PROJECT#: 17004.�5 DATE OF ISSUANCE: Zi/z4/zoi5 ❑ FIELD
❑
OWNER: Lionshead Inn, LLC ARCHITECT: OZ Architecture, Inc.
Patricio Burillo
Rodrigo Cortina TO CONTRACTOR: PCL
705 West Lionshead Circle CONTRACT FOR: Construction
Vail,CO 8i657
CONTRACT DATED: May zo14
The work shall be carried out in accordance with the following supplemental instructions issued in accordance with the Contract
Documents without change in Contract Sum or Contract Time. Prior to proceeding in accordance with these instructions, indicate your
acceptance of these instructions for minor change to the Work as consistent the Contract documents and return a copy to the Architect.
DESCRIPTION:
The Following information is forthe issuance of`FOR CONSTRUCTION DOCUMENTS'to be included in the permit set
of drawings issued 3/3i/zoi4.
ELECTRICAL:
Note:This revision reconciled the unit load center locations per RFI�47�753�$44�and 93g.
• Sheet Ez.ii:
s. Unit iD
a. Relocated load center from Dining area to wall location across from Laundry room.
• Sheet Ez.iz:
1. Unit 3H-L
a. Added load center to wall location across from Powder room.
• Sheet Ez.i3:
z. Unit zF
a. Relocated load centerfrom Secondary Bedroom to wall location across from Laundry room.
• Sheet Ez.i6:
1. Unit 4B-L
a. Relocated load centerfrom hallway location to hallway location on opposite side of doorway,
b. Relocated load center from Jr. Master Bedroom to hallway location(same location as in(a.)
above).
• Sheet Ez.i7:
i. Unit 3C-L
a. Relocated load center from Secondary Bedroom wall outside of Master Bath to opposite wall
behind door.
• Sheet Ez.ig:
i. Unit PA:
a. Relocated load center from wall bordering stairwel I to the center of the same wall.
• Sheet Ez.z3:
i. Unit 3A-L:
a. Relocated SMC from hallway location to closet wall in Secondary Bedroom.
b. Relocated SMC from Laundry room to Walk-In Closet. Relocated load center from hallway
s�,z,,r,::5;
Page.� _
G:1zo j I i� � �i, _ �,��_E.t�le C��&�L<yad .°-�e�Suhir�C a' Sf_o3�4 �ized Lo 'Cen.t r
Locai_� ..i �n i , �� �e, ,4, < DENVER PHONE: 303.861.5704
I€ 3003 LARIMER STREET FAX: 303.861.9230
DENVER BOULDER COLORADO SPRINGS ] DENVER,COLOR4D0 80205 WWW.OZARCH.COM
\ �
' ��
location to previous SMC location in Laundry room.
• Sheet Ez.z6:
i. Unit 4A-L:
a. Relocated load center and SMC from Jr.Master Bedroom to Laundry room.
• Sheet Ez.z7:
1. Unit 3J-L:
a. Relocated load center and SMC from outside Mechanical room to Laundry room.
• Sheet Ez.z8:
i. Unit 5A:
a. Relocated load center from hallway location to Secondary Bedroom behind the door.
ATTACHMENTS:
Electrical Sheets:Ez.1i,Ez.iz,Ez.i3, Ez.i6, Ez.17,Ez.ig, Ez.z3, Ez.z6,Ez.z7, Ez.z8
ISSUED BY: � �2 ACCEPTED BY:
ARCHITECT: (]Z ArChiteCture CONTRACTOR:
llrZalZOls
Page z of z