HomeMy WebLinkAboutB15-0323 NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES
raM:
Town of Vail, Community Development, 75 South Frontage Road,Vail, Colorado 81657
p. 970.479.2139, f. 970.479.2452, inpsections 970.479.2149
COMBINATION BLDG PERMIT Permit #: B15-0323
Project #: PRJ15-0480
Job Address: 5042 SNOWSHOE LN VAIL Applied • 09/01/2015
Location • Issued. . . : 10/26/2015
Parcel No • 209918219016
OWNER SPADES AROUND THE WORLD LLC 09/01/2015
PO BOX 1353
GRAPEVINE
TX 76099
APPLICANT CHARLES KESSLER 09/01/2015 Phone: 972-822-6701
CONTRACTOR EAGLE ELECTRIC INC 10/26/2015 Phone: 970-471-6155
MICHAEL KOENEN
140 PRICE PLACE
GYPSUM
CO 81637
License: C000004156
Description:
Re-set Electric Meter
Occupancy: R-3 Type Construction: VB Valuation: $1,200.00
FEE SUMMARY ........................«.....................«..............................«
Building Permit-------> $44.85 Bldg Plan Check-----> $29.15 Use Tax Fee -- -> $0.00
Electrical Permit > $57.50 Elec Plan Check– -> $37.38 Restuarant Plan Review—> $0.00
Mechanical Permit > $0.00 Mech Plan Check-------> $0.00 Additional Fees--- -> ($74.00)
Plumbing Permit > $0.00 Plmb Plan Check--> $0.00 Recreation Fee---- -> $0.00
$0.00
Will Call--- - > $5.00
TOTAL PERMIT FEES— > $99.88
Payments--- —> $99.88
BALANCE DUE-----• -> $0.00
DECLARATIONS
I agree to comply with the information and plot plan, to comply with all Town ordinances and state laws, and to build this structure
according to the town's zoning and subdivision codes, design review approved, International Building and Residential Codes and
other ordinances of the Town applicable thereto.
REQUESTS FOR INSPECTION SHALL BE MADE TWENTY-FOUR HOURS IN ADVANCE BY TELEPHONE AT 970.479.2149
OR AT OUR OFFICE FROM 8:00 AM -4:00 PM.
combination permit_012811
TCNfl VAII,
*Rr»k*wR»Rfff*RR*xf»**xx*Rxxx*»*RRR»*www»»f*Rfxffx» **********»******w***»*w**»*R**»Rff*»**f*f***xfmf
CONDITIONS OF APPROVAL TO BE MET PRIOR TO FINAL SIGN OFF
Permit#: B15-0323 Address: 5042 SNOWSHOE LN VAIL
Owner: SPADES AROUND THE WORLD LLC Location:
*wR»Rwff»ffRR»ffff»ffff»fffr»fff*»****» RRR*»****»*R**»ffff»f***»****»**►w»***R»wx*f»1**»f****»*f***f**f R»**f*»****»****»****»**w*»*R*f»Rw**»*f
combination permit_012811
TOWN OF PAIL lai
REQUIRED INSPECTIONS AND STATUSES
Permit* B15-0323 Address: 5042 SNOWSHOE LN VAIL
Owner: SPADES AROUND THE WORLD LLC Location:
Item: 00120 ELEC-Rough
Item: 00190 ELEC-Final
Item: 00090 BLDG-Final
combination permit_012811
HOLY CROSS ENERGY
RESIDENTIAL - LOAD INFORMATION AND METER LOCATION ON FORM
On the space provided below please sketch the structure site including roads,driveways,
fences,transformer location (overhead or underground) and proposed
plan. Outdoor meters shall be installed in a location that is accessible ble at all ti sidewalks.
located Outdoor
on the side wall designated by in Cross Energy location(s)or provide site be
times. The meta shad to
front of any proposed fencing, Holy 9Y within the front one-third of that wall and to the
IT Down of Vail
g' REVIEWED FOR CODE
N - �� COMPLIA.N E
,5�� gate:.____ . . - /S
By: ______
•
Code
5f\bvi S+I6-
/
-ETA
e.6 h hfint
(OCk).)
Physical add'ess of project: _ 5—Oka S 14 of 5 r fOE'
08/01/10 F'� J ti ft
Department of Community Development
75 South Frontage Road
�.��� �� �A��� vai�, co s�ss7
Tel: 970-479-2128
www.vailgov.com
Development Review Coordinator
BUILDING PERMIT APPLICATION
(Separate applications are required for alarm &sprinkler)
Proje treet Address: � Project#: ���J`� ���
���-�. �� s�
DRB#:
(Number) (Street) (Suite#) ������
Building Permit#:
BuildinglComplex Name: /�
Contractor Information Lot#:Q�,Block# Subdivision: ��`t�t—��>�"�''L`.L�
� �
Business Name: ���L.� �L.EG`�{�fZ.�C �$�'C �
Work Class: New((�jj Addition((�jj Alteration( l�
Business Address: SwYV�L�
City ��11— State: CO Zip:��� Type of Building:
�i �� ���N�� Single-Family�j Duplex(�j Multi-Family((�jj
Contact Name:
Commercial(�j Other�j
Contact Phone: �L � ` °' �t �� ��\_
_..�_
Contact E-Mail: T�'� F`�deN 1��� Cei�`�'R�I��N� � ork Type: Interior Q Exterior� Both �
I hereby acknowledge that I have read this application,filled out Valuation of �
in full the information required,completed an accurate plot plan, Work Included Plans Included Work
and state that all the information as required is correct. I agree to Electrical �Yes �)No �Yes �No ��
comply with the information and plot plan,to comply with all Town
ordinances and state laws, and to build this structure according to Mechanical �Yes Q)No �Yes �No
the town's zoning and subdivision codes, design review ap-
proved, International Building and Residential Codes and other Plumbing �Yes QjNo �Yes �jNo
ordinances of the Town applicable thereto.
Building �Yes �No QYes QNo
X � r t Value of all work being performed: $ � i U "v��-
Owner/Owner's Representative Signature(Required) (value based on IBC Section 109.3&IRC Section 108.3�
Electrical Square Footage Q
Applicant Information Detailed Scope and Location of Work: L.O �9�1�.. `T7'1�
Applicant Name: C�'l�f�RL£� K�S�� j/��.��� � `
Applicant Phone: 170Z�"�� r'/�� !��
Applicant E-Mail:
Projectlnformation 5���� ���� ,�,��
Owner Name:
t,�oR�...D �--�-
Parcel#: �n`1� ° I SL��-'��1 -- A��
(For Parcel#,contact Eagle County Assesso►s Office at(970-328-8640 or visit
www.eag lecou nty.us/pati e)
(use additional sheet if necessary) � / -¢_
�, ! .�� -...,,�
For Oftice Use Only: g
�.G�� Date Received:
Fee Paid: - "��
____,.___-__
_ ._�_
Received From: � � -
�/�_
Cash Check# f �
CC: Visa/ MC Last 4 CC# exp date:
Auth #
12-Mar-2012
_ _. _ _ _. _--
HCE No. f�� � .:Si C�N: �' —�_�-
---- _
Meter Locat�on Approvec vE,s : ocation
h;, __---- --
Secondary �ed. New �_ t x�strnc �n9�'�eer
_ _�_�_--i-
Secondary '✓oltage �!____�, � '?atP --
- ?rdr� i o � . _ __KVA __ ___.�_ ___
HOLY CROSS ENERGY -
RESIDENTlA; LOAD lNFORMA110N AND ME 1 ER LOCATION FURM
Is this: .__� Temp tier��icc . I c►np in N�•rru F'o,iti�►ci
1 rniE� tu Perm ��" permanent Posirion
Applic$nt Varne____��-#�fl�---�.-� �'" '
�_�5���� f'hunr �Zf / � I
,
a
tiLBD[VISIO�� f:��J' j �fI-1� L� � :
�-------.�__—.. I <)f —---. R 1.()t'ti _� F'I L I\G-----__
PN�'Sl('AI, A!)DRt:11 O�' Pk[)JF< 1 �
_ __ __��' �-����/U� t; ' �
t.(K'.4TIOn: Withen �'it� i.in�it�:' `� -
If locadon not in cit�• timits please pro�;dc coun�tuNnship'rran�� L
�econdan• �'olta�e:��� �,1.�.h Yhase � 311d ��tiun.
___ ,�---- — �rr°ndar� N'irc tiii�
\umber of conciuctors per pttasc r
___ — t ahie� 1)ierance � � ransforn�er to meter) � 1
�teter Location: � p��� ! _titructurr . ---�_ft
�Ycdextal
\l,'!�lBERS ON F':�('�. UF 1'K:�\tiFOK.�1F:R �upper Irft and rikht rornrrsl f �
� ��3�-9
'vearb� existinK meter number
---_______--___�_--
_..--— _ .
-00 amp or icss, self-containrd mctcr �ocl.ct _ '� � •----
� �l(Hi 1rnp. .clf-contained I�) �r�irc
�'taio Fuse/Breaker tiizc ��.,� ` � —________
---�t! <"1 '. r�•y u�rrd'' � Iv � E'hoto � ultdic
��alculated Maximum nemand (\E(�) � � ----
-�__� I.�'1 ti�•r.icr '�iie ` `�
EL1�:<'TRICIA'! .�`�� ' _ �j j-�7-1��� f� (a�nps)
- _._ t'HO�E' �
�AyE OF HQ!1 ('RI�S�E�F:R(:l F\C:1\EF R c c>�1 �< !t 1� F
'------�__._
tiER�1('t'REQI F'S`Tf n. _
�...
�-------
--—
,�" _ `.rnur t
____ PKryAc
�- --
Housc(iq.(f)� � � �IoAufar��jir.
t:l.F('I RJ( LOAU t\FORAIA 170\• — �>rhor
_____
_ _ ___.
---_ ._--
LiEhtin� _{,\\
_ K�o^c f trrtni �\,
(70! / -_ . �n�ht�uintKr
bca Dr�cr Elect•ic _--_ �or<a�
-___._---.J� _. {�N cdC4i\wnBrt - -
Ncat: Elrctnc _--.. _____ ,ur (.�.
_ i.N (1�pr ___.�
' --- ,. ♦�tur�l�.a�Prup.�na
� ______.__
�mal!app4ancc , — /+� ---
---- f.\1 l aurtdr� t,\1 �._ __ __
��uer Hrrter. Eiectru �" � '#�A�t�nnin�;_
____,�_ �N r�ch(1 u m th r - _._________1�1�
OthcrM1tiJork.lectricl.oaA�lnoHmrlUOri�� ���1���4. —_ __ \a�urait.�� Prnp•rnr
(.uti��r hiv(t�pr n / , ,__ .__._�
.._"_— -- -�-- - t i.�1 1.
'J�/n)i.;j
NOLY CROSS ENERGY
RESIDENTiAL - LQAD INFORMATION AND METER �OCATIpN f=t�RM
(continued)
On the spac:e provided below please sketch the structure site including roads,drivewa �;
fences, transformer location (overhead or underground) and
plan. Outduar meters shall be installed in a location that is accessible at all times. The �,��S�dewalks,
�ocaced on the side wail designated by Nol pfOpOSed meter location(s}c,r provide site
front af any proposed fencing. y C��ss Energy W�thin the front one-third of th�it wa(i and to the
� ( .
L�'"`�
N ���
����
�:�'
� �
,� ��t>~-� �'���"
r__..____
, _ _ _____.
; �` ����t .��'.�
� ��.��- �1°�'�
C, �
i r�� ���/ p i �
� � � �� � �:��,-L t�--
� ����
�
���
Phys,cal add-ess of project:__
__ .�C'�'_�.__ S�_c-� �F-f�� _ C.�`� (L_,.
08�0,,�o --- —_._.—.-� ----_