Loading...
HomeMy WebLinkAboutB13-0552 B14-0032 REV10 plans APPROVED52143 B GG 6 7 8 H HSS8x6x1/2 BP8 22 k W1 0 x 7 7 13 k HS S 1 0 x 1 0 x 1 / 2 10 k 9k HS S 1 0 x 8 x 3 / 8 9k HS S 1 0 x 4 x 1 / 4 W1 4 x 3 4 22 k 47 k W1 8 x 1 3 0 HSS10x8x3/8 HSS10x8x3/8 HSS10x4x3/16 8k HSS10x8x3/8 8k 9k HSS10x8x3/8 9k 8k HSS10x8x3/8 8k 8k HSS10x8x3/8 8k HSS10x8x3/8 HSS10x4x3/16 HSS6x4x1/4 HSS6x4x1/4 HSS10x4x3/16 HSS10x4x3/16 HSS10x4x3/16 HSS10x4x3/16 HS S 6 x 4 x 1 / 4 HS S 1 0 x 4 x 1 / 4 HS S 1 0 x 4 x 1 / 4 HSS10x4x1/4 HSS6x4x1/4 HSS10x8x3/8 9k HSS10x8x3/8 9k HSS10x8x3/8 9k HSS10x8x3/8 9k HSS10x4x3/16 HSS10x4x3/16 E HSS6x6x1/4 HDG - BP2 HS S 6 x 4 x 1 / 4 HS S 6 x 4 x 1 / 4 HS S 6 x 4 x 1 / 4 99'-3" 1. 5 V L I 5 V D 1.5VL3A 9k 9k HS S 1 0 x 8 x 3 / 8 9k 9k HS S 1 0 x 8 x 3 / 8 HS S 1 0 x 4 x 1 / 4 102'-9" C F A 21 k 1.5VL3A 1. 5 V L 3 A 99 ' - 3 " 13'-11" 6'-8 1/2" 15'-10 1/2" 21'-10 1/2" 26'-9" 6'-0" 16'-3" 31 ' - 1 1 1 / 2 " 23 ' - 6 " 9' - 1 1 " 11 ' - 9 1 / 2 " 26 ' - 2 1 / 2 " 15 ' - 1 0 " 9'- 4 " 11 S330 7 S310 W1 4 x 2 6 9k 9k DN UP SOG8A SEE ARCH UP 9 S550 5'-5" 5'-1" 5'-1" 1'-10" 3'-11 1/2" 4'-1 1/2" 1'-3" 8 S503 8 S531 1'-0" 3' - 2 " 4' - 0 " 4' - 0 " 4' - 0 " 3' - 1 1 3 / 4 " 3' - 5 " 3' - 0 1 / 4 " 1'- 3 3 / 4 " 3' - 8 " 5'- 2 " 5' - 2 " 5' - 2 " 4' - 4 " 0" 5' - 1 1 " HSS6x4x1/4 BP1 10 ' - 5 " S530 8 TYP 3 S530 12 S550 1 S211 B/ D E C K = 98 ' - 7 1 / 2 " HSS10x8x3/8 HSS10x8x3/8 HS S 1 0 x 4 x 1 / 4 HS S 1 0 x 4 x 1 / 4 S530 8 TYP 6 S530 SOG4A 6 S531 HSS10x4x1/4 HSS10x4x1/4 HS S 1 0 x 4 x 1 / 4 EQ EQ EQ S531 5 TYP CONCRETE PAN STAIR WITH STL STRINGERS BY STAIR SUPPLIER. SEE ARCH FOR ADDNL INFO CONCRETE PAN STAIR WITH STEEL CHANNEL STRINGERS BY CONTR. SEE ARCH FOR ADDNL INFO 8 S310 S531 5 S313 4 6 S321 TYP AT MTL DECK TO CONC WALL HSS10x4x3/16 5'-11 1/4" 8k 8k 8k 8k HS S 1 0 x 4 x 1 / 4 HSS10x4x1/4 HSS6x6x1/2 9k HSS10x8x3/8 9k HSS6x6x1/2 8 S502 12 S320 TYP HSS TO CONC WALL 7 S502 TYP HSS TO WF 3 S503 2 S501 DO NOT REMOVE DECK UNTIL CONCRETE HAS REACHED 75% f'c. PROVIDE TRIM REINF FOR OPENING "10" OR LESS" PER TYP GRID 2 AND 4 /5 S531 10 S312 7 S532 2" 2" 6' - 8 1 / 4 " S330 2 HS S 1 0 x 4 x 1 / 4 6 S531 TYP NOTCH SLAB EDGE AT HANDRAIL HSS10x4x3/16 18 k 16 k EQ EQ EQ 11 S320 SIM SIM 8k 2 S501 S531 5TYP 7k 7k 7k 7k W1 4 x 2 6 CONT W10 TO ALLOW FOR TYP HSS TO WF CONN PER /7 S502 9" 5'- 1 0 1 / 4 " 5' - 1 1 / 2 " 6" TYP 6' - 0 1 / 4 " 5'- 8 3 / 4 " 5'- 8 3 / 4 " 6' - 0 1 / 4 " VA R I E S , S E E A R C H 1 S322 7 S502 SEE S101 FOR FOOTING BEYOND SEE S101 FOR FOOTING BEYOND 1 S503 3" 4'-8" HSS10x4x3/16 3'- 2 " 3' - 2 " 3' - 7 " 8" END PLATE 11 k TYP 10 " END PL 5" 2" 4" 3'-8 1/2" HS S 1 0 x 4 x 1 / 4 7k 7k 1 1 5' - 6 " S530 9 6 S531 1 1 TYP STEEL WALLS BY WATER FEATURE SUPPLIER 1" W E S T 9 S502 HSS6x6x1/4 BP1 1 CO L C L 3 S503 1 HSS4x6x1/4 2 S502 1 2 S502 1 9 S503 3 S322 1 9 S551 SIM 104'-3" 104'-3" SOG4A 104'-3" SOG8A TYP 5'-3 1/4" 5' - 4 1 / 4 " 3" 3" T/CURB = SEE ARCH 6" TYP 4'-2 1/2" /1 S532 EE 2 S314 TOC= 98'-4" 2 HSS10x8x3/8 HSS10x8x3/8 3 S314 2 3 S314 2 5 S314 2 12 S312 6 S313 TYP AT SITE WALL TO FND 3 S331 GRID D TO E 4 3 S331 4 SO G 4 A 5 S313 3 HS S 1 0 x 4 x 1 / 4 7k 7k 9 S322 5 5 10 S313 6 RFI 081 7 PROJECT: DRAWN BY : DATE : REVISIONS : 13.0291.S.01 KH DE S I G N E R S : K H / S M DA T E P R I N T E D : MM J O B # : 1 3 . 0 2 9 1 . S . 0 1 PR I N C I P A L : P D EO R : P D PR O J E C T M A N A G E R : S M 07/21/2015 7/ 2 1 / 2 0 1 5 2 : 0 3 : 0 6 P M C: \ P r o j \ 1 3 . 0 2 9 1 - Z e k e l m a n - R S 1 3 _ k e v i n h . r v t S102 BEDROOM (A)/REC (B) FLOOR PLAN 09.09.2013 1/4" = 1'-0" BEDROOM (A)/REC (B) LEVEL STEEL FLOOR FRAMING PLAN NOTES 1. SEE S0 SERIES SHEETS FOR GENERAL NOTES, QUALITY ASSURANCE NOTES, SYMBOLS AND ABBREVIATIONS. 2. SEE S5 SERIES SHEETS FOR TYPICAL STEEL DETAILS. 3. SEE S530 FOR TYPICAL METAL DECK DETAILS AND SCHEDULE. 4. SEE S500, S501 & S502 FOR TYPICAL STEEL CONNECTION DETAILS AND SCHEDULE. AT BEAMS THAT DO NOT HAVE A REACTION NOTED ON PLAN, PROVIDE CONNECTION WITH MINIMUM CAPACITY OF 7k. 5. SCREED CONCRETE TO PROVIDE CONSTANT THICKNESS 6. SPACE BEAMS EQUALLY BETWEEN GRID LINES UNLESS DIMENSIONED OTHERWISE. 7. TOP OF BEAM ELEVATION = BOTTOM OF METAL DECK UNLESS NOTED OTHERWISE ON PLAN. 8. SEE S101 FOR FOUNDATION PLAN NOTES 9. SEE S100 FOR T/WALL AND T/WALL ELEVATIONS 10. SEE S100 FOR FOUNDATION DIMENSIONS PLAN NORTH 1 2 3 4 5 6 7 PRICING SET 09.09.2013 PERMIT SET 12.09.2013 PERMIT SET REVISION 02.14.2014 PRICING SET REVISION 02.14.2014 STEEL PACKAGE #1 06.13.2014 PERMIT SET REVISION 07.03.2014 CD PACKAGE #1 07.25.2014 PERMIT SET REVISION 09.23.2014 CD PACKAGE #1 REV 11.06.2014 ASI 011 01.12.2015 ASI 014 01.29.2015 RFI47 03.13.2015 CONFORMED SET 05.05.2015 ASI 038 05.26.2015 RFI REVISION 07.21.2015 52143 B GG 6 7 8 H HSS5x5x1/4 HSS6x6x3/8 BP9 HSS5x5x3/16 BP4 - SIM W1 2 x 4 5 22 k W1 2 x 4 5 36 k 11 k W1 2 x 4 5 11 k 9k HSS10x6x3/8 9k HSS10x6x3/8 9k HS S 1 0 x 6 x 3 / 8 10k W10x49 10k HSS10x4x1/4 9k HSS10x6x3/8 9k 9k HSS10x6x3/8 9k 9k HSS10x6x3/8 9k 9k HSS10x6x3/8 9k HSS10x4x1/4 HSS10x4x1/4 HSS10x4x1/4 W12x22 W10x100 W10x88 HS S 1 0 x 4 x 1 / 4 W1 0 x 6 0 24 k W1 0 x 1 0 0 22 k W10x45 W18x40 14k HSS10x10x3/8 10k 8k HSS10x8x3/8 8k 8k HSS10x8x3/8 8k 8k HSS10x8x3/8 8k HSS10x4x1/4 15k HSS10x10x1/2 10k 11 k HS S 1 0 x 1 0 x 3 / 8 13 k 11 k HS S 1 0 x 1 0 x 3 / 8 11 k 11 k HS S 1 0 x 1 0 x 3 / 8 11 k 11 k HS S 1 0 x 1 0 x 3 / 8 11 k HSS6x6x1/2 HSS6x6x1/2 HSS6x4x1/2 BP1 HSS6x6x1/2 BP1 HSS6x6x3/8 BP3 HSS5x5x1/4 BP4 HSS7x5x3/8 HSS5x5x1/2 HSS5x5x1/4 HSS5x5x1/4 BP1 E 1.5VL3A 10 9 ' - 9 " 1.5VL3.5V D C HS S 1 0 x 8 x 3 / 8 1. 5 V L 3 A F A HS S 1 0 x 6 x 3 / 8 HSS10x4x1/4 9k 9k 1. 5 V L 3 A 1. 5 V L I 6 V B/ D E C K = 10 9 ' - 1 1 / 2 " 11 6 ' - 3 " HSS10x4x1/4 HS S 1 0 x 6 x 3 / 8 13'-11" 6'-8 1/2" 15'-10 1/2" 21'-10 1/2" 26'-9" 6'-0" 16'-3" 31 ' - 1 1 1 / 2 " 23 ' - 6 " 9' - 1 1 " 11 ' - 9 1 / 2 " 26 ' - 2 1 / 2 " 15 ' - 1 0 " 9'- 4 " SOG6A HSS7x5x5/16 HSS5x5x1/4 HSS5x5x1/4 S210 1 S210 5S210 7 S210 6 S210 8 HS S 1 0 x 8 x 3 / 8 HSS6x6x3/8 BP1 SO G 8 A 11 4 ' - 9 " HSS10x2x3/8 (FLAT) TREAD HSS14x6x1/2 STRINGER CONCRETE PAN LANDING AND STEEL STAIR TREADS WITH STEEL PLATE STRINGERS BY CONTR. SEE ARCH FOR ADDNL INFO DN UP UP DN 0". 9 S550 8 S531 8" 4'-10 1/4" 4'-10 1/4" 3'-10 1/2" 4'-3" 4'-3" 4'- 1 1 / 4 " 2" DN 5" 8' - 4 1 / 2 " 8' - 4 3 / 4 " 9k HSS10x6x3/8 9k HSS10x4x1/4 HSS10x4x1/4 W1 2 x 2 6 21k 20k 2 S503 (2) LOCS 8" 3 S532 1 S313 3" 3" B/ D E C K = 10 9 ' - 2 1 / 2 " 3 S530 1. 5 V L I 5 V 1 S313 SIM 12 S550 8" 5 S550 S200 7 1 S211 1'-5 1/2" HSS6x6x3/8 BP1 3" S320 10 HSS6x6x3/8 BP9 1'-5 1/2" 4" 3'-9" 12 k 12 k 10k W10x49 10k HSS10x4x1/4 1' - 0 " 2 S501 6 S531 9 S312 9 S312 6 S503 7 S531 9 S312 1 S532 7" S331 1 TYP AT EXT EQUIP SEE MECH FOR LOC AND EXTENTS CONCRETE PAN STAIR WITH STEEL CHANNEL STRINGERS BY CONTR. SEE ARCH FOR ADDNL INFO OPEN TREAD STAIR WITH STL STRINGERS BY STAIR SUPPLIER. SEE ARCH FOR ADDNL INFO VARIES, SEE ARCH HSS5x5x1/4 BP1 6 S531 6 S321 TYP AT MTL DECK TO CONC WALL 9k S312 7TYP AT WALL CORNERS 6 S531 3'-9" 6" 5' - 5 " 5' - 2 " 5' - 3 " 10 1 / 2 " 3' - 2 " 4'- 1 " 4' - 1 " 4' - 6 " 9' - 9 " 3 S313 S321 3 FOR BASE PLATE TYP 2 S331 109'-9" 5'-0" 4'-4 1/4" 4'-4 1/4" 4'-4 1/4" 1. 5 V L 3 A 1.5VL3A 109'-9" 10 9 ' - 9 " 6' - 1 1 1 / 4 " 4' - 2 1 / 4 " 4' - 1 1 / 2 " 4' - 1 1 / 2 " 21k 9k HS S 1 0 x 1 0 x 1 / 2 9k 9k HS S 1 0 x 1 0 x 1 / 2 9k 9k HS S 1 0 x 1 0 x 1 / 2 9k 9k HS S 1 0 x 1 0 x 1 / 2 9k 17 k W1 0 x 6 8 19 k 19 k W1 2 x 4 5 19 k 9k W1 0 x 6 8 9k 9k W1 0 x 6 8 9k 9k W1 0 x 6 8 9k 9k W1 0 x 6 8 9k 9k HSS10x6x3/8 7k 7k HSS10x6x3/8 7k 7k HSS10x6x3/8 7k 7k HSS10x6x3/8 7k HS S 1 0 x 6 x 3 / 8 HSS10x4x1/4 7k HSS10x8x3/8 7k 7k HSS10x8x3/8 7k 5'-0" 4'-2 1/2" 4'-2 1/2" 4'-2" 5'-0" ( 108' - 6 1/2" ) S200 2 HSS4x4x1/4 DO NOT REMOVE DECK UNTIL CONCRETE HAS REACHED 75% f'c. PROVIDE TYP TRIM REINF PER TYP /6 S532 S200 3 9 S531 S531 5 C6x8.2 @ 4'-0" OC, MAX 5 S503 HS S 1 0 x 4 x 1 / 4 16 k 9 S502 8 S532 3" 2" 3" 6'-6 1/8" 7' - 4 1 / 8 " 3" 6 S531 6" 5" B/DECK = 114'-1" 1/2" NORTH 11 " W2 4 x 5 5 8 S321 5'- 0 3 / 4 " 1' - 3 3 / 4 " 1' - 0 " 6 S531 TYP NOTCH SLAB EDGE AT HANDRAIL 3'-8" S502 12 W10x12 W10x12 W10x12 5 S503 C6x8.2 @ 4'-0" OC, MAX 12 S532 1/2" NORTH 9k 1/2" NORTH 7 S502 OH 3" 5'-0 1/4" 3" 2" 5' - 4 1 / 4 " S321 11 1 S314 1. 5 V L I 5 V B/ D E C K = 10 9 ' - 2 1 / 2 " VA R I E S , S E E A R C H VA R I E S , S E E A R C H /12 S510 /12 S510 /12 S510 S200 5 /8 S505 6 S502 6 S502 TYP @ HSS TO HSS 5'- 1 1 / 4 " 4' - 8 1 / 8 " 4' - 8 1 / 8 " 4' - 8 1 / 8 " SIM 3" 8 S504 4'- 1 0 " 4' - 8 " 3" 3" 8 S532 3 S503 2 S501 ( 10 9 ' - 1 1 / 2 " PROVIDE DECK CLOSURE AT STEP IN METAL DECK S504 9 1 1 S530 9 1 COL CL 1 / 1 1 S 5 0 3 BEAM CL W10x30 2 S502 9 S503 1 12 S503 SIM 2 S551 1 5 S551 9 S551 1 9 S552 (1 0 9 ' - 1 1 / 2 " ) B B B B 4'-0 1/2" 2" 7'-3 1/2" 1'-0" /1 S532 ./1 S532 . 116'-4 1/2" VA R I E S , S E E A R C H STRUCTURAL GLASS RAIL AND TREADS BY STAIR SUPPLIER 1 8 S531 /12 S503 1 W10x30 7 1/2" 21'-5 1/2" 3 5 / 8 " HSS6x6x1/4 HSS6x6x1/4 3 5 / 8 " 2 2 4 S322 6 S322 4" TYPE A 2 TYPE A 7 S322 7 S322 HSS4x4x1/4 BP4 7' - 1 " SEE CIVIL FOR PAVING 12 S504 12 S504 2 1/2" 8 1/2" 8 S321 OH SIM 5" 6" B /7 S510 /12 S510 B B B B 3 S331 TYP 3 11" 5 1/2" 4'-10 1/2" 11'-0" 3 GRADE = 110'-0" GRADE = 115'-0" SLOPE UP 6 S313 6 S313 6 S550 HSS6x6x1/2 5 RFI 072 RFI 072 RFI 072 RFI 072 5 5/8" 3'-9 3/8" 5 5/8" 5 3/8" 5 5 / 8 " 6' - 1 3 / 4 " 5 5 / 8 " RFI 092 RFI 092 RFI 083 RFI 081 RFI 094 6 6 6 PROJECT: DRAWN BY : DATE : REVISIONS : 13.0291.S.01 KH DE S I G N E R S : K H / S M DA T E P R I N T E D : MM J O B # : 1 3 . 0 2 9 1 . S . 0 1 PR I N C I P A L : P D EO R : P D PR O J E C T M A N A G E R : S M 07/21/2015 7/ 2 1 / 2 0 1 5 2 : 0 3 : 4 8 P M C: \ P r o j \ 1 3 . 0 2 9 1 - Z e k e l m a n - R S 1 3 _ k e v i n h . r v t S103 MAIN (A)/BEDROOM (B) FLOOR PLAN 09.09.2013 1/4" = 1'-0" MAIN (A)/BEDRO0M (B) LEVEL PLAN NORTH STEEL FLOOR FRAMING PLAN NOTES 1. SEE S0 SERIES SHEETS FOR GENERAL NOTES, QUALITY ASSURANCE NOTES, SYMBOLS AND ABBREVIATIONS. 2. SEE S5 SERIES SHEETS FOR TYPICAL STEEL DETAILS. 3. SEE S530 FOR TYPICAL METAL DECK DETAILS AND SCHEDULE. 4. SEE S500, S501 & S502 FOR TYPICAL STEEL CONNECTION DETAILS AND SCHEDULE. AT BEAMS THAT DO NOT HAVE A REACTION NOTED ON PLAN, PROVIDE CONNECTION WITH MINIMUM CAPACITY OF 7k. 5. SCREED CONCRETE TO PROVIDE CONSTANT THICKNESS 6. SPACE BEAMS EQUALLY BETWEEN GRID LINES UNLESS DIMENSIONED OTHERWISE. 7. TOP OF BEAM ELEVATION = BOTTOM OF METAL DECK UNLESS NOTED OTHERWISE ON PLAN. 8. SEE S101 FOR FOUNDATION PLAN NOTES 9. SEE S100 FOR T/WALL AND T/WALL ELEVATIONS 10. SEE S100 FOR FOUNDATION DIMENSIONS 1 2 3 4 5 PRICING SET 09.09.2013 PERMIT SET 12.09.2013 PERMIT SET REVISION 02.14.2014 PRICING SET REVISION 02.14.2014 STEEL PACKAGE #1 06.13.2014 PERMIT SET REVISION 07.03.2014 CD PACKAGE #1 07.25.2014 PERMIT SET REVISION 09.23.2014 CD PACKAGE #1 REV 11.06.2014 ASI 014 01.29.2015 ASI 022 03.03.2015 STEEL RE-SUBMTL 03.06.2015 CONFORMED SET 05.05.2015 RFI REVISION 07.21.2015 6 52143 B GG 6 7 8 1.5VL3.5V H HSS5x5x5/16 W10x30 20k W10x77 HS S 1 0 x 4 x 3 / 1 6 HS S 1 0 x 1 0 x 1 / 2 30 k W1 0 x 1 1 2 30 k W10x45 W10x30 W10x45 W1 0 x 3 0 HS S 1 0 x 8 x 3 / 8 9k W10x77 9k 9k W10x77 9k 9k W10x77 9k 9k W10x77 9k HSS10x4x3/16 HSS10x4x3/16 HSS10x4x3/16 HSS10x4x3/16 8k HSS10x10x1/2 8k HSS10x4x3/16 HS S 1 0 x 4 x 3 / 1 6 33k W10x88 HSS10x4x3/16 29k W10x112 19k W14x26 14k 11 k 11 k 11 k 11 k 11 k 11 k 11 k 11 k 16 k W1 2 x 2 6 6k HS S 1 2 x 6 x 1 / 2 9k W1 0 x 4 5 9k W10x30 14k W10x30 15k HSS10x10x1/2 11k W1 0 x 3 0 HSS10x4x1/4 HS S 1 0 x 4 x 1 / 4 W1 0 x 3 0 13 k W1 0 x 4 5 13 k HSS10x4x1/4 12k W10x30 HSS10x8x3/8 7k HSS10x6x3/8 7k HS S 1 0 x 4 x 3 / 1 6 HSS10x4x3/16 7k W1 0 x 3 0 7k HS S 1 0 x 6 x 3 / 8 HSS10x4x3/16 9k HSS10x8x3/8 9k 9k HSS10x8x3/8 9k HSS10x4x3/16 HS S 1 0 x 4 x 3 / 1 6 W10x30 W1 0 x 3 0 W1 0 x 3 0 HSS5x5x1/4 HSS5x5x1/4 BP4 SIM HSS5x5x1/4 HSS5x5x1/4 BP3 E D C 1. 5 V L 3 A F A 12 0 ' - 4 " HS S 1 0 x 1 0 x 3 / 8 HS S 1 0 x 1 0 x 3 / 8 HS S 1 0 x 1 0 x 3 / 8 HS S 1 0 x 4 x 1 / 4 HSS5x5x3/16 BP3 HSS5x5x1/4 29k 13'-11" 6'-8 1/2" 15'-10 1/2" 21'-10 1/2" 26'-9" 6'-0" 16'-3" 31 ' - 1 1 1 / 2 " 23 ' - 6 " 9' - 1 1 " 11 ' - 9 1 / 2 " 26 ' - 2 1 / 2 " 15 ' - 1 0 " 9'- 4 " S210 1 S210 2 S210 3 S210 4 S210 5S210 7 S210 6 S210 8 HSS10x2x3/8 TREAD (FLAT) HSS14x6x1/2 STRINGER. UP DN 0". HSS10x4x3/16 HS S 1 0 x 4 x 1 / 4 HSS10x4x1/4 GLASS LANDING AND RAILING BY SUPPLIER HSS10x4x1/4 DN 7" 4 1 / 2 " 6' - 1 3 / 4 " 4' - 3 3 / 4 " 3' - 8 1 / 2 " 3' - 8 1 / 2 " 3' - 8 1 / 2 " 4 1 / 2 " 7" 9 S550 1. 5 V L 3 V 3" 5 S551 HSS5x5x5/16 12 S550 HS S 1 0 x 4 x 3 / 1 6 HS S 1 0 x 4 x 3 / 1 6 HS S 1 0 x 4 x 3 / 1 6 HS S 1 0 x 4 x 3 / 1 6 HS S 1 0 x 4 x 3 / 1 6 5 S550 2 S532 2 S532 8k HSS10x10x1/2 8k 8k HSS10x10x1/2 8k 8k HSS10x10x1/2 8k 8k HSS10x10x1/2 8k W1 0 x 1 1 2 1 S211 2 S503 (2) LOCS 31 k 35 k 3 S503 EE 1 S503 C6x8.2 @ 4'-0" OC MAX 3 S503 5 S503 4" 3'-9" EE 1. 5 V L 3 V HSS5x5x1/4 BP1- OH VARIES, SEE ARCH B/ D E C K = 12 6 ' - 4 1 / 2 " 3 S503 3" 3" 4'-1" 4'-1" 4'-6" 4'-6" 1'-4 1/4" 11 k 11 k W2 1 x 4 4 1 S532 3' - 9 " 4" 3'-10" 3" 3'-9" 6" 6 S531 (117'-11") HSS5x5x3/16 0" . W1 0 x 1 5 HSS10x4x3/16 6k S200 3 3" 4 S541 S531 5 4 S541 SIM 2" 5" 8'-6" 1'- 4 1 / 2 " 5" 3'-8" S502 12 1 S503 S502 12 VA R I E S , S E E A R C H B/ D E C K = 1 1 9 ' - 1 0 1 / 2 " 12 0 ' - 4 " 1. 5 V L 3 A 12 6 ' - 1 0 " B/DECK = 127'-0" 10 S532 ( 12 6 ' - 5 1 / 2 " ) 10 S321 11 S503 12 S503 HSS20x4 TRELLIS BEAMS, SEE S105 4" 7" HSS5x5x5/16 3" 5'-0 1/4" 6' - 1 1 1 / 2 " 4' - 8 " 4'- 1 0 " 2" 6 1 / 4 " 4' - 8 " 4' - 8 " 6' - 6 " 8' - 0 1 / 4 " 5 S504 2 S550 7 S504 7 S504 /12 S510 /12 S510 /12 S510 S200 5 TYPE A TYPE A 6 S502 TYP @ HSS TO HSS DO NOT REMOVE DECK UNTIL CONCRETE HAS REACHED 75% f'c. PROVIDE TRIM REINF FOR OPENING "10" OR LESS" PER TYP /5 S531 4" 7 S541 1 S532 DO NOT REMOVE DECK UNTIL CONCRETE HAS REACHED 75% f'c. PROVIDE TRIM REINF FOR OPENING "10" OR LESS" PER TYP /5 S531 HSS10x4x1/4 1. 5 V L 3 A VA R I E S . S E E A R C H 4" 1 12 S532 SIM 1 1 S502 1 1 2 S502 3" HSS5x5x1/4 ( 124' - 6" ) 0" . 9 S312 9 S312 2 S551 1 (119'-10 1/2") (119'-10 1/2") (119'-10 1/2") (119'-10 1/2") (119'-10 1/2") (119'-10 1/2") 9 S551 5 S552 (119'-11 1/2") (119'-10 1/2") (1 1 9 ' - 1 0 1 / 2 " ) SPACER PL ON T/BM. SEE /10 S531 (1 1 9 ' - 1 0 1 / 2 " ) ( 1 1 9 ' - 1 0 1 / 2 " ) ( 1 1 9 ' - 1 0 1 / 2 " ) ( 1 1 9 ' - 1 0 1/ 2 " ) ( 1 1 9 ' - 1 0 1 / 2 " ) ( 1 1 9 ' - 1 0 1 / 2 " ) 10 S531 4'-4" 4'-0" DEEP (MAX) HOT TUB. SEE ARCH 8 S532 2 S552 11 S551 SIM 10 S532 SPACER PL ON T/BM. SEE /10 S531 (126'-4 1/2") (126'-4 1/2") 10 S531 (126'-4 1/2") (1 2 6 ' - 4 1 / 2 " ) ( 1 2 6 ' - 4 1 / 2 " ) 11 S531 (126'-5 1/2") (126'-5 1/2") (126'-5 1/2") (1 2 6 ' - 5 1 / 2 " ) (126'-5 1/2") (1 2 6 ' - 5 1 / 2 " ) (126'-5 1/2") (126'-5 1/2") (126'-5 1/2") (1 2 6 ' - 5 1 / 2 " ) S200 6 9 S552 /3 S322 SIM /9 S321 B B B 1'-2 1/4" 4" HSS5x5x3/16 ( 125'-0" ) 6 S504 BEAM GIRT BEYOND STRUCTURAL GLASS RAIL AND TREADS BY STAIR SUPPLIER 1 HDG 22 /10 S321 . 3'-9" 1.5VL3.5V B/DECK = 125'-11 1/2" 4 S314 HS S 8 x 4 x 1 / 4 HS S 8 x 1 0 x 3 / 8 11 S532 W21x44 W21x44 8 S322 12 S504 TYPE A 4'-6" 4'-0" 3'-10 3/4" TYP (3) SIDES 1' - 2 " 8 3 / 4 " (120'-7") (1 2 0 ' - 7 " ) S505 6 S505 9 HSS10x4x1/4 3 1'-10" 8" 1' - 2 " 4'-4 7/8" 3 ( 126' - 5 1/2" ) ( 126' - 5 1/2" ) (1 2 6 ' - 5 1 / 2 " ) 11 S531 SIM (1 2 6 ' - 4 1 / 2 " ) 3" 3" HSS5x5x1/4 BP1- OH 4'-4 7/8" 3 12 S541 TYP AT CHIMNEY STONE 12 S314 10" SLAB SEE AT WALL OPNGS /6 S300 SLOPE DOWN, SEE LANDSCAPE 11 S314 SIM FOR T/WALL TRANSITION 6 S322 6 S550 6' - 5 " 8" 3'-2" 7" RFI 093 RFI 091 RFI 089 RFI 084 RFI 084 RFI 080 6 5 7 7 RFI 079 7 7 7 PROJECT: DRAWN BY : DATE : REVISIONS : 13.0291.S.01 KH DE S I G N E R S : K H / S M DA T E P R I N T E D : MM J O B # : 1 3 . 0 2 9 1 . S . 0 1 PR I N C I P A L : P D EO R : P D PR O J E C T M A N A G E R : S M 07/21/2015 7/ 2 1 / 2 0 1 5 2 : 0 4 : 1 6 P M C: \ P r o j \ 1 3 . 0 2 9 1 - Z e k e l m a n - R S 1 3 _ k e v i n h . r v t S104 MASTER (A)/MAIN (B) FLOOR PLAN 09.09.2013 1/4" = 1'-0" MASTER (A)/MAIN (B) LEVEL STEEL FLOOR FRAMING PLAN NOTES 1. SEE S0 SERIES SHEETS FOR GENERAL NOTES, QUALITY ASSURANCE NOTES, SYMBOLS AND ABBREVIATIONS. 2. SEE S5 SERIES SHEETS FOR TYPICAL STEEL DETAILS. 3. SEE S530 FOR TYPICAL METAL DECK DETAILS AND SCHEDULE. 4. SEE S500, S501 & S502 FOR TYPICAL STEEL CONNECTION DETAILS AND SCHEDULE. AT BEAMS THAT DO NOT HAVE A REACTION NOTED ON PLAN, PROVIDE CONNECTION WITH MINIMUM CAPACITY OF 7k. 5. SCREED CONCRETE TO PROVIDE CONSTANT THICKNESS 6. SPACE BEAMS EQUALLY BETWEEN GRID LINES UNLESS DIMENSIONED OTHERWISE. 7. TOP OF BEAM ELEVATION = BOTTOM OF METAL DECK UNLESS NOTED OTHERWISE ON PLAN. 8. SEE S101 FOR FOUNDATION PLAN NOTES 9. SEE S100 FOR T/WALL AND T/WALL ELEVATIONS 10. SEE S100 FOR FOUNDATION DIMENSIONS PLAN NORTH 1 2 3 4 5 PRICING SET 09.09.2013 PERMIT SET 12.09.2013 PERMIT SET REVISION 02.14.2014 PRICING SET REVISION 02.14.2014 STEEL PACKAGE #1 06.13.2014 PERMIT SET REVISION 07.03.2014 CD PACKAGE #1 07.25.2014 PERMIT SET REVISION 09.23.2014 CD PACKAGE #1 REV 11.06.2014 ASI 014 01.29.2015 ASI 022 03.03.2015 STEEL RE-SUBMTL 03.06.2015 CONFORMED SET 05.05.2015 REVISION 07.01.2015 RFI REVISION 07.21.2015 7 6 52143 B GG 6 7 8 H HSS10x6x3/8 W10x30 W10x30 HS S 1 0 x 6 x 3 / 8 HS S 1 0 x 6 x 3 / 8 W10x30 HSS10x4x3/16 12k W18x40 12k 16 k W10x30 HSS10x6x3/8 HSS10x4x1/4 12 k HS S 1 2 x 6 x 1 / 2 HS S 1 0 x 4 x 1 / 4 35k W10x112 19k HS S 1 0 x 4 x 1 / 4 HSS10x4x1/4 HS S 1 0 x 8 x 3 / 8 W1 0 x 3 9 HSS10x8x3/8 HSS10x8x3/8 HSS10x8x3/8 HSS10x4x1/4 11 k HS S 1 0 x 6 x 3 / 8 11 k HSS10x4x1/4 HS S 1 0 x 4 x 1 / 4 HSS10x6x3/8 HSS10x6x3/8 11 k W1 0 x 4 5 11 k HSS10x6x3/8 HS S 1 0 x 6 x 3 / 8 8k HSS10x6x3/8 8k HS S 1 0 x 4 x 1 / 4 HS S 1 0 x 4 x 1 / 4 HSS10x4x3/16 HS S 1 0 x 6 x 3 / 8 HSS10x4x3/16 HSS10x4x1/4 W8x40 W8x40 HSS10x4x1/4 HSS10x4x1/4 W10x30 W1 0 x 3 0 W1 0 x 3 0 W1 0 x 3 0 14k HSS10x8x3/8 HSS6x4x1/2 9k E D HSS8x4x1/4 HSS8x4x1/4 W8x31 HSS8x4x1/4 W10x33 W10x49 HSS10x6x3/8 W2 7 x 9 4 W8x24 W8x24 7k 12k HS S 1 0 x 4 x 1 / 4 C 1. 5 V L I 5 V W1 0 x 3 9 1. 5 V L I 5 V 1. 5 V L 3 A 13 7 ' - 3 " 1. 5 V L 3 A F A 15k 13k 18k 24k 13k 14 k 1. 5 V L I 6 V 1.5VLI5V W1 8 x 3 5 W1 0 x 3 0 W18x35 18 k W1 4 x 9 0 18 k W1 0 x 7 7 19 k W1 0 x 1 0 0 54 k 54 k 13'-11" 6'-8 1/2" 15'-10 1/2" 21'-10 1/2" 26'-9" 6'-0" 16'-3" 31 ' - 1 1 1 / 2 " 23 ' - 6 " 9' - 1 1 " 11 ' - 9 1 / 2 " 26 ' - 2 1 / 2 " 15 ' - 1 0 " 9' - 4 " HS S 1 4 x 6 x 1 / 4 HS S 1 4 x 6 x 1 / 4 C6x8.2 @ 4'-0" OC MAX 8k HS S 1 0 x 4 x 1 / 4 10 k 10 k HS S 1 0 x 6 x 3 / 8 10 k 9k HSS10x6x3/8 13k HSS10x6x3/8 13k HSS6x6x1/2 HSS4x4x1/4 11k W10x39 6k 9k 10 k HSS10x4x1/4 HSS10x4x1/4 HS S 1 0 x 4 x 1 / 4 S210 1 S210 2 S210 3 S210 4 S210 5S210 7 S210 6 HSS10x2x3/8 (FLAT) TREAD HSS14x6x1/2 STRINGER HS S 5 x 5 x 1 / 4 G I R T (1 2 2 ' - 1 " ) HS S 5 x 5 x 1 / 4 G I R T (1 2 2 ' - 1 " ) HS S 6 x 6 x 1 / 4 G I R T (1 2 2 ' - 1 " ) DN 0". HSS6x6x1/4 ( 128' - 10" ) 1'-0" 4" 1'-10" 8" 3" W10x33 HSS5x5x1/4 HSS5x5x1/4 HSS8x4x1/4 HSS10x6x3/8 10k 10k HSS8x4x1/4 HSS10x6x3/8 10k 10k 1 S503 GRID 4 (2) LOCS 9 S503 TYP AT LOW GIRT 14 k HS S 1 0 x 6 x 3 / 8 HS S 1 0 x 4 x 3 / 1 6 HS S 1 0 x 4 x 3 / 1 6 3" 3'-10" HS S 1 4 x 6 x 1 / 4 (126'-10") W10x30 W16x31 0" TYP HSS10x6x3/8 0" T Y P HS S 8 x 4 x 1 / 4 4 S503 4 S503 OH 5 S503 5 S551 18 k W1 0 x 7 7 3" 8" 8" 6 S530 1. 5 V L I 6 V 1. 5 V L I 5 V HSS10x8x3/8 13k 13k 12k HSS10x8x3/8 HSS10x4x1/4 HSS10x4x1/4 18 k 19 k 3 S550 1 S503 4" 7" 3' - 4 1 / 2 " 6' - 4 1 / 4 " 6' - 4 1 / 4 " 2' - 5 " 4' - 1 " 4" 5 S550 W1 0 x 3 9 0". HS S 1 0 x 4 x 1 / 4 W10x88 W10x88 W10x88 W10x88 1 S211 AT HIGH GIRDER EE PLAN NOTE 8 TYP 9 S550 HSS5x5x5/16 (125'-10") 0" . 9 S503 AT HSS GIRT EE W10x88 16k 16k 16k 16k 16k 16k 16k 16k 16k 16k 3' - 7 " 3' - 7 " 3'- 7 1 / 2 " 3" 8" VA R I E S , S E E A R C H 1 S532 16 k W2 1 x 4 4 2 S503 (#) (#) (#) (#) (#) (# ) (# ) (# ) 0" . 0". (#) (#) (# ) (# ) (#) (#) (#) (#) TOS = 139'-9 1/4" AT BMS NOTED THUS: (#) 5 S503 C6x8.2 @ 4'-0" OC MAX HSS20x4x5/16 HS S 2 0 x 4 x 5 / 1 6 HS S 2 0 x 4 x 5 / 1 6 HS S 2 0 x 4 x 5 / 1 6 HS S 2 0 x 4 x 5 / 1 6 HSS20x4x5/16 ( 140' - 8 1/2" ) ( 14 0 ' - 8 1 / 2 " ) ( 14 0 ' - 8 1 / 2 " ) ( 14 0 ' - 8 1 / 2 " ) ( 14 0 ' - 8 1 / 2 " ) ( 140' - 8 1/2" ) ( 14 0 ' - 8 1 / 2 " ) HS S 1 6 x 4 x 5 / 1 6 (# ) (# ) 0". 1 S503 (#) HSS10x4x1/4 0". 12 S531 HS S 2 0 x 4 x 5 / 1 6 HS S 2 0 x 4 x 5 / 1 6 HS S 2 0 x 4 x 5 / 1 6 HS S 2 0 x 4 x 5 / 1 6 HS S 2 0 x 4 x 5 / 1 6 HSS20x4x5/16 HSS20x4x5/16 ( 127' - 10 1/2" ) ( 12 7 ' - 1 0 1 / 2 " ) ( 12 7 ' - 1 0 1 / 2 " ) ( 12 7 ' - 1 0 1 / 2 " ) ( 12 7 ' - 1 0 1 / 2 " ) ( 12 7 ' - 1 0 1 / 2 " ) ( 127' - 10 1/2" ) 6 S530 ( 13 7 ' - 3 " ) HSS5x5x5/16 0" . HS S 5 x 5 x 5 / 1 6 9 S503 TYP AT GIRT TO COL CONN 0". HS S 8 x 4 x 1 / 4 18 k 18 k 21 k 29k 18 k 7k VA R I E S , S E E A R C H B/ D E C K = 1 2 6 ' - 1 0 " VARIES, SEE ARCH B/DECK = 130'-10 1/2" VA R I E S , S E E A R C H B/ D E C K = 1 3 4 ' - 6 " B/ D E C K = 1 3 8 ' - 7 " VA R I E S , S E E A R C H B/ D E C K = 1 3 9 ' - 9 1 / 4 " 10 " 3'-10 1/2" 3'-10" 3'-10" 3'-9" 6" 6" 5' - 0 " 3' - 5 " 3' - 5 " 2'- 1 1 " 3'-9" 4" 0". 3'- 9 " 4" 4'-4" S200 4 HSS5x5x1/4 10 S502 S502 12 7 S503 TYP @ HSS TO WF 9 S532 2 S550 8 S541 5' - 8 3 / 4 " 1' - 1 3 / 4 " 3 S503 3" 5'-0 1/4" 3" 3" 5'- 1 1 / 4 " 2" 2 S552 S504 2 TYP AT TRELLIS BM TO COL S504 2 SIM S504 1TYP @ TRELLIS 3 S504 SIM 3 S504 AT TRELLIS 4'-7 5/8" 4'-4 7/8" 4'-4 7/8" 4'-4 7/8" 4'-4 7/8" 1'- 3 " S504 1 HSS10x6x3/8 0" . T/STEEL = 135'-4" 12 S321 5 S504 OH 3 S502 ( 138' - 0" ) ( 13 8 ' - 0 " ) HSS5x5x3/16 HSS5x5x3/16 ( 132' - 4" ) 0" . 0" 1 S532 1 S532 1 S532 1 S532 1 S532 1 S532 S200 5 19k 13k 1'-11 1/2" 8'-0 1/2" ( 13 0 ' - 1 0 1 / 2 " ) 4'-8" 8'-5 3/4" 3" 11 1/4" 3" 5 S503 HSS10x4x1/4 10 S504 11 S504 11 S504 SIM 11 S504 2 S322 4 S532 1 S532 3 S322 AT GIRT HS S 1 0 x 4 x 1 / 4 1 1 EQ EQ EQ 1 GIRT GI R T 12 k W1 0 x 2 6 ( 13 6 ' - 1 0 1 / 2 " ) 6k 17 k W1 0 x 3 0 ( 13 8 ' - 7 " ) 17 k 10 S541 11 S541 5 S552 11 S551 9 S551 1 3 S552 6 S552 9 S552 (1 2 6 ' - 1 0 " ) ( 1 2 6 ' - 1 0 " ) ( 1 2 6 ' - 1 0 " ) 3" CONTR COORD GIRT EL W/ WINDOW SUPPLIER. TYP 1HS S 1 0 x 4 x 1 / 4 3" 8" 1 1 1 4" 4" 5" 5" 6" TYP T/CURB = SEE ARCH HS S 1 0 x 4 x 3 / 1 6 B 2" 1' - 8 3 / 4 " 9 1 / 2 " 3 S502 S501 12 TYP OF (3) 28k 1.5VLI5V B/DECK= 126'-10" 1 S533 S504 2 4 S502 TYP AT HIGH GIRT SPLIT DECK AT BEAM AND CONN PER /8 S530 OPEN TO BELOW. TYP HSS10x4x1/4 7'-5 1/2" 3 4' - 1 " 3' - 5 1 / 4 " 1'- 2 " HSS10x6x3/8 12 S541 12 S541 TYP AT CHIMNEY STONE 7 S541 SIM 12 S541 TYP AT STONE T/COL = 140'-8 1/2" 12 S505 W10x33 HS S 1 0 x 4 x 1 / 4 SEE S104 FOR TRELLIS CONN TO LEVEL BELOW 4 RFI 087 5 PROJECT: DRAWN BY : DATE : REVISIONS : 13.0291.S.01 KH DE S I G N E R S : K H / S M DA T E P R I N T E D : MM J O B # : 1 3 . 0 2 9 1 . S . 0 1 PR I N C I P A L : P D EO R : P D PR O J E C T M A N A G E R : S M 07/21/2015 7/ 2 1 / 2 0 1 5 2 : 0 4 : 4 6 P M C: \ P r o j \ 1 3 . 0 2 9 1 - Z e k e l m a n - R S 1 3 _ k e v i n h . r v t S105 MAIN ROOF/MASTER (B) FLOOR PLAN 09.09.2013 1/4" = 1'-0" MAIN ROOF/MASTER (B) LEVEL STEEL ROOF FRAMING PLAN NOTES 1. SEE S0 SERIES SHEETS FOR GENERAL NOTES, SYMBOLS AND ABBREVIATIONS. 2. SEE S5 SERIES SHEETS FOR TYPICAL STEEL DETAILS. 3. SEE S530 FOR TYPICAL METAL DECK DETAILS AND SCHEDULE. 4. SEE S500, S501 & S502 FOR TYPICAL STEEL CONNECTION DETAILS AND SCHEDULE. AT BEAMS THAT DO NOT HAVE A REACTION NOTED ON PLAN, PROVIDE CONNECTION WITH MINIMUM CAPACITY OF 7k. 5. SCREED CONCRETE TO PROVIDE CONSTANT THICKNESS 6. SPACE BEAMS EQUALLY BETWEEN GRID LINES UNLESS DIMENSIONED OTHERWISE. 7. TOP OF BEAM ELEVATION = BOTTOM OF METAL DECK UNLESS NOTED OTHERWISE ON PLAN. 8. AT CONNECTIONS NOTED THUS: PROVIDE SINGLE PLATE CONNECTION WITH MAX # OF BOLTS, STD HOLES IN PLATE AND BEAM WEB AND SC BOLTS. UNO PLAN NORTH 1 2 3 4 PRICING SET 09.09.2013 PERMIT SET 12.09.2013 PERMIT SET REVISION 02.14.2014 PRICING SET REVISION 02.14.2014 STEEL PACKAGE #1 06.13.2014 PERMIT SET REVISION 07.03.2014 CD PACKAGE #1 07.25.2014 PERMIT SET REVISION 09.23.2014 CD PACKAGE #1 REV 11.06.2014 ASI 014 01.29.2015 CONFORMED SET 05.05.2015 REVISION 07.01.2015 RFI REVISION 07.21.2015 5