Loading...
HomeMy WebLinkAboutOTC15-0017 , �Iv �� 06-11-2015 Inspection Request Reporting Page 6 4;9� t�m V�,1'.� - Citv Of Requested Inspect Date: Friday June 12 2015 Site Address: 174 GbRE CRE�K DR VAIL Lodge at Vail A/P/D Information Activity: OTC15-0017 Type: OTC Sub Type: AMF Status: ISSUED Const Type: Occupancy: Use: Insp Area: Owner: LODGE AT VAIL Applicant: LOFF ROOFING SERVICES Phone: 970-471-9412 Contractor: LOFF ROOFING SERVtCES Phone: 970-471-9412 Description: Repair 3 areas o ing roof. Remove cedar shingles and install new underlayment,metal and cedar shakes Comment: paper submitt outed�o laserfiche-CGODFREY Re uested Ins ection Item: 54 PLAN-F AL Requested Time: 08:00 AM Requestor: L FF ROO ING SERVICES Phone: 970-471-9412 Comments: 1-9412 ,pcssigned To: RUTHE ered By: JMONDRAGON K 5n� Action: Time Exp: � � � � Item 90 BLDG-Final sted Tim 08:30 AM � Requesto . LOFF ROOFING SERVICES Ph e: 970-471-9412 Comment : 471-9412 Assigned T : JMONDRAGON E red By: JMONDRAGON K Actio : Tim xp: t v Ins ection Histo Item: 542 PLAN- Item: 90 BLDG-Final � \A/V �� � / . i�� 1 REPT131 Run Id: 14955 � NOTE: TH/S PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES .• m�t�v���` Town of Vail, Community Development, 75 South Frontage Road, Vail, Colorado 81657 p. 970.479.2139, f. 970.479.2452, inpsections 970.479.2149 OVER THE COUNTER PERMIT OVER THE COUNTER Permit #: OTC15-0017 Project #: PRJ15-0156 Job Address: 174 GORE CREEK DR VAIL Appiied.....: 04/21/2015 Location......: Lodge at Vail Issued. . . : 04/24/2015 Parcel No....: 210108281003 Valuation.....: $29,900.00 OWNER LODGE AT VAIL 04/21/2015 390 INTERLOCKEN CRESCENT STE 1000 BROOMFIELD, CO 80021 APPLICANT LOFF ROOFING SERVICES 04/21/2015 Phone: 970-471-9412 TONY LOFF PO BOX 670 GYPSUM CO 81637 License: C000004098 CONTRACTOR LOFF ROOFING SERVICES 04/21/2015 Phone: 970-471-9412 TONY LOFF PO BOX 670 GYPSUM CO 81637 License: C000004098 Description: Repair 3 areas of leaking roof. Remove cedar shingles and install new underlayment, metal and cedar shakes «................................................................................ FEE SUMMARY ........«......,....__._,......,....,.,,...............,....,..................., Building Permit-----------> $441.75 Bldg Plan Check----------> $287.14 Use Tax Fee-----------------------> $398.00 Electrical Permit---------> $0.00 Elec Plan Check-----------> $0.00 Mechanical Permit------> $0.00 Mech Plan Check---------> $0.00 Additional Fees--------------------> $0.00 Plumbing Permit--------> $0.00 Plmb Plan Check---------> $0.00 Investigation-----------------------> $0.00 Will Call------------------------------> $5.00 TOTAL PERMIT FEES--------------> $1,131.89 Payments-------------------------------> $1,131.89 BALANCE DUE------------------------> $0.00 •frt�lrfl44�ir1(41`��R4a#ilM�Ltki(YtiFiFLfYrf�A'�k�1'�kY'4#'�R�M'#'i1'Y'YrMfrfitrYrY'Y'Y'YrYril'�,F�4a�YrY'RA�kARfrMNM4#f�t�e�R4wxtRf*fffR+tf*�41(lfAf(t�lt*Rf1`1(4�t�1�1�#4+tf ff41`�Rfrdl�4tRtfr1�4f4f#41(1ef1`t1`1(4441(#firf#Lilt`Mtrt'�k�kYY`Y�1'rtY'rtfY'trYrrt#'#'tY(�khYrtrYr DECLARATIONS I agree to comply with the information and plot plan, to comply with all Town ordinances and state laws, and to build this structure according to the town's zoning and subdivision codes, design review approved, International Building and Residential Codes and other ordinances of the Town applicable thereto. REQUESTS FOR INSPECTION SHALL BE MADE TWENTY-FOUR HOURS IN ADVANCE BY TELEPHONE AT 970.479.2149 OR AT OUR OFFICE FROM 8:00 AM -4:00 PM. combination permit_012811 ! ._ ` . :t ��V��f�/�.1 1 . ..x«..�+.++......+.........+.e...�....•e...........•.«..+.••........•.+.x....:•x•••e.+v.xx...x...:..awxxxx..x....+..xx.wxxr.w.ww��w........w............x.x......:w.x+x.xxw�.r.....w. CONDITIONS OF APPROVAL TO BE MET PRIOR TO FINAL SIGN OFF Permit#: OTC15-0017 Address: 174 GORE CREEK DR VAIL Owner: LODGE AT VAIL Location: Lodge at Vail ...........................................................................................................x.....,,,,,.,,.....,.,....,..,..........».......,.....,,,,..,,..,......... Cond: 8 (PLAN): No changes to these plans may be made without the written consent of Town of Vail staff and/or the appropriate review committee(s). Cond: 201 (PLAN): DRB approval shall not become valid for 20 days following the date of approval, pursuant to the Vail Town Code, Chapter 12-3-3: APPEALS. Cond: 202 (PLAN): Approval of this project shall lapse and become void one (1)year following the date of final approval, unless a building permit is issued and construction is commenced and is diligently pursued toward completion. combination permit_012811 � � 1 1 VWN V��C11L � **..,...**,*.*.*�*�„*,.****.*.*********.,«.,«*******,,,,.*****,.,*****,************«****,*,,*****.*********,,,,**,.*******.,.*****�***««*,.,,,,*.«****„*..**.**.**« REQUIRED INSPECTIONS AND STATUSES Permit#: OTC15-0017 Address: 174 GORE CREEK DR VAIL Owner: LODGE AT VAIL Location: Lodge at Vail *„««**.*«***.*.*****�*********««««*.*.**�*****...******«*««**«*«****.******«*****.********�««***********************************«****.*�********�**«« Item: 00542 PLAN-FINAL Item: 00090 BLDG-Final combination permit_012811 ,..�� � - : --�:- . - _, � _ •- � � �`"''t'���`�±l.�� `x__�,.... �„� - � �� `•�` �=z.'..r- � "�"'�,.""�!'� _ �---.,"'"'�� � '�,. '���.. ' �. ' �,i�*.,��. ' ' :.�vf. � . .. . . , � � . � ii' _ . _. 1""��� � ..��� - . ,. ��� r '— �� - - 3 ` . .. �; � ,A . -� ,. _ __��� _ `�. ,, . � _ . . _ �� - . � . - -.-. . � � < .. �- �- _ - � .. _ � , _-• � „� -_._ . . �{ . .� ' Y ;.'.. _�.�.���F�__. �- .� . �.- • ' .�. _ .. 1a'�. .. 'S? ` • , y � . , ��ik _� . �� ., k'"'s ,�-- . _ -+. ., _ . _ � . s� ^ _ ��1'� �} V - . : , , ' ,� � � '.� - "� � ^� _ '� " • *�h :`M"' �- _ �� _ :. . � . ��� 3. �i�N, � 1 � . . ;� -� -.�� _ _ .. .:.. - �a I t;,� 1 i ,a„y 1 s - , _='f . "_ . .,�"`->'�.� � ,y� � •,. � � +''�> ..r ,_�_ .,�.••r �,,, ... • ; ; �, .�I-f'� i"�'r - ,�, ..+e _ '�_, -�. , 1�C��. . � , _ � w� " -n. �'� , � . . .� . �. pJ� •�/ �7 � I, • ,,,,, ,:�'�. r . _� .., r - .+ .�r=a .. . 1. . . .. ' r ,.. . .A° r ' � "�1 �s,,y� " .. .. , „ , �r a.. t ' ,��; �� . . �. -ye�. ..r ., • ,�.r . •. ''w � - �... �� � ,�`"�'y� .�`�� �� � r �. — ' '�y—=� ,.,� �r� � � ', �'� �I,..� er '� , -.. L—,�--_ - , ... � �.r , - . �. �� w � . ,� �.\ . � �, ,__,___,_�----, `"""' ' ,. ` -y�—' e�� f - ``•+ \ ' �'`-�"� -.�.� � -----_- . �- .�_ '� w .,! +7� �� ~ J� � _ _ ' � �� � �,r' � "' � � � � t��:�, . � ,. � r ,i -' ,�� ^` ��""^ t • ,�- ' i+ .� . � � �� �j' "_� .. R . . �� �.... .. � . . . L vt � , . yr� � * _ . , , _ � ♦ . . ,�. . � ': �� . ` �� , ,... � . . , .r ,. ?�` . .,;. :� - -- -.� , � G.+ � '� �� �� �,�u�c ! :3 ,i � t �. {', ¢ "•` � ����{ , •-� 'a_° •"3�• ''"�+► . . r � G����Ie ea rt h feet 200 meters 60 � a; ; I'. �"► � . . �.. , _.. ,, '�-- o, �!14 —+ �„ - � �*±�, �•;• �� �� � ��' I „ ��.�. , � �•s ' --� - v�-� - �� ���r'� i +Y � 4. . . - -� r ..'�t ��, �"' • ` � •,� � �� �i. ..� - . :.,� :�. �� 1► � ^r1 �� , r ��ti �. _. —' . — ,. — .- ` �r . • 4 . ....- ' ' , . 1 . % • a • • �,,..��. ,�, ��..--� . �� ". � 'L; r�I 1 i ' '.�-�IUl! ._ ...- J _ �n' :�� �.���4 +► ^� ._ � • �' 4� � � � '" - -- � . ' �� � �4 � � � � �, . -- a... � � ` ' ^ � � . . ` ..�- � � �.". . r,,,, . .`�' � . ^- � . , t ..- , _ . „ ,.�, . . � - � �� - .� � . • � �. ,� �, � ' _ ' �. �- �, , � . � .-- „ . . . . . _ � . ��� � _..�,__e,. ,,� .. ."'� '� ' ,,,�1,• '�„ r . ♦ ... — .. ,_ ..--�. _ 1 ► �,. ' L.,��.. .....- - ,. .....-_ - _ _ A� _ `,� � ' ♦ � � w ri ,� ,/_ ,,i . r ^ ' � .....�+* -- ,. � • � .� ..�, -� .� '�`� � °' t'��r,,,.•,.�•, � ,, / ����,, ` �� ` �, � F � ��ra��� � v � ��`���� �,r•� . � ,'� ` 1 , "�' _ _ 1 * V�����¢I'� earth feet 100 O meters; 40 � / � Repair Area 2 Refer to Figure 3 Repair Area 1 Refer to Figure 2 � � 0 0 000 a �--l�F-�►-- Repair Area 3 Refer to Figure 4 Lodge at Vail FIGURE 1 - Plan View of Penthouse Roof , 9CALE:NONE e�n a i e� BC&EI�°°,°������ t Eo6i�����,ioc. � `� - __ �--��►-. ---- ZO�t � 2 °p 4 6 5 7 I 6a 8 __---9�t— — -- —1---- 22't Notes: 3 1.Install new,longer 24ga drip metal which closes the gap at the fascia lnstall addition line of heat-trace under the drip edge,between the drip edge and the face of the gutter. 2.Replace existing valley metal construction with new valley construction including a double layer of Crrace Ice and Water Shield,new sheet-metal valiey with edges stripped in with Grace Ice and Water Shield.Carefully integrate new valley construction with existing cricket construction. 3.Remove existing cedar shake roofing and associated components in the area indicated on Figure 1.Install compiete coverage of Grace Ice and Water Shieid.Install new medium grade multi-width cedar shakes with 30#felt interlaced Instail new 24 ga.galv.sheet-metal flashings at rake,eave,and penetrations.Strip-in all flashings with Grace Ice and Water Shieid. At the eave condition wrap Grace Ice and Water Shield down behind drip edge and over top leg of existing gutter. 4.Existing cricket at chimney to remain.Strip-in edges of new waterproofing to existing cricket construction and solder new valley metal to existing cricket consrivction. 5.Remove and reset existing roof haich in order to extend and properly terminate New Ice and Water Shield.Install fillet bead of Grace LM3000 at base of hatch to ease the transition of the Ice and Water Shield. 6.Install LM3000 liquid membrane fillet bead at the base of each snow-fence penetration.Install new 2-pc.sheet-metal flashing sleeve integrated with roofing and new sealant at prepared,cleaned steel bases.Refer to attachment snow-fence sleeve conceptual detail- FIGURE 5.At ba explore the possibility of moving the snow-fence support out of the middle of the vailey. At a minimum,solder all joints in the metal base to the valley metai. 7.Integrate new roofing system,including underlayments with with existing roofing system along hip conditions. 8.Properly reinstall existing snow-melt cables and ensure they are in working order. Lodge at Vaii FIGURE 3- Partial Pian View of Re air Area 2 3 HCFLE:NONE B C&EI e.�ia�n' coe��ir�e�� . d En'i�eaia.In<, � _ __ �■��{�} �." 1 2 ----- 28't 8 6 5 o � � 4 c � ±� N w- � � O r- :a � C � �6 ` �� 7 Notes: 3 L Install new,longer 24ga drip metal which closes the gap at the fascia lnstall addition line of heat-trace under the drip edge,between the drip edge and the face of the gutter. 2.Install new surface-mounted counter-flashing with sealant cup and sealant above exposed edged of stucco to limit moisture behind the face of the gutter. 3.Remove existing cedar shake roofing and associated components in the area indicated on Figure 1.Install complete coverage of Grace Ice and Water Shield.Install new medium grade multi-width cedar shakes with 30#feit interlaced.Install new 24 ga.galv.sheet-metal flashings at rake,eave,and penetrations.Strip-in all flashings with Grace Ice and Water Shield At the eave condition wrap Grace Ice and Water Shield down behind drip edge and over top leg of existing gutter. 4.Remove existing cricket and step flashings at chimney.Remove bottom portion of stucco on three sides of the chimney to install new double-layer of Grace Ice and Water Shield over cricket framing and 24-inches up the wa(Is. Install new watertight,solid soldered cricket pan and new step flashings around base of chimney.Install new stucco holding it up a minimum of 2-inches from the roofing.New stucco to properly integrated with existing lath and weather-resistive barrier and shall have 24 ga.galv.drip edge and weep screed at the base on 3 sides only. 5.Install new watertight cap with new solid support which provide pitch to drain. New support sha11 be waterproofed with new Grace Ultra(high-temp)sheet-applied waterproofing with laps and terminations sealed with Grace LM3000. Cap metal to be solid soldered K'ith drip edge around. Provide new drip rings,sealants,and hoods for existing pipe penetrations. 6.Install LM30001iquid membrane fillet bead at the base of each snow•fence penetration.Install new 2-pc.sheet-metal flashing sleeve integrated with roofing and new sealant at prepared,cleaned steel bases.Refer to attachment snow-fence sleeve conceptual detail- FIGURE 5 '7.Integrate new roofing system,including underlayments with with existing roofing system along hip conditions. 8.Properly reinstall existing snow-melt cables and ensure they are in working order. Lodge at Vail FIGURE 2 - Partial Plan View of Re air Area 1 2 9CaLE:NONE — s,�i d;n s BC&EI�.°�������� d Eesi���ie:lo�. NOTE: ALL METAL FLASt11NG St1ALL BE COMPLETELY 50LDERED FILL POCKET WITti LIQUID / MEMBRANE (APPLY WITI1 CAULKING GUN) � / FULL CANT BEAD OF � LIQUID MEMBRANE � � � \ �, FIELD SIIEET OF GRACE ICE AND WATER St11ELD BOTTOM FLA5111NG (INSTALL FIRST OVER FIELD SIIEET�F ICE AND WATER SNIELD) UPPER FLASIIING (INSTALL � SECOND OVER BOTfOM FIAStiING � FIELD St1EET OF ICE AND WATER SHfELD �STRIP-IN BOTTOM � UPPER FLASHING WITt1 ICE AND WATER St11ELD Lodge at Vaii FIGURE 5- Plan View of Penthouse Roof 5 SCALE:NONE B�ildie` C&EI�°.s°�".�s t Eo�i��e��:1��. l-H�--�•- — 15'f 7 � � 5 � � 6 4 8-�'.,_.- � co 2 3 5�� — -- � 1 �t �_`'_----5 4 7 -- 10't _----------- -- _ Notes: 1.Install new,longer 24ga.drip metai which closes the gap at the fascia lnstall addition line of heat•trace under the drip edge,between the drip edge and the face of the gutter. 2.Replace existing valley metal construction with new copper valley construction including a double layer of Grace Ice and Water Shieid, new sheet-metal valley with edges stripped in with Grace Ice and Water Shield. 3.Remove existing cedar shake roofing and associated components in the area indicated on Figure 1.Install complete coverage of 2-layers of Grace Ultra(high temp).Integrate with transition from existing shake roof to remain.Strip-in all flashings. At the eave condition wrap Grace Ultra down behind drip edge and over top leg of existing gutter.Treat all terminations(possible reverse at the existing shake roof to remain)with LM300�. Cover the new underlayment with rosin paper slip sheet and install new flat-semed copper mofing with S-Style seams. 4.Remove existing cedar shake roofing and associated components in the area indicated on Figure 1.Install complete coverage of Grace Ice and Water Shield.Install new medium grade multi-width cedar shakes with 30#felt interlaced.Install new 24 ga,ga1v.sheet-metal flashings at rake,eave,and penetrations.Strip-in all flashings with Grace Tce and Water Shield. At the eave condition wrap Grace Ice and Water Shield down behind drip edge and over top leg of existing gutter. 5.Provide ADD Alternate for the addition of Bylin in the two valiey conditions. 6.Insta(1 LM30001iquid membrane fillet bead at the base of each snow-fence penetration.Install new 2-pc.sheet-metal flashing sleeve integrated with roofing and new sealant at prepared,cleaned steel bases.Refer to attachment snow-fence sleeve conceptual detail- FIGURE 5. 7.Integrate new roofing system,including underlayments with with existing roofing system along hip conditions. 8.Properly install new snow-melt cables and ensure they are in working order. Lodge at Vail FIGURE 4-Partial Plan View of Re air Area 3 , SCALE:NONE 71� p Tle,iia��6 K i[7 H c..�.i��.0 J./ V�.LJ 1 Eqi��n�,loa. Community Development Department 75 South Frontage Road West Vail, CO 81657 TOWN QF VAIL� Tel: 970-479-2128 Comnaunity Development www.vailgov.com Department Development Review Coordinator RE-ROOF PERMIT APPLICATION (This permit is applicable to one and two family dwelling units, multifamily buildings) (Permit fee= standard building fees and design review fee) Project Information . � Type of Building: Owner Name: ��� � ��� Multifamity(`�') One Family(�) Two Family(Duplex)(�) �arcel�: �— � 2ioC��Z /003 � ` (For Parcel#,contact Eagle County Assessors Office at(970•328-8640 or visit Submittal Requirements www.eaglecounty.us/patie) . Joint Property Owner Written Approval Letter(duplex or Project Street Address: multi-family HOA) _ , , �� / %r� G�, �� • :wo(2)plan sets indicating: _�_��__ 5t" � Site plan showing location of balconies,decks, stair- (Number) (Street) (Suite#) ways, sidewalks, pedestrian and vehicular exits from the buiiding and utility meters Contractor Information • Roof plan showing pitch and slope / (� • Snow retention method and location. Multi-family Business Name: (�b.�'r �do� lt�C�i �'�U 6��7 building snow retention is required to be designed, �r6 n � ��� signed and sealed by a licensed engineer Business Address: i r�� . If heat tape is to be used as snow retention, load cal- /—� /ry culations must be provided City�y�.5�'� State: �� Z�P� �/ . Material type(i.e.Composite Shingles Class A)and r � I color Contact Name: �✓I�L� . Full view roof photos of the entire building Contact Phone:��� '1 �` / / ' � • Note: Roofs with a horizontal dimension less than 48" _.._.— � �, " r,�.��—` d � are exempted from snow retention Contact E-Mail: �U �'� �+'`'t`'�'�� Detailed Scope and Location of Work: � ��� 3 °t�r�5 / � Applicant Information(fill in if different from contractor) +1_�,�. wr f� J�tik�'��� ��,,..,o��� �d�,r ��,�f/t; i�f �I r� ApplicantName: j�� � be� U�°l���� q'�� G�dK� j�tti� Applicant Phone: (use additional sheet if necessary) Applicant E-Mail: Valuation of Work Included Plans Included Work I hereby acknowledge that I have read this application,filled out Electrical (Q)Yes (�)No (Q)Yes (�)No in full the information required,completed an accurate plot plan, �2� q�0,p0 and state that all the information as required is correct. I agree to guilding (�)Yes (�)No (�)Yes ((Q)No 1 comply with the information and plot plan,to comply with all Town �-\ ordinances and state laws, and to build this structure according to Value of all work being performed: $ � the town's zoning and subdivision codes, design review ap- (value based on IBC Section 109.3 81RC Section 108.3� proved,International Building and Residential Codes and other Electrical Square Footage ordinan s of the ow applicable thereto. X �� Date R �,i e� C„ �� � �� L� Owner/Owne epresentative Signature Required(typed or digital 1 �, Lljsignature) I ��'i� 2 � 201� ( ) Checking this box indicates you are electronically signing � I this application and agree to the above statement. -rowN �� �w�L For Office Use Only: `� � , �I � Project#: �sr�/I�� - Fee Paid: Received From: Building Permit#: �� �i�J �� � � • 1f Cash Check# Lot#:�-Block#_ Subdivision:� -�� �v� 1 I v� CC: Visa/MC Last 4 CC# Auth#: 13-Jan 18 ?'OWN DF VA!!.k JOINT PROPERTY OWNER WRITTEN APPROVAL LETTER The applicant must submit written joint property owner approval for applications affecting shared ownership properties such as duplex, condominium, and multi-tenant buildings. This form, or similar written correspondence, must be com- pleted by the adjoining duplex unit owner or the authorized agent of the home owner's association in the case of a con- dominium or multi-tenant building.All completed forms must be submitted with the applicants completed application. ��bY�e- CI( Z��'�'������ , a joint owner, or authority of the association, I, (print name) � � of property located at LO� �+ V`�` ` , provide this letter as written approval of the plans dated which have been submitted to the Town of Vail Community Development Department for the proposed improvements to be completed at the address not- ed above. I understand that the proposed improvements include: I understand that modifications may be made to the plans over the course of the review process to ensure compliance with the Town's applicable codes and regulations; and that it is the sole responsibility of the applicant to keep the joint property owner apprised of any changes and ensure that the changes are acceptable and appropriate. Submittal of an application results in the applicant agreeing to this statement. ,,,, � �.� - 21 - 2C� ts Si ur - Date ���r� ��l(z� Print Name '