HomeMy WebLinkAboutB13-0508 CR1 Department of Community Development
75 South Frontage Road
���� �� ��j� Vail, CO 81657
Tel: 970.479.2128
www.vailgov.com
Development Review Coordinator
TRANSMITTAL FORM
Use this form when submitting additional information for planning applications or building permits.
This form is also used for requesting a revision to building permits. A two hour minimum building review
fee of$110 will be charged upon reissuance of the permit.
Application/Permit#(s) information applies
to: Attention: �Revisions
B13-0508 CR1 �Response to Correction Letter
�attached copy of correction letter
PRJ13-0512 �Deferred Submittal
�Other
Project Street Address:
126 Forest Road
(Number) (Street) (Suite#)
Building/Complex Name: Description of Transmittal/List of Changes, Items Attached:
Applicant Information
(architect, contractor, owner/owner's rep)
Contact Name: KH Webb Architects
Address: 710 W. Lionshead Cir., Ste A
City Vail State: CO Zip: 81657
Contact►vame: Michael Current
(use additional sheet if necessary)
Contact Phone: Building Permits:
mlChael khwebb.com Revised ADDITIONAL Valuations (Labor&Materials)
Contact E-Mail: @ (DO NOT include original valuation)
I hereby acknowledge that I have read this application,filled out Building: $
in full the information required,completed an accurate plot plan,
and state that all the information as required is correct. I agree to Plumbing: $
comply with the information and plot plan, to comply with all Town
ordinances and state laws, and to build this structure according Electrical: $
to the town's zoning and subdivision codes, design review ap-
proved, International Building and Residential Codes and other Mechanical: $
ordinances of the Town applicable thereto.
X Total: $�
Owner/Owner's Representative Signature(Required)
Date Received:
For Office Use Only:
Fee Paid:
Received From:
Cash Check#
CC: Visa/ MC Last 4 CC# exp. date:
Authorization #
��
I
,
,,
Vail, Colorado
Denver, Colorado
\`a Frisco, Colorado
;
I `,
December 12, 2013 Monroe 8� Newell
Town of Va i I Engineers, Inc.
� Community Development
75 South Frontage Road
Vail, CO 81657
Attn. Mr. Martin Haeberle
Re: Cross Residence Remodel at 126 Forest Road — Building Department
Comments, Vail, Eagle County, Colorado (M&N #9319)
Gentlemen:
Monroe & Newell Engineers, Inc., have reviewed the comments of the Town of
Vail Community Development Department. The following are our responses to
the structural comments:
1. Code and design criteria: see structural general notes on sheet S3.0,
issued in the revised construction documents, dated December 9, 2013.
2. Special Inspection criteria: see structural general notes, section 2 on sheet
S3.0, issued in the revised construction documents, dated December 9,
2013.
3. Design for guard rails: see section 1/S2.2 on sheet S2.2, issued in the
revised construction documents, dated December 9, 2013.
The items listed above should resolve the structural comments of the Town of
Vail Community Development Department. If additional questions arise, please
call.
MONRQE & NEWELL ENGINEERS, INC.
� ������
I ����
.�.�
,�:..,;
� � ��
Hannes Spaeh, P.E. - i�:�' �, �;=;'�
Principal ���'1� ��`F�� '�
•.�. •
. .
. ;
s
� Z .
"••�•o.e ••��.�,
•a
�.��.�.s��°yr�,�`'
�'�?`�
www.monroe-newell.com
70 Benchmark Road • Suite 204 • P.O. Box 1597 • Avon, Colorado 81620
(970) 949-7768 • FAX (970) 949-4054 • email: avonQmonroe-newell.com
12.1 1.2013
B13-0508
126 Forest Road
Vail, Co 81657
Cross Residence
Permit revisions comments letter:
Over-all:
I. Notes added to address general permit drawing requirements
2. Drawings amended to address legibility of"new" versus "existing" conditions
3. Drawings amended to address legibility of notes and dimensions.
A104:
I. Provide details showing weatherproofing, insulation, and flashing
a. Provided typical construction notes for wood siding and roof
b. Added typical wall section #I-A500.
2. Provide stair details showing code compliance
a. Provided applicable notes to stairs and guards that are to remain or that are new to
match existing referencing IRC R3 I I that includes 36" height requirement and that
they shall not allow the passage of a 4" sphere.
b. Added typical exterior railing detail #3-A500.
3. Size of kitchen exhaust? Outside air?
a. New notes added regarding new down draft hood with less than 400cfm flow rate
that should not require additional make-up air.
4. Gas? Provide piping plan {in regard to outdoor fire pit}
a. Notes added for specification of fire pit and general piping layout
5. Floor drain relocation/size and overflows...
a. Notes added and drawings revised to show relocated floor drains and over flow
scuppers.
b. Added over flow scupper detail #2-A500.
A106:
I. Roofing materials? Snow retention? Ventilation? Slope?
� a. Notes added and drawings amended to clarify new roof area, snow retention, typical
roof construction...
� A200:
I. In regard to railings— Less than 4" opening req'd.
� a. Notes added to address this IRC requirement
2. General —
� a. Note added to illustrate slope of roof
b. Drawings amended to show proposed trellis
' S2.1:
I. Provide code and design criteria on plans
� 2. Indicate special inspection criteria
3. Provide design for proposed guards
• a. See separate letter from structural engineer.
�
110 vVESi LIONSHEAD URCLE, SUITE A VAIL
910.411.2990 970.411.2965''- www.khwebb.�om
�I::I'r�R Q� i:'if A;14FR1(;?N I :