Loading...
HomeMy WebLinkAboutPEC150002 VVMC West Wing Employee Mititgation Report Warren's Comment 030415VVMC WEST WING EXPANSION Employee Housing Plan March 2, 2015 Introduction Expansion plans proposed by the Vail Valley Medical Center Master Plan will create new employee generation. Chapter 21Commercial Linkage�of the oown(wde requires redevelopment projects to provide mitigation for net new employees in accordance with Employee Generation rates found in Chapter 23. These employee generation rates do not, however, address hospitals, medical centers, clinics or other uses similar to VVMC. In such I cases the ordinance stipulates that the "the administrator shall determine the applicable Employee nPra 'mjalLby consultinE the town's current nexus stud)('. In accordance with s�ction 12 2 B., the purpose of this report is to "provide competent evidence and information regarding the anticipated employee generation of the redevelopment". d3 Specifically, this report includes the following: • Summary of two underlying factors relative to the expansion of VVMC that will influence employee generation, a Baseline inventory of existing uses and employees for all VVMC departments and all other organizations that operate at the campus, • Evaluation of specific expansion (and/or contraction or relocation) plans for each department and organization within the West Wing and how these plans impact employee generation, and • Summary of required employee mitigation and how mitigation will be provided for the West Wing expansion. A subsequent report will be provided with the CUP application for the East Wing portion of the VVMC redevelopment that will address employee generation from the East Wing and all other elements of the project. Background While considered one of the world's most advanced mountain -community hospitals, VVMC's infrastructure is due for modernization. Facilities are at an age, condition and size where they must be modernized to meet the challenges of modern medicine and to ensure that facilities provide VVMC staff with the resources necessary to provide the utmost in quality health care. The VVMC Master Plan involves the addition of approximately 80,000 square feet of floor area. VVMC West Wing CUP VVffi&Employee Housing Report /,p P CAI. 11 C tof e5 h9O_7J OZ s 641 I kb� 0- res 0At O-�' r4racofte•,e % This addition will bring the total square footage of the campus to approximately 290,000 square feet. The VVMC Master Plan is not, however, a case of pursuing expansion simply to be larger. To the contrary, this expansion is primarily necessary to bring the size and quality of existing facilities up to c rrent medical standards. During an internal planning process prior to presenting the Master Plan to the Town, medical center staff and consultants evaluated all existing facilities relative to current operations and how these facilities compared to industry standards.",Based on this evaluation it was found that the following hospital departments were deficient in ize (square footage): ff I e. • Emergency Department - 140% • Imaging - 78% • Patient Care Unit (hospital beds) - 53% • VVMC Surgery - 32% • VVSC Surgery - 30% • Cardiopulmonary - 75% • Howard Head PT/OT-40% • Steadman/SPRI - 83% • Vail Summit Ortho - 167% • Materials Management - 87% • Sterile Processing Department - 39% These deficiencies are significant and these statistics tell a compelling story with respect to the current size of VVMC departments and other organizations that operate at the Vail campus. Specifically that today, these and other departments warrant significant increases in square footage. These increases are necessary to satisfy current needs and to bring facilities up to contemporary standards. When implemented, VVMC expansion will improve a multitude of aspects related to patient care, and with only a few exceptions will not drive increased business or activity, nor will they generate a significant amount of new employee generation. At a national level medical advances have resulted in shorter hospital stays and more out- patient procedures that require no hospital stays what so ever. VVMC has observed these same trends. In addition, facilities like the Surgery Center in Edwards and urgent care facilities throughout the Valley have shifted patient activity away from the Vail Campus. The result of this is that overall patient activity at VVMC over the past seven years has decreased. Since 1998 VVMC has seen declines in admissions, births, total patient days, emergency room visits VVMC West Wing CUP Employee Housing Report Page 2 and surgeries. These trends further support the premise that expansion to the campus is necessary to improve the quality of patient care and not to foster more "business". The underlying purpose of expanding VVMC is "de -compression", enlarging and improving facilities to provide VVMC staff with the resources necessary to offer quality medical care. While there are some exceptions, most VVMC departments are not expected to see increases in activity from this redevelopment. By way of example, more than doubling the size of the Emergency Department will not increase the number of emergencies treated at VVMC, but it will improve the quality of care, patient privacy and other considerations. Doubling the size of the Sterile Processing Department will not result in an increase to the number of surgeries performed at VVMC, but it will improve the efficiencies of staff operations. -��ndanwr►�c� � These two factors are foundational in evaluating information below regarding employee generation from the West Wing expansion. Existing Conditions A baseline inventory of existing employees has been prepared in order to understand the overall employee situation at VVMC. This inventory includes employees from all VVMC departments that work at the Vail campus. A number of independent organizations also operate at VVMC. Examples of these include The Steadman Clinic, Colorado Mountain Medical, Mountain Surgical Associates and Vail Summit Orthopedics. Employees from these \ organizations are also included in this inventory. In most cases the square footage of space utilized by each department or organization is also provided. In some cases, however, due to 'lf' the nature of how departments are organized and how square footage is utilized, it is not feasible to provide square footage allocations specific to all existing uses. Emp to ee numbers are presented two ways — the total number of employees that work for any Y �S given department or organization and the typical number of employees on duty during the day shift for each department or organization. This distinction is relevant for departments that have 24/7 employee coverage. Examples of departments with "shift work" include the Emergency Department and Patient Care/Intensive Care units Fwfi) ja,n;eOn.��� Q � VVMC employees 436 people who work at the Vail Campus. Other organizations employ a total of 234 people, resulting in a total of 670 employees. On a typical weekday VVMC employees on campus total 395 and other organizations employees total 173, resulting in 568 total employees on a typical work day. The difference between total employees and typical day shift employees is due to the number of departments that operate shifts 24/7. VVMC West Wing CUP Employee Housing Report �n.� �(►ou�'Y �'i i5 r� e�u�t fn ✓1�'► Gny ��e� Page e� �A-ta' 6m !a eS,aAtare 'ODI c O� en�ba yew P � ll f II�--// ' pSf �Jtn !h i f; c� -W1► S i nye oa ha.,e, overs #. P K� � 1 -Eo sig o 3 e u,�&Ace oaf s4 i t!5 wee ac,~+J lar. A spread sheet of the employee inventory is provided at the end of this report. Employee Generation The following is a summary of how each department and organization in the existing West Wing will be affected by the West Wing expansion. This summary addresses changes to location, square footage and operations of each use and how this will influence employee generation. A number of uses will change with the West Wing expansion — existing uses will be relocated elsewhere on campus, new uses will be introduced, some uses will get smaller and other uses will get larger. As described below, each use is unique with respect to if or how it will experience increased employee generation. Existing and proposed West Wing floor plans depicting the changes described above and a spread sheet summarizes uses, employees and square footage in the West Wing are found at the end of this report. StAl"/rkAri si Basement Level Existing uses in the basement level include food service/cafeteria, a small office for Facilities Management and mechanical/back of the house spaces. The main changes at the Basement Level include: • The food service/cafeteria will remain virtually unchanged and no employee increases are planned. • Mechanical and other back of house functions will remain. • The Facilities Management office will be removed (relocated to East Wing in the future). • 3,230sf of meeting room space for VVMC staff will be created. With construction of this new meeting room approximately 2,000sf of meeting room space in the East Wing will be removed, resulting in a net gain of just�f of meeting room space. ,-.- l a0z) Impact on new Employee Generation: Changes to the basement level will result in no new generation of employees. Level 1 A variety of uses on Level 1 include the retail pharmacy, gift shop, MRI office, Howard Head Sports Medicine (HHSM) and Colorado Mountain Medical (CMM). The main changes on Level 1 and how they affect uses, square footage and/or employees include: • The retail pharmacy and gift shop will be expanded slightly, but will have no incr se to employees (note, these uses are relocated to the East Wing in 2019 • HHSM will be expanded by 3,342sf. While a significant amount of square footage, this expansion will result in only a nominal increase to patient treatment areas (from 28 to 30). The bulk of new square footage is to improve patient care by increasing the size of VVMC West Wing CUP Employee Housing Report Page 4 patient treatment areas and by increasing areas for patient exercise (and apparatus). An increase of two employees is planned for HHSM. CMM will be relocated to the US Bank Building, meaning CMM employees and patient traffic from 16 exam rooms will be removed from the West Wing. PAI G�&h9f i A S!Ze or SPRI will utilize the former CMM space and have 5,772sf on Level 1. SPRI will also have OlZrA1OA a5 space on new Level 4. Employee generation from the expansion of SPRI's space is a (4(4(f 0' discussed below on page 4. re, 6cxfrm► Impact on new Employee Generation: Changes to Level 1 will result in the generation of 2 new employees from the expansion of HHSM. The new SPRI space will generate new employees, this generation is discussed below. Level 2 The primary use on the second floor is patient care, or hospital beds. Both the Primary Care Unit (PCU) and Intensive Care Unit (ICU) are located on this level and expansion of the West Wing will add a total of 2,487 square feet to Level 2. Of this additional square footage, 1,630 square feet is dedicated to a new Cath Lab. The balance of new square footage will provide space to enhance other aspects of patient care. The main changes on Level 2 and how they affect uses, square footage and/or employees include: • New square footage will be utilized in the conversion of a number of double -bed rooms to single -bed rooms, this change will having no impact on employees. • Four hospital beds will be eliminated (reducing the hospitals total bed count from 58 to 54), resulting in a nominal reduction in employees needed to service hospital beds. • The ICU will be relocated and enlarged, however the number of ICU beds will remain unchanged (4), rearg no impact on employees.61:2V t A� ? • The new Cath Lab will generate the need for 3 new employees. Impact on new Employee Generation: Changes to Level 2 will result in the generation of 3 new employees from the development of the new Cath Lab. Level 3 Existing uses on Level 3 include the Surgical Suites and The Steadman Clinic. The Steadman Clinic's 6,502 square feet of space will be relocated to the new 4th Level and with the completion of the West Wing expansion Level 3 will be devoted entirely to the Surgical Suites. Total square footage on Level 3 increases from 16,344sf to 21,780sf, an increase of 5,436sf. VVMC West Wing CUP Employee Housing Report Page 5 The main changes on Level 3 and how they affect uses, square footage and/or employees include: • There will be no increase to the four existing operating rooms. This is significant because the number of operating rooms is the main driver in patient activity and employees. • The majority of new square footage on Level 3 (3,925sf) will be used to relocate the Sterile Processing Department (SPD) to the West Wing from two areas of the East Wing. The new SPD will be located adjacent to the Surgical Suites (a much improved location) and will increase is size by roughly 40%. There will be no increase to SPD employees (note that the space needs study described above concluded that the existing SPD is deficient in size by 39%). • 8,013sf will be added to the Surgical Suites. The bulk of this square footage will be used to significantly increase the size and privacy of pre-op and post-op areas. Significant enhancements will also be made to support space within the Suites. Examples of these spaces include waiting areas, staff showers and lockers, staff lounge, offices, consultation rooms and storage. With no increases to the number of operating rooms, these enhancements will have no impact on employee generation. Expansion of Level 3 is an excellent example of de -compression. Impact on new Employee Generation: Changes to Level 3 will result in no new generation of employees. Level 4 Level 4 is a new level and will provide 17,165sf of space for The Steadman Clinic and 7,278sf for SPRI. With 5,772sf on Level 1, SPRI will have a total of 13,050sf of space. At the completion of the West Wing, The Steadman Clinic will vacate 8,401sf (on the 3rd and 2nd levels) and SPRI will vacate 8,828sf (on the basement and 1st levels). As a result, the net increase of new square footage for these organizations is 8,764sf for The Steadman Clinic and 4,222sf for SPRI. The Steadman Clinic currently operates out of five offices located throughout the Vail campus. The new 4th level will consolidate two of these offices (an MRI on the main level of the hospital, an administrative office and a small clinic in the US Bank Building will remain). New space on Level 4 will provide additional space for the Clinic, however much of the new square footage will involve de -compression of existing uses or providing new space for uses not currently provided for by existing facilities. The main changes to The Steadman Clinic on Level 4 and how they affect uses, square footage and/or employees include: VVMC West Wing CUP Employee Housing Report Page 6 • Increased square footage will provide new space for many functions that are not currently provided (or adequately provided) by existing space. Examples of these uses include offices for all physicians and other staff members, space for athletic trainers, PRP room, MDV rooms and a dedicated IT room. • The Clinic currently operates with 30 exam rooms. 36 exam rooms are proposed on Level 4. These rooms alone account for 5,210sf and reflect a significant increase when compared to the size of existing exam rooms. • The Steadman Clinic expects that the new West Wing will give them the flexibility to add 2 physicians to their practice. On average each physician will have 4 support employees, resulting in up to 10 additional employees. The existing number of support employees (billing, scheduling, etc.) can accommodate these additional physicians. SPRI currently operates in under -sized facilities lacking in many basic elements necessary for the organization's operation. While new space is designed to accommodate new programs, the bulk of new square footage for SPRI will address existing space deficiencies. The main changes to SPRI on Levels 1 and 4 and how they affect uses, square footage and/or employees include: • Increased square footage will provide new space for many functions that are not currently provided by existing space. Examples of these uses include meeting rooms for educational programs and other uses, staff lockers, rest rooms, bio -hazards, IT, and offices for staff and researchers. These predominantly "back of the house" uses will not contribute to new employee generation. • Increased square footage will decompress a number of existing uses, including but not limited to bio skills, clinic research, bio -motion and surgical labs, bio -mechanical research and machine shop. Increased space for these uses address the existing space deficiencies outlined above. • Improved and enlarged work stations will be created for staff, along with enhanced and more controlled circulation patterns and reception/lobby areas. • SPRI plans to expand research efforts to include regenerative medicine. Increased square footage will allow this to happen. Employee growth from this expansion would include one lead researcher and support staff, or six new employees. Impact on new Employee Generation: Changes to the SPRI space on Level 4 (and Level 1) will result in the generation of 6 new employees. Changes to The Steadman Clinic on Level 4 will result in the generation of 10 new employees. VVMC West Wing CUP Employee Housing Report Page 7 Employee Mitigation Employee Generation from West Wing Based on the analysis above, 21 new employees will be generated from the West Wing expansion. These employees are a result of the following: 6 employees at SPRI - addition of new regenerative medicine research program 10 employees at The Steadman Clinic — two new physicians and support staff 3 employees at Cath Lab — staff to support new facility 2 employees at HHSM — addition of therapists Method of Mitigation Employee housing mitigation is to be provided by payment cash -in -lieu based on current cash in lieu rates. 50% On-site Requirement Section 12-23-6 of Chapter 23 stipulates that in cases where employee generation exceeds 1.25 employees, 50% of required mitigation must be provided on-site, provided however that at the sole discretion of the applicable governing body, "an exception may be ranted based upon one :kw�� �S e^���of the following findings". Based on the response to findings below, a request for an exception 118 y, the on-site requirement is proposed. a. Implementation of the on-site unit mitigation method would be contrary to the intent and �b purpose of the applicable zone district. Response N/A b. Implementation of the on-site unit mitigation method would be contrary to the goals of the applicable elements of the Vail comprehensive plan and the town's development objectives. Response A waiver to the on-site requirement is consistent with the VVMC Master Plan. This plan states that 'for two reasons all required employee housing will be provided off-site." These reasons include: • VVMC is an intensive, institutional land use. Introducing a residential land use on the site would not be compatible with the primary purpose of the site, which is toM66 accommodate a hospital and relate medical uses. �k t for • VVMC has very limited land area. The primary purpose of this site is to COU accommodate the medical center's existing needs as well as to retain opportunities for future expansion to the medical center. Introducing residential VVMC West Wing CUP Employee Housing Report Page 8 land use would conflict with the intended use of the site, limit future expansion opportunities and not be consistent with the town's comprehensive plan. c. Exceptional or extraordinary circumstances or conditions apply to the site that prevents the implementation of the on-site unit mitigation method. Response VVMC is a unique land use and an "extraordinary circumstance". With VVMC's limited land area, introducing housing to the site would compete with the need to accommodate medical uses (now and in the future) and in doing so conflict with the Town's goal for this site to be used for medical purposes. d. The method of mitigation proposed better achieves the intent and purpose of this chapter and general and specific purposes of this title than the on-site mitigation unit method. Response Addressing employee impacts with off-site mitigation provides a more workable solution for addressing not only the goals of the housing regulations, but also the town's master plan goals for VVMC. VVMC West Wing CUP Employee Housing Report Page 9 W MC Total Employees -Existing Baseline Condition 3/1/2015 Typical Peak Total Location of Emp Appx Existing SF DEPARTMENT/ORGANIZATION Day Shift Emp Employees Work Place of Work Place VVMC Patient Care/Intensive Care 39 WW/1.2 16349 Cardiatric Area 7 CW/L1 2001 Specialty Clinic/Avanti 12 US Bank Bldg 1615 Womans and Children Center 11 CW/1-2 11135 Surgery Suites/Pre-op 46 WW/1-3 9842 Sterile Processing 12 EW/ 2731 Mtn Surgical Assoc./ Trauma 14 EW/1.2, US Bank 2532 Emergency Department 12 CW/L1 5503 Hospitalists - Ped and Adult 6 EW/1-1, WW/1-2 130 Lab 9 EW/1-1, CW/1.2 2918 Rad, CTS, MRI 14 WW/L1 5515 Gift Shop 3 WW/L1 528 Retail Pharmacy 6 WW/L1 912 Hospital Pharmacy 8 EW/1.1 1267 Howard Head Sports Medicine 33 WW/L1, US Bank Bldg 7301 Vail Valley Surgery Center 38 CW/1-2 11160 Social Services 2 Health Info Systems 2 Patient Relations 5 WW/L1 390 SHC, MSOff, UtilRev, QRMgmt. PtRel 17 US Bank Bldg 1047 Cafeteria/Nuitrition 18 WW/Bmt 4163 Facilities Management 8 WW/Bmt, ? 727 Valet/Parking Lot/Concierge 7 WW/L1 Security 3 CW/L1 100 House Keeping 9 EW/BMT 1502 IT, Comp., PatFinS 25 EW/Bmt, WWBmt, USB 3359 Admissions 13 CW/L1 589 Admistration 10 EW/1-2 3208 Material Management 3 EW/L1 909 HR/Property Mgmt 3 EW/L1 and 1.2, USB 1131 395 436 98564 Other Organizations VV EM Phy 3 3 Apollo 10 17 CW/1-2, WWL3 791 CMM 17 20 WW/L1 4216 The Steadman Clinic 98 114 WW/1.1/3, CW/1-2, USB 12903 Vail Summit Orthopeadic 10 40 US Bank Bldg 2844 SPRI 32 35 CW/1-1, EW/Bmt, EW/L1 8828 Ambulance District 3 5 Separate Bldg 3828 173 234 33410 dill VVMC West Wing CUP Employee Housing Report Page 10