HomeMy WebLinkAboutB06-0196 Detail Inspection Report 12.10.2009 to 02.01.2 Inspection Detail Report 12/ 10/ 2009 - 02/01/ 2010
� � , , ' � - � � � - � � r' • � e r - � .�...fl - , — � .U'I!l�
�
Four Seasons 12/11/2009 Level 006 611 Insulation Corridor 611, 12/il/2009 Pass
612, 613 & 614
Four Seasons 12/11/2009 Level 006 612 Insulation Corridor 611, 12/11/2009 Pass
612, 613 & 614
Four Seasons 12/11/2009 Level 006 613 Insulation Corridor 611, 12/11/2009 Pass
612, 613 & 614
Four Seasons 12/11/2009 Level 006 614 Insulation Corridor 611, 12/11/2009 Pass
612, 613 & 614
Four Seasons 12/14/2009 Level 003 350 Rough Plumbing Copper vents 12/14/2009 Pass
for gas
regulators.
Four Seasons 12/14/2009 Level 005 522 Rough Snowmelt 12/14/2009 Fail
Mechanical tubing for
loadina dock.
Four Seasons 12/15/2009 Level 005 522 Rough Level 5 Loading 12/15/2009 Partial Pass
Mechanical Dock Snowmelt
Tubing and Air
TPSt �
FourSeasons 12/14/2009 Level 005 5-502 Rough 12/14/2009 Pass
Mechanical
Four Seasons 12/14/2009 Level 002 250C Rough Plumbing 12/14/2009 Pass
Four Seasons 12/14/2009 Level 002 268 Rough Plumbing 12/14/2009 Pass �
Four Seasons 12/18/2009 Level 005 504 Drywall 12/18/2009 Partial Pass
Four Seasons 12/18/2009 Level 005 520 Drywall 12/18/2009 Partial Pass
W
Four Seasons 12/18/2009 Level 005 531 Drywall 12/18/2009 Partial Pass
Four Seasons 12/18/2009 Level 005 545 Drywall 12/18/2009 Partial Pass
Four Seasons 12/18/2009 Level 005 504 Rough Frame 12/18/2009 Partial Pass
Four Seasons 12/18/2009 Level 005 520 Rough Frame 12/18/2009 Partial Pass
Four Seasons 12/18/2009 Level 005 531 Rough Frame 12/18/2009 Partial Pass
Four Seasons 12/18/2009 Level 005 545 Rough Frame 12/18/2009 Partial Pass
Four Seasons 12/18/2009 Level 003 355 Rough Frame 12/18/2009 Partial Pass
Four Seasons 12/18/2009 Level 003 381 Rough Frame 12/18/2009 Partial Pass
Four Seasons 12/22/2009 Level 003 381 Rough Electric CEILING ONLY 12/22/2009 Cancelled
Please
Four Seasons 12/22/2009 Level 005 524 Rough Electric ROOMS: 531, 12/22/2009 Pass
525, 525A,
� � � � I 528B528A 527,
CEILING ONLY
PIPACP
Four Seasons 12/22/2009 Level 005 525 Rough Electric ROOMS: 531, 12/22/2009 Pass
525, 525A,
i � i � I 525B, 524, 527,
I I 528, 528A -
CEILING ONLY
PIPaCP
Four Seasons 12/22/2009 Level 005 528 Rough Electric ROOMS: 531, 12/22/2009 Pass
525, 525A,
525B, 524, 527,
528, 528A -
CEILING ONLY
PIPaCP
Four Seasons 12/22/2009 Level 005 531 Rough Electric ROOMS: 531, 12/22/2009 Pass
525, 525A,
525B, 524, 527,
� � � � � 528, 528A - �
CEILING ONLY
PIPACP
Four Seasons 12/22/2009 Level 006 6220 Insulation Under Deck 12/22/2009 Partial Pass
Insulation
Four Seasons 12/22/2009 Level 006 6222 Insulation Under Deck 12/22/2009 Partial Pass
Insulation
Four Seasons 12/22/2009 Level 006 6224 Insulation Under Deck 12/22/2009 Partial Pass
Insulation
Four Seasons 12/22/2009 Level 003 350 Rough Electric 12/22/2009 Partial Pass
Four Seasons 12/23/2009 Level 005 5104 Rough Electric 12/23/2009 Pass
Four Seasons 12/23/2009 Level 006 6103 Rough Electric 12/23/2009 Pass
Four Seasons 12/23/2009 Level 006 6104 Rough Electric 12/23/2009 Pass
Four Seasons 12/28/2009 Level 003 3005 Drywall Level 3 12/28/2009 Partial Pass
Corridors - 2nd
Layer Drywall
Tnsnectinn
Four Seasons 12/28/2009 Level 004 4004 Drywall Level 4 12/28/2009 Partial Pass
Corridors - 1st
Layer Drywall
Tnsnectinn
Four Seasons 12/28/2009 Level 006 611 Insulation Level 6 BOH 12/28/2009 Partial Pass
Insulation
Insnection
Four Seasons 12/28/2009 Level 004 G-413 Rough Plumbing 12/28/2009 Partial Pass
Four Seasons 12/28/2009 Level 006 617 Rough Plumbing 12/28/2009 Partial Pass
Four Seasons 12/28/2009 Level 006 619 Rough Plumbing 12/28/2009 Partial Pass
Four Seasons 12/28/2009 Level 006 G-616 Rough Plumbing 12/28/2009 Partial Pass
Four Seasons 12/28/2009 Level 007 713 Rough Plumbing 12/28/2009 Partial Pass
Four Seasons 12/28/2009 Level 007 716 Rough Plumbing 12/28/2009 Partial Pass
Four Seasons 12/28/2009 Level 007 G-703 Rough Plumbing 12/28/2009 Partial Pass
Four Seasons 12/28/2009 Level 008 G-802 Rough Plumbing 12/28/2009 Partial Pass
Four Seasons 12/28/2009 Level 008 G-812 Rough Plumbing 12/28/2009 Partial Pass
Four Seasons 12/28/2009 Level 008 G-816 Rough Plumbing 12/28/2009 Partial Pass
Four Seasons 12/28/2009 Level 010 G-1013 Rough Plumbing 12/28/2009 Partial Pass
Four Seasons 12/28/2009 Level 010 1001 Rough Plumbing 12/28/2009 Partial Pass
Four Seasons 12/30/2009 Level 010 1011 Final Mechanical Attic Duct Work 12/30/2009 Fail �
Four Seasons 12/30/2009 Level 010 1012 Final Mechanical Attic Duct Work 12/30/2009 Fail
Four Seasons 12/31/2009 Level 003 X Rough Frame Level 3 Corridor 12/31/2009 Cancelled
Rough Frame
Four Seasons 12/31/2009 Level 004 4004 Rough Frame Level 4 Corridor 12/31/2009 Cancelled
Rough Frame
Four Seasons 12/31/2009 Level 005 501 Rough Frame Level 5 Corridor 12/31/2009 Pass
Rough Frame
Four Seasons 12/31/2009 Level 007 7315 Rough Electric Walls &Ceilings 12/31/2009 Pass
- PM Inspection
Please
Four Seasons 12/31/2009 Level 007 7501 Rough Electric Walls &Ceilings 12/31/2009 Pass
- PM Inspection
Please
Four Seasons 12/31/2009 Level 007 7502 Rough Electric Walls &Ceilings 12/31/2009 Pass
- PM Inspection
Please
Four Seasons 12/31/2009 Level 007 7503 Rough Electric Walls &Ceilings 12/31/2009 Pass
- PM Inspection
Please
Four Seasons 12/31/2009 Level 007 C-712 Rough Electric Wall &Ceilings - 12/31/2009 Pass
PM inspection
olease
Four Seasons 12/31/2009 Level 007 C-716 Rough Electric Wall &Ceilings - 12/31/2009 Pass
PM inspection
nlease
Four Seasons 12/31/2009 Level 007 C-717 Rough Electric Wall &Ceilings - 12/31/2009 Pass
PM inspection
olease
Four Seasons 12/31/2009 Level 007 C711 Rough Electric Wall &Ceilings - 12/31/2009 Pass
PM inspection
nlease
Four Seasons 12/31/2009 Level 007 E-712 Rough Electric Wall &Ceilings - 12/31/2009 Pass
PM inspection
olease
Four Seasons 12/31/2009 Level 007 E-712A Rough Electric Wall &Ceilings - 12/31/2009 Pass
PM inspection
nlease
Four Seasons 12/31/2009 Level 007 G-711 Rough Electric Wall &Ceilings - 12/31/2009 Pass
PM inspection
olease
Four Seasons 12/31/2009 Level 007 G-712 Rough Electric Wall &Ceilings - 12/31/2009 Pass
PM inspection
olease
Four Seasons 12/31/2009 Level 007 G-713 Rough Electric Wall &Ceilings - 12/31/2009 Pass
PM inspection
nlease
Four Seasons 12/31/2009 Level 007 G-715 Rough Electric Wall &Ceilings - 12/31/2009 Pass
PM inspection
nlease
Four Seasons 12/31/2009 Level 007 G-716 Rough Electric Wall &Ceilings - 12/31/2009 Pass �
PM inspection
nlease
Four Seasons 12/31/2009 Level 002 201 Rough Electric Electrical Shafts 12/31/2009 Cancelled
A & B between
Level 2 & 10 -
� � � � � PM inspection � �
please
Four Seasons 12/31/2009 Level 002 201 Shaft Electrical Shafts 12/31/2009 Cancelled
A & B between
� � � � I Level 2 & 10 - �
PM inspection
please
Four Seasons 12/31/2009 Level 006 611 Drywall Level 6 BOH 1st 12/31/2009 Pass
layer drywall
outside walls
nnlv
Four Seasons 1/5/2010 Level 002 210A Rough Electric Electrical Shaft 1/5/2010 Pass
Inspection - PM
Inspection
nlPasP
Four Seasons 1/5/2010 Level 002 218 Rough Electric Electrical Shaft 1/5/2010 Pass
Inspection - PM
Inspection
nlPasP W �
Four Seasons 1/5/2010 Level 003 376 Rough Electric Electrical Shaft 1/5/2010 Pass
Inspection - PM
Inspection
nlPasP
Four Seasons 1/5/2010 Level 003 E-302 Rough Electric Electrical Shaft 1/5/2010 Pass
Inspection - PM
Inspection
nlPasP
Four Seasons 1/5/2010 Level 004 E-402A Rough Electric Electrical Shaft 1/5/2010 Pass
Inspection - PM
Inspection
nIP�sP
Four Seasons 1/5/2010 Level 004 G-413 Rough Electric Electrical Shaft 1/5/2010 Pass
Inspection - PM
Inspection
nlPasP
Four Seasons 1/5/2010 Level 005 G-502 Rough Electric Electrical Shaft 1/5/2010 Pass
Inspection - PM
inspection
nlPasP
Four Seasons 1/5/2010 Level 005 G-513 Rough Electric Electrical Shaft 1/5/2010 Pass
Inspection - PM
inspection
nlPasP
Four Seasons 1/5/2010 Level 005 G-515 Rough Electric Electrical Shaft 1/5/2010 Pass
Inspection - PM
inspection
nIP�sP
Four Seasons 1/5/2010 Level 006 G-604 Rough Electric Electrical Shaft 1/5/2010 Pass
Inspection - PM
inspection
nlPasP
Four Seasons 1/5/2010 Level 007 G-703 Rough Electric Electrical Shaft 1/5/2010 Pass
Inspection - PM
inspection
nlPasP W �
Four Seasons 1/5/2010 Level 007 G-713 Rough Electric Electrical Shaft 1/5/2010 Pass
Inspection - PM
inspection
nlPasP
Four Seasons 1/5/2010 Level 008 C-801 Rough Electric Electrical Shaft 1/5/2010 Pass
Inspection - PM
inspection
nlPasP
Four Seasons 1/5/2010 Level 008 G-802 Rough Electric Electrical Shaft 1/5/2010 Pass
Inspection - PM
inspection
nlPasP
Four Seasons 1/5/2010 Level 008 G-812 Rough Electric Electrical Shaft 1/5/2010 Pass
Inspection - PM
inspection
nlPasP
Four Seasons 1/5/2010 Level 009 901 Rough Electric NOTE: Room 1/5/2010 Pass
901 should be
Room M-901 -
� � � � I Electrical Shaft �
Inspection - PM
Inspection
nio��o
Four Seasons 1/5/2010 Level 009 G-911 Rough Electric NOTE: Room 1/5/2010 Pass
901 should be
Room M-901 -
Electrical Shaft
� I Inspection - PM �
Inspection
nlo�co
Four Seasons 1/5/2010 Level 009 9001 Rough Electric PERMIT: E07- 1/5/2010 Pass
0126 - Electrical
Shaft Inspection
- PM Inspection
please
Four Seasons 1/5/2010 Level 010 G-1001 Rough Electric Electrical Shaft 1/5/2010 Pass
Inspection - PM
Inspection
nlPasP
Four Seasons 1/5/2010 Level 010 G-1013 Rough Electric Electrical Shaft 1/5/2010 Pass
Inspection - PM
Inspection
nlPasP
Four Seasons 1/5/2010 Level 010 1001 Rough Electric PERMIT: E07- 1/5/2010 Pass
0126 - Electrical
� � � � I Shaft Inspection
- PM Inspection
please
Four Seasons 1/5/2010 Level 002 210A Shaft Electrical Shaft 1/5/2010 Pass
Inspection - PM
Inspection
nlPasP
Four Seasons 1/5/2010 Level 002 218 Shaft Electrical Shaft 1/5/2010 Pass
Inspection - PM
Inspection
nlease
Four Seasons 1/5/2010 Level 003 376 Shaft Electrical Shaft 1/5/2010 Pass
Inspection - PM
Inspection
nlPasP
Four Seasons 1/5/2010 Level 003 E-302 Shaft Electrical Shaft 1/5/2010 Pass
Inspection - PM
Inspection
nlPasP
Four Seasons 1/5/2010 Level 004 E-402A Shaft Electrical Shaft 1/5/2010 Pass
Inspection - PM
Inspection � �
nlPasP
Four Seasons 1/5/2010 Level 004 G-413 Shaft Electrical Shaft 1/5/2010 Pass
Inspection - PM
Inspection
nlPasP
Four Seasons 1/5/2010 Level 005 G-502 Shaft Electrical Shaft 1/5/2010 Pass
Inspection - PM
inspection
nlPasP
Four Seasons 1/5/2010 Level 005 G-513 Shaft Electrical Shaft 1/5/2010 Pass
Inspection - PM
inspection
nlPasP
Four Seasons 1/5/2010 Level 005 G-515 Shaft Electrical Shaft 1/5/2010 Pass
Inspection - PM
inspection
nlPasP
Four Seasons 1/5/2010 Level 006 G-604 Shaft Electrical Shaft 1/5/2010 Pass
Inspection - PM
inspection
nlPasP
Four Seasons 1/5/2010 Level 007 G-703 Shaft Electrical Shaft 1/5/2010 Pass
Inspection - PM
inspection
nlPasP
Four Seasons 1/5/2010 Level 007 G-713 Shaft Electrical Shaft 1/5/2010 Pass
Inspection - PM
inspection
nIP�sP
Four Seasons 1/5/2010 Level 008 C-801 Shaft Electrical Shaft 1/5/2010 Pass
Inspection - PM
inspection
nlPasP
Four Seasons 1/5/2010 Level 008 G-802 Shaft Electrical Shaft 1/5/2010 Pass
Inspection - PM
inspection
nlPasP W �
Four Seasons 1/5/2010 Level 008 G-812 Shaft Electrical Shaft 1/5/2010 Pass
Inspection - PM
inspection
nlPasP
Four Seasons 1/5/2010 Level 009 901 Shaft NOTE: Room 1/5/2010 Pass
901 should be
Room M-901 -
� � � � I Electrical Shaft �
Inspection - PM
Inspection
nio��o
Four Seasons 1/5/2010 Level 009 G-911 Shaft NOTE: Room 1/5/2010 Pass
901 should be
Room M-901 -
� � � � I Electrical Shaft �
Inspection - PM
Inspection
nlo�co
Four Seasons 1/5/2010 Level 009 9001 Shaft PERMIT: E07- 1/5/2010 Pass
0126 - Electrical
� � � � I Shaft Inspection
- PM Inspection
please
Four Seasons 1/5/2010 Level 010 G-1001 Shaft Electrical Shaft 1/5/2010 Pass
Inspection - PM
Inspection
nIP�sP
Four Seasons 1/5/2010 Level 010 G-1013 Shaft Electrical Shaft 1/5/2010 Pass
Inspection - PM
Inspection
nlPasP
Four Seasons 1/5/2010 Level 010 1001 Shaft PERMIT: E07- 1/5/2010 Pass
0126 - Electrical
Shaft Inspection
� � � � � - PM Inspection
please
Four Seasons 1/7/2010 Level 004 402 Rough Frame Corridor 401 & 1/7/2010 Fail
402 Ceiling
Rough Frame
� � � � I Inspection �
Four Seasons 1/7/2010 Level 004 C-401 Rough Frame Corridor 401 & 1/7/2010 Fail
402 Ceiling
Rough Frame
Inspection
Four Seasons 1/7/2010 Level 010 1002 Rough Attic duct to 1/7/2010 Partial Pass
Mechanical plenum - Final
Rough
� � � � I Mechanical � �
Four Seasons 1/7/2010 Level 008 8308 Rough Duct Rough In 1/7/2010 Partial Pass
Mechanical
Four Seasons 1/5/2010 Level 007 G-713 Rough Electric shaft 1/5/2010 Pass
Four Seasons 1/7/2010 Level 005 535 Rough 1/7/2010 Partial Pass
Mechanical
Four Seasons 1/8/2010 Level 006 6103 Insulation AM inspection 1/8/2010 Cancelled
please
Four Seasons 1/8/2010 Level 006 6104 Insulation AM inspection 1/8/2010 Cancelled
please
Four Seasons 1/8/2010 Level 004 4101 Shaft Shaft enclosure 1/8/2010 Pass
inspection
Four Seasons 1/8/2010 Level 005 5101 Shaft Shaft enclosure 1/8/2010 Pass
inspection
Four Seasons 1/8/2010 Level 006 6101 Shaft Shaft enclosure 1/8/2010 Pass
inspection
Four Seasons 1/8/2010 Level 003 355 Rough Electric 1/8/2010 Pass �
Four Seasons 1/11/2010 Level 006 611 Drywall Level 6 BOH ist 1/11/2010 Partial Pass
layer
Four Seasons 1/11/2010 Level 005 501 Rough Frame Level 5 Corridor 1/11/2010 Partial Pass
Four Seasons 1/12/2010 Level 006 6103 Drywall 1/12/2010 Fail
Four Seasons 1/13/2010 Level 006 611 Drywall Level 6 BOH 1/13/2010 Partial Pass
2nd Layer
Drywall
Tnsnectinn
Four Seasons 1/13/2010 Level 005 501 Drywall Level 5 Area 2 1/13/2010 Partial Pass
ist Layer
Drywall
Tnsnectinn
Four Seasons 1/19/2010 Level 006 6103 Drywall 1/19/2010 Partial Pass
Four Seasons 1/19/2010 Level 004 402 Drywall Shaft Inspection 1/19/2010 Partial Pass
Level 4 Area 2
&3B
Four Seasons 1/19/2010 Level 004 402 Rough Frame Shaft Inspection 1/19/2010 Partial Pass
Level 4 Area 2
&3B
Four Seasons 1/19/2010 Level 004 402 Shaft Shaft Inspection 1/19/2010 Partial Pass
Level 4 Area 2
&3B
Four Seasons 1/19/2010 Level 005 501 Drywall Level 5 Area 2 1/19/2010 Partial Pass
&3B Shaft
Insnection
Four Seasons 1/19/2010 Level 005 501 Rough Frame Level 5 Area 2 1/19/2010 Partial Pass
&3B Shaft
Insnection
Four Seasons 1/19/2010 Level 005 501 Shaft Level 5 Area 2 1/19/2010 Partial Pass
& 3B Shaft
Insoection
Four Seasons 1/19/2010 Level 006 611 Drywall Shaft Inspection 1/19/2010 Partial Pass
Level 6 Area 2
&3B
Four Seasons 1/19/2010 Level 006 611 Rough Frame Shaft Inspection 1/19/2010 Partial Pass
Level 6 Area 2
&3B
Four Seasons 1/19/2010 Level 006 611 Shaft Shaft Inspection 1/19/2010 Partial Pass
Level 6 Area 2
&3B
Four Seasons 1/19/2010 Level 007 701 Drywall Shaft Inspection 1/19/2010 Partial Pass
Level 7 Area 2
&3B
Four Seasons 1/19/2010 Level 007 701 Rough Frame Shaft Inspection 1/19/2010 Partial Pass
Level 7 Area 2
&3B
Four Seasons 1/19/2010 Level 007 701 Shaft Shaft Inspection 1/19/2010 Partial Pass
Level 7 Area 2
&3B
Four Seasons 1/19/2010 Level 009 901 Drywall Shaft Inspection 1/19/2010 Partial Pass
Level 9 Area 2
&3B
Four Seasons 1/19/2010 Level 009 901 Rough Frame Shaft Inspection 1/19/2010 Partial Pass
Level 9 Area 2
& 3B
Four Seasons 1/19/2010 Level 009 901 Shaft Shaft Inspection 1/19/2010 Partial Pass
Level 9 Area 2
&3B
Four Seasons 1/20/2010 Level 006 611 Drywall Horizontal Shaft 1/20/2010 Partial Pass
Level 6 Corridor
Four Seasons 1/20/2010 Level 006 611 Rough Frame Horizontal Shaft 1/20/2010 Partial Pass
Level 6 Corridor
Four Seasons 1/20/2010 Level 006 611 Shaft Horizontal Shaft 1/20/2010 Cancelled
Level 6 Corridor
Four Seasons 1/20/2010 Level 006 6220 Drywall Demising Wall 1/20/2010 Pass
Room 6220
I � I � I � �
Four Seasons 1/20/2010 Level 006 6220 Rough Frame Demising Wall 1/20/2010 Pass
Room 6220
Four Seasons 1/20/2010 Level 005 501 Drywall 2nd Layer Level 1/20/2010 Partial Pass
5 Corridor Area
2 &3B
Four Seasons 1/20/2010 Building Exterior 000 Other SNOWMELT 1/20/2010 Partial Pass
FOR POOL
PAVILION
STATRS �
Four Seasons 1/21/2010 Level 004 C-401 Rough Electric 1/21/2010 Pass
Four Seasons 1/21/2010 Level 005 C-501 Rough Electric 1/21/2010 Pass
Four Seasons 1/21/2010 Level 006 C-601 Rough Electric 1/21/2010 Partial Pass
Four Seasons 1/22/2010 Level 003 351 Rough Frame 1/22/2010 Pass
Four Seasons 1/22/2010 Level 003 355 Rough Frame 1/22/2010 Pass
Four Seasons 1/22/2010 Level 003 376 Rough Frame 1/22/2010 Pass
Four Seasons 1/22/2010 Level 003 378 Rough Frame 1/22/2010 Pass
Four Seasons 1/22/2010 Level 003 381 Rough Frame 1/22/2010 Pass
Four Seasons 1/22/2010 Level 003 333 Rough Duct Wrap and 1/22/2010 Fail
Mechanical Fire Wrap -
Include ROOM
337 Too
PLEASE
Four Seasons 1/22/2010 Level 003 334 Rough Duct Wrap and 1/22/2010 Fail
Mechanical Fire Wrap -
Include ROOM
337 Too
PLEASE
� � �
Four Seasons 1/22/2010 Level 003 338 Rough Duct Wrap and 1/22/2010 Fail
Mechanical Fire Wrap -
Include ROOM
337 Too
PLEASE
� � �
Four Seasons 1/22/2010 Level 003 341 Rough Duct Wrap and 1/22/2010 Fail
Mechanical Fire Wrap -
Include ROOM
337 Too
PLEASE
Four Seasons 1/22/2010 Level 003 342 Rough Duct Wrap and 1/22/2010 Fail
Mechanical Fire Wrap -
Include ROOM
337 Too
PLEASE
� � �
Four Seasons 1/22/2010 Level 003 343 Rough Duct Wrap and 1/22/2010 Fail
Mechanical Fire Wrap -
Include ROOM
337 Too
PLEASE
� � �
Four Seasons 1/22/2010 Level 003 347 Rough Duct Wrap and 1/22/2010 Fail
Mechanical Fire Wrap -
Include ROOM
337 Too
PLEASE
� � �
Four Seasons 1/22/2010 Level 003 C-303 Rough Duct Wrap and 1/22/2010 Pass
Mechanical Fire Wrap -
Include ROOM
337 Too
PI FASF
Four Seasons 1/22/2010 Level 003 E-313 Rough Duct Wrap and 1/22/2010 Pass
Mechanical Fire Wrap -
Include ROOM
337 Too
PI FASF
Four Seasons 1/22/2010 Level 004 M-402B Rough Duct Wrap & 1/22/2010 Cancelled
Mechanical Fire Wrap -
ROOM 402A
PIPasP
Four Seasons 1/26/2010 Building Exterior 000 Underground 1/26/2010 Partial Pass
Mechanical
Four Seasons 1/28/2010 Level 003 3005 Other PT repair rough- 1/28/2010 Pass
in inspection -
Area 1 & 3A
Four Seasons 1/28/2010 Level 004 4004 Other PT repair rough- 1/28/2010 Pass
in inspection -
Area 1 &3A
Four Seasons 1/28/2010 Level 005 501 Other PT repair rough- 1/28/2010 Pass
in inspection -
Area 1 &3A
Four Seasons 1/28/2010 Level 006 6101 Other PT repair rough- 1/28/2010 Pass
in inspection -
Area 1 &3A
Four Seasons 1/29/2010 Level 005 5104 Insulation 1/29/2010 Partial Pass
� - �
.
Ma� Denney
Matt Denney
� Matt Denney
Matt Denney
laundry 1/2", Matt Denney
kitchen 1" and
Area 2 3rd floor
3/4"_
pressure test Matt Denney
required -
snowmelt.
100# test on Nick Chand
snowmelt
re-routed Matt Denney
heat/chilled.
DWV - Swimsuit Matt Denney
dryer.
DWV - Swimsuit Matt Denney
dryer.
drywall on walls Nick Chand
ok
drywall ok on Nick Chand
walls �
walls ok for Nick Chand
drvwall
drywall ok on Nick Chand
walls
celing frame ok Nick Chand
celing frame ok Nick Chand
frame ok at Nick Chand
celin4
celing frame ok Nick Chand
frame ok at Nick Chand
celina �,
celing frame ok Nick Chand
Matt Denney
above ceiling. Matt Denney
� � �
above ceiling Matt Denney
� � I
above ceiling Matt Denney
above ceiling Matt Denney
� � I
insulation ok Nick Chand
insulation ok Nick Chand
insulation ok Nick Chand
walls and Matt Denney
ceilings; exclude
area south of
columns.
Matt Denney
� Matt Denney
Matt Denney
corridor drywall Nick Chand
ok I
corridor drywall Nick Chand
ok
insulation ok in Nick Chand
back of house
ok to close shaft Nick Chand �
ok to close shaft Nick Chand
ok to close shaft Nick Chand
ok to close shaft Nick Chand
ok to close shaft Nick Chand
ok to close shaft Nick Chand
ok to close shaft Nick Chand
ok to close shaft Nick Chand
ok to close shaft Nick Chand �
ok to close shaft Nick Chand
ok to close shaft Nick Chand
ok to close shaft Nick Chand
called contact Nick Chand
no answer �
called contact Nick Chand
and no answer
Matt Denney
� Matt Denney
Matt Denney
Matt Denney
Matt Denney
Ma� Denney
Ma� Denney
Matt Denney
� Matt Denney
Matt Denney
Matt Denney
� Ma� Denney
Matt Denney
Matt Denney
Matt Denney
� Matt Denney
Matt Denney
� Matt Denney
Ma� Denney
� �
Matt Denney
� �
Matt Denney
electrical in Matt Denney
shaft.
electrical in Matt Denney
shaft.
� W I
electrical in Matt Denney
shaft.
electrical in Matt Denney
shaft.
electrical in Matt Denney
shaft.
electrical in Matt Denney
shaft.
electrical in Matt Denney
shaft.
electrical in Matt Denney
shaft.
electrical in Matt Denney
shaft.
electrical in Matt Denney
shaft.
electrical in Matt Denney
shaft.
� W I
electrical in Matt Denney
shaft.
electrical in Matt Denney
shaft.
electrical in Matt Denney
shaft.
electrical in Matt Denney
shaft.
electrical in Matt Denney
shaft.
� � I
electrical in Matt Denney
shaft.
� � I
electrical in Matt Denney
shaft.
electrical in Matt Denney
shaft.
electrical in Matt Denney
shaft.
electrical in Matt Denney
shaft.
� � I
electrical in Matt Denney
shaft.
electrical in Matt Denney
shaft.
electrical in Matt Denney
shaft.
electrical in Matt Denney
shaft.
electrical in Matt Denney
shaft.
electrical in Matt Denney
shaft.
electrical in Matt Denney
shaft.
electrical in Matt Denney
shaft.
electrical in Matt Denney
shaft.
electrical in Matt Denney
shaft.
electrical in Matt Denney
shaft.
electrical in Matt Denney
shaft.
electrical in Matt Denney
shaft.
electrical in Matt Denney
shaft.
� W I
electrical in Matt Denney
shaft.
electrical in Matt Denney
shaft.
� � I
electrical in Matt Denney
shaft.
� � I
electrical in Matt Denney
shaft.
� � �
electrical in Matt Denney
shaft.
electrical in Matt Denney
shaft.
� W �
electrical in Matt Denney
shaft.
I
need to submit Nick Chand
revision to plans
for review and
aproval of the
celing height I
changes
need to submit Nick Chand
plans for review
on the changes
in celing heigts
of the exit
passageway.
attic exhaust Nick Chand
duct rough ok
not for unit duct
rough just for
termination of
exhaust duct. �
unit duct HVAC Nick Chand
rouah ok
wall and ceiling Matt Denney
rouah
100# test on Nick Chand
hydronics going
around the fire
command room.
W W �
Matt Denney
Matt Denney
Matt Denney
Matt Denney
Matt Denney
walls and Matt Denney
ceilinas.
drywall ok lst Nick Chand
layer at Back of
house office
drywall at 5th Nick Chand
floor corridor �
ist laver ok
drywall fail Nick Chand
drywall ok at Nick Chand
BOH 2nd layer I
ist layer of Nick Chand
drywall ok at
corridor area 2.
drywall ok in Nick Chand
unit
Shaft ok Nick Chand
Shaft ok Nick Chand
shaft ok Nick Chand
shaft ok Nick Chand
shaft ok Nick Chand
shaft ok Nick Chand I
shaft ok Nick Chand
shaft ok Nick Chand
shaft ok Nick Chand
shaft ok Nick Chand
shaft ok Nick Chand
shaft ok Nick Chand
shaft ok Nick Chand
shaft ok Nick Chand
shaft ok Nick Chand
shaft ok Nick Chand
shaft ok Nick Chand �
Matt Denney
demising wall Matt Denney
btwn 6Z20 and
6218, and shaft
wall rebuild in
h»n
demising wall Matt Denney
btwn 6220 and
6218, and shaft
wall rebuild in
���n
shaft ok Nick Chand
Snowmelt for Matt Denney
pool pavillion
stairs. 100psi
tPSI'.
ceilings Matt Denney
ceilings Matt Denney
walls only Matt Denney
walls and Matt Denney
ceilinqs.
walls and Matt Denney
ceilinqs.
walls and Matt Denney
ceilinqs
walls and Matt Denney
ceilinqs
walls and Matt Denney
ceilinas
Manufacturer Matt Denney
information for
product
Fyrewrap Elite
1.5 states - 2
layer system for
2HR grease
duct protection.
1 layer
.__.._��..a
Manufacturer Matt Denney
information for
product
Fyrewrap Elite �
1.5 states - 2
layer system for
2HR grease
duct protection.
1 layer
.__�_��...,
Manufacturer Matt Denney
information for
product
Fyrewrap Elite
1.5 states - 2
layer system for
2HR grease
duct protection.
1 layer
.__.._��..a
Manufacturer Matt Denney
information for
product
Fyrewrap Elite
1.5 states - 2
layer system for
2HR grease
duct protection.
1 layer
.��i�ll'.J
Manufacturer Matt Denney
information for
product
Fyrewrap Elite �
1.5 states - 2
layer system for
2HR grease
duct protection.
1 layer
.__�_��...,
Manufacturer Matt Denney
information for
product
Fyrewrap Elite
1.5 states - 2
layer system for
2HR grease
duct protection.
1 layer
.__.._��..a
Manufacturer Matt Denney
information for
product
Fyrewrap Elite
1.5 states - 2
layer system for
2HR grease
duct protection.
1 layer
.��i�II�.J
walls and Matt Denney
ceilings.
� � I
walls and Matt Denney
ceilings.
�
Matt Denney
�
100# test on Nick Chand
snowmelt
reinspection of Matt Denney
previously
inspected
framing. this I
area has been
re-opened for
structural
evaluatuion for
concrete
columns. the
framing and
drywall that has
been removed
is in non-rated
construction.
reinspection of Matt Denney
previously
inspected
framing. this I
area has been
re-opened for
structural
evaluatuion for
concrete
columns. the
framing and
drywall that has
been removed
is in non-rated
construction.
reinspection of Matt Denney
previously
inspected
framing. this I
area has been
re-opened for
structural
evaluatuion for
concrete
columns. the
framing and
drywall that has
been removed
is in non-rated
construction.
reinspection of Matt Denney
previously
inspected
framing. this I
area has been
re-opened for
structural
evaluatuion for
concrete
columns. the
framing and
drywall that has
been removed
is in non-rated
construction.
insulation in Matt Denney
corridor wall not
completed at
this time, this
inspection can �
be performed
from the
corridor side at
a later date.