan
review, and will delay your pCIect if found to be inaccurate)
applicant signature
OR
r The building was constructed after October 12, 1988. The date of construction was
original consFuction date
( qqG . /?7-7
F:\cdev\FoRMS\Permits\Building\buildingJrermit. DOC Page 4 of 16 0zlw/200s
BUILDING PERMIT ISSUANCE TIME FRAME
If this permit requires a Town of Vail Fire Departrnent Approval, Engineer's (Public Works) review and approval,
a Planning Department review or Health Departrnent review, and a review by the Building Depaftmen! the
estimated time for a total review will take as long as three (3) weeks.
All commercial (large or small) and all mulU-family permits will have to follow the above mentioned maximum
requirements. Residential and small projects should take a lesser amount of time. However, if residential or
smaller projects impact the various above mentioned departments with regard to necessary review, these
projects may also take three (3) weeks to review and approve.
Every attempt will be made by this department to expedite this permit as soon as possible.
I, the undersigned, understand the plan check procedure and time frame. I also understand that if the permit
is not picked up by the expiration date, that I must still pay the plan check fee and that if I fail to do so it may
affect future permits that I apply for,
Agreed to by:
Project Name:
Print name
F;\cdev\FoRMS\Permib\Building\buildingl]ermiLDOC Page 5 of 16 02l09lzws
WHEN A'PUBLIC WAY PERJIIIf IS REQUIRED
PTEASE READ AND CHECK OFF EACH OF THE FOLLOWTNG QUESTIONS REGARDTNG THE NEED FOR A*PUBLIC WAY PERMIT":
Is this a new residence?YES- Nq
Does demoliUon work being performed require the use of thd(ight-oFWay, easements or
public property? YES-NO__ r'_
o
Is any utility wo* needed? YES NO
Are there any improvemenE being done to the driveway? YES _Nq
Is a different access needed to the site other than the o<isting driveway? YES NO
Is any drainage work beingy'one that affects the Right-of-Way, easements, or public property?YES_NO_____V_
-/Is a "Revocable Rightof-Way Permif'required? YES_ NOJZ_
Is the Right-of-Way, easerpenE or public property to be used for staging, parking or fencing?
YES NO ,/
If answer it NO, is a parkin ging or fencing plan required by Public Works?YES_ Nq
If you have answered YES to any of these questions, a "Public Way Permif' must be obtained.
"Public Way Permif'applications may be obtained at the Public Works office or at Community Development (a sample is
attached). If you have any questions please call Leonard Sandoval in Public Work at970479-2L98.
Ar.t THE ABOVE QUESnONS.
)€V?l-ttlz l\ut rt>trtrl9 ///c
Company Name
PRI#:__
F:\cdev\FoRMS\Permits\Building\buildingjermit.DOC
I HAVE READ AND
Page 7 of 16
APPLICATION
FOR TOWN OF VAIL
PUBLIC WAY PERMTT 20_Bldg. Permit#: B
PW#;
Parcel #:
)
Job Name
Excavating Contractor Namc
Start Date
Street Ad&ess
Mail Address
Compl*ion Date
Sewer Gas Electric Telephone
Contractor License Nurnber - REQUIRED
Ciry
3.
(Permit Expiration
Landscaplng Temp. Sitc AcrecsWork is for (circle one) W
Trench-width
(min. 4')
Depth
Total SF $
Bond Amount $
Total LF
Total Permit Fee $
6.
7.
ALL MATERIAL, EQUIPMENT, AND TRAFFIC DEVICES MUST BE ON THE JOBSITE BEFORE THE JOB IS STARTED.
Rubber out-riggers are required on orcavating equipment working on asphalL Asphalt surfac€s undemeath the bucket and lugs shall
be protected at all times.
A signature below indicates a review ofdre area locations approval. Once all utility company signatures are obtained ,
permiltee has option of routing rpplication
Please allow up to one week to process.
the Public W olfice to obtrin thc necessary Torru of Vail signatures
Xcel Eneagy / Public Service Company (l -1987)
Xcel Energy High Pressure (1-80G922-l
Quest (1-80G922-1987)
Comcast Cable (l -800-922-1987)
Eagle River Water & Sanitation (970-47G?480, ext I 14)
Holy Cross Electric Company (l-800-922-l
Town of Vail Electricians (970-479-2158)
Town of Vail lrrigation (970479-2158)
THERE WILL BE NO TOTAL STREET CLOSLEES! A construction traffic conrol plan must be submitted and approved by the Public Works Depanment
ptior to issuancc of the pcrruit.
9. All excavation must be done by hand within 18" of utilities - (Senate Bill 172).
10. Pcrnrittee must contact tlre Public Works Dgpartrneut at 4762198 24 hours orior to conrmencing of work. Failure to Notiry the Town will result in
forfeiture ofbond money. Scheduled inspections that are not ready may result in the Town charging the confractor a reinspection fee.
I 1. I certi! that I have read all chapters of Title 8 - Public Ways and Property, of the Vail Municipal Code and all utility Company agreem€,irts, signed
by mg and will abideby the sarng and that all utilities have been notified as required.
(Ifunknown cail
Contractor's Sig!ature of Agreement Print name clearly
ATTACH PLAN OF WORK INCLIJDING CONSTRUCTION TRAFFIC CONTROL PLAI\
Show street with names, buildings, and location of cuts. USE DASH LINES FOR CUT.
Date of signature
White - Public Works
Yellow - Contractor
PUBLIC WAY PERMIT PROCESS
Page 8 of 15 021W12005
PUBLIC WORKS AND THE
,,\,I0}l,ru.0[l- -ilding\building-.permit.DOC
How it relates to Building Permits:
Fill out the attached check list with the Buildino Permit Application.
If yes was answered to any of the questions then a "Public Way''permit is rcquired. You can pick up an
application at either Community Development, located at 75 South Frontage Road or Public Works, located at
1309 Elkhorn Drive.
Notice sign-offs for utility companies. ALL utilities must field verify (locate) respective utilities prior to signing
application. Some utility companies require up to 48 hours notice to schedule a locate.
A construction traffic control/staging plan must be prepared on a separate sheet of paper. An approved site plan
may also be used. This plan will show locations of all traffic control devices (signs, cones, etc.) and the work
zone, (area of consfuction, staging, etc,). This plan will expire on November 1$ and will need to be resubmitted
for consideration for approval Srrough he winter. Be aware that your resubmission for winter may be denied
depending on the location of construction.
Sketch of work being performed must be submitted indicating dimensions (length, width and depth of work).
This may be drawn on the traffc control plan or a site plan for the job.
Submit completed application to the Public Works office for review. If required, locates will be scheduled for the
Town of Vail elecficians and irrigation crew. The locates take place in the morning, but may require up to 48
hours to perform.
The Public Works Construction Inspector will review the application and approve or deny the permit. You will be
contacted as to the status and any requirements that may be needed. Most permits are released 48 hours of
being received, but please allow up to one (1) week to process.
As soon as the permit is approved, the Building Departnent will be notified, allowing the "Building Permit" to be
released. Please do not confuse the "Public Way Permit" with the "Building Permit".
November 15rn. A new Public Way Permit is requircd each year if work is not complete. Re-
applicaUon each November 15b does not mean an automatic renewat.
4retqt n 6rt / Datesigned
,*ffi
I have read and u
F:\cdev\FORMS\Permits\Building\buildingjermit.DOC Page 9 of 16 02/0912005
DRAINAGE AND CULVERT INSPECTIONS ARE REOUIRED BY PUBLIC WORI(S!
Please read and dred< offeach of the items below:
. The Town of Vail Building Department has the following procedures to ensure that new construction
sites have adequately established proper drainage building sites along and adjacent to Town of Vail roads or
streets.
r The Town of Vail Public Works Departnent be required to inspect and approve drainage adjacent to Town of
Vail roads or streets the installation of or permanent culverb at access points from the road or
skeet onto the Such must be obtained prior to any requests for inspection by the
Town of Vail Building for temporary electical or any other inspection, Please call Leonard
Sandoval at 970-479-2198 to
hour notice.
Also, the Town of Vail Public Department
resulting road patching as
issuance.
Agred to by:
Print Name
Signature
Project Name:
Date Signed:
inspection from the Public Works Departnent. Allow minimum of 24
be approving all final drainage and culveft insbllation wisr
Such approval be obtained prior to any Final Certificate of Occupanry
F: \cdev\FoRMS\Permib\Buildi ng\buildin glrennit DOC Page l0 of 15 ozlwl2005
MATERIAL STORAGE AND CONSTRUCTION PARKING
Please read and dreck off each of the items below.
(Copies of mmplete text are available upon request)
CODE 5-2-10: DEPOSITSON PUBUC WAYS PROHIBITED
Unlawful deposits: Subject to subsection C thereof, it is unlawful for any person to litter, track or deposit, or cause to
be littered, tracked or deposited, sand, gravel, rocks, mud, dift, snow, ice, or any other debris or material upon any
street, sidewalk, alley or public place, or any portion thereof.
Notice; Abatement: The Director of Public Works may notiff and require any person who violates or causes another
to violate the provision of subsection A hereof, or who has in the Director's employment a person who violates or
causes another to violate the same, top remove such sand, gravel, rocks, mud, dirt, snow, ice or any other debris or
material within twenty four (24) hours after receipt of said notice by the Director of Public Works. In the event the
person so notified does not comply with the notice wlthin the period of Ume herein specified, the Director of Public
Works, or other authorized agent may cause any such sand, gravel, rocks, mud, dirt, snow, ie, debris or any other
material to be removed from any street or alley at the expense of the notified.
Summons and Penalty: As an alternative to the notice for removal provided in subsection B above, any person
who violates or c:tuses another to violate the same, may be issued a summons to appear before the Municipal Court of
the Town for said violations, and upon being found guilty of a violation hereunder be punished as provided in Section
1-4-1 of this code.
Notice and Penalty: It is unlawful for any person to fail or refuse to comply with the notice of the Director of Public
Works as provided in subsection B hereof, and any such person shall, in addition to payment of the expense of removal
incurred by the Director of Public Works, as provided in subsection B hereof, upon being found guilty of a violation
hereunder, be punishable as provided in Section 1-4-1 ofthis Code. (1997 Code: Ordinance 6 (1979).
CODES 7.34.1 AND 7.3A-3: PARKING OBSTRUCTING TRAFFIC & IMPOUNDMENT AUTHORUED
No person shall park any vehicle upon a street or at any other place within this Municipality in such a manner or under
such conditions as to intefere with the free movement of vehicular traffic or proper street or highway maintenance.
(ord. 2(1s68) $ 1)
Whenever any police officer finds a vehicle attended or unattended, standing upon any portion of a street or upon any
place within this Municipality in such a manner as to constitute a violation of any section of this Article, or left
unattended for a period of twenty four (24) hours or more and presumed to be abandoned under the conditions
prescribed by Colorado Revised Statutes section 42-4-1102, as amended, the officer shall require the vehicle to be
removed or @use it to be removed and placed in storage in the nearest garage or other place of safety designated or
maintained by this Municipality, and the charges for towing and storage of such vehicle shall be charged to the owner
of the vehicle in addition to a ten dollar ($10) impoundment charge. (Ord. 2(1968) g 3: Ord. 28(1981) 5 1)
I have read and will comply with the above code provisions:Je( L,TL
Position or Relationship to
Date Signed:
F:/weryondfonns/bldpermT
F:\cdev\FoRMS\Permits\Building\buildi ngJrermitDOC Page 11 of 16 021091200s
Vail 2006
Vail Village and LionsHead Village Construction Hours
Information Handout
Problem Statement
The Vail Village and LionsHead Village are invaluable assets to the community. Thousands of people come to Vail each year to
sightsee, recreate, shop and to enjoy everything the Vail Valley has to offer. The community and merchants rely upon our guests to
generate revenue. Our summer/winter guests expest a pleasant operience while in Vail,
To insure that all of the proposed construction has as little negative impact on the @mmunity and on our guestas possible, theTown
of Vail finds it imp€rative to create and implement the Vail Village and LionsHead Village Construction Hours Handout.
It would be irresponsible for the Town of Vail, the construction contractors and the merchants, to not actively participate to minimize
the impact of construction in the Vail and LionsHead Village areas.
The Vail Village Streetscape Project will continue through 2006. Improvements scheduled for
2006 will be concentrated along Gore Creek Drive west of the Children's Fountain, Gore Creek
Promenade and around the frontage of the Mill Creek Court Building. Additionat streetscape
improvements are scheduled to begin along East Meadow Drive.
All construction projects and/or remodels within the Vail Village Core Area should contact
Scott Bluhm, Town of Vail Streetscape Coordinator, at 970-477-3418 for further information.
Givens
The following givens are intended to provide the basic foundation by which construction will be completed in
the villages:
. The public's health, safety and welfare shall be honored at all times..
. Adequate pedestrian, loading/delivery, vehicle, and emergency vehicle access and circulaUon shall be
maintained.
. Roadways and pedestrian walkways shall be kept clean and free of dirt and debris.
. All construction deliveries, equ[pment, tools and materials entering the Vail Village and pedestrian areas
must go through CheckPoint Charlie. All LionsHead construction activity must go to the Vail Police
Department for a parking permit. Do not use delivery zones for construction parking; refer to approved
staging plan or make other arrangements for parking.
. The hours of outside construction activity shall be as follows:
- April 15 - June 23 & September 5 - November 17,7:00 a.m. until 7:00 p.m., seven days a week.
June 3O thru September 1, work must end by 4:00 p;m. on Fridays.
November 13 - April t5,2007 work allowed within daylight hours only.
- Deliveries shall be restricted to the hours of 7:00 a.m. to 11:30 a,m. on Gore Creek Drive and 7:00 a,m.
to B:30 a.m. on Bridge Street.
F:\cdev\FoRMS\Permits\Building\buildingjermiLDOC Page 12 of 16 0409/200s