Loading...
HomeMy WebLinkAboutPRJ05-0485 DRB050563fr { / mu n t i, p a!. ? r, t dr"I' unytdk*b Decign Beview Eoard ACTTOI{ FORtr{ Departnent o# Community Develapment 75 South Frontage Road. Uail. Calsrido E1657 tel:9t0.479.2139 fix:970.{79.2{52 web: rww. rai lgoy.comoa tfFr fflEuttEtt Project llame: DRB ilumber: DR8050563 Prcject Description: FINALAPPROVALTO REMOVE AND REPI-ACE WITH SAME MATERIALTHE GLUI.AM BEAMS SUPPORTING THE GIASS ROOF STRUCruRE ATTHE UONSHEAD zuS STOP, Pafticlpants: OWNER VAIL COLORADO MUNTCTPAL BLDG10/18/2005 75 S FRONTAGE RD VAIL co 816s7 APPUCANT YAMPAH BUILDERS, INC, 715 GRAND AVENUE GLENWOOD SPRINGS @ 81501 License: 123-A col.tTRAcToR yAMpAH BUI| "DERS, INC. t0lL8l2ffi5 Phone: 970-379-5222 cell# 715 GRAND AVENUE GLENWOOD SPRTNGS @ 8160r Llense: 123-A 75 S FRONTAGE RD WESTVAIL Loft Block Subdivision: Unplatted 2101-064-0000-3 SEE @NDITIONS 10/18/2005 Phone: 970-37*5222 e;ll# LocationrProiect Address: UONSHEAD BUS STOP Legal Description: Paroel Number: Commentsr Mdon By: Seond By: v@: GondlUons: BOARD/SfAFF ACTTON ACdON: STAFFAPR Dah of ApprcvaE lOl2U2O05 Cond: 8 (P|-AN): No changes to these plans may be made without the viritten consent of Town of Vail staff and/or the appropriate review committee(s). Cond: 0 (P|-AN): DRB approval does not constitute a permit for building. Please consult wlth Town of Vail Building personnel prlor to constructlon actlvltles. Cond: 201 DRB approval shall not become valkl for 20 days folloalng the date ofapproval. ,t Cond: 202 Apprcnal of thls prolrt shall l4se and beome rmtd ore (f) year tufiovirg Brg dab of linal apprcnnl, unless a bulldfrrg pennit is lssred ard consfudion b comrenaed and is dllgenUy purcued bwad ompleUon. Planner: Joe Sutfier DR"! F€€ pald: *250.0 t_ Minor Exterior Alterations Application for Desisn *Spffi,oJ=Wio , " mT;'*!l?#[Vjil HiilllKi5nF ; n n p novnt \ tel:970.479.2l28 ft**, *** Al|projectsrequiringdesignrwiewmustreceiveapprova|priortosubstftFf,fu refer to the submittal requirements for the particular approval that is requested. A\ aflplication for Design Review General Information: cannot be accepted until all required information is received by the Community owdopment Department. The project may also need to be reviewed by the Town C,ouncil and/or the Planning and Environmental Commission. Design review approval lapses unless a building permit is issued and constructaon commenF within one year of the apprcval. Description of the Request: aL Location of the Proposall LoH_Block:_ Subdivision: r)P6lvv\s Kw Name(s) of Owner(s): '---f r,O ^f o € dA: L MailingAddress: *- S' ,Qa"n-afL 3r/ Physicaf Address: /tb"sr./t& .S.-rd"{ r{ A, ny ParcetNo.: Z{O( ObV dOOOS (@ntactEagleCo.Assessorat9T0-328-3640forparcetno.) Zoning:GO qal\^^Owner(s) Si gnature(s) : Name of Applicant: Mailing Address: Phone: Phone: qza =3??- 5 Q? 2t Fax: $50 Plus $1.00 per square foot of total sign area. No Fee $650 For construction of a new building or demolrebuild. $300 For an addition where square footage is added to any residential or - commercial building (includes 250 additions & intenbr conversions). 3i5{ For minor changes to buildings and site improvements, such as, re-roofing, painting, window additions, landscaping, fences and retaining walls, etc. $20 For minor changes to buildings and site improvements, st ch as, re'rmfing, paintng, window additions, landscaping, fences and retaining walls, etc. $20 For revisions to plans already approved by Planning $ff or the Design Revierv Board, No Fee Type of Review and Fee: tr Signs El Conceptual Review tr New Constructiontr Addition EIIMinor Alteration (mulu-family/commercia l) tr Minor Alteration (singlefamily/d uplex) tr Changes to Approved Plans tr Separation Request F$rff*Y=P"*'-cnecrno.: - ay: tutnt:ngo"t", l(- /t'€ oiectNo.: ?iUoS - 9t{l p h' ; From: Charlie DavisTo: Yampah Builders, Inc.Date: 1011912005 12:07:25PMSubject: Re: Lionshead Bus stop Virgil, With the information given, it is hard to determine if a building permit is required. I have verbally authorized this work to occur without a building permit. You are proceeding at your own risk for: Structural design. (80 or''|00# snowload is required depending of roof slope) Materials being used. lf Glu-Lams are being used, they must be rated for weather exposure or some type of banier is required so that this does not occur again Staging issues to be resolved with Public Works Planning issues. Must match existing construction and size Hope this helps. Charlie Davis Chief Building Official >>> 'Yampah Builders, lnc." <yampah@rof.net> 1Ol14l2OO51 1 :50:47 AM >>> Charlie on another job: Lionshead bus stop across from Subway, the West and North beams that support the glass roof structure are very rotten, more so than what we had originally thought, I inspected them on Wed. mourning and found them to be saturated with water and could pull out chunks with my hand. John does not think they can take another year of snow and I would have to agree We are going to replace them with what is there now and try and fix the water/rot issue We can do the work with out blocking Fire/ADlr/Ped./or bus access (this was Leonard's concern) The reason for this email is to ask your permission to proceed without the 4$ week permit process, I have filled out a permit, made a sketch and have two pictur€s ( Joe said DRB staff would need these) my job super, Mike Kuhn will be dropping this packet off this aftemoon. I would like to have this job done ASAP, at least before 11/15 Virgil CC: John Gallegos