HomeMy WebLinkAboutB06-0196 Locks Holds Notices Four Seasons L/H/N
Date Entered Entered By Comment Rev#
7/19/2006 Joe Suther ROUTED TO CIA 2 , MATT GENNETT, FIRE AND PUBLIC WORKS
7/20/2006 Mike McGee Initial Fire Department review of Fire Access and Egress Plan is Denied as noted
under A rovals.
8/16/2006 Joe Suther REVISIONS SUBMITTED ADDRESSING THE MASTER EXIT PLAN, SHEET
A0.3.00 THROUGH A0.3.10. ROUTED TO CIA(PICKED UP BY JIM WITH NO
STAMPS ON PLANS), MATT GENNETT, FIRE AND PUBLIC WORKS.
10/4/2006 Joe Suther ADDITIONAL MATERIAL FOR THE G & E SUBMITTED ROUTED TO CIA(2),
WARREN CAMPBELL, PUBLIC WORKS AND FIRE. 10/02/2006
10/4/2006 Joe Suther HOLY CROSS UTILITY AND DEWATERING PERMIT SUBMITTED AND
ROUTED TO CIA 2 , WARREN CAMPBELL, FIRE AND PUBLIC WORKS
10/12/2006 Joe Suther LETTER OF INTENT FOR A PHASED APPROACH SUBMITTED AND
ROUTED TO CIA 2 , WARREN CAMPBELL, FIRE AND PUBLIC WORKS.
10/24/2006 Lynne Campbell OUTSOURCED TO CIA: 80% BULIDING PERMIT FEES; 80% BUILDING PLAN
CHECK FEE; 100% ELECTRICAL FEES
10/26/2006 Joe Suther SHORING CALCULATIONS SUBMITTED ROUTED TO CIA, WARREN
CAMPBELL, FIRE AND PUBLIC WORKS
12/13/2006 Charlie Davis Staging Plan recieved showing location of construction trailer and proposed
location of temp power for trailer Routed to CIA,Public Works,Fire & Charlie
Davis
2/21/2007 Joe Suther ADDITIONAL STAGING PLAN MATERIAL SUBMITTED ROUTED TO PUBLIC
WORKS, WARREN CAMPBELL AND FIELD SET. CIA
3/15/2007 Lynne Campbell IF CUSTOMER ASKS, THE PLAN CHECK FEE HAS BEEN PAID IN FULL,
THEY CURRENTLY OWE FOR THE PERMIT FEE, $258,795.64, THE REC
FEES (WHEN CALCULATED)AND WILL CALL FEE. THE FEE SCREEN WILL
NOT READ THAT WAY DUE TO HOW THE MONEY WAS APPLIED ON THE
SECOND CHECK.
3/20/2007 Joe Suther FIRE AND LIFE SAFETY REPORT SUBMITTED ROUTED TOCIA(2),
WARREN CAMPBELL, FIRE AND PUBLIC WORKS
3/20/2007 Joe Suther G & E PACKAGE SUBMITTED AND ROUTED TO CIA(4), WARREN
CAMPBELL, FIRE AND PUBLIC WORKS.
3/21/2007 Leonard Sandoval Sta in plan denied, revison required.
3/29/2007 Matt Ro er IR:1215- Gradin and Excavation ermit a roved with conditions.
6/1/2007 Joe Suther REVISIONS ADDRESSING COMMENT SUBMITTED AND ROUTED TO CIA(2
AND 1/2 SET , WARREN CAMPBELL, FIRE AND PUBLIC WORKS
6/8/2007 Joe Suther CRANE FOOTING DESIGN PLANS SUBMITTED AND ROUTED TO CHARLIE
DAVIS (3)approved 6/12/07 Contractor notified. No addtional fees assessed
7/31/2007 Joe Suther REVISIONS SUBMITTED FOR ADDITIONAL WORK ADDED TO APPROVED
PHASED SCOPE OF WORK. ROUTED TO CIA (2), WARREN CAMPBELL,
FIRE AND PUBLIC WORKS
8/6/2007 John Plano Additional work approved for phasing. Underground plumbing, underground
electrical, rebar and concrete placement for elevator and sump pits. NO
APPROVAL FOR MAT SLAB
8/7/2007 Joe Suther REVISIONS ADDRESSING COMMENTS SUBMITTED AND ROUTED TO SAFE
BUILT (4-FIELD, OFFICE, SAFE-BUILT AND REDUCED SET), WARREN
CAMPBELL (REDUCED SET), FIRE AND PUBLIC WORKS.
8/13/2007 Lynne Campbell ALL INSPECTIONS ARE SCHEDULED DIRECTLY WITH SAFEBUILT (CIA).
9/13/2007 Lynne Campbell Ready for issue on full set. Field set located by the Fire and PW pick up boxes
on floor. Give these to customer.
\\VWS-Storage\Desktops$\cgodfrey\Desktop\B06-0196 Locks-Holds_Notices 1 of 6 12/28/2015
Date Entered Entered By Comment Rev#
9/13/2007 Joe Suther 3 SETS OF SHOP DRAWINGS SUBMITTED AND ROUTED SAFEBUILT (3)
9/25/2007 Joe Suther FIRE ALARM SYSTEM DEVICES 2 SUBMITTED, ROUTED TO FIRE.
10/8/2007 Warren Campbell Planning has released the Letter of Credit in the amount of$3,287,590.00 for
fillin the site in and radin to a arklike condition.
10/9/2007 Lynne Campbell LETTER OF CREDIT (COMPLETION BOND)#6466285 HAS BEEN
RETURNED TO LAYTON CONSTRUCTION COMPANY, 9090 S. SANDY
PKWY, SANDY, UT 84070.
10/9/2007 Joe Suther SHEER WALLS FORM BANNER REBAR SHOP DRAWINGS SUBMITTED
ROUTED TO SAFEBUILT 3
10/11/2007 Charlie Davis Routed Temp Gas Piping Plans to Safe Built 10/11/07. Plans were orginally
reviewed and routed to Vail Fire.
10/17/2007 Joe Suther SHEARWALL REBAR SHOP DRAWINGS FORM BANNER REBAR
SUBMITTED AND ROUTED TO SAFEBUILT 3
10/19/2007 John Plano Do not issue a mechanical permit until new mechanical drawings are submitted
and approved!
10/22/2007 Matt Ro er REV 4 IR 5881: Approved shop drawings for stamps only. No charge.
10/22/2007 Matt Ro er REV 3,IR 5512: SHOP DRAWINGS. NO ADDITIONAL CHARGE.
11/1/2007 Joe Suther Rev 6--RFI-0221 AND 0237 WITH RESPONSES FROM ARCHITECT
SUBMITTED AND ROUTED TO SAFEBUILT 3
11/9/2007 Joe Suther Rev 5 SHOP DRAWINGS SUBMITTED#03200-007 (STUD RAILS) FROM
SUNCOAST AND#3200-008 (LEVEL 2 SLAB AND COLUMN REINFORCING)
FROM BANNER. ROUTED TO SAFEBUILT 3
11/13/2007 Matt Royer REV5/IR6042. Approved shop drawings for designers stamps. No added
valuation.
11/16/2007 Joe Suther SHOP DRAWINGS#03365-002-POST TENSIONING MATERIALS-
ENCAPSULATION SYSTEM (3), #03365-001-POST TENSION SYSTEM AND
CALCS.-LEVEL 42 3 . ROUTED TO SAFE BUILT 3
11/28/2007 Lynne Campbell FOUR SEASONS OFFICE TRAILER PHONE 970-479-5389, FAX 970-479-
5916.
11/28/2007 Lynne Campbell Spoke to Loren at the job site that revisions 3, 4, 5 are ready to be picked up and
there is a balance due of$60.00.
11/29/2007 Joe Suther STRUCTURAL PLAN CHECK RESPONSES AND STRUCTURAL
CALCULATIONS (3), BULLETIN #001 STRUCTURAL ISSUES ONLY(3);
BULLETIN #002 BOTH STRUCTURAL AND ARCHITECTURAL ISSUES (3).
ROUTED TO SAFEBUILT.
11/30/2007 John Plano Rev7/IR6058. A roved RFI-0237, No added valuation.
11/30/2007 John Plano Rev6/IR6057. Approved RFI-0221, No added valuation.
12/7/2007 Charlie Davis Level 2 Wall Rebar Sho Drawin s recevied and sent to SafeBuilt
12/4/2007 Joe Suther REV.13 SAFEBUILT REFERENCE NUMBER SUBMITTAL#03200-016 (STUD
RAILS, LEVELS 4 &5) FORM SUNCOAST SUBMITTED AND ROUTED TO
SAFEBUILT 3
12/14/2007 Joe Suther REV 12 SAFEBUILT REFERENCE NUMBER LAYTON SUBMITTAL#05510-004
(EMBEDS @ LEVEL 1, 2, 3 ns 4) FROM JT STEEL, ROUTED TO SAFEBUILT
3
12/18/2007 John Plano Rev9/IR6236. Approved shop drawings for post-tension slabs, no added
valuation
12/21/2007 Matt Royer SAFEbuilt performs all inspections. For complete inspection history, please
contact SAFEbuilt at 970-328-1790.
12/21/2007 Joe Suther LAYTON SUBMITTAL#16700-001 FIRE ALARM DEVICES FROM LUDVIK
ELECTRIC SUBMITTED AND ROUTED TO MIKE MCGEE
12/24/2007 L nne Campbell Left messa e for Loren Revision#9 read for pick up. No fee due.
12/26/2007 John Plano Rev10/IR6252. A roved chan in a ost tension cable with thickened slab.
12/27/2007 Matt Ro er Rev11/IR6266,6267. Rebar shop drawin s reviewed for appropiate stamps
\\VWS-Storage\Desktops$\cgodfrey\Desktop\B06-0196 Locks-Holds_Notices 2 of 6 12/28/2015
Date Entered Entered By Comment Rev#
1/22/2008 Joe Suther SUPPLEMENTAL INFORMATION SUBMITTED AND ROUTD TO SAFEBUILT
3
1/29/2008 Joe Suther #05510-055 (EMBEDS @ LEVEL 5) SHOP DRAWINGS SUBMITTED ROUTED
TO SFB
2/1/2008 front counter asst REVISION SUBMITTED FOR BULLETINS 003,004,006 RECEIVED 1/21/08
APPLICATION ROUTED TO SAFE BUILT 2/1/08 NO ADDED VALUATION
2/5/2008 Joe Suther 3 COPIES, SEALED AND SIGNED, REMAINING STRUCTURAL PLAN CHECK
COMMENTS ( BULLETINS#013 AND STRUCTURAL CALCULATIONS FOR
BULLETINS#001 AND#002). ROUTED TO SAFE BUILT.(3)
2/7/2008 Joe Suther SHOP DRAWINGS SUBMITTED FOR CONCRETE REINFORCEMENT SLAB
LEVEL 4 PARTIAL. SUBMITTAL#03200-010. ROUTED TO SAFEBUILT (3)
3/12/2008 Joe Suther SHOP DRAWINGS FOR STEEL STAIRS F; ROUTED TO SAFEBUILT 3
3/12/2008 Joe Suther SHOP DRAWINGS FOR LEVEL 3 PT MILL CERTIFICATIONS SUBMITTED,
ROUTED TO SAFEBUILT 3
3/12/2008 Joe Suther SHOP DRAWINGS FOR EMBEDS/STRUCTURAL STEEL @ LEVELS 3, 4 AND
5. ROUTED TO SAFEBUILT 3
3/12/2008 Joe Suther SHOP DRAWINGS FOR CONCRETE POST-LEVEL 5 AND FRICTION LOSS
CALCULATIONS. ROUTED TO SAFEBUILT 3
3/21/2008 Joe Suther SHOP DRAWINGS SUBMITTED FOR CONCRETE SLAB-LEVEL 5. ROUTED
TO SAFEBUILT.
3/21/2008 Joe Suther SHOP DRAWINGS ADDRESSING METAL DECKING SHOPS POOL PAVILION
SUBMITTED, ROUTED TO SAFEBUILT 3
3/21/2008 Joe Suther SHOP DRAWINGS FOR CONCRETE POST-LEVEL 6 SUBMITTED AND
ROUTED TO SAFEBUILT
3/27/2008 John Plano SHOP DRAWINGS RECEIVED 3/27/08- FILED
3/28/2008 Rachel Friede SHOP DRAWINGS RECIEVED 3/28/08- ROUTED TO SAFEBUILT. PLEASE
CALL LOREN 970-401-0904
4/14/2008 Rachel Friede ROUTED CONCRETE REINFORCEMENT SHOP DRAWINGS TO SAFEBUILT
AND OFFICE SET
4/14/2008 Rachel Friede ROUTED EMBEDS/STRUCTURAL STEEL AT LEVEL 6 SHOP DRAWINGS TO
SAFEBUILT AND OFFICE SET
4/23/2008 Rachel Friede SHOP DRAWINGS OF STEEL STAIR J RECEIVED. ROUTED TO SAFEBUILT.
4/23/2008 Rachel Friede SHOP DRAWINGS FOR COLD-FORMED METAL FRAMING RECEIVED.
ROUTED TO SAFEBUILT.
4/28/2008 Mike McGee Unsafe Job site. Only one exit. Illegal storage of flammable gases. Open shafts.
Trip hazards. No Haz Com Plan No fire protection. Working on fire system
without permit. Mark Reed notified 13:00 hrs 04/28/08. Lock on Permit released
pending compliance with Fire Dept orders. Standpipe system must be installed
per IFC.
4/29/2008 Mike McGee Hazard Tag issued 04/29/08 for failure to comply with agreements to install
second exit. Hazard Tag effective starting at 19:00 hrs 04/29/08 and continues
until the second exit is installed and inspected. Second exit has been installed.
5/9/2008 Rachel Friede 2 SETS OF SHOP DRAWINGS SUBMITTED. ROUTED TO SAFEBUILT AND
FILE (OFFICE SET). SET ONE IS STEEL STAIR AE SHOPS, SET TWO IS
STEEL STAIR N SHOPS FOR GATE.
5/12/2008 Rachel Friede SHOP DRAWINGS FOR CONCRETE REINFORCEMENT SLAB LEVEL 7
RECEIVED. ROUTED TO FILE AND SAFEBUILT.
5/20/2008 Rachel Friede FIRE PROTECTION SPEC BINDERS, CALCS, SHOP DRAWINGS ROUTED
TO FIRE
\\VWS-Storage\Desktops$\cgodfrey\Desktop\B06-0196 Locks-Holds_Notices 3 of 6 12/28/2015
Date Entered Entered By Comment Rev#
5/21/2008 Rachel Friede Five bulletins received: BULLETING 12, 17, 20, 23 AND 23A ROUTED TO
SAFEBUILT
5/22/2008 Rachel Friede REVISION RECIEVED- ONE OUTDOOR SWIMMING POOL, 2 OUTDOOR
SPAS, 2 INDOOR SPAS, 2 INDOOR COLD PLUNGES- ROUTED TO JOHN
PLANO.
6/10/2008 Jennifer Eliuk REVISIONS REC'D FROM SAFEBUILT AFTER THEIR REVIEW FOR OTHER
DEPARTMENTS. ROUTED TO WARREN CAMPBELL, FIRE AND PUBLIC
WORKS.
6/9/2008 Jennifer Eliuk REVISIONS REC'D FROM HILL GALZIER: BULLETINS#025, 031, 035,
ROUTED TO JOHN PLANO
6/23/2008 Jennifer Eliuk REVISIONS FOR STORM AND SANITARY SEWERS REC'D, ROUTED 3
COPIES TO JOHN PLANO AND 1 COPY TO PUBLIC WORKS
7/3/2008 Jennifer Eliuk REVISIONS TO STORM/SEWER REC'D 7/1/08. ONE COPY ROUTED TO
JOHN PLANO, THREE COPIES ROUTED TO PW.
7/8/2008 John Plano Rev 19, IR 7989 are a roved, Bulletins 10,25,29,31,35,40
7/10/2008 Lynne Campbell Left message on voicemail that revisions 14,15,16 and 19 are ready and $1200
due.
8/1/2008 John Plano Rev 20, IR8245 are approved, storm and sewer connetions outside the building,
ublic works has a orved it.
9/9/2008 Jennifer Eliuk MECHANICAL PLANS REC'D, ROUTED TO SAFEBUILT
9/25/2008 Jennifer Eliuk REVISED PLANS FOR 11 ISSUED BULLETINS RECEIVED 9/19/08, ROUTED
TO JOHN PLANO (#36, 37, 39, 40, 43, 44, 50, 51, 52, 55, 56). LANDSCAPE
PLANS ROUTED TO WARREN AND PW.
9/29/2008 John Plano MECHANICAL PERMIT APPROVED, SUBDUCT SYSTEM FOR THE DRYERS
AND RANGE HOODS UNDER REVIEW
11/18/2008 Jennifer Eliuk REVISED FIRE AND LIFE SAFETY PLANS, INCLUDING EXTERIOR
COMBUSTIBLE MATERIALS INFO, RECEIVED AND ROUTED TO JOHN
PLANO (TWO COPIES), FIRE AND MARTIN HAEBERLE. MARTIN'S COPY IS
THE TOV OFFICE COPY AND NEEDS TO ALSO GET ROUTED TO JOHN
PLANO WHEN HIS REVIEW IS COMPLETE.
12/10/2008 Lynne Campbell ADDITIONAL DETAIL FOR FIRESTOPPING, ORIGINALLY SUBMITTED
9/19/08. ROUTED TO JEN FOR REROUTING. (NOT SURE WHO IT GOES
TO)-RACHEL
12/11/2008 Jennifer Eliuk ADDITIONAL FIRE STOPPING DETAILS RECEIVED, FOUR COPIES ROUTED
TO SAFEBUILT
12/19/2008 Jennifer Eliuk ENVIRONMENTAL HEALTH SUBMITTAL RECEIVED, ROUTED TO BILL
CARLSON. CHECK FOR$75.00 PLAN REVIEW FEE RECEIVED AND
PROCESSED.
1/5/2009 Jennifer Eliuk FIRE RESISTIVE DUCT WRAP SUBMITTAL RECEIVED, ROUTED TO FIRE
AND THREE COPIES TO SAFEBUILT.
1/5/2009 Jennifer Eliuk REVISIONS FOR BULLETINS LISTED BELOW READY TO BE PICKED UP,
JOHN CURTIS AT HKS ARCHITECTS NOTIFIED. PAPERWORK BEING
STORE ON PERMIT INTAKE COUNTER BECAUSE THERE IS NO ROOM IN
THE READY TO ISSUE AREA. Rev21/IR9008, Approved Bulletins 036, 037,
039, 040, 043, 044, 050, 051, 052, 055, 056 and firestopping submittal. 055,
generator fueling needs fire department approval prior to issuance 056, deck
extention needs DRB approval prior to issuance 29 hours of plan review
due=$1740.00
1/6/2009 Diane Golden Revision 23 was given to John Curtis, HKS Architects
1/29/2009 Jennifer Eliuk RESIDENTIAL SUB-DUCTS FOR CLOTHES DRYER EXHAUST PLANS
RECEIVED, TWO COPIES TO SAFEBUILT, ONE TO MARTIN HAEBERLE
NEEDS TO BE THE TOV OFFICE COPY AND ONE TO FIRE
2/12/2009 Lynne Campbell Left message for Mike to pick up revision 26 paper work and sign off on permit.
\\VWS-Storage\Desktops$\cgodfrey\Desktop\B06-0196 Locks-Holds_Notices 4 of 6 12/28/2015
Date Entered Entered By Comment Rev#
2/18/2009 Jennifer Eliuk PLAN FOR MOVING FIRE DEPARTMENT CONNECTION(S) RECEIVED,
ROUTED TO FIRE.
3/19/2009 Jennifer Eliuk REVISED PLANS FOR BULLETINS: 59, 61, 62, 63, 64, 68, 69, 72 AND 73
RECEIVED. ROUTED TO SAFEBUILT. ONE COPY OF 62 AND 72 ROUTED
TO PUBLIC WORKS. NO ADDITIONAL VALUATION.
4/21/2009 Jennifer Eliuk REVISED PLANS FOR TWO-HOUR EXIT PASSAGEWAYS RECEIVED,
ROUTED TO FIRE AND SAFEBUILT
5/13/2009 Jennifer Eliuk WRITTEN COMMENTS/RESPONSES TO SAFEBUILT COMMENTS DATED
4/23/09 REGARDING EXIT PASSAGEWAYS RECEIVED. ROUTED TO
SAFEBUILT AND FIRE. NO ADDED VALUATION OR PLANS SUBMITTED.
5/19/2009 administrator Received responses to bulletins 59/64, routed to Safebuilt.
6/11/2009 Lynne Campbell Sent email to Michael Rossi, director of construction, RAL Development to send
letter indicating the request to change contractors on permit.
mrossi ralcom anies.com
6/11/2009 L nne Campbell Chan e of contractor letter received and added to file.
9/23/2009 Jennifer Eliuk REVISED PLANS FOR BULLETIN 110, THERMAL INSULATION AT EXTERIOR
WALLS, RECEIVED. NO ADDITIONAL VALUATION. ROUTED TO SAFEBUILT.
11/13/2009 Jennifer Eliuk Letter from Architect John Curtis requesting to use the 2003 ANSI standards
instead of the 1998 standards received. Routed to Martin Haeberle.
12/18/2009 Jennifer Eliuk Classification of fire-rated diffusers (in regards to Rev 28/IR 9926) received.
Routed 3 copies to SafeBuilt, 1 to Fire. No additional valuation.
1/14/2010 Jennifer Eliuk Revised plans, Bulletin 123 received. $10,000 additional valuation added.
Revisions include: railing in employee corridor, reflected ceiling plan, removal of
coiling door in kitchen service bar. Three copies routed to SafeBuilt.
1/19/2010 Shelle Bellm ILC received, routed to Warren Cam bell
1/28/2010 Jennifer Eliuk Revised plans, Bulletin 123 received back from SafeBuilt. Field AND Office
copies routed to Warren Campbell for review. Warren to return plans to Jen for
processin upon review.
1/29/2010 Jennifer Eliuk Revised structural plans received, four copies routed to SafeBuilt. No additional
valuation.
2/8/2010 Lynne Campbell Rev. 28 & 30 fees have been added, those revisions are still under review by Fire
#28 and Plannin #30 , not et read for release.
2/1/2010 Jennifer Eliuk Revised plans (Revision 32) received, routed three copies to SafeBuilt, one to
Fire. Many misc changes, two rolls per plan set. No additional valuation. Upon
receipt of approved plans from SafeBuilt, route Office Copy to Warren Campbell
for Plannin review. Includes bulletins 71-121R.
2/1/2010 Jennifer Eliuk BULLETIN 121R IS PART OF THE SUBMITTAL FOR REVISION 32. THIS IS
NOT A SEPERATE REVISION. JAE 03.02.10 Revised plans (Revision 33)for
bulletin 121 R received. Routed three copies to SafeBuilt, one to Fire. No
additional valuation. Upon receipt of approved plans from SafeBuilt, route Office
Co y to Warren Cam bell for Plannin review.
2/18/2010 Jennifer Eliuk RESPONSE TO CORRECTIONS FOR BULLETIN 126 AND STRUCTURAL
COLUMN REPAIR DETAILS RECEIVED. NO ADDITIONAL VALUATION. FOUR
COPIES AND TRANSMITTAL ROUTED TO SAFEBUILT.
2/17/2010 Warren Campbell Revisions to Bulletin #123 are to be coming in to address planning concerns.
The plans are located in Warren's office awaiting revisions to arrive.
2/26/2010 Jennifer Eliuk Response to SafeBuilt corrections and additional column repair detail received. 4
co ies routed to SafeBuilt. No additional valuation.
\\VWS-Storage\Desktops$\cgodfrey\Desktop\B06-0196 Locks-Holds_Notices 5 of 6 12/28/2015
Date Entered Entered By Comment Rev#
3/2/2010 Jennifer Eliuk THIRD response to SafeBuilt corrections and additional column repair detail
received. 4 copies routed to SafeBuilt. No additional valuation. (Rev 31 - 3rd
round res onses
3/2/2010 Jennifer Eliuk When revision 32/33 comes back from SafeBuilt, route to Warren for review.
This is known as Rev 32 onl .
3/5/2010 front counter asst Recieved revision for bulletin 123R: delete kitchen roll down door, revised ceiling
heights at passageway- level 4, delete railing and gates at level 3 employee
balcony and gates at level 4. Includes architectural sheets: A2.03.1, A2.03.3,
A2.04.1, A2.04.3, A3.04.1, A5.02, A6.01.6, A8.40.2 and A-SK123R, dated
2/18/10. Routed to Warren. After his review routed all 4 sets to Safebuilt. (Rev
30 LC
3/9/2010 front counter asst Received a NEW submittal for column details and caps. Column repair details,
sheet S9.0113, dated 3/5/10: 13/A5-L7, 10.6/A9.9-L8, 11.6/A10-L8, 15/A5-L8,
15/A5-L8, 7/A8-L2, 8/A8-L2, C3/CB-L6, 10.5/A9.9-L4 (6 sets submitted).
Structural calcs for column fixes (package 3) 5 copies each. Routed to Safebuilt.
LC
3/9/2010 Lynne Campbell Rev 33 has been assigned to submittal#2 for structural repair. (Column repair
submittal received 2/26/10.
3/11/2010 Jennifer Eliuk Two separate revision packages for structrual column repair received. Submittal
for columns#6 (number assigned by contractor) are response to
corrections/revisions to the package submitted 2/26/2010. Submittal#7 they are
calling "new package#4". Four copies of each routed to SafeBuilt, no additional
valuation.
3/11/2010 Jennifer Eliuk Revision 32 received back from SafeBuilt, routed to Warren for review. Upon his
approval assess the additional plan review fee and notify applicant it is ready to
be picked up.
3/18/2010 Jamie Eaton Rev 30/Rev 35 For Clarification Only: Bulleting 123R (Rev 35) is modification to
Bulletin 123 (Rev 30).*** Modification on 3rd level per TOV Design Review
Board.***A2.03.1, A2.03.3, A2.04.1, A2.04.3, A3.04.1, A5.02, A6.1.06 &A8.4.02
Guards/Railings -A3.04.1 Ceiling Height Change at Exit Passageways &A-SK-
123 Deletion of Coiling Door. Bulletin#123R Final Approved Document Jae
03.18.10
\\VWS-Storage\Desktops$\cgodfrey\Desktop\B06-0196 Locks-Holds_Notices 6 of 6 12/28/2015