HomeMy WebLinkAboutVAIL VILLAGE FILING 1 BLOCK 4 VAIL TRAIL CHALET UNIT 2TOWN OF VAIL DEPARTMENTOF COMMUNIry DEVELOPMENT
75 S.FRONTAGEROAD
VAIL, CO 816s7
970-479-2138
NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES
MECHANICAL PERMIT Permit #: M04-0041
Job Address: 413 GORE CREEK DRVAIL Status . . . : ISSUED
Location.....: 413 FORE CREEK DRIVE, LINIT #2 Applied . . : 0410112004
ParcelNo...: 210108233002 Issued. . : 04/02/2004
ProjectNo: Expires..: 09/2912004
owNER MILLCREEK PROPERTTES, IrlD 04/0t/2004 phone:
PO BOX 430
SILOAM SPRINGS
AR 72761.
License:
CoNTRACTOR HEARTH EXCIiAITGE, rNe. (Tt#) O4/0L/2O04 Phone: 97O-827-9623
P.O BOX 670
MINTURN, CO
8L645
License t L74-M
APPTTICANf HEARTH ExCI{A}lcE, INC. (THE) 04/0L/2004 Phonez 9'10-827-9623
P.O BOX 570
MINTT'RN, CO
8164 5
License z 174-M
Desciption: INSTALLATION OF A'B" VENT GAS PIREPLACE
Valuation: $2.795.00
Fireplace Information: Restricted: Y # ofGas Appliances: 0 # ofGas togs: 0 #of Wood Pellet: 0
{i'}*|'t:}*'t*'||:tt*t.|+.ii*.*it+|i+|*||'|*|t*l++**|*ll.ti*|*|1||.******.{
Mechanical---> S50. oo Restusrant Plan Review-> So . 0o Total Calculated Fees--> S7s . 00
Plan Check-> S15. 0O DRB Fee...-._-.> SO . OO Additional Fees-----> $0 . 00
Investigation-> $0. O0 TOTAL FEES-> $?8 . OO Total Pemit F€€--> S78 .00
Will Call--> $3 . 00 Payments---------> S78 .00
BALANCE DUE---> 9o. oo
**+'t|t+i*t*t||'i*1.|l.t*it*+l|+tl|tt|{tt*l|+|t|ttt*x|t|*'*fllt*t*.*i*|l*ttllt{lt.t|****|'l*t|lt||t***+t|++itt|*.fl||*+|+Item: 05100 BUILDING DEPARTMENI
04/0L/20o4 JS Action: AP
Item: 05600 FIRE DEPARTMENT
CONDITION OF APPROVAL
Cond: 12
(BI-,DG.): FIELD INSPECTIONS ARE REQUIRED TO CHECK FOR CODE COMPIJIANCE.
Cond: 22
(BLDG.): CODIBUSTIONAIR IS REQUIRED PER SEC. 70L OF THE 1997 UMC, OR SECTION
701 0F. THE 1997 rMC.
Cond: 23
(BL,DG.): INSTAL,L,ATION MUST CONFORM TO I{AI'IUFACTTRES INSTRUCTIONS AND TO CHAPTER
10 OF TIIE 1997 I]MC, CIIAPTER 10 OF THE 1997 IMC.
Cond: 25
(BI,DG. ) : GAS APPI,IANCES SHAI.I, BE VENTED AccoRDTNG To CHAPTBR 8 AIIID SHAI,I,
TERMINATE AS SPECIFIED IN SEC.805 OF THE 1_997 I]MC, OR CHAPTER 8 OF THE 1997 rMC.
Cond: 29
(BLDG.): ACCESS TO HEATING EQUIPMENT MUST COMPL,Y WITH CIIAPTER 3 AIID SEC.101? OF
THE 1997 UMC A}ID CHAPTER 3 OF TTIB 1997 TMC.
Cond: 31
(BL,DG.): BOILERS SIIAIJIJ BE MOITNTED ON FLOORS OF NONCOMBUSTIBLE CONST. TNLESS
I.,ISTED FOR MOU}ITING ON COMBUSTIBI,E FIJOORING.
Cond: 32
(BI-,DG.): PERMIT,PLANS AND CODE ANALYSIS MUST BE POSTED IN MECHANICAL ROOM PRIOR
TO AN INSPECTION REQI'EST.
Cond: 30
(BLDG. ) : DRAINAGE OF MECIIANICAL ROOMS CONTAINING HEiATING OR HOT-WATER SUPPLY
BOIITERS SHAIJIT BE EQUIPPED WITH A FIJOOR DRAIN PBR SEC. 1-022 OF THE 1997 UMC, OR
SECTIOIT 1004.6 0F THE 1997 IMC.
DECLARATIONS
I hereby acknowledge that I have read this application, filled out in full the information required, completed an accurirte plot plarL
and state that all the information as required is conect. I agree to comply with the information and plot plan, to comply with all
Town ordinances and state laws, and to build this structure according to the towns zoning and subdivision codes, design review
approved, Uniform Building Code and other ordinances ofthe Town applicable thereto.
AT 479-2149 OR AT OUR OFFICE FROM 8:00 AM - 4 PM.
ELF AND OWNEF
'* * * * * * * * + * * + * * * * * * t * * + 'f 't * * * * * * i t * + ** * * * * * *** * {. ** * * * * i * * * * * * * * * * *'* * * {' * * * * * * * t * * * * * * * * * * * * * * * *
TOWNOF VAIL, COLORADO Statement
* ** * i * * +..******* * * t * * *+ + ** ** * f f ****+ + tl**** ** * * * t*** * * * ** +***f1** * l* * *:t ** * t * ** * * * ** * * t ** * * **
Statement Number: R040005548 Amount: $?8.00 04/02/2OO4O2:13 PM
Palment. Method: check Init: DDG
Notation: Hearth
Exchange 5447
Permit No : M04 - 0041 Tl4)e : I{ECHANICAIJ PERMIT
Parce1 No: 210108233 0 02
Site Addrees: 413 GORE CREEK DR \rAIL
Location: 413 FORE CREEK DRfVE. ttNIT #2
Total Fees: S78 . 00
This Payment: $?8.00 Total ALL Pmt6: $78.00
Balance: 50.00
* * * * * * * * * + f i * + * + + * * 'l*** * {' '} * * * * * * * * * * ** * * l * * t * * * ** * * * * d' '} * + + * f f * * * * * + * + {( * * * * * * **+ {.*{. *******lt,}*
ACCOUNT ITEM LIST:
Account Code Descr"iption Curnent Pmts
l',|P OO1OOOO31111OO MECHANICAL PERI'4IT FEES 60.00
PF 00100003112300 PLAN CHECK FEES 15.00
h]C OO1OOOO31128OO WILL CALL INSPECTION FEE 3.OO
Permitwil notueaccep@
;$
Frontage Rd.Colorado 816s7
rRd.
n
mw
75 S. Fror
Valf Coto
RECEIt/EO
ul,
$rn ba.ltb In
co,.MRAgIO R TMORMATTON
COMPLETE VALUATION FOR MFCI{AI,T'AI l!r & Materials)
Conbct anO-Fhone
co^a
** !r* ***lt,t,l.**!trr**trfi ******
PO BOX 2ds4
2008
VAIL
rE A ^{E|l'Fl_g \/,PEgTqt
FAX. 970.t
DEC 11
TOWN OF
hlt{
tirl
Transmittal
Date:
12.05.08
Ta
TomOf Vail
Attn: Martin Haeberle
ProdlllobNumbr
Mill Creek Building ffi21248.
#Pap,es
FiddReport /on, /)en-zea\n, - t/ltit Gr pgturn- tz,/A )/7/4wr-
Nores: 4Z,l ?i q?g 7lfr2- c^u/ftiev //t f,hzz, ThT
v7t {)z/ ao,rt / fi;:h,*"ftr;::::T:,
4J,
\- t
'D!
-i:,4r, i<,t \ ftvs{v=fuufr,+,:-i ) -\r Ttr;;
sbned: \X\ lett- tv'
V,,- \,$ ^\ilr- e."-^il.n ir -'.il'rr{r
"'h\" no, *4' 'c
q\'\'
k'a/
P.O. AOX 24911
AVO'.t.CO 81620
PF970 9.{9.7r00
fAx I7 0.9.{ 9.3377
!rlutions.inc
--J
ENGIIlEERING
Field Report
December 2. 2008.Arrival: Nwember2Tth, 2008, 8:30am
Deoart: 9:30 am
Proiect Mill Creek Buildinq. Gore Creek Drive. Vail. CO #0212{8
At the request of Leah Peterson of Montage Properties, I visited the site referenced above to obserue the south
side exterior foundation wall. On the wening of Ncvember 26', the water main supplying the building had
ruptured, and the Town of Vail Building official, Martin Haeberle, was concemed about the structural integrity of
the wall due to the hydrostatic pressure. The walkway, wtrich is constructed with sand-set pavers, had been
undermined by the water, and collapsed in some areas. From the basement, lwas able to observe that the
main floor joists appeared to be 2x12's at 16" on center with plyvtlood sheathing.
The concrete foundation wall appears to be retaining approximately 22 feet of earth. From inside the storage
closets in the basement, I observed no signs of structural damage to the wall. There was one srnall crack in the
Men's restroom wtrich appeared to be alloMng water through the concrete wall, which was bubbling the paint.
This crack was of very srnall width, and appeared to be a typical shrinkage crack, not a sign of struclural failure.
Horever, it does raise into question the integrity of the waterprcofing of the foundation wall; I also observed no
waterproofing membrane where the upper floor joists meet the top cf foundation wall. This may cause
deterioration of the floor joists and ledger.
I retumed to the site on Saturday, Nwember 29'to obeerve the excavation. At the time cf my visit, litde had
been excavated at the location of the rupture. I retumed to the site on Monday December 1" and saw that the
water main had been repaired, and Quintana excavation was just beginning to fill the hole.
We do not belisre that the rupture cf the water main caused any structural damage to the concrete wall- We
recommend that the waterproofing of the wall, especially tre area wilere the upper floor joists are $pported by
the wall, be improved or installed. We recanmend contacting a waterprcofing consultant, or other agenry to
obtain recommendations in this regard.
lf you have queSions about these recommendations, please do not hesitate to call.
Jeffrey P. Leonardo,
! 37558.. - ,--: :
#;i,',(:/'..8..,,&$b,fus
tlutions
-:
ENGINEERING
P.O. AOX 24911
AVON.CO 81620
rr 970 949.7 r 00
FA970.949.3377
Field Report
December2.2008.Anival: Norember 27th, 2008, 8:30 am
Depart: 9:30 am
Proieet Mill Creek Buildinq. Gore Cr€ek Drive. Vail. GO #0212{8
At the request of Leah Peterson of Montage Properties, I visited the site referenced abcnr'e to observe the south
side exterior foundation wall. On the evening of No/ember 26', the water main supplying the building had
ruptured, and the Town of Vail Building official, Martin Haebede, was concerned about the s{ructural integrity of
the wall due to the hydrostatic pressure. The walkway, which is constructed with sand-set patrers, had been
undermined by fre water, and collapsed in sorne areas. From the basement, I was able to observe that the
main floor joists appeared to be 2x12's at 16" on center witr plywood sheathing.
The concrete foundation wall appears to be retaining approximately 22 feet of earth. Frorn inside the storage
closets in the basement, I observed no signs of structural damage to the wall. There was one srnall crack in the
Men's restroom which appeared to be allowing water through the concrete wall, wltich was bubbling the paint.
This crack was of very srnall width, and appeared to be a typical shrinkage crack, not a sign of structural failure.
Horever, it does raise into question the integrity of the waterproofing of the foundation wall; I also observed no
waterproofing mernbrane where the upperfloor joists meet the top of foundation wall. This may cause
deterioration of the floor joisls and ledger.
I retumed to the site on Saturday, Ncrvernber 29h to observe the excavdion. At the time of my visil litle had
been excavded at the location of the rupture. I returned to the site on Monday Decernber 1" and saw that the
water mdn had been repaired, and Quintiana excavation was just beginning to fillthe hole.
We do not believe that the rupture of the water main caused any structural damage to the concrete wall. We
recommend that the waterproofing of the wall, especially the area wtrere the upper floor joists are supported by
the wall, be imprwed or installed. We recommend contacting a waterproofing consultant, or other agency to
obtain recommendations in this regard.
lf you have questions about these recommendations, please do not hesitate to call.
Jeffrey P. Leonardo, !
i ' gzseg ";
f;L'//*.e\,ffiofiiN