HomeMy WebLinkAboutVAIL VILLAGE FILING 9 LOT 2 UNIT BTOWN OF VAIL DEPARTMENT OF COMMIJNITY DEVELOPMENT
75 S. FRONTACEROAD
vArL, co 81657
970-479-2138
NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES
ADD/ALT SFR BUILD PERMIT Permit #: 802-0167
Job Address: 895 RED SANDSTONE CR VAIL Status . . . : ISSUED
Location.....: 895 REDSANDSTONE CIR Applied. . : 05/29/2002
ParcelNo...: 210106303003 Issued...: 06/04/2002
Project No : r. t/ L Expires . ..: l2l0ln0l2
owNER GORDOII \T. MCCREEDY FAI,'IIJY TT.OS/29/20O2 Phone:
2552 E AIA!4EDA 3
DEN\TER CO
802 09 -3 324
License:
CoNTRACTOR BEDROCK CONSTRUCTTOII OF CO, 05/29/2002 Phone: 97O-328-2OL5
P.O. BOX 425
EAGI-,E, CO
81631
License z L27 -A
APPIJICANI BEDROCK CONSTRUCTION OF CO, 05/29/2002 Phone: 97O-328-20L5
P.O. BOX 425
E;AGLE, CO
81631
L,icense z 127 -A
Description:
RE-ROOF OF RESIDENCE. REMOVINC SHAIG SHINGIJES AND REPIACING
SAI,IE FOR SAME T'NITS A&B
Occupancy:
Type Construction:
Valuation: $10,789.00 Add Sq Ft: 0
Fireplrce Information: Restricted: Y # ofGas Appliances: 0 # of Gas Logs: 0 # of wood P€llet: 0
|'||.|.**'}:|'t..|.*t.'.'|.t+.t.tt*'}*|'|1|t|'|'t*f*.|.|'lt|t.ll|+t|t***|*l*
Building--> 5155 . OO Restuarant Phn Review--> $0 . OO Total Calculated F€es-> S258 .75
Plan Check--> S1oo. ?5 DRB F€€-.---> $0 - oo Additional Fe€s---> $0. oo
Inv€sligation-> gO. OO Recrcotion Fe€-----> $0 . O0 Total Permit Fe€--> 9258 .75
Will Call-> $3 . OO Clean-up Dep,osil-> SO. 00 Pa}Tnents-__..-.> $258 .75
TOTAL FEES--------> S2s8 . ?s BALANCE DUE----> $0 .0o
a* t't'*r *a1*l* a* al *aa aat *** r:t*t*r* * a
Approvals:IEem: 05100 BUILDING DEPARTMENI
05/29/2002 DF Action: AP
ftem: 05400 PIANNING DEPARTMEMT
Item: 05600 FIRE DEPARII!{EIIT
Item: 05500 PITBLIC WORKS
,t* *t +at * a*i* a*taa
See page 2 of this Document for any conditions that may apply to this permit.
DECLARATIONS
I hereby acknowledge that I have read this application, filled out in full the information required, completed an accurate plot plan,
and state that all the information as required is correct. I agree to comply with the information and plot plan, to comply with all
Town ordinances and state laws, and to build this structure according to tlre towns zoning and subdivision codes, design review
approved, Uniform Building Code and other ordinances ofthe Town applicable thereto.
REQUESTS FOR INSPECTION SHALL BE MADE TWENTY-FOUR HOURS IN ADVANCE BY TELEPHONE AT 479-2138 OR AT OUR OFFICE FROM 6:00 AM . 5 PM.
Send Clean-up Deposit To: N/A
CTOR FOR HIMSELF AND OWNER
PAGE 2
+**+*l'}**'}{'!i*:t,t*,}'}'t****:t't+**,t'|{.********'f*'*'t*****'}**{'!*'}{'*,}{.***,****'i********!*'}'t*{t'l****:t**:*+:t|******'t*****
CONDITIONS OF APPROVAL
Permit #: 802-0167 as of 06-04-2002 Status: ISSUED
*{.***|.'|*'|**'|''}*****:|:i'l'*'}!*:t'l.'*+,|t'i*******:**:|t*,}:|.'t:t*,|t{t**'|*'}'|*'}t|**********'*'}'|**:},F***t'}*{!'}*******
Permit Type: ADD/ALT SFR BUILD PERMIT Applied: 0529/2002
Applicant BEDROCK CONSTRUCTION OF CO, INC. lssued: 06/04/2002
970-328-2015 To Expire: 12101/2002
Job Address: 895 RED SANDSTONE CR VAIL
Location: 895 REDSANDSTONE CIR
ParcelNo: 210106303003
Description:
RE-ROOF OF RESIDENCE. REMOVING SHAKE SHINGLES AND REPLACING
SAME FOR SAME I.JNITS A&B
**'t:***,f*'***'**:t***ti{t{t:t'}:t'tt't:t('},t't'|,|.*'t,t{.*,}{.,*!t**t**{.****Conditions****'t1i{''******'t***,|(*******
Cond: l2
(BLDC.): FIELD INSPECTIONS ARE REQUIRED TO CHECK FOR CODE
COMPLIANCE.
Cond: l6
(BLDG.): SMOKE DETECTORS ARE REQUIRED IN ALL BEDROOMS AND
EVERY STORY AS PER SEC.3IO.6.I OF T}IE 1997 UBC.
***{' + + + *{t***f+*****'t* *{' **** ***** *+ **+ + f+ +** t ++t '} + +* *+l ***** * f * ** f, + + t+t + * i fi * * t ** * * * 'la * *+ ****
TOWNOFVAIL, COLORADO Statement
****+*t ++ + + +'}+ * * + ****l ** * * * *+ * *+*+t + + *'t** | * ***{' ti + + ++f * * * ** *** ****:}*+t f * * ** * * * ******* + + + ++ ++
Statement Nurnber: ROOOOO2slO Amount: $258.?5 06/04/2OO2O8:47 AM
Pa)ment Method: Check Init: LC
Notation: #7358/Bedrock
Construction
Permit No: 802-0L57 Type: ADD/ALT SFR BUrLD PERMTT
Parcel No: 2101063 03 0 03
Site Addrege: 895 RED SAMSTONE CR VAIIJ
I,ocaIion: 895 REDSANDSTONE CIR
Total Feea: 5258.75
This Palment: $258.75 Total ALIJ Pmts: $258.75
Balance: 50.00
**+ * * ** + t * ft + + + ft t + I' tt I + i ++ + + + *+++ * * ++*l * * lt* +'i + + * f* ** * * ** * + + +* * * **** * + + ++ * * * t* * +*'i+ + * * t* * * * *
ACCOIJNT ITEM LIST:
Account Code Description Current Pmts
BP OO1OOOO31111OO BUILD]NG PERI4IT FEES 155.00
PF 00100003112300 PLAN CHECK FEES 100.75
I,'C OO1OOOO31128OO WILL CALL JNSPECTION FEE 3.OO
PLETE OR UNSIGNED
Separate Permits are required for
CONTRACTOR I
and,Rhone #'s:
o,o Li*,J 47t- l9v{
COMPTETE VATUATIONS FOR BUILDING PERMIT (LAbOT & MAIETIAIS
BUILDING: $ 16,-781 ELECTRICAL: $OTHER: $
PLUMBING: $MECHANICAL: $rorAL: q b,7*7 .-
# Contact Assessorc Office at 970-328-8640 or visit
o 3 <'q3 qJ05oo2- (A)
lob Name:1[-'J-. - Q5*$-1 s}r.- C:" [).;l.Co
Lesar Description ll r-ot, ' o{ ll etoct: ft I ririne: 1 ll suoa:uition' $o.\ (J .'( \.-:-g
gle;11 Nffila,- Lo^.,'* e--{,r.Address 7q *- lt "x--o-sl-. oQ"&phggs*zss_ rrz3
Architect/Designe* NA t Address:Phone:
Engineer: NA lllddress:Phone:
Detailed descriotion of work:"il]I]*" ]-f *r)*.-... $**o.,1,- S\-\-Shr'rt= \"il".." t'/ot'.h
WorkClass: New() Addition( ) Remodel( ) Repair(tffino( ) Other( )
WorkType: Interior ( ) Exterior 1 r.)4-oth (Does an EHU exist at this location: Yes ( ) No ( )
Type of Bldg.: Singlefamily ( ) Two-family 1|/},fim-tamity ( ) Commercial ( ) Restaurant ( ) Other ( )
No. of Existing Dwelling Units in this building: 2 No. of Accommodation Units in this building:
No/Tvoe of Fireplaces Existino: Gas Aooliances ( ) Gas tms ( ) Wood/Pellet ( ) Wood Burninq (
No/Tvoe of Fireplaces Proposed: Gas Appliances ( I Gas LoSs ( ) Wood/Pgllet ( ) Wood Burni
l-Does-Fire Sprinkler System Exist: Yes ( ) No ('J-
****************************:**********FOR OFFICE USE ONLY************************************:l*
F:/everyoneforms/bldqperm
ffi
g
D
o
tr
LJ
o
o
tr
D
tr
D
o
o
o
D
Applicant's Signaturel
rul{,'N
Department of Com m unity Development
Project Name:
Proiect Address:
This Cheklist must be omoleted before a Buildina Permit apolication is
ll pages of application is complete
Has DRB approval obtained (if required) Provide a copy of approval form
Condominium Association letter of approval attached if project is a Multi-Family complex
Complete site plan submitted
Public Way Permit application included if applicable (refer to Public Works checklist)
Staging plan included (refer to Public Works checklist) No dumpster,parkino or material storaoe
allowed on roadwavs and shoulders without written aooroval
Asbestos test and results submitted if demolition is occurring
Architect stamp and signature (All Commercial and Multi family)
Full floor plans including building sections and elevations(4 sets of plans for Multi-Family and
Commercial)
Window and door schedule
Full structural plans, including design criteria (ie.loads)
Structural Engineer stamp and signature on structural plans (All Commercial and Multi Family)
Soils Report must be submitted prior to footing inspection
Fire resistive assemblies specified and penetrations indicated
Smoke detectors shown on plans
Types and quantity of fireplaces shown
Questions? Call the Building Team at 479-2325
Date of submittal:
F:/everyone/forms/bldperm2
Received By:
ftJ'n.At$dJNnfriny
HOW DID WE RATE WTTH YOU?
Town of Vail Survey
Community Development Departnent Russelt Fonest Directol
(970) 479.2139
Check allthat applies.
1. Which Deparfinent(s) did you contac?
Building _ Environmental _ Housing_ Admin _Planning DRB _ PEC
2. Was your initial contact with our shfi immediate_ slow or , ' '
.
no one available ?
3. lf you were required to wait, how long was it before you were
helped?
4. Was your project reviewed on a timely basis? Yes / No
lf no, why no?
5, Was this your first time to fle a DRB app_ PEC app_
Bldg Permit_ t',I/A | :
6. Please rate the performance of the staff person who assisted you:5432lName:
(knowledge; responsiveness, availability)
7. Overall efiectiveness of he Front Service Counbr. 5 4 I 2 1
8. What is the best time of day for you to use $e Front SeMce
Counter?
9. Any commenb you have which would allow us to better serve you
nexttime?
Thank you for taking the time to complete this survey. We are
commitFd b improving our service.
IUtr/Y0F
WHEN A *PUBLIC WAy PERMIT" IS REQUIRED
PLEASE READ AND CHECK OFF EACH OF THE FOLLOWING QUESNONS REGARDING THE NEED FOR A
"PUBUC WAY PERIVIIT":
o
o
o
o
o
o
Is this a new residence?YES NO
Does demolition work being performed require the gse;oftf-e Right-of-Way, easements or
public property? YES_ NO v
Is any utility work needed? YES
Is the driveway being repaved?
NO
YES NO
No/Is a different access needed to the site other than the existing driveway? YES_
Is a "Revocable Right-of-Way Permit" required?YES
Is any drainage workbeiggffiethat affects the Right-of-Way, easements, or public propefi?
YES NO \-/
r-/
NOo
o Is the Right-of-Way, easgnents or public property to be used for staging, parking or fencing?YEs No L-
If:nswer is NO,is a Og@S.g or fencing plan required by Public Works?
If you answered YES to any of these questions, a "Public Way Permit" must be obtained.
"Public Way Permit" applications may be obtained at the Public Work's office or at Community
Development (a sample is attached). If you have any questions please call Leonard Sandoval in Public
Work at 479-2L98.
I HAVE READ AND ANSWERED ALL THE ABOVE QUESTIONS,
bJ^..LC.-.-F.s$G=--.
Job or Project Name:
Date Signed:
F : /everyoneforms/bldperm4
Contrdttor Signature Company Name
PUBTIC WORKS AND THE PUBLIC WAY PERMIT PROCESS
How it relates to Building Permits:
Fill out the attached check list with the Building Permit Aoplication.
If yes was answered to any of the questions then a "Public Way" permit is required. you
can pick up an application at either Community Development, located at 75 South Frontage
Road or Public Works, located at 1309 Elkhorn Drive.
Notice sign-offs for utility companies, ALL utilities must field verifo (locate) respective
utilities prior to signing application. Some utility companies require up to 48 hours notice to
schedule a locate.
A construction traffic control/staging plan must be prepared on a separate sheet of paper.
An approved site plan may also be used. This plan will show locations of all traffic control
devices (signs, cones, etc.) and the work zone, (area of construction, staging, etc.). This
plan will expire on November lst and will need to be resubmitted for consideration for
approval through the winter. Be aware that your resubmission for winter may be denied
depending on the location of construction.
Sketch of work being peformed must be submitted indicating dimensions (length, width
and depth of work), This may be drawn on the traffic control plan or a site plan for the job.
Submit completed application to the Public Work's office for review. If required, locates will
be scheduled for the Town of Vail electricians and irrigation crew. The locates take place in
the morning, but may require up to 48 hours to perform.
The Public Work's Construction Inspector will review the application and approve or deny
the permit. You will be contacted as to the status and any requirements that may be
needed. Most permits are released within 48 hours of being received, but please allow up
to one (1) week to process.
D As soon as the permit is approved, the Building Department will be notified, allowing the
"Building Permit" to be released. Please do not confuse the "Public Way Permit" with a
"Building Permit".
) NOTE: The above process is for work in a public way ONLY. Public Way
Permits are valid only until November 15th. A new Public Way Permit is required
each year if work is not complete. Re-application each November 15th does not
mean an automatic renewal.
I have read and understand the above.
Signature
F:/everyoneforms/bldperm5
Date Signed
BUILDING PERMIT ISSUANCE TIME FRAME
If this permit requires a Town of Vail Fire Department Approval, Engineer's (Public Works)
review and approval, a Planning Depaftment review or Health Department review, and a review
by the Building Department the estimated time for a total review will take as long as three (3)
weeks.
All commercial (large or small) and all multi-family permits will have to follow the above
mentioned maximum requirements. Residential and small projects should take a lesser amount
of time. However, if residential or smaller projects impact the various above mentioned
departments with regard to necessary review, these projects may also take three (3) weeks to
review and approve.
Every attempt will be made by this department to expedite this permit as soon as possible.
I, the undersigned, understand the plan check procedure and time frame. I also understand
that if the permit is not picked up by the expiration date, that I must still pay the plan check fee
and that if I fail to do so it may affect future permits that I apply for,
F:everyone/forms/bldperm3
APPLICAflON
FOR TOWN OF VAIL
PUBLIC WAY PERMIT
PW*:IT'TT!T
Parcer#:I X I n - I n I - X n - I I n
1e- Brds.Permito'E I I-[ I I I
1.Job Name Streel Addr€s8 nnn-n (tfunknorvncallI ll ll I I | 479-2138 ext.o
Excavating Contrector Name Maillng Addross TOV Contractor's License Number REQU]REO
()
ztp Phone #
4.
Slart Dals
Work is lor (ctrcle one)
Completlon Date
Water Sewer Gas Electric Telephone CATV
(Permit Explration Date)
Landscaping Temp. Site Access
Other
c.Trench-width
(min.4')
Bond Amount $
ALL MATERIAL, EQUIPMENT, AND TRAFFIC
JOB IS STARTED.
7.Rubber out-riggers are required on
Asohalt surfaces undemeath lhe
A signature below indicates a
signatures are obtained, permittee
necessary Town of Vail signatures.
BE ON THE JOBSITE BEFORE THE
working on asphalt.
at all times.
utility locations and approvals. Once all utility company
application through the Public Works office to obtain the
up to one week to pK,cess.
Depth
TotalsF $
Total LF $
Permit Fee Total Permit Fee $
Public Service Natural Gas Group (1'800-922-1587l-
Public Service Company (1
U.S. West (1-800-922-1987)
TCI Cablevision of the Rockies (1'800'922'1987)
Eagle River Water & Sanitation District (970'476-7480, ext. 114)
Holy Cross Electric Company (1'800'922'1987)
Town of Vail Eloctricians (970-479-2158)
Town of Vail lrrigation (970-479'2158) '
Town of Vail Public Works Construction Inspectol (970"479'2198)
THERE WILL BE NO TOTAL STREET CLOSURESI A construction traffic control plan must be approved by the
Public Works Department prior to issuance of the permit,
All excavation musl be done by hand within 18" of utilities - (Senate Bill 172),
Failure to notify
the Town will resuli in forfeiture of bond money. Scheduled inspections which are not ready may result in the Town
charging the contractor a reinspection fee.
12. I certity that I have read all chaplers of Tiile 8 - Public Ways and Property, ol the Vail Municipal Code and all utility
company agreements, signed by me, and will abide by the same, and that all utilities have been notified as required.
L
10.
11.
Contractor's Signature of Agreement
ATTACH PLAN OF WORK, INCLUDING CONSTFUCnON TRAFFIC CONTROL PLAN
show streets with names, buildings, and location ol cuts. USE DASH LINES FOR CUT.
Prinl nama clsarly Date of Signalure
White - Public Wotks
Yellow - contractor