Jll�y28� 2�I5
Gorman & Company, Inc.
Attn: Rob Padley
200 N. Main Street
Oregon, Wisconsin 53575
Job No. 109 310E
Subject: Compliance of Construction and Materials through July 24, 2015, Lions
Ridge Apartment Homes Building 3, 1265 N. Frontage Road West, Vail,
Colorado
Dear Mr. Padley:
Hepworth-Pawlak Geotechnical, Inc. is providing construction observation and materials
testing services for foundation soil bearing conditions and structural backfill, reinforcing
steel and concrete during construction of Building 3 as part of our services for the overall
site redevelopment. Our field inspection and testing services For the project began on
September 30, 2014 and are continuing on an as-requested basis. Our services for the
construction of Building 3 began on June 13, 2015.
Our services are being performed under the direction of the undersigned licensed
Engineer registered in the State of Colorado. Any nonconforming conditions, materials
and/or workmanship identified during construction are immediately being brought to the
attention of the contractor for correction. Our testing and observation reports are being
distributed under separate cover.
Based on inferences drawn from our observations during construction and the results of
our testing as documented by the referenced field and laboratory reports, it is our
professional opinion that the referenced foundation soil bearing conditions, reinforcing
steel, conerete, and structural backfill for Building 3 through July 24, 2015 have achieved
the specified conditions, and/or currently accepted industry practices as applicable.
Please recognize that eonstruction observation and testing are sampling funetions that
, . .� . - . . _ .�i� � �„ ��,;�I ,_ � i�)_r, , „h._ � . . i _ . �-
Gorman and Company, Inc.
July 28, 2015
Page 2
involve direct observation and testing of very limited amount of the overall wark to
evaluate the construction compliance.
If you have any questions, please contact the undersigned.
Sincerely,
HEPWORTH - PAWLAK GEOTECHNICAL, INC.
/�'�
Thomas J. Westhoff, C T.
Reviewed by:
�.'��N���pq��9
a�'�s7�.
�� ��o�� ��
y �
ss2a� :
{ �'s
Steven L. Pawlak, P E y' 7/���,r;•'t
,��aA.t Ee`, 4q�
,�;'r`eq�o�
TJW/ksw
Distribution: Gorman & Company, Inc. —Rob Padley(rpadley@gormanusa.com)
Gorman & Company, Inc. —Matt Bribach (mbribach@gonnanusa.com)
Gorman & Company, Inc. —Kathy Henshue (khenshue@gormanusa.com)
Project No. 109 310E
~PtGCh