Loading...
HomeMy WebLinkAboutB14-0043 Res Check Report REScheck Software Version 4.5.0 Compliance Certificate Project Lions Ridge Bldg 1 & 2 Energy Code: 2012 IECC Location: Vail, Colorado Construction Type: Multi-family Project Type: New Construction Conditioned Floor Area: 18,986 ft2 Glazing Area 23% Climate Zone: 6 (9248 HDD) Permit Date: Permit Number: Construction Site: Owner/Agent: Designer/Contractor: 1265 North Frontage Road West Vail Timber Ridge LLC Ben Marshall Town of Vail, CO 81657 200 N. Main Street Gorman & Company, Inc. Oregon, WI 53575 200 N. Main Street Oregon, WI53575 608-835-5534 bmarshall@gormanusa.com Compliance: 0.5%Better Than Code Maximum UA: 2145 Your UA: 2134 The%Be[ter or Worse Than Cotle Intlex reflects how dose ta mmpliance the house is based on wtle[ratle-off rules. I[DOES NOT provide an estima[e of enerqy use or cost relative ro a minimum-code home. Envelope Assemblies �, , East Elevation: Wood Frame, 16" o.t. 4,650 21.0 0.0 0.057 179 l: Other 957 0.300 287 3: Other 132 0.300 40 9: Other 124 0300 37 Patio/Deck: Glass 288 0300 86 West Elevation: Wood Frame, 16" o.c. 4,650 21.0 0.0 0,057 181 l: Other 165 0.300 50 2: Other 660 0.300 198 3: Other 132 0300 40 lO: Other 196 0300 59 Patio/Deck: Glass z88 0.300 86 Entrance: Glass 40 0.300 12 North Elevation: Wood Frame, 16" o.c. 2.346 21.0 0.0 0.057 128 5: Other 60 0.300 18 8: Other 41 0.300 12 Project Title: Lions Ridge Bldg 1 & 2 Report date: 04/15/14 Data filename: P:\_Projects\Markets\CO\_Projects\Timber Ridge - 2013\Architectural\Energy Page 1 of 9 Calculations\Bldg 1-2.rck �. . South Elevation: Wood Frame, 16" o.c. Z,246 21.0 0.0 0.057 119 4: Other 56 0.290 16 S: Other 90 0.300 27 6: Other 13 0.290 4 Ceiling 1: Raised or Energy Truss 7,402 50.0 0.0 0.020 148 Floor 1: Slab-On-Grade:Unheated 592 10.0 0.687 407 Insulation depth: 3.5' Compliance Statement: The proposed building design described here is consistent with the building plans, specifications, and other calculations submitted with the permit application.The proposed building has been designed to meet the 2012 IECC requirements in REScheck Version 4.5.0 and to comply with the mandatory requirements listed in the REScheck Inspection Checklist. Name-Title Signature Date Project Title: Lions Ridge Bldg 1 & 2 Report date: 04/15/14 Data filename: P:\_Projects\Markets\CO�_Projects\Timber Ridge - 2013\Architectural\Energy Page 2 of 9 Calculations\Bldg 1-2.rck REScheck Software Version 4.5.0 Inspection Checklist � Energy Code: 2012 IECC Requirements: 0.0% were addressed directly in the REScheck software Text in the "Comments/Assumptions" column is provided by the user in the REScheck Requirements screen. For each requirement, the user certifies that a code'requirement will be met and how that is documented, or that an exception is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided. _ ___ - -- -- - _ _-- r5ection � plans Verified � Field Verified r # I Pre InspectioNPlan Review - Value I_ Value � �omplies? Comments/Assumptions & Req.ID ..�._�_ 1 .r__,,,/// � 103.1, Construction drawings and , . , . . ; �Complies � 103.2 documentation demonstrate Does Not [PRl]' energy code compliance for the i �� building envelope. ❑Not Observable ❑Not Applicable .. _ .._--..._---. ....._. . ____-- 103.1, Construction drawings and ❑Complies 103.2, documentation demonstrate ❑Does Not �. 403.7 energy code compliance for [PR3]' lighting and mechanical systems. ❑Not Observable y�, Systems serving multiple �Not Applicable dwelling units must demonstrate I compliance with the IECC •. Commercial Provisions. , 302.1, Heating and cooling equipment is Heating: Heating: ❑Complies 403.6 sized per ACCA Manual S based Btu/hr_ Btu/hr_ ❑Does Not [PR21� on loads cakulated per ACCA Coolin Coolin q�� Manual J or other methods Btu/hrg� Btu/hr9� ❑Not Observable approved by the code official. — �Not Applicable � __ — Additional Comments/Assumptions: 1 High Impact (Tier 1) 2 Medium Impact (Tier 2) 3 Low Impact(Tier 3) Project Title: Lions Ridge Bldg 1 & 2 Report date: 04/15/14 Data filename: P:\_Projects\Markets\CO\_Projects\Timber Ridge - 2013\Architectural\Enerqy Page 3 of 9 Calculations\Bldg 1-2.rck i Section � Plans Verified i Field Verified # Foundation Inspection Value Value � Complies? � Comments/ASSUmptions � j & Req.ID � ii �. ', I40211 Slab edge insulation R-value. R-� R- omplies See me Envelopeassemblies � ���[FOl]i �Unheated Unheated �oes Not table for values. � ;�i ❑ Heated Heated ❑NOt Observable �� I ❑Not Applicable � i 303.2, Slab edge insulation installed per I�C lies � omp �402.2.9 manufacturer's instructions. ❑DOes Not [F02]� �, ❑NOt Observable - ❑Not Applicable .. - ------- -----� 40211 Slab edge insulation ft ft �omplies See me Envelopeassemblies [F03]i depth/length. , uDOes Not table for values. ?�' � � ��' ��• ❑Not Observable ❑Not Applicable 303.2.1 A protective covering is installed �Complies [F011]� to protect exposed exterior poes Not �� insulation and extends a ❑Not Observable minimum of 6 in. below grade. ❑Not Applicable 403.8 Snow-and ice-melting system , . ❑Complies� � � � � [F012]� controls installed. � ❑DOes Not �'F'•' ❑Not Observable ` F�IVot Applicable . .. __ —_--- - -----_- _. . ___..._— _—.__--- - - -._ _ ___-_. Additional Comments/ASSUmptions: 1 High Impact(Tier 1) 2 Medium Impact (Tier 2) 3 Low Impact (Tier 3) Project Title: Lions Ridge Bldg 1 & 2 Report date: 04/15/14 Data filename: P:\_Projects\Markets\CO\_Projects\Timber Ridge - 2013\Architectural\Energy Page 4 of 9 Calculations\Bldg 1-2.rck Section Plans Verified �. Field Verified # �Framing / Rough-In Inspection Value Value �� �omplies? Comments/Assumptions I� & Req.ID I ' ' 402.1.1, Glazing U-factor(area-weighted U- •3 U- .Zg ❑Complies See me EnvelopeASSemblies 402.3.1, avelage). �Does Not table for values. 402.3.3, �4023.6, ❑NOt Observable � �'402.5 ❑Not Applicable IFR21i i ui ' �303.13 U-factors of fenesVation products �Complies . ,[FR4p are determined in accordance ❑DOes Not ��, �, �� with the NFRC test procedure or ❑Not Observable � �� taken from the default table. ❑NOt Applicable i 402.4.11 Air barrier and thermal barrier ��Complies [FR231i installed per manufacturer's ❑DOes Not � instructions. ❑NOt Observable �Not Applicable .__—___—___ __. . .... . � 402.4.3 Fenestration that is not site built OCOmplies , [FR20P is listed and labeled as meeting ❑Does Not ' I �� AAMA/WDMA/CSA 101/1.5.2/A440 or has infiltration rates per NFRC ❑NOt Observable I 400 that do not exceed code �Not Applicable limits. -- - _ 402.4.4 IC-rated recessed lighting fixtures OComplies [FR16]� sealed at housing/interior finish ❑Does Not ; I ,�� and labeled to indicate <_2A cfm I '� leakage at 75 Pa. ❑Not Observable �Not Applicable i403.2.1 Supply ducts in attics are �R-_ R-_ ❑Complies �[FR12]' insulated to >_R-8. All other ducts R_ R_ ❑Does Not �� in unconditioned spaces or — I outside the building envelope are ❑NOt Observable insulated to aR-6. �NOt Applicable , i403.2.2 All joints and seams of air ducts, �� � � ❑Complies '� [FR13]1 air handlers, and filter bozes are ❑DOes Not �I , �, sealed. ❑Not Observable ' �NOt Applicable I403.23 Building cavities are not used as �Complies I '�[FR15]' ducts or plenums. ❑DOes Not sd� ❑Not Observable ❑NOt Applicable ' 4033 HVAC piping conveying fluids R-_ R-_ ❑Complies � [FR17]' above 105 °F or chilled Fluids ❑DOes Not I .v, 3elow 55 °F are insulated to >_R- ❑NOt Observable � �Not Applicable �403.3.1 Protettion of insulation on HVAC ❑Complies [FR24]z pipinq. ❑Does Not ❑Not Observable , �Not Applicable � .__._ ... __. _._._. ' I403.4.2 Hot water pipes are insulated to �R- � R- �COmplies �. [FR18]� aR-3. ❑Does Not �i :�?�� ❑Not Observable I�' �Not Applicable ' 403.5 Automatic or gravity dampers are � � � ❑Complies ' !�[FR19]� installed on all outdoor air ❑Does Not � �I ,�� intakes and exhausts. ', ❑Not Observable � � �i�lot Applicable � ._-____-- - -.. ___-.__.__ -- -- Additional Comments/ASSUmptions: 1 High Impact(Tier 1) 2 Medium Impact (Tier 2) 3 Low Impact (Tier 3) Project Title: Lions Ridge Bldg 1 & 2 Report date: 04/15/14 Data filename: P:\_Projects\Markets\CO\_Projects\Timber Ridge - 2013\Architectural\Energy Page 5 of 9 Calculations\Bldg 1-2.rck 1 High Impact (Tier 1) 2 Medium Impact (Tier 2) 3 Low Impact (Tier 3) Project Ti[le: Lions Ridge Bldg 1 & 2 Report date: 04/15/14 Data filename: P:\_Projects\Markets\CO\_Projects\Timber Ridge - 2013\Architectural\Energy Page 6 of 9 Calculations\Bldg 1-2.rck . Sedion Plans Verified '� Field Verified �, # � Insulation Inspection Value �� Value ' Complies? '� Comments/Assumptions �I & Req.ID I . . ___ _ �'303.1 All installed insulation is labeled � �omplies �[IN131� or the installed R-values Does Not � , ..,�� provided. ❑NO[ Observable '� � ❑NOt Applicable '� 402.1.1, Wall insulation R-value. If this is a R- R- ❑Complies 5ee the enveiopeassemblies �. ��402.2.5, mass wall with at least'/� of the table for values. � ❑ Wood ❑ Wood �Does Not I402.2.6 wall insulation on the wall �i pN3]' exterior, the exterior insulation � Mass ❑ Mass []NOt Observable ' y�, requirement applies (FR10). ❑ Steel ❑ Steel �Not Applicable I ----------. .. -- 303.2 Wall insulation is installed per �� omplies [IN4]' manufacturer's instructions. ❑Does Not � N� ❑Not Observable �I . . ❑Not Applicable _ I -- - - -- --------- . - _._----- --- — -_ ..---. _____ .. __ _ ____. ___ .. Additional Comments/Assumpt�ons: 1 High Impact (Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: Lions Ridge Bldg 1 & 2 Report date: 04/15/14 Data filename: P:\_Projects\Markets\CO\_Projects\Timber Ridge - 2013\Architectural\Energy Page 7 of 9 Calculations\Bldg 1-2.rck : Section Plans Verified Field Verified � i & Re ID Final Inspection Provisions Value I Value , Complies? Comments/Assumptions q• j 402.1.1. Ceiling insulation R-value. R- 5V R- 5.7 Complies See the EnvelopeAssem6lies i4�z.z.1, ❑ Wood ❑ Wood �DoesNot tableforvalues. �, I402.2.2, 4�z z 6 ❑ Steel � Steel ❑NOt Observable ���� �[FIl]' ❑Not Applicable ��, �d� I 3031.1.1, Ceiling insulation installed per � ❑Complies -�� aat M�lt�� 303.2 manufacturer's instructions. Y�poes Not Y �' [FI2]' Blown insulation marked every ❑NOt Observable n� �`��4f� ����"S ,� 300 R�. ❑Not Applicable . ---._- _ -------------... -- 402.2.3 Vented attics with air permeable �Complies [FI22]� insulation indude baffle adjacent Does Not to soffit and eave vents that ❑NOt Observable ; extends overinsulation. � ❑Not Applicable 402.2.4 Attic access hatch and door � R-� R-�3 �Complies i[FI3]� insulation aR-value of the ❑Does Not y, adjacent assembly. ❑Not Observable ❑Not Applicable 402.41.2 Blower door test @ 50 Pa. <=5 ACH 50 = 3 ACH 50 = ❑Complies ' [FI17]' ach in Climate Zones 1-2, and -z �_ 3 � �DOes No[ �, <=3 ach in Climate Zones 3-8. ❑Not Observable ; ❑NOt Applicable �402.4.2 Wood-burning fireplaces have � � � ❑Complies [FI8j� tight fitting flue dampers and ❑DOes Not �;, outdoor air for combustion. �. ❑Not Observable I �'Not Applicable 403.2.2 Duct tighMess test result of a=4 cfm/100 cfm/100 ❑Complies [FI4p cfm/100 ft2 across the system or ftz ft� ❑DOes Not <=3 cfm/100 ft2 without air � � � handler @ 25 Pa. For rough-in ❑Not Observable tests, verification may need to `�Not Applicable occur during Framing Inspection. � 403.2.2.1 A�gandler leakage designated � � � qDO spNot �I [FI24]' b manufacturer at <-2% of I ���desi n air flow. I Not Observable � �DoesNotcable I ---- __ pp I I403.1.1 Programmable thermos[ats ❑Complies ,[FI9]z installed on forced air furnaces. ❑ i �, . ❑NOt Observable , ' ❑Not Applicable �� �403.1.2 Heat pump thermostat installed OComplies � (FI10]� on heat pumps. ❑Does Not i �' ❑Not Observable ,�Not Applicable I _ _ _ ; �403.4.1 Circulating service hot water ❑COmplies [FI11]� systems have automatic or ❑Does Not ,U, accessible manual controls. ❑Not Observable �I �fJOt Applicable ,�' 403.5.1 All mechanical ventilation system ❑Compties '[FI25]� fans not part of tested and listed ❑DOes Not ' HVAC equipment meet efficacy �Not Observable and air flow limits. � �_ _ _ __ NotApplitable I 1 High Impact (Tier 1) 2 Medium Impact(Tier 2) 3 Low Impatt(Tier 3) Project Title: Lions Ridge Bldg 1 & 2 Report date: 04/15/14 Data filename: P:�_Projects\Marke[s\CO\_Projects\Timber Ridge - 2013\Architectural\Energy Page 8 of 9 Calculations�Bldg 1-2.rck '. Section Plans Verified I Field Verified � ' # � Final Inspection Provisions Value Value Complies? Comments/ASSUmptions I & Req.ID���, � I, ��. _ _. _ _. _. ___ . _ �403.9.1 Readily accessible switch on ❑Complies �� ���[FI12]' heaters for swimming pools or ❑DOes Not '� '� ,�, permanentin-ground spas. ❑Not Observable �'. . . _. ..----__..__._ _ �Not Applicable 403.9.2 Timer switches on heaters and ❑Complies ��, I[FI19]' pumps serving pools and ❑Does Not li �� permanent spas. i ❑Not Observable � . �Not Applicable . _---------_ .__.___—_ ._ �403.9.3 Heated pools and permanent ❑Complies [FI20]3 spas have a vapor retardant ❑Does Not � cover. ❑NOt Observable �Not Applicable ___- .--__..__. �__-_.__.------ -- . . .. . 404.1 75% of lamps in permanent ❑Complies [FI6]' fixtures or 75%of permanent ❑Does Not �, fixtures have high efficacy lamps. Not Observable Does not apply to low-voltage lighting. Not Applicable 404.1.1 Fuel gas lighting systems have ❑Complies [FI23]' no continuous pilot light. ❑DOes Not ❑NOt Observable �NOt Applicable 401.3 Compliance certificate posted. OComplies [F�71Z ❑DOes Not i �.�J ❑NotObservable I �.Not Applicable �i 303.3 Manufacturer manuals for ❑Complies [FI18]' mechanical and water heating ❑Does Not I y�, systems have been provided. ❑Not Observable � �71Not Applicable �– ---- --- � -- ------------..– __.... _ --------------- _ . .._. _... _--------- � Additional Comments/ASSUmptions: r j � ,w.«,. G' �g�°;; �� �:- �.���� � � * .� �1 � ��.�RA� ��, � ; s 4;�' ��y � � ; s��• 1 High Impact (Tier 1) 2 Medium Impact (Tier 2) 3 Low Impact (Tier 3) Project Title: Lions Ridge Bldg 1 & 2 Report date: 04/15/14 Data filename: P:�_Projects\Markets\CO�_Projects\Timber Ridge - 2013\Architectural\Energy Page 9 of 9 Calculations\Bldg 1-2.rck 2012 IECC Energy Efficiency Certificate wall zi.00 Floor 10.00 Ceiling / Roof 50.00 Ductwork (uncanditioned spaces): _ � . Window 0.30 Door 0.30 Heating System: Cooling System: Water Heater: Name: Date: � �d(S_ Comments /�,��.�F ` 7 � � O � # * �� ARC. o � ��`rF0 AF��`�\