Loading...
HomeMy WebLinkAboutVAIL VILLAGE FILING 9 LOT 2 UNIT BTOWN OF VAIL DEPARTMENT OF COMMIJNITY DEVELOPMENT 75 S. FRONTACEROAD vArL, co 81657 970-479-2138 NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES ADD/ALT SFR BUILD PERMIT Permit #: 802-0167 Job Address: 895 RED SANDSTONE CR VAIL Status . . . : ISSUED Location.....: 895 REDSANDSTONE CIR Applied. . : 05/29/2002 ParcelNo...: 210106303003 Issued...: 06/04/2002 Project No : r. t/ L Expires . ..: l2l0ln0l2 owNER GORDOII \T. MCCREEDY FAI,'IIJY TT.OS/29/20O2 Phone: 2552 E AIA!4EDA 3 DEN\TER CO 802 09 -3 324 License: CoNTRACTOR BEDROCK CONSTRUCTTOII OF CO, 05/29/2002 Phone: 97O-328-2OL5 P.O. BOX 425 EAGI-,E, CO 81631 License z L27 -A APPIJICANI BEDROCK CONSTRUCTION OF CO, 05/29/2002 Phone: 97O-328-20L5 P.O. BOX 425 E;AGLE, CO 81631 L,icense z 127 -A Description: RE-ROOF OF RESIDENCE. REMOVINC SHAIG SHINGIJES AND REPIACING SAI,IE FOR SAME T'NITS A&B Occupancy: Type Construction: Valuation: $10,789.00 Add Sq Ft: 0 Fireplrce Information: Restricted: Y # ofGas Appliances: 0 # of Gas Logs: 0 # of wood P€llet: 0 |'||.|.**'}:|'t..|.*t.'.'|.t+.t.tt*'}*|'|1|t|'|'t*f*.|.|'lt|t.ll|+t|t***|*l* Building--> 5155 . OO Restuarant Phn Review--> $0 . OO Total Calculated F€es-> S258 .75 Plan Check--> S1oo. ?5 DRB F€€-.---> $0 - oo Additional Fe€s---> $0. oo Inv€sligation-> gO. OO Recrcotion Fe€-----> $0 . O0 Total Permit Fe€--> 9258 .75 Will Call-> $3 . OO Clean-up Dep,osil-> SO. 00 Pa}Tnents-__..-.> $258 .75 TOTAL FEES--------> S2s8 . ?s BALANCE DUE----> $0 .0o a* t't'*r *a1*l* a* al *aa aat *** r:t*t*r* * a Approvals:IEem: 05100 BUILDING DEPARTMENI 05/29/2002 DF Action: AP ftem: 05400 PIANNING DEPARTMEMT Item: 05600 FIRE DEPARII!{EIIT Item: 05500 PITBLIC WORKS ,t* *t +at * a*i* a*taa See page 2 of this Document for any conditions that may apply to this permit. DECLARATIONS I hereby acknowledge that I have read this application, filled out in full the information required, completed an accurate plot plan, and state that all the information as required is correct. I agree to comply with the information and plot plan, to comply with all Town ordinances and state laws, and to build this structure according to tlre towns zoning and subdivision codes, design review approved, Uniform Building Code and other ordinances ofthe Town applicable thereto. REQUESTS FOR INSPECTION SHALL BE MADE TWENTY-FOUR HOURS IN ADVANCE BY TELEPHONE AT 479-2138 OR AT OUR OFFICE FROM 6:00 AM . 5 PM. Send Clean-up Deposit To: N/A CTOR FOR HIMSELF AND OWNER PAGE 2 +**+*l'}**'}{'!i*:t,t*,}'}'t****:t't+**,t'|{.********'f*'*'t*****'}**{'!*'}{'*,}{.***,****'i********!*'}'t*{t'l****:t**:*+:t|******'t***** CONDITIONS OF APPROVAL Permit #: 802-0167 as of 06-04-2002 Status: ISSUED *{.***|.'|*'|**'|''}*****:|:i'l'*'}!*:t'l.'*+,|t'i*******:**:|t*,}:|.'t:t*,|t{t**'|*'}'|*'}t|**********'*'}'|**:},F***t'}*{!'}******* Permit Type: ADD/ALT SFR BUILD PERMIT Applied: 0529/2002 Applicant BEDROCK CONSTRUCTION OF CO, INC. lssued: 06/04/2002 970-328-2015 To Expire: 12101/2002 Job Address: 895 RED SANDSTONE CR VAIL Location: 895 REDSANDSTONE CIR ParcelNo: 210106303003 Description: RE-ROOF OF RESIDENCE. REMOVING SHAKE SHINGLES AND REPLACING SAME FOR SAME I.JNITS A&B **'t:***,f*'***'**:t***ti{t{t:t'}:t'tt't:t('},t't'|,|.*'t,t{.*,}{.,*!t**t**{.****Conditions****'t1i{''******'t***,|(******* Cond: l2 (BLDC.): FIELD INSPECTIONS ARE REQUIRED TO CHECK FOR CODE COMPLIANCE. Cond: l6 (BLDG.): SMOKE DETECTORS ARE REQUIRED IN ALL BEDROOMS AND EVERY STORY AS PER SEC.3IO.6.I OF T}IE 1997 UBC. ***{' + + + *{t***f+*****'t* *{' **** ***** *+ **+ + f+ +** t ++t '} + +* *+l ***** * f * ** f, + + t+t + * i fi * * t ** * * * 'la * *+ **** TOWNOFVAIL, COLORADO Statement ****+*t ++ + + +'}+ * * + ****l ** * * * *+ * *+*+t + + *'t** | * ***{' ti + + ++f * * * ** *** ****:}*+t f * * ** * * * ******* + + + ++ ++ Statement Nurnber: ROOOOO2slO Amount: $258.?5 06/04/2OO2O8:47 AM Pa)ment Method: Check Init: LC Notation: #7358/Bedrock Construction Permit No: 802-0L57 Type: ADD/ALT SFR BUrLD PERMTT Parcel No: 2101063 03 0 03 Site Addrege: 895 RED SAMSTONE CR VAIIJ I,ocaIion: 895 REDSANDSTONE CIR Total Feea: 5258.75 This Palment: $258.75 Total ALIJ Pmts: $258.75 Balance: 50.00 **+ * * ** + t * ft + + + ft t + I' tt I + i ++ + + + *+++ * * ++*l * * lt* +'i + + * f* ** * * ** * + + +* * * **** * + + ++ * * * t* * +*'i+ + * * t* * * * * ACCOIJNT ITEM LIST: Account Code Description Current Pmts BP OO1OOOO31111OO BUILD]NG PERI4IT FEES 155.00 PF 00100003112300 PLAN CHECK FEES 100.75 I,'C OO1OOOO31128OO WILL CALL JNSPECTION FEE 3.OO PLETE OR UNSIGNED Separate Permits are required for CONTRACTOR I and,Rhone #'s: o,o Li*,J 47t- l9v{ COMPTETE VATUATIONS FOR BUILDING PERMIT (LAbOT & MAIETIAIS BUILDING: $ 16,-781 ELECTRICAL: $OTHER: $ PLUMBING: $MECHANICAL: $rorAL: q b,7*7 .- # Contact Assessorc Office at 970-328-8640 or visit o 3 <'q3 qJ05oo2- (A) lob Name:1[-'J-. - Q5*$-1 s}r.- C:" [).;l.Co Lesar Description ll r-ot, ' o{ ll etoct: ft I ririne: 1 ll suoa:uition' $o.\ (J .'( \.-:-g gle;11 Nffila,- Lo^.,'* e--{,r.Address 7q *- lt "x--o-sl-. oQ"&phggs*zss_ rrz3 Architect/Designe* NA t Address:Phone: Engineer: NA lllddress:Phone: Detailed descriotion of work:"il]I]*" ]-f *r)*.-... $**o.,1,- S\-\-Shr'rt= \"il".." t'/ot'.h WorkClass: New() Addition( ) Remodel( ) Repair(tffino( ) Other( ) WorkType: Interior ( ) Exterior 1 r.)4-oth (Does an EHU exist at this location: Yes ( ) No ( ) Type of Bldg.: Singlefamily ( ) Two-family 1|/},fim-tamity ( ) Commercial ( ) Restaurant ( ) Other ( ) No. of Existing Dwelling Units in this building: 2 No. of Accommodation Units in this building: No/Tvoe of Fireplaces Existino: Gas Aooliances ( ) Gas tms ( ) Wood/Pellet ( ) Wood Burninq ( No/Tvoe of Fireplaces Proposed: Gas Appliances ( I Gas LoSs ( ) Wood/Pgllet ( ) Wood Burni l-Does-Fire Sprinkler System Exist: Yes ( ) No ('J- ****************************:**********FOR OFFICE USE ONLY************************************:l* F:/everyoneforms/bldqperm ffi g D o tr LJ o o tr D tr D o o o D Applicant's Signaturel rul{,'N Department of Com m unity Development Project Name: Proiect Address: This Cheklist must be omoleted before a Buildina Permit apolication is ll pages of application is complete Has DRB approval obtained (if required) Provide a copy of approval form Condominium Association letter of approval attached if project is a Multi-Family complex Complete site plan submitted Public Way Permit application included if applicable (refer to Public Works checklist) Staging plan included (refer to Public Works checklist) No dumpster,parkino or material storaoe allowed on roadwavs and shoulders without written aooroval Asbestos test and results submitted if demolition is occurring Architect stamp and signature (All Commercial and Multi family) Full floor plans including building sections and elevations(4 sets of plans for Multi-Family and Commercial) Window and door schedule Full structural plans, including design criteria (ie.loads) Structural Engineer stamp and signature on structural plans (All Commercial and Multi Family) Soils Report must be submitted prior to footing inspection Fire resistive assemblies specified and penetrations indicated Smoke detectors shown on plans Types and quantity of fireplaces shown Questions? Call the Building Team at 479-2325 Date of submittal: F:/everyone/forms/bldperm2 Received By: ftJ'n.At$dJNnfriny HOW DID WE RATE WTTH YOU? Town of Vail Survey Community Development Departnent Russelt Fonest Directol (970) 479.2139 Check allthat applies. 1. Which Deparfinent(s) did you contac? Building _ Environmental _ Housing_ Admin _Planning DRB _ PEC 2. Was your initial contact with our shfi immediate_ slow or , ' ' . no one available ? 3. lf you were required to wait, how long was it before you were helped? 4. Was your project reviewed on a timely basis? Yes / No lf no, why no? 5, Was this your first time to fle a DRB app_ PEC app_ Bldg Permit_ t',I/A | : 6. Please rate the performance of the staff person who assisted you:5432lName: (knowledge; responsiveness, availability) 7. Overall efiectiveness of he Front Service Counbr. 5 4 I 2 1 8. What is the best time of day for you to use $e Front SeMce Counter? 9. Any commenb you have which would allow us to better serve you nexttime? Thank you for taking the time to complete this survey. We are commitFd b improving our service. IUtr/Y0F WHEN A *PUBLIC WAy PERMIT" IS REQUIRED PLEASE READ AND CHECK OFF EACH OF THE FOLLOWING QUESNONS REGARDING THE NEED FOR A "PUBUC WAY PERIVIIT": o o o o o o Is this a new residence?YES NO Does demolition work being performed require the gse;oftf-e Right-of-Way, easements or public property? YES_ NO v Is any utility work needed? YES Is the driveway being repaved? NO YES NO No/Is a different access needed to the site other than the existing driveway? YES_ Is a "Revocable Right-of-Way Permit" required?YES Is any drainage workbeiggffiethat affects the Right-of-Way, easements, or public propefi? YES NO \-/ r-/ NOo o Is the Right-of-Way, easgnents or public property to be used for staging, parking or fencing?YEs No L- If:nswer is NO,is a Og@S.g or fencing plan required by Public Works? If you answered YES to any of these questions, a "Public Way Permit" must be obtained. "Public Way Permit" applications may be obtained at the Public Work's office or at Community Development (a sample is attached). If you have any questions please call Leonard Sandoval in Public Work at 479-2L98. I HAVE READ AND ANSWERED ALL THE ABOVE QUESTIONS, bJ^..LC.-.-F.s$G=--. Job or Project Name: Date Signed: F : /everyoneforms/bldperm4 Contrdttor Signature Company Name PUBTIC WORKS AND THE PUBLIC WAY PERMIT PROCESS How it relates to Building Permits: Fill out the attached check list with the Building Permit Aoplication. If yes was answered to any of the questions then a "Public Way" permit is required. you can pick up an application at either Community Development, located at 75 South Frontage Road or Public Works, located at 1309 Elkhorn Drive. Notice sign-offs for utility companies, ALL utilities must field verifo (locate) respective utilities prior to signing application. Some utility companies require up to 48 hours notice to schedule a locate. A construction traffic control/staging plan must be prepared on a separate sheet of paper. An approved site plan may also be used. This plan will show locations of all traffic control devices (signs, cones, etc.) and the work zone, (area of construction, staging, etc.). This plan will expire on November lst and will need to be resubmitted for consideration for approval through the winter. Be aware that your resubmission for winter may be denied depending on the location of construction. Sketch of work being peformed must be submitted indicating dimensions (length, width and depth of work), This may be drawn on the traffic control plan or a site plan for the job. Submit completed application to the Public Work's office for review. If required, locates will be scheduled for the Town of Vail electricians and irrigation crew. The locates take place in the morning, but may require up to 48 hours to perform. The Public Work's Construction Inspector will review the application and approve or deny the permit. You will be contacted as to the status and any requirements that may be needed. Most permits are released within 48 hours of being received, but please allow up to one (1) week to process. D As soon as the permit is approved, the Building Department will be notified, allowing the "Building Permit" to be released. Please do not confuse the "Public Way Permit" with a "Building Permit". ) NOTE: The above process is for work in a public way ONLY. Public Way Permits are valid only until November 15th. A new Public Way Permit is required each year if work is not complete. Re-application each November 15th does not mean an automatic renewal. I have read and understand the above. Signature F:/everyoneforms/bldperm5 Date Signed BUILDING PERMIT ISSUANCE TIME FRAME If this permit requires a Town of Vail Fire Department Approval, Engineer's (Public Works) review and approval, a Planning Depaftment review or Health Department review, and a review by the Building Department the estimated time for a total review will take as long as three (3) weeks. All commercial (large or small) and all multi-family permits will have to follow the above mentioned maximum requirements. Residential and small projects should take a lesser amount of time. However, if residential or smaller projects impact the various above mentioned departments with regard to necessary review, these projects may also take three (3) weeks to review and approve. Every attempt will be made by this department to expedite this permit as soon as possible. I, the undersigned, understand the plan check procedure and time frame. I also understand that if the permit is not picked up by the expiration date, that I must still pay the plan check fee and that if I fail to do so it may affect future permits that I apply for, F:everyone/forms/bldperm3 APPLICAflON FOR TOWN OF VAIL PUBLIC WAY PERMIT PW*:IT'TT!T Parcer#:I X I n - I n I - X n - I I n 1e- Brds.Permito'E I I-[ I I I 1.Job Name Streel Addr€s8 nnn-n (tfunknorvncallI ll ll I I | 479-2138 ext.o Excavating Contrector Name Maillng Addross TOV Contractor's License Number REQU]REO () ztp Phone # 4. Slart Dals Work is lor (ctrcle one) Completlon Date Water Sewer Gas Electric Telephone CATV (Permit Explration Date) Landscaping Temp. Site Access Other c.Trench-width (min.4') Bond Amount $ ALL MATERIAL, EQUIPMENT, AND TRAFFIC JOB IS STARTED. 7.Rubber out-riggers are required on Asohalt surfaces undemeath lhe A signature below indicates a signatures are obtained, permittee necessary Town of Vail signatures. BE ON THE JOBSITE BEFORE THE working on asphalt. at all times. utility locations and approvals. Once all utility company application through the Public Works office to obtain the up to one week to pK,cess. Depth TotalsF $ Total LF $ Permit Fee Total Permit Fee $ Public Service Natural Gas Group (1'800-922-1587l- Public Service Company (1 U.S. West (1-800-922-1987) TCI Cablevision of the Rockies (1'800'922'1987) Eagle River Water & Sanitation District (970'476-7480, ext. 114) Holy Cross Electric Company (1'800'922'1987) Town of Vail Eloctricians (970-479-2158) Town of Vail lrrigation (970-479'2158) ' Town of Vail Public Works Construction Inspectol (970"479'2198) THERE WILL BE NO TOTAL STREET CLOSURESI A construction traffic control plan must be approved by the Public Works Department prior to issuance of the permit, All excavation musl be done by hand within 18" of utilities - (Senate Bill 172), Failure to notify the Town will resuli in forfeiture of bond money. Scheduled inspections which are not ready may result in the Town charging the contractor a reinspection fee. 12. I certity that I have read all chaplers of Tiile 8 - Public Ways and Property, ol the Vail Municipal Code and all utility company agreements, signed by me, and will abide by the same, and that all utilities have been notified as required. L 10. 11. Contractor's Signature of Agreement ATTACH PLAN OF WORK, INCLUDING CONSTFUCnON TRAFFIC CONTROL PLAN show streets with names, buildings, and location ol cuts. USE DASH LINES FOR CUT. Prinl nama clsarly Date of Signalure White - Public Wotks Yellow - contractor