Loading...
HomeMy WebLinkAboutB14-0042 B14-0043 Air Duct report �r�l�:'�1���'� �i�T���.�'���l���.�'a��. Lion's Ridge Apartments —Buildings 1 & 2 Final Duct Leakage Report Testing Date: September 4; September 9 Builder: Gorman Builders Contact: Chuck Collins Site Address: Lion's Ridge Apartments,Vail Testing By: Kristen Hartel Report By: Kristen Hartel Background Final Duct Leakage Performance testing was completed for all upper level units in buildings 1 and 2 of Lion's Ridge Apartments. The Town of Vail has adopted the 2012 IECC, which currently requires that losses within the duct system do not exceed 4 cubic feet per minute(cfm)to the exterior of the unit for every 100 square feet of living space. Measured Leakage Building 1 Unit Number Unit Type Allowable Confirmed Leaka e Leaka e 1301 A 22 cfm 16 cfm 1302 D 33 cfm 17 cfm 1303 C 32 cfm 30 cfm 1304 D 33 cfm 26 cfm 1305 C 32 cfm 27 cfm 1306 D 33 cfm 23 cfm 1307 C 32 cfm 19 cfm 1308 E 34 cfm 31 cfm Building 2 Unit Number Unit Type Allowable Confirmed Leakage Leakage 2301 A 22 cfm 10 cfm 2302 D 33 cfm 13 cfm 2303 C 32 cfm 29 cfm 2304 D 33 cfm 12 cfm 2305 C 32 cfm 19 cfm 2306 D 33 cfm 15 cfm 2307 C 32 cfm 24 cfm 2308 D 33 cfm 15 cfm Please call with any questions or concerns. �risten ��arte� P: 970-306-4Z48 Kristen@ActiveEner�ies.com P.O. Box 7627, Avon,CO 81620 I P: 970.306.4233 � F: 866.403.3485 � www.activeenergies.com