Loading...
HomeMy WebLinkAboutB06-0196 Detail Inspection Report 12.10.2009 to 02.01.2 Inspection Detail Report 12/ 10/ 2009 - 02/01/ 2010 � � , , ' � - � � � - � � r' • � e r - � .�...fl - , — � .U'I!l� � Four Seasons 12/11/2009 Level 006 611 Insulation Corridor 611, 12/il/2009 Pass 612, 613 & 614 Four Seasons 12/11/2009 Level 006 612 Insulation Corridor 611, 12/11/2009 Pass 612, 613 & 614 Four Seasons 12/11/2009 Level 006 613 Insulation Corridor 611, 12/11/2009 Pass 612, 613 & 614 Four Seasons 12/11/2009 Level 006 614 Insulation Corridor 611, 12/11/2009 Pass 612, 613 & 614 Four Seasons 12/14/2009 Level 003 350 Rough Plumbing Copper vents 12/14/2009 Pass for gas regulators. Four Seasons 12/14/2009 Level 005 522 Rough Snowmelt 12/14/2009 Fail Mechanical tubing for loadina dock. Four Seasons 12/15/2009 Level 005 522 Rough Level 5 Loading 12/15/2009 Partial Pass Mechanical Dock Snowmelt Tubing and Air TPSt � FourSeasons 12/14/2009 Level 005 5-502 Rough 12/14/2009 Pass Mechanical Four Seasons 12/14/2009 Level 002 250C Rough Plumbing 12/14/2009 Pass Four Seasons 12/14/2009 Level 002 268 Rough Plumbing 12/14/2009 Pass � Four Seasons 12/18/2009 Level 005 504 Drywall 12/18/2009 Partial Pass Four Seasons 12/18/2009 Level 005 520 Drywall 12/18/2009 Partial Pass W Four Seasons 12/18/2009 Level 005 531 Drywall 12/18/2009 Partial Pass Four Seasons 12/18/2009 Level 005 545 Drywall 12/18/2009 Partial Pass Four Seasons 12/18/2009 Level 005 504 Rough Frame 12/18/2009 Partial Pass Four Seasons 12/18/2009 Level 005 520 Rough Frame 12/18/2009 Partial Pass Four Seasons 12/18/2009 Level 005 531 Rough Frame 12/18/2009 Partial Pass Four Seasons 12/18/2009 Level 005 545 Rough Frame 12/18/2009 Partial Pass Four Seasons 12/18/2009 Level 003 355 Rough Frame 12/18/2009 Partial Pass Four Seasons 12/18/2009 Level 003 381 Rough Frame 12/18/2009 Partial Pass Four Seasons 12/22/2009 Level 003 381 Rough Electric CEILING ONLY 12/22/2009 Cancelled Please Four Seasons 12/22/2009 Level 005 524 Rough Electric ROOMS: 531, 12/22/2009 Pass 525, 525A, � � � � I 528B528A 527, CEILING ONLY PIPACP Four Seasons 12/22/2009 Level 005 525 Rough Electric ROOMS: 531, 12/22/2009 Pass 525, 525A, i � i � I 525B, 524, 527, I I 528, 528A - CEILING ONLY PIPaCP Four Seasons 12/22/2009 Level 005 528 Rough Electric ROOMS: 531, 12/22/2009 Pass 525, 525A, 525B, 524, 527, 528, 528A - CEILING ONLY PIPaCP Four Seasons 12/22/2009 Level 005 531 Rough Electric ROOMS: 531, 12/22/2009 Pass 525, 525A, 525B, 524, 527, � � � � � 528, 528A - � CEILING ONLY PIPACP Four Seasons 12/22/2009 Level 006 6220 Insulation Under Deck 12/22/2009 Partial Pass Insulation Four Seasons 12/22/2009 Level 006 6222 Insulation Under Deck 12/22/2009 Partial Pass Insulation Four Seasons 12/22/2009 Level 006 6224 Insulation Under Deck 12/22/2009 Partial Pass Insulation Four Seasons 12/22/2009 Level 003 350 Rough Electric 12/22/2009 Partial Pass Four Seasons 12/23/2009 Level 005 5104 Rough Electric 12/23/2009 Pass Four Seasons 12/23/2009 Level 006 6103 Rough Electric 12/23/2009 Pass Four Seasons 12/23/2009 Level 006 6104 Rough Electric 12/23/2009 Pass Four Seasons 12/28/2009 Level 003 3005 Drywall Level 3 12/28/2009 Partial Pass Corridors - 2nd Layer Drywall Tnsnectinn Four Seasons 12/28/2009 Level 004 4004 Drywall Level 4 12/28/2009 Partial Pass Corridors - 1st Layer Drywall Tnsnectinn Four Seasons 12/28/2009 Level 006 611 Insulation Level 6 BOH 12/28/2009 Partial Pass Insulation Insnection Four Seasons 12/28/2009 Level 004 G-413 Rough Plumbing 12/28/2009 Partial Pass Four Seasons 12/28/2009 Level 006 617 Rough Plumbing 12/28/2009 Partial Pass Four Seasons 12/28/2009 Level 006 619 Rough Plumbing 12/28/2009 Partial Pass Four Seasons 12/28/2009 Level 006 G-616 Rough Plumbing 12/28/2009 Partial Pass Four Seasons 12/28/2009 Level 007 713 Rough Plumbing 12/28/2009 Partial Pass Four Seasons 12/28/2009 Level 007 716 Rough Plumbing 12/28/2009 Partial Pass Four Seasons 12/28/2009 Level 007 G-703 Rough Plumbing 12/28/2009 Partial Pass Four Seasons 12/28/2009 Level 008 G-802 Rough Plumbing 12/28/2009 Partial Pass Four Seasons 12/28/2009 Level 008 G-812 Rough Plumbing 12/28/2009 Partial Pass Four Seasons 12/28/2009 Level 008 G-816 Rough Plumbing 12/28/2009 Partial Pass Four Seasons 12/28/2009 Level 010 G-1013 Rough Plumbing 12/28/2009 Partial Pass Four Seasons 12/28/2009 Level 010 1001 Rough Plumbing 12/28/2009 Partial Pass Four Seasons 12/30/2009 Level 010 1011 Final Mechanical Attic Duct Work 12/30/2009 Fail � Four Seasons 12/30/2009 Level 010 1012 Final Mechanical Attic Duct Work 12/30/2009 Fail Four Seasons 12/31/2009 Level 003 X Rough Frame Level 3 Corridor 12/31/2009 Cancelled Rough Frame Four Seasons 12/31/2009 Level 004 4004 Rough Frame Level 4 Corridor 12/31/2009 Cancelled Rough Frame Four Seasons 12/31/2009 Level 005 501 Rough Frame Level 5 Corridor 12/31/2009 Pass Rough Frame Four Seasons 12/31/2009 Level 007 7315 Rough Electric Walls &Ceilings 12/31/2009 Pass - PM Inspection Please Four Seasons 12/31/2009 Level 007 7501 Rough Electric Walls &Ceilings 12/31/2009 Pass - PM Inspection Please Four Seasons 12/31/2009 Level 007 7502 Rough Electric Walls &Ceilings 12/31/2009 Pass - PM Inspection Please Four Seasons 12/31/2009 Level 007 7503 Rough Electric Walls &Ceilings 12/31/2009 Pass - PM Inspection Please Four Seasons 12/31/2009 Level 007 C-712 Rough Electric Wall &Ceilings - 12/31/2009 Pass PM inspection olease Four Seasons 12/31/2009 Level 007 C-716 Rough Electric Wall &Ceilings - 12/31/2009 Pass PM inspection nlease Four Seasons 12/31/2009 Level 007 C-717 Rough Electric Wall &Ceilings - 12/31/2009 Pass PM inspection olease Four Seasons 12/31/2009 Level 007 C711 Rough Electric Wall &Ceilings - 12/31/2009 Pass PM inspection nlease Four Seasons 12/31/2009 Level 007 E-712 Rough Electric Wall &Ceilings - 12/31/2009 Pass PM inspection olease Four Seasons 12/31/2009 Level 007 E-712A Rough Electric Wall &Ceilings - 12/31/2009 Pass PM inspection nlease Four Seasons 12/31/2009 Level 007 G-711 Rough Electric Wall &Ceilings - 12/31/2009 Pass PM inspection olease Four Seasons 12/31/2009 Level 007 G-712 Rough Electric Wall &Ceilings - 12/31/2009 Pass PM inspection olease Four Seasons 12/31/2009 Level 007 G-713 Rough Electric Wall &Ceilings - 12/31/2009 Pass PM inspection nlease Four Seasons 12/31/2009 Level 007 G-715 Rough Electric Wall &Ceilings - 12/31/2009 Pass PM inspection nlease Four Seasons 12/31/2009 Level 007 G-716 Rough Electric Wall &Ceilings - 12/31/2009 Pass � PM inspection nlease Four Seasons 12/31/2009 Level 002 201 Rough Electric Electrical Shafts 12/31/2009 Cancelled A & B between Level 2 & 10 - � � � � � PM inspection � � please Four Seasons 12/31/2009 Level 002 201 Shaft Electrical Shafts 12/31/2009 Cancelled A & B between � � � � I Level 2 & 10 - � PM inspection please Four Seasons 12/31/2009 Level 006 611 Drywall Level 6 BOH 1st 12/31/2009 Pass layer drywall outside walls nnlv Four Seasons 1/5/2010 Level 002 210A Rough Electric Electrical Shaft 1/5/2010 Pass Inspection - PM Inspection nlPasP Four Seasons 1/5/2010 Level 002 218 Rough Electric Electrical Shaft 1/5/2010 Pass Inspection - PM Inspection nlPasP W � Four Seasons 1/5/2010 Level 003 376 Rough Electric Electrical Shaft 1/5/2010 Pass Inspection - PM Inspection nlPasP Four Seasons 1/5/2010 Level 003 E-302 Rough Electric Electrical Shaft 1/5/2010 Pass Inspection - PM Inspection nlPasP Four Seasons 1/5/2010 Level 004 E-402A Rough Electric Electrical Shaft 1/5/2010 Pass Inspection - PM Inspection nIP�sP Four Seasons 1/5/2010 Level 004 G-413 Rough Electric Electrical Shaft 1/5/2010 Pass Inspection - PM Inspection nlPasP Four Seasons 1/5/2010 Level 005 G-502 Rough Electric Electrical Shaft 1/5/2010 Pass Inspection - PM inspection nlPasP Four Seasons 1/5/2010 Level 005 G-513 Rough Electric Electrical Shaft 1/5/2010 Pass Inspection - PM inspection nlPasP Four Seasons 1/5/2010 Level 005 G-515 Rough Electric Electrical Shaft 1/5/2010 Pass Inspection - PM inspection nIP�sP Four Seasons 1/5/2010 Level 006 G-604 Rough Electric Electrical Shaft 1/5/2010 Pass Inspection - PM inspection nlPasP Four Seasons 1/5/2010 Level 007 G-703 Rough Electric Electrical Shaft 1/5/2010 Pass Inspection - PM inspection nlPasP W � Four Seasons 1/5/2010 Level 007 G-713 Rough Electric Electrical Shaft 1/5/2010 Pass Inspection - PM inspection nlPasP Four Seasons 1/5/2010 Level 008 C-801 Rough Electric Electrical Shaft 1/5/2010 Pass Inspection - PM inspection nlPasP Four Seasons 1/5/2010 Level 008 G-802 Rough Electric Electrical Shaft 1/5/2010 Pass Inspection - PM inspection nlPasP Four Seasons 1/5/2010 Level 008 G-812 Rough Electric Electrical Shaft 1/5/2010 Pass Inspection - PM inspection nlPasP Four Seasons 1/5/2010 Level 009 901 Rough Electric NOTE: Room 1/5/2010 Pass 901 should be Room M-901 - � � � � I Electrical Shaft � Inspection - PM Inspection nio��o Four Seasons 1/5/2010 Level 009 G-911 Rough Electric NOTE: Room 1/5/2010 Pass 901 should be Room M-901 - Electrical Shaft � I Inspection - PM � Inspection nlo�co Four Seasons 1/5/2010 Level 009 9001 Rough Electric PERMIT: E07- 1/5/2010 Pass 0126 - Electrical Shaft Inspection - PM Inspection please Four Seasons 1/5/2010 Level 010 G-1001 Rough Electric Electrical Shaft 1/5/2010 Pass Inspection - PM Inspection nlPasP Four Seasons 1/5/2010 Level 010 G-1013 Rough Electric Electrical Shaft 1/5/2010 Pass Inspection - PM Inspection nlPasP Four Seasons 1/5/2010 Level 010 1001 Rough Electric PERMIT: E07- 1/5/2010 Pass 0126 - Electrical � � � � I Shaft Inspection - PM Inspection please Four Seasons 1/5/2010 Level 002 210A Shaft Electrical Shaft 1/5/2010 Pass Inspection - PM Inspection nlPasP Four Seasons 1/5/2010 Level 002 218 Shaft Electrical Shaft 1/5/2010 Pass Inspection - PM Inspection nlease Four Seasons 1/5/2010 Level 003 376 Shaft Electrical Shaft 1/5/2010 Pass Inspection - PM Inspection nlPasP Four Seasons 1/5/2010 Level 003 E-302 Shaft Electrical Shaft 1/5/2010 Pass Inspection - PM Inspection nlPasP Four Seasons 1/5/2010 Level 004 E-402A Shaft Electrical Shaft 1/5/2010 Pass Inspection - PM Inspection � � nlPasP Four Seasons 1/5/2010 Level 004 G-413 Shaft Electrical Shaft 1/5/2010 Pass Inspection - PM Inspection nlPasP Four Seasons 1/5/2010 Level 005 G-502 Shaft Electrical Shaft 1/5/2010 Pass Inspection - PM inspection nlPasP Four Seasons 1/5/2010 Level 005 G-513 Shaft Electrical Shaft 1/5/2010 Pass Inspection - PM inspection nlPasP Four Seasons 1/5/2010 Level 005 G-515 Shaft Electrical Shaft 1/5/2010 Pass Inspection - PM inspection nlPasP Four Seasons 1/5/2010 Level 006 G-604 Shaft Electrical Shaft 1/5/2010 Pass Inspection - PM inspection nlPasP Four Seasons 1/5/2010 Level 007 G-703 Shaft Electrical Shaft 1/5/2010 Pass Inspection - PM inspection nlPasP Four Seasons 1/5/2010 Level 007 G-713 Shaft Electrical Shaft 1/5/2010 Pass Inspection - PM inspection nIP�sP Four Seasons 1/5/2010 Level 008 C-801 Shaft Electrical Shaft 1/5/2010 Pass Inspection - PM inspection nlPasP Four Seasons 1/5/2010 Level 008 G-802 Shaft Electrical Shaft 1/5/2010 Pass Inspection - PM inspection nlPasP W � Four Seasons 1/5/2010 Level 008 G-812 Shaft Electrical Shaft 1/5/2010 Pass Inspection - PM inspection nlPasP Four Seasons 1/5/2010 Level 009 901 Shaft NOTE: Room 1/5/2010 Pass 901 should be Room M-901 - � � � � I Electrical Shaft � Inspection - PM Inspection nio��o Four Seasons 1/5/2010 Level 009 G-911 Shaft NOTE: Room 1/5/2010 Pass 901 should be Room M-901 - � � � � I Electrical Shaft � Inspection - PM Inspection nlo�co Four Seasons 1/5/2010 Level 009 9001 Shaft PERMIT: E07- 1/5/2010 Pass 0126 - Electrical � � � � I Shaft Inspection - PM Inspection please Four Seasons 1/5/2010 Level 010 G-1001 Shaft Electrical Shaft 1/5/2010 Pass Inspection - PM Inspection nIP�sP Four Seasons 1/5/2010 Level 010 G-1013 Shaft Electrical Shaft 1/5/2010 Pass Inspection - PM Inspection nlPasP Four Seasons 1/5/2010 Level 010 1001 Shaft PERMIT: E07- 1/5/2010 Pass 0126 - Electrical Shaft Inspection � � � � � - PM Inspection please Four Seasons 1/7/2010 Level 004 402 Rough Frame Corridor 401 & 1/7/2010 Fail 402 Ceiling Rough Frame � � � � I Inspection � Four Seasons 1/7/2010 Level 004 C-401 Rough Frame Corridor 401 & 1/7/2010 Fail 402 Ceiling Rough Frame Inspection Four Seasons 1/7/2010 Level 010 1002 Rough Attic duct to 1/7/2010 Partial Pass Mechanical plenum - Final Rough � � � � I Mechanical � � Four Seasons 1/7/2010 Level 008 8308 Rough Duct Rough In 1/7/2010 Partial Pass Mechanical Four Seasons 1/5/2010 Level 007 G-713 Rough Electric shaft 1/5/2010 Pass Four Seasons 1/7/2010 Level 005 535 Rough 1/7/2010 Partial Pass Mechanical Four Seasons 1/8/2010 Level 006 6103 Insulation AM inspection 1/8/2010 Cancelled please Four Seasons 1/8/2010 Level 006 6104 Insulation AM inspection 1/8/2010 Cancelled please Four Seasons 1/8/2010 Level 004 4101 Shaft Shaft enclosure 1/8/2010 Pass inspection Four Seasons 1/8/2010 Level 005 5101 Shaft Shaft enclosure 1/8/2010 Pass inspection Four Seasons 1/8/2010 Level 006 6101 Shaft Shaft enclosure 1/8/2010 Pass inspection Four Seasons 1/8/2010 Level 003 355 Rough Electric 1/8/2010 Pass � Four Seasons 1/11/2010 Level 006 611 Drywall Level 6 BOH ist 1/11/2010 Partial Pass layer Four Seasons 1/11/2010 Level 005 501 Rough Frame Level 5 Corridor 1/11/2010 Partial Pass Four Seasons 1/12/2010 Level 006 6103 Drywall 1/12/2010 Fail Four Seasons 1/13/2010 Level 006 611 Drywall Level 6 BOH 1/13/2010 Partial Pass 2nd Layer Drywall Tnsnectinn Four Seasons 1/13/2010 Level 005 501 Drywall Level 5 Area 2 1/13/2010 Partial Pass ist Layer Drywall Tnsnectinn Four Seasons 1/19/2010 Level 006 6103 Drywall 1/19/2010 Partial Pass Four Seasons 1/19/2010 Level 004 402 Drywall Shaft Inspection 1/19/2010 Partial Pass Level 4 Area 2 &3B Four Seasons 1/19/2010 Level 004 402 Rough Frame Shaft Inspection 1/19/2010 Partial Pass Level 4 Area 2 &3B Four Seasons 1/19/2010 Level 004 402 Shaft Shaft Inspection 1/19/2010 Partial Pass Level 4 Area 2 &3B Four Seasons 1/19/2010 Level 005 501 Drywall Level 5 Area 2 1/19/2010 Partial Pass &3B Shaft Insnection Four Seasons 1/19/2010 Level 005 501 Rough Frame Level 5 Area 2 1/19/2010 Partial Pass &3B Shaft Insnection Four Seasons 1/19/2010 Level 005 501 Shaft Level 5 Area 2 1/19/2010 Partial Pass & 3B Shaft Insoection Four Seasons 1/19/2010 Level 006 611 Drywall Shaft Inspection 1/19/2010 Partial Pass Level 6 Area 2 &3B Four Seasons 1/19/2010 Level 006 611 Rough Frame Shaft Inspection 1/19/2010 Partial Pass Level 6 Area 2 &3B Four Seasons 1/19/2010 Level 006 611 Shaft Shaft Inspection 1/19/2010 Partial Pass Level 6 Area 2 &3B Four Seasons 1/19/2010 Level 007 701 Drywall Shaft Inspection 1/19/2010 Partial Pass Level 7 Area 2 &3B Four Seasons 1/19/2010 Level 007 701 Rough Frame Shaft Inspection 1/19/2010 Partial Pass Level 7 Area 2 &3B Four Seasons 1/19/2010 Level 007 701 Shaft Shaft Inspection 1/19/2010 Partial Pass Level 7 Area 2 &3B Four Seasons 1/19/2010 Level 009 901 Drywall Shaft Inspection 1/19/2010 Partial Pass Level 9 Area 2 &3B Four Seasons 1/19/2010 Level 009 901 Rough Frame Shaft Inspection 1/19/2010 Partial Pass Level 9 Area 2 & 3B Four Seasons 1/19/2010 Level 009 901 Shaft Shaft Inspection 1/19/2010 Partial Pass Level 9 Area 2 &3B Four Seasons 1/20/2010 Level 006 611 Drywall Horizontal Shaft 1/20/2010 Partial Pass Level 6 Corridor Four Seasons 1/20/2010 Level 006 611 Rough Frame Horizontal Shaft 1/20/2010 Partial Pass Level 6 Corridor Four Seasons 1/20/2010 Level 006 611 Shaft Horizontal Shaft 1/20/2010 Cancelled Level 6 Corridor Four Seasons 1/20/2010 Level 006 6220 Drywall Demising Wall 1/20/2010 Pass Room 6220 I � I � I � � Four Seasons 1/20/2010 Level 006 6220 Rough Frame Demising Wall 1/20/2010 Pass Room 6220 Four Seasons 1/20/2010 Level 005 501 Drywall 2nd Layer Level 1/20/2010 Partial Pass 5 Corridor Area 2 &3B Four Seasons 1/20/2010 Building Exterior 000 Other SNOWMELT 1/20/2010 Partial Pass FOR POOL PAVILION STATRS � Four Seasons 1/21/2010 Level 004 C-401 Rough Electric 1/21/2010 Pass Four Seasons 1/21/2010 Level 005 C-501 Rough Electric 1/21/2010 Pass Four Seasons 1/21/2010 Level 006 C-601 Rough Electric 1/21/2010 Partial Pass Four Seasons 1/22/2010 Level 003 351 Rough Frame 1/22/2010 Pass Four Seasons 1/22/2010 Level 003 355 Rough Frame 1/22/2010 Pass Four Seasons 1/22/2010 Level 003 376 Rough Frame 1/22/2010 Pass Four Seasons 1/22/2010 Level 003 378 Rough Frame 1/22/2010 Pass Four Seasons 1/22/2010 Level 003 381 Rough Frame 1/22/2010 Pass Four Seasons 1/22/2010 Level 003 333 Rough Duct Wrap and 1/22/2010 Fail Mechanical Fire Wrap - Include ROOM 337 Too PLEASE Four Seasons 1/22/2010 Level 003 334 Rough Duct Wrap and 1/22/2010 Fail Mechanical Fire Wrap - Include ROOM 337 Too PLEASE � � � Four Seasons 1/22/2010 Level 003 338 Rough Duct Wrap and 1/22/2010 Fail Mechanical Fire Wrap - Include ROOM 337 Too PLEASE � � � Four Seasons 1/22/2010 Level 003 341 Rough Duct Wrap and 1/22/2010 Fail Mechanical Fire Wrap - Include ROOM 337 Too PLEASE Four Seasons 1/22/2010 Level 003 342 Rough Duct Wrap and 1/22/2010 Fail Mechanical Fire Wrap - Include ROOM 337 Too PLEASE � � � Four Seasons 1/22/2010 Level 003 343 Rough Duct Wrap and 1/22/2010 Fail Mechanical Fire Wrap - Include ROOM 337 Too PLEASE � � � Four Seasons 1/22/2010 Level 003 347 Rough Duct Wrap and 1/22/2010 Fail Mechanical Fire Wrap - Include ROOM 337 Too PLEASE � � � Four Seasons 1/22/2010 Level 003 C-303 Rough Duct Wrap and 1/22/2010 Pass Mechanical Fire Wrap - Include ROOM 337 Too PI FASF Four Seasons 1/22/2010 Level 003 E-313 Rough Duct Wrap and 1/22/2010 Pass Mechanical Fire Wrap - Include ROOM 337 Too PI FASF Four Seasons 1/22/2010 Level 004 M-402B Rough Duct Wrap & 1/22/2010 Cancelled Mechanical Fire Wrap - ROOM 402A PIPasP Four Seasons 1/26/2010 Building Exterior 000 Underground 1/26/2010 Partial Pass Mechanical Four Seasons 1/28/2010 Level 003 3005 Other PT repair rough- 1/28/2010 Pass in inspection - Area 1 & 3A Four Seasons 1/28/2010 Level 004 4004 Other PT repair rough- 1/28/2010 Pass in inspection - Area 1 &3A Four Seasons 1/28/2010 Level 005 501 Other PT repair rough- 1/28/2010 Pass in inspection - Area 1 &3A Four Seasons 1/28/2010 Level 006 6101 Other PT repair rough- 1/28/2010 Pass in inspection - Area 1 &3A Four Seasons 1/29/2010 Level 005 5104 Insulation 1/29/2010 Partial Pass � - � . Ma� Denney Matt Denney � Matt Denney Matt Denney laundry 1/2", Matt Denney kitchen 1" and Area 2 3rd floor 3/4"_ pressure test Matt Denney required - snowmelt. 100# test on Nick Chand snowmelt re-routed Matt Denney heat/chilled. DWV - Swimsuit Matt Denney dryer. DWV - Swimsuit Matt Denney dryer. drywall on walls Nick Chand ok drywall ok on Nick Chand walls � walls ok for Nick Chand drvwall drywall ok on Nick Chand walls celing frame ok Nick Chand celing frame ok Nick Chand frame ok at Nick Chand celin4 celing frame ok Nick Chand frame ok at Nick Chand celina �, celing frame ok Nick Chand Matt Denney above ceiling. Matt Denney � � � above ceiling Matt Denney � � I above ceiling Matt Denney above ceiling Matt Denney � � I insulation ok Nick Chand insulation ok Nick Chand insulation ok Nick Chand walls and Matt Denney ceilings; exclude area south of columns. Matt Denney � Matt Denney Matt Denney corridor drywall Nick Chand ok I corridor drywall Nick Chand ok insulation ok in Nick Chand back of house ok to close shaft Nick Chand � ok to close shaft Nick Chand ok to close shaft Nick Chand ok to close shaft Nick Chand ok to close shaft Nick Chand ok to close shaft Nick Chand ok to close shaft Nick Chand ok to close shaft Nick Chand ok to close shaft Nick Chand � ok to close shaft Nick Chand ok to close shaft Nick Chand ok to close shaft Nick Chand called contact Nick Chand no answer � called contact Nick Chand and no answer Matt Denney � Matt Denney Matt Denney Matt Denney Matt Denney Ma� Denney Ma� Denney Matt Denney � Matt Denney Matt Denney Matt Denney � Ma� Denney Matt Denney Matt Denney Matt Denney � Matt Denney Matt Denney � Matt Denney Ma� Denney � � Matt Denney � � Matt Denney electrical in Matt Denney shaft. electrical in Matt Denney shaft. � W I electrical in Matt Denney shaft. electrical in Matt Denney shaft. electrical in Matt Denney shaft. electrical in Matt Denney shaft. electrical in Matt Denney shaft. electrical in Matt Denney shaft. electrical in Matt Denney shaft. electrical in Matt Denney shaft. electrical in Matt Denney shaft. � W I electrical in Matt Denney shaft. electrical in Matt Denney shaft. electrical in Matt Denney shaft. electrical in Matt Denney shaft. electrical in Matt Denney shaft. � � I electrical in Matt Denney shaft. � � I electrical in Matt Denney shaft. electrical in Matt Denney shaft. electrical in Matt Denney shaft. electrical in Matt Denney shaft. � � I electrical in Matt Denney shaft. electrical in Matt Denney shaft. electrical in Matt Denney shaft. electrical in Matt Denney shaft. electrical in Matt Denney shaft. electrical in Matt Denney shaft. electrical in Matt Denney shaft. electrical in Matt Denney shaft. electrical in Matt Denney shaft. electrical in Matt Denney shaft. electrical in Matt Denney shaft. electrical in Matt Denney shaft. electrical in Matt Denney shaft. electrical in Matt Denney shaft. � W I electrical in Matt Denney shaft. electrical in Matt Denney shaft. � � I electrical in Matt Denney shaft. � � I electrical in Matt Denney shaft. � � � electrical in Matt Denney shaft. electrical in Matt Denney shaft. � W � electrical in Matt Denney shaft. I need to submit Nick Chand revision to plans for review and aproval of the celing height I changes need to submit Nick Chand plans for review on the changes in celing heigts of the exit passageway. attic exhaust Nick Chand duct rough ok not for unit duct rough just for termination of exhaust duct. � unit duct HVAC Nick Chand rouah ok wall and ceiling Matt Denney rouah 100# test on Nick Chand hydronics going around the fire command room. W W � Matt Denney Matt Denney Matt Denney Matt Denney Matt Denney walls and Matt Denney ceilinas. drywall ok lst Nick Chand layer at Back of house office drywall at 5th Nick Chand floor corridor � ist laver ok drywall fail Nick Chand drywall ok at Nick Chand BOH 2nd layer I ist layer of Nick Chand drywall ok at corridor area 2. drywall ok in Nick Chand unit Shaft ok Nick Chand Shaft ok Nick Chand shaft ok Nick Chand shaft ok Nick Chand shaft ok Nick Chand shaft ok Nick Chand I shaft ok Nick Chand shaft ok Nick Chand shaft ok Nick Chand shaft ok Nick Chand shaft ok Nick Chand shaft ok Nick Chand shaft ok Nick Chand shaft ok Nick Chand shaft ok Nick Chand shaft ok Nick Chand shaft ok Nick Chand � Matt Denney demising wall Matt Denney btwn 6Z20 and 6218, and shaft wall rebuild in h»n demising wall Matt Denney btwn 6220 and 6218, and shaft wall rebuild in ���n shaft ok Nick Chand Snowmelt for Matt Denney pool pavillion stairs. 100psi tPSI'. ceilings Matt Denney ceilings Matt Denney walls only Matt Denney walls and Matt Denney ceilinqs. walls and Matt Denney ceilinqs. walls and Matt Denney ceilinqs walls and Matt Denney ceilinqs walls and Matt Denney ceilinas Manufacturer Matt Denney information for product Fyrewrap Elite 1.5 states - 2 layer system for 2HR grease duct protection. 1 layer .__.._��..a Manufacturer Matt Denney information for product Fyrewrap Elite � 1.5 states - 2 layer system for 2HR grease duct protection. 1 layer .__�_��..., Manufacturer Matt Denney information for product Fyrewrap Elite 1.5 states - 2 layer system for 2HR grease duct protection. 1 layer .__.._��..a Manufacturer Matt Denney information for product Fyrewrap Elite 1.5 states - 2 layer system for 2HR grease duct protection. 1 layer .��i�ll'.J Manufacturer Matt Denney information for product Fyrewrap Elite � 1.5 states - 2 layer system for 2HR grease duct protection. 1 layer .__�_��..., Manufacturer Matt Denney information for product Fyrewrap Elite 1.5 states - 2 layer system for 2HR grease duct protection. 1 layer .__.._��..a Manufacturer Matt Denney information for product Fyrewrap Elite 1.5 states - 2 layer system for 2HR grease duct protection. 1 layer .��i�II�.J walls and Matt Denney ceilings. � � I walls and Matt Denney ceilings. � Matt Denney � 100# test on Nick Chand snowmelt reinspection of Matt Denney previously inspected framing. this I area has been re-opened for structural evaluatuion for concrete columns. the framing and drywall that has been removed is in non-rated construction. reinspection of Matt Denney previously inspected framing. this I area has been re-opened for structural evaluatuion for concrete columns. the framing and drywall that has been removed is in non-rated construction. reinspection of Matt Denney previously inspected framing. this I area has been re-opened for structural evaluatuion for concrete columns. the framing and drywall that has been removed is in non-rated construction. reinspection of Matt Denney previously inspected framing. this I area has been re-opened for structural evaluatuion for concrete columns. the framing and drywall that has been removed is in non-rated construction. insulation in Matt Denney corridor wall not completed at this time, this inspection can � be performed from the corridor side at a later date.