HomeMy WebLinkAboutB11-0496 REV13 change directives � ARCHITECTURE CONSTRUCTION CHANGE DIRECTIVE � URBAN DESIGN INTERIOR DESIGN PROJECT NAME: The Lion CCD#: oi4 �OWNER �ARCHITECT �CONSULTANT �CONTRACTOR PROJECT#: i7oo4.15 DATE OF ISSUANCE: o5/zz/zoi5 ❑ FIELD ❑ CONTRACTOR: PCL Construction ARCHITECT: OZ Architecture,Inc, z000 South Colorado Blvd Tower Two Suite z-5oo OWNER: LionsHead Inn, LLC Denver,Colorado 8ozzz CONTRACT FOR: Construction Vail Colorado CONTRACT DATED: May zo14 YOU ARE HEREBY DIRECTED TO MAKE THE FOLLOWING CHANGE(S) IN THIS CONTRACT: Create an opening in the level i slab of building B's trash room. See attached Structural and Architectural Drawings. ATTACHMENTS: 52.o1-B,52.o1S5-B,A2.01B-5 PROPOSED ADJUSTMENTS i. The proposed basis of adjustment to the Contract Sum or Guaranteed maximum Price is: i. ❑ Lump Sum Decrease of$00000.00 ii. � Unit Price of$00000.00 per iii. [�C]As provided in Subparagraph 7.3.6 of AIA Document Azoi, zoo7 edition. iv. ❑As follows: 2. The Contract Time is proposed to remain unchanged .The proposed adjustment,if any,is no change of days. WHEN SIGNED BY THE OWNER AND ARCHITECT AND RECEIVED BY THE CONTRACTOR,THIS DOCUMENT BECOMES EFFECTIVE IMMEDIATELY AS A CONSTRUCTION CHANGE DIRECTIVE(CCD)AND THE CONTRACTOR SHALL PROCEED WITH THE CHANGE(S) DESCRIBED ABOVE. SIGNATURE BY THE CONTRACTOR INDICATES THE CONTRACTOR'S AGREEMENT WITH THE PROPOSED ADJUSTMENTS IN CONTRACT SUM AND CONTRACT TIME SET FORTH IN THIS CONSTRUCTION CHANGE DIRECTIVE. ARCHITECT: OWNER: CONTRACTOR: OZ Architecture, Inc. Lionshead Inn, LLC PCL Construction 3003 Larimer Street 705 West Lionshead Circle z000 South Colorado Blvd. Denver,Colorado 8ozo5 Vail,CO 8i657 Denver,CO 8ozzz Vail,CO SIGNED; •� f SIGNED: SIGNED: . BY: �� � s� BY: BY: DATE: �/���� �_/ DATE: DATE: l �' DENVER PHONE: 303.861.5704 3003 LARIMER STREET FAX: 303.861.9230 DENVER BOULDER COLORADO SPRINGS � DENVER,COLORADO 60205 WWW.OZARCH.COM � ARCHITECTURE CONSTRUCTION CHANGE DIRECTIVE URBAN DESIGN _ INTERIOR DESIGN PROJECT NAME: Lion Vail(Strata Vail) CCD#: oi4-ri �OWNER �ARCHITECT �CONSULTANT �CONTRACTOR PROJECT#: i7oo4.15 DATE OF ISSUANCE: 07/16/zoi5 ❑ FIELD ❑ CONTRACTOR: PCL Construction ARCHITECT: OZ Architecture, Inc. z000 South Colorado Blvd Tower Two Suite z-5oo OWNER: LionsHead Inn, LLC Denver,Colorado 8ozzz CONTRACT FOR: Construction ' Vail Colorado CONTRACT DATED: May zoi4 YOU ARE HEREBY DIRECTED TO MAKE THE FOLLOWING CHANGE(S) IN THIS CONTRACT: ARCHITECTURE: • Sheet Az.oPi-B: i. Added CMU walls to create a trash room z. Double door#BiiS from Ls trash room is to be relocated to this trash room(door#BPizo) 3. Relocated bollard to corner of trash room. • Sheet Az.oi6: i. Door BiiS changed from pair of doors to(ix)4'-o"x7'-o"HM 45min door and frame. Relocate existing door to room BPizo. z. Wall was adjusted to align with elevator wall. • Sheet Az.oiB-S: i. Updated background with new door. z. Added dimension between chute and elevator shaft. • Sheet A3.o1-B: i. Updated RCP with new room and door layout. • Sheet A3.oPi-B: 1. Updated RCP with new room layout. • Sheet Az.33� i. Door BiiS changed from pair of doors to(ix)4'-o"x7'-o"HM door and frame.Relocate existing door to room BP1zo. • Sheet A6.i3: i. Drawing i—updated chute section,extending chute to Pi. Note there is an offset required to extend chute to Pi. • Sheet A8.oi: i. Added new door type F.z 4'-o"x7'-o"45 min HM door and frame. Revised EF-6 CFM,voltage, motor HP and Method of Control for new requirements. MECHANICAL: • Sheet Mi.o4: i. Fan Schedule(EF,GEF, KEF,SF,TF) a. Revised EF-6 CFM,voltage, motor HP and Method of Control for new requirements. • Sheet Mz.oP-i6 Floor paln: i. New Trash Room a. Added supply transfer air with FSD and exhaust duct with FSD. Added FSD damperto i8xi4 supply air duct. . DENVER PHONE: 303.661.5704 3003 LARIMER STREET FAX: 303.861.9230 DENVER BOULDER COLORADO SPRINGS I DENVER,COLORADO 80205 WWW.OZARCH.COM � �; b. Coordinate location of exhaust duct and grille with Electrical Contractor for panel service clearances requirements. PLUMBING: • Sheet Pz.oP-iB Floor Plan Piping Level: i. New Trash Room a. Added HB-i and 3/4'domestic cold piping. ELECTRICAL: • Sheet Ei.o7: i. Revised EF-6. • Sheet Ei.ii: i. Revised EF-6 circuit. • Sheet Ez.oP-i: i. Revised lighting. • Sheet Ez.oP-1B: i. Relocated electrical gear. z. Added power and lighting to Trash Room. Added power to fire/smoke dampers. ATTACHMENTS: SV_CCD i4R-1-Drawings Final.pdf PROPOSED ADJUSTMENTS i. The proposed basis of adjustment to the Contract Sum or Guaranteed maximum Price is: i. ❑ Lump Sum Decrease of$00000.00 ii. ❑ Unit Price of$00000.00 per iii. �As provided in Subparagraph 7.3.6 of AIA Document Azoi, zoo7 edition. Iv. ❑As follows: 2. The Contract Time is proposed to remain unchanged.The proposed adjustment,if any,is no change of days. WHEN SIGNED BY THE OWNER AND ARCHITECT AND RECEIVED BY THE CONTRACTOR,THIS DOCUMENT BECOMES EFFECTIVE IAMAEDIATELY AS A CONSTRUCTION CHANGE DIRECTIVE(CCD)AND THE CONTRACTOR SHALL PROCEED WITH THE CHANGE(5) DESCRIBED ABOVE. SIGNATURE BY THE CONTRACTOR INDICATES THE CONTRACTOR'S AGREEMENT WITH THE PROPOSED ADJUSTMENTS IN CONTRACT SUM AND CONTRACT TIME SET FORTH IN THIS CONSTRUCTION CHANGE DIRECTIVE. ,nb;��25 Page z of 3 G:�zoo71i7oo�,Lionshead Inn�CA1CCDI,CCD mG Ri rrash ChutelCCD_otGRi Trash Room combined docx � �: ARCHITECT: OWNER: CONTRACTOR: OZ Architecture, Inc. Lionshead Inn, LLC PCL Construction 3003 Larimer Street 705 West Lionshead Circle z000 South Colorado Blvd. Denver,Coloradt�8ozo5 Vail,CO 81657 Denver,CO 8ozzz Vail,CO SIGNED: ��' • SIGNED: SIGNED: BY: � � �x BY: BY: DATE: � ,//_, �� DATE: DATE: (/ For review of AIA Document G714-ZOOi G�:Y�oo7�i7ooy Lionshead Inn�CA1CCD�CCD_oiq Rt Trash ChuteACCD_oiGR�Trash Roort�ccmbined docx