HomeMy WebLinkAboutAir Clearance - Timber Ridge Vail Bldgs C G H
Asbestos Consulting Services
PROJECT
AIR MONITORING REPORT
TIMBER RIDGE APARTMENTS
BUILDINGS C, G, H
1280 NORTH FRONTAGE ROAD WEST
VAIL, COLORADO
81657
PREPARED FOR: Gorman & Company Inc.
200 North Main Street
Oregon, Wisconsin 53575
Report Prepared: July 20, 2014
SEI Project Number: SEI14-P096
Prepared By:
Sunrise Environmental, Inc.
371 Crest View Drive
Black Hawk, Colorado 80422 Phone: 720-209-5282 www.sunrise-enviro.com
EXECUTIVE SUMMARY
Sunrise Environmental, Inc. provided air monitoring services for Gorman & Company, Inc. at
the Timber Ridge Apartments, 1280 North Frontage Road West, Vail, Colorado July 02 -17, 2014. The field representative for Sunrise Environmental, Inc. was Mr. Scott D. Sanders. Work
was performed in conjunction with asbestos abatement at the site. Asbestos abatement was
conducted by Eco Tech Environmental Inc.; a Colorado Department of Public Health &
Environment (CDPHE) licensed General Abatement Contractor (GAC).
SEI’s scope of work included collection and analysis of final clearance air samples, performing a
visual inspection of the work area prior to collection of air samples, and assembling project
documentation.
Subsequent to cleanup, Sunrise Environmental, Inc. visually inspected the containment areas for visible dust and debris. Upon passage of visual inspection, Sunrise Environmental, Inc. collected
final clearance air samples and notified ETE and Gorman & Company, Inc. when laboratory
results indicated airborne fiber concentrations were not in excess of 0.01f/cc as required by
CDPHE Regulation No. 8.
At project completion, air-monitoring results indicate concentrations of airborne fibers were not
in excess of 0.01f/cc as required by the Environmental Protection Agency (EPA) and CDPHE for
re-occupancy following asbestos abatement.
CLIENT: Gorman & Company Inc.
200 North Main Street Oregon, Wisconsin 53575
PROJECT
LOCATION: Timber Ridge Apartments
1280 North Frontage Road West Vail, Colorado 81657
Buildings C, G, and H
DESCRIPTION
OF WORK: Final Visual Inspection & Final Clearance Air Monitoring
ASBESTOS
ABATEMENT
CONTRACTORS: Eco Tech Environmental Inc. 2331 West Hampden Avenue
Suite 137
Sheridan, Colorado 80110
SUNRISE
ENVIRONMENTAL INC.
REPRESENTATIVE: Mr. Scott D. Sanders
INTRODUCTION
SEI provided air monitoring services for Gorman & Company, Inc. at the Timber Ridge
Apartments, 1280 North Frontage Road West, Vail, Colorado July 02 -17, 2014. The field
representative for Sunrise Environmental, Inc. was Mr. Scott D. Sanders. Work was performed
in conjunction with the removal of asbestos containing building materials at the site. Asbestos
abatement was conducted by Eco Tech Environmental Inc.; a Colorado Department of Public Health and Environment (CDPHE) licensed General Abatement Contractor (GAC).
Sunrise Environmental, Inc. performed the final visual inspection, and the collection and analysis
of Phase Contrast Microscopy (PCM) air samples after asbestos abatement. SEI successfully
participates in the AIHA Proficiency Analytical Testing (PAT) Program (Laboratory ID# 196102). All SEI analysts have been certified in NIOSH 582E to perform collection and analysis
of PCM air samples.
SCOPE OF WORK
Eco Tech Environmental Inc.’s scope of work for this project consisted of the removal/disposal
of:
1. Approximately 600 square feet of sheet vinyl flooring was removed from Building H,
Units 1, 2, 3, and 5 kitchen floors (approx. 150 square feet each kitchen).
2. Approximately 450 square feet of sheet vinyl flooring was removed from Building G,
Units 2, 4 and 5 kitchen floors (approx. 150 square feet each kitchen).
3. Approximately 450 square feet of sheet vinyl flooring was removed from Building C, Units 4, 5 and 6 kitchen floors (approx. 150 square feet each kitchen).
SEI has performed the following Industrial Hygiene services:
· Performed a visual inspection of the abatement areas,
· Collection and analysis of PCM air samples to monitor concentrations of airborne
fibers after asbestos abatement in accordance with CDPHE Regulation No. 8,
· Assembled and submitted project documentation.
The findings set forth in this report are strictly limited in time and scope to the date of the
evaluation. The conclusions presented in the Report are based solely on the services described therein, and not on scientific tasks or procedures beyond the scope of agreed upon services.
PROJECT DESCRIPTION
Sequence of field work: Table 1 summarizes the field work in the order in which it was
completed.
Table 1. Summary of Field Work
DATE FIELD WORK
07-02-14 Pre-clearance visual inspection of Building H, Unit #2 kitchen
containment is performed. Visual inspection passes.
Collection of five (5) PCM final clearance air samples inside Building H,
Unit #2 kitchen containment.
Pre-clearance visual inspection of Building H, Unit #1 kitchen
containment is performed. Visual inspection passes
Collection of five (5) PCM final clearance air samples inside Building H,
Unit #2 kitchen containment.
All PCM clearance samples are analyzed and found to be below 0.01f/cc. Eco Tech Environmental Inc. on-site supervisor is notified.
07-08-14 Pre-clearance visual inspection of Building H, Unit #5 kitchen
containment is performed. Visual inspection passes.
Collection of five (5) PCM final clearance air samples inside Building H,
Unit #5 kitchen containment.
Pre-clearance visual inspection of Building H, Unit #3 kitchen containment is performed. Visual inspection passes
Collection of five (5) PCM final clearance air samples inside Building H,
Unit #3 kitchen containment. All PCM clearance samples are analyzed and found to be below 0.01f/cc.
Eco Tech Environmental Inc. on-site supervisor is notified.
07-11-14 Pre-clearance visual inspection of Building G, Unit #2 kitchen
containment is performed. Visual inspection passes.
Collection of five (5) PCM final clearance air samples inside Building G,
Unit #2 kitchen containment.
Pre-clearance visual inspection of Building G, Unit #4 and Unit #5 kitchen
containment is performed. Visual inspection passes
Collection of five (5) PCM final clearance air samples inside Building G,
Unit #4 and Unit #5 kitchen containment.
All PCM clearance samples are analyzed and found to be below 0.01f/cc. Eco Tech Environmental Inc. on-site supervisor is notified.
07-17-14 Pre-clearance visual inspection of Building C, Unit #4, #5, #6 kitchen
containment is performed. Visual inspection passes.
Collection of five (5) PCM final clearance air samples inside Building C,
Unit #4, #5, #6 kitchen containment.
All PCM clearance samples are analyzed and found to be below 0.01f/cc. Eco Tech Environmental Inc. on-site supervisor is notified.
AIR MONITORING
Sample Collection
The effective filter area for samples collected on July 02 through 17, 2014 was 385mm2. PCM
samples were collected on 25 millimeter (mm) mixed cellulose ester membrane filters (0.8
micron pore size). The filters were preassembled by the manufacturer. Air samples were collected at a flow rate of 15.4 to 15.7 liters per minute (LPM). Flow rates were recorded at the
beginning and at the end of the sampling period using a DryCal™ Primary Standard flow
calibrator. All air samples were collected open-faced and positioned at breathing zone height
(approximately five feet above the floor) with exposed portion of the cassette facing downward.
Clearance air samples were collected aggressively and in accordance with CDPHE Regulation #8. (See Appendix A for sample data)
PCM Analysis Methodology
PCM samples were analyzed by SEI according to the NIOSH 7400 Method (“A” counting rules).
This method can be found in the NIOSH Manual of Analytical Methods. All air sample results
are calculated with blank corrections, checked and reviewed. Unused portions of samples are
archived three months unless client requests special handling. Laboratory analysis was
accomplished utilizing a Phase Contrast Microscope. Size and fiber counts were performed at 400X magnification. The microscopy field area (MFA), defined by the Walton-Beckett
Graticule is 0.00785mm2.
Report Data Key
Fbrs/Flds: Fibers per fields; total fibers counted over total areas examined. LOD: Limit of Detection; the calculated lower limit of detection expressed in fibers per
cubic centimeter. Based on limit of detection of (5.5/100 fibers/field).
F/cc: Fibers per cubic centimeter.
<LOD: Less than the limit of Detection; thus, the analytical result is less than the value
indicated in the LOD column. CONCLUSIONS
At project completion, air-monitoring data indicate concentrations of airborne fibers were not in excess of 0.01f/cc as required by the Environmental Protection Agency (EPA) and CDPHE for re-occupancy following asbestos abatement.
Reviewed and signed for the company by:
_________________________________ Scott D. Sanders President
APPENDIX A
PCM AIR SAMPLE DATA
SUNRISE ENVIRONMENTAL, Inc.
Phase Contrast Microscopy Sampling Data Sheet
PROJECT
DATE: July 02, 2014
PROJECT NUMBER: SEI14-P096
CLIENT: Gorman & Company 200 North Main Street, Oregon, Wisconsin 53575 PROJECT ADDRESS: Timber Ridge Apartments
1280 North Frontage Road West, Vail, Colorado 81657
Building H, Unit 1 and 2 Sample (Time) Total (Flow Rate (l/min) Total Fibers/
Number Start Stop Minutes Start Stop Avg. Volume Field LOD Fibers/cc
0702-01 --- --- --- --- --- --- --- 1/100 --- ---
0702-02 --- --- --- --- --- --- --- 0/100 --- ---
0702-03 1440 1559 79 15.5 15.3 15.4 1217. 5/100 0.002 ≤ LOD
0702-04 1441 1600 79 15.5 15.5 15.5 1225. 3/100 0.002 ≤ LOD
0702-05 1441 1600 79 15.5 15.3 15.4 1217. 4.5/100 0.002 ≤ LOD
0702-06 1442 1601 79 15.5 15.5 15.5 1225. 4.5/100 0.002 ≤ LOD
0702-07 1443 1602 79 15.5 15.5 15.5 1225. 3/100 0.002 ≤ LOD
0702-08 1459 1619 80 15.5 15.5 15.5 1240. 4/100 0.002 ≤ LOD
0702-09 1500 1620 80 15.5 15.5 15.5 1240. 2/100 0.002 ≤ LOD
0702-10 1501 1621 80 15.5 15.3 15.4 1232. 3/100 0.002 ≤ LOD
0702-11 1502 1621 79 15.5 15.5 15.5 1225. 4.5/100 0.002 ≤ LOD
0702-12 1503 1622 79 15.5 15.7 15.6 1232. 4/100 0.002 ≤ LOD
Sample Sample Number Type Location/Description Results
0702-01 Field Blank 1/100
0702-02 Field Blank 0/100
0702-03 CLEARANCE Bldg. H, Unit #2, kitchen, north end ≤ LOD 0702-04 CLEARANCE Bldg. H, Unit #2, kitchen, east end ≤ LOD
0702-05 CLEARANCE Bldg. H, Unit #2, kitchen, west end ≤ LOD
0702-06 CLEARANCE Bldg. H, Unit #2, kitchen, center ≤ LOD
0702-07 CLEARANCE Bldg. H, Unit #2, kitchen, south end ≤ LOD 0702-08 CLEARANCE Bldg. H, Unit #1, kitchen, north end ≤ LOD
0702-09 CLEARANCE Bldg. H, Unit #1, kitchen, south end ≤ LOD
0702-10 CLEARANCE Bldg. H, Unit #1, kitchen, center ≤ LOD
0702-11 CLEARANCE Bldg. H, Unit #1, kitchen, east end ≤ LOD
0702-12 CLEARANCE Bldg. H, Unit #1, kitchen, west end ≤ LOD
LOD= Limit of Detection
SUNRISE ENVIRONMENTAL, Inc.
Phase Contrast Microscopy Sampling Data Sheet
PROJECT DATE: July 08, 2014
PROJECT
NUMBER: SEI14-P096
CLIENT: Gorman & Company
200 North Main Street, Oregon, Wisconsin 53575 PROJECT ADDRESS: Timber Ridge Apartments 1280 North Frontage Road West, Vail, Colorado 81657
Building H, Unit 3 and 5 Sample (Time) Total (Flow Rate (l/min) Total Fibers/
Number Start Stop Minutes Start Stop Avg. Volume Field LOD Fibers/cc
0708-01 --- --- --- --- --- --- --- 0/100 --- ---
0708-02 --- --- --- --- --- --- --- 0/100 --- ---
0708-03 1451 1609 78 15.6 15.4 15.5 1209. 5/100 0.002 ≤ LOD
0708-04 1452 1610 78 15.6 15.6 15.6 1217. 3/100 0.002 ≤ LOD
0708-05 1452 1610 78 15.6 15.6 15.6 1217. 4/100 0.002 ≤ LOD
0708-06 1453 1611 78 15.6 15.6 15.6 1217. 4/100 0.002 ≤ LOD
0708-07 1453 1611 78 15.6 15.6 15.6 1217. 3.5/100 0.002 ≤ LOD
0708-08 1508 1628 80 15.6 15.8 15.7 1256. 2.5/100 0.002 ≤ LOD
0708-09 1509 1629 80 15.6 15.6 15.6 1248. 3/100 0.002 ≤ LOD
0708-10 1509 1629 80 15.6 15.6 15.6 1248. 2/100 0.002 ≤ LOD
0708-11 1510 1630 80 15.6 15.6 15.6 1248. 4/100 0.002 ≤ LOD
0708-12 1510 1631 81 15.6 15.6 15.6 1248. 4.5/100 0.002 ≤ LOD
Sample Sample Number Type Location/Description Results 0708-01 Field Blank 0/100
0708-02 Field Blank 0/100
0708-03 CLEARANCE Bldg. H, Unit #5, kitchen, north end ≤ LOD
0708-04 CLEARANCE Bldg. H, Unit #5, kitchen, south end ≤ LOD 0708-05 CLEARANCE Bldg. H, Unit #5, kitchen, west end ≤ LOD
0708-06 CLEARANCE Bldg. H, Unit #5, kitchen, east end ≤ LOD
0708-07 CLEARANCE Bldg. H, Unit #5, kitchen, center ≤ LOD
0708-08 CLEARANCE Bldg. H, Unit #3, kitchen, north end ≤ LOD 0708-09 CLEARANCE Bldg. H, Unit #3, kitchen, south end ≤ LOD
0708-10 CLEARANCE Bldg. H, Unit #3, kitchen, west end ≤ LOD
0708-11 CLEARANCE Bldg. H, Unit #3, kitchen, east end ≤ LOD
0708-12 CLEARANCE Bldg. H, Unit #3, kitchen, center ≤ LOD
LOD= Limit of Detection
SUNRISE ENVIRONMENTAL, Inc.
Phase Contrast Microscopy Sampling Data Sheet
PROJECT
DATE: July 11, 2014
PROJECT NUMBER: SEI14-P096
CLIENT: Gorman & Company 200 North Main Street, Oregon, Wisconsin 53575 PROJECT ADDRESS: Timber Ridge Apartments
1280 North Frontage Road West, Vail, Colorado 81657
Building G, Units 2, 4 and 5 Sample (Time) Total (Flow Rate (l/min) Total Fibers/
Number Start Stop Minutes Start Stop Avg. Volume Field LOD Fibers/cc
0711-01 --- --- --- --- --- --- --- 0/100 --- ---
0711-02 --- --- --- --- --- --- --- 0/100 --- ---
0711-03 1307 1426 79 15.5 15.5 15.5 1225. 3/100 0.002 ≤ LOD
0711-04 1307 1426 79 15.5 15.5 15.5 1225. 1.5/100 0.002 ≤ LOD
0711-05 1308 1427 79 15.5 15.5 15.5 1225. 3.5/100 0.002 ≤ LOD
0711-06 1309 1427 78 15.5 15.7 15.6 1217. 2.5/100 0.002 ≤ LOD
0711-07 1310 1428 78 15.5 15.5 15.5 1209. 3/100 0.002 ≤ LOD
0711-08 1320 1440 80 15.5 15.5 15.5 1240. 2/100 0.002 ≤ LOD
0711-09 1320 1440 80 15.5 15.3 15.4 1232. 1/100 0.002 ≤ LOD
0711-10 1321 1441 80 15.5 15.5 15.5 1240. 3/100 0.002 ≤ LOD
0711-11 1322 1441 79 15.5 15.5 15.5 1225. 2/100 0.002 ≤ LOD
0711-12 1322 1442 80 15.5 15.5 15.5 1240. 3.5/100 0.002 ≤ LOD
Sample Sample Number Type Location/Description Results
0711-01 Field Blank 0/100
0711-02 Field Blank 0/100
0711-03 CLEARANCE Bldg. G, Unit #2, kitchen, north end ≤ LOD 0711-04 CLEARANCE Bldg. G, Unit #2, kitchen, south end ≤ LOD
0711-05 CLEARANCE Bldg. G, Unit #2, kitchen, west end ≤ LOD
0711-06 CLEARANCE Bldg. G, Unit #2, kitchen, east end ≤ LOD
0711-07 CLEARANCE Bldg. G, Unit #2, kitchen, center ≤ LOD 0711-08 CLEARANCE Bldg. G, Unit #4, kitchen, north center ≤ LOD
0711-09 CLEARANCE Bldg. G, Unit #4, kitchen, south center ≤ LOD
0711-10 CLEARANCE Bldg. G, between Unit #4 & Unit #5 ≤ LOD
0711-11 CLEARANCE Bldg. G, Unit #5, kitchen, north center ≤ LOD
0711-12 CLEARANCE Bldg. G, Unit #5, kitchen, south center ≤ LOD
LOD= Limit of Detection
SUNRISE ENVIRONMENTAL, Inc.
Phase Contrast Microscopy Sampling Data Sheet
PROJECT DATE: July 17, 2014
PROJECT
NUMBER: SEI14-P096
CLIENT: Gorman & Company
200 North Main Street, Oregon, Wisconsin 53575 PROJECT ADDRESS: Timber Ridge Apartments 1280 North Frontage Road West, Vail, Colorado 81657
Building C, Units 4, 5 and 6 Sample (Time) Total (Flow Rate (l/min) Total Fibers/
Number Start Stop Minutes Start Stop Avg. Volume Field LOD Fibers/cc
0717-01 --- --- --- --- --- --- --- 0/100 --- ---
0717-02 --- --- --- --- --- --- --- 1/100 --- ---
0717-03 1227 1351 84 15.6 15.6 15.6 1310. 5/100 0.002 ≤ LOD
0717-04 1227 1352 85 15.6 15.6 15.6 1326. 7/100 0.002 0.002
0717-05 1228 1352 84 15.6 15.4 15.5 1302. 6/100 0.002 0.002
0717-06 1228 1353 85 15.6 15.6 15.6 1326. 4/100 0.002 ≤ LOD
0717-07 1229 1353 84 15.6 15.6 15.6 1310. 5.5/100 0.002 ≤ LOD
Sample Sample
Number Type Location/Description Results
0717-01 Field Blank 0/100 0717-02 Field Blank 1/100 0717-03 CLEARANCE Bldg. C containment, Unit #4, kitchen, center ≤ LOD
0717-04 CLEARANCE Bldg. C containment, between units 4 & 5 0.002
0717-05 CLEARANCE Bldg. C containment Unit #5, kitchen, center 0.002
0717-06 CLEARANCE Bldg. C containment between units 4 & 5 ≤ LOD 0717-07 CLEARANCE Bldg. C containment, Unit #6 ≤ LOD LOD= Limit of Detection
APPENDIX B VISUAL INSPECTION FORMS
APPENDIX C
CERTIFICATIONS