HomeMy WebLinkAboutGORE CREEK PARK LOT 6 LANDMARC TOWNHOMES UNIT 6ETOWN OF VAIL DEPARTMENT OF COMMUNITY DEVELOPMENT
75 S.FRONTAGEROAD
VAIL. CO 81657
97U479-2138
NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES
ADD/ALT SFR BUILD PERMIT Permit #: 806-0328
Project # PRI06-0487
Job Address: 3954 BIGHORN RD VAIL Status . . . : ISSUED
Location.....: LANDMARK TH 6E Applied . . : I0/23/2N6
ParcelNo...: 210111104010 Issued. .. : lO/24/2M
Expires. ..: 0412212W7
owNER M. B. LOTTRE RESTDENCE TRUST LO/23/2006J. O. LOTIRE RESIDENCE TRUST
2552 E AIAI{EDA AVE 117
DEIiMERco 80209
APPT,TCANT C & H CONSTRUCTTON, LLC !0/23/2006 'Phone:. 970-949-L5O2
PO BOX 341
cor,oRiaDo a7.620
I-,icense: 822-B
CONTRACTOR C & H CONSTRUCTION, LLC LO/23/2006 Phone: 970-949-1'502
PO BOX 341
AVON
cor,oRiADo aL620
License : 822-8
uescnpuon:
REPI,ACE FAILING WINDOW A}ID STDING SAME FOR SAME
Occupancy:
Type Construction:
Valuation: $8,000.00 Revision Valuation: $0.00 Total Sq Ft Added: 0
+,tti*t**:l***'i***'t
Building-----> $153.25 Resfltarant Plan Review-> $0.m Tohl Calculated Fe€s- > $255.86
Plan Check-- > $99.61 Recreation Fee-------- > $0.m Additional Fels--:--> $0'm
Investigation- > $0.00 TOTAL FEES-------------> $255.86 Total Permit Fee---*> $255.86
will Call---> $3.00 Payments--------- > $255.86
BALANCE DUE--.----> $O.M
Approvals:
Item: 05100 BUILDING DEPARTMEMT
to/23/2oo6 trRM Action: AP
Item: 05400 PLANIIIITG DEPARTMENT
to/23/2006,JS ACIiON: AP WINDOW AND SIDING
MUST MATCH EXISTTNG, SrZE AND COLOR
See the Conditions section of this Document for any that may apply.
DECLARATIONS
I hereby acknowledge that I have read this application, filled out in full the information required, completed an accurate plot
plan, and state that all the information as required is correct. I agree to comply with the information and plot plan, to comply
with all Town ordinances and state laws, and to build this structure according to the towns zoning and subdivision codes, design
review approved, International Building and Residential Codes anil other ordinances of the Town applicable thereto.
REQIJESTS FOR INSPBCTION SIIALL BE MADE TWENTY.TIOUR HOIJRS IN ADVANCE BY OR AT OIJR OITICE IIROM 8:00
AM.4PM.
SIGNATIJRE HIMSELF AND OWNER
********1.****,f *rt *{.***rt *:t *****:t *******{.**************t **rt{.*t *,F*****t(*t {.!t ***1.*{.*i.***{<*i.***{.*{.::f*:t:F**:*:&**:1.:t
CONDITIONS OF APPROVAL
Permit #: 8064328 as of 10-24-2006 Status: ISSUED
:t'*:F:****:******!t*{.*****!**:****:F*,**:f *{!*:B**'f **,e******i.**{.*i.*'t******1.:1.:f ***i.*,f *****:*'t,f ***X.***t(***********1.*****
Permit Type: ADD/ALT SFR BUILD PERMIT Applied: l0lnl2n6
Applicant: C & H CONSTRUCTION, LLC Issued: l0l24l2ffi6
970-949-1502 To Expire: 04122120ff
Job Address: 3954 BIGHORN RD VAIL
Location: LANDMARK TH 6E
ParcelNo: 210111104010
Description:
REPLACE FAILING WINDOW AND SIDING SAME FOR SAME
*!e**:trt't**d.***********'****:F***!t*:t****************** COnditiOnS *:1.********t *{cr!**1.********rt******,t **i({.***'t(*i.*
Cond: 12
(BLDG.): FIELD INSPECTIONS ARE REQUIRED TO CHECK FOR CODE
COMPLIANCE.
Cond: 16
(BLDG.): (SFR) SMOKE DETECTORS ARE REQUIRED PER SECTION
R313 OF THE 2OO3 IRC.
a64vgz\f,=C82,-EttrroST'U*
GP
Separate Permits are requ electrical,
Permit #:
, mechan , etc.!
75 S. Frontage Rd.
Vail, Colorado 81657
PLETE OR U*''O'n$ilProject#: t.. r\
CONTRACTOR INFORMATION
PLETE VALUATIONS FOR
H COnt
BUILDING PERMIT & Materials
BUILDTNG: S ), SOD ELECTRICAL: $OTHER:$
PLUMBING: $MECHANICAL: $ro-rAL: s H, &M,DD
Assessors Office at 970-328-8640 or visit
Fffdg#
Z.lOl - Ill. ort- O/O
JobName: Lohr< ?tsilencc JobAddress: yt'r &1ln PA Lg
LesalDescription ll r-ot: f,Ellawrx, ll ririns,su bd ivisio n : lntlaol a tCyal *
oqffg'EN"llh/ar<Address;'a BtnLtsliltoo (El 0>Phone: g 26- glso
AichitecttDTfpr:Address:Phone:
Ensin*r:7yl1y'Address:Phone:
Detailed description of work: ., ,
K(phc<f^if rq tptJou / St/i"1
----=-r---=
WorkClass: New() Addition( ) Remodet ( ) Repairp( Dem6( ) Other( )
Work Type: Interior ( ) Exterior fi Both ( )Does an EHU exist at this location: kr t I No 0{
Typeof Blclg.: single-family( ) Two-famity(f( urniramity( ) commerciat ( ) Restaurant( ) other(- )
No. of Existing Dwelling Units in this building:No. of Accommodation Units in this building:
No/Tvpe of Fireplaces Existing: Gas Applianges ( ) Gas Logs ( ) wood/peilet ( ) wood Burnins (
No/Tvpe of Fireplaces Proposed: Gas Appliances ( ) Gas Logs ( ) wood/pellet ( ) wood Burning (Nor ALLOWED)
Does a Fire Alarm Exist: Yes ( ) No (Does a Fire Sprinkler System Exist: Yes ( ) No t4
FOR OFFIGE USE ONLY
For Parcel # Contact
h+r€
ffsT coP\
lvprsll
tdz
04091200sF: \cdev\FoRMS\Permits\Building\bu ildi ngJrermit. DOC Page 1 of 16
Questions?Buifding Team at 479-2325Call the
Project Name:
Depadrnent of Community Development
Loktc
tr
o
tr
o
o
o
tr
o
o
D
o
o
o
o
o
0
ProjectAddres, ?qS1 64ot,\ R4
This Chxklist mu* be omoled before a Buildina Permit aooliation is
arcotrld.
All pages of application is complete
Has DRB approval obtained (if required) Provide a copy of approval form
Plan Check Fee required at submittal for projects valued over $100,000.00 (see attached fee
schedule)
@mplete site plan submitted
Public Way Permit application included if applicable (refer to Public Works checklist)
Staging plan included (refer to Public Works checklist) No dumoster,oarkino or material storaoe
allowed on roadwavs and shoulderc without written aooroval
Asbestos test and results submitted if demolition is occurring
Architect stamp and signature (All Commercial and Multi family)
Full floor plans including building sections and elevations(3 sets for remodels, 4 sets of plans for SFR
and Duplex, 5 sets of plans for MultFFamily and Commercial Buildings)
Window and door schedule
Full strucfural plans, including design criteria (i.e.loads)
Structural Engineer stamp and signature on structural plans (All Commercial and MulU Family)
Soils Report must be submitted prior to footing inspection
Fire resistive assemblies specified and penetrations indicated
Smoke detectors shown on plans
Types and quantity of fireplaces shown
Applicanfs Signature:
Date of submittal:
Received By:
F:\cdev\FORMS\Permib\Building\building$ermit.DOC Page 2 of 16 0u09l2005
trt
PI.AN CHECK FEES TABLE
Depatunent of Community Evelopment
Building htdy and Inffiion tuvies
75 South Fronbge Road
Vail, Colondo 81557
97M79-2138
Fp(97H79-2452
www.vailgov.am
Plan check fees are required for projects with a valuation over $100,000, at the time of Building permit
submittal. Please use the table below to calculate your plan check fee total.
$100,000-$150,000 Multiply by
$ 150,001-$250,000 Multiply by
$250,001-$400,000 Multiply by
$401,000-$750,000 Multiply by
$750,001-$1,000,000 Multiply by
.0055 of Valuation Total
.005 of Valuation Total
.0045 of Valuation Total
.004 of Valuation Total
.0035 of Valuation Total
Valuations over $1,000,000 will be calculated by the Town of Vail Building Departnent.
If you have any fufther questions, please contact the Town of Vail Building Department at970-479-2L28,
F : \cdev\FoRMS\Permits\Building\buildi ngLl]ermit DOC Page 3 of 16 0u09l200s
ASBESTOS TESTTNG REQUTREM ENTS
THE TOWN OF VAIL AND SrATE OF COLOMDO DEPARTMENT OF PUBUC HEALTH REQUIRE ASBESTOS TESTTNG
ANY TIME WHEN MORE THAN 160 S.F. OF MATERI,AL WIII BE DISTURBED OR REMOVED.
AN ASBESTOS TEST AND REPORT IS REQUIRED TO BE SUBMITTED WITH YOUR BUILDING PERMIT APPUCATION
FOR ALL REMODEI, ADDMON OR OTHER PROJECTS INVOLVING ANY DEMOLTTION OR REMOVAL OF BUILDING
MATERI.AIS THAT MAY CONTAIN ASBESTOS. BUILDINGS CONSTRUCTED AFTER OCTOBER 12, 1988 THAT HAVE
NO ASBESTOS CONTAINING MATERTALS ARE E(EMPT.
A COPY OFTHE REPORT MUST BE SUBMITTED WITH YOUR BUILbING PERMITAPPUCATION
. I have included the asbestos test and repoft with my building permit application
apdicant dgnau-,re
OR
oate
o I certiff my project will not disturb or remove more than 160 s.f. of building
plans submitted with my application clearly indicate this information. (This will
material. The construction
be verified during plan
review, a4d will delay your project if found to be inaccurate)
r The building was constructed after October 12, 1988. The date of construction was
original consfuction date
F:\cdev\FoRr'1s\Pennits\Building\buildin gjermit. DOC Page 4 of 15 ou09lz0f5
BUILDING PERMIT ISSUANCE TIME FRAME
If this permit requires a Town of Vail Fire Departnent Approval, Enginee/s (Public Works) review and approval,
a Planning Department review or Health Department review, and a review by the Building Department the
estimated time for a total review will take as long as three (3) weeks.
All commercial (large or small) and all multi-family permits will have to follow the above mentioned maximum
requirements. Residential and small projecE should take a lesser amount of time. However, if residential or
smaller projecls impact the various above menUoned departments with regard to necessary review, these
projecB may also take three (3) weeks to review and approve.
Every attempt will be made by this departrnent to ocpedite this permit as soon as possible.
I, the undersigned, understand the plan check procedure and time frame. I also understand that if the permit
is not picked up by the expiration date, that I must still pay the plan check fue and that if I ftil to do so it may
affect future permits that I apply for.
Asreed "by, R"bl{ql
Project Name:
F : \cdev\FORMS\Permits\Buildin g\buildingJrrmit. DOC Page 5 of 16 0209/200s
WHEN A'PUBLIC WAY PERMTT" rS REQUTRED
ptEAsE READ AND CHECK OFF EACH OF THE FOLLOWTNG QUESTTONS REGARDTNG THE NEED FOR A*PUBLIC WAY PERMTT":
Is this a new residence? YES NO
Does demolition work being performed require the use;fthe Right-of-Way, easements or
public property? YES-NO---2-____?_
Is any utility work needed? YES- NO-J/-
Are there any improvemenE being done to the driveraray? YES N o--/-
Is a different access needed to the site other than the o<isting driveway? YESF+--L/
Is any drainage work beirgzdone that affects the Right-of-Way, @sements, or public proPerty?YEs_No t /
Is a "Revocable Right-of-Way Permif'required? YES- nO U-
Is the Right-of-Way, e9rfrrenb or public property to be used for staging, parking or fencing?yEs_ No+Z__7/
{ir:ryT,? ,t.Ft, stasins or fencins plan required bv Public works?
If you have answered YES to any of these questions, a "Public Way Permi( must be obtained.
"Public Way Permit" applications may be obtained at the Public Works office or at Community Development (a sample is
attached). Ifyou have any questions please call Leonard Sandoval in PublicWorks at97Q479-2L98.
^u
., Lokrt RcsCrLo^cl
o
o
Job or Project
Date Signed:
PRI #:__-
F:\cdev\FoRI'lS\Permits\Buildi ng\hil di ngjermit. DoC
ALLfiE ABOVE QUESIONS.
Company Name
Page 7 of 16
How it relates to Building Permits:
Flll out fte attached check list with the Building Permit Application.
If yes was answered to any of the questions then a "Public Way" permit is rcquired. You can pick up an
application at either Community Development located at 75 South Frontage Road or Public Works, located at
1309 Elkhorn Drive.
Notice sign-ofFs for utility companies. ALL utilities must field verifo (locate) respective utilities prior to signing
application. Some utility companies require up to 48 hours notice to schedule a locate.
A construction faffic control/staging plan must be prepared on a separate sheet of paper. An approved site plan
may also be used. This plan will show locations of all traffic control devices (signs, cones, etc.) and the work
zone, (area of construction, staging, etc.). This plan will opire on November 1s and will need to be resubmitted
for consideration for approval through the winter. Be aware that your resubmission for winter may be denied
depending on the location of construction.
Sketch of work being performed must be submitted indicating dimensions (lengEh, width and depth of work).
This may be drawn on the traffic control plan or a site plan for the job.
Submit completed application to the Public Works office for review. If required, locates will be scheduled for the
Town of Vail electricians and irrigation crew. The locates take place in the morning, but may require up to 48
hours to perform.
The Public Works Construction Inspector will reMew the application and approve or deny the permit. You will be
contacted as to the status and any requirements that may be needed. Most permits are released 48 hours of
being received, but please allow up to one (1) week to process.
As soon as the permit is approved, the Building Depaftrnent will be notified, allowing the "Building Permit" to be
released. Please do not confuse the "Public Way Permit" with the "Building Permit".
NOTE: The above pnocess is for work in a public way ONLY, Public Way Permits are valid only until
November 15th. A new Public Way Permit is rcquircd each year if work is not complete. Re-
application each November 156 does not mean an automatic renewal.
/ftl^-t:4-
Date Signed
F:\cdev\FoRMS\PermiE\Building\buildingJrermit.DOC Page 9 of 16 021091200s
DRAINAGE AND CULVERT INSPECTIONS ARE REOUIRED BY PUBLIC WORI(S!
Please read and check off each of the items below:
The Town of Vail Building Department has developed the following procedures to ensure that new construction
sites have adequately established proper drainage ftom building sites along and adjacent to Town of Vail roads or
streets.
. -The Town of Vail Public Works Deparfnent will be required to inspect and approve drainage adjacent to Town of
Vail roads or sfeeb and the installation of temporary or permanent culvefts at access poinb from the road or
street onto the conslruction site. Such approval must be obtained prior to any requesE for inspection by the
Town of Vail Building Department for footings, temporary electrical or any other inspection. Please call Leonard
Sandoval at970479-2798 to request an inspection from the fublic Works Departrnent. Allow minimum of 24
hour notice.
Also, the Town of Vail Public Works Department will be approving all final drainage and culvert insbllation with
resulting road patching as necessary. Such approval must be obtained prior to any Flnal Certificate of Occupanry
issuance.
Agreed to by:
Project Name:
Date sisned: /O'( 6- fb
F:\cdev\FoRMS\Permits\Building\buildingjermit. Doc Page 10 of 16 02109lz0os
*m
MATERIAL STORAGE AND CONSTRUCTION PARKING
Please read and ched< off each of tlre items below.
(Copies of complete teld are available upon request)
CODE 5.2.10: DEPOSITS ON PUBUC WAYS PROHIBITED
Unlawful deposits: Subject to subsection C thereof, it is unlawful for any person to litter, track or deposit, or cause to
be littered, tracked or deposited, sand, gravel, rocks, mud, dirt, snow, ice, or any other debris or material upon any
street sidewallg alley or public place, or any portion thereof.
Notice; Abatement: The Director of Public Work may notiff and require any person who violates or @uses another
to violate the provision of subsection A hereof, or who has in the Director's employment a person who violates or
causes another to violate the samg top remove such sand, gravel, rocks, mud, dirt, snow, ice or any other debris or
material within twenty four (24) hours after receipt of said notice by the Director of Public Works. In the event the
person so notified does not comply with the notice within the period of time herein specified, the Director of Public
Works, or other authorized agent, may cause any such sand, gravel, rocks, mud, dirt, snow, ice, debris or any other
material to be removed from any street or alley at the expense of the notified.
Summons and Penalty: As an alternative to the notice for removal provided in subsection B above, any person
who violates or ctruses ano$rer to violate the same, may be issued a summons to appear before the Municipal Court of
the Town for said violations, and upon being found guilty of a violaUon hereunder be punished as provided in Section
14-1 of this code.
Notice and Penalty: It is unlaMul for any person to fail or refuse to omply with the notice of the Director of Public
Works as provided in subsection B hereof, and any such person shall, in addition to payment of the expense of removal
incurred by the Director of Public Works, as provided in subsection B hereof, upon being found guilty of a violation
hereunder, be punishable as provided in Section 14-1 of this @de. (1997 Code: Ordinance 6 (1979).
CODES 7-3A-l AND 7-3A-3: PARIGNG OBSTRUCTING TRAFFIC & IMPOUNDMEI{T AUTHORIZED
No person shall park any vehicle upon a street or at any other place within this Municipality in such a manner or under
such conditions as to interfere with the free movement of vehicular traffic or proper street or highway maintenance.
(ord.2(1e68) 5 1)
Whenever any police officer finds a vehicle attended or unattended, standing upon any portion of a street or upon any
place within this Municipality in such a manner as to constitute a violation of any section of this Article, or left
unattended for a period of twenty four (24) hours or more and presumed to be abandoned under the conditions
prescribed by Colorado Revised Statutes section 42-4-1102, as amended, the officer shall require the vehicle to be
removed or cause it to be removed and placed in storage in the nearest garage or other plaae of safety designated or
maintained by this Municipality, and the charges for towing and storage of such vehicle shall be charged to the owner
of the vehkle in addition to a ten dollar ($10) impoundment charge. (Ord. 2(1968) $ 3: Ord. 28(1981) 5 1)
I have read and will conply with the above code provisions:
Position or Relationship to Project
DateSigned: I O.t6- Ob
F:/everyondfonns/bldpermT
F: \cdev\FORMS\Permib\Building\buildingJrrmit. DOC Page 11 of 15 ozlwl20o5
Vail 2006
Vail Construction Hours Policy
lnformation Handout
Problent Statement
The Vail Village and LionsHead Village are invaluable assets to the community. Thousands of
people come to Vail each year to sightsee, recreate, shop and to enjoy everything the Vail Valley
has to offer. The community and merchants rely upon our guests to generate revenue. Our
summer/winter guests expect a pleasant experience while in Vail.
To insure that all of the proposed construction has as little negative impact on the community and
on our guest as possible, the Town of Vail finds it imperative to create and implement the Vail
Village and LionsHead Village Construction Hours Handout.
It would be inesponsible for the Town of Vail, the construction contractors and the merchants, to
not actively participate to minimize the impact of construction in the Vail and LionsHead Village
areas.
The Vail Village Streetscape Projec't will continue through 2006. lmprovements scheduled
for 2006 will be concentrated along Gore Creek Drive west of the Ghildren's Fountain, Gore
Creek Promenade and around the frontage of the Mill Creek Court Building. Additional
streetscape improvements are scheduled to begin along East Meadow Drive.
All construction projects and/or remodels within the Vail Village Core Area should contact
Scott Bf uhm, Town of Vail Streetscape Coordinator, at 97O477-3418 for further information.
Givens
The followlng givens are intended to provide the basic foundation by which construction will be
completed in the villages:
o The public's health, safety and welfare shall be honored at all times.
. Adequate pedestrian, loading/delivery, vehicle, and emergency vehicle access and circulation
shall be maintained.
o Roadways and pedestrian walkways shall be kept clean and free of dirt and debris.
r All construction deliveries, equipment, tools and materials entering the Vail Village and
pedestrian areas must go through CheckPoint Charlie. All LionsHead construction activity
must go to the Vail Police Department for a parking permit. Do not use delivery zones for
construction parking; refer to approved staging plan or make other arrangements for parking.
o The hours of outside construction activity shall be as follows:
- April 15 -June 23 & September 5 - November 17,7:Q0 a.m. until 7:00 p.m., seven days a
week.
June 30 thru September 1, work must end by 4:00 p.m' on Fridays'
November 13 - April 15,2007 work allowed within daylight hours only.
- Deliveries shall be restricted to the hours of 7:00 a.m. to 11:30 a.m. on Gore Creek Drive
and 7:00 a.m. to 8:30 a.m. on Bridge Street.
- Special construction delivery permits must be requested in advance from Public Works in
conjunction with Code Enforcement at Checkpoint Charlie'
No construction activity shall occur on Saturday or Sunday between June 26 and
September 3.
*ts
h.
t
s'
S:
-
tt*a*ltft****l,t***'f,lr*****t**tl***l***t*t1lf,{'**+{.1'******l***********,i'}****f*ll{'*l'i'**llt+ttllll
TOWNOFVAIL. COLORADO Statco€ot
+*t+aaft*****+++t't*t*'t{.'}***+'t*{'r.*+***********+*a******r*+***'N.*********+{'*{'{**++**l******++++
Statement Number: RO5O0Or?86 Ar,rount: $255.86 L0/23/200604:33 PM
Payment Method: Check Init: iISNotation: 5544/C&H CONST
Permit No:
Parcel No:
Site AddresE:
Locaeion:
lhis Pa.yrnent :
ACCOUNT ITEM LIST:
Account code
BP 00100003111100
PF 0010 00 031123 00
wc 00100003L72800
B06-0328
2101-111- 0401- 0
3954 BIGHORII RD
LAIIDMARK TH 5E
s2s5.86
T)4)E: ADD/AI,T SFR BUTIJD PERMIT
VAII'
Total Feea:
Total- ALt PmtE:
Balance :
ll{rtfaa!'}+***********{.******t ***i****:}+**+t***+***{'*++++**'t******1.******:1.*'},f+***********lrtl**
BUILDING PERMIT FEES
PI,AN CHECK FEES
TIIIT.I, CALIJ ]NSPEC TON FEE
$2ss,85
$2ss. s6
$0.00
Current Pmta
153 .25
99.51
3.00
Descript- ion