HomeMy WebLinkAboutB14-0096 CR3 Rescheck APPROVEDGenerated by REScheck-Web Software
Compliance Certificate
Project Snowberrry Duplex
Energy Code:2012 IECC
Location:Vail, Colorado
Construction Type:Single-family
Project Type:New Construction
Orientation:Bldg. faces 333 deg. from North
Conditioned Floor Area:11,552 ft2
Glazing Area 25%
Climate Zone:6
Permit Date:
Construction Site:
2744 + 2754 Snowberry Lane
Vail, Colorado 81657
Owner/Agent:Designer/Contractor:
Mike Dantas
Slopeside Construction
2121 N Frontage Rd W #206
Vail, Colorado 81657
(970) 376-5444
Permit Number:
Compliance: Passes using UA trade-off
17.2% Better Than Code Maximum UA:1272 Your UA:1053
The % Better or Worse Than Code Index reflects how close to compliance the house is based on code trade-off rules.
It DOES NOT provide an estimate of energy use or cost relative to a minimum-code home.
Compliance:
Envelope Assemblies
Assembly
Gross Area
or
Perimeter
Cavity
R-Value
Cont.
R-Value U-Factor UA
Ceiling - MAIN: Cathedral 2,939 38.0 21.0 0.017 50
Ceiling - SECONDARIES: Cathedral 1,939 57.0 21.0 0.013 25
Wall - E Wood: Wood Frame, 24in. o.c.
Orientation: Left side
1,051 23.0 0.0 0.053 44
Window: Vinyl Frame, 2 Pane w/ Low-E
Orientation: Left side
199 0.300 60
Door: Glass
Orientation: Left side
21 0.230 5
Basement 3 E: Solid Concrete or Masonry
Orientation: Left side
Wall height: 10.0'
Depth below grade: 7.6'
Insulation depth: 10.0'
145 19.0 0.0 0.046 7
Basement 2 E: Solid Concrete or Masonry
Orientation: Left side
Wall height: 12.0'
Depth below grade: 12.0'
Insulation depth: 12.0'
229 19.0 0.0 0.037 8
Basement 1 E: Solid Concrete or Masonry
Orientation: Left side
Wall height: 12.0'
Depth below grade: 12.0'
Insulation depth: 12.0'
518 19.0 0.0 0.037 19
Project Title: Snowberrry Duplex
Data filename:Page 1 of10
04/23/15Report date:
Assembly
Gross Area
or
Perimeter
Cavity
R-Value
Cont.
R-Value U-Factor UA
Wall - N Wood: Wood Frame, 24in. o.c.
Orientation: Front
3,965 23.0 0.0 0.053 153
Window: Vinyl Frame, 2 Pane w/ Low-E
Orientation: Front
694 0.300 208
Door Entry: Solid
Orientation: Front
56 0.200 11
Door Garage: Solid
Orientation: Front
324 0.059 19
Wall - W Wood: Wood Frame, 24in. o.c.
Orientation: Right side
774 23.0 0.0 0.053 23
Window: Vinyl Frame, 2 Pane w/ Low-E
Orientation: Right side
323 0.300 97
Door: Glass
Orientation: Right side
21 0.230 5
Basement 3 W: Solid Concrete or Masonry
Orientation: Right side
Wall height: 10.0'
Depth below grade: 10.0'
Insulation depth: 10.0'
148 19.0 0.0 0.039 6
Basement 2 W: Solid Concrete or Masonry
Orientation: Right side
Wall height: 12.0'
Depth below grade: 12.0'
Insulation depth: 12.0'
244 19.0 0.0 0.037 9
Basement 1 W: Solid Concrete or Masonry
Orientation: Right side
Wall height: 12.0'
Depth below grade: 12.0'
Insulation depth: 12.0'
489 19.0 0.0 0.037 18
Wall - S Wood: Wood Frame, 24in. o.c.
Orientation: Back
943 23.0 0.0 0.053 29
Window: Vinyl Frame, 2 Pane w/ Low-E
Orientation: Back
244 0.300 73
Door: Glass
Orientation: Back
157 0.300 47
Basement - 4 S Masters: Solid Concrete or Masonry
Orientation: Back
Wall height: 7.0'
Depth below grade: 7.0'
Insulation depth: 7.0'
425 19.0 0.0 0.043 18
Basement - 3 S: Solid Concrete or Masonry
Orientation: Back
Wall height: 10.0'
Depth below grade: 10.0'
Insulation depth: 10.0'
942 19.0 0.0 0.039 37
Basement - 2 S: Solid Concrete or Masonry
Orientation: Back
Wall height: 12.0'
Depth below grade: 12.0'
Insulation depth: 12.0'
1,112 19.0 0.0 0.037 41
Basement - 1 S: Solid Concrete or Masonry
Orientation: Back
Wall height: 12.0'
Depth below grade: 12.0'
Insulation depth: 12.0'
1,112 19.0 0.0 0.037 41
Project Title: Snowberrry Duplex
Data filename:Page 2 of10
04/23/15Report date:
Name - Title Signature Date
Compliance Statement: The proposed building design described here is consistent with the building plans, specifications, and other
calculations submitted with the permit application. The proposed building has been designed to meet the 2012 IECC requirements in
REScheck Version 5.5.0 and to comply with the mandatory requirements listed in the REScheck Inspection Checklist.
Project Notes:
Two-unit duplex, North facing, set into hillside. All buried concrete walls checked as "basement" walls. Building
checked as a single building.
Project Title: Snowberrry Duplex
Data filename:Page 3 of10
04/23/15Report date:
Inspection Checklist
Requirements: 0.0% were addressed directly in the REScheck software
REScheck Software Version 5.5.0
Text in the "Comments/Assumptions" column is provided by the user in the REScheck Requirements screen. For each
requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception
is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided.
Energy Code: 2012 IECC
Section
#
& Req.ID
Pre-Inspection/Plan Review Plans Verified
Value
Field Verified
Value Complies?Comments/Assumptions
103.1,
103.2
[PR1]1
Construction drawings and
documentation demonstrate
energy code compliance for the
building envelope.
Complies
Does Not
Not Observable
Not Applicable
103.1,
103.2,
403.7
[PR3]1
Construction drawings and
documentation demonstrate
energy code compliance for
lighting and mechanical systems.
Systems serving multiple
dwelling units must demonstrate
compliance with the IECC
Commercial Provisions.
Complies
Does Not
Not Observable
Not Applicable
302.1,
403.6
[PR2]2
Heating and cooling equipment is
sized per ACCA Manual S based
on loads calculated per ACCA
Manual J or other methods
approved by the code official.
Heating:
Btu/hr_____
Cooling:
Btu/hr_____
Heating:
Btu/hr_____
Cooling:
Btu/hr_____
Complies
Does Not
Not Observable
Not Applicable
Additional Comments/Assumptions:
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title: Snowberrry Duplex
Data filename:Page 4 of10
04/23/15Report date:
Section
#
& Req.ID
Foundation Inspection Plans Verified
Value
Field Verified
Value Complies?Comments/Assumptions
402.1.1
[FO4]1
Conditioned basement wall
insulation R-value. Where interior
insulation is used, verification
may need to occur during
Insulation Inspection. Not
required in warm-humid locations
in Climate Zone 3.
R-_____
R-_____
R-_____
R-_____
Complies
Does Not
Not Observable
Not Applicable
See the Envelope Assemblies
table for values.
303.2
[FO5]1
Conditioned basement wall
insulation installed per
manufacturer’s instructions.
Complies
Does Not
Not Observable
Not Applicable
402.2.8
[FO6]1
Conditioned basement wall
insulation depth of burial or
distance from top of wall.
_____ ft _____ ft Complies
Does Not
Not Observable
Not Applicable
See the Envelope Assemblies
table for values.
303.2.1
[FO11]2
A protective covering is installed
to protect exposed exterior
insulation and extends a
minimum of 6 in. below grade.
Complies
Does Not
Not Observable
Not Applicable
403.8
[FO12]2
Snow- and ice-melting system
controls installed.
Complies
Does Not
Not Observable
Not Applicable
Additional Comments/Assumptions:
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title: Snowberrry Duplex
Data filename:Page 5 of10
04/23/15Report date:
Section
#
& Req.ID
Framing / Rough-In Inspection Plans Verified
Value
Field Verified
Value Complies?Comments/Assumptions
402.1.1,
402.3.4
[FR1]1
Door U-factor.U-_____U-_____Complies
Does Not
Not Observable
Not Applicable
See the Envelope Assemblies
table for values.
402.1.1,
402.3.1,
402.3.3,
402.3.6,
402.5
[FR2]1
Glazing U-factor (area-weighted
average).
U-_____U-_____Complies
Does Not
Not Observable
Not Applicable
See the Envelope Assemblies
table for values.
303.1.3
[FR4]1
U-factors of fenestration products
are determined in accordance
with the NFRC test procedure or
taken from the default table.
Complies
Does Not
Not Observable
Not Applicable
402.4.1.1
[FR23]1
Air barrier and thermal barrier
installed per manufacturer’s
instructions.
Complies
Does Not
Not Observable
Not Applicable
402.4.3
[FR20]1
Fenestration that is not site built
is listed and labeled as meeting
AAMA /WDMA/CSA 101/I.S.2/A440
or has infiltration rates per NFRC
400 that do not exceed code
limits.
Complies
Does Not
Not Observable
Not Applicable
402.4.4
[FR16]2
IC-rated recessed lighting fixtures
sealed at housing/interior finish
and labeled to indicate ≤2.0 cfm
leakage at 75 Pa.
Complies
Does Not
Not Observable
Not Applicable
403.2.1
[FR12]1
Supply ducts in attics are
insulated to ≥R-8. All other ducts
in unconditioned spaces or
outside the building envelope are
insulated to ≥R-6.
R-_____
R-_____
R-_____
R-_____
Complies
Does Not
Not Observable
Not Applicable
403.2.2
[FR13]1
All joints and seams of air ducts,
air handlers, and filter boxes are
sealed.
Complies
Does Not
Not Observable
Not Applicable
403.2.3
[FR15]3
Building cavities are not used as
ducts or plenums.
Complies
Does Not
Not Observable
Not Applicable
403.3
[FR17]2
HVAC piping conveying fluids
above 105 ºF or chilled fluids
below 55 ºF are insulated to ≥R-
3.
R-_____R-_____Complies
Does Not
Not Observable
Not Applicable
403.3.1
[FR24]1
Protection of insulation on HVAC
piping.
Complies
Does Not
Not Observable
Not Applicable
403.4.2
[FR18]2
Hot water pipes are insulated to
≥R-3.
R-_____R-_____Complies
Does Not
Not Observable
Not Applicable
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title: Snowberrry Duplex
Data filename:Page 6 of10
04/23/15Report date:
Section
#
& Req.ID
Framing / Rough-In Inspection Plans Verified
Value
Field Verified
Value Complies?Comments/Assumptions
403.5
[FR19]2
Automatic or gravity dampers are
installed on all outdoor air
intakes and exhausts.
Complies
Does Not
Not Observable
Not Applicable
Additional Comments/Assumptions:
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title: Snowberrry Duplex
Data filename:Page 7 of10
04/23/15Report date:
Section
#
& Req.ID
Insulation Inspection Plans Verified
Value
Field Verified
Value Complies?Comments/Assumptions
303.1
[IN13]2
All installed insulation is labeled
or the installed R-values
provided.
Complies
Does Not
Not Observable
Not Applicable
402.1.1,
402.2.5,
402.2.6
[IN3]1
Wall insulation R-value. If this is a
mass wall with at least ½ of the
wall insulation on the wall
exterior, the exterior insulation
requirement applies (FR10).
R-_____
Wood
Mass
Steel
R-_____
Wood
Mass
Steel
Complies
Does Not
Not Observable
Not Applicable
See the Envelope Assemblies
table for values.
303.2
[IN4]1
Wall insulation is installed per
manufacturer’s instructions.
Complies
Does Not
Not Observable
Not Applicable
Additional Comments/Assumptions:
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title: Snowberrry Duplex
Data filename:Page 8 of10
04/23/15Report date:
Section
#
& Req.ID
Final Inspection Provisions Plans Verified
Value
Field Verified
Value Complies?Comments/Assumptions
402.1.1,
402.2.1,
402.2.2,
402.2.6
[FI1]1
Ceiling insulation R-value.R-_____
Wood
Steel
R-_____
Wood
Steel
Complies
Does Not
Not Observable
Not Applicable
See the Envelope Assemblies
table for values.
303.1.1.1,
303.2
[FI2]1
Ceiling insulation installed per
manufacturer’s instructions.
Blown insulation marked every
300 ft².
Complies
Does Not
Not Observable
Not Applicable
402.2.3
[FI22]2
Vented attics with air permeable
insulation include baffle adjacent
to soffit and eave vents that
extends over insulation.
Complies
Does Not
Not Observable
Not Applicable
402.2.4
[FI3]1
Attic access hatch and door
insulation ≥R-value of the
adjacent assembly.
R-_____R-_____Complies
Does Not
Not Observable
Not Applicable
402.4.1.2
[FI17]1
Blower door test @ 50 Pa. <=5
ach in Climate Zones 1-2, and
<=3 ach in Climate Zones 3-8.
ACH 50 =_____ACH 50 =_____Complies
Does Not
Not Observable
Not Applicable
403.2.2
[FI4]1
Duct tightness test result of <=4
cfm/100 ft2 across the system or
<=3 cfm/100 ft2 without air
handler @ 25 Pa. For rough-in
tests, verification may need to
occur during Framing Inspection.
_____ cfm/100
ft2
_____ cfm/100
ft2
Complies
Does Not
Not Observable
Not Applicable
403.2.2.1
[FI24]1
Air handler leakage designated
by manufacturer at <=2% of
design air flow.
Complies
Does Not
Not Observable
Not Applicable
403.1.1
[FI9]2
Programmable thermostats
installed on forced air furnaces.
Complies
Does Not
Not Observable
Not Applicable
403.1.2
[FI10]2
Heat pump thermostat installed
on heat pumps.
Complies
Does Not
Not Observable
Not Applicable
403.4.1
[FI11]2
Circulating service hot water
systems have automatic or
accessible manual controls.
Complies
Does Not
Not Observable
Not Applicable
403.5.1
[FI25]2
All mechanical ventilation system
fans not part of tested and listed
HVAC equipment meet efficacy
and air flow limits.
Complies
Does Not
Not Observable
Not Applicable
404.1
[FI6]1
75% of lamps in permanent
fixtures or 75% of permanent
fixtures have high efficacy lamps.
Does not apply to low-voltage
lighting.
Complies
Does Not
Not Observable
Not Applicable
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title: Snowberrry Duplex
Data filename:Page 9 of10
04/23/15Report date:
Section
#
& Req.ID
Final Inspection Provisions Plans Verified
Value
Field Verified
Value Complies?Comments/Assumptions
404.1.1
[FI23]3
Fuel gas lighting systems have
no continuous pilot light.
Complies
Does Not
Not Observable
Not Applicable
401.3
[FI7]2
Compliance certificate posted.Complies
Does Not
Not Observable
Not Applicable
303.3
[FI18]3
Manufacturer manuals for
mechanical and water heating
systems have been provided.
Complies
Does Not
Not Observable
Not Applicable
Additional Comments/Assumptions:
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title: Snowberrry Duplex
Data filename:Page 10 of10
04/23/15Report date:
2012 IECC Energy
Efficiency Certificate
Insulation Rating R-Value
23.00Above-Grade Wall
19.00Below-Grade Wall
0.00Floor
59.00Ceiling / Roof
_______Ductwork (unconditioned spaces):
Glass & Door Rating SHGCU-Factor
0.30Window
0.06Door
Heating & Cooling Equipment Efficiency
_______Heating System:_________________________
_______Cooling System:_________________________
_______Water Heater:___________________________
Name:Date:
Comments